BIO- METHANATION

PROJECT
20 MT CAPACITY - INDORE
INPLANT TRAINING (09.06.2018 – 30.06.2018)
Key Process – Bio gas

 Segregation (organic – Inorganic) (dry and Wet waste)


 Grinding waste with water (slurry water used for maintaining PH value)
 Mixing Chamber with Agitator (Aerobic process)
 Mixture transferred to Digestor 1 & Digestor 2 (Anaerobic process)
 Later from Digestor 1 to Digestor 2 (Anaerobic process)
 Bio gas collected in both digestor Domes & Slurry water fed into the slurry
storage tank
 Slurry water transferred to Solid liquid separator from slurry storage tank
 Sludge (Residues) from solid liquid separator used for Manure process
 Slurry water stored in Slurry Recovery tank for grinding
Key Process - Manure

 Garden waste (dry) fed into shredder for finer particles


 Finer particles treated with sludge & slurry water for 15 days (Aerobic
process)
 Finer particles fed into sieving machine (5mm)
 End Product - High quality manure.
Purification Process – Bio Methanation
Digestor Digestor
1 2

Water
Bath
System
Surge
Blower Tank
MPSA MPSA Vacuum
Desulphuris Tower 1 Tower 2 Suction Pot
er
Moisture
Vacuum

Equalisation
After Separator
Pump
cooler

cycle
MPSA
After Vacuum
Moisture cooler Discharge Vent out
Separato Pot
r Desulphuris
Dryer Dryer er
Tower 1 Tower 2 Vacuum Blower
MPSA MPSA Suction Pot
Tower 1 Tower 2 Recove
Vacuum
Vacuum Safety
Discharge ry
Surge Pump Valve
Pot Balloon
Tank Cascade
If CH4 < 300 mbar
90% Fine 1
Buffer Balloo Compress Cascade
Desulphuris Blower Dispenser
Tank n or 2
er Cascade
400 mbar 200 mbar 200 bar
3
50 Generato
mbar
Main supply
r
Cascade Filling
Compressor