PRESENTED BY GUIDE
PRAMOD M(1VE15CV069) Ast. prof Ms. SHILPA
Dept. Of Civil Engineering
SHARATH H MYLARAPPA(1VE15CV090)
SVCE
SHASHIKANTHA N(1VE15CV091)
SHESHA SAGAR B R (1VE15CV093)
CONTENT
• Introduction
• Literature review
• Scope and objective
• Methodology
• Expected outcomes
INTRODUCTION
VARIATION OF ROAD LENGTHS OVER YEARS IN BANGALORE:
1. Road works are causing time delay on both private
and public transportation.
Affect of road works on time travel reliability implications on private and public transportation
Sources of road works WEATHERING
OF SOIL
NATURAL FLOODS
LAND SLIDES
INDUCED MAINTAINANCE
TRAFFIC
LITERATURE REVIEW
•Comparing practice ;Ready forecast models for weekly and monthly fluctuations of average daily
traffic and enhancing accuracy by weighting methods
Andera pompigna,Fedrico Rupi(2017)
SCOPES AND OBJECTIVES
• To determine the reliability of public transport system during road work progression
• To determine the impact of road work on ease mobility of traffic.
• To determine the comparison between reliability of different transport service during road work in
terms time as parameter.
• To determine the traffic congestion indices before and after suggesting the reroute due to road works.
• To reduce the traffic congestion due to road works in an urban area.
• To reduce delays due to the road networks.
• To achieve the optimum reliability in terms of time for all transport services in an urban area during the
road work progression.
METHODOLOGY
Travel time
Existing network
Assignment
Road works scheme 1 model