Expectations
Professional
Benefits of NOS:
Higher Quality
Lower Cost
Greater Flexibility
INPUTS PROCESS
OUTPUTS
•Mind changes •Implementation of work
plan •Higher quality
•Vision, passion, commitment
•NOS/ lean tools •Lower cost
•Measurables
•Problem solving • Shorter lead time
•Roles & responsibilities
•Worker involvement •Greater flexibility
•Implementation strategy
•Continuous improvement •Mutual trust and respect
•Resources
Learning Objective
•Understand the basic history and transition of the
Toyota Production System, Lean, and NOS, and be
able to explain to others.
FPS
American
Mass
Market
Eliminate Waste
“The point is the saving of human labor so that it may be made more
effective and more valuable.”
Use Continuous Flow Manufacturing
Synchronization of main & subassembly lines
Practice Quality at the Source
Zero-defect production
Eliminate the need for end-of-line quality checks
Standardization & Continuous Improvement
“We take it as our duty to use the public’s money to the advantage
of the public by pressing always for a better and cheaper product.”
Standards are necessary, but “Standardization means nothing
unless it means standardizing upwards.”
Increasingly Complex
Vehicles and Diverse
Market
Goals:
• Small Market 1st Oil
(oil/ gas crisis)
Quality,
• Few Resources Cost, Lead
• Need Cash Time, Shock
• Lousy Quality Flexibility
“Catch up
TOYOTA Japanese industry, Fantastic
PRODUCTION recognizes TPS &
with U.S.A!” SYSTEM dissemination begins.
Success!
U.S. Quality & Supermarket
Productivity Seminars System
Just-in-Time Jidoka
3.Kaizen-Continuous improvement
Lean systems:
Systems that create a more value-added
production flow
Systems that make the most of their human
resources
Systems that continually improve
The result:
Higher Quality
Lower Cost
Shorter Lead Time
Greater Flexibility
Mutual Trust & Respect
Labor Productivity
Downtime
Objectives:
• Understand NOS measurables.
No value is added by just collecting data or reporting trends (don’t report for
the sake of reporting – use the data to drive improvement).
Labor Productivity
Downtime
Definition:
Measure ability to produce defect free products
the first time without repair.
Key Requirements:
Implementation of well-defined standards
Quality rate of Stitching , Stock fit & Final Assembly: Measuring in half pairs produced
Cutting: Outsole:
Total # pieces produced: 10,000 Total # half pairs produced: 1,000
Defect: 10 Defect : 22
Rework: 0 Rework: 0
=9990 =978
Prefit: PU:
Total # pieces produced: 8,000 Total # half pairs produced: 1,000
Defect : 5 Defect : 48
Rework: 42 Rework: 60
=7953 =892
Stitching: Phylon:
Total # half pairs produced: 998 Total # half pairs produced: 1,000
Defect : 2 Defect : 98
Rework: 120 Rework: 0
=876 =902
BOTTOM FTT:
= Quality Rate (Outsole) x Quality Rate (PU) x Quality rate (PH)
= 0.98 x 0.89 x 0.90
= 0.78
= 78%
Definition:
Measure the ability to produce products to a plan
which considers volume, mix and sequence.
Key Requirements
No overproduction
Process capability
Build to Schedule:
BTS = (volume performance) x (mix performance) x (Sequence performance)
Definition:
Measure the time required for material and
products to flow through the plant from raw
material warehouse to finished goods
warehouse.
Key Requirements:
Continuous material and information flow
A focus on plant/operation constraint areas
Work groups focused on waste
Level /sequenced production
Reduction in inventory levels
Small batch size
More frequent material delivery/withdrawals
Assemble
Raw Material W W W W W Finished
I I I I I
Warehouse
P
Cut P
Stitch P P
Pack P
Goods
Upper Value Stream L/T: Lead time of (Cut +Prefit + Stitching + Final Assembly)
Outsole L/T: Lead time of (O/S + S/F + F/A)
PU L/T: Lead time of (PU + S/F + F/A)
PHYLON L/T:Lead time of ( PHYLON + S/F + F/A)
Lead Time is the longest of the 4 measures above.
F/G
Raw Mtrl WIP WIP WIP WIP
I I I I W/H
Storage area
Definition:
Measure the actual cost to produce a unit of
production.
Notes : Toyota focuses on the process of waste elimination. Cost
reduction is an outcome.
Key Requirements:
All production system tools(physical and cultural)
Activity based focus
Notes:
Material Cost :all material actually used (not the specification or FOB calculation) including
additional issued material.
Non-material cost : Labor + Overhead + B grades + Customer returns
Core Value Stream downtime for a line is the sum of daily downtime in Cutting
+ daily downtime in Prefit + daily downtime in Stitching + daily downtime in S/F +
daily downtime in F/A.
Bottom Value Stream is the sum of daily downtime in O/S, PU and PH.
Mindset
Objectives
•Understand why a change in Mindset may be
necessary in a NOS environment
•Explain basic concepts of each Mindset
Exercise
Objectives
•Understand mass lean transformation concepts
Background Information:
$100 Million in Annual Sales
1,000 Employees
Fabrication and Assembly of Electronic Coils
Spindle
Winding
Mount
Upper Core
Lower Core
Contacts
Completed
Coil
Mount Core
Assembly Assembly
Contact
Coil Spindle
74 NOS Learning Center
Process Flow - Charlie’s Coil Factory
10
Assemble
Weld Coil to Core 40
20
Commutator
1 20
Assemble
Commutator 30
to Mount
10
Final
Assembly 50
10
Inspect 60
Pack 70
5L + 5S
Ship 80
75 NOS Learning Center
Charlie’s Coil Factory
• 1 Minute = 1 Day
77 NOS Learning Center
Constraints - Round 1
Reactions?
What is your “one word” description of
this round?
Any problems?
What kept us from meeting our
customer demand?
• Large batch sizes drive long cycle times and high inventory levels
Waste is:
- anything that takes time,
resources or space but
does not add to the value of
the product or service delivered to
the customer.
X
Customer Product
Waste
Order Shipment
Time
Over-production
Correction(Rework,Reject)
Transportation
Motion WASTE
Over-processing
Waiting
Inventory
88 NOS Learning Center
Waste of Over-production
Definition
Creating more than, or ahead of, customer requirement.
Examples …………..?
89 NOS Learning Center
Example
Waste of Over-production
JIT W/H
In 5500prs
Out 1500prs
More parts = More money
• extra defects
• extra handling
• extra space
Results • extra machining
• extra paperwork
• extra people
• extra overhead
90 NOS Learning Center
Waste of Correction
Definition:
Producing a product that must be touched up,
reworked, or scrapped ---any Rework or Reject
Examples …………..?
91 NOS Learning Center
Correction Waste of Correction
Example
(Rework / Rejects)
Bond
Gap
Paint
Touch-up
Definition
people, machinery, material or product “sleeping”,
or sitting idle
Examples …………..?
People
Machinery
Material
JIT
W/H
Result:
We must inform tracking personnel where to pick up material
We will need additional storage location other than point of use
We need additional material movement personnel and equipment
Definition
Performing any operation that is not required to
manufacture or assemble the product to the
customer’s quality expectations.
Waste of Over-processing
Counting
Cutting at Cutting
Inspecting
Packing
Counting
at JIT W/H
Counting
at Stitching Stitching
Waste of Over-processing
Install Tongue Cover Remove Cover Guard
Definition
Ergonomic stress or extra movement by people or
machines not required to add value.
Examples……………………?
101 NOS Learning Center
Waste of Motion
Categories of Work
•Value Added - something the customer will pay for Motion
•Incidental - something which has to be done
•Waste - provides no value or service
“Eliminate Waste:
Reduce Incidental Work”
102 NOS Learning Center
Example
Waste of Motion
WASTE
( Stand up , Bend down
Lift boxes, Put down boxes …….. )
Definition
Excess material (raw, WIP, finished)
beyond what is necessary to meet
demand
Examples……………….?
Waste of Inventory
In process Inventory
Component W/H
105 NOS Learning Center
Waste of Inventory
Sea of
Poor
Inventory Line
Lack of
Quality House-
Scheduling
Problems Imbalance Keeping
Commun-
Machine Long Set-
Vendor ication
Breakdown Up Time Problem
Long Delivery Absenteeism
Transportation
Lack of
Poor Line
Quality House-
Scheduling
Problems Imbalance Keeping
Commun-
Machine Long Set-
Vendor ication
Breakdown Up Time Problem
Long Delivery Absenteeism
Transportation
Sea of
Inventory
Poor Line
Quality
Scheduling Long Set- Lack of
Problems Imbalance House-
Machine Up Time
Long Keeping
Breakdown Vendor Absenteeism
Transportation Delivery
2) Inventory
3) Correction
(Defects)
4) Transportation
(Handling)
5) Motion
6) Over-
processing
7) Waiting
Increase safety.
Improve communication.
In a Visual Factory:
There is nothing extra.
1: Sort (Organization)
2: Stabilize (Orderliness)
3: Shine (Cleanliness)
4: Standardize (Adherence)
5: Sustain (Self-Discipline)
Before
Red Coloring
To Indicate Danger “Danger” Signs
2S: Stabilize - Marking Standards for Safety
Fire Lane or Access Fire Lane or Access Red with White Letters
NonSmoking
- Area Red and Black Stripe with
No-Smoking Area White Letters
Rework Bin or Area Rework Orange with White Letters
Containers
Team Maintenance?
Leader? Operator?
Group
leader?
VS
Summary
Removing unneeded items makes it easier to find what you need.
Identifying item locations can help you find things and put them back.
• Check
• Standardize
• Maintain
• Monitor
• Improve
LOWEST SCOREX4
Unidentified parts >4 4 3 2 1 0
Excess materials >4 4 3 2 1 0
SCOREX4
>4 4 3 2 1 0
SECTION
SCORE =
LOWEST
TOTAL
No Walls, Floor &Window s clear and clean >4 4 3 2 1 0
Shine
SCORE = LOWEST
Not 4 days
TOTAL SECTION
No housekeeping schedule available and updated Visible
days
old
days days days
old old old old
SCOREX4
No standard of housekeeping displayed in area >4 4 3 2 1 0
STANDARDISE
SCORE = LOWEST
0 1 2 3 4 >4
TOTAL SECTION
No 5S improvement activities documented 0 1 2 3 4 >4
SCOREX4
SUSTAIN
TOTAL
SCORE:
Visual Display……
Is a system of visual devices that distinguish and
Visual Control……
Is a system of visual devices that identify
6 Prevent
abnormalities
5 Stop abnormalities Visual
Controls
4 Warn about abnormalities
NOS Board
Visual Display
Levels Of Visual Factory:
Example
Level 4-
Warn about abnormalities Bell or buzzer sounds when the temperature goes out of spec.
Level 5-
Stop abnormalities Trays are not moving-line stops when temperature goes out of
spec.
Red tagging
Red lines
Communicate important
information, but do not
VISUAL control or modify what
DISPLAYS people or machines do.
30 30
Level 1: 30
20 40 20 40 20 40
– Standards are indicated
10 50 10 50 10 50
separately. Meters read
according to a check sheet. Month/Date
Check Sheet
30 30 30
Level 2: 20 40 20 40 20 40
Communicate important
information and standards in a
VISUAL way that controls conformance
CONTROLS to those standards. Visual
controls modify behavior.
6 Prevent
abnormalities
5 Stop abnormalities Visual
Controls
4 Warn about abnormalities
Level 3:
20 35 10
Visual indicator of standards 10 30 25 45 50 20
checked at a glance,
standard is at 12 o’clock.
Check Sheet
20 35 10
Level 4:
25 45 50 20
10 30
A warning signal will activate 15 55 40 30
50 40
in a non-standard conditions.
20 +/- 3 35 +/- 3 10 +/- 3
Problem Solving
Objectives
Understand and explain steps in PDCA
problem solving
Check
Action
CHECK DO
CHECK DO
PURPOSE: PURPOSE:
STEPS: Check progress of Take action to ensure
I. Monitor Progress of STEPS:
implementation and countermeasures are
Implementation Plan I. Develop Implementation Plan
check effectiveness effectively and
II. Modify Plan if Necessary II. Communicate Plan
of results efficiently
III. Monitor Results III. Execute Plan
implemented
(Effectiveness)
161 NOS Learning Center
PDCA REPORT FORMAT
Theme
Theme PLAN
ACTION
CHECK
PLAN
DO
Theme
2.
3.
4.
172
10
/1
0
10
20
30
40
5/
20
10 02
/1
7/
20
10 02
/1
9/
20
10 02
/2
1/
20
10 02
/2
3/
20
10 02
/2
5/
20
10 02
/2
7/
20
10 02
/2
9/
20
10 02
/3
1/
20
11 02
/0
2/
Week of
20
11 02
/0
8/
20
PLAN - PRESENT SITUATION
11 02
/1
0/
20
11 02
/1
2/
20
02
PDCA REPORT FORMAT
Actual
Target
PDCA REPORT FORMAT
PRESENT SITUATION
ACTIVITY
Theme
TARGET
ACTIVITY
Theme
THEME
ACTIVITY
Theme
EFFECT
(Undesirable
Outcome)
EFFECT
(Undesirable
Outcome)
MATERIAL ENVIRONMENT
-Available as Needed -Group/Team Morale
-Meets Standard -Area Lighting
-Climate
-Work Area Arrangement
Man Method
Skill Level Work Sequence
Training Posture
Individual Morale Cycle Time Long
Ability Inconsistent Long shift
Method changeover
Malfunction Not Capable Area time
Lighting
Not
Machine available Work Area
Arrangement
Environment
Material
Therefore test:
•ROOT CAUSE…
-Therefore Why5 –
-Therefore… Why 4-
-Therefore… Why 3-
-Therefore… Why 2-
-Therefore… Why 1-
Therefore…Problem Statement.
Therefore test:
No system for approving and posting STW
-Therefore… Standardized work not completed for operation
-Therefore… Work instruction not communicated with operators
-Therefore… Operator doesn’t follow work instruction
-Therefore… Inconsistent method
-Therefore… Changeover time has
averaged 25 minutes .
ANALYSIS
ACTIVITY
Theme
PLAN - COUNTERMEASURE
•Short term: Team leader for all shifts prepare and present work instruction
(standardized work) to all team members
•Long term: Develop and post new standardized work with input from team members
•Recurrence prevention: Set up system to approve and post standardized work
•Why recommended: Positive impact on all areas (clarifies standard for how, when
to implement and post standardized work); prevents problem from happening for same
root cause; low cost
Theme
•Execution: Do it!
Team Leader for PU work station Team Leader 11/18/2002
operations determine STW (S. Nguyen)
Team Leader share STW PU work stations Team Leader 11/19/2002
with all operators (S. Nguyen)
Determine procedure for Factory Manager – ABC 12/31/2002
creating, updating STW Dept.
Follow procedure for PU work station Team Leader 1/31/2003
updating STW (S. Nguyen)
Time (minutes)
20
10
0
12-Nov 19-Nov 26-Nov 03-Dec 10-Dec 17-Dec 24-Dec 31-Dec 07-Jan 14-Jan 21-Jan 28-Jan 05-Feb
Week of
207 NOS Learning Center
PDCA REPORT FORMAT
CHECK - FOLLOW-UP
•Implementation progress:
WHAT WHERE WHO WHEN STATUS
Team Leader for PU work station Team Leader 11/18/2002
operations determine STW (S. Nguyen)
Team Leader share STW PU work stations Team Leader 11/19/2002
with all operators (S. Nguyen)
Determine procedure for Factory Manager – ABC 12/31/2002
creating, updating STW Dept.
Follow procedure for PU work station Team Leader 1/31/2003
updating STW (S. Nguyen)
208 NOS Learning Center
PDCA REPORT FORMAT
CHECK - FOLLOW-UP
•Countermeasure effectiveness: Meeting target? Yes!
Time (minutes)
20
10
0
12-Nov 19-Nov 26-Nov 03-Dec 10-Dec 17-Dec 24-Dec 31-Dec 07-Jan 14-Jan 21-Jan 28-Jan 05-Feb
Week of
ACTION - FOLLOW-UP
•Based on results of CHECK phase
•Meet target: Standardize countermeasure(s)
•Meet target (but problem could recur): Repeat PDCA
•Not meeting target: Repeat PDCA
•Mixed results: Standardize effective countermeasure(s) and
repeat PDCA
Quality: Safety:
Review data on defects Review injury data reports
Check process/product at Check safety wear
startup/breaks Observe whether
Observe complete process or standardized work is being
product followed
Review standardized work charts
Cost:
Overtime
Operating supply cost
Other:
Maintenance check sheet
Material Flow
Objective
•Define synchronous material flow
•Explain Push versus Pull Systems
•Explain benefits compared to current practices
1Shift
1Shift
FIFO 1Shift FIFO C/T= 9sec I
I
33 204 1Shift
1Shift
1Shift
FIFO 1Shift FIFO C/ T= 9sec I
I
33 204 1Shift
1Shift
1Shift
FIFO 1Shift FIFO C/ T= 9sec I
I
33 204 1Shift
Pull System
Schedule is
provided to final
production
department
Customer
Example of a Schedule
Customer
Example of a Schedule
Pull System
The supplying department now produces
to fill up its stock level. It withdraws the
supplies it needs from the upstream
process.
Customer
Example of a Schedule
Pull System
The customer’s needs are filled long
before the initial department even knows
about the request.
Customer
Step 2 – Determine how to make it flow
Central Market Area
Min/Max Level
Stability Academy
Develop a replenishment plan for parts and materials
be packaged?
Min/Max
246 NOS Learning Center
Stability Academy
Use of Flow Racks
Standardized Work
Objective
•Explain benefits of standardized work
•Understand elements and documents of standardized
work
•Develop standardized work
Standardized Work
Classroom Simulation
A P
C D
Standardize Improve
A P
C D
Standardize Improve
A P
C D
258 NOS Learning Center
STW Definition
Standardized Work…
is a method of STANDARDIZING and
IMPROVING process steps
3 - Standard In-
Process Stock
Quality Work
Standardized
Work
Our Focus
Standardized
Work
Standard In-
Sheet
Process Stock
Production
Capacity Quality Work
Sheet Standardized
Work Standardized
Work
Combination
Work Equipment Takt Table
Sequence Time
Totals
“Takt Time”
Is Defined as:
The pace (how often) you should produce a
part to meet customer demand.
Results:
•The customer is buying this product at a rate of one
piece every 59 seconds.
•This is out Target rate for producing a product and its
components. This is called “Takt Time”
Cycle Time
The time it actually takes to process 1 unit.
Cycle
Time
A B C D E
Operators
Job D e scription: D a te :
W orke r N a me : S hift:
R e p e ti ti o n : Time in Seconds
W ork E le me nt 1 2 3 4 5 6 7 8 9 10
10
11
Total for One Cycle
R e p e ti ti o n : Time in Seconds
W ork E le me nt 1 2 3 4 5 6 7 8 9 10
10
11
Total for One Cycle 31
Job Analysis
Demonstration
and
Exercise
Version 3.0
Standardized Worksheet Example
Department/
Standardized Work Sheet Section
Process
Takt Time
Part Name
Cycle Time Part #
Version 3.0
Step
#
Version 3.0
Date:
Worksheet #
Version 3.0
Date:
Worksheet #
Version 3.0
Move Your Information to the Standardized
Worksheet
Department/
Worksheet #
Takt Time Part Name T/M 1st T/M 2nd T/L 1st T/L 2nd Sup. 1st Sup. 2nd
IN-PROCESS
10
11
Total for One Cycle Totals
Safety Safety
Lock(s) Gloves Earplugs Other
Glasses Shoes
Work elements
Best repeatable time
286 NOS Learning Center
STW Is A Baseline
Version 3.0
Department/ Work Sequence Layout
Date:
Standardized Work Sheet Section
Time Elements
Process Worksheet #
KEY:
IN-PROCESS
KEY
DELTA
C QUALITY
QUICK Q VISUAL
FACTORY
Total Prod.Maint.
ERROR
PROOFING
D
OTHER
SAFETY/ CHANGE
STOCK
ERGO
CRITICAL CHECK
OVER C TPM
Time Elements Possible Recommended
Step Safe Job
Work Steps Hazards
# Procedures
Manual Auto Walk
TOTALS
Totals
Version 3.0
Safety Safety
Lock(s) Glasses Shoes Gloves Earplugs Other
Possible Recommended
Hazards Safe Job
Procedures
Version 3.0
Work Sequence Layout
Version 3.0
Safety Safety
Lock(s) Glasses Shoes Gloves Earplugs Other
Version 3.0
STW Sheets
If equipment is moved.
Exercise
Objective:
•Explain benefits of quick change over
•Perform a quick change over activity
Flexibility
Flexibility
process or product.
Change Over time is the net time from the last good part to the first
A A B B B
1. Select a Team
2. Observe and Record the Current Change
over Process
3. Reduce the current Change over Time
4. Develop new process and standardize
1 Collect tools 50
3 330
Remove platen
7 795
Plug in heater
9 Adjust 1050
11 Heat up 1285
13
TOTAL TIME
1 Collect tools 50 50
Remove nuts
2 and washers 285 235
Install new
5 platen 535 90
Replace nuts
6 765
and washers 230
7 Plug in heater 30
795
13
TOTAL TIME 1320
1. Pre-stage/Preset (preparation)
2. Remove the old set-up
3. Insert the new set-up
4. Perform any necessary adjustments
5. Clean- up and replace the outgoing equipment
Internal:
Activities that must be performed while the
machine is shut-down.
External:
Activities that can be performed while the
machine is producing.
Develop checklists:
List up necessary tools, specs, special checking requirements
etc.
Identify the number of workers needed
Verify set-up conditions such as pressures, times and volumes
Clarify Measurement dimensions
317 NOS Learning Center
Step 3 - Reduce Change Over Time (Cont.)
BENEFIT
PRIORITY TABLE SMALL LARGE
2 1
IMPLEMENTATION
EASY
EASE OF
4 3
HARD
(Low Priority) (Medium Priority)
Time
Time
(seconds)
Date
Date
Totals
Lock(s Safety Safety Gloves Earplug Other
) Glasse Shoes s
s
PLAN
Continuous
Improvement
ACT DO
CHECK
20 minutes 0 minutes
16 seconds 3 seconds
• Can move one operation (but not cut & form winding)
TPM-Cleaning is Inspecting
Objective:
Understand the benefits of TPM and be able
to implement the first steps of an autonomous
maintenance program.
Module Agenda
Overview of TPM
Introduction to OEE
Steps 1—3 of Autonomous Maintenance
Steps 4—7 of Autonomous Maintenance
Team Exercises and Presentations
Review and Summary
“Just Imagine…..”
Yourself……
Your workplace……
Your product………
The Concept of Zero
What’s in it for me…..?
Expectations—WIIFM
(What’s In It For Me?)!!
What am I going to get out of this from a
business perspective?
What am I going to get out of this
personally?
Definition of TPM
Key Attributes of TPM
The Concept of Zero
The History of TPM
The 12 Steps of TPM
Japan’s Experience
Safety
yes*/no
Items 1. Any damage to safety devices, enclosures, shields?
2. Any other unsafe conditions? yes*/no
*A "yes" answer to any Safety Item requires immediate repair.
Overall
Performance
Equipment = Availability x Efficiency
x Quality
Effectiveness
Identifiable Minor
Stoppages
Equipment Breakdowns Reduced speed losses Quality defects in
process losses
Tooling Losses
Startup Losses
OEE
Overall equipment effectiveness (OEE) is the primary measure of performance
in TPM. OEE views losses from the eyes of the operator, from the eyes of the
machine, and from the eyes of the material.
It measures the effective utilization of capital assets by expressing the impact
of equipment-related losses. Seven types of equipment loss are tracked:
Quality
Defects in
Tooling
Process
Losses
Startup
Losses
Equipment
Reduced Breakdowns
Speed
Idling Setup
& Minor & Adjustments
Stoppage
OEE Definitions Tables
Overall Availability,
Equipm Performan
ce OEE = Availability x
ent
Efficiency, Performance
Efficien Quality Efficiency x Quality
cy Rate Machine Efficiency Rate Equipment performance measurement
Total Available Total Available Time = Shift Time equipment could run during a shift (or other
Time operating hours time period)
Unplanned Downtime =
Machine stoppages +
Unplanned Machine breakdown + Unplanned time equipment is not operating
Downtime Setups + Adjustments (downtime)
Speed Ratio or
Equipment Performance Efficiency =
Performance Performance (Ideal Cycle Time x Total
Efficiency Efficiency Parts Run)/ Operating Time
Availability: 0.88
Performance efficiency: 0.96
Quality rate: 0.91
Cleaning is inspecting!
Improving equipment cleanliness
Developing cleaning and lubrication standards
Developing inspection procedures
Organizing work areas
Continuously improving the work process
1: Initial cleaning
4: General inspection
5: Autonomous inspection
6: Process discipline
1:Initial cleaning
2: Preventive cleaning measures
4: General inspection
5: Autonomous inspection
6: Process discipline
Purpose:
Small work groups are able to join together in
accomplishing a common goal.
Promotes a better understanding of, and familiarity
with, the machine or process area.
The actual machine cleaning regularly uncovers
hidden defects that, when corrected, have a positive
effect on equipment performance. Cleaning is
inspecting!
Perform all activities necessary to shut down, isolate, and make the equipment or process area totally safe.
Obtain copies of equipment drawings, documentation, histories, and other relevant information. (This documentation is used in successive
levels of autonomous maintenance to develop standards for lubrication and autonomous inspections.)
Document initial condition of the equipment through photographs. Prepare forms for documenting equipment problems and tags for marking
items needing further inspection.
Segment portions of the machine or process area, and plan how to clean the machine or area with maximum efficiency and effectiveness.
Obtain hand tools, rags, brushes, solvents, mops, brooms, scrapers, and any other tools required to perform the cleaning tasks.
Clean each machine segment in a methodical manner. Return the equipment to an “as new” condition.
Remove all dirt, grime, dust, grease, oil, sludge, chips, trash, and excess materials. Note any equipment abnormalities. Cleaning is inspecting!
Re-torque all bolts including hold-down, fastener, adjustment, and structural bolts. Mark all bolts by painting a stripe across both the stud head
and the bolt to indicate the relative positions of both when properly torqued.
Repaint areas if necessary according to predetermined repaint specifications. Color-code piping, utilities, and guards for ease of observation.
Note and mark all lubrication points. Again, use color coding.
Photograph the clean machine or process area and compare with a “before” photograph to verify progress.
Formally turn the equipment or process area back to production for startup and operation.
Machine:
Problem:
Machine:
Problem:
1: Initial cleaning
4: General inspection
5: Autonomous inspection
6: Process discipline
Overview
Definition
Purpose
Process Leaks
Floor Exercise
Controlling Process Excess
External Environmental Factors
Floor Exercise
Definition
Preventive cleaning measures are designed to
“engineer” a solution for maintaining
cleanliness. This is similar to preventive
maintenance activities that are designed to
prevent equipment failures and ensure
reliability.
Purpose
Sources of contamination are identified,
isolated, and controlled. Basic types of
contaminants are process leaks, process
excess, and external environmental
contaminants. These include leaking process
fluids, leaking lubricants, dust, corrosion,
process scrap, material handling scrap,
worker-generated trash, and other external
pollutants.
Locate the leak and identify its source, the type of fluid leaking, and the severity of the leak
Fill out leak tag form noting this information as well as your name and date
Detach the two-part form and, affix one portion to the leak or in near proximity of the leak
Send or hand the other part of the form to the group responsible for backlogging work orders
Document the abnormality of the Machine/Equipment Problem Listing, and record the tag information
on the Tag Log
Name: Date:
Fluid: Priority:
Area: Equip No:
Description:
Name: Date:
Fluid: Priority:
Area: Equip No:
Description:
Deliverables
-Initial Cleaning Checklist
-Process Leak Checklist
-Tag Log - Use Machine Problem Tags and
Process Leak Tags for all abnormalities and
record on tag log
389 NOS Learning Center
Step Two-Controlling Process Excess
Measure the direction of movement of the process excess as it is separated from the end product.
Design a controlling mechanism that absorbs the process excess or redirects it to an appropriate
removal vehicle.
Deliverables
-Controlling Process Excess and External
Environment Checklist
-Preventive Cleaning Measures Worksheet
1: Initial cleaning
5: Autonomous inspection
6: Process discipline
We will discuss:
Cleaning and Lubrication Standards Checklist
Lubrication Standards Diagram
“Better than New” Standards
Frequency of Cleaning/Inspection Requirements
Lubrication Standards Worksheet
Initials Activity
Convene small groups under the guidance of a facilitator, and create a vision of the equipment’s condition as
“better than new.” Gather and review all relevant materials such as manufacturers’ manuals, drawings, existing
PM check sheets, or historical operational data.
Describe what each component of the equipment would look like if it were in a “better than new” condition
Use existing drawings or develop new ones that visually show the equipment. Label each component of the
equipment, and identify each lubrication point on the picture.
For each component, document the “better than new” condition, using terms such as: free of all oil; painted;
free of all dust buildup; and free of process excess.
Establish and document the frequency of cleaning or inspection required to maintain this “better than new”
condition.
For each lubrication point, document the following:
Lubricant required
Reservoir capacity
Filter requirements
Frequency of checks
Frequency of sampling
Frequency of change
Safety considerations
All machine lubrication points should be physically marked, using color codes corresponding to the type
lubricant to be used at that lubrication point.
Department Name______________
Machine Name and Number______
Drawing of machine
Label components
Identify/Number Lubrication Points
Department___________________________
Machine/Equipment____________________
(Drawing of machine or piece of equipment with components labeled and lubrication points numbered.)
Deliverables
-Cleaning and Lubrication Standards Checklist
-Lubrication Standards Diagram (Pictorial)
-Frequency of Cleaning/ Inspection Requirements
-Lubrication Standards Worksheet
408 NOS Learning Center
The Seven Steps of Autonomous Maintenance
1: Initial cleaning
4: General inspection
5: Autonomous inspection
6: Process discipline
1: Initial cleaning
4: General inspection
5: Autonomous inspection
6: Process discipline
Review existing preventive maintenance, predictive maintenance, and inspection procedures for accuracy and
completeness.
Document the general inspection standards in a format similar to that used for the lubrication and cleaning standards.
Categorize all inspection procedures into those that can be performed presently by production operators, those that can be performed by
production operators with training, and those that should be performed by craftspeople.
Identify all training required to educate production operators in the safe performance of designated tasks.
416 NOS Learning Center
The Seven Steps of Autonomous Maintenance
1: Initial cleaning
4: General inspection
5: Autonomous inspection
6: Process discipline
Initials Activity
Develop checklists for each operator position; and organize them by performance interval,
e.g., daily, weekly, monthly.
Distribute to various personnel and/or shifts so that the workload is spread evenly across
workers and variances in operating conditions.
The maintenance management system should be used to schedule checks that occur at
intervals of one week or greater. This will provide an electronic record of the check and
related performance.
1: Initial cleaning
4: General inspection
5: Autonomous inspection
6: Process discipline
Initials Activity
List potential work processes that are perceived to be less than optimal in terms of effort
or resource.
Map the present method of performing work in terms of activities, decisions, and
interactions with equipment, people, and other systems.
Examine the work flow diagram to identify multiple ways of accomplishing the same task.
Verify that the upgraded method is superior to historical methods by testing it on the plant
floor.
Repeat the entire process as required until all work procedures in the plant have been
evaluated.
428 NOS Learning Center
The Seven Steps of Autonomous Maintenance
1: Initial cleaning
4: General inspection
5: Autonomous inspection
6: Process discipline
Definition
Purpose
Who
SUSTAINMENT!!
Production Control
Suppliers Purchasing Scheduling Customer
? Materials
? Manpower
? Priority
Need
Parts
Make
Material Manpower
Parts
Available Available
Paint
Dept
R.M
Cutting Stitching
W/H
Lead Time Lead Time
Quality R
Mixing Down Time
Airbag Airbag
Pouring PU Spray
washing Spray
Lead Time Lead Time Lead Time Lead Time
Material
Roll Pressing
Mixing
Lead Time Lead Time Lead Time
Our Focus
information
Production Flow
material
Product Family
First, we draw the current
Current State
state map by gathering Drawing
Product Family
Current State
From this, we begin to Drawing
Product Family
Current State
Drawing
Assembly
FIFO
ABC Corp.
__pcs
__day
Data Box
Pull of Material from one Truck Shipment
process to next
__/wk
_ hour
Marketplace
A Signal Production Card
B
Electronic Information Flow C
Production Schedule
Production Instruction Card
weekly Indicates path of Production Instruction Card
Shift
O/P’s Operators
D/T Downtime
An Example:
WH 65
3,000 prs/day
The customer’s warehouse is - 2,000 “A”
represented with a factory icon - 1,000 “B”
R.M
W/H
I
Cutting Stitching Assembly
I
7500 C/T= 10sec I C/T= 2100secc I C/T= 1320sec
Lamination 1Shift 1Shift 8114
4000 2032 2448 1Shift
33 204
VAT= 45sec
1Shift
CSI WH 65
3,000 prs/day
At the other end, we represent the - 2,000 “A”
material supplier with another factory - 1,000 “B”
icon. We use the truck icon and Box = 12 prs
Tues &
broad arrow to show movement of 2 shifts
Thurs material from the supplier to our plant.
1x
Daily
R.M
W/H
I
Cutting Stitching Assembly
I
7500
C/T= 10sec
I C/T= 2100sec
I C/T= 1320sec
Lamination
4000 1Shift 2032 1Shift 2448 1Shift 8114
33 204
VAT= 45sec
1Shift
What to make?
Weekly Schedule
Tues &
Thurs
1x
Daily Ship Daily
Schedule
I
Cutting Stitching Assembly
I
R.M
W/H C/T= 10sec
I C/T= 2100sec I C/T= 1320sec
4000 1Shift 2032 1Shift
2448 1Shift 8114
33 204
Weekly Schedule
Tues &
Thurs
1x
Daily Ship Daily
Schedule
I
Cutting Stitching Assembly
I
R.M
W/H C/T= 10sec
I C/T= 2100sec I C/T= 1320sec
1Shift 1Shift 1Shift 8114
4000 33
2032 204 2448
Cutting Stitching
11 10 9 8 7 6 5 4 3 2 1
1 day 1 day
Stitching
10 pairs 15 pairs
5 pairs = 1 day
Down Time
R.M
Cutting Stitching
W/H
Lead Time Lead Time
Quality R
Mixing Down Time
Airbag Airbag
Pouring PU Spray
washing Spray
Lead Time Lead Time Lead Time Lead Time
Material
Roll Pressing
Mixing
Lead Time Lead Time Lead Time
Mixing
Time
Qualit
y R
Down
L/T or NVA
Airbag Airbag Time
Pouring PU Spray
washing Spray
Lead Lead Lead Lead
Time
Qualit Time
Qualit Time
Qualit Time
Qualit
yR
Down yR
Down yR
Down yR
Down
Time Time Time Time
Material
Mixing
Roll Pressing VA= 2406 Sec %VA=
Lead
Time
Qualit
Lead
Time
Qualit
Lead
Time
Qualit
L/T = 10.5 Days 0.80%
yR
Down yR
Down yR
Down
Time Time Time
Hopefully, you can now see the Value Stream and begin
to recognize areas of opportunity. However, a
“current state map” and the effort required to create it
are wasted unless it is used to quickly create and
implement a “future state map” and work plan.
Exercise
Product Family
First, we drew the current
Current State
state map by gathering Drawing
R.M
Cutting Stitching
W/H
Lead Time Lead Time
Quality R
Mixing Down Time
Airbag Airbag
Pouring PU Spray
washing Spray
Lead Time Lead Time Lead Time Lead Time
Material
Roll Pressing
Mixing
Lead Time Lead Time Lead Time
Product Family
Current State
From this, we begin to Drawing
Product Family
Current State
Drawing
Product design
Processing machinery
Remote locations of some activities.
R.M
Cutting Stitching
W/H
Lead Time Lead Time
Quality R
Mixing Down Time
Airbag Airbag
Pouring PU Spray
washing Spray
Lead Time Lead Time Lead Time Lead Time
Material
Roll Pressing
Mixing
Lead Time Lead Time Lead Time
R.M
Cutting Stitching
W/H
Lead Time Lead Time
Quality R
Mixing Down Time
Airbag Airbag
Pouring PU Spray
washing Spray
Lead Time
Quality R
Lead Time
Quality R
Lead Time
Quality R
Lead Time
Quality R
Down time
Down Time Down Time Down Time Down Time
Quality rate
Material
Roll Pressing
Mixing
Lead Time Lead Time Lead Time
30 s
Stitching
20 s
H/F welding
Cutting
Takt Time
50 s 55 s 58.6 seconds
H/F welding
Stitching
Cutting
FIFO
C/T=50 sec C/T=55 sec
C/T=61
C/O = 0.5 hr C/O=10 min
Uptime: 80% Uptime: 100%
Assembly
FIFO
ABC Corp.
__pcs
__day
Data Box
Pull of Material from one Truck Shipment
process to next
__/wk
_ hour
Production Schedule
Sequential Production Schedule Material Withdraw Card Indicates path of Material with withdraw card
Supplier
Customer
W
Lamination Cutting Stitching Assembly
X FIFO
1Shift 1Shift 1Shift FIFO C/T= 1320sec I
I Y 33 204 1Shift
Mapping Exercise
IMPLEMENTATION
What Where Who When Status
Planning Exercise
Next Steps…