TAMBANG
PERENCANAAN TAMBANG
• EXPECTATION SCALE
• MARKET • MINE LIFE
• ABILITY • 5YEAR
• ANNUAL
• MONTHLY
PERENCANAAN TAMBANG
CONTENT :
• Kuantitas Produksi
Target produksi, Alat yang dipakai, Asumsi waktu kerja
• Design Tambang, sekuen kerja
Pit design (pit, disposal, road, ditch), sekuen (urut-urutan
pemotongan tambang)
• Kualitas
Parameter kualitas (proxymate, ultimate, AA, CV)
KUANTITAS
Rencana
produksi
Waste Source material
Blasting
Ripping
Dirrect digging
Coal Ton
SR BCM/ton
Equipment
Jumlah
Ketersediaan
Productivity
Distance
Cycle time
Isian/muatan
Waktu Kerja
‘(Asumsi) Loss time
Terjadwal
Change shift
Rest, meal
Blasting
Tidak terjadwal
Rain,slip
Others
Excavator OB Fleet OB Fleet
Coal – OB Poduction
Drilling Machine
Blasting
Dozer
Lub Truck
CxE
PRODUCTIVITY ( Q ) Unit/Hr
Cycle Time
C
•
•
Exc. .... Bucket cap x bucket fill factor
Truck .. Vessel cap x vessel fill factor
E
•
isian excavator
Dozer...Blade cap x blade factor 0.8
•Time
• Ripping ... Penampang ripper •Working Condition
• Gradder... Blade width x effective blade •Operator
KEADAAN ALAT
KEADAAN MEDAN
MEMUASKAN BAGUS BIASA BURUK
MEMUASKAN 0.84 0.81 0.76 0.70
Cycle Time
BAGUS 0.78 0.75 0.71 0.65
BIASA 0.72 0.69 0.65 0.60
BURUK 0.63 0.61 0.57 0.52
NORMAL 0.75
BURUK / JELEK 0.50 - 0.60
Cycle Time
Excavator
HAULING TIME
LOADING TIME
DUMPING TIME
-Iddle day
MONTHLY PLAN PIT GAHARU
JANUARY 2006
Date : 4 January 2006
1 Working Hours
Exclude Friday Friday Overshift Number of days
Description
3 shift 2 shift 3 shift 2 shift 3 shift 2 shift
Working Hours per day (24 hrs - std. OS) 22:00 22:00 10:30 Friday 4
Lost Time Rain & Slippery 1:30 1:30 0:30 Overshift 3
Lost Time others (overshift, breaks, etc.) 0:00 0:30 0:00 Others 23
Estimate lost time of prayer (hr) 0:00 0:30 0:00 Eff WH 523.35 hr / month
Estimate add lost time OS 0:00 0:00 0:00
Available Working Hours per day 20:30 20:00 10:00 Iddle day 1
Utilization of Available Hours per day 90% 90% 90%
Effective Working Hours per day 18:27 18:00 9:00
2 Equipment plan
Prodty Unit Plan N0's Unit Cap. Remarks ALLOCATION UNIT
Equipment
PA Monthly pit O4 Pit N1 Pit L1
Eq. For Production
Excavator
Cat385 Caterpilar 400 BCM/hr 90% 2 376,812 OB - - 2 376,812
Cat345 Caterpilar 230 BCM/hr 90% - OB - - -
PC3000 Komatsu 900 BCM/hr 90% 2 847,827 OB 1 423,914 0.5 211,957 0.5 211,957
PC1250 Komatsu 450 BCM/hr 90% 2 423,914 OB 1 211,957 - 1 211,957
994 Liebher 800 BCM/hr 90% 1 376,812 OB 1 376,812 - -
Hyundai 220 BCM/hr 90% 1 103,623 Coal getting only - - -
PC300 Komatsu 130 BCM/hr 90% 1 61,232 Coal getting only - - -
Total Cap. 2,190,220 1,012,682 211,957 800,726
Dump Truck deppend on distance
Cat773 Caterpilar 110 BCM/hr 90% 4 207,247
HD785 Komatsu 150 BCM/hr 90% 15 1,059,784
•Asumsi Waktu
Cat740 Caterpilar 90 BCM/hr 90% 8 339,131
Renault 30 BCM/hr 90% 10 141,305
•TARGET PRODUKSI
Total Cap. 1,957,329
Gradder
GD 14 H Caterpilar 1
GD 16 H Caterpilar 2
Water truck 3
PRODUCTION SCHEDULE BLOCK A - B - C (LCI)
Date 17 Nov 2006
YEAR 2007
MONTH Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07
Working days day 31 28 31 30 31 30 31 31 30 31 30 31
iddle day day 1 1 1
Rain - slip hr/day 2 2 2 2 1.5 1.5 1 1 1 2 2 2
Working hours hr/day 24 24 24 24 24 24 24 24 24 24 24 24
Overshift / hr/day 0.6 0.4 0.4 0.6 0.4 0.4 0.6 0.4 0.4 0.6 0.4 0.6
Rest hr/day 2 2 2 2 2 2 2 2 2 2 2 2
Change shift daily hr/day 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Blasting hr/day 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Pray hr/day 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Working Effeciency 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85%
Eff. Working hours / month 527.85 497.42 550.715 527.85 550.715 532.95 545.445 532.95 532.95 545.445 532.95 527.85
PA
exc PC3000 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
LBR 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%
PC1250 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95%
WASTE
CAT-385 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%
HD HD 785 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%
CAT 777 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80%
CAT 773 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80%
CAT 740 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75%
exc CAT 345 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75%
CAT 330 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75%
COAL
PC 300 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%
DT RENAULT 6X4 90% 85% 85% 85% 85% 85% 90% 90% 90% 80% 80% 80%
HINO 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80%
RENAULT 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70% 70%
•Asumsi Waktu
•Equipment
Availability /
Ketersediaan alat
•TARGET PRODUKSI
PRODUCTION SCHEDULE BLOCK A - B - C (LCI)
Date 17 Nov 2006
YEAR 2007
MONTH Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07
CAP. PLAN 451,312 803,333 889,405 852,478 653,974 405,042 414,538 227,836 - - - -
PC3000 800
LBR 800
N0-1
PC1250 450
CAT-385 400
CAP. PLAN - - - - - - - - - - - -
COAL CAP. PLAN
exc CAT 385 350
CAT 330 200
PC 300 200 2 2 2 2 2 2 2 2
CAP. PLAN 190,026 179,071 198,257 190,026 198,257 191,862 196,360 191,862 - - - -
dt RENAULT 6X4 24 12 12 12 12 12 12 12 12
•Rencana Kapasitas
CAP. PLAN 154,554 138,482 153,319 146,953 153,319 148,373 159,706
156,048 - - - -
MIN. CAP. PLAN 154,554 138,482 153,319 146,953 153,319 148,373 159,706
156,048 - - - -
•TARGET PRODUKSI
PRODUCTION SCHEDULE BLOCK A - B - C (LCI)
Date 17 Nov 2006
YEAR 2007
MONTH Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07
COAL EXPOSSED - - - - - - - - - - - - -
SR MINE -
WASTE - - - - 365,675 596,904 346,903 - - - - - 1,309,482
stage3
U2N-
COAL EXPOSSED 45,131 80,333 93,622 89,735 81,747 57,863 69,090 45,567 - - - - 563,087
SR MINE 10.00 10.00 9.50 9.50 8.00 7.00 6.00 5.00 8.34
WASTE - - - - 235,431 455,672 349,767 - - - - - 1,040,870
N0-1
COAL EXPOSSED - - - - - - - - - - - - -
SR MINE -
•Penjadwalan produksi
TOTAL
WASTE 1,443,670 1,360,444 1,506,206 1,443,670 1,506,206 1,457,618 1,491,792 956,379 - - - - 11,165,983
COAL EXPOSSED 209,500 155,742 169,180 155,423 190,083 177,794 193,897 110,054 - - - - 1,361,674
COAL GETTING
SR MINE
154,554
6.89
138,482
8.74
153,319
8.90
146,953
9.29
153,319
7.92
148,373
8.20
159,706
7.69 •OB, Coal, SR
156,048
8.69 -
-
-
-
-
-
-
- 1,210,755
8.20
SR CONT. 9.34 9.82 9.82 9.82 9.82 9.82 9.34 6.13 - - - - 9.22
PIT INVENTORY
OPENING
CLOSING
45,845
100,791
100,791
118,052
118,052
133,912
133,912
142,381
142,381
179,145
179,145
208,566
208,566
242,757 •TARGET PRODUKSI
242,757
196,764
DESIGN, SEKUEN TAMBANG
Design tambang (sekuen tambang termasuk di dalamnya)
• SR OPTIMUM
Contour SR, Cross section, Block model
• PIT LIMIT
• DETIL DESIGN
BENCH, RAMP, DITCH
SR CONTOUR
OB RATIO Contour
Crop line
SR contour
OB
Coal
Line cross
Crop line
coal
topo
CROSS SECTION
CROSS SECTION
SR
PIT LIMIT
Coal 6,171,674
Waste 58,696,241
ALL SR 9.510587
KUMULATIF
Blok
Strip 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 - - - - - - - 4.41 - - - - - - - - - - - - - - - - - - - - - - - - -
7 - - - - - - - 4.63 - - - - - - - - - - - - - - - - - - - - - - - - -
8 - - - - - - - 6.99 6.09 - 7.62 - - - - - - - - - - - - - - - - - - - - - -
9 - - - - - - - 9.14 6.84 ### 6.86 7.80 - - - - - - - - - - - - - - - - - - - - -
10 - - - - - - - ### 9.05 8.33 8.42 ### 3.27 2.66 - - - - - - - - - - - - - - - - - - -
11 - - - - - - - ### 8.42 9.45 9.28 ### 4.84 2.69 ### - - - - - - - - - - - - - - - - - -
12 - - - - - - - ### 7.57 ### ### ### 6.43 3.02 3.81 - - - - - - - - - - - - - ## 3.88 4.01 - -
13 - - - - - - - ### 7.82 ### ### ### 8.29 3.47 3.17 - - - - - - - - - - - - - ## 3.89 3.50 - 3.80
14 - - - - - - - 9.87 8.37 ### ### ### 9.98 4.36 3.16 3.48 - - ### 4.98 - - - - - - - 6.52 ## 4.86 3.78 4.68 3.51
15 - - - - - - 0.21 9.79 8.98 ### ### ### ### 5.81 5.86 7.79 3.34 6.53 9.06 8.74 2.83 5.79 ### 4.97 5.38 ### - 3.41 ## 6.27 6.65 8.29 4.05
16
Pit limit
- - - - - - 1.50 9.97 9.51 ### ### ### ### 8.41 9.70 ### 8.51 9.65 9.59 ### 4.50 4.50 4.68 3.75 4.81 3.35 3.66 4.12 ## 8.21 9.34 4.22 6.07
17 - - - - - 4.03 4.19 ### 9.76 ### ### ### ### ### ### ### ### ### 9.64 ### 8.78 ### 8.36 6.19 6.68 5.33 5.19 5.36 ## 9.71 ### 6.23 ###
18 - - - - - 2.70 5.90 ### 9.60 ### ### ### ### ### ### ### ### ### 9.88 ### ### ### 9.72 8.62 8.47 7.85 7.63 7.02 ## 9.94 ### 8.89 ###
19 - - - - - 2.80 6.47 ### 9.62 ### ### ### ### ### ### ### ### ### ### 9.30 8.84 9.80 9.00 9.92 9.92 9.45 ### 8.69 ## ### ### ### ###
20 - - - - - 2.97 6.94 ### 9.74 ### ### ### ### ### ### ### ### 9.83 9.79 8.38 7.74 8.63 8.29 9.54 9.50 9.40 ### 9.83 ## ### ### ### ###
21 - - - - - 3.03 7.07 ### 9.92 ### ### ### ### ### ### ### ### 9.25 9.10 7.76 7.18 7.96 7.75 9.02 9.62 8.83 9.74 9.88 ## ### ### ### ###
22 - - - - 0.99 3.18 7.03 ### ### ### ### ### ### ### ### ### 9.79 8.79 8.55 7.43 6.91 7.57 7.52 8.96 9.80 8.62 9.30 9.38 ## 9.90 ### ### ###
23 - - - - 1.37 3.54 6.97 ### ### ### ### ### ### ### ### ### 9.23 8.41 8.11 7.24 6.87 7.58 7.53 9.02 9.88 8.64 9.05 9.38 ## 9.70 ### ### ###
24 - - - - 1.31 3.77 6.86 ### ### ### ### ### ### ### 9.98 ### 8.92 8.22 7.82 7.20 7.08 7.85 7.70 9.10 9.83 8.61 8.94 9.56 ## 9.47 ### ### ###
25 - - - - 1.30 3.91 6.72 ### ### ### ### ### ### ### 9.84 ### 8.81 8.07 7.66 7.19 7.28 8.10 7.90 9.22 9.66 8.55 8.61 9.14 ## 9.26 ### ### ###
26 - - - - 1.30 3.96 6.79 ### ### ### ### ### ### ### 9.86 ### 8.71 7.98 7.54 7.21 7.44 8.33 8.11 9.20 9.53 8.49 8.51 8.89 ## 9.30 ### ### ###
27 - - - - 2.46 4.31 6.88 ### ### ### ### ### ### ### 9.94 ### 8.62 7.96 7.50 7.25 7.55 8.54 8.33 9.10 9.49 8.44 8.36 8.66 ## 9.43 ### ### ###
28 - - - - 4.13 4.71 7.01 ### ### ### ### ### ### ### ### 9.96 8.56 7.95 7.52 7.29 7.62 8.73 8.56 9.17 9.51 8.35 8.25 8.61 ## 9.45 9.96 ### ###
29 - - - - 4.68 5.02 7.15 ### ### ### ### ### ### ### ### 9.97 8.55 7.94 7.54 7.34 7.70 8.91 8.80 9.31 9.54 8.30 8.13 8.57 ## 9.43 9.93 ### ###
30 - - - - 5.17 5.33 7.15 ### ### ### ### ### ### ### ### 9.92 8.54 7.96 7.57 7.39 7.75 8.97 9.01 9.45 9.56 8.31 8.11 8.61 ## 9.45 9.89 ### ###
31 - - - - 5.53 5.72 7.15 10.45 10.22 10.13 10.48 10.59 10.35 10.64 10.09 9.82 8.48 7.98 7.65 7.44 7.75 8.99 9.14 9.60 9.61 8.33 8.15 8.72 9.19 9.45 9.91 10.26 13.33
32 - - - - 5.77 6.04 7.26 10.31 10.18 10.10 10.36 10.49 10.30 10.56 10.06 9.76 8.42 7.96 7.70 7.48 7.77 9.02 9.22 9.59 9.53 8.35 8.17 8.80 9.25 9.48 9.95 10.27 13.24
33 - - - - 6.05 6.32 7.40 10.17 10.06 10.09 10.32 10.46 10.29 10.51 10.04 9.72 8.41 8.02 7.77 7.56 7.86 9.07 9.34 9.57 9.46 8.38 8.22 8.84 9.34 9.59 10.07 10.37 13.46
34 - - - - 6.22 6.55 7.49 10.03 9.96 10.08 10.36 10.52 10.36 10.49 10.05 9.69 8.47 8.11 7.89 7.68 7.99 9.14 9.49 9.58 9.45 8.47 8.35 8.94 9.43 9.74 10.30 10.58 13.85
35 - - - - 6.26 6.66 7.53 9.98 9.92 10.09 10.40 10.57 10.44 10.53 10.07 9.73 8.55 8.20 7.99 7.78 8.10 9.21 9.57 9.68 9.50 8.56 8.43 9.02 9.53 9.88 10.43 10.74 13.99
PIT DESIGN
Seam floor
Ramp
High Wall
DISPOSAL DESIGN
• JARAK BUANG
• Cost
• AKSES JALAN
• GEOTEKNIK • Stability
PIT
DISTANCE
Disposal
Disposal
Sediment pond
ROAD ACCES
ENVIRONMENT
SEDIMENT
AIR ASAM TAMBANG
ROAD DESIGN
•Main Road
Coal haul road
Cut-fill min. – Ballance
Grade, loaded – empty
Min. Road Maint.
Drinage
Surfacing / perkerasan
OB haul road
Max. Fill, free charge
Material selection
•Ramp
Include pit dgn
Temporer
Fix Ramp
Floor seam
High Wall
GEOMETRY
Center Line
Safety Berm
Ditch
Road width
PIT RAMP
967750
967700
967650
967600
Ramp
Ramp (High Wall)
967550
967500
967450
dip
967400
Fill
967300
PIT L1 W
967250
dip
967200
511400 511450 511500 511550 511600 511650 511700 511750 511800 511850
SEKUEN KERJA TAMBANG
3 Sequence
Location Block / Sta Cut Elv. Material Dumping Distance
Pit / Seam Remarks
From To From To Thick Overburden Soil Coal Location (m)
L1 L1 Start Sapoan Cut +- 10 meter 800,726 24,000 N1 800 Cut from South Corner, Sump setting near high Wall
L0 - 1X 385 loading for bund wall construction
BLOK C
MINE SEQUENCE
PUSH BACK Triwulan 1 2007
dISPOSAL
Triwulan 1 2007
pit
pit
pit
pit
pit
Stage 1
pit
Out pit
dump
pit pit
Mine
pit Progress
Out pit
dump
In pit
dump
Out pit
dump
Stage 2
pit
Out pit
dump
Mine
Progress
pit
pit
In pit
dump
In pit
Mine dump
Progress
Out pit
dump
Out pit
dump
Stage 3
pit
pit
pit In pit
dump
Mine
Progress
In pit
In pit dump
dump
Stage 5
pit
Mine
Out pit Progress
dump
pit
Mine In pit
Progress dump
In pit
In pit dump
dump Out pit
dump
Out pit
dump
Stage 4
Mine
Progress
In pit
Out pit dump
dump
Mine
Progress
In pit
dump In pit
dump
In pit
In pit dump
dump
Out pit
dump
Out pit
dump
KUALITAS / QUALITY
• PROXYMATE
Ash, Moisture, VM, FC
• ULTIMATE
C–H–O–N-S
• ASH ANALISIS
Na2O, Fe2O3, CaO, SiO2, Al2O3 ....
• AFT
IDT, Sperical, Hemisphere, Flow
Trace Element
CV, TM, HGI
QUALITY SPEC. MARKET
THERMAL COAL
• CV adb, ar • N
• Fe2O3
• TS • CaO
• Ash • MgO
• Al2O3
• HGI
• SiO2
• AFT • H
• Na2O • O
• Cl
RENCANA KUALITAS
COAL GETTING SCHEDULE Nov-06 Dec-06 TOTAL Jan-07 Feb-07 Mar-07 Apr-07 May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07 TOTAL
2006 2007
IM - - - - - - - - - - - - - - - -
Ash adb - - - - - - - - - - - - - - - -
TOTAL
TS adb - - - - - - - - - - - - - - - -
CV adb - - - - - - - - - - - - - - - -
CV ar - - - - - - - - - - - - - - - -
Na2O - - - - - - - - - - - - - - - -
COAL GETTING 114,016 120,000 234,016 109,554 75,000 77,932 74,137 75,000 70,000 71,725 70,000 - - - - 623,348
TM 15.77 15.67 15.72 15.77 15.32 15.23 14.79 14.46 14.32 13.38 12.94 - - - - 14.62
BLOCK B
IM 10.99 10.62 10.80 11.00 10.50 10.13 9.73 9.71 9.77 9.45 9.33 - - - - 10.02
Ash adb 5.84 5.94 5.89 5.84 5.78 5.89 5.79 5.62 5.53 5.80 5.90 - - - - 5.77
TOTAL
TS adb 3.20 3.30 3.25 3.20 3.30 3.39 3.46 3.43 2.41 1.52 0.89 - - - - 2.75
CV adb 6,051 6,034 6,042 6,051 6,023 6,006 5,981 5,974 6,076 6,157 6,216 - - - - 6,058
CV ar 5,728 5,695 5,711 5,728 5,699 5,666 5,646 5,659 5,770 5,890 5,968 - - - - 5,749
Na2O 0.61 0.69 0.65 0.61 0.62 0.70 0.68 0.58 0.60 0.69 0.73 - - - - 0.65
COAL GETTING - 31,979 31,979 45,000 63,482 75,387 72,816 78,319 78,373 87,982 86,048 - - - - 587,407
TM - 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 - - - - 17.00
BLOCK C
IM - 10.92 10.92 10.92 10.92 10.92 10.92 10.72 10.50 10.42 10.30 - - - - 10.67
Ash adb - 5.16 5.16 5.16 5.16 5.16 5.16 5.28 5.42 5.47 5.54 - - - - 5.31
TOTAL
TS adb - 1.13 1.13 1.13 1.13 1.13 1.13 1.16 1.19 1.20 1.21 - - - - 1.16
CV adb - 6,223 6,223 6,223 6,223 6,223 6,223 6,221 6,220 6,219 6,218 - - - - 6,221
CV ar - 5,798 5,798 5,798 5,798 5,798 5,798 5,784 5,768 5,762 5,754 - - - - 5,780
Na2O - 3.44 3.44 3.44 3.44 3.44 3.44 3.25 3.03 2.95 2.83 - - - - 3.20