HAP

HOURLY ANALYSIS PROGRAM

1
5/4/18
Carrier offers HVAC
Software solutions to help
the HVAC Design
Professional estimate
building loads and HVAC
system loads.

2
5/4/18
Hourly Analysis
Program is developed by
National Institute of Build
ing Sciences
and is used by 739 users
of Software Informer. The
most popular versions of
this product among our
users are: 4.0, 4.1, 4.2,
5/4/18
3

4.3, 4.4 and 4.5


Energy Analysis Features:
1. HAP performs a true hour-
by-hour energy analysis, using
measured weather data for all
8,760 hours of the year to
calculate building heat
transfer and loads, air system
operation, and plant
equipment operation.
4
5/4/18
2. Hourly energy consumption
by HVAC components (e.g.,
compressors, fans, pumps,
heating elements) and non-HVAC
components (e.g., lighting, office
equipment, machinery) is
tabulated to determine the total
building energy use profile as
well as daily and monthly totals.
5
5/4/18
Hardware Requirements:

Operating System: Microsoft Windows


98, NT, 2000, XP, Vista or Windows 7

Random Access Memory (RAM): At least


64 MB.

6
5/4/18
Display Monitor: VGA with
at least 800 x 600
resolution and 256 colors.

A CD-ROM Drive

7
5/4/18
CIVIL PLAN

8
5/4/18
CALCULATIONS

AREA OF THE ROOM = 4 X 7.15 X 10.75 = 307sqft


AREA OF SW Wall = 4 X 3.28 X 10.75 = 131.2ft
AREA OF SW GLASS: WIDTH = 2.36 X 3.28 = 7.7ft
HEIGHT = 2 X 3.28 = 6.56ft

PARTITION: 1.3 + 2.6 = 3.9


3.9 X 3.28 X 10.75’ = 128ft

9
5/4/18
10
5/4/18
Please Click on OK
to begin 11
5/4/18
12
Right Click on UNTITLED and go for
5/4/18
properties
Enter the Project related Details shown
Below

13

5/4/18
Right Click on Weather option and click
on properties

14
5/4/18
Click on the Drop down list given for region to select our own
region.

Similarly Click on the Drop down list given for Location and City
to select our own Location and city as per the requirement.

Latitude, Longitude, Elevation, Summer DB & WB, Winter DB &


WB and Daily range etc are filled automatically after entering
Region, Location and City.

Then click on OK and proceed 15

5/4/18
Right click on Spaces and click on New to enter
the data in Spaces

Enter the details as per the requirements 16


as shown above.
5/4/18
Click on Internals tab to enter
the data

Fill up the details as shown above. 17

5/4/18
Click on Walls, Windows, Doors tab and fill
the details

18
5/4/18
Click on Roofs, Skylights tab and fill the
details

19

5/4/18
Click on Infiltration tab and fill the
details

20

5/4/18
Click on Floors tab and fill the
details

21

5/4/18
Click on Partitions tab and fill the
details

Click on OK and proceed 22


further
5/4/18
Right click on Systems and click on New to enter
the data in Systems

23

5/4/18
Click on System Components tab and click on
Duct System to enter Sensible and latent
heat

24

5/4/18
Click on Zone Components tab and add the
assignments

25

5/4/18
Click on Thermostat and create a schedule in
Zone Components

26

5/4/18
Click on Sizing Data tab and enter the
values

27
Click on
OK
5/4/18
How to Save the Project?
Click on Archive Button “A”

A message box is shown below which


confirms to save the project or not.
Just click on “OK” to save your project

28

5/4/18
The below message box will be displayed
which will ask you the “Project Name” to save
it internally within the HAP Software

Click on “Save” then


another message box will
be displayed on your
screen 29
5/4/18
The option is given to you if you want to save
the project in your system also, apart from
HAP

Give the destination folder to save the file


in your computer
30
5/4/18
Below message box confirms that
your project is saved successfully

Go to the desktop where you can


find the file which was saved
31
5/4/18
Click on Sizing Data tab and
enter the values

32
5/4/18
Click on
OK
To view the output select the particular
item from the systems and click on “View
Design Reports”

33
5/4/18
Click on “Preview” option to view the
output

34
5/4/18
Click on “Preview” option to
view the output

35
5/4/18
This is how the output looks
like

Tonnage and Maximum Block CFM


is shown above in the Word
Document
36
5/4/18
How to Retrieve the same
project ?

After opening HAP the above message box


will be displayed Automatically. Click on
Open 37
5/4/18
Another method is to click on Retrieve
“R” option after opening HAP

Click on
“R”

38
5/4/18
We’ll get the option to retrieve the file where
we have saved.

39
Click on 5/4/18

Open
40
Click on 5/4/18
“Retrieve”
A message box is shown and
the project is retrieved
successfully

Click on
OK

41
5/4/18
THANKS A LOT
FOR YOUR
PATIENCE
42
5/4/18