CPM(Network analysis)

Network analysis
Network models can be used as an aid in scheduling large
complex projects that consist of many activities.
If the duration of each activity is known with certainty,
then the critical path method (CPM) can be used to
determine the length of time required to complete a
project.
CPM also can be used to determine how long each activity
in the project can be delayed without delaying the
completion of the project.
CPM was developed in the late 1950s by researchers at
DuPont and Sperry Rand.
CPM and PERT
If the duration of the activities is not known with certainty,
the Program Evaluation and Review Technique (PERT)
can be used to estimate the probability that the project will
be completed by a given deadline.
PERT was developed in the late 1950s by consultants
working on the development of the Polaris missile.
CPM and PERT were given a major share of the credit for the
fact that the Polaris missile was operational two years
ahead of schedule.
CPM and PERT applications
CPM and PERT have been successfully used in many
applications, including:
Scheduling construction projects such as office buildings,
highways, and swimming pools.
Installing a new computer system
Designing and marketing a new product
Building a ship
CPM rules
project network or project diagram) can be constructed
by using the following rules:
Node 1 represents the start of the project. An arc should
lead from node 1 to represent each activity that has no
predecessors.
A node (called the finish node) representing the
completion of the project should be included in the network.
CPM rules
Number the nodes in the network so that the node
representing the completion of an activity always has a
larger number than the node representing the beginning of
an activity.
An activity should not be represented by more than one arc
in the network.
Two nodes can be connected by at most one arc.
Finding a critical path of a project
Widgetco is about to introduce a new product (product
3). One unit of product 3 is produced by assembling 1
unit of product 1 and 1 unit of product 2. Before
production begins on either product 1 or 2, raw
materials must be purchased and workers must be
trained. Before products 1 and 2 can be assembled
into product 3, the finished product 2 must be
inspected. A list of activities and their predecessors
and of the duration of each activity is given in Table
12. Draw a project diagram for this project.
Finding a critical path of a project
Finding a critical path of a project
Finding a critical path of a project
Computation of Early Event Time:
The early event time for node i, represented by ET(i), is the earliest time at which
the event corresponding to node i can occur.
Finding a critical path of a project
Computation of Late Event Time:
Finding a critical path of a project
Free Float:
Finding a critical path of a project
Critical Path:

Critical Path: 123456


Finding a critical path of a project
Free float: