Anda di halaman 1dari 18

PLC Based Object Sorting Machine

PRESENTED BY :
ABDULFATTAH ALSHAWI
MURTADHA ALMUTAWAH
Contents

Introduction
Project goals
Designs
Calculations
Project schedule
Budget
Risk assessment
Circuits diagram
Coding Object sorting machine
Introduction

Purpose of Object Sorting machine


How it works
Where can it be installed
Project Goals

Optimizing product line that able to decide


the color.
Move the product to the right direction.
Design

The design consists of following structures:

Base of the conveyor Conveyor belt with base structure


Design

Color imagine sensor results:


Working

Object passes on conveyor belt and is being detected by a


sensor
Sensor detects color ( red for KITKAT blue for Snickers)
Color sensor sends signal to PLC
PLC acts according to the action plan
For red kit Kat solenoid remain inactive
For blue snickers the solenoid energizes and it pushes the bar
Calculations

Determination of the speed of conveyer belt:

Length of belt= 30 inches


Motor rpm = 218 rotations per minute = 218/60 = 3.63 rotations per sec
Time needed to cover the distance of conveyor belt for complete path = 8.30 sec
For 3.63 rotations /second, the total distance covered = 4.28 inches
Time taken by bar to reach solenoid valve = 4.30 sec
The weight for each box:
Calculations

Average Velocity for the conveyor:

D= 30 inches = 30/12 = 2.5 f


Average Speed=
Power Calculations:
To run conveyor belt motor we need two
amperes of current and 230 V and PLC input voltages ranges from 4-23
mA and 24 v standard DC voltage
Project Schedule

Project is scheduled as follow:


Project Schedule

The project is sub divided into 4 separate tasks which will be


performed one after another :

1st Circuit design


2nd PLC coding and testing
3rd Mechanical design of conveyer belt
4th Complete testing
Budget Components Cost in USD

Camera sensor COGNEX MODEL R00039


MSIP-REM-CGX-
IS2000(From University)
Components cost can be divided as : (5000 $)
Conveyer belt Manufactured in

University ( 300 $)
Motor Controller 40 $

Solenoid Valve 32 $

Holders for camera and 15 $

motor
Boxes 10 $

Cables 15 $

PLC AB Compact Logix 1(From

University lab)
Total we paid 112 $

Total including University 5,412 $

Parts
Risk Assessment

Below is the table of precautions:


Risk Assessment

Mitigations:
Circuit Block Diagram

No signal
Move bar
to
to Blue
solenoid
bucket
valve
Check
Bar
from Signal
whether
the to color the bar is
conveyo sensor
r belt
Snickers /
Kit Kat

Activate Move bar


Solenoid to Red
valve bucket
Coding

The project is designed in RS Logix


500.
and we have just used timers for
time delay.
Conclusion

Labor is saved
Labor cost is saved
Cost of utilization decreased
Work is made easy by use of PLC
The End