One water & process technology company ,2 complementary platforms

Engineered solutions Specialty chemicals & Aftermarket

Engineering, Design, Manufacturing, Assembly and


Description Commissioning of desalination, potable water, Provision of specialty chemicals & spare parts
wastewater and reuse projects

Reverse Osmosis Chemical injection Desalination: antiscalants, membrane cleaning chemicals,


systems
MF, NF & UF solutions Cooling : corrosion inhibitors, antiscalants, antifoulant…
Electrical control panel
MBR Boiler: oxygen scavengers, antiscalants, alkalinity builder,
MBR, BWRO & SWRO dispersants, corrosion inhibitors, combustion catalyst…
Biological, physicochemical
processes skids
Water / Wastewater: coagulant, flocculant, pH control,
Key products Disinfection, Ozonation & UV Modular skids antifoam, disinfectant, corrosion & scale inhibitors
& solutions Containerized solutions Metal treatment: degreasers, iron & zinc phosphatizing…
Multimedia filtration,
PAC/GAC, Iron removal…
Ion exchange processes, Oil field: fluid additives, stimulation & production chemicals…
Chemical dosing, preparation softening,
& system Metal treatment chemicals
demineralization &
Modular oil skids specific ion removal Good & Beverage & Commercial laundry chemicals

Upstream Oil & Gas Food & Beverage Upstream Oil & Gas Food & Beverage
Served Downstream Oil & Gas Pulp & Paper Downstream Oil & Gas Pulp & Paper
segments
Power Other industries Power Other industries

Financial
2016 Turnover & EBITDA 2016 Turnover & EBITDA
highlight

1
PRELIMINARY
AES participates in the whole project lifecycle

Conceptual stage Feed stage Tender stage EPC stage EPC execution

Identifying various parties and Helping FEED contractors with Involvement with all the Formal RFQ It all depends on the size and
stakeholders design and technical discussions International EPC contractors Evaluation of the Enquiry type of the equipment however
Start making touch base with Working with all EPC Proposals submission The Lead Time between
various relevant parties contractors receiving PO and the Delivery is
Technical clarification
AES way of doing

Positioning properly to avoid Submitting Proposals normally 9-12 months.


meetings
any weak link Technical clarification meetings Commercial
business

Technical & commercial Close clarification/negotiation


out Award

Operation &
Pre-Design Engineering Procurement Construction Start-up
Maintenance

Conceptual design Detailed engineering Sourcing Equipment Testing Plant operation and
Front-end engineering Purchasing manufacturing Commissioning maintenance
Supplier quality Material control Engineering support
surveillance Quality control
of expertise

Training
AES area

Expediting
Logistics
Warehousing