Process Improvement Project

Systematic Problem Solving methodology


Project Title- SO3 optimization and Usage of Low Purity Gypsum
at Asian Cement

Gagal Cement Works

Project

Plan

Actual

Start Date

4 April2016

4 April2016

Completion
Date

30 Oct2016

Current Status: Completed

1
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Team Information: Cross Functional


N
o

Description

Name

Designation

Dept

Email

Project Leader

Anil Kumar

Sr. Analyst

Quality

anilk.kumar@acclimited.com

Mentor

Ramesh Kumar
Gupta

Chief Manager

Quality

Ramesh.gupta@acclimited.com

Member 1

Deepak Jasuja

GM Production

Production

Deepak.jasuja@acclimited.com

Member 2

Ashok Kumar
Dwivedi

Manager

Quality

Ashokkumar.dwivedi@acclimit
ed.com

Member 3

Shaikh Abdul
hamid

Asst.Manager

Quality

Shaikh.hamid@acclimited.com

Member 4

Saurabh Srivastava

Production
Manager

P&QC

saurabhsrivastava@asianceme
nts.com

Member 5

Hunar Singh

Sr.Analyst

P&QC

Hunar.singh@asiancements.co
m

3
4
5

2
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Group photo: Cross Functional

3
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Step 1: - Problem Definition

4
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Step 1:- (a) Problem Definition


1.1) Brief description of Problem
1.

At present, We are using High Purity Imported Gypsum at Asian Cements due to
which we are facing less mill availability due to shortage of fly-ash in 2015 (500
hrs), hence it is considered that during less fly ash availability, usage of Low Purity
gypsum will be beneficial as it helps to reduce clinker factor as well as increase
productivity.

a)

Tangible Benefit A. 3.60 Crores Rs saving annually(50 Rs/T) cement in Asian By


reducing 2% Clinker Factor
B. 6 % plant availability will improve in poor fly ash availability
C. Powdery nature of Low Purity gypsum will increase mill
productivity.
D. Energy saving will get down.

a)

Intangible Benefit:-1) Improvement in Quality Product


2) Good Customer Satisfaction

Present Level:
Target:

Uses of High Purity Imported Gypsum


Uses of Low Purity Gypsum in case of less fly ash availability
and Optimization of SO3 as per type of Gypsum Used.
5

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Cost Benefit Analysis


Present: Cost Analysis For PPC Cement (With Imported Gypsum)
Asian
%
Jan-16
Consum
Rate/Cemen
Qty
ption
Amount
Rate
Cement t
Flyash

16,918

27.29

12,011,780

710

61,996

194

Imported Gyp

2,116

3.41

5,634,908

2,663

61,996

91

Clinker

42,962

69.30

143,922,700

3,350

61,996

2,321

Total

61,996.00 100.00

161,569,388

2,606

Year

Target :Cost Analysis For PPC Cement (With Low Purity Gypsum)
Asian
%
Consum
Rate/Cemen
Qty
ption
Amount
Rate
Cement t

Flyash
Low Purity
Gypsum

16,918

27.29

12,011,780

710

61,996

194

3,410

5.50

6,734,316

1,975

61,996

109

Clinker

41,668

67.21

139,588,537

3,350

61,996

2,252

Total

61,996.00 100.00

158,334,633

2,554

ACC/ Plant name

SPC- Process Improvement Project of Year2016

6
2016

Gypsum Consumption %
By using Low Purity
gypsum

Y2015 Clinker produced with normal coal


Present Level & Target-2016 by using
petcoke clinker.
7
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

% Clinker Factor
By using Low Purity
Gypsum

Y2015 Clinker produced with normal coal


Present Level & Target-2016 by using
petcoke clinker
ACC/ Plant name

SPC- Process Improvement Project of Year2016

8
2016

Summary of Problem Definition step


Summary of above slide:
1)Poor mill availability due to less fly-ash available in market.
2)Low productivity due to imported gypsum and pet coke clinker.
3)Cost optimization by lowering down clinker factor by using
Low Purity gypsum in period of low fly-ash availability.

9
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

2. Observation
Cement Mill Circuit block Diagram

Clinker
RC Fan
Gypsum

Fly-Ash

Bag Filter
Separator
Cyclone
Elevator

Hammer
Crusher
Weigh
Feeders

Grinding Mill

Bag Filter
PG
Conveyor

Fly mixing at
mill outlet

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

2. Observation
Imported Gypsum Sieve Analysis
Sive Size in
mm
88.9

Wt.

% Residue

2.12

7.61

% Cum
Residue
7.61

76.2

1.89

6.78

14.39

85.61

63.5

2.76

9.90

24.29

75.71

50.8

6.27

22.50

46.79

53.21

38.1

1.92

6.89

53.67

46.33

25.4

3.12

11.19

64.87

35.13

19.05

0.22

0.79

65.66

34.34

12.7

2.23

8.00

73.66

26.34

6.35

1.23

4.41

78.07

21.93

3.18

0.912

3.27

81.34

18.66

5.2

18.66

100.00

27.87

100.00

ACC/ Plant name

% Passing
92.39

1.
2.
3.

Large lumps are found which is above 50 mm


(47%).
Cause of Gypsum Hopper Jamming
Difficult to grind as compare with Low Purity
gypsum

SPC- Process Improvement Project of Year2016

2016

2. Observation
Low Productivity Due To Pet Coke Clinker
Asian-1
Month
Jan-15

Run Hours Production


282.67

Asian-2

TPH

Run Hours Production

12644

44.73

314.2

47017

149.64

After using pet coke clinker, there


is significant drop in mill
productivity 29 TPH in Asian-2 and
11.5 TPH in Asain-1.

2.

To ensure the pet-coke impact,


clinker grind-ability test carried out
for Gagal-1 and Gagal-2

TPH

Feb-15

117

5224

44.65

337.95

51641

152.81

Mar-15

285.6

13048

45.69

364.07

56412

154.95

Apr-15

312.9

14219

45.44

360.7

56238

155.91

May-15

331.38

15726

47.46

460.25

69275

150.52

Jun-15

410.17

19374

47.23

483.62

68609

141.87

Jul-15

443.46

18809

42.41

424.97

57865

136.16

Aug-15

481.05

19567

40.68

444.6

61516

138.36

Sep-15

485.81

20804

42.82

500.1

69201

138.37

Oct-15

500.05

21558

43.11

552.43

78542

142.18

Nov-15

430.26

18155

42.2

442.57

62527

141.28

Jan-Nov 15

4080.35

179128

43.9

Coal
Clinker

4685.46

678843

144.88

Dec-15

536.64

18699

34.84

Pet Coke
Clinker

564.6

65103

115.31

Jan-16

558.47

16969

30.38

559.01

61996

110.9

Feb-16

567.36

17734

31.26

558.89

64286

115.02

Mar-16

510.34

16135

31.62

459.88

55540

120.77

Apr-16

283.75

10486

36.96

361.3

43613

120.71

May-16

348.8

13532

38.80

404.9

49386

121.97

Jun-16

311.2

10124

32.53

334.22

40821

122.14

Dec-15 To
June-16

3116.56

103679

33.2

3242.8

380745

117.4

ACC/ Plant name

1.

Microsoft Office
Word 97 - 2003 Document

3.

Low Purity gypsum is easier to


grind as compare to imported
gypsum.

SPC- Process Improvement Project of Year2016

2016

2. Observation
Clinker Factor Optimization In Low Fly-Ash Availability Period

FA Unavailbilit
y
Jan-15
Feb-15
Mar-15
Apr-15
May-15

1.
2.
3.

Asian-1

Asian-2

Asian-1

Asian-2

Clinker

Gypsum

Fly-Ash

Total

Clinker

Gypsum

Fly-Ash

Total

0
50.9

17.83
35.50

63.9
64.45

5.78
5.34

30.32
30.21

100
100

63.93
64.59

5.82
5.30

30.25
30.11

100
100

115.6
224.35
25.54

58.98
140.82
32.63

65.93
69.93
64.15

5.25
5.16
5.14

28.82
24.9
30.71

100
100
100

Imported

67.47
71.85
64.86

5.28
5.13
5.14

27.25
23.02
30

100
100
100

Jun-15

0.00

63.61

5.61

30.78

100

63.77

5.63

30.61

100

Jul-15
Aug-15
Sep-15

4.65
17.93
0

13.62
27.40
13.35

63.94
63.8
64.7

5.4
5.51
5.22

30.67
30.68
30.08

100
100
100

63.96
64.03
64.66

5.44
5.37
5.22

30.6
30.6
30.12

100
100
100

Oct-15
Nov-15
Dec-15

16
0

13.30
0.00

64.46
63.59
65.47

5.29
6.92
6.27

30.24
29.49
28.26

100
100
100

64.53
64.69
66.05

5.11
4.84
5.72

30.36
30.47
28.23

100
100
100

Jan-16
Feb-16

0
6

4.53
3.95

100
100
100

Jun-16
July-16

5.65

100

Aug-16
Sept-16

0
0
0

0
0
16.33

Oct-16

68.46
69.05
69.75
64.42
64.67
64.96
65.66
63.52
64.67
65.2

4.25
3.45
3.62
7.54
7.20
6.94
6.99
8.31
7.09
6.42

27.29
27.50
26.63
28.04
28.13
28.10
27.35
28.17
28.24
28.39

100
100

5.05
4.10
0.00

27.40
27.53
27.01
27.55
28.25
28.14
28.25
0
28.13
0

55.61
0
0

4.71
3.76
3.56
7.27
7.47
6.88
7.22
0
6.87
0

100
100

Mar-16
Apr-16
May-16

67.89
68.71
69.43
65.18
64.28
64.98
64.53
0
65
0

100
0
100
0

100
100
100
100
100
100
100
100

In Month of April-15, Asian-1 and Asian-2 were running at low fly-ash absorption (24.90% in Asian-1 and 23.02 % in Asian-2) due to less availability in
market.
In year of 2015, there is 455 hrs of plant unavailability due to fly-ash shortage in Asian-1 and 354 hrs for Asian-2.
Low Purity gypsum will help in clinker optimization and to make the plant available.

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Summary of Observation step


Summary of above slide:
1) In case of Imported Gypsum, Very big boulders present in
Gypsum cause jamming of gypsum weigh feeder and harder
to grind.
2) Less mill output due to high grind-ability of clinker when pet
coke is used as fuel which can be improved by using easy to
grind Low Purity gypsum.
3) Very high Clinker factor during less fly ash availability which
can be compensated by using Low Purity gypsum of low
purity.

14
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Analysis

15
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Brain Storming has been done and following point have been identified

Gypsum granulometry--(Mr.Prem Sagar)

Weigh Feeder Performance(Mr.Pradeep Singh)

Crusher/Grizzly Reliability (Mr. Hardeep Singh)

Unskilled Labour (Mr.Hunar)

Unavailability of SOP (Mr.Abhishek)

Inappropriate Training (Mr.Prem Sagar)

Higher Moisture Content leads hopper jamming (Mr.Abhishek)

Fly-Ash Availability (Mr.Chhabra)

Improper Sampling (Mr. Anil)

XRF calibration(Ms.Charu Lata)

Gypsum purity variation(Mr. Hunar Singh)

SO3 variation in Clinker (Mr.Anil)

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Root Cause Analysis


Man

Machine
Weigh Feeder Performance

Unskilled
Labour

Crusher/Grizzly
Reliability

Improper sampling

Higher Cement Cost


Due to use of
imported gypsum
and To improve
customer satisfactory
index

Fly-Ash Unavailability
Unavailability of SOP

Higher Moisture Content


leads hopper
jamming

SO3 variation in Clinker


Gypsum purity variation
Inappropriate Training

Gypsum granulometry

XRF Calibration

Method

Material
17

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

3. Analysis

Confirm the probable cause: TEST OF HYPOTHESIS


Conclusion

No

Probable Cause

Testing and Observations

1.

Due to improper size of grizzly,


gypsum feed size is not under
control

Feed size of gypsum at weigh feed is abnormal (more than 50%


on 50 mm Sieve)

2.

Fly-Ash Unavailability

In month of April-15 , fly-ash was at 23-24% which increase


clinker factor resulting per ton cost of cement increased

Valid

Gypsum supplier of imported gypsum provided coarser gypsum


which is above 50 mm

Valid

3.
4.

Gypsum Granulometry

Gypsum purity variation

In year of 2016 , Low Purity Gypsum purity variation from 40%


to 75%.

Valid
Ref Slide no.22

Valid

Microsoft Office
Excel Worksheet

Microsoft Office
Excel Worksheet

Microsoft Office
Excel Worksheet

18
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

3. Why-why analysis

3.3 . Identify the root Causes


No.
1.

Valid Probable causes

why

why

Gypsum feed size is not under


control at Plant Site

Grizzly size is not uniform

Grizzly was made with scrap


material (Scrap Utilization)

Fly-Ash Unavailability

Market scenario for power demand is not


under control of Cement Plant Power
demand is fluctuating in market

2.

3.
Gypsum Granulometry (at
Supplier End)

4.

Gypsum purity variation

Variation of gypsum size from the supplier

a)Crusher unavailability at mine

site;
b)Different source of mines

Low Purity gypsum supplied by vendor.

--

19
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Action

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

4. ACTIONS
4.1 Actions Decided
Sl.No.
1

Root
Cause

Cause

Action Plan

Grizzly was
made with
scrap material
Prone of
damage its
screen

Gypsum
granulometr
y

New Grizzly material has been ordered


and fabricate at site to make well
designed grizzle to arrest bolder

Fly-Ash
Unavailab
ility

Increased
clinker factor
and per ton
cement cost.

Gypsum
blockage due
to higher
particle size at
grizzly and
other feeding
points

Resp.

25 July2016

Status

Mr.
Hardeep/Mr.Pre
m Sagar
Completed

Gypsum
Granulometr
y

Low purity
Low Purity
gypsum
supplied by
ACC/ Plant namevendor.

Gypsum purity
variation

Target
Date

-Increase Liaisoning with logistic to

enhance the fly-ash availability


-Asian has been requested to enhance the
fly-ash storage capacity new fly-ash silo
(1000 MT)

Low Purity Gypsum has been introduced


which has fine powder and does not
block the passage in flow at weigh
feeders

30-June2016
30-Nov2016

Mr.Anil/Mr.Saura
bh
In progress
Adobe Acrobat
Document

30-June2016

Mr.Anil/Mr.Saura
bh

Completed

30-Sept2016

Mr.Anil/Mr.Hunar

In Progress

Mail to purchase section.

SPC- Process Improvement Project of Year2016

Adobe Acrobat
Document

21
2016

New Grizzly for Gypsum

Before

After

New Grizzly made to arrest bolder Gypsum


22
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

Low Purity Gypsum Usage

Action:
To start the Low Purity gypsum, trial has been done at Asian

Trial Results:
Trail with Low Purity Gypsum at Asian
Trial No.
Clinker %
Gypsum %
Fly-Ash %
Low Purity /
Imported Ratio
Chemical
Parameter
CaO
SO3
LOI
Blaine
Residue (R45 mic)
1 Day
3 Days
7 Days
28 Days

Normal (100%
imported)

Trial-1

Trial-2

Trial-3

Trial-4

UOM

64.20
5.00
30.80

63.40
5.80
30.80

62.50
6.70
30.80

61.10
8.10
30.80

59.00
10.20
30.80

%
%
%

0:100'

25:75'

50:50'

75:25'

100:0'

Averag
e
42.30 42.25

Normal PPC

Set-1

42.80

42.50

2.52

2.48

1.96
381
10.6
14.9
27.9
36.6
Awaited

Averag
Set-1
e
41.60 42.05 42.40

Set-2
2.62

2.55

2.40

Averag
Set-1
e
41.50 41.95 42.89

Set-2
2.42

2.41

2.57

Averag
Set-1
e
42.34 42.62 42.20

Set-2
2.34

2.46

2.38

Set-2
2.47

2.43

1.96
2.53
2.2
2.16
1.95
2.06
1.70
1.78
1.74
1.88
1.66
1.77
398
386
392
396
390
393
383
398
391
395
380
388
10.8
10.2
10.5
10.8
11.8
11.3
10.0
10.0
10.0
10.0
10.5
10.3
14.2
14.6
14.4
14.4
14.0
14.2
14.2
13.8
14.0
12.7
12.4
12.6
25.0
27.5
26.3
26.5
26.0
26.3
24.2
24.8
24.5 Awaited Awaited Awaited
31.8
34.0
32.9
32.0
33.5
32.8
31.8
34.2
33.0 Awaited Awaited Awaited
Awaited Awaited Awaited Awaited Awaited Awaited Awaited Awaited Awaited Awaited Awaited Awaited

Microsoft Office
Word Document

%
%
m2/kg.
%
MPa
MPa
MPa
MPa

23
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

5. Check

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

SO3 Optimization

SO3 optimization has bee done for both type of clinker and gypsum.
a) - With Coal and High Purity Gypsum:- SO3 Range: 2.1-2.6%
b) - With Pet coke and Low Purity Range:- SO3 Range: 2.44-2.67%

Microsoft Office
Excel 97-2003 Worksheet

Coal and High Purity Gypsum

Microsoft Office
Excel Worksheet

Pet coke and Low Purity Gypsum

28
ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

BENEFITS
Asian Cement Works
SPC- Process Improvement Project of 2016
Tangible saving validation sheet

Project Title:- SO3 optimization and Usage of Low Purity Gypsum at Asian Cement
Saving through:- Systematic Problem Solving Methodology
Project period:- 4 April 2016 to 30 Oct 2016

Improvement by reducing clinker factor by 3.52% with the use of low purity gypsum and
consequently, productivity, plant availability and per ton power consumption has been improved by
3 TPH productivity, 2874 MT PCC per month and 5-6 kWhr. Per ton of cement respectively.

Details of saving:-Calculation
a) Annual Saving in Clinker Consumption @3.52% Clinker Factor Reduced = 18837 MT = 4.20
Crore @ Rs. 2252 /MT of Clinker.
b) Annual Saving in Production By increasing Plant Availability in Low Fly-Ash Availability = 34488
MT cement produced = 8.99 Crore @ Rs. 2606 /MT of PPC

Annual Saving in Crore = 13.19


Remarks:Validated By:Project Leader
ACC/ Plant name

Mentor

Head Finance

SPC- Process Improvement Project of Year2016

Director Plant
2016

6. Standardization
6.1 Updation of documents:
1.

Gypsum sampling & testing is done truck wise.

2.

SOP for SO3 Optimization .

6.2 Training:
Training given to Site Lab testers and CCR regarding SOP of SO3 Optimization and monitoring of
abnormal lumps received from low purity gypsum and checking of Grizzly Size.

6.2 Additional Audit / Check


1.

Proper Monitoring of Purity of incoming gypsum and clinker SO3%.

2.

Follow up for SO3 Optimization (twice in a year at least)

ACC/ Plant name

SPC- Process Improvement Project of Year2016

2016

7. Conclusion
7.1 Horizontal Deployment:
Cost reduction approach can be deployed to other department like minimization of waste

material/recycling to regenerate the product efficiently.

7.2 Lessons Learnt:


Learnt about importance of PSD, Route Cause Analysis, Cause & Effect Diagram (Fish bone
diagram), Why-Why analysis etc.etc.
How to optimize the clinker factor and to make system more profitable.
Importance and usage of low purity gypsum .

ACC/ Plant name


ACC Gagal

SPC- Process Improvement Project of Year2016

2016

Thank You