Contents :
1. Definition of work permit
2. Terminology
3. Work Requiring permit
4. Work Not Requiring Permit
5. Types of work permit
6. Responsibilities of GSI/FPI/Issuer
7. Responsibilities of Receiver
8. Procedure for Hot Work & General Instruction
9. Procedure for Confined Space Entry & General Instruction
10. Gas test for work permit.
11. Work at height Permit
12. Excavation Permit
13. Radiation Permit
14. Electrical Permits
15. Case Study
16. Any Queries
Definition of Work Permit
Avoid fire
For all critical activities, he will thoroughly check the work site condition
(such as hot work in running unit / near OSW lines, working at height,
entry in confined space, radiography etc.) and compliance of permit
conditions at site before signing.
Sewers, Manholes, Closed Blow Down (CBD) etc. and Hot Surfaces
covered:
Lack of oxygen
Combustible gases
Corrosive chemicals
Steam / Condensate
High humidity
Any Others
PROTECTION MEASURES
In addition to standard PPEs like Helmet, Safety Shoes, handgloves
etc, to be mentioned.
Protective clothing
Hearing protection
Safety Harness
Eye protection
Face protection
Respiratory protection
Keep fire equipment stand-by
Life Line
Any Other
Procedure for Hot Work Permit
General Instruction for Hot Work
For renewal of work clearance, the issuer shall ensure that the conditions are
satisfactory for the work to continue.
Permit shall be considered issued for job after “Clearance renewal” is signed.
This clearance on the same permit can be renewed / extended This clearance on
the same permit can be renewed / extended up to a maximum of seven calendar
days, except in case of plant shutdown, where permit can be issued for a
maximum period of 15 days. Blanket permit may be issued for a maximum
period of 30 days.
Daily Toolbox talk / safety briefing to be ensured by the permittee before start
of job and record to be maintained.
Permit issuing authority, RSM & F&S personnel or any authorized person
can check the permit and stop the job and even cancel the permit on safety
norms violation any time.
In case of gas welding/ cutting, cylinders (acetylene cylinder must) should be
kept in upright position and these should be easily identifiable by its colour.
Hose connections of gas cylinders should be checked before starting of hot job.
The hoses must be free from all cuts & kinks and distinct in color (Maroon for
acetylene and black for oxygen).
In case of welding/ cutting/ gauging etc., it should be ensured that spark is
arrested at site only, especially while carrying out hot work at height.
Executer shall ensure use of flash back arrestor in gas cylinders while using
oxy-acetylene sets. Use welding lighters only to light the welding torch.
General Instruction for Hot Work…Cont
While carrying out hot work inside confined space, proper ventilation and
illumination should be ensured before start of job.
Electric cable shall be free from joints with sound insulation. Portable
electrical equipment should have no loose connections.
Executor shall ensure that the lifting machine (Crane), tools & tackles are
properly tested and SWL and date of testing is displayed on equipment.
Barricading of the area below lifting machine (Crane) should be ensured before
carrying out the job.
Executor shall ensure that all vehicles entering inside battery area, spark
arrestor is on exhaust. Vehicle shall move on designated route only.
Executor must know the nearest Fire Alarm point, Fire Order, Fire Station
phone number, nearest safety shower, escape route and siren code of refinery.
Procedure for Entry into Confined Space
Preparing the equipment & Gas test. Issuing authority shall determine the
requirement of gas test & frequency of re-checking.
When a person is entering confined space, the receiver must keep minimum
two trained attendants-designated persons at the manhole or entry point.
Wherever forced ventilation is used. The gas test should be carried out
after minimum 10 minutes of stopping the eductor / fan / blower.
Use suitable respiratory protection for entry in the confined space having
O2deficiency or having toxic gases more than TLV.
Attendant should be available all the times at man way entry for resuce /
till the work is in progress inside. The permit should be available with him
and he shall maintain attendance in prescribed form.
General Instruction for Entry into Confined Space…Cont
Special precautions are required for entry into inert gas atmosphere. It
requires the controlled condition inside confined space as well as mandatory
use compressed breathing air supply to person going inside with alternate
air supply arrangement.
Use Personal gas monitors while entering inside. Use SCBA where there is
likelihood of accumulation of gas during the work such as in severs, OWS
line etc
Carry out regular gas test of confined spaces, where there is possibility of
generation due to nature of work being performed inside line cleaning of
sludge, hot works etc.
GAS TEST FOR WORK PERMIT
This permit will be issued in Triplicate. This permit shall be valid for a period of 8
hours only, unless it is renewed/ extended. This clearance on the same permit can
be renewed/ extended up to a maximum of seven calendar days.
Concerned area HODs & Executing HODs signature is needed for permit beyond
normal working hours (8.00 Hrs to 17.00 Hrs.)/ round the clock/ Sundays &
holidays.
General Guideline for Working at Height
Risk Assessment by Issuer & Receiver
Scaffold erected on firm ground and sole plate & base plate provided.
Hanging baskets used of proper construction, tested and certified for the
purpose.
Work platform made free of hazards of all traps/ trips/ slips & fall.
Platforms provided with Toe board, guardrail & area below is barricaded.
Checked whether safety harness & necessary arrangement for tying the
life-line, fall arresters etc provided to the worker for working at height.
Have precaution been listed below for safe working at height for source of
energy Such as electricity
Is the workers are working near unguarded shafts, excavations or hot line?
All works at height shall be discontinued during rain/ high wind/ floods.
PROCEDURE FOR EXCAVATION / ROAD CUTTING /
DYKE CUTTING / ROAD CLOSUREPERMIT
Initiate Excavation Clearance (Annexure – III) by executor(A grade and above)
by filling all the entries and attaching sketch/indicating on permit form
Clearance from EL maint./ Telecom,F&S,Civil,PN/Area in charge
Registered at Fire Station.
This clearance shall be obtained for a maximum period of 15 days, except at
construction sites, non-operational areas, where it shall be for a maximum period
of 1 month.
For cutting of road in addition to this clearance, format for Road Closure and
Excavation permit shall be required.
For Road Cutting, approval of HOD of issuing Dept & for Dyke cutting DGM of
issuing Dept. is required.
Format for Road Closure (Annexure – IV)
Format for information about Main Road Closure (Annexure – V)
On completion , permit closure and return to Fire Station/ Area in charge.
General Instruction for Excavation
Barricading of 1M height (with red & white band/ self glowing caution
boards) should be carried out for excavation beyond 1.5 M depth.
Practice to giving permission to cut half road and utilizing half road for
movement of vehicle should be avoided, unless the conditions mentioned in
Sl.–4(Don’ts) is complied.
No vehicle should be allowed to go too close to the edge of the excavation
because it may cause side collapse. Maintain at least 2 M distances from the
edge of the excavation.
Incident – 3: In Shut down clearance was given to carry out hot job at
elevation and at bottom the draining operation was in progress. Due to which
there was small fire. In permit it was clearly mentioned to contain spark
locally.
Incident – 4 : During cutting of over head pipe line in offsite at one of the
refinery due to miss communication wrong naphtha line was cut and there
was fire.