Al-Ma’amari
B. Eng. in Civil Engineering
from S.Q.U. - July 2002
Joined to PDO - Mid. Nov. 2002
Civil Construction Engineer - Fahud
16/06/03 1
Yibal Turnoff to Natih Roundabout
Road Repairs Project Review
16/06/03 2
Agenda:
16/06/03 3
General types of road:
o Unpaved surfaces.
o Chemical treatments.
o Composite.
16/06/03 4
Background:
o Constructed in 96/97.
o Heavy rain in 1997:
i. Wash out.
ii. Settlements.
o Investigation carried out that found poor quality
materials (not to specifications).
o Other factors:
Traffic loading & Climate or Environment.
16/06/03 5
General life cycle of roads
Maintenance
Performance
Pavement
Condition
Time or Traffic
16/06/03 6
Sample of failure
16/06/03 7
Purpose of the project:
Base (250mm)
Geo grid
Subbase
16/06/03 8
Steps of the work
16/06/03 9
1. Surveying
16/06/03 10
2. Temporary diversions
16/06/03 11
3. Remove the existing road
(Asphalt & Road base).
16/06/03 12
4. Mix & compact the original soil
16/06/03 13
5. Geo grid (new technology)
o Take load
(Weak subgrade).
o Avoid cracks.
16/06/03 14
6. Base road & Asphalt layout
16/06/03 15
16/06/03 16
Tests during the project:
16/06/03 17
HSE in the project:
o Kick off meeting.
o Workshop.
o Toolbox talk.
o Monthly meetings.
o Site inspection.
16/06/03 18
Comments on the project:
o Shortage in manpower.
o Shortage in equipments.
o HSE issues.
o General faults (old equipments which generally gets
break down).
o Lack of proper planning.
o Completion date.
16/06/03 19
END
16/06/03 20