Power Systems
ELECTRICAL
SYSTEMS
Future Workshop
Aesthetics
Lamp temperature
Colour rendering
Presentation Title 3/24/17 Page 3
Code Compliant
Power Systems Objectives, Constraints, &
Considerations
Objectives
Other Considerations
Cost effectiveness.
Flexibility of installations.
Site Distribution
Site Distribution
Strategy
Strategy
Building Distribution
Building Distribution
Power Systems
Sub-Circuit
Sub-Circuit
Distribution
Distribution
Critical Power
Critical
SystemsPower Future Workshop
Systems
Alternative Energy
Alternative Energy
Strategies
Strategies
Stand-By
Stand-By
Power
Future Workshop
Presentation Title 3/24/17
Power
Page 6
Power Systems- Hospital Infrastructure Design
Drivers for
Hospital
Infrastructure
Design
Disaster recovery role Facilities
Facilities must
must have
have the
the capability
capability
of delivering on a continuous basis
delineation - advice for a period exceeding several
from MOH weeks
weeks all
all critical
critical health
health services.
services.
Agreed
Sustainability/efficiency
target
Authority Regulations/
Approvals Limited duration disruption capability.
Single Feeding
Dual Feeding
Vacuum
Presentation Title 3/24/17 Page 8
Power Systems- Incoming Service Dual Feeding
The incoming service is a 115kV supply
from the Saudi Electrical Company.
Currently arranged as a single supply.
There are advantages to a second
feeder if taken from a different 115kV
sub-station supply
Saudi Electrical Company have
identified the cost of a second supply
as 55 Million Riyals
2 Options Ring
Influenced by
Maintenance
M
MV
VCCa
abble
les
s
Primary
Primary S/S
S/S
115/13.8
115/13.8 kV
kV
3/24/17 Page 13
Power Systems- Building Distribution
Building Option 1
Distribution
All Transformers are located in one
location-
Eg Ground Level
Location of Transformer
Option 2
and LV Rooms
Tx. Rooms and LV Rooms are located on
different levels.
Cable Trays
Maintenance
Option 1
All
All Transformers
Transformers are
are located
located in
in one
one location-
location-
Transformer Disposition Strategy Eg
Eg Ground Level
Ground Level
Future Workshops
Emergency
Power
Diesel Generators
Emergency Lighting
Uninterruptable Power
Supply (UPS)/ Isolated Theatre Lamps
Power System (IPS)
Central battery
Fire Alarm &
Inverters
Detection Systems
Resilience:
Less generation capacity loss in event of failure
Cost :
The 5 MVA set would necessarily be a medium speed solution = limited choice (this platform is
inherently more expensive from a capex standpoint).
The 2 MVA set is a high speed platform and with multiple suppliers the customer has considerable
choice and consequently
a much lower price.
Availability :
The high speed platform ( 2 MVA) is typically available ex factory 12-16 weeks, the 5 MVA set
would have a delivery in excess of 24-32 weeks.
Size : The 5 MVA set occupies approx. 30 % extra space due to large civil foundations.
Response time for emergency use : both sets can meet the response time of 10 - 15 seconds from
start to load acceptance.
Maintenance requirements :
the time before overhaul for a standby application is largely irrelevant however there is approx. a 1: 2
ratio on overhauls.
A 5 MVA set would come up for major overhaul in 40,000 hrs against 20,000 hrs for a 2 MVA. this
difference is today mitigated
by providing
Presentation Title replacement engines
3/24/17 where an engine canPage
be 19
changed in less than 24 hours to reduce
downtime.
Power Systems- Critical Systems
Uninterruptable Power
Supply (UPS)/ Isolated Option 2 Centralised
Power System (IPS) UPS
Central battery
Inverters
lower price
Smaller foot print
No loss of Clinical space
Higher efficiency ,lower energy costs
Better medical equipment reliability
Savings in the Initial and Maintenance
costs Option 2 Centralized
Readily interconnected for greater UPS
resilience
Option 2
Protection of data and some portion of the s
Data Centre such as the table, the gantry,
or the fluoro mode of the Cath lab
Option 3
IPS
System
Medical Equipment
Group 0
Medical location where no applied parts
(medical devices) are intended
to be used (or connected to patients)
Some
Group 1
Medical location where applied parts
are to be used externally not invasively
(with the exception of intra-cardiac procedures)
and where failure of supply is not a threat to life
(often a clinical risk assessment is required to
determine this).
Group 2