Anda di halaman 1dari 57

Remote Automatic Precise Intelligent Detector

for
Automated Deformation
Monitoring System
(RAPID ADMS)

TOPCON Rapid ADMS

TOPCON Rapid ADMS

Company Introduction

TOPCON Rapid ADMS

Company Background

PT. Exsol Trimitra is subsidiary of PT. Exsol Innovindo as exclusiv


e distributor of TOPCON, FARO & MSP Products
PT Exsol TRIMITRA was built as Monitoring and Scanning Special
ist as our focus business

TOPCON Rapid ADMS

Company Background

PT Exsol TRIMITRA with partnership wih Monitoring Solution


Provider Pte Ltd (MSP) offer and provide total solution of
geodetic monitoring which focus on Automatic Deformation
Monitoring System
MSP is well known monitoring service provider in Singapore,
which provide most of MRT tunnel monitoring, road, bridge and
land slide monitoring.
In 2011, MSP handle more than 40 project in Singapore using 100
set of total station and now MSP also handle project on another
asian country (Thailand, Myanmar, Hongkong, Vietnam)

TOPCON Rapid ADMS

Agenda
Introduction
What is Deformation Monitoring
Deformation Monitoring Application

RAPID Deformation Monitoring System


TOPCON RAPID ADMS SYSTEM - Overview
Case Study : Deformation Monitoring in Singapore

Deformation Monitoring workflow


Land Transport Authority Code of Practice for Rail
Mass Rapid Transit (MRT) Development Plan
Deformation Monitoring Project Bridge, Train Tunnel, Viaduct
Another Project

TOPCON RAPID ADMS - Demonstration


Demonstration Topcon RAPID ADMS

TOPCON Rapid ADMS

INTRODUCTION

TOPCON Rapid ADMS

INTRODUCTION
Engineering Structures such as dams, bridges, viaducts, high rise b
uildings, train tunnels and etc, may be subjected to movement caus
e by excavation, heavy construction or piling etc. Deformation may a
lso be due to land subsidence, such as changes of ground water lev
el or movement of soil
Existing aboveground
buildings
Underground
construction

How sure can we be that the existing engineering structures and


ongoing structures that are being built will be safe? In todays modern
world, constructions are carry out 24 hours a day and 7 days a week.
Accident can happen. Can we anticipate?
TOPCON Rapid ADMS

What is Deformation Monitoring

Deformation monitoring (also referred to as Deformation survey)


is the systematic measurement and tracking of the alteration in the s
hape or dimensions of an object as a result of the application of stre
ss to it. Deformation monitoring is a major component of logging me
asured values that may be used to for further computation, deformat
ion analysis, predictive maintenance and alarming.

Deformation monitoring is primarily related to the field of applied sur


veying, but may be also related to the civil engineering, mechanical
engineering, plant construction, soil and rock stability mechanics.

The causes for deformation monitoring are changes (Land Subsiden


ce) in the bedrock, increase or decrease of weight, changes of the
material properties or outside influences.

The used measuring devices (1) for a deformation monitoring depe


nd on the application (2), the chosen method (3) and the required
regularity (4).
Source : Wikipedia

TOPCON Rapid ADMS

1) Measuring devices
Measuring devices (or sensors) can be sorted in two main groups, geodetic
and geotechnical sensors. Both measuring devices can be seamlessly co
mbined in modern deformation monitoring.
Geodetic measuring devices measure geo-referenced displacements or mov
ements in one, two or three dimensions. It include the use of instruments suc
h as robotic total stations, digital levels and GNSS receivers.

Geotechnical measuring devices measure non geo-referenced displacement


s or movements and related environment effects or conditions. It includes th
e use of instruments such as extensometers, pizometers, rain gauges, therm
ometers, tilt meters, accelerometers, seismometers etc.

Source : Wikipedia
TOPCON Rapid ADMS

2) Application
Deformation monitoring can be required for the following application
s:
- DAM,
- Roads,
- Bridges & Viaducts,
- High-rise & Historical Buildings,
- Foundation,
- Construction Sites
- Mining,
- Landslide and Volcanoes slope,
- Settlement area.
- Earthquake area
3) Methods
Deformation monitoring can be made manually or automatically.
An automatic monitoring system may be used for periodic or continu
ous monitoring.
Source : Wikipedia
TOPCON Rapid ADMS

4) Regularity and scheduling


The monitoring regularity and time interval of the measurements mu
st be considered depending on the application and object to be moni
tored. Objects can undergo both rapid, high frequency movement an
d slow, gradual movement. For example, a bridge might oscillates wi
th a period of a few seconds due to the influence of traffic and wind
and also be shifting gradually due to tectonic changes.
5) Risk management
Deformation monitoring systems provide a proactive control of a haz
ard related to possible change or failure of a structure. Policyholders
can reduce risk exposure before and during construction and throug
hout the lifecycle of the structure and hence decrease the insurance
premium

Source : Wikipedia
TOPCON Rapid ADMS

Introducing..
TOPCON RAPID ADMS SYSTEM

TOPCON Rapid ADMS

TOPCON RAPID ADMS SYSTEM

Monitoring Total Station


(MS05AX, MS1AX )
with.

RAPID - Remote Automatic Precise Intelligent Detector


for

ADMS - Automated Deformation Monitoring System.

TOPCON Rapid ADMS

BENEFIT OF USING TOPCON RAPID ADMS SYSTEM

Continous automated deformation monitoring system 24 hour 7 day


365 days

Real time alert via sms, email and siren when the deformation
exceed the tolerance.

RAPID ADMS System can combine with another geotechnical


device to enhance displacement analysis.

Monitoring device (Topcon MS) protect by TS Shield, the latest anti


theft protection technology from Topcon

TOPCON Rapid ADMS

TOPCON RAPID ADMS MONITORING SYSTEM


HOW IT WORKS

TOPCON Rapid ADMS

Data Collection:
Take measurement of the prisms
Save the measurements into Raw Files

TOPCON Rapid ADMS

Data Checking:
Validates the Raw data for processing

Data Processing:
Process the Raw data and generates
reports

RAPID ADMS Workflow

Graphically display measured points


Trigger alarm if data exceed target
limit

Send notification to nominated


recipients via e-mail / SMS

TOPCON Rapid ADMS

Monitoring Via Site PC/PDA

Computer is installed with MSP RAPID PC


RAW data are then send to Processing server via GSM/GPRS/Wifi
Processing Server receives the Raw data and automatically process the Data

TOPCON Rapid ADMS

Monitoring via Remote Access


Monitoring via Remote Access

MSP RAPID PC Suite is installed in the ProcessingServer


MSP RAPID PC connects to MSP RAPID IU 4 via TCP Connection
MSP RAPID DataCheck and MSP RAPID StarPro automatically process the data

TOPCON Rapid ADMS

POWER SUPPLY AND SET UP


POWER SUPPLY AND SET UP

MSP RAPID IU 4

TOPCON Rapid ADMS

MSP RAPID IU 2

SITE MONITORING FLOWCHART

TOPCON Rapid ADMS

SITE MONITORING FLOWCHART

TOPCON Rapid ADMS

MONITORING TOTAL STATION


(MS05AX/MS1AX)

TOPCON Rapid ADMS

Monitoring Total Station - Specification


MS05AXII

Distance Measurement
Sheet

( 0.5 + 1ppm )mm

( 1 + 1ppm )mm

Prism

( 0.8 + 1ppm )mm

( 1 + 1ppm )mm

( 1 + 1ppm )mm

( 2 + 1ppm )mm

Sheet

200m

300m

Prism

3500m

3500m

Non-Prism

100m

400m

0.01mm

0.1mm

Accuracy

Non-Prism

Range

Display Resolution

Angle Measurement
Accuracy

0.5"

1"

Display Resolution

0.1" / 0.5"

0.1" / 0.5"

Auto Collimation
AP Prism
Dust and Water protection

TOPCON Rapid ADMS

MS1AXII

1.3 m to 1000 m

1.3 m to 1000 m

IP64

IP64

Auto-Tracking

Auto-collimation

TOPCON Rapid ADMS

Exclusive Auto-Pointing Algorithm


Effective for measuring fixed points in a
displacement/deformation monitoring situation.
When presented with multiple targets in the
telescopes field of view, the one closest to the crosshairs center will be automatically sighted.

Typical methods involve


distance Vs EDM window
size

TOPCON Rapid ADMS

Exclusive Auto-Pointing Algorithm

A predetermined prism
to be measured

MS
Automatically sights the prism
closest to the telescope center
unaffected by the strength of
returned signal.

Another prism at closer


distance from the
instrument
Usual Auto-pointing Total Stations
Sights the prism closest to the
instrument with the strongest light
reflection.

TOPCON Rapid ADMS

Worlds first cloud-based total station management sy


stem!

Total station equipped with module of communication and GPS can


be connected to internet.
TSshield is a brand new total station asset management system.
TOPCON Rapid ADMS

Geodetic Deformation Monitoring Workf


low
and
General Code of Practice in Singapore

TOPCON Rapid ADMS

LAND TRANSPORT AUTHORITY CODE OF PRACTI


CE
Example of Code of Practice for Railway Protection
(CPRP) under Land Transport Authority, for any
development to be carried out within the railway
protection zone
Changes in Height Coordinates (mm)

Changes in Height Coordinates at Office (STN1)

System should be capable of obtaining Absolute


Displacement and Distortion of the tunnel

System should automatically start monitoring at


predetermined intervals and is practically continuous

System accuracy shall be better than +1mm and shall not


deviate 0.5mm from one to another

Manual Survey for displacement shall be conducted to


check consistency of the readings obtained from system

4.0

3.0

2.0

1.0

R12-dRL(mm)

0.0

-1.0

-2.0

-3.0

-4.0

22-May-03

23-May-03

Date and Time

TOPCON Rapid ADMS

Typical ADMS Workflow

Site visit to determine the placement of the Measurement Station (if necessary)

Pre-Construction Survey

Geometry Survey (applicable to Tunnel Monitoring Only)

Submission of Instrumentation Layout Plan, Geometry Survey Plan and Method


Statement to relevant authorities for approval.

Installation works, including cabinet housing and instrument brackets

Initial Manual Survey (3 times) & Datum Checking (once) on monthly basis

Commissioning of automated monitoring system analysis of cyclic trends and


environmental fluctuation to obtain base readings

Weekly Report Submission


TOPCON Rapid ADMS

- Case Study Deformation Monitoring In Singapore

TOPCON Rapid ADMS

Construction Industry - Singapore

Year 2008 Year 2009

Year 2010

Year 2011
Year 2012

Construction
Construction
Construction
Construction
Contract awarded Contract awarded Contract awarded Contract to be
awarded
: S$35.7 billion
: S$21 billion
: S$21 to S$27
billion
: S$18 to S$25
billion
Source: Ms Fu Hai Yien, Senior Minister of State for Development (Bca-Redas Construction & Property Prospects 2010 seminar, 13 January 2010)

TOPCON Rapid ADMS

Construction Railway

Train Transport
Lines

Length

Status

North South and East


West Line (MRT)

89.4 KM

In operation

Bukit Panjang (LRT)

7.8 KM

In operation

Punggol and Sengkang


(LRT)

20.6 KM

In operation

Circle Line (MRT)

33.3 KM

Near Completion
and partial
operation

Downtown Line (MRT)

3.4KM

Near Completion
and partial
operation

Bukit Timah and Eastern


Region Line (MRT)

36.6KM

In process of
construction

Total Length of Railway Lines (Tunnel & Surface) : 191.1KM


TOPCON Rapid ADMS

ADMS Projects in Singapore - Highlight

C905 Shears Bridge


C907 CST Tunnel

C901 MRT Overun


Tunnel
TOPCON Rapid ADMS

Contract C907: Common Service Tunnel

C907 CST Tunnel

TOPCON Rapid ADMS

Contract C901 : Marina Bay Underground MRT Station

C901 MRT Overun


Tunnel
TOPCON Rapid ADMS

Typical Prism setup in a MRT tunnel Multiple target rec


ognition

TOPCON Rapid ADMS

Contract C905 : Shears Bridge Monitoring

C905 Shears Bridge

TOPCON Rapid ADMS

- Another ProjectBridge Monitoring


Dam Monitoring

TOPCON Rapid ADMS

Bridge Monitoring Project - Singapore

The objective of the project (Automatic Deformation Monitori


ng of Benjamin Sheares Bridge) is to provide the Land Transp
ort Authorities (LTA) and their consultants with all day round
(24/7) automated deformation monitoring of the Benjamin S
heares Bridge during the tunneling construction work which i
s underneath the bridge.

The ADMS provide timely detection of any displacement of th


e Sheares Bridge which may be induced by the tunneling wor
k. If any displacement that exceed predefined trigger value is
detected, the ADMS immediately send notification to alert ke
y project personnel for immediate action. It acts as a safety al
ert system SAFETY ENGINEERING.

TOPCON Rapid ADMS

Project C905 : Shears Bridge Monitoring

TOPCON Rapid ADMS

Project C905
Bridge Monitoring

Contract 905 is the design, construction and completion of


tunnels between Promenade Station and Marina Bay. It incl
udes two pairs of stacked bored tunnels between the Integr
ated Resort (IR) development and Promenade interchange
station. The length of the tunnel route is about 0.75km lon
g cutting across the Marina Bay.

Proposed
C905 Tunnel

TOPCON Rapid ADMS

Zone of
Monitoring

C905 - Design Criteria

Distance of the monitoring points to the total station to be


kept below 250 m to achieve the required accuracy when
monitoring under harsh environment. eg (Hot afternoon su
n and the shimmering effects of the water body at sea)

The Measurement Station deployed must have 1 accuracy


in angular measure and 1+1pmm accuracy for distance me
asurement.

Equipment/Measurement Station to be used must also hav


e high ratings in dust and water protection.

Power consumption of all equipment used must be kept to


the minimum due to the lack of constant power supply.

TOPCON Rapid ADMS

C905 System proposal

TOPCON Rapid ADMS

C905 - RAPID Instrument Setup

(STN1) was installed on the


bridge column that is within
the C905 site office

(STN2 & STN3) were installed


on the pile caps of the bridge
column that is within the Marina
Bay channel

TOPCON Rapid ADMS

Changes in Height Coordinates (mm)

Changes in Height Coordinates at Office (STN1)


4.0

3.0

2.0

1.0

R12-dRL(mm)

0.0

-1.0

-2.0

-3.0

-4.0

22-May-03

23-May-03

Date and Time

TOPCON Rapid ADMS

RAPID WebPro

Graphical View
TOPCON Rapid ADMS

Land Slide Monitoring in Turkey

TOPCON Rapid ADMS

TOPCON Rapid ADMS

TOPCON Rapid ADMS

Why choose
TOPCON RAPID MONITORING SYSTEM

TOPCON Rapid ADMS

Most Reliable
Deformation Monitoring Geodetic Instrument

TOPCON MS05AX / MS1AX

TOPCON Rapid ADMS

Most Reliable
MSP RAPID ADMS Software / I.U

RAPID PC /Datachecker/StarPro/Processor
RAPID Intelligent Unit
TOPCON Rapid ADMS

Most Reliable
ADMS Partner

No.1 Deformation Service Provider in Singapore


Topcon ADMS Partner
TOPCON Rapid ADMS

Thank You
For Further Information
Please contact :
Edy (edy@exsol-trimitra.com)
Stanley (stanley@exsol-trimitra.com)

TOPCON Rapid ADMS

Anda mungkin juga menyukai