Anda di halaman 1dari 28

By Ccoyure Tito

INTRODUCTION - POWER PLANT GENERAL


GENERAL COMPONENT LOCATIONS
INLET COWL

PURPOSE
CAUTION:
LOCATION DURING REMOVAL CAUTION: ADJUST
CHARACTERISTICS
& INSTALLATION, DO NOT
REMOVAL & INSTALLATION SLING TO TAKE ONLY
LEAVE TOOLS OR OTHER WEIGHT OF INLET
OBJECTS IN AIR INLET COWL

(P61)
FAN COWL PANELS

PURPOSE
LOCATION
CHARACTERISTICS
OPERATIONS & LIMITATIONS
REMOVAL & INSTALLATION

WARNING: ENSURE THAT HOLD- OPEN ROD IS FULLY


EXTENDED AND LOCKED. RED BAND & “UNLOCKED”

CAUTION: DO NOT ALLOW FAN COWL


PANEL TO SLAM CLOSED
FAN COWL REMOVAL AND INSTALATION

WARNING: ADEQUATELY
CAUTION: RAISING OR
SUPPORT FAN COWL
LOWERING AFTER REMOVAL
PANEL DURING
MAY DAMAGE UPPER COWL
HANDLING. WEIGH
SEAL. LIFT PANEL OUTWARD
APROX. 50 KG EACH
FROM STRUT HINGE
FAN COWL PANEL LATCH ADJUSTMENT

CAUTION: DO NOT USE ADJUSTMENT


OVER 100 POUNDS (445 N) TEST- Force req. to close latches

FORCE TO PUSH LATCH


HANDLE CLOSED.

CAUTION: DO NOT ROTATE KEEPER


GAP: .06 A 0.18” EYEBOLT TO ADJUST LATCH TENSION
FAN COWL CHINE
THRUST REVERSER
THRUST REVERSER TENSION LATCHES
THRUST REVERSER TENSION LATCH ADJUSTMENT

CLOSING FORCE: 0.5 A 2.5”


THRUST REVERSER LATCH ASSEMBLY
THRUST REVERSER OPENING ACTUATOR

RELIEF VALVE: 4350 – 4500 PSIG


THRUST REVERSER OPENING / CLOSING
CORE COWL PANELS
CORE COWL REMOVAL & INSTALLATION

CORE CORE PANEL WEIGH APROX 41 KG


CORE COWL PANEL LATCH ADJUSTMENT
TURBINE EXHAUST SLEEVE AND PLUG
ENGINE MOUNTS

Anda mungkin juga menyukai