Anda di halaman 1dari 2

FINAL ASSIGNMENT

FINAL EXAMINATION (TWO WEEKS INDIVIDUAL WORK)


to be submitted at the final semester examination schedule
A Port for container ship will be built at a steep slope coast.
Design ship is A DWT (A is two rear digits of NRP multiply by 500)
Max number of ship berthing at the same time is B ships (B is 10 minus one rear digits of
NRP)
Annual container transported to and from ship is C TeUs (C is A*B/2)
All of containers will be handled in container yard in D days average (D is 4 for odds NRP
and 6 for even NRP)
Composition of export/ import/ empty container is 50% / 35% / 15% respectively
Calculate the area required for export container, import container and empty container
If 1/5 of export and import container break up at CFS, calculate the required area for CFS
Sketch a lay-out plan of port and container terminal (including CFS) with handling equipment
system decided for you (rear digit NRP 0 and 5 for Chassis; 1 and 6 for straddle carrier; 2
and 7 for rubber tired gantry crane, 3 and 8 for rail mounted gantry crane; 4 and 9 for
forklift)
Other requirement for calculation can be assumed by yourself

Anda mungkin juga menyukai