CIVIL ENGINEERING
Planning system
Development System
Planning
system
Previous
terrain
recognition
Basic Project of
project execution
The basic formulation of
They contain the design,
the project is done, which
blueprints, detailed
consists of the design of
specifications, temporary
plants and elevations,
programming of project
without determining the
execution and budget.
exact dimensioning.
DEVELOPMENT SYSTEM
Provisional
constructions and
preliminary works
Provisional Provisional
installations Preliminary works
constructions
Telephone and
Warehouses Dining rooms Hygienic services Electric power communication
installation
Strokes,
levels and
The stakeout is the
operation that aims
to transfer to the
stakeout The leveling
consists in
establishing a
terrain the permanent
dimensions and reference level
shapes indicated in during the
the blueprints. construction.
Excavations
Manual Mechanics
Cuts: The cuts are open-pit excavations in the natural terrain
to reach the level specified in the blueprint.
Fillings: Filling is the work carried out in the construction to
raise the elevation of the natural profile of the terrain, or
restore a level after excavation.
Foundations: Part of the structure that allows the transmission
of the loads that act, towards the ground or the underlying
rock.
Upon - foundations: Structural elements are found above the
foundations and serve as a link between the wall and the
foundation.
Columns Beams
The columns are structural
elements that serve to support
axial loads that come from the
Linear constructional element
factorized loads of all the
that works mainly in bending.
mezzanines or roofs,
producing in them
compression and tension.