Anda di halaman 1dari 7

Implementation steps of

mplementation MFCA-7 steps of MFCA-7


entification of inputs and outputs for each quantity
centre
Identification inputs and outputs for each quantity
center

Co., Ltd. All Rights reserved. 25


Implementation steps of MFCA-8

• Quantification of the material flows in


physical units
• Quantification of the material flows in
monetary units
• Interpretation of MFCA results and
consideration/implementation of
improvement measures
View of Production Processes in MFCA

Quantity Center
(A Production Process)
I nput Materials Products
Production Process of
    Product and Material loss (Output as Good products)

Mass Balance
& Product Costing
Material L oss
( Output as Wastes)            
Approach of MFCA
Case Study : Approach of
MFCA
Electricity

Material
Input Output Product
Factory (70 ton)
(100 ton)
Printed material

Output

Material loss
Wastewater 30 ton

Waste Carbon emissions Emissions to air

Propharm Japan Co., Ltd. All Rights reserved. 18


Solving Analysis
Conventional management Point of MFCA evaluation

Processing cost: Electricity


$350,000
Input Output Input Output
Product: 70 ton Product 70 ton
Material Material cost: $650,000
Material Factory
QC-2
(100 ton) QC-1 Factory
QC-2 QC-3 Processing cost: 100 ton
$ 350.000
$650,000 --------------------------------
Total $ 1,000,000

Equivalent cost
evaluation
Material loss 30 ton

Material loss: 30 ton

Propharm Japan Co., Ltd. All Rights reserved. 20

Propharm Japan Co., Ltd. All Rights reserved. 19


Cost calculation based on MFCA-1

Energy cost: $50,000 System cost


Electricity: 10 kW $250,000

Input Output
Product: 70 ton
Material Material cost: $520,000
(100 ton) QC-1 Factory
QC-2 QC-3 System cost: $ 175.000
Energy cost: $ 35,000
$650,000 --------------------------------
Total $ 730,000

Material loss: 30 ton


Material cost : $130,000
System cost: $75,000
Energy cost: $15,000
Waste management cost:$50,000
------------------------------------------
Total $270,000
Cost calculation based on MFCA-2

Energy cost: $50,000 System cost


Electricity: 10 kW $250,000

Input Output
Product: 70 ton
Material Material cost: $520,000
(100 ton) QC-1 Factory
QC-2 QC-3 System cost: $ 175.000
Energy cost: $ 35,000
$650,000 --------------------------------
Total $ 730,000

Key for improvement


Material loss: 30 ton
Material cost : $130,000
System cost: $75,000
Wastewater Energy cost: $15,000 Emissions to air
Waste management cost:$50,000
------------------------------------------
Total $270,000

Waste Carbon emissions


Propharm Japan Co., Ltd. All Rights reserved. 22

Anda mungkin juga menyukai