Table of Content
Introduction
Qualities of Good Formwork
Uses of Formwork
Major Considerations in Formwork
Stages of Formwork
Types of Formwork
Removal of Formwork and Its time period
Advantages of Steel Formwork
Loads on Formwork
Formwork design
2
Introduction
Its is an artificial support provided below and around the precast
or cast in situ concrete work.
Steel
Wood
It should be strong
minimum .
6
Three Different Stages of Formwork
b) Concrete placement
7
Types of Formwork:
Temporary Structure
Permanent Structure
8
Formwork detail for different structural
members
In concrete construction formwork is commonly
provided for the following structural members.
o Wall
o Column
o Stairs
9
Formwork for Wall
It consists of
Timber sheeting
Vertical posts
Horizontal
members
Rackers
Wedges
Stakes
After completing one
side of formwork
reinforcement is
provided at the place
then the second side
formwork is provided. 10
Wall forms:
Wall forms principally resist the lateral pressure
generated by fresh concrete as a liquid or semi
liquid material.
12
Formwork for Column
It consists of the
following
Side & End Planks
Yoke
Nut & Bolts
Two end & two
side planks are
joined by the
yokes and bolts.
13
Column forms:
Round steel forms are generally used for larger columns and
bridge piers and come in diameters about 0.36m to 3mts..
14
15
Formwork for Slabs & beams:
It consists of
Sole plates
Wedges
Props
Head tree
Planks
Batten
Ledgers
Beam formwork rests
on head tree
Slab form work rests
on battens and joists
If prop height are
more than 8 provide
horizontal braces.
16
FORMWORK FOR SLAB:
17
FORMWORK FOR STAIRS:
It consists of
Vertical &
inclined posts
Inclined members
Wooden Planks or
sheeting
Stringer
Riser Planks
18
FORMWORK FOR STAIRS:
19
Loads on Formwork
20
Formwork Design
21
Advantages of steel form work:
22
Removal of formwork:
Time of formwork removal depends on the following factors
1. Type of Cement
1. Rapid hardening cements require lesser time as compared to OPC
(Ordinary Portland Cement)
3. Weather condition
1. Hydration process accelerates in hot weather conditions as compared to
cold and humid weather conditions.
23
Time of Removal of formwork:
Sr. OPC Rapid
No Structural Member (Ordinary Portland Hardening
Cement) Cement
24
THANK YOU