O&M handbook
Scope
SJD
O&M handbook
Technical
specifications Training
• Checklist listing all the potential (high) risk activities. If any of the activities on this lists are involved to implement the Work Order, a Permit
to work must be applied for and issued
• Governing documents requirements describing the risks that it is not acceptable to not eliminate before performing work
• LOTO instructions describing what to be closed/locked/tagged to avoid risks for a specific task
• SOP detailed Work Instructions describing step-by-step why, what and how to do execute the tasks for specific work operations
• Permit to work when workplace are secured/locked/tagged by personnel on site, they can report and apply for Permit to work. Approver
3and applier of a Permit to work may NOT be the same person.
Improved safety planning is the main focus area
Addressed directly in project
The new process shall embed and support the use of LOTO and SOP as
barriers for energy control
Identifying required safety measures to be put in place before conducting work
Verifying how to conduct the actual work safely