PRACTICES ASSESSMENT TOOL

Focus of this assessment tool

Technical System Management Infrastructure


Planning and internal logistics Management Organization design
Loss elimination Infrastructure Contractors and suppliers
Maintenance system management
Quality system Performance management
Manpower system Operating Support function processes
Safety and housekeeping Capability building processes
System
CI infrastructure

Mindsets &
Behaviors

Mindsets, capabilities and behaviours

1
Technical System planning and internal logistics
1 2 3 4 5

Material flow Production processes Production processes are Production processes are There is not Coordinated 1X1
(The movement of product are isolated islands departmentalised, but departmentalised, but departmentalization. WIP production occurs for all
along the value stream with large amounts of there are efforts to reduce there is an orchestrated is always minimized. operations, as well as
(both within and between WIP between operations WIP between various effort to reduce WIP coordinated shutdowns
value-adding process (i.e.departmentalized). stations for planned downtime.
steps)
Lot of movement and Complex conveyance Material movement is There is minimized
systems is in place to Material movement is
hand handling of through conveyance through conveyance transportation of people /
material takes place optimise material systems, with minimum materials through the
systems and there are
outside normal process movement, but theres lot manual handling / plant
efforts to minimize
flow of handling outside transportation conveyance requirements
conveyance
(eg planning / redesign)

Material enters and is There is some concept of


pull at the bottleneck There is a notion of pull, Production system is Production is driven by
pushed down-stream on but the system is not driven by Pull system. Pull signal from
forecast only. Over- stations, but there is lot of
visual, and controlled WIP at bottle neck and downstream process.
production is the norm to overproduction in the
daily counts/adjustments change over points in WIP is strictly limited &
mask downtimes. system
system system highly disciplined

Current bottleneck Bottleneck known from Detailed fact-based


experience. Bottle neck Detailed fact-based Detailed fact-based
unknown. Equipment analysis of bottleneck has analysis of bottleneck has analysis of bottlenecks is
productivities are not equipment capacities been conducted. Bottle regularly updated.
been conducted.
known are recorded but values neck equipment Equipment productivity
Equipment
are not used uptime schedule are in best practice
productivities are place but not adhered
benchmarked against to strictly standards are
Industry leader established and known

Information flow Complex production Production planning Production planning Pull production system Simplified production
(Production control planning processes that continues to be forecast process are simple, and driven by customer planning processes that
processes for logistics, promote push and only push system promote pull production, demand for made to translate actual customer
production instruction, and production (start based based however there is a degree order products. demand (throughout the
conveyance) on forecast as early as of overproduction built processes) into
you can and make as into the planning system production instruction;
much as you can) to deal with production build only whats
inefficiencies consumed or ordered

Production volumes and Production volumes and Visual signals vs.


WIP are controlled WIP and volumes are WIP are controlled daily Some built in over complex order
controlled on weekly basis. through an MRP system. production is there to instructions are deployed;
weekly through an MRP
Theres a target inventory Target inventory is based account for fluctuation is flow of product volume is
system. Inventory is
level but varies a lot on minimum safety buffer demand. Target inventory dictates production order.
uncontrolled no target,
depending on production required. is based on minimum Inventory seldom varies
no planning
(reactive vs proactive safety buffer required and from buffer inventory.
inventory) is usually met.
2
Technical System loss elimination
1 2 3 4 5

Waste reduction No clear understanding There has been some Moderate understanding Value addition from Value in the eyes of the
(Anything which adds of what adds value and education / analysis on of customer value customer perspective is customer is clearly defined &
cost but no value in the what does not. what adds value and the clearly defined. understood throughout the
eyes of the customer) sources of loss in organization. 7 types of waste
manufacturing processes are well understood throughout
the organization

Concept of waste (eg 7 A systematic approach is used


Theres a lot of waste (eg types) is understood but There is evidence of Concept of waste is to identify & eliminate sources
energy waste through no to little efforts are waste elimination, but clearly understood by of waste. Energy or spare parts
leaks, multiple start-stop) made to eliminate it the effort is neither everyone and regular waste is at a minimum
although employees are except for capex. vigorous nor systematic. improvement happen.
not aware. Improvement Efforts to minimize
focus on large capex energy / spare parts
projects only. loss have mixed results.

Variability reduction Performance is not Efforts are made to the Performance measure Daily address system for Visual management is used to
(Deviation from the target measured at machine root cause of the problem by department with crucial processes highlight current condition or
value) level but problem solving paper/computer reports performance versus the target
approach is not followed value
Variability reduction is
Variability is accepted as partly tackled through Variability reduction Root cause analysis is used by
project approach Root cause analysis is
the norm and dealt with approach is project used by engineers to all. People distinguish between
through overcapacity, based only (e.g. 6 solve the problems in common cause and special
large WIP, overttime Sigma) and takes a long projects and in daily cause, 80% effort is daily, 20%
time. Engineers analyse shopfloor activities. project based
the root causes of
Equipment speed limits variability. Regular technical study to
are known from Equipment speed limits identify new speed
Equipment speed limits are known from facts. A technical study have improvement opportunities.
are not known. No experience. Recording of identified the technical
speed information but The speed performance Very detailed record of speed
recording of actual speed limit and improvement
patchy and unreliable is well recorded and and review every day
levers to increase
reviewed regularly
speed. The speed is well
recorded.

Inflexibility reduction New product introduction New product introduction The disturbance caused Staff is trained for crucial New products are
(The inability to provide leads to months of takes around 2 months to by new product processes before job systematically debugged, the
exactly what the quality and delivery be debugged introduction is dealt with one on the new line line adapted and the staff
customer wants when the issues in both new and in a relatively effective trained before job 1, there is
customer wants it) existing product lines manner almost no disturbance to
production

In the eyes of the The value of flexibility is There is a common


There is some Flexibility is highly understanding the flexibility is
organization, flexibility is understanding of value of recognized versus unit valued by everyone
something to suppress to cost (e.g., in investment indispensable and costs less
flexibility but it is still
improve unit cost viewed as an added cost. decisions)
3
Technical System maintenance system (1/2)
1 2 3 4 5

Maintenance Planning <50% planned work 50% planned work (man- 75% planned work (man- 90% planned work >95% of work is planned
and scheduling (man-hours) hours) hours) and scheduled in details
(The processes which 1 week in advance
ensure the people with right Most of the work done in Maintenance team has to Number of emergencies Number of emergencies Almost no emergencies
information, skills, and emergency and parts / deal with a lot of is manageable is manageable
resources are doing the tools are often missing emergency
right job at the right time) High backlog (>6 months) Backlog of ~3 months Backlog is < 6weeks Backlog is less than 3
Backlog is <4 weeks
weeks
No detailed advanced A distinct planner function Detailed planning and Complete work package Kitting and work package
planning or scheduling prepares plans for all jobs schedule development: are prepared for most preparation for all jobs.
(scope, responsibility and clear critical path for jobs before they start Schedule adherence is
resources) shutdowns, 1 week (tools, spare parts). >90%
schedule for routine Schedule adherence is
maintenance. Schedule 80-90%
adherence is <80%

Planned shutdowns often Planned shutdowns Planned shutdowns never Planned shut down never
Planned shutdowns seldom run over
always run over run over run over run over

Maintenance strategy No or over-aged Preventive maintenance Use of condition Preventive plan for all A specific reliability
(Execute low total cost preventive maintenance plan defined and use monitoring, preventive equipment regularly engineering function
equipment strategies plan some condition plan for all equipment updated and 100% continuously seeks to
focused on preventing monitoring (but mainly implemented. Advanced optimize cost and
failures) visual inspection). condition monitoring downtime by reviewing
Preventive plan not extensively used (when equipment strategies and
defined for all equipment cost effective) updating all preventive
and/or not fully plans
implemented

Critical equipment known Critical equipment Critical equipment


Critical equipment from experience Critical equipment analysis conducted analysis conducted
unknown assessed from facts and
No clear equipment FMEA conducted
FMEA conducted and FMEA conducted and
No equipment strategies strategy Some calculation of MTBF calculated for MTBF calculated for
MTBF 100% equipment
>75% of equipment
Some information A single CMMS is used CMMS extensively used
No records of equipment recorded (history, work Use of computer system by maintenance for by everyone (incl.
history (work done, order) even if patchy and to record complete equipment history, technicians)
breakdowns, etc.) unreliable reliable equipment history planning, W/O tracking

4
Technical System maintenance system (2/2)
1 2 3 4 5

Work execution Operators not involved Operators dont Operators do daily Daily involvement of Operators extensively
(Utilize best practice in maintenance the participate but clean and check (but operators in and proactively
efficiency tools -- (e.g. equipment is yours to communicate and mainly visual maintenance: clean, participate in
SMED, standardized repair and maintain cooperate with inspection) check (not only visual) maintenance (incl.
work, 5S etc. to maintenance lube, simple changes assist in preventive
execute maintenance jobs and repairs,
jobs without waste) problem solving)

Some record of job Clear SOPs and target Regular job have an
No tracking of job Time to complete SOP that is strictly
execution time but patchy and jobs / MTTR measured time for all regular
unreliable maintenance jobs followed
and tracked

-- Tracking of MTTR / Each job has a target


-- SOPs and target time time and actual vs.
for some jobs time to complete jobs
target is tracked

Root cause problem No root cause problem Ad-hoc analysis on Systematic root cause All issues are Equipment fixed right
solving solving repeated problems but problem solving systematically the first time through
(The processes to Maintenance only do mainly involving methodology used for analyzed to the root systematic cross-
continuously improve quick-fix and problems maintenance / major issues involving cause using a functional-problem
equipment reliability reoccur engineering only. ooperators, engineers, standardized process. solving issues never
through root cause Simple problem maintenance, Involvement of repeat themselves.
problem solving) solving tool (eg 5 equipment supplier operators, engineers, Very high employees
whys) together maintenance, involvement in
equipment supplier etc problem elimination

Maintenance downtime Maintenance Aggressive OEE and OEE and maintenance


No tracking of is measured but downtime is measured maintenance downtime target are
downtime / production patchy and unreliable and reviewed weekly downtime target set regularly reviewed and
loss and chart of actual vs chart of actual vs
target visible in control target visible in control
room room
Pareto analysis has Pareto analysis of top
Small list of identified Pareto analysis has identified and provided issues updated
No list of identified issues, but no identified and provided
issues data on top 10 issues regularly
prioritization data on top 10 issues on each machine
on each machine

5
Technical System quality system
1 2 3 4 5

Quality assurance Customer complaints are Customer complaints Production is actively Production is actively Production is actively
handled by marketing or are well communicated involved in dealing with involved in dealing with involved in dealing with
quality department, not by and timely addressed customer complaints and customer complaints customer complaints
production developing solution

No efforts to record or No problem solving Ad-hoc quality tools are Proper quality tools are PDCA* action plans are
take care of customer culture for customer used to solve problems used in a structured initiated and conducted
complaints complaints problem solving approach by production team
No record of customer Rework, scrap and Complete rework, scrap Rework, scrap and Quality knowledge and
feedback is kept in Customer complaints are and customer complaints customer complaints are ownership in every step
production department recorded in production are kept in production visually displayed in of production value chain
department but not 100% area production area
complete / accurate Operator well aware of
quality issues

Quality control No Standard Operating SOP and Quality control SOP and Quality control In case of deviation from Clear SOP and trouble
Procedure (SOP) and procedure are procedure are quality standard, shooting guidelines
Quality control Procedure documented but not documented and easily operators follow clear Process audits are
easily accessed accessed instructions given by a performed and corrective
standard trouble-shooting action plans are set up
guide, record and report systematically
timely
Quality KPIs are tracked Quality KPIs are tracked Operators own quality
High defect rate in daily Quality KPIs are defined and reviewed daily.
and tracked weekly. No and reviewed daily. KPIs and drive review
production, but no clear Source of the variance
major focus on solving Quality problems are and improvement action
tracking of quality KPIs are analyzed weekly and
quality problems prioritized at least on a plans by themselves
weekly basis actions are
taken to improve

SPC is properly used for


Clear process mapping in SPC is used for some key processes SPC properly used for all
No real process control processes but could be process
place and KPIVs/
improved
Records are complete
KPOVs** are and accurate
identified Incomplete record Data plot on SPC charts
Done only 1/ shift several times per shift
Done on the computer,
not on the shopfloor
Periodical measurement Periodic MSA and
system analysis and calibration is done for Periodical measurement
calibration plan for testing most testing equipment- system analysis and
Periodic plan exist for
No plan for testing / some equipment for is not equipments calibration plan for testing
measurement equipment rigorously followed equipments. Error
maintenance proofing systems are
established by type of
products and machines

6
Technical System manpower system
1 2 3 4 5

Work standards Primitive work standards Work standards are Manual processes have More than 60% manual Almost 100% manual
(The way that the most exists. But adherence is adhered to but not work standards (25%) tasks have defined work tasks have defined work
efficient and safest way to poor improved developed by engineers. standards, developed or standards, developed or
get the job done is defined) The standards are not all finalised by shop-floor. finalised by shop-floor.
up-to-date or rigorously Audit system exists to Multiple methods exist
followed ensure standards are including audits to ensure
followed standards are followed

Work standards are one Work standards used as Work standards used as
Workload planning is Occasional use of the of the factors for planning basis for planning and basis for planning and
based on historic work standards to do evaluation to improve evaluation to improve
(other factors: e.g.
achievements (perceived macro level workload work loading (balance to work loading (balance to
Individual operator
capacity) planning demand rate) and demand rate) and
capability) and labour
efficiency measure improve labour efficiency improve labour efficiency

There are trainings for Effective, visual training Effective, visual training
New hires are trained There are some trainings new comers including tools that enables quick tools that enables quick
through apprenticeship for new comers, these problem solving new hire training of best new hire training of best
only trainings are not methodology training, but practice methods practice methods
comprehensive (e.g. no some are outdated
problem solving
methodology training)

Manpower allocation There is little or no multi- Majority of the work force Some critical processes Skill matrix is used to Manpower are flexible
(Method for optimizing tasking due to lack of is trained to work on a have multiple people man critical processes. (cross skilled workforce)
labour productivity) training, layout single process. Only a trained, the skill matrix is and the processes are
constraints or union couple of processes are used scarcely regularly rebalanced to
agreements based on multi manned face up to changing
based on ease of training customer demand

7
Technical System safety and housekeeping
1 2 3 4 5

Priority on people, health No personal protection Personal protection Personal protection Personal protection Personal protection
and safety equipment available equipments are available equipments are used by equipments are used by equipments are used by
(Anything that can effect but not used by all all operators all operators all operators
health or safety of the operators
people)

No safety training Employees have been Anybody entering the site Safety protocol for Mandatory safety training
trained for safety (employee, visitor) needs visitors and training for all for all, with graduation
regulations before they to pass a safety induction employees is a must and regular refresher
start their work in the course
company

Visual safety indicators Visual safety indicators,


(eg number of incidents) Visual safety indicators, Visual safety indicators,
No safety communication Regular safety every shift meeting safety part of the culture,
communication mention safety issues / every meeting, even
observations. Regular management, start with a
safety audits safety discussion

Accidents are reported by Accidents are captured Accidents and near


Accidents are measured misses are actively
Accidents are the the safety manager, but and acted upon by the by the line management
there is good debrief with and root cause problem measured and acted
responsibility of the line management. Near
the front line employees solving is done in due upon by the line
safety manager, he misses are not captured
course of time. Near management, any
records and reports them
misses are captured but accident report can not
not dealt with thoroughly be closed unless the root
causes identified and
counter-measured, all
potential unsafe areas
and activities are
eliminated through
systematic FMEAs

Plant is very clean: no


Plant is very clean: no dust, everything is at the
Awareness of No unsafe conditions. dust or trash can be right place, employees
No or little housekeeping: housekeeping issues: lot Lots of effort on pro-actively take initiative
found
dust and trash of efforts to clean but housekeeping but still to improve work
everywhere, lot of unsafe impact is minimized by doesnt result on plant environment /
conditions leaks / poor practices. being very clean housekeeping
Still some unsafe
conditions

8
Management Infrastructure organisation design
1 2 3 4 5
Line organisation There are no team leaders Team leaders are in Team leaders span of There is an appropriate There is an appropriate
structure on some or all shifts. Only position along with control is inadequate (i.e. spans of control for team spans of control for team
Design and structure of the supervisors exist supervisors stretched) leaders leaders
front line size
The production The ops organisation is The operation has The operation organis-
The production organization is organised by function, the links started to organize like ation is by value stream or
organisation is by function, by function but linkages between functions are value stream and cross if by function, links are
the primary objective of are not defined defined but not fully functional teams are clearly defined and
functions to self optimise implemented available promote value streams
Functional organisation Functional support Functional support of Functional supports Explicit linkage of Explicit linkages (e.g.,
structure departments are silos that day to day working linkage to front-line are immediate support dotted lines) show
Design and structure of the optimise themselves requirements are linked well defined functions is fully defined. important relationships,
functional organizations, before serving front-line to the front line. such as between service
including integration with providers and internal
the front line customers
Decision for centralised Decision of centralized Proper mix of central-ized
Decision for centralised Good mix of centralized and decentralized support
versus decentralised versus decentralized of versus decentralised and decentralized help maximize service
depts are based on history direct support depts are based on support help maximize quality efficiency &
or individual managers department is need production needs but cost service quality efficiency responsiveness
preference based primarily & responsiveness of
certain support functions
Job design Jobs are not clearly Jobs are defined at top Jobs are clearly defined Jobs are not defined at Comprehensive job
Specific content of the defined at any level management level for managers only engineer level, with no descriptions articulate
positions within the description of direct each employees duties,
hierarchy, e.g., job working staff roles & responsibilities
descriptions, roles and
There are no team leaders Team leaders dont have Team leader position is Team leaders roles are Team leader/supervisor
responsibilities amply clear with clear roles are clearly defined
clearly defined teams defined but no resources
team structure
are provided
Decision process Decision rights are not Decision rights are Decision rights are Decision rights are Decision rights are clear
The decision rights and defined defined at managerial defined at some functions defined for all functional and codified
responsibilities (who level only levels
decides, who has a say, Group decisions are made Group decisions at Group decisions are Group decisions by Group decision are based
and who is involved) and by the senior managers middle mngmt made by dept managers majority consensus
decision-making protocols Decision making is Lower levels feel
(e.g., individual authority associated to position empowered to make
versus committee with no inputs from
Lower levels do not decisions in their area of
Decisions tend to be made
Decisions are made that always feel easy to use at the lowest possible
consensus) functional level. expertise
the highest level their decision rights levels
Communication There is little awareness of Information is not Important info reach the Important information is Communication channels
Formal mechanisms by important information at classified as important front line, but in amply displayed ensure people are aware
which information is shared the front line and otherwise and there inadequate intervals of important information at
and actions are are no channels for all levels
coordinated, e.g., regular propagation
meetings, dissemination of
Senior management hardly Senior managers don't Senior Managers carry Comms. channels are
executive committee have regular visit to Communication designed to maximize
ever go to shopfloor out some commun- meetings are held for
minutes, etc. shop floor contact between
ications but this is often interaction at regular
short & one way managers & operators
intervals
9
Management Infrastructure contractors and suppliers management
1 2 3 4 5

Contractors management Trade-off between internal Trade-off evaluated for Trade-off between Trade-off between Continuous trade-off
and contract resources some jobs based on price internal and contract internal and contract between internal and
are not evaluated (make only. Contractors resources only done for resources only done for contract based on price,
vs. buy). Anyone in the requirement go through major jobs. There is major jobs. The availability, performance,
facility can bring in a selection/need process rigorous control of the contractors used must be possible loss of capability.
contractor and use any procurement of pre-qualified and on an Contractors used must be
firm of their choosing contractors approved list pre-qualified
Full partnership between
No input from the line Line management input Line management input the line. purchasing and
Some input from the line the contractor in well
(production/maintenance) in contractor selection. systematically asked by systematically asked by
in contractor selection. purchasing for contractor purchasing for contractor defined contractor
Contractors not involved
Contractors not involved selection. Contractors are selection. Contractors are selection process
in work scoping.
in work scoping involved in major scope involved in major scope
decision decisions
Contractors leader has
Contractor presence in Site team leaders review Site team leaders review daily interactions with site
plant is not monitored. Contractor work is contractor work in most contractor work as part of personnel on status of
informally monitored cases and react to normal standard daily work being performed
problems rounds
Every job is completely
No evaluation procedure Major jobs are evaluated Major jobs are evaluated evaluated and
for contract performance Major jobs are evaluated, with performance criteria with performance criteria performance criteria is
in place. with little feedback to based on preset based on preset part of contractor
contractor. agreement on a job-by- agreement on a job-by- agreement.
job basis. job basis.
Contractors productively
Full scope of contractor Full scope of contractor establish program to
No reviews of overall performance vs. improve performance and
contractor performance performance vs.
Contractor performance established KPIs established KPIs share improvement ideas
reviews only held when conducted quarterly with across site
conducted yearly
major concerns/ action plans for
issues arise improvement

Suppliers management Equipment/sub- Some purchasing on Equipment/sub- Equipment purchased on Equipment purchased on
components purchased direct life-cycle cost components purchased total life-cycle cost (direct total life-cycle cost (direct
on lowest up-front cost where maintainers insist on total direct and throughput loss). and throughput loss).
upon it, Equipment maintenance life-cycle Equipment spares costs Equipment replacement
spares replacement cost costs. Equipment spares negotiated after cost negotiated with
reduced by using costs negotiated after equipment purchased supplier when equipment
secondary suppliers equipment purchased purchased

Vendor rating system for Vendor rating system for Vendor rating system for Vendor rating system for
No vendor rating system some vendors most vendors most vendors and all vendors with corrective
corrective action action and continuous
requirement improvement
expectations
10
Management Infrastructure support functions
1 2 3 4 5

HR HR function is only HR is involved in HR function supports all HR is actively involved The HR group proactively
HR supports the involved in recruitment, capability building but in necessary people related in all the activities but supports 4 key processes:
manufacturing systems disciplinary actions and a limited way issues, but in a reactive there is no genuine Recruiting, orientation
union negotiation manner (wait for follow up. Staffing, scheduling
HR does not actively complaints or requests by Training
support capability building line managers) Payroll, benefits
and talent management

IT The IT group is not The IT group is resp- The IT group is resp- The IT group is held The IT group is held
IT supports the responsible for supporting onsible for supporting onsible for supporting accountable for accountable for assessing
manufacturing systems manufacturing systems manufacturing systems, manufacturing systems, assessing and meeting and meeting the hardware,
but not held accountable but not held accountable the hardware, software, software, and training
and training needs of needs of the manufacturing
the manufacturing system
system IT reports are generated at
Strategic IT decisions value stream levels, KPIs
IT investments often run IT investments are IT investments are (e.g., ERP) are linked are directly obtained from
contrary to manufacturing reviewed in-line with reviewed in-line with with and support the the IT system, shop floor
future needs manuf. Strategy but manuf. Strategy but often manufacturing strategy has IT displayes supporting
often based on cost / based on cost / payback manufactuing system
payback

Finance Finance department and The financial tracking The financial tracking Technology/processes Technology/processes
Finance supports manufacturing tech/processes are well tech/processes are well created for financial created for financial
manufacturing group with management track spend defined but the defined but the tracking provide line tracking provide line
appropriate data and and revenue separately responsibility left to responsibility left to both managers needed managers needed
working capital (no trust) finance department finance and operations information on spend information on spend,
department and revenue revenue and other
Finance provides management accounting
Investment decisions are Investment decisions are Investment decisions are working capital as information (cost variance,
based on financial return based on manufacturing based on manufacturing needed by the utilization, efficiency etc)
only and have no link to strategy but have to strategy but have to manufacturing system,
manufacturing strategy payback within short payback within short term and the manufacturing Finance accounts cost by
(which is often unknown) term (e.g. 1 year) (e.g. 1 year) system is consistent value stream and guides
with the financial operations through flow
strategy manufacturing accounting

Sales There is little or no There is some There are some channels Manufacturing receives Manufacturing will get
Manufacturing works in working communication communication between setup to provide sales feedback from sales constant feedback form
collaboration with sales with sales apart from at sales and manufacturing feedback to production, periodically (every 2-3 sales and improve product
the highest level but sparsely used months) spec/quality/

Sales regularly Sales try to respect the Sales try to set a balance Sales force ensure that Sales work to ensure the
compromise prod needs production schedule but between respecting the production schedule manufacturing system
(e.g. level production) to their own KPIs are top production needs and is respected without parameters are respected
fulfil their KPIs (e.g end- most priority their KPIs effecting their own KPIs
month targets) to a very large extent
11
Management Infrastructure performance management
1 2 3 4 5

Clear KPIs, linked to There are too few or too Important KPIs are Clear KPIs measuring Shop floor linkage of Clear KPIs, linked to
business objectives, are many KPIs with weak identified and their linkage performance (and bottle neck equipment business objectives, are
defined and cascaded link to business to the business need is partially health) are and process KPI is clear, defined & cascade to
and used at the front line objectives and even clear. No shop floor KPI defined and cascaded; with tracking system. frontline with balance of
weaker link to shop-floor are defined the link to shopfloor KPIs leading and lagging
metrics are weak indicators to track
Data collection at performance & health
There is little or no There is performance Data collection starts at important stations by Data collection starts at
performance tracking or tracking or data collection shopfloor by supervisors operators and input shopfloor and is visual, It
data collection on the on the shop floor only for and input directly into IT. directly into IT. Wide use is supported by IT
shopfloor. No visual few or critical processes. Some visual of visual management. systems . Wide use of
mamagement. No visual management. management. visual management.
Targets at each
There are no real shop- There are shop floor There are targets set at hierarchical level match Performance and health
floor targets, the targets at some levels, but each level of hierarchy, targets are set & casca-
operational targets do they do not match the BP the targets do not match ded throughout hierarchy
not match the BP

There are no shop-floor Occasional shop floor Regular and constructive Effective performance
The performance reviews performance reviews are
reviews, management reviews, but they are held are open and systematic. reviews (using visual tools)
held regularly
reviews are adhoc and systematically. Everyone They are held at every are held at every level
not fact based, everyone protects their silos level but shopfloor using calendared meeting
protects their silos process and with a
constructive but
challenging dialogues
No or little corrective Corrective action plan is
action planning. Most of used effectively. 50% of Corrective action planning
Some corrective action Corrective action actions are planned & is used effect-ively. 80% of
the effort is spent fire planning in place (in some planning is common executed within the actions are planned &
fighting critical areas). place, the improve-ment review cycle executed within the review
lead-times exceed cycle
reviews cycle

Performance monitoring People below managers Front line operators have There are personal Personal objectives are Personal objectives are
and review mechanism have no real personal no personal objectives set. objectives set for most set for everyone in the set and linked to
are in place and adequate objectives discussed or Personal reviews happens people in the organization. operations objectives.
countermeasures are agreed. There are no but the frequency is low. organisation, however Performance reviews Personal review processes
taken personal reviews in failing objectives has little take place at right are mostly executed with
place. consequence. intervals, however there appropriate coaching,
Performance is reviewed is no coaching for the development and
but the improvement identified corrective corrective action in real
levers are vague. actions. time
There are no or little Financial or non-financial Motivation system is Effective motivation
performance related pay Financial or non financial incentives (e.g. bonus) more related to financial system design allows
or non-financial incentives are linked to have little link to people rewards, no system for management of rewards
incentives to promote performance only at the performance (individual or punishing and consequences for
people performance top level. No incentive at team) underperformers underperformance
lower levels. 12
Management Infrastructure capability building processes
1 2 3 4 5

Training & development The only real training is There are some basic The are trainings at The process of need There is formal process to
Formalized programs for new starters and is trainings that are given to engineers/managers based training identify training needs
(content) and processes, brief (days) everyone without realising levels, which is identified identification doesnt Trainings are immediately
and infrastructure for the applicability by the indi-vidual based exist applicable
training and developing the on his/her preference and
skills, knowledge, and less by business needs
abilities of employees Regular skills evaluation
Skill requirements are and tracking
Skill requirement not practically defined to meet A skill matrix is used A skill matrix is visually
clarified and reviewed at least displayed and updated
job needs and are
every 6 months to track regularly
documented in a job
skills
description

Concept of coaching Most trainings are class-


doesnt exist room based Emphasis is there on Trainings are through
All training is class-room coaching as well
based classroom & coaching

Knowledge management There is no system to Best practices are codified Best practices are Best practices are Best practices are codified
Codification and share best practices but there is no system of codified but known only codified but sharing is and effectively shared with
dissemination of constantly sharing to engineers not regular across all related
evolving best practices; different levels
guardian of the production No one owns the exiting Know how capturing exists Knowledge is owned Dissemination of Evolution and dissemination
system know-how within the but is not thorough. centrally but the knowledge not rigorous of knowledge is managed
organisation dissemination is weak but managed centrally centrally
and not systematic

Talent review There is no value Employee value Employee value Employee value Employee value proposition
Formalized activities to proposition defined for proposition is defined only proposition is defined but proposition is clearly is clearly articulated
attract, develop, and retain employees for very few employees not known outside HR defined
talented staff
People performance is Employee evaluation is Employee evaluation is Reviews are based on Employee evaluation is
not reviewed linked to performance linked to performance 360 degree feedback linked to performance and
but process is not health (e.g. values)
rigorously followed.
No periodic reviews Reviews are not Reviews are top-down Reviews are 360 based Reviews are based on 360
transparent and one way but not frequently done degree feedback

13
Management infrastructure CI infrastructure
1 2 3 4 5

CI resource No continuous There are some There is a dedicated The CI team runs More than 90%
Dedicated continuous improvement resource resources responsible for cross-functional CI team improvement workshop at improvement activities
improvement resources to continuous improvement At least 1 person per least once every three driven by CI team are
drive improvement from department has been month in each flow implemented on time
shop floor base trained in improvement The CI team supports 25% of all personnel
tools (e.g., SMED, problem solving on the trained on improvement
6Sigma, etc.) shop floor to deal with tools (e.g., 25% of staff is
daily issues raised a 6Sigma GB/BB)

Managers / supervisors ~50% employees are >90% of employees are


No involvement of Mainly managers / are key drivers of CI involved in regular CI actively involved in CI
employees in CI supervisors are involved activities activities activities to reach the
in CI Some efforts to involve Operators own CI improvement goals
Some operators involved operators in CI activities activities themselves, not
in CI but on a case by on a regular basis driven by management
case / project basis

Problem solving No root cause problem Employee suggestion Improvement process Standardised, company Standardised
methodology solving. No clear process scheme is a primary and root cause problem tailored improvement improvement process and
Systematic problem solving for improvement idea source of CI. Ad-hoc solving methodology process and root cause root cause problem
methodology and process generation analysis on key problems. used (eg DMAIC, PDCA) problem solving solving methodology
supported by a strict Use of some problem but limited to a few methodology used by widely used by all
implementation tracking solving methodology (eg selected key projects. 50% of employees employees, incl.
mechanism 5 whys) Problem solving is only operators, technicians in
through brainstorming day to day activities

Action plans recorded in


Action plans informal and meeting minutes but not Action plans are recorded All action plans well
not documented (oral All action plans well
easily available to all and centralised recorded and documented with KPIs,
commitment)
Tracking is informal and Action plans include documented (incl. targets, deadline, and
No tracking of initiatives highly depends on the responsibilities and responsibilities
financial impact)
area manager deadline but KPIs and Monthly review of project Action plans and their
financial targets not progress progress visually
clearly defined Management more available to all
Manager review and track involved in pushing Deadlines are met
implementation implementation (holding Management involved
the whip) than problem more in problem solving
solving mode than progress
supervision

Improvement ideas Peoples ideas for Idea capturing is not Systematic idea capturing Idea capturing is a well CI org. captures and
CI organization translates improvement are not systematic and no system in place where established system, but syndicates the
ideas into new front-line captured collection point is there important ideas are implementation is not improvement ideas and
and management practices implemented business need based ensures implementation

14