REB500 Presentation content

Introduction
Central Unit Architecture & Hardware
Arrangements
Protection functions
Users interface
Event & disturbance recording
Communications interfaces
References
Bay Unit Bay Unit
ABB Switzerland Ltd. - 2
2007-05-01 / Ch. Pinzon

ABB
A Substation ...

is the energy node in a


power supply grid
is the base for a
successful industry
is the basis for a
successful growth of a
country
is the center for power
transmission and
distribution
provides / distributes the
energy makes energy to the end -
customer
ABB Switzerland Ltd. - 3
2007-05-01 / Ch. Pinzon

empowerment
of a country
ABB
To run a substation bears some risk for...

Industry
sensitive processes require uninterrupted power

Utilities
have to guarantee the delivery of power all the time
have contracts with the industry

Blackout are costs for


ABB Switzerland Ltd. - 4
2007-05-01 / Ch. Pinzon

the industry and the utility


ABB
Value of Energy Transfer
Example:

Soazza 380kV is the


link Switzerland - Italy
1200 MVA
Value of energy
transfer: 900 kCHF/day
(up to 2 Mio)
Loss of profit for EGL if
this link is out of
service: 250 kCHF/day
ABB Switzerland Ltd. - 5
2007-05-01 / Ch. Pinzon

ABB
A fault in a substation might cause ...

cascading trips
can be avoided by selective Tripping of a busbar
keep the power loss time short
selective fault isolation prevent extensive outages

heavy damage (burn down) to the busbar


long re-built time

damage to connected primary and secondary equipment


ABB Switzerland Ltd. - 6
2007-05-01 / Ch. Pinzon

ABB
Minimising impacts of black-outs
Example : Black-out in Brazil on March 11, 1999
no busbar- / breaker failure protection installed

CO
VE
The resulting disruptions and losses caused by a busbar fault
EC
no selective tripping
NE
PE NBR Result: cascading trip
BO
SE
PY
CH

S
UR
Tripped main transmission lines 4 x 400 kV
AR
Disruption duration 4h, 20 min.
Energy not served 24500 MWh
Inhabitants left in the dark 100 Mio
Overall loss 10 Mio $

Assumption:
ABB Switzerland Ltd. - 7

Selective tripping would have ensured that half of the power could still be
2007-05-01 / Ch. Pinzon

delivered.
Result:
5 Mio $ Revenue saved in only one day
with a Busbar Protection System ABB
Numerical busbar protection...

cannot avoid faults, but it limits the damage

is the insurance of a substation

protects the important nodes in a network and its selectivity


increases the network stability

is the investment in a substation to secure revenues

provides monitoring functions of the substation from remote


ABB Switzerland Ltd. - 8
2007-05-01 / Ch. Pinzon

ABB
Typical substation layouts
Double busbar
Single busbar T1 Q0

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1

Q0 Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1
Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1

1 breaker system

Triple busbar Q1
Q2
Q3

Q01 Q01 Q01 Q01 Q01


T01 T01 T01 T01 T01 Q1 Q2 Q3 Q1 Q2 Q3 Q1 Q2 Q3 Q1 Q2 Q3 Q1 Q2 Q3 Q1 Q2 Q3
ABB Switzerland Ltd. - 9

Q03 Q03 Q03 Q03 Q03


Q0 Q0 Q0 Q0 Q0
2007-05-01 / Ch. Pinzon

T03 T03 T03 T03 T03


T1 T1 T1 T1 T1

T02 T02 T02 T02 T02

ABB
Q02 Q02 Q02 Q02 Q02
Possible faults in a feeder
Feeder
double busbar 1 Busbar fault Protection Solutions
Busbar protection
2 Fault between breaker and current transformer
Endfault protection
Q1 Q2
3 Line fault / Transformer fault
4 Line protection / Transformer protection
5 Q0
4 Breaker fails to open after trip command
6 Breaker failure protection
T1 T5
5 Breaker opens / closes not 3 pole
Pole discrepancy protection
3
ABB Switzerland Ltd. - 10

6 GIS - breaker cannot open due low gas pressure


2007-05-01 / Ch. Pinzon

Trip re - direction

ABB
Conventional arrangement of protection devices

High cost by
expensive engineering
expensive commissioning
expensive maintenance
space requirement (main-
and backup protection
requires several cabinets )
long copper cabling for the
process to protection devices
cabinets for interposing CTs
ABB Switzerland Ltd. - 11
2007-05-01 / Ch. Pinzon

ABB
Central arrangement of protection devices

Reduction of cost by
less engineering
simpler commissioning
simpler maintenance
less space requirement
simple retrofit (existing
cables can be used)
simple function adaptation
via SW
ABB Switzerland Ltd. - 12
2007-05-01 / Ch. Pinzon

ABB
De - central arrangement of protection devices

Reduction of cost by
less engineering
simpler commissioning
simpler maintenance
low space requirement
simple function adaptation
via SW
ABB Switzerland Ltd. - 13
2007-05-01 / Ch. Pinzon

ABB
Advanced numerical decentralized arrangement

Reduction of cost by
less engineering
simpler commissioning
simpler maintenance
low space requirement
less copper cabling,
since devices are
located near the
process
simple function
adaptation via SW
ABB Switzerland Ltd. - 14
2007-05-01 / Ch. Pinzon

Up to 60 long wires are substituted


by one fibre optical cable per bay only for BBP & BFP
ABB
History of protection relays
Electromechanical Relays 1903
Static Relays 1960
INX2 BBP 1966
Micro Processor Relays & INX5 BBP 1981
Numerical Generator Protection 1987
Numerical Control Devices 1991
From 1903
to 2002

Numerical HV Automation System 1991


Numerical Busbar & Breaker Failure Protection 1994
Fully Graphical HMI 1997
Automation System with Sensors & Actors 1998
Station Protection
Advanced Integrated Protection Functions 2001
ABB Switzerland Ltd. - 15
2007-05-01 / Ch. Pinzon

ABB has 100 Years Experience


in establishment of new protection devices
ABB
REB500, the numerical decentral busbar protection

Based on long experience in busbar and breaker failure


protection, ABB developed the first numerical and de-central
busbar protection. In 1995 the first REB500 was successful
commissioned.

V7.40

07-04-20
Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1
ABB Switzerland Ltd. - 16

Q0 Q0 Q0 Q0 Q0 Q0
2007-05-01 / Ch. Pinzon

T1 T1 T1 T1 T1

ABB
Definition: numerical busbar protection
100% integrated functionality
100% settings / adjustments via SW
No external auxiliary relays to build logic's
No interposing current transformers necessary (ratio - adjustment via SW)
Decision based on numerical data
Input via A/D - converter & filter => SW - calculations
Two independent protection algorithm based on two different principles
Numerical signal processing
Optical fibres replace mostly copper cable => de-central arrangements
Additional functionality without any further hardware
Changes do not requires any external wiring changes => signal
arrangements via SW
ABB Switzerland Ltd. - 17
2007-05-01 / Ch. Pinzon

Graphical user Interface in users software


Flexible adaptation of substation layout (special feeder / couplers)
Integration into substation control and monitoring systems
ABB
REB500 main characteristics

De-central installation and functionality in the bay - units


Two independent algorithms based on different principles
Low CT requirements
Selective operation despite CT - saturation
High reliability via continuous self - supervision
Single point of access for:
substation system configuration
event & disturbance recording
ABB Switzerland Ltd. - 18

system monitoring
2007-05-01 / Ch. Pinzon

Interface to substation automation and monitoring system


ABB
Bay protection solution REB500
Why numerical de-centralised
Busbar Protection REB500 ?
Fast clearance of busbar faults
Reliable fault isolation
Avoid heavy damages of primary and
secondary equipment
Prevent cascading trips & keep power
losses small
Maintain maximum power availability
Multiple and reliable measurement criteria
to achieve maximum security
Continuous self supervision enhances
reliability and availability
Modular design reduces spares stocking
levels
Functionality is mainly defined by software
Integrated disturbance recording for optimal
ABB Switzerland Ltd. - 19

fault evaluation
2007-05-01 / Ch. Pinzon

Integrated event recording for optimal fault


evaluation

ABB
REB500 Presentation content

Introduction
Central Unit Architecture & Hardware
Arrangements
Protection functions
Users interface
Event & disturbance recording
Communications interfaces
References
Bay Unit Bay Unit 1 1/2 breaker solutions
ABB Switzerland Ltd. - 20
2007-05-01 / Ch. Pinzon

ABB
De-central Protection concept with distributed
REB500 Functionality & HW functionality and intelligence in the bay units

1
2
Bay Protection - Functions
Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1

BFP EFP OC PD U< DR ER HMI


Q0 Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1

phasor &
Fourier Filter

1
2

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2

Q0 Q0 Q0
T1

Q0 Q0 Q0 Q0 Q0
Central Unit Protection - Functions
T1 T1 T1 T1 T1 T1 T1

COM (Remote) Test


BBP I0 ER
SA HMI generator

Installations: Applications:
1 4 busbars incl. transfer bus solidly grounded networks
1 breaker configuration isolated networks
60 bay units BU03 - 32 protections zones resistive grounded networks
ABB Switzerland Ltd. - 21

Compensated networks
Hardware Options:
2007-05-01 / Ch. Pinzon

bay unit and central unit with optional redundant power supply Fast selective protection of busbars
central unit with optional 2nd I/O board in HV, MV and EHV substations
Abbreviations:
BBP = busbar protection Protection of outdoor, indoor and GIS switchgear

ABB
PD = pole discrepancy protection
BFP = breaker failure protection I0 = neutral current detection
DR = disturbance recorder Com = communication
ER= event recording HMI = human machine interface
EFP = end fault protection
OC = over current protection
REB500 Hardware central unit 03
19 Rack
12 Binary inputs (+12 as option)
9 Binary outputs (+9 as option)
Redundant power supply module
Binary inputs Binary outputs
as option
U

Starcoupler modules
OC
1
1
OC01 2

2
OC02 CR01 3

3 CR02 4
CPU boards
OC03
CR03 5
4
5
OC04 Front HMI with programmable
LEDs
6
6
CR04
7 7
OC05
8

9
OC06
CR05
8
9
Connection facilities for:
OC07
10
10
11
OC08 11
PC (serial or TCP/IP)
12
CR06 12
ABB Switzerland Ltd. - 22

13
13 Remote communication
OC09
2007-05-01 / Ch. Pinzon

14

Substation automation and


14
OC10 15

15
CR07
16
OC11
CR08
16

17
monitoring system as option
OC12

ABB
17
18 CR09 18

500BIO01
REB500 Hardware central unit 03
Starcoupler

Serial Port
GPS
modem

TCP/IP Port

Redundant
Power supply Power supply
ABB Switzerland Ltd. - 23
2007-05-01 / Ch. Pinzon

Communication
Master CPU board

ABB
interface
12 Binary in
Slave CPU board
9 Binary out
REB500 Hardware Bay Unit BU03
Current
Optical Connection
Inputs to Central Unit 1/3 19 Rack I 1
Transformers
1

5
1 2 I1
A OC01
0
2 3
OC02
3 1
Voltage
4 U 5
Transformers 5 I2
5 1
0
OC03 6
6 U1 1
OC04 0 7
7 2
Local HMI Interface 8
5
I3
8 4 0
9
9
OC05 U2
10 Outputs 0 10
1

OC06 5
11 11 5
I0
12 7 0
12
13
OC07
Inputs U3
1
1 C 0

14 B OC10 CR01 2
8
OC08
15 2
OC11 3 10
16 3 4
17 4
OC12 Outputs 0
U4
OC09 CR02 5 11
18 5
6 Power Supply
13
6 +
OC13 1 7 P 1
D -
7 2 CR03 8 U5 2
OC14 0

CR08 14
8 3 9
OC15
9 CR09 10
4 Redundant Power
10 CR04 Supply (option)
CR10 11
11
5
CR05 +
4 CTs 1 or 5 A
OC16 6 12 R 1
12 13 2
- Ratio adjustable
OC17 7
13 CR11 8
CR06
14 via SW
ABB Switzerland Ltd. - 24

OC18
14 CR12 9
CR07 15 &
5 VTs
2007-05-01 / Ch. Pinzon

15
16
CR13 10 Power supply
OC19
11 Ratio adjustable
17
18
OC20 12 via SW
CR14 13
&
CR15

ABB
14
CR16 15
Red. Power Supply
20 Binary Inputs
48 250 VDC 16 Binary Outputs
Adjustable via SW
REB500sys Local HMI03 with 20 programmable LEDs
At the central unit and bay unit,
the local HMI allows a quick reading of

Alarms
CU03 Events
BU03
LHMI03 Settings / Adjustments
Measurements

V7.40 in reduced format also without PC


07-04-20
ABB Switzerland Ltd. - 25
2007-05-01 / Ch. Pinzon

ABB
REB500 bay unit 03

arrangements of bay unit BU03


ABB Switzerland Ltd. - 26
2007-05-01 / Ch. Pinzon

ABB
REB500 Presentation content

Introduction
Central Unit Architecture & Hardware
Arrangements
Protection functions
Users interface
Event & disturbance recording
Communications interfaces
References
Bay Unit Bay Unit 1 1/2 breaker solutions
ABB Switzerland Ltd. - 27
2007-05-01 / Ch. Pinzon

ABB
REB500 De-central / central arrangement

Central unit

Bay unit
ABB Switzerland Ltd. - 28
2007-05-01 / Ch. Pinzon

Central Version De-central Version


ABB
Images
Currents

Numerical centralized solution with REB500 Interconnections


Trip channel
Fiber Optical cable

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2

T1 T2 GIS
Q0
Q0 Q0 Q0 Q0
or
T1 T1 T1 T1
AIS
T2 T5 T2 T2 T5 T2

Marshalling
cabinets

Line Transformer Busbar Line Transformer


Protection Protection Protection Protection Protection

M1 M1 M1 M1

M2 M2 BBP M2 M2
ABB Switzerland Ltd. - 29

BFP
2007-05-01 / Ch. Pinzon

Aux Aux Aux Aux

Trip Trip Trip Trip Trip

ABB
TCS TCS TCS TCS TCS
Images
Currents

Numerical de-centralized solution with REB500 Interconnections


Trip channel
Fiber Optical cable

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2

T1 T2 GIS
Q0
Q0 Q0 Q0 Q0
or
T1 T1 T1 T1
AIS
T2 T5 T2 T2 T5 T2

Marshalling
cabinets

Line Transformer Busbar Line Transformer


Protection Protection Protection Protection Protection

M1 M1 M1 M1

M2 M2 BBP M2 M2
ABB Switzerland Ltd. - 30

BFP
2007-05-01 / Ch. Pinzon

Aux Aux Aux Aux

Trip Trip Trip Trip Trip

ABB
TCS TCS TCS TCS TCS
Images
Currents

Numerical de-centralized solution with REB500 Interconnections


Trip channel
Fiber Optical cable

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2

T1 T2 GIS
Q0
Q0 Q0 Q0 Q0
or
T1 T1 T1 T1
AIS
T2 T5 T2 T2 T5 T2

Line Transformer Busbar Line Transformer


Protection Protection Protection Protection Protection

M1 M1 M1 M1

M2 M2 M2 M2

BBP
BFP
Aux Aux Aux Aux

Trip Trip Trip Trip Trip


TCS TCS TCS TCS TCS
ABB Switzerland Ltd. - 31
2007-05-01 / Ch. Pinzon

ABB
REB500 fibre optical cable

Up to 1200 Meter
<= 5dB

Rx TX

TX Rx

Central unit Bay unit


FST Connector
ABB Switzerland Ltd. - 32

2 core optical fibre


2007-05-01 / Ch. Pinzon

per bay unit

ABB
Process connection to / from REB500

Feeder
double busbar

Q1 Q2

Q0
ABB Switzerland Ltd. - 34
2007-05-01 / Ch. Pinzon

T1 T5 VT Trip Signalization
CT Image of Aux.
terminals terminals terminals terminals Isolators, terminals
for start breaker
REB500sys failure

ABB
and/or DR
New possibilities with numerical decentral busbar protection

Standard
Option
REB500 Main functionality
Busbar protection (87B) X Functionality as in
Isolator supervision X conventional
Differential current supervision X busbar protection
Comprehensive self-supervision X
Software Matrix for Inputs / Outputs / Trip matrix X
Time synchronization X
Event recording up to 1000 events X
Additional Functionality
Disturbance recorder (4 x I, 5x U ) 1.5 sec; (U if VT avail.) X
Dynamic Busbar replica with display of currents X
as Standard in REB500
Testgenerator X
Remote-HMI X
Trip command re-direction X
Measurement of neutral current / neutral current detection I0 (87B) X
Breaker failure protection (51BF) X
End-fault protection (51) X
Breaker pole discrepancy (51) X
ABB Switzerland Ltd. - 36

Overcurrent check feature (51) X Possible further functionality


2007-05-01 / Ch. Pinzon

Voltage check feature (27/59) X to benefit from


Overcurrent protection (def. time) (51) X the numerical technologies
Disturbance recorder (4 x I, 5 x U) up to 10 sec. at 2400 Hz X
Communication interface IEC61850-8-1 / LON / IEC60870-5-103
2nd Binary input output card for central unit
Redundant power supply for central- and/or bay units
X
X
X
ABB
REB500 / REB500sys functionality
REB500sys functionality = REB500 +
Distance protection (21)
Autoreclosure (79) Central Unit
Synchrocheck (25)
Direct. sensitive EF prot. for
grounded systems (67N)
Direct. sensitive EF prot. for ungrounded or
compensated systems (32N)
Transformer differential protection
2-/3 w & Auto Transformer (87T)
Thermal overload (49)
Peak value over and
undercurrent protection (50)
Definite / Inverse time over
and undercurrent protection (51)
Definite time over
and undervoltage protection (59/27)
Inverse time earth fault Bay Unit Bay Unit
overcurrent protection (51N)
Directional overcurrent definite / inverse
ABB Switzerland Ltd. - 37

time protection (67)


2007-05-01 / Ch. Pinzon

Three phase current / voltage


plausibility (46 / 47)
Power (32)

ABB
Overfluxing definite / inverse time (24)
Frequency (81)
Rate-of-change of frequency df/dt (81)
Test Sequenzer
REB500 Busbar protection - algorithms
Current data and pre-processing in the bay unit

DSP
A/I Max DIG
S/H MUX A/D

I2 Signal-
prolongation
at
Fourier filtering: CT saturation
Only 50, resp. 60Hz
component will be
ABB Switzerland Ltd. - 38

evaluated, no DC, no 0 t
2007-05-01 / Ch. Pinzon

Harmonics are taken for


the protection algorithm

Continuously measurement => no measurement blocking during ext. fault ABB


REB500 Busbar protection - algorithms
1) Stabilized differential current (percentage differential current)
k=1

Tripping characteristic of Criteria


stabilized
Differential differential current Algorithm IDiff
current al k set k= > kset
e rn
t
In ault
f
IRest
N
IDiff = I Ln
IDiff > IK min
n=1

Restraint Ikmin = threshold for the


(through fault)
differential current
IKmin
ABB Switzerland Ltd. - 39
2007-05-01 / Ch. Pinzon

0 k = stabilizing factor
N
0 Restrained current
IHalt = I Ln
n=1
ABB
REB500 Busbar protection - algorithms
2) Current direction comparison (phase comparison)
case 1: external fault =139
Im
12 =139
I1 I2 I2
2

1 I1 Re
Phase difference

Im

180 Re
External I1
fault
I2 12 =40
ABB Switzerland Ltd. - 40

74 min = 74
2007-05-01 / Ch. Pinzon

Internal case 2: internal fault =40


0
fault
Case 1 2
ABB
REB500 Busbar protection - algorithms
k=1
Two independent protection
k set
algorithms based on
Differential

p
Tri
Current

different principles
IKmin
Restrained
(through fault) 1) Stabilized differential Current
0 (percentage differential current)
0 Restrained Current

IL1 &
& Phase segregated incl. I0
& Decision:
Phase difference

IL2 &
IL3 selective per protection
zone Trip Busbar

180
External

fault
ABB Switzerland Ltd. - 41

min = 74 2) Current direction comparison


2007-05-01 / Ch. Pinzon

74
I1 2 I2 (phase comparison)
Internal
0
case 1 2 fault
1
ABB
ABB Switzerland Ltd. - 42
2007-05-01 / Ch. Pinzon

REB500 Busbar protection - settings

ABB
Checkzone was required in
High Impedance BBP, where CTs
No Check zone in REB500 required were switched via aux. contacts

I diff
T1 Q0 T1
Check zone

Q0 Q0 Q0 Q0 Q0 Q0 Check zone is not


T1 T1 T1 T1 T1 T1 Zone oriented = 1.5 Criteria only
T2 T2 T2 T2 T2 T2
Check zone requires 2 separate CTs
and a 2nd protection device
I diff

I diff

Q0
I direction
T1 T1

k - factor

3 Criteria per zone


ABB Switzerland Ltd. - 43

1 CTs
2007-05-01 / Ch. Pinzon

Q0 Q0 Q0 Q0 Q0 Q0 Maximum security
T1 T1 T1 T1 T1 T1

ABB
but available in REB500
REB500 Neutral current measurement (protection)

BBP NEUTRAL measurement BBP PHASE measurement

independent settings
ABB Switzerland Ltd. - 49
2007-05-01 / Ch. Pinzon

ABB
REB500 Breaker failure protection - function
120 ms Trip Busbar 1
X Busbar 1 Timer t1 via inter - tripping
L1 I>
CB A >I
t 100 ms after line protection trip
& TRIP BFP L1

Circuit breaker CB A
L2
>I
t
& TRIP BFP L2

L3
>I
t
& TRIP BFP L3

Starting (tripping-) contacts 120 ms


1 Timer t2
+
L1 120 ms after BFP t1 LP - Trip
t TRIP
+
L2 BFP t2

+
L3 TRIP
BFP t1

t
Line protection trip Remote Trip
ABB Switzerland Ltd. - 50
2007-05-01 / Ch. Pinzon

BFP=> t1 bay local, t2 uses topology for intertripping ABB


ABB Switzerland Ltd. - 51
2007-05-01 / Ch. Pinzon

REB500 Breaker failure protection - Setting

ABB
REB500 Breaker failure protection - Benefits
Benefits of integrated breaker failure protection:
Feeder
double busbar 50% less external wiring
DC supply
CT connections
Isolator images
Tripping circuits
Q1 Q2 Internal start BFP
No external logics to be build up
Less space requirements
Q0 Common use image of isolators (topology via Central
Unit; selectivity warranted)
T1 T5 Integrated intertripping scheme, which is supervised
Common trip channels
Less Engineering
Simpler Commissioning & Maintenance (common for
ABB Switzerland Ltd. - 52
2007-05-01 / Ch. Pinzon

BBP & BFP)


Protection concept is easier and more secure
Simple setting adaptation via SW within on common
tool for BBP & BFP
ABB
REB500 End fault protection - function
Feeder Feeder
CT inside CT outside
1 1
2 2

Q1 Q2 Q1 Q2

T1 36 ms
Q0 open t
t
Q0 &

Q0 T1 L1
>I

L2
>I 1

L3
ABB Switzerland Ltd. - 53

>I
2007-05-01 / Ch. Pinzon

Inter tripping
(here busbar 2) TRIP
Remote trip after
t + 36 ms

ABB
REB500 End fault protection - settings

function is activated by
CB open + Pick - up time
tripping time =
Pick - up time +36 ms
ABB Switzerland Ltd. - 54
2007-05-01 / Ch. Pinzon

ABB
REB500 Overcurrent protection - function & setting

Feeder

1
2

Q1 Q2

Q0 I>
L1
T1 >I

L2 t
>I 1 Trip CB
ABB Switzerland Ltd. - 55
2007-05-01 / Ch. Pinzon

L3
>I
Definite time

Only local tripping => no busbar inter tripping


ABB
REB500 Voltage - Check & overcurrent release Function
Feeder Feeder

Undervoltage-
relay
Central unit
Q1 Q2 or external release Q1 Q2

<U

Q0 Bay unit Bay unit Q0


T1 T1

T5 Tripping command from CU


ABB Switzerland Ltd. - 57

>I TRIP CB
2007-05-01 / Ch. Pinzon

Voltage release
BU &
from CU

ABB
<U
BU
REB500 Voltage - Check setting

Over or under -
Voltage Release
ABB Switzerland Ltd. - 58
2007-05-01 / Ch. Pinzon

ABB
REB500 overcurrent release & trip matrix - setting
Overcurrent - Release

Trip - Matrix
ABB Switzerland Ltd. - 59
2007-05-01 / Ch. Pinzon

ABB
REB500 Trip command re-direction (without BFP)
Underpressure situation in the CB (SF6 gas pressure is to low): CB OPEN coil is blocked
=> it sends a signal Low gas pressure
=> direct inter tripping of the allocated busbar and remote trip in fault situation

trip redirection
X

L1
>I
&
OC release

L2
>I >= 1

L3
>I
TRIP BB (BFP t2) &
&
Remote Trip

LP Tripping- contact

+ External Trip
>= 1
ABB Switzerland Ltd. - 60

any REB500
2007-05-01 / Ch. Pinzon

internal trip

ABB
REB500 Trip command re-direction ( in combination with BFP )
Underpressure situation in the CB (SF6 gas pressure is to low): CB OPEN coil is blocked
=> it sends a signal Low gas pressure
=> direct inter tripping of the allocated busbar and remote trip in fault situation

Timer 1 & 2
trip redirection =>
10 ms
X

L1
>I
t
& TRIP BFP L1
10 ms

L2
>I
t
& TRIP BFP L2
10 ms

L3
>I
t
& TRIP BFP L3
10 ms
Starting (tripping-) contacts
1 Timer t2
+
L1
ABB Switzerland Ltd. - 61
2007-05-01 / Ch. Pinzon

t
+ TRIP BB (BFP t2)
L2
10 ms
Remote Trip
+

ABB
L3
TRIP BFP t1
REB500 Blocking - Isolator Alarm
Isolator supervision
+
Optocoupler input
Q1 off
A1

OC01
Q1
Feeder
Q1 on
A2

- OC02
1 L1 L2 L3 A3

A4

2 Isolator aux. contacts

Inconsistent image of isolator causes:


Q1 Q2
Isolator alarm and a switch inhibit

Q0 The following blocking options can be chosen:


T1
Remain in operation
ABB Switzerland Ltd. - 62
2007-05-01 / Ch. Pinzon

Selective block of tripping


System wide block of tripping
ABB
ABB Switzerland Ltd. - 63
2007-05-01 / Ch. Pinzon

REB500 Blocking - ABB Isolator Alarm schemes

ABB
REB500 Blocking - Differential Current Alarm
Differential current supervision
G
N CT Module
1
D I 1
5
2 IL1
Feeder 0
3
1
4
5
1 5 IL2
6 0

2 7 1
5
8 IL3
9 0

1
10
Q1 Q2 11 5 IL0
L1 L2 L3 12 0

e.g. interruption of CT - cable causes

Q0
Differential Current Alarm

T1
ABB Switzerland Ltd. - 64

The following blocking options can be chosen:


2007-05-01 / Ch. Pinzon

Remain in operation
Selective block of tripping
System wide block of tripping ABB
ABB Switzerland Ltd. - 65
2007-05-01 / Ch. Pinzon

REB500 Blocking - settings

ABB
REB500 Fault on a busbar
Double busbar

1
2

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1

Q0 Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1
ABB Switzerland Ltd. - 66
2007-05-01 / Ch. Pinzon

1
2

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1

Q0 Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1

ABB
REB500 Current Plausibility Check
Double busbar
1
2

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1

Q0 Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1

1
2

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1

Q0 Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1
ABB Switzerland Ltd. - 67

In case of an disturbance the system could interprets a virtual current peak


2007-05-01 / Ch. Pinzon

This virtual current could result in a differential current and initiate a BBP trip

ABB
REB500 will block under this condition due to Current Plausibility Check
REB500 Inter tripping - Selective tripping
Double busbar

1
2

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1

Q0 Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1
ABB Switzerland Ltd. - 68
2007-05-01 / Ch. Pinzon

1
2

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1

Q0 Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1

ABB
REB500 Presentation content

Introduction
Central Unit Architecture & Hardware
Arrangements
Protection functions
Users interface
Event & disturbance recording
Communications interfaces
References
Bay Unit Bay Unit 1 1/2 breaker solutions
ABB Switzerland Ltd. - 70
2007-05-01 / Ch. Pinzon

ABB
HMI500 SW Configuration Tool & Users Interface
Operates under MS-Windows (98, NT4.0, 2000, XP)
32 bit technology
Program handling as in common windows
applications
Parameterization off-line (in the office)
Cyclic updates of events & disturbance record files
Cyclic up-load of display of measurement values
Online Test - Generator for commissioning /
maintenance
Functionality is visualized (Dynamic busbar replica,
trip characteristic, parameterization,In- / Output
configuration, ...)
Up-load and download of parameter on REB500
Simulation - Mode for training
Supporting different languages
ABB Switzerland Ltd. - 71
2007-05-01 / Ch. Pinzon

Overall substation documentation in report (setting,


system-response, )
One connection point to configure and monitor the
whole substation
ABB
REB500 selector => from V3.20 onwards

Start
selected
Offline Starting setfile
Check
status
Online

HMI500 Start
ABB Switzerland Ltd. - 72
2007-05-01 / Ch. Pinzon

Start Tool

ABB
with respective
Setfile
HMI500 Users HMI

Single Line Diagram


ABB Switzerland Ltd. - 73

Binary Outputs configuration


2007-05-01 / Ch. Pinzon

Binary Inputs configuration

ABB
REB500 Logic & Delay / integrator as Standard in BU03 V7.00
Delay
For delaying pick-up or reset or for
integrating 1 binary signal
Provision for inverting the input

Logic for 4 binary inputs


OR gate
AND gate
ABB Switzerland Ltd. - 74

Bistable flip-flop with 2 set and 2 reset


2007-05-01 / Ch. Pinzon

inputs (both OR gates), resetting takes


priority

ABB
ABB Switzerland Ltd. - 75
2007-05-01 / Ch. Pinzon

Selectable color of switch objects

ABB
HMI500 Signal engineering & adjustments
Signal Filter per function

Signal Engineering inputs


CT Ratios

Signal Engineering outputs


ABB Switzerland Ltd. - 76
2007-05-01 / Ch. Pinzon

ABB
HMI500 extension

Active (existing)
Pre-engineered (future)
Feeder / Coupler
Feeder
ABB Switzerland Ltd. - 77
2007-05-01 / Ch. Pinzon

Simply activate / de - activate of a bay within HMI500

ABB
users interface
HMI500 Online Help function

F1
Online help function
provides required
information during
usage of HMI500
program
ABB Switzerland Ltd. - 78
2007-05-01 / Ch. Pinzon

ABB
HMI500 database / setfile compare function

Details of changes will


be displayed
Comparison
possibilities of setfile:
PC - PC
PC - Central Unit
(online)
PC - Bay Unit (online)
ABB Switzerland Ltd. - 79
2007-05-01 / Ch. Pinzon

ABB
REB500 Flexibility

Q1 Sectionalizer can be allocated to


Q2 a bay unit
Q3
=> less Hardware
Q1 Q2 Q3

Q0
T1
ABB Switzerland Ltd. - 80
2007-05-01 / Ch. Pinzon

ABB
REB500 HMI500 / Documentation

REB500 Documentation
of substation data /
settings & I/O
configuration
as Print
as print pre-view
generate PDF
generate HTML
ABB Switzerland Ltd. - 81
2007-05-01 / Ch. Pinzon

ABB
REB500 Presentation content

Introduction
Central Unit Architecture & Hardware
Arrangements
Protection functions
Users interface
Event & disturbance recording
Communications interfaces
References
Bay Unit Bay Unit 1 1/2 breaker solutions
ABB Switzerland Ltd. - 82
2007-05-01 / Ch. Pinzon

ABB
REB500 Event recording
Event memory
Central unit
Central unit: 1000

Event memory
Bay unit: 100

Bay unit Bay unit

The event list in HMI500 offers


filtering
Recording of: data export (ASCII)
switching operations cyclic updates
ABB Switzerland Ltd. - 83

protection events printing


2007-05-01 / Ch. Pinzon

REB500 system events


test events Local connection at

Resolution 1 ms
central unit or bay unit
ABB
REB500 Disturbance recorder DR
SA Systems like SAS5xx or SMS530

Local connection at
central unit or bay unit

0,5 s 0,5 s 0,5 s


Pr- Pos

Internal trigger from BBP or


external trigger from
e.g. line protection Split 1.5 sec into 3 records

Sampling rate 2400Hz (50Hz) 1200Hz (50Hz) 600Hz (50Hz) Remark:


(Power system 2880Hz (60Hz) 1400Hz (60Hz) 720Hz (60Hz) 5 U only if VTs
ABB Switzerland Ltd. - 84

frequency) available
802 Hz (16,7Hz) 401 Hz (16,7Hz)
2007-05-01 / Ch. Pinzon

The disturbance recorder in 1.5 sec 3 sec 6 sec Standard 4I 5U


HMI500 offers Recording time 6 sec 12 sec 24 sec Option 4I 5U
data format COMTRADE 91 or 99

ABB
10 sec 20 sec 40 sec Option 4I 5U

cyclic Up-Load
binary signal - recording
REB500 Disturbance recorder - settings

DR Settings
DR upload
ABB Switzerland Ltd. - 85
2007-05-01 / Ch. Pinzon

DR cyclic upload
ABB
ABB Switzerland Ltd. - 86
2007-05-01 / Ch. Pinzon

HMI500 via TCP/IP (e.g. fast upload of DR)

ABB
REB500 Disturbance recorder DR => PSM integration
Start Wineve out of HMI500 automatically after DR upload
The available disturbance recorders in REB500 allows a simple and
quick fault analysis

One mouse-click
away
ABB Switzerland Ltd. - 87
2007-05-01 / Ch. Pinzon

ABB
REB500 Dynamic busbar replica
Central unit
Q1 Q2 Q1 Q2
T1

Q0 Q0 Q0
T1 T1

Bay unit Bay unit

Small
Substation monitoring system
ABB Switzerland Ltd. - 88

with HMI500
2007-05-01 / Ch. Pinzon

dynamic
busbar replica Local connection at
central unit or bay unit
feeder currents
differential currents / zone
ABB
REB500 with embedded web server
Easy Monitoring on
station computer via
Internet Explorer over
LAN in the substation
Easy: no entering with
password, just IP-
Address
Analogue values
Dynamic busbar replica /
single line diagram
Eventlist: no deletion of
events in the target =>
Event can are still stored
and can be retrieved with
ABB Switzerland Ltd. - 89

HMI500
2007-05-01 / Ch. Pinzon

Cyclic update

Baden V7.30
ABB
REB500 Test generator
The test generator provides plenty of
useful functions
Analogue Input Measurements
Status & and forcing of (I/Os)
Switchgear object (refer also to
dynamic busbar replica)
Blocking / Reset
Analogue Input Measurements
Password protection
ABB Switzerland Ltd. - 90

Blocking Modes & Reset


2007-05-01 / Ch. Pinzon

I/Os forced

ABB
REB500 Revision & Maintenance

Revision (incl. supervision)


via optocoupler input the isolators
/ breaker are forced to open in SW
replica
=> means the bay is taken out off
the measurement
up to 4 revision cases can be
programmed
Maintenance (incl. supervision)
via optocoupler input the isolators
/ breaker are frozen in the last
position in SW replica
=> measurement is taken into
account accordingly
ABB Switzerland Ltd. - 91
2007-05-01 / Ch. Pinzon

ABB
REB500 Presentation content

Introduction
Central Unit Architecture & Hardware
Arrangements
Protection functions
Users interface
Event & disturbance recording
Communications interfaces
References
Bay Unit Bay Unit 1 1/2 breaker solutions
ABB Switzerland Ltd. - 92
2007-05-01 / Ch. Pinzon

ABB
Central unit
REB500 Time synchronization
1- 2 / Accuracy of
time periodic Telegram The time synchronization of REB500 is
10 ms IEC-103 - Bus GPS
1ms IEC61850 & possible via:
LON - Bus
1 - Radio or satellite clock
2 - Interbay bus (IEC61850-8-1 / LON /
IEC60870-5-103)
Starcoupler 3 - Minute or Second pulse (periodic pulse
onto an optocoupler)
4 - PC via HMI500

RS 232

Min/Sec
pulse 3 - Accuracy
10 ms (min)
Central unit
ABB Switzerland Ltd. - 93

+
2007-05-01 / Ch. Pinzon

ABB
4 - Accuracy
approx. 1min / month
REB500 Communication interface
Ethernet - (TCP/IP)
1
2

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1

Q0
HMI500
Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1 via TCP/IP Substation
Automation or
Monitoring Systems
e.g.: SAS5xx or SMS530

1
2

Q1 Q2

Q0
Q1

Q0
Q2 Q1

Q0
Q2
T1

Q0
Q1

Q0
Q2 Q1

Q0
Q2 Q1

Q0
Q2 Q1

Q0
Q2

IEC61850-8-1 HMI500
via LON
T1 T1 T1 T1 T1 T1 T1

IEC 60870-5-103 or LON


Signals for LON Signals for IEC 103
1
2
Event text can be adapted acc. Public part
Q1 Q2 Q1 Q2 Q1 Q2
T1
Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
User specific requirements and language Private part
Further signal can be added any time with HMI500 Generic part
Q0 Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1

Group alarms can be build in SAS / SMS

Remote control via Modem


ABB Switzerland Ltd. - 94

Remote - HMI
2007-05-01 / Ch. Pinzon

1
2

Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2 Q1 Q2
T1

Q0 Q0 Q0 Q0 Q0 Q0 Q0 Q0
T1 T1 T1 T1 T1 T1 T1

Modem Modem
Local front connection at
central unit or bay unit

ABB
REB500 IEC 61850-8-1

Supporting generic IEDs for Standard IEC 61850 Clients


DR Upload
Monitoring
SCD / ICD import

UCA Certificate
ABB Switzerland Ltd. - 95
2007-05-01 / Ch. Pinzon

ABB
REB500 IEC61850-8-1 Ethernet / TCP/IP connection
Substation
Automation or
Monitoring Systems

SCD File
export out of HMI500
for easy import into engineer tools

Commands (e.g. reset)


Trips & Events & Alarms

Time sync. SNTP


and signal mapping

Disturbance records
Diff current
IEC 61850-8-1
electrical
ABB Switzerland Ltd. - 96

or F/O single point


connection
2007-05-01 / Ch. Pinzon

ABB
ABB Switzerland Ltd. - 97
2007-05-01 / Ch. Pinzon

REB500 Communication interface - settings

ABB
REB500 Performance

Start-up time < 5 min

Setfile download time < 8 min (60 BU setfile)

Min. tripping time 20 ms


ABB Switzerland Ltd. - 98
2007-05-01 / Ch. Pinzon

ABB
REB500 Spare parts
Central unit
each of the used plug-in units
1 x 500CPU05 (processor module)
1 x 500PSM03 (power supply module)
1 x 500SCM01 (starcoupler module)
1 x 500BIO01 (input / output module)
1 x 500CIM06 (communication module)
1 x 500OCC02 (front connection cable for PC)

Bay unit BU03


Monolith - solution => 1-2 pieces per substation
ABB Switzerland Ltd. - 99
2007-05-01 / Ch. Pinzon

Automatic up- and downgrade


of bay unit to correct SW-Version
(from V7.01 onwards)
ABB
REB500 Spare part handling & configuration

REBLOAD as a part of HMI500


makes the handling of spare parts
easy
simple configuration via REBLOAD
Central Unit 03
check versions
set IP address in CU03
Plug and play of cards in the CU03

Bay units:
Node- and Device ID - configuration
(addressing) via Front HMI
ABB Switzerland Ltd. - 100
2007-05-01 / Ch. Pinzon

ABB
REB500 Presentation content

Introduction
Central Unit Architecture & Hardware
Arrangements
Protection functions
Users interface
Event & disturbance recording
Communications interfaces
References
Bay Unit Bay Unit 1 1/2 breaker solutions
ABB Switzerland Ltd. - 101
2007-05-01 / Ch. Pinzon

ABB
REB500 Reference of operation experience
Stability
Zell am Ziller 220kV / Austria in Nov. 1995
ext. Fault in Transformer approx. 6kA
Laufenburg / Switzerland in Dez. 95
ext. Fault of 7kA R/S/Ground for 450ms
ABB Switzerland Ltd. - 102
2007-05-01 / Ch. Pinzon

ABB
REB500 Reference of operation experience
Successful selective BBP - trip
Zell am Ziller 380 kV / Austria
Trip in 26ms at 1.8 x In, single pole - ground GIS
Feb. 1997
Zell am Ziller 380 kV / Austria /
Trip Nov 1999
Ayer Rajah 400kV / Singapore
Trip in 29ms at 2 x In / June1998
AL ERAAD 33KV MOBILE / UAE
Trip Dec 2000
RWE / BASF W210 220kV / Germany
Trip Sept. 2001
Bosques 220kV / Argentina
Trip Oct 2001: explosion of a CB breaker
Hamma 220kV / Algeria
Trip Dec. 2001: 8 kA single pole
Wadi Houf 220kV / Egypt
Trip June 2002: 3 kA single pole
ABB Switzerland Ltd. - 103

Wadi Houf 220kV / Egypt


2007-05-01 / Ch. Pinzon

Trip August 2002


UW Rosenau / Schweiz
Trip May 2007

ABB
REB500 Reference of operation experience

Successful selective BBP - trip Successful selective BBP - trip


220kV AIS Lskovec / CZ United 220kV / Saudi Arabia
Trip Dec 03: Phase - ground 22. Nov 2003, 35kA, total clearance
fault, total clearance time: 50 ms time 55ms (measured via external
fault recorder)
Successful selective BBP - trip
Successful selective BBP - trip
Bayer Dormagen 30kV / A789 /
V3.20 Merwededhaven / NL 03/2006
total clearance time: 49 ms
Aug 2005
3 pole fault, total clearance time
60ms
ABB Switzerland Ltd. - 104
2007-05-01 / Ch. Pinzon

ABB
Successful REB500 Trip in AIS Lskovec 220kV in CZ

Phase - ground Fault 2

Phase - ground Fault 1

On 6 December 2003, 10:18h Key data of REB500 / Lskovec 220kV


REB500 has successfully tripped a Customer: EPS,a.s.
single pole fault in the SW Version: V4.33
Configuration: 8 Feeder
Busbar W21 and 2nd fault on W11
ABB Switzerland Ltd. - 105

1 Coupler
The total clearance time was 50ms
2007-05-01 / Ch. Pinzon

Delivered: February 1998


(REB500 Tripping time + Circuit breaker opening time) Commissioned: June 1998

ABB
Successful REB500 Trip in AIS Lskovec 220kV in CZ
On 6 December 2003, 10:18h the REB500
successfully and selectively tripped a phase to
ground fault at Liskovec 220kV substation.
During storm a station grounding wire was
broken and its one end fell down and hit busbar
W21 disconnector. in the measuring VT field and
caused phase L1 to ground fault. The REB 500
detected the busbar fault on W21 and selectively
tripped the entire busbar.
After a while the second part of the broken
grounding wire swung and hit an interconnection
bar between VT and disconnector at busbar
W11. The REB 500 detected and tripped
consecutive L1 to ground fault on W11.
The total clearance time for the first fault was
approx 50 ms (REB500 tripping time + circuit
ABB Switzerland Ltd. - 106

breaker opening time) and 70 ms for the second


2007-05-01 / Ch. Pinzon

fault.

Detail of the

ABB
disconnector after
fault clearance
Successful REB500 Trip in GIS S/S Hamma 220kV in Algeria

8.13 kA Fault

On 9 December 2001, 11:43h Key data of REB500 / Hamma 220kV


REB500 has successfully tripped a 8.13kA Customer: SONELGAZ
single pole fault in the SW Version: V4.20
Configuration: 10 Feeder
Line Feeder KOUBA 2
ABB Switzerland Ltd. - 107

1 Coupler
The total clearance time was 55ms
2007-05-01 / Ch. Pinzon

Delivered: June 2000


(REB500 Tripping time + Circuit breaker opening time) Commissioned: December 2001

ABB
Successful REB500 Trip in GIS S/S Hamma 220kV in Algeria
ABB Switzerland Ltd. - 108
2007-05-01 / Ch. Pinzon

ABB
Selective REB500 Trip in GIS Wadi Houf 220kV in Egypt
3.4 kA Fault

Flash-over at the isolator Q1 (=D02)


with a low short circuit current

Key data of REB500 / Wadi Houf 220kV


On 6 June 2002, 17:01h
Customer: Egyptian electricity
REB500 has successfully tripped a
transmission company
3.4kA phase - ground fault in the SW Version: V5.01
Wadi Houf 220kV GIS Configuration: 7 Feeder / 1 Coupler
ABB Switzerland Ltd. - 109

located in Cairo 4 Sectionalizer


2007-05-01 / Ch. Pinzon

Delivered: October 2001


The total clearance time was 68 ms
Commissioned: May 2002

ABB
(REB500 Tripping time + Circuit breaker opening
time)
Successful REB500 Trip in GIS Wadi Houf 220kV in Egypt
Phase Ground Fault
Fault current: 3.4kA
Peak Current: 5.8kA

REB500 internal
disturbance record
ABB Switzerland Ltd. - 110

evaluated
with E_wineve
2007-05-01 / Ch. Pinzon

ABB
Display of phasors components Wadi Houf 220kV with PSM

Phasor Display with


E_wineve module,
a component of PSM

Locus of fault phasor over time


ABB Switzerland Ltd. - 111
2007-05-01 / Ch. Pinzon

ABB
Display of impedance Wadi Houf 220kV with PSM

Locus of fault impedance over time


ABB Switzerland Ltd. - 112
2007-05-01 / Ch. Pinzon

ABB
Display of Symmetric components Wadi Houf 220kV with PSM

Locus of symmetric components over time


ABB Switzerland Ltd. - 113
2007-05-01 / Ch. Pinzon

ABB
The POWER of REB500

This coupler was


High flexibility protected by
ABB Switzerland Ltd. - 114

for busbar configurations REB500:


2007-05-01 / Ch. Pinzon

Brwalde
Graustein

ABB
The POWER of REB500
66kV substation in
=>1
Singapore

=>1 =>2 26 x feeder


5 coupler

=>3
4 Sectionalizer
=>2
resistive grounded

=>4
=>3 36 x bay units
BBP incl. I0
ABB Switzerland Ltd. - 115
2007-05-01 / Ch. Pinzon

=>4
BFR
31 x CB

ABB
REB500 numerical substation protection summary
Benefits of numerical technique and communication within substation protection

Improved functionality (optional functions On-line alarms and On-line event list
per bay) Ethernet connection (TCP/IP)
Less space required (NO auxiliary relays Connection to SCS/SMS (fault analysis)
for isolator image)
Disturbance record transfer
Easily extendible (activating pre-
engineered feeders) Data archiving (disturbance/events)

Reduced copper wiring (optical fibers), Access to remote disturbance data


savings up to 60% (Remote fault analysis)

Reduced number of HW modules/spare Disturbance analysis


parts Synchronous system events
Parameters easily changed on site via Remote support
user friendly HMI
ABB Switzerland Ltd. - 116

Signal simulation (test generator)


Continuous self-supervision
2007-05-01 / Ch. Pinzon

Safe guarded investment for future


Less costs for maintenance (maintenance extensions & upgraded functionality
on demand)

ABB
In 77 Countries > 1300 REB500 sold
Installed REB500 approx. 1150 installed and in service

(Mar 2007)
ABB Switzerland Ltd. - 117
2007-05-01 / Ch. Pinzon

> 100 REB500 with IEC61850-8-1

ABB
REB500 is more than 26 Mio h in service = more than 3000 years proven experience
REB500 & IEC61850 References
REB500 is the first numerical
decentral busbar protection with
IEC61850-8-1 (since Aug 2005)
Proven interoperability (refer to left)
References:
NEK Bulgaria Dobrudja
BKW Switzerland
Atel Switzerland
Power Grid India
Italy Terna
Saudi Arabia
ABB Switzerland Ltd. - 118
2007-05-01 / Ch. Pinzon

ABB
REB500 IEC61850-8-1
Using for
Disturbance transfer
Monitoring
SCD / ICD Export

UCA Certificate
REB500
REB500sys
ABB Switzerland Ltd. - 119
2007-05-01 / Ch. Pinzon

ABB
REB500 / REB500sys on the internet

http://www.abb.com/substationautomation

REB500 / REB500sys
ABB Switzerland Ltd. - 120
2007-05-01 / Ch. Pinzon

ABB
ABB Switzerland Ltd. - 121
2007-05-01 / Ch. Pinzon

ABB

Anda mungkin juga menyukai