COMPANY PROFILE

Welcome to

CETHAR LIMITED,
Tiruchirapalli, Tamilnadu,
India.

CETHAR & Associates

CETHAR VESSELS

CETHAR CONSTRUCTIONS

PIPELINES &
PROCESS EQPTS.

MICROMAX SYSTEMS

CETHAR

CETHAR CONSULTING
ENGINEERS

CETHAR CONSULTANCY
SERVICES

CETHAR ENERGY

6
CETHAR LIMITED

CETHAR INC.

Products

Cethar Vessels
Limited

1984

Boilers, Power Plants, Centrifugal


Fans, Water Treatment Plant, ESP,
Cooling Towers, Steam/Water Piping

2)

Cethar Constructions
Limited

2008

All Civil Works

3)

Micromax Systems
Limited

1992

Manufacture and supply of DCS


process control systems

2006

RFID, Information Technology.

Sl.
No.

1)

4)

Company

Cethar Consultancy
Services (P) Limited

Year of

Commencement

CETHAR & Associates

5)
6)

7)

8)

Company

Cethar Inc.
Cethar Energy Limited

Cethar Consulting
Engineers (P) Limited

Pipelines & Process


Equipments (P) Limited

Commencement

Sl.
No.

Year of

CETHAR & Associates

Products

2006

Boilers & Boiler Components

2006

Power Plant development,


Operation and maintenance of
power plants upto 300 MW
Capacity.

2006

Consultation on Power Plant


feasibility Reports, Tender
Document preparation for
Power Plant Equipments,
Evaluation of Technical &
Commercial Bids, Project
Management.

1979

Manufacture of Boiler
Components

CETHAR LIMITED - Brief History


Promoted in 1981 by Engineers with rich experience gained from
the world leader in boiler manufacturing - Bharat Heavy Electricals
Limited, India.
Located at Tiruchirappalli, Tamilnadu, India about 325 kms south
of Chennai.
Commenced manufacturing in 1984.
Commissioned 1256 boilers of various types. (as on January-2012)
Commissioned 34 Captive Power Plants along with BoPs of
cumulative capacity of 835.20 MW.
Another 16 Captive Power Plants of cumulative capacity of 304 MW
are under various stages of execution.
Currently executing Utility Power Projects equivalent to 3460 MW
(EPC including BoP / BTG / BOILER)
Commissioned 18 Numbers GT Exhaust HRSGs.

UTILITY POWER PROJECTS UNDER EXECUTION


Sl.
No.

CUSTOMER NAME

CAPACITY
(MW)

FUELS

TYPE OF
BOILER

SCOPE

1)

SKS Power Generations


(Chhattisgarh) Limited, Raigarh.

4 x 300

Indian Coal

PC

EPC

2)

Ind Barath Energy (Utkal) Limited,


Jharsuguda, Orissa

2 x 350

Indian Coal

PC

Boiler

3)

Meenakshi Energy Private Limited,


Nellore, Andhra Pradesh

2 x 300

Imported Coal &


Indian Coal

PC

Boiler

2 x 150

Petcoke, F Grade
Coal, Imported Coal,
Lignite & Fly Ash

CFBC

EPC

4)

Shree Cements Limited,


Beawer, Rajasthan

EPC

5)

Aryan Coal Beneficiations Private


Limited, Korba, Chhattisgarh.

2 x 135

Washery Rejects

CFBC

6)

Vandana Vidhyut Limited, Korba


(Chhattisgarh)

2 x 135

Indian Coal

PC

BTG

7)

Jai Prakash Associates Limited,


Sidhi, Madhya Pradesh

2 x 60

Indian Coal &


Washery Rejects

CFBC

Boiler

PROJECTS UNDER EXECUTION: 3460 MW

Vision, Mission & Values

Vision
Achieving market leadership in Power Plant
Equipments sector, through World Class Products and
Services.

Mission
Empowering Human Resources through centers of
Excellence.

Values
Passion for Change.
Commitment to Excellence.
CETHAR LIMITED

Quality Policy

To deliver products / services conforming


to applicable regulations and National /
International standards to satisfy
CUSTOMER NEEDS.
To work across the organization for
continual improvement of products /
services through effective implementation
of Quality Management System.
CETHAR LIMITED

PRODUCTS LIST OF CETHAR

Power Plant
Boilers
Boiler Auxiliaries
Balance of Plant
Shree Mega Power
2 x 150 MW
CFBC THERMAL
POWER PLANT,

Beawar, Rajasthan,
India.

Engineering software in use:

WINSTEAM & SG Program

: Boiler heat transfer & performance.

EBoiler CECAD : Automated Design & Drafting package for


ANSYS CFX

Boilers.

: Flow modeling.

ANSYS FLUENT

: Simulation and modeling of flow

especially for

combustion & heat transfer.

ICEM CFD

: Flow modeling.

ANSYS STRUCTURAL : Structural Analysis.


Caesar

: Piping Flexibility Analysis.

CAEPIPE

: Piping Flexibility Analysis.

STAADPRO

: Structural Analysis & Design.

In-house Developed Software : Thermal Design, Chimney Sizing.

CETHAR LIMITED

Engineering & Technology

Circulating Fluidized Bed Combustion (CFBC) Boilers


150 MW boiler already commissioned.
10 Units are under operation from 15 MW to 40 MW sizes.
20 Units are under different stages of execution.
2 x 135 MW CFB based Power Plant Commissioned.
2 x 150 MW CFB based Power Plant Commissioned.
Experience of technical experts in Bubbling Bed Boilers
and higher size.
CFB boiler design and operations ensure a smooth transition
to higher capacity CFB boiler Design and Manufacture.
Basic designs up to 350 MW completed.
CETHAR LIMITED

Engineering & Technology

Pulverized coal fired boilers - Sub-critical pressures


Technical collaboration with Riley Power Inc., a group
company of Babcock Power Inc., USA for capacities
up to 600 MW Unit size.
Provides full fledged technology transfer in

Thermal engineering & sizing of the components.


Detailed design.
Sub- delivery selection procedures.
Manufacturing practices.
QAPs.
Erection & Commissioning Procedures.
Updates in the above will be available.

CETHAR LIMITED

Contd

Engineering & Technology

Pulverized coal fired boilers - Sub-critical pressures


Training of Cethar Engineers in the above areas.
Review of basic and product design for three
contracts by collaborator is part of the agreement.
Executing contracts for 2 x 135 MW, 2 x 350 MW,
2 x 300 MW, 4 x 300 MW Pulverized Coal fired boilers.

CETHAR LIMITED

Engineering & Technology

HRSG, Oil & Gas fired boilers


Technical collaboration with NeM, Netherlands for
Heat Recovery Steam Generators behind Gas
Turbines up to Frame 9 sizes.
Spot licensing from Riley Inc. for Oil & Gas fired boilers.

CETHAR LIMITED

Engineering & Technology

Steam turbine & Generator Module:


Long term sourcing agreement with Harbin Turbine
Company (HTC), China is already existing.
HTC will also provide all necessary technical assistance
for Erection & Commissioning.
HTC will conduct performance guarantee tests as per
code requirements.
HTC will provide training to Cethar / Customer Engineers.

CETHAR LIMITED

Engineering & Technology

Super Critical-Steam Generators & Turbine Generator Module


Cethar signed a Memorandum of Understanding with OJSC
Power Machines, Russia to set up a Joint Venture
Company in India for the Design and Manufacture of
Super Critical Steam Turbines and Turbo Generators.
Cethar has signed a collaboration agreement with Riley
Power Inc for Design, Manufacture and Supply Super Critical/
Ultra Super Critical sliding pressure (Benson) Boilers.

CETHAR LIMITED

Engineering & Technology Balance of Plant

Water Treatment Plant (WTP):

Executed Water Treatment Plants equivalent to 600 MW.


Coal Handling Plant:

Executed a contract equivalent to that of a 600 MW Power


Plant.
Cooling Tower:

In house expertise available for Basic Engineering.


Waste Water Treatment Plants:

In house expertise available for Basic Engineering.


CETHAR LIMITED

Engineering & Technology Balance of Plant

Ash Handling Plant:

In-house design expertise available for Basic Engineering.


Fuel Oil Storage & Handling:

In-house Design expertise is available.


E - Balance of Plant:

In-house expertise is available for Design and Construction.


Civil & Structures:

In-house expertise is available for Design and Construction.


CETHAR LIMITED

Competent & Experienced HUMAN RESOURCE


Combined Strength of Board of Directors, Senior Executives & Experienced
Specialists with collective experience of more than 2500 man-years as on Nov-2011.

Cadre

Strength

Manager & above

231

Upto Manager

1371

Upto JE

1551

Consultants
TOTAL STRENGTH

65
3218

Knowledge Management System


Automation for Sizing, Performance Engineering &
Product Engineering for the following 13 Products
1) PC Boilers

3) WHR Boilers

2) CFBC Boilers

4) AFBC Boilers

Contd..

Knowledge Management System


Automation for Sizing, Performance Engineering & Product Engineering
for the following 13 Products
5) Fuel Preparation &
Coal Handling System

7) Fan

6) ESP

Other Products:8) Traveling Grate Boilers


9) Process Boilers
10) Water&Waste Water Treatment System
11) Civil & Structural Works
12) e-BoP
13) Controls & Instrumentation

PROJECT MANAGEMENT
Usage of Customized, Self Developed ERP, a online
Project Management tool, compatible to
Primavera if required.

Ra or Co
f

29.4mX256m
2

y
6m
av tion
1
e
6
,
H ca
47
ri p
b
Fa Sho

,28
6
2

CO

8m

IL

Fan Shop
Additional
Covered Bay

Total Area: 120 Acres


(4,85,623 Square Meters)

Covered Area:
1. Fan Shop
: 2.0 acres
2. Coil Shop
: 6.5 acres
3. Heavy
Fabrication
Shop

: 11.5 acres
-----------------

Covered Area : 20.0 acres

FA
N
Co
mm

u
To nica
we ti
on
r

Storage Area:
23.6 Acres

we
Po

P
O
H

HFS
W

k
an
T
e
ag
or
t
nS
go
r
Lab
A

Wo
rke
r

8,6
4

9m

ora

ant
e en

tor
y

I
IN

ST

VE
TI
A
R

2
m:
o
o
rR

HFS GATE
orke
rs C
a

ntee
n

d
un
ro g ts)
g
r in m
de ark 72
Un P s X
t
n
8m
2
(
ee

t
an
C
f
af
St

SH
OP
M
AD

sC

S
HF

M
AI
N
Po
G
AT
w
er
E
R
oo
m
:1

ate
v
i
r
sP d
m
e
ed
sto ond use
u
i sh s
o
n
C
B
i
)
F
od Shop
reh ays)
o
a
G
W -B
il
Co 0m
(2
&
23
n
a
X
(F 25m
m
170
X
al
31m
teri
a
M
r
Raw rd Fo p
m
219
Ya Sho
X
31m
Fan X230m
25m

Raw Material
Yard For HFS
29.4mX230m

Finished
Goods HFS

Under
Construction

Aerial View of Unit-7 Complex

t s).
ll e
Bu 2 No
rd
G
LP Lit &
l Ya
a
i
0
r
,0 0
ate hop
(20
w M il S

P
D ers
ep o
ar nn
tm el
en
t

Proposed Staff Quarters

K
OC
L
B

g
in
rk s)
a
P tr
n d 62m
u
o X
gr s
er tr
d
m
Un (13

al
n
tio
Na

5-B
4
NH

ay in
w
h
or
Hig utic
hy
Tric

-T

TH
U
SO

High Bay with


36.55 mtrs Height

i al s
er um
t
Ma Dr )
& m
w
Ra WW X90
r
m
Fo (75
te
iva
r
P
ms ded e
o
st on us
Cu B eho 0m)
r
4
Wa mX1
(75

Tu

(3X31mX250m)

(3

r
de
n
(U

r
bo
La

be

Raw Material
For HRSG

s
od s
o
G rum
d
D
) )
e
sh W & 09m tion
i
n
Fi W X2 struc
r
m n
Fo 1 Co

n
io
at )
r
a
m
ep .5
Pr X17
n
Fi 10m
(1

Pr

or
at

L
L
A

t
lle Nos
u
B 2

G T
LP 5 M

yur
i
a
r
Thu

(Under Construction)

CANTEEN

HOSTEL

Employees Resting Room


Power House
MAIN GATE

Tower

Finished Goods
of HRSG
(2X31mX240m)

3
7.

U
R 194m
D

Communication
Guest house
(Under Construction)

TOTAL AREA
: 94.07 acres
COVERED AREA : 16.44 acres.

)
m
1
3

x
m
H
24 SHO
P (5 RSG
(1 (U
)
nder
m )
1
Cons Bays)
3 M
truct
x 17
ion)
g
8m f H
0
(2 oo
(R

s)
W
y
R Ba )
E
m
4
P
AT P ( x 3 1
O
W O m
H
4
S
m
H
9
S (1
M x22

(1 epa
75
r
m atio
x3
n
1m Sh
op
)

Aerial View of Unit-5

62
SH-

hyCovered Area Details:


c
i
r
T
1.
2.
3.
4.
5.

Drum Shop
Tube Prepn Shop
Fin Prepn Shop
Water Wall Shop
HRSG Shop

:
:
:
:
:

1.05 acres
1.34 acres
0.50 acres
6.21 acres
7.34 acres

TOTAL : 16.44 acres

CETHAR INFRASTRUCTURE & APPROVALS


World class Manufacturing Seven Units at Trichy in Tamil Nadu.
Units annual capacity 8000 MW 0.1 million MT of Pressure Parts.
Current capacity being enhanced to 12,000 MW by March-2012.
Shops have total land area of 8,47,363 m2 with covered production
shop area of 1,79,695 m2 .
Some of the Critical machines are: 4-Roll Plate Rolling Machine,
Serpentine Coil Bending, Incremental Pipe Bending, Furnace Panel
Welding, Spiral Fin Welding and Stress Relieving Furnaces.
Unit-5 & Unit-7 have ASME Accreditation for S, U, R & PP Stamps;
and approvals for Environmental Management System (EMS)
BS EN ISO 14001:2004 and Occupational Health and Safety
Assessment Series OHSAS 18001:2007.
ISO Certification for all Seven Units with BS EN ISO 9001:2008.

Infrastructure
Critical Machines / Equipments
4 Roll Plate Rolling Machine
Plate rolling capacity : 220mm thick x 3 meter width
Suitable for boiler upto 600 MW
Annual capacity : 24,000 MW
Furnace Panel Welding Machine
20, 8, 4 welding heads machines
Max. panel width 3.2 meter
Annual capacity : 16,000 MW
Serpentine Coil Bending Line
Max coil length : 120 meters
Max height/width of the coil: 28 meters
Annual capacity : 10,000 MW
CETHAR LIMITED

Contd

Infrastructure
Critical Machines / Equipments

Incremental Pipe Bending Machines

Max pipe size : 1400 mm


Max pipe thickness : 100 mm
Suitable for power plants upto 800 MW
Annual capacity : 10,000 MW

Stress Relieving Furnaces


Max job size: 4 metres x 4 metres x 26 metres

Spiral Fin Welding Machine


Current overall supply capabilities is 8000 MW.
Being enhanced to 12,000MW by June 2011.
CETHAR LIMITED

Domains
Proposals & Performance Engineering.
Product Detail Engineering.
Plant Engineering.
Controls and Instrumentation.
Manufacturing.
Quality control and Assurance.
Erection and Commissioning.
Field Engineering Services.
Renovation and Modernization.