Anda di halaman 1dari 19

Indian Institute of Technology, Kanpur

Course- Advance Hydrology (CE610A)


Term Paper on
Rainfall Runoff Modelling for Identification of Check Dam sites using SWAT
In Sina Catchment, Maharashtra
Name of Student Deshpande Prasad Jayant
Roll no -17103270
Program Ph.D. (HWRE , Civil Dept.) 1
Contents
Overview
Objective
Methodology
Preprocessing
Model Run
Results & Conclusion
Summary & Future Scope

Rainfall Runoff Modelling by SWAT 2


Overview
Study Area Sina catchment.
Sub-basin of Bhima
Bhima is sub-basin of Krishna River
Catchment Area = 12600 km2
Length = 180 km.
Highest point in watershed = 818 m
Lowest point in watershed = 441 m

Rainfall Runoff Modelling by SWAT 3


Overview
SWAT (Soil Water Assessment Tool)
Open Source Hydrological Modelling Tool.
Developers-
Natural Resources Conservation Service, and
Texas A&M University
ArcGIS / QGIS as a base GIS
Type
Semi Distributed Model

Rainfall Runoff Modelling by SWAT 4


Overview
More facts about SWAT
Used for
1. Surface Runoff
2. Evapotranspiration
3. Ground Water Flow
4. Sediment Transport
5. Pollutant Transport

Rainfall Runoff Modelling by SWAT 5


Objective
Rainfall Runoff Modelling in SWAT
Calculation of
Cross verification with observed data
Finding Statistical Parameters

Identification of Check Dam sites in Sina catchment


Identification of Sub-basins of Maximum Runoff
Locating the Sub-basins in Catchment Map

Rainfall Runoff Modelling by SWAT 6


Methodology- Preprocessing

Image ref Srinivas J S,


IJTRA Vol -3, Issue 4.

Rainfall Runoff Modelling by SWAT 7


Methodology- Preprocessing
Watershed Delineation-
DEM used SRTM 90 m resolution
UTM Zone 43N
Flow Accumulation & Direction
Creation of streams depending upon cell
size
Selection of watershed outlet
Sub-basin creation

Rainfall Runoff Modelling by SWAT 8


Methodology- Preprocessing
Watershed Delineation-

Rainfall Runoff Modelling by SWAT 9


Methodology- Preprocessing
HRU Creation
LULC Data
Ref- waterbase.org
Soil Map
Ref FAO
(Food & Agriculture
Organization of UN)
4 Soil types present in study
area
Predominant Type - Clay

Rainfall Runoff Modelling by SWAT 10


Methodology- Preprocessing
HRU Creation
Slope Map
Extracted from DEM.
More the slope classes, better the Threshold
results.
Currently divided into 4 classes

Threshold Setting-
Adjusting the threshold values for LULC,
Soil & Slope bands, number of HRUs
formed is adjusted.

Rainfall Runoff Modelling by SWAT 11


Methodology- Preprocessing
HRU Creation
Slope Map
Extracted from DEM.
More the slope classes, better the results.
Currently divided into 4 classes

Threshold Setting-
Adjusting the threshold values for LULC,
Soil & Slope bands, number of HRUs
formed is adjusted.

Rainfall Runoff Modelling by SWAT 12


Methodology- Preprocessing
HRU Creation
Raster file of HRUs is
generated
A report in text format is
also generated containing
unique HRU no, soil type
and LULC .
Also its percentage to total
area is given.
HRUs are independent on
weather data.

Rainfall Runoff Modelling by SWAT 13


Methodology- Preprocessing
Weather Data
Main Input Parameters-
1. Precipitation
2. Relative Humidity
3. Temperature
4. Solar radiation
5. Wind speed
Weather data input is
form 1965 to 2005.

Rainfall Runoff Modelling by SWAT 14


Methodology- Model Run
Period of Simulation
Period of Simulation-
1991 to 2000
Printout Setting
Warm up period
3 years
Output in format .std and
.mdb (Microsoft Access)

Rainfall Runoff Modelling by SWAT 15


Results & Conclusion
Catchment Characteristics Observed
No. of sub-basins created = 17
Largest = 184401 ha (14.69 %)
Smallest = 2524 ha (0.20 %)

No. of HRU created = 192

Rainfall Runoff Modelling by SWAT 16


Results & Conclusion
Chart Title
700
Simulated Data..
600

500

400

300

200

100

0
37

85
13
17
21
25
29
33

41
45
49
53
57
61
65
69
73
77
81

89
93
97
1
5
9

101
105
109
113
117
121
125
129

Obsereved Data

Rainfall Runoff Modelling by SWAT 17


Results & Conclusion
Site Selection for Check Dams
Location should be such that
the runoff at that sub-basin
should be maximum.
Sub-basins with maximum
surface runoff are 7,6,2 resp.
Check dam location is
encircled in the map,

Rainfall Runoff Modelling by SWAT 18


Thank You !!!

Rainfall Runoff Modelling by SWAT 19

Anda mungkin juga menyukai