Anda di halaman 1dari 17

Renewable Energy Sources

Solar PV System
PV system integration with building architecture
CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
Renewable Energy
System Design

Electrical Consultant RE System


Design

HVAC Consultant RE
Consultant
RE System
Architect
Performance
Simulation
Critical Inputs for RE System Design

Available
Total load to
area Land /
be connected
roof / façade

Energy Solar
generation radiation
requirements Data
Net Metering Feed in tariff : >1MW
Grid Connection
Point of interconnection: 33kV or higher
Solar PV System Size at
<10 kWp 240 V Incentives: Generation based incentive [for
10 kWp to <15 kWp 240 V / 415 V >5MW plants]
Accelerated Depreciation
15 kWp to <50 kWp 415 V
50 kWp to <100
kWp 415 V Tariff determination: CERC guidelines
>100 kWp 11 kV

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
Wind
Load/Lift
[subject to site
wind profile]

Dead weight: 1 – 2 kg/ft2


[ 10 – 20 kg/m2]

Code of Practice for Design Loads for Buildings and Structures Part 2 Imposed Loads
Flat, sloping or curved roof with slopes up to and including 10 degrees: 1.5 kN/m2
≈150 kg/m2
RETscreen
Simulation

Annual
Generation
≈ 1500
kWh/kW
Assuming
16%
efficiency
Installation Area
Required
≈ 10 m2/kWp
Conventional Practices

• System Design
• Generally hot water system is left out
during the design stage
• Installed as add on to the building
• No consideration for water quality
• No consistency with building plumbing
systems

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
Thermo siphon system
(<3000 LPD) Forced circulation system
(> 3000 LPD)

System with heat exchanger


Flat plate collector.
40ºC to 80ºC
Evacuated tube collector
80ºCto 120ºC

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
FPC ETC

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
100 lpd system
collector area ≈2 sq.m
Rooftop area  ≈ 3 sq.m

Average Electricity Saving  ≈ 5 units/day


≈ 1200 units/year

Dead Load on Roof


2 sq m collector weight: 50 kg
Water Tank : 1.2 kg/L

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
Total hot water requirement = 10100 LPD
Case SHW Annual Energy % offset Points
sizing saved by SHW of annual
At 60 oC system energy
(LPD) (MWh) consumpti
on
Case1 2020 25.5 21% 1

Case2 5151 64.9 51% 1+1

Case3 7171 90.4 71% 1+2

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE
RETscreen
Simulation

CRSBS
CENTER FOR RESEARCH ON BUILDING SCIENCE

Anda mungkin juga menyukai