Page 4
CHRONOLOGY OF EVENTS
2008 2010
Dialogue with Alburquerque officials with lawyer,
HUGALNA representatives, PTA Consultant
(POIEL), EcoGov, BEMO
LGU Officials and HUGALNA required the PTA
to submit the necessary documents (FS,
Detailed Engineering Design) and requested
the contractor not to proceed the construction
not unless the documents they required will be
submitted.
Another meeting was conducted, LGU Officials
and HUGALNA were not contented with
documents submitted.
Page 5
CHRONOLOGY OF EVENTS
2008 2010
Meeting conducted moderated by Ms. Paredes ,
agreed to have a consultation to Alburquerque
constituents to address the issue by the
opposition of having no IEC conducted. Focus
Group Discussion was planned to address the
need.
Completion of SLF facility, phase 1 in the amount
of P85M (November 16, 2008)
Page 6
Page 7 On-going construction of Albur SLF taken last March 5, 2008
Leachate pipes to be used in the Albur SLF
Page 8
On-going construction
Of Albur SLF taken
April 11, 2008
Page 9
Stock pile of silica excavated from the
Sanitary Landfill placed at Sta. Fe, Albur
Page 10
October 2008
Page 11
July 19, 2010
Page 12
Page 13
CHRONOLOGY OF EVENTS
2011
Gov. Chatto created the Bohol Advisory Council and a
TWG is organized to look into the Alburquerque
Cluster Sanitary Landfill (whose members are Deans
and professors of Environment and Engineering
Colleges of UP)
President Aquino announce during his visit in Bohol
that there is a founding for the completion of the
SLF in the amount of P 140M
Experts/Consultants were provided with all documents of
the Alburquerque Sanitary Landfill for review
Governor Chatto meet the Advisory Council last
September 2011 to brief the Council and TWG on the
scenario of the Alburquerque SLF
Page 14
CHRONOLOGY OF EVENTS
2011
One member of the TWG visited the SLF site (Oct 4) to
conduct inspection and verification of the area and
report has been submitted to the Team Leader of the
TWG
UP TWG convened November 16, 2011 to discuss their
findings and observations of the facility
Gov. Chatto have sent letter to Mr. Mark Lapid (COO)
of TIEZA to conduct inventory of the Phase 1
construction of the SLF
Page 15
CHRONOLOGY OF EVENTS
2011
Page 16
October 4, 2011
Page 17
October 4, 2011
Page 18