WASTAGE CONTROL
Waste management
The process of managing waste materials. It involves the
collection, transport, processing and/or disposal of waste
materials.
Non-biodegradable
cannot be degraded (plastics, bottles, old machines,
cans, containers and others)
5
Classification of Wastes according to
their Effects on Human Health and the Environment
Hazardous wastes(HW):-The number of industries that
generate HW are maximum in Maharashtra (30.38%)
followed by Gujarat (22.93%). Minimum HW is reported in
Chandigarh (0.0069%).
Scrap Control
Spoilage Control
Control of Defectives
Waste Control
Quantity Control:- It involves maintenance of
detailed records of quantities with an object to
detect shrinkage, breakage, loss etc
Operational efficiencies.
1. Equipment,
2. Materials,
3. Labour
4. Capital
Incidenc Executio
e of n of Addition
Material unnecess al Costs
Losses ary work
Audit
Monitoring Tools
Audit Tools
No waste is best.
Waste has to be separated as
directed to use it.
Find Resources in Waste.