Version 3.

NOS Stability Academy


Ten Day Class

NOS Learning Center

1 NOS Learning Center


Stability Academy
Objectives
By the end of the workshop you should be able to:
1) Identify 7 types of waste
2) Implement 5S/ Visual Factory system
3) Establish and use NOS Measures to drive improvement
4) Construct Current State Map of a value stream
5) Mindsets required for NOS
6) Understand and demonstrate the use of the TPM concept of “Cleaning is Inspecting” in the
workplace.
7) Fully understand and be able to demonstrate use of Problem Solving through an application
assignment
8) Teach the concept of standardized work to others and apply at the process
9) Apply changeover reduction
10) Teach the benefits and concepts of improved material flow
11) Construct a Future State Map of a value stream

2 NOS Learning Center


Ground Rules

 Be courteous of one another


 No “sideline” conversations
 Respect other’s ideas
 The great marvels of today were once only someone’s idea.
 Turn off cell phones
 Return on time from breaks and lunch
 Keep the class interactive
 Participate
 Ask questions
(some questions may be put on the parking lot depending on time)

3 NOS Learning Center


Stability Academy

Expectations

What do you hope to gain from attending this class?


What type of information are you hoping to gather?
What do you expect to do after you complete the class?
What do others expect of you?

4 NOS Learning Center


Stability Academy
Introductions - 6-Box Exercise
Name:
PAST PRESENT FUTURE
Personal

Professional

5 NOS Learning Center


Stability Academy Introduction

 Benefits of NOS:

 Higher Quality
 Lower Cost

 Shorter Lead Time

 Greater Flexibility

 Mutual Trust & Respect

6 NOS Learning Center


Stability Academy
The NOS Process

INPUTS PROCESS
OUTPUTS
•Mind changes •Implementation of work
plan •Higher quality
•Vision, passion, commitment
•NOS/ lean tools •Lower cost
•Measurables
•Problem solving • Shorter lead time
•Roles & responsibilities
•Worker involvement •Greater flexibility
•Implementation strategy
•Continuous improvement •Mutual trust and respect
•Resources

7 NOS Learning Center


History of NOS

8 NOS Learning Center


Stability Academy

Learning Objective
•Understand the basic history and transition of the
Toyota Production System, Lean, and NOS, and be
able to explain to others.

9 NOS Learning Center


What is NOS ?
‘Nike’s Lean System based on
Toyota Production System’

NOS is an acronym for


NOVUS
ORDO
SECLORUM
Which in Latin means

‘ A New Order has Begun ’


10 NOS Learning Center
History of NOS

FPS

11 NOS Learning Center


The Evolution of NOS:
Craft  Mass Production  NOS

Henry Ford Devised Non-Craft Method of Production to Meet


Market’s Needs

 In the 1920’s, the Ford Rouge Complex became the


benchmark for best-in-the-world manufacturing
techniques.

 These included just-in-time delivery and manufacturing.

 It was duplicated in other Ford factories in Europe, and


later, used as the model for Toyota City in Japan.

12 NOS Learning Center


Greatness of Henry Ford
Broke craft tradition by devising a production
method to fill the needs of early 1900’s society

American
Mass
Market

MASS PRODUCTION Fantastic


Goal: Success!
“Economies of Scale ”
Precision
Division - Limited Product Variety
Machine
of Labor
Tools
- Flow Production

Weaving Toyota Motor Poor Vehicles


Looms Corporation Little Success

1900 1915 1935 WWII

13 NOS Learning Center


Henry Ford’s Original
Manufacturing Philosophy (1926)

 Eliminate Waste
 “The point is the saving of human labor so that it may be made more
effective and more valuable.”
 Use Continuous Flow Manufacturing
 Synchronization of main & subassembly lines
 Practice Quality at the Source
 Zero-defect production
 Eliminate the need for end-of-line quality checks
 Standardization & Continuous Improvement
 “We take it as our duty to use the public’s money to the advantage
of the public by pressing always for a better and cheaper product.”
 Standards are necessary, but “Standardization means nothing
unless it means standardizing upwards.”

14 NOS Learning Center


Complex Vehicles & Diverse Customers
Mass Production spreads and tries to adapt to changes.
Lean Manufacturing emerges as the alternative.

Increasingly Complex
Vehicles and Diverse
Market

Large -Lot Production U.S. Consumers look for


Postwar Boom Emphasis on
smaller cars. Big 3
(Mass ideas Finance and
Automation Market share decline
cemented in) Accounting
begins.

Goals:
• Small Market 1st Oil
(oil/ gas crisis)
Quality,
• Few Resources Cost, Lead
• Need Cash Time, Shock
• Lousy Quality Flexibility

“Catch up
TOYOTA Japanese industry, Fantastic
PRODUCTION recognizes TPS &
with U.S.A!” SYSTEM dissemination begins.
Success!
U.S. Quality & Supermarket
Productivity Seminars System

1945 1973 1980

15 NOS Learning Center


The “House of Toyota”

Goal: Highest Quality, Lowest Cost, Shortest Lead Time

Just-in-Time Jidoka

Continuous Flow Stop & notify


of abnormalities
Takt Time
Separate man’s work
Pull System & machine’s work

Heijunka Standardized Work Kaizen

Stability and Safety

TPS Pillars = Just-In-Time + Jidoka


TPS maintained and improved through iterations of standardized work and
kaizen, following PDCA.

16 NOS Learning Center


The House of Toyota

Definitions of the House


1.Heijunka- Balanced, level,and sequenced production

2. Standardized Work-agreed upon best method and


sequence to perform manufacturing or assembly operations

3.Kaizen-Continuous improvement

4. Stability-Production that is consistent and predictable

5. Just-in-Time – the receiving of the correct amount, with


the right mix at the correct time

6. Jidoka-”autonomation” (machine with brain) Machine


shutdown when error or defect is made

17 NOS Learning Center


What the NOS system will look like:

Close your eyes…

18 NOS Learning Center


What the NOS system will look like:

 Continuous material flow – uninterrupted


by non-value added steps

 Low inventories – reduced capital tied up


and less space used

 Empowered workers – workers involved


in making decisions and making
improvements
19 NOS Learning Center
What the NOS system will look like:

 Frequent replenishment – small batch sizes

 Flexible equipment – right sized and QCO


capable to meet daily demand

 Rapid response to problems – systematic


problem solving method

20 NOS Learning Center


What We Need to Realize Our Vision

 Lean systems:
 Systems that create a more value-added
production flow
 Systems that make the most of their human
resources
 Systems that continually improve

21 NOS Learning Center


NOS System

 The result:
 Higher Quality
 Lower Cost
 Shorter Lead Time
 Greater Flexibility
 Mutual Trust & Respect

22 NOS Learning Center


History Quiz

23 NOS Learning Center


Measurables

24 NOS Learning Center


NOS Measurables

 Quality – First Time Through (FTT)

 Delivery – Build to Schedule (BTS)

 Flexibility – Lead Time

 Labor Productivity

 Downtime

25 NOS Learning Center


Measurables

Objectives:
• Understand NOS measurables.

• Understand how to use it in a footwear factory.

• Review the NOS measurables templates.

26 NOS Learning Center


Importance of new measures

 “Tell me how I will be measured, and I’ll


tell you how I’ll perform”
 People will perform to how they are measured
 Traditional methods cause resistance to change-there is comfort
in methods by which people have been measured

 Are we managing problems or “shooting


the messenger”?

27 NOS Learning Center


What is our purpose in measuring?
 Everyone can understand if they are supporting the goals. This is known as
“alignment”.

 Measurement drives performance improvements.

 No value is added by just collecting data or reporting trends (don’t report for
the sake of reporting – use the data to drive improvement).

 Focus on using data to provide feedback and control problems—share


information.

 Allow for easy collection of information—are we meeting our customer


demand (cost, quality, safety, efficiency)?

 Comparing our current situation to our goals.

 Use measured information to develop plans for improvement!

28 NOS Learning Center


“Data is of course important in manufacturing
but I place the greatest emphasis on facts”
Taiichi Ohno

29 NOS Learning Center


The importance of “Gemba”

 Go see the actual place

 Make first hand observation

 Talk to the people

 Know the real situation-don’t rely on old data or reports.

 Insist problems are defined from facts.

 Look for current measurement tools and methods

30 NOS Learning Center


NOS Measurables

 Quality – First Time Through (FTT)

 Delivery – Build to Schedule (BTS)

 Flexibility – Lead Time

 Labor Productivity

 Downtime

31 NOS Learning Center


First Time Through (FTT)

 Definition:
Measure ability to produce defect free products
the first time without repair.
 Key Requirements:
 Implementation of well-defined standards

 Stable/ capable processes

 Sound maintenance of equipment

 Empowered and skillful workforce

32 NOS Learning Center


First Time Through (cont.)

1. Defect: Loss or something cannot be repaired


For example: B or C grade components/shoes

2. Rework: Any part produced out of standard, that


must be repaired offline or online with/without
stoppage is considered rework.

33 NOS Learning Center


First Time Through (cont.)

 Core Value Stream FTT:


= Quality Rate (Cutting) x Quality Rate (Prefit) x Quality rate (stitching) x
Quality rate (Stockfit) x Quality rate (Final Assembly)

 Quality rate of Cutting : Measuring in pieces

Total # pieces produced – (Defect+ Rework)


Quality Rate =
Total # pieces produced
Total # pieces = Daily target x # of components per pair

 Quality rate of Stitching , Stock fit & Final Assembly: Measuring in half pairs produced

Total # half pairs produced – (Defect + Rework)


Quality Rate =
Total # half pairs produced

34 NOS Learning Center


First Time Through (cont.)

 Quality rate of Prefit:


For embroidery, HF, Upper Molding and the like, include in Prefit…and for
those that come from a “supplier” or a brown-field part of the factory – just
measure the bad parts received as defects.

Total # components produced/received – defects


Quality Rate =
Total # components produced/received

35 NOS Learning Center


First Time Through (cont.)

 Bottom Process FTT: Measuring in half pairs


= Quality Rate (Outsole) x Quality Rate (PU) x Quality rate (PH)

Total # shoes produced – (defects + Rework)


Quality Rate =
Total # shoes produced

36 NOS Learning Center


First Time Through (cont.)
Daily Customer demand: 500prs/day

Cutting: Outsole:
Total # pieces produced: 10,000 Total # half pairs produced: 1,000
Defect: 10 Defect : 22
Rework: 0 Rework: 0
=9990 =978

Prefit: PU:
Total # pieces produced: 8,000 Total # half pairs produced: 1,000
Defect : 5 Defect : 48
Rework: 42 Rework: 60
=7953 =892

Stitching: Phylon:
Total # half pairs produced: 998 Total # half pairs produced: 1,000
Defect : 2 Defect : 98
Rework: 120 Rework: 0
=876 =902

Stockfit: Final Assembly:


Total # half pairs produced: 978 Total # half pairs produced: 973
Defect 5 Defect 10
Rework 140 Rework 150
=833 =813

37 NOS Learning Center


First Time Through (cont.)
Daily Customer demand: 500prs/day

Core Value Stream FTT:


= Quality Rate (Cutting) x Quality Rate (Prefit) x Quality rate (stitching)
x Quality rate (Stockfit) x Quality rate (Final Assembly)

= 0.99 x 0.99 x 0.88 x 0.85 x 0.84


= 0.62
= 62%

BOTTOM FTT:
= Quality Rate (Outsole) x Quality Rate (PU) x Quality rate (PH)
= 0.98 x 0.89 x 0.90
= 0.78
= 78%

38 NOS Learning Center


First Time Through
Exercise

39 NOS Learning Center


Build To Schedule (BTS)

 Definition:
Measure the ability to produce products to a plan
which considers volume, mix and sequence.
 Key Requirements
 No overproduction

 Process capability

 Reliable material delivery

 Empowered and skillful workforce

40 NOS Learning Center


Build To Schedule (cont.)

 Build to Schedule:
BTS = (volume performance) x (mix performance) x (Sequence performance)

Volume Performance = actual # of units produced


scheduled # of units

Mix Performance = actual # of units build to mix


actual # of units produced

Sequence Performance = actual # of units build to sequence


actual # of units produced

41 NOS Learning Center


Build To Schedule (cont.)

Volume Performance = Production A.CL BW Xcellerator A.Trblnc 9


actual # of units produced Plan
scheduled # of units Schedule 20 30 50

Actual # of units produced = 95


Scheduled # of units = 100

Volume performance = 95/100 Actual Xcellerator A. Trblnc 9 A. Cl BW


Production
= 0.95
Actual 30 60 5

42 NOS Learning Center


Build To Schedule (cont.)

Mix Performance = Production A.CL BW Xcellerator A.Trblnc 9


Plan
actual # of units build to mix
actual # of units produced Schedule 20 30 50

Actual # of units build to mix = 5+30+50


= 85
Actual # of units produced = 95

Actual Xcellerator A. Trblnc 9 A. Cl BW


Mix performance = 85/95 Production
= 0.89
Actual 30 60 5

43 NOS Learning Center


Build To Schedule (cont.)

BTS = (volume performance) x (mix performance)

Volume performance =0.95


Mix performance = 0.89

BTS = 0.95 x 0.89 = 0.85


= 85%

44 NOS Learning Center


Build to Schedule Exercise

45 NOS Learning Center


Lead time

 Definition:
Measure the time required for material and
products to flow through the plant from raw
material warehouse to finished goods
warehouse.
 Key Requirements:
 Continuous material and information flow
 A focus on plant/operation constraint areas
 Work groups focused on waste
 Level /sequenced production
 Reduction in inventory levels
 Small batch size
 More frequent material delivery/withdrawals

46 NOS Learning Center


Lead time

Raw Mat’l Storage Manufacturing Lead Time FG Storage

Assemble
Raw Material W W W W W Finished
I I I I I
Warehouse
P
Cut P
Stitch P P
Pack P
Goods

47 NOS Learning Center


Lead time

 Upper Value Stream L/T: Lead time of (Cut +Prefit + Stitching + Final Assembly)
 Outsole L/T: Lead time of (O/S + S/F + F/A)
 PU L/T: Lead time of (PU + S/F + F/A)
 PHYLON L/T:Lead time of ( PHYLON + S/F + F/A)
 Lead Time is the longest of the 4 measures above.

Upper Value Stream L/T:


LT of ( Raw Mtrl Storage W/H + Cut + Prefit + Stitching + F/A + F/G W/H)

Cutting Prefit Stitching F/A

F/G
Raw Mtrl WIP WIP WIP WIP
I I I I W/H
Storage area

48 NOS Learning Center


Outsole L/T: LT of (Outsole + Stockfit + F/A + F/G W/H)

O/S S/F F/A

WIP WIP WIP F/G


I I I W/H

PU L/T: LT of (PU + Stockfit + F/A + F/G W/H)

P/U S/F F/A

I WIP WIP WIP


F/G
I I W/H

Phylon L/T:LT of ( Phylon+ Stockfit + F/A + F/G W/H)

P/H S/F F/A

I WIP WIP WIP F/G


I I W/H

49 NOS Learning Center


Lead time
* Daily customer demand is 3,000 pairs / 8 hours working day
Lead time of Cutting : 4 hours ( 0.5 day )
Lead time of Prefit: 2 hours (0.25 day)
Lead time of Stitching : 6 hours ( 0.75 day )
Lead time of Stockfit: 2 hours (0.25 day)
Lead time of Outsole: 5 hours ( 0.62 day)
Lead time of PU: 4.5 hours (0.56 day)
Lead time of Phylon: 4.5 hours (0.56 day)
Lead time of Assembly : 2 hours ( 0.25 day )
Lead time of F/G W/H : 1.5days

Upper Value Stream Lead Time: PU Lead Time:


0.5 + 0.25 + 0.75 +0.25 + 1.5 = 3.25 days 0.56 + 0.25 + 0.25 + 1.5 = 1.06 days
Outsole Lead Time: Phylon Lead Time:
0.62 + 0.25 + 0.25 + 1.5 = 2.62 days 0.56 + 0.25 + 0.25 + 1.5 = 2.56 days

Total Lead Time is the longest of the 4 measures: 3.25days

50 NOS Learning Center


Lead Time Exercise

51 NOS Learning Center


Total Cost

 Definition:
Measure the actual cost to produce a unit of
production.
 Notes : Toyota focuses on the process of waste elimination. Cost
reduction is an outcome.

 Key Requirements:
 All production system tools(physical and cultural)
 Activity based focus

52 NOS Learning Center


Total Cost (cont.)

 Total Cost per Unit:


{material + Labor + overhead + B grades + customer returns }
# of good units produced in a given period

Notes:
Material Cost :all material actually used (not the specification or FOB calculation) including
additional issued material.
Non-material cost : Labor + Overhead + B grades + Customer returns

53 NOS Learning Center


LABOR PRODUCTIVITY

 Pairs per operator per hour.

 This includes all direct labor including Group & Team


Leaders, material handlers, maintenance & QC.

 Outside vendors are not included.

54 NOS Learning Center


DOWN TIME

 Downtime is defined as any unscheduled line or process stoppage. Causes of


downtime include: Material shortage, Line Full, Machine Breakdowns, Quality
issues.

 Core Value Stream downtime for a line is the sum of daily downtime in Cutting
+ daily downtime in Prefit + daily downtime in Stitching + daily downtime in S/F +
daily downtime in F/A.

 Bottom Value Stream is the sum of daily downtime in O/S, PU and PH.

 Downtime for the month is the average downtime per day.

Notes : Downtime should be counted in minutes


55 NOS Learning Center


MEASURABLES QUIZ

56 NOS Learning Center


NOS Mindset

57 NOS Learning Center


Stability Academy

Mindset
Objectives
•Understand why a change in Mindset may be
necessary in a NOS environment
•Explain basic concepts of each Mindset

58 NOS Learning Center


NOS Mindsets

Core Values of NOS

 Job Security: people are our greatest asset

 Problems are Good: They bring out opportunities

 Floor Level Involvement: Ask the “experts”

 Value Add / Support Value Add:


there are those who add value, and those of us who support those who add value!

 Accountability & Responsibility:


who, will do what, by when?

59 NOS Learning Center


NOS Mindsets

Traditional Factory NOS Factory


Fearful environment Fear free environment
Job uncertainty is Job security is believed
common
Problems are hidden Problems are opportunities
Managers are problem All workers are problem
resolvers and fire fighters. solvers.

Maximize labor usage Maximize value add through


support of the worker.
60 NOS Learning Center
NOS Mindsets

Lean Principles - Basis for Manufacturing

 Customer defines value


 Customer establishes pull
 Involve and empower value add workers
 Focus on elimination of waste in the value
stream
 Use Total System Cost as the ultimate
performance metric
61 NOS Learning Center
NOS Mindsets

Customer Defines Value


 Total customer focus is the only option
 Value add is defined by the customer
 Anything that is not value add is defined
as waste - Waste is defined as anything
that adds cost but not value to the product

62 NOS Learning Center


NOS Mindsets

Customer Establishes Pull for Production


Schedule

 Rate of production for each product is


equal to the rate of customer consumption
 Making what is needed, when needed,
and in the amount needed
 Production is leveled over time

63 NOS Learning Center


NOS Mindsets

Involve and Empower the People Adding


Value to the Product
 There are only two types of people in the manufacturing
organization, those that add value to the product and those
that support people who add value to the product.
 The best ideas come from the people who are closest to the
work
 The more people know about the goals, objectives, and
performance of the organization, the better the performance
 People want to do a good job
 Implementation of lean CAN NOT result in elimination of jobs

64 NOS Learning Center


NOS Mindsets

Focus on Elimination of Waste in the


Value Stream
 Use the tools of lean manufacturing to find,
minimize and finally eliminate waste: from
the beginning of our process all the way
through until the end!

65 NOS Learning Center


NOS Mindsets

Use Total System Cost As the Ultimate


Performance Metric to Drive Performance

 The mission of manufacturing is to minimize total “per


unit” cost while maximizing quality / safety and
minimizing response time
 The lowest total system cost is achievable only if safety
and quality are maximized and response time is
minimized.
 Focus on the optimization of total system cost rather
than optimization of components of the system. Look at
the “big picture”.

66 NOS Learning Center


NOS Mindsets

Exercise

67 NOS Learning Center


NOS Mindset QUIZ

68 NOS Learning Center


Simulation

69 NOS Learning Center


Stability Academy

Objectives
•Understand mass  lean transformation concepts

•List the benefits of a lean transformation

•See why measurables are necessary

•Communicate the concepts and benefits of this


transformation to others.

70 NOS Learning Center


Welcome

Charlie’s Coil Factory


71 NOS Learning Center
Charlie’s Coil Factory

Background Information:
 $100 Million in Annual Sales
 1,000 Employees
 Fabrication and Assembly of Electronic Coils

Goals and Objectives of the Company:


 High Quality
 Customer Service
 JIT Delivery
 Low Cost Operations

72 NOS Learning Center


Coil Bill of Materials

Spindle
Winding
Mount
Upper Core
Lower Core
Contacts

73 NOS Learning Center


Coil Manufacturing Process

Completed
Coil

Mount Core
Assembly Assembly
Contact

Commutator Assembly Mount Lower Core Upper Core

Coil Spindle
74 NOS Learning Center
Process Flow - Charlie’s Coil Factory

Cut & Form


Coil 10

10
Assemble
Weld Coil to Core 40
20
Commutator
1 20

Assemble
Commutator 30
to Mount
10

Final
Assembly 50

10

Inspect 60

Pack 70

5L + 5S

Ship 80
75 NOS Learning Center
Charlie’s Coil Factory

Our Current Situation:


• Previous quality problems means we’re behind 2 days in
shipments to our most important customer, and the
customer is upset!

• We have just returned from a shutdown – so there is no


product in the pipeline.

• We need to satisfy our customer as quickly as possible to


salvage our relationship and maintain prospects for any
future business.
76 NOS Learning Center
Ground Rules

• Treat marked parts as any other; do not expedite, and


do not scrap.

• First in, first out for all materials.

• Colors of blocks are not significant

• Do not rework unless the assemblies fall apart.

• 1 Minute = 1 Day
77 NOS Learning Center
Constraints - Round 1

• Cannot change layout


• Cannot change job descriptions
• Cannot change process
• Cannot expedite materials
• Cannot change lot sizes
• Cannot add or eliminate people

78 NOS Learning Center


Round 1

79 NOS Learning Center


Round 1

Reactions?
What is your “one word” description of
this round?

Any problems?
What kept us from meeting our
customer demand?

80 NOS Learning Center


Learning Points - Round 1

• Large batch sizes drive long cycle times and high inventory levels

• High inventory levels hide problems and magnify the impact of


quality problems

• Most of the time product is in the plant is non-value added time

• Chaotic process makes effective problem solving difficult, if not


impossible

81 NOS Learning Center


7 Wastes

82 NOS Learning Center


Module Objectives

Understand and be able to explain the 7 forms of waste


(symptoms, causes, effects) to others.

Identify examples of each and solutions to eliminate

83 NOS Learning Center


How should we determine what “Waste” is?

Waste is:
- anything that takes time,
resources or space but
does not add to the value of
the product or service delivered to
the customer.

84 NOS Learning Center


Toyota’s Famous Pursuit of Waste

 Muda- (Waste) The seven forms of


Waste, and the scope of this module.
 Muri- (Overburden) Overworking or
stressing of an operator or machine.
 Mura- (Unevenness) The imbalance of
workload amongst workers.

85 NOS Learning Center


How should we determine what
“Value Add” is?
 Value Add: Any activity that changes
the shape, form, or function of material
to meet customer requirements
 Non-value Add: Activities that add cost

but not value to the product (WASTE),


as defined by the customer.
 Incidental: Work that needs to be done

but does not add direct value to the part


86 NOS Learning Center
“Customer demand” is the universal driver in
change.

Conditions that were satisfactory yesterday are not acceptable


today. Tomorrow’s demands will be even greater.

X
Customer Product
Waste
Order Shipment

Time

X Lean Manufacturing helps


Customer Product to shorten the timeline
WASTE
Order Shipment between the customer
order and the product
shipment.
Time

87 NOS Learning Center


While products made in each factory may be different,
the typical wastes found in factories are similar:

 Over-production

 Correction(Rework,Reject)

 Transportation

 Motion WASTE
 Over-processing

 Waiting

 Inventory
88 NOS Learning Center
Waste of Over-production

Definition
Creating more than, or ahead of, customer requirement.

Effects: poor use of time, excess transportation, extra


space, effort, $$$, potential quality issues.
Overproduction leads to all other forms of waste.

Causes (examples): unstable work environment


(downtime, quality issues, “JIC”, etc.)

Examples …………..?
89 NOS Learning Center
Example
Waste of Over-production

JIT W/H
In 5500prs
Out 1500prs
More parts = More money

• extra defects
• extra handling
• extra space
Results • extra machining
• extra paperwork
• extra people
• extra overhead
90 NOS Learning Center
Waste of Correction

Definition:
Producing a product that must be touched up,
reworked, or scrapped ---any Rework or Reject

Effects: loss of productive time, duplicated effort,


$$$ lost,potential defect to customer

Causes (examples): unclear or no standard,


incorrect machine settings, poor in station quality,
poor training, poor or no error proofing,etc.

Examples …………..?
91 NOS Learning Center
Correction Waste of Correction
Example

(Rework / Rejects)

Bond
Gap

Paint
Touch-up

92 NOS Learning Center


Waste of Waiting

Definition
people, machinery, material or product “sleeping”,
or sitting idle

Effects: idle time, space required for material ,


effort, $$$ tied up in inventory, etc.

Causes: unclear or no standard, layouts, lack of


instructions, workload imbalance of operator,etc.

Examples …………..?

93 NOS Learning Center


Example
Waste of Waiting

People

Machinery

Material

94 NOS Learning Center


Waste of Transportation

Definition: Movement of product or materials from one


place to another (by hand carry, by cart, by conveyor,
by truck, etc.) without adding value.

Effects: time, cost, equipment, effort, potential for


quality issues MOVE IT OVER
THERE UNTIL
WE NEED IT

Causes: Poor factory layout,


or poor cell design
Examples …………..?

95 NOS Learning Center


Example
Waste of Transportation

Cut parts being stored away from the place of use.


( Distance JIT W/H to Stitching line 19 is 100 m )

JIT
W/H

Result:
We must inform tracking personnel where to pick up material
We will need additional storage location other than point of use
We need additional material movement personnel and equipment

96 NOS Learning Center


Waste of Over-processing

Definition
Performing any operation that is not required to
manufacture or assemble the product to the
customer’s quality expectations.

Effects: wasted time, added cost, extra effort, $$$

Causes: unclear or no standard


Poor communication
Examples …………..?

97 NOS Learning Center


Example

Waste of Over-processing

Counting
Cutting at Cutting

Inspecting

Packing

Counting
at JIT W/H

Counting
at Stitching Stitching

 Do all of these steps add value to the customer?

98 NOS Learning Center


Waste of Over-processing
Example

Waste of Over-processing
Install Tongue Cover Remove Cover Guard

 Do all of these steps add value to the customer?


100 NOS Learning Center
Waste of Motion

Definition
Ergonomic stress or extra movement by people or
machines not required to add value.

Effects: wasted or lost time, ergonomic problems,


effort, injuries,$$$ used for non production

Causes: cell layout, machine set-up, poor designs

Examples……………………?
101 NOS Learning Center
Waste of Motion

• Whatever time not spent in adding value to the


product should be eliminated as much as
possible.
• Movement does not necessarily indicate value-
added work
• This is also called ”necessary, but non-value
added’ or incidental work.
• Examples?

Categories of Work
•Value Added - something the customer will pay for Motion
•Incidental - something which has to be done
•Waste - provides no value or service

“Eliminate Waste:
Reduce Incidental Work”
102 NOS Learning Center
Example

Waste of Motion

Pick up the below box to make FIFO

WASTE
( Stand up , Bend down
Lift boxes, Put down boxes …….. )

Twist and pick up parts from flow rack

103 NOS Learning Center


Waste of Inventory

Definition
Excess material (raw, WIP, finished)
beyond what is necessary to meet
demand

Effects: lengthens lead time, ties up working capital, effort,


transportation, $$$, potential quality issues, covers up
problems

Causes: unclear or no standard, incorrect machine settings,


fear of running out (Just In Case), etc.

Examples……………….?

104 NOS Learning Center


Example

Waste of Inventory

In process Inventory

Component W/H
105 NOS Learning Center
Waste of Inventory

Sea of
Poor
Inventory Line
Lack of
Quality House-
Scheduling
Problems Imbalance Keeping
Commun-
Machine Long Set-
Vendor ication
Breakdown Up Time Problem
Long Delivery Absenteeism
Transportation

Lots of inventory means smooth sailing because


inventory HIDES problems

106 NOS Learning Center


Waste of Inventory

Lack of
Poor Line
Quality House-
Scheduling
Problems Imbalance Keeping
Commun-
Machine Long Set-
Vendor ication
Breakdown Up Time Problem
Long Delivery Absenteeism
Transportation

 Reducing inventory exposes hidden


problems
107 NOS Learning Center
Waste of Inventory

Sea of
Inventory
Poor Line
Quality
Scheduling Long Set- Lack of
Problems Imbalance House-
Machine Up Time
Long Keeping
Breakdown Vendor Absenteeism
Transportation Delivery

 Problem Solving can then permit smooth


sailing once again, but with LESS
INVENTORY!
108 NOS Learning Center
Waste Exercise
Type of WASTE Factory Example(s) Cause Effect
(why happening?) (why bad?)
1) Overproduction

2) Inventory

3) Correction
(Defects)
4) Transportation
(Handling)
5) Motion

6) Over-
processing
7) Waiting

109 NOS Learning Center


Waste Quiz

110 NOS Learning Center


5S / Visual Factory

111 NOS Learning Center


5S Game: round one
Circle the numbers 1—49 in order

112 NOS Learning Center


5S Game: round two
Circle the numbers 1-49 in order

 Let’s remove what we do not need to do our job.


113 NOS Learning Center
5S Game: round three

 With organization, the pattern becomes clear.


114 NOS Learning Center
5S Game: round four

 Standardization: “A place for everything, and everything


in it’s place”. Any Difference in time or quality??
115 NOS Learning Center
5S Game Part Two:
Can you find the Two Missing Numbers!!

 Remember our “old way”?


116 NOS Learning Center
Can you find the missing numbers?

117 NOS Learning Center


5S and Visual Factory
Module Objectives

Explain the benefits of 5S and visual control: the


Visual Factory concept
Explain 5S (each ‘S’)
Give examples of 5S, Visual Displays, and Visual
Controls

118 NOS Learning Center


Visual Factory

Visual Factory is the use of controls that will


enable an individual to immediately recognize
the standard and any deviation from it.

119 NOS Learning Center


Some Examples of Visual Factory
Material ID Indicator Light Andon Board

M/C Checklist Job Aids Marked Floor Areas


Visual Control Examples
Gage Parameters NOS Board

Safety Information Standardized Work


The Visual Factory Can Help You:

 Reduce searching time.

 Eliminate many frustrations.

 Increase safety.

 Improve communication.

 Increase job satisfaction.

122 NOS Learning Center


Elements of the Visual Factory: 5S

123 NOS Learning Center


The Visual Factory Vision

In a Visual Factory:
 There is nothing extra.

 The environment is immaculate (very clean),


safe, and self-cleaning.
 Standards are easy to recognize and
abnormal conditions are easier to correct.
 Performance and progress are readily
apparent
 “Zero Defects” is a reality!

124 NOS Learning Center


The Foundation of the Visual Factory: 5S

 1: Sort (Organization)
 2: Stabilize (Orderliness)
 3: Shine (Cleanliness)
 4: Standardize (Adherence)
 5: Sustain (Self-Discipline)

125 NOS Learning Center


1S : Sort (Organization)

Distinguish Between What Is and Is Not Needed

126 NOS Learning Center


After

Before

127 NOS Learning Center


2S: Stabilize (Orderliness)

A Place For Everything


and
Everything In Its Place

128 NOS Learning Center


2S: Stabilize - Location maps ,Indicators

129 NOS Learning Center


2S: Stabilize

Guidelines For Location Indicators


To Indicate Locations Address Signboards
Limit Lines
Location Lines
Labels

To Set Limits Height Lines (Red)


Standard Container Sizes

Red Coloring
To Indicate Danger “Danger” Signs
2S: Stabilize - Marking Standards for Safety

Aisles and Walkways Yellow

Fire Lane or Access Fire Lane or Access Red with White Letters

NonSmoking
- Area Red and Black Stripe with
No-Smoking Area White Letters
Rework Bin or Area Rework Orange with White Letters

Scrap Bin or Area Scrap Red with White Letters

Safety Apparatus or Area Green

Material Storage Area P/N 26063681 Blue with White Letters

Quality Hold or MRB Area Blue and Yellow Stripe

Caution or Danger Area Caution Yellow with Black Stripe and


Letters
131 NOS Learning Center
2S: Stabilize – Color coding for identification

Containers

Upper Finish Sole Outsole Phylon

132 NOS Learning Center


2S: Stabilize – Color coding for identification

uniform Operator Team


leader
Group Maintenance
leader

Team Maintenance?
Leader? Operator?

Group
leader?
VS

133 NOS Learning Center


1S and 2S: Sort & Stabilize

 Summary
 Removing unneeded items makes it easier to find what you need.

 Relocating items can improve workflow.

 Identifying item locations can help you find things and put them back.

 Together the first and second keys increase work efficiency.

 They also make your workplace a more pleasant place.

134 NOS Learning Center


3S: Shine (Cleanliness)

 Eliminate all forms of dirt.

 Find ways to keep the workplace clean.

 Adopt cleaning as a form of inspection.

 Make cleaning part of everyday work.

135 NOS Learning Center


3S Example

Spare M/C Storage Area

136 NOS Learning Center


4: Standardize(Adhere)

• Check
• Standardize
• Maintain
• Monitor
• Improve

Maintain and monitor first 3S ( Sort, Stabilize, Shine )

137 NOS Learning Center


5S: Sustain

•Continuously improving the 5S system

•Everyone in the organization (not just


manufacturing) is involved

•Requires self discipline and commitment from


everyone at all levels of the organization

138 NOS Learning Center


5S Audit Sheet
SCO RE
5S Items SCO RE NO TES
0 1 2 3 4 5

TOTAL SECTION SCORE =


Unused equipment or excess furniture and un-
>4 4 3 2 1 0
necessary items on w ork station

LOWEST SCOREX4
Unidentified parts >4 4 3 2 1 0
Excess materials >4 4 3 2 1 0

SORT No Notices are up to date >4 4 3 2 1 0


No notices and graphs indicate w hen
>4 4 3 2 1 0
updated/removed
TOTAL
No rubbish in defined bin >4 4 3 2 1 0 SCORE:
No gauge or indicator for standard of machine is
>4 4 3 2 1 0
available
No aislew ays are defined & clear >4 4 3 2 1 0
No cables off floor

TOTAL SECTION SCORE = LOWEST


>4 4 3 2 1 0
No sample parts labelled and in defined location >4 4 3 2 1 0
No production parts in defined location >4 4 3 2 1 0
Rejects in defined location

SCOREX4
>4 4 3 2 1 0

No packaging in defined /standardized location >4 4 3 2 1 0

STABILISE No notices in defined location >4 4 3 2 1 0


No cupboards, draw ers, furniture labelled >4 4 3 2 1 0
No machines and w orkstations labelled >4 4 3 2 1 0
Broken or damaged labels >4 4 3 2 1 0
No production parts are in defined coding for TOTAL
>4 4 3 2 1 0 SCORE:
identification
No containers, baskets, or boxes have size, quantity,
>4 4 3 2 1 0
and acceptable inventory level
No "Danger" marked w ith red coloring >4 4 3 2 1 0

Damaged tools or equipment w ithout repair tag >4 4 3 2 1 0

SECTION
SCORE =
LOWEST
TOTAL
No Walls, Floor &Window s clear and clean >4 4 3 2 1 0
Shine

No cleaning material and equipements available and TOTAL


>4 4 3 2 1 0 SCORE:
in place & desiginated area
Excess dirt / oil /dust on machines >4 4 3 2 1 0
>4 >3 >2 >1

SCORE = LOWEST
Not 4 days

TOTAL SECTION
No housekeeping schedule available and updated Visible
days
old
days days days
old old old old

SCOREX4
No standard of housekeeping displayed in area >4 4 3 2 1 0
STANDARDISE

No cupboard standard displayed on outside TOTAL


>4 4 3 2 1 0 SCORE:
(except if "Personal")
No Plan
Only
None of 5S Training percentage of people or
Planned
>20% >50% >80% 100%
Record

No previous audit items displayed & corrected

SCORE = LOWEST
0 1 2 3 4 >4

TOTAL SECTION
No 5S improvement activities documented 0 1 2 3 4 >4

SCOREX4
SUSTAIN
TOTAL
SCORE:

139 NOS Learning Center


Elements of the Visual Factory:
Displays and Controls

140 NOS Learning Center


Definition: Visual Displays & Controls

Visual Display……
 Is a system of visual devices that distinguish and

communicate promptly between normal and


abnormal conditions.

Visual Control……
 Is a system of visual devices that identify

abnormal conditions, and modify human


behavior to help all conditions to be in normality.

141 NOS Learning Center


Levels Of The Visual Factory

6 Prevent
abnormalities
5 Stop abnormalities Visual
Controls
4 Warn about abnormalities

Build standards into


3
the workplace

2 Share standards at the worksite Visual


Displays
1 Share information

SORT STABILIZE SHINE STANDARDIZE SUSTAIN 5S


0
5S  Visual Display  Visual Control

5S Event Visual Display

NOS Board

Visual Display
Levels Of Visual Factory:
Example

Item to be controlled The oven temperature must be 50  2C


when operator attaches upper and bottom

Level 1- Instructions to check oven temperature are located someplace,


Share information but not at the workstation. Standard is unclear to worker.

Level 2- Post Standards on the conveyer so they can easily be


Share standards at the site seen by operators. “Oven setting temperature is 50  2C

Level 3- “Oven Setting temp 50  2C ” comes up automatically on the
Build standards into the workplace control panel while the conveyer is running.

Level 4-
Warn about abnormalities Bell or buzzer sounds when the temperature goes out of spec.

Level 5-
Stop abnormalities Trays are not moving-line stops when temperature goes out of
spec.

Level 6- Temperature is automatically adjusted before going out of spec.


Prevent abnormalities

144 NOS Learning Center


Visual Displays

 Red tagging

 White or yellow lines

 Red lines

145 NOS Learning Center


About Visual Displays

Communicate important
information, but do not
VISUAL control or modify what
DISPLAYS people or machines do.

Fall into the first two levels


of the Visual Factory
pyramid.

146 NOS Learning Center


Integrating Standards Into The
Workplace

30 30
 Level 1: 30
20 40 20 40 20 40
– Standards are indicated
10 50 10 50 10 50
separately. Meters read
according to a check sheet. Month/Date

Check Sheet

30 30 30
 Level 2: 20 40 20 40 20 40

– Standards on labels. Meter 10 50 10 50 10 50

readings can be compared to


labels. 20 +/- 3 35 +/- 3 10 +/- 3

147 NOS Learning Center


Definition Of Visual Control

Communicate important
information and standards in a
VISUAL way that controls conformance
CONTROLS to those standards. Visual
controls modify behavior.

Fall into the top four levels of


the Visual Factory pyramid.

148 NOS Learning Center


Levels Of The Visual Factory

6 Prevent
abnormalities
5 Stop abnormalities Visual
Controls
4 Warn about abnormalities

Build standards into


3
the workplace

2 Share standards at the worksite Visual


Displays
1 Share information

SORT STABILIZE SHINE STANDARDIZE SUSTAIN 5S


0
Integrating Standards Into The Workplace

 Level 3:
20 35 10
 Visual indicator of standards 10 30 25 45 50 20

are built into meters. All 50 40 15 55 40 30

conditions can be seen Month/Date

checked at a glance,
standard is at 12 o’clock.
Check Sheet

20 35 10
 Level 4:
25 45 50 20
10 30
 A warning signal will activate 15 55 40 30
50 40
in a non-standard conditions.
20 +/- 3 35 +/- 3 10 +/- 3

150 NOS Learning Center


Error-Proofing & The Visual Factory

 Error-proofing expands the Visual Factory tool kit to


include methods that

 Broadcast information to problem solvers,


 Prevent defects and abnormalities from causing
further problems, and
 Eliminate the possibility of certain problems altogether.

151 NOS Learning Center


Error Proofing & The
Visual Factory

152 NOS Learning Center


Visual Controls Summary

 Visual Controls, like Visual Displays, can


resolve many information and communication
problems in the workplace.
 Again, the result is improved work efficiency
and effectiveness.
 Another important result is fewer work
frustrations and a more satisfying work
experience.

153 NOS Learning Center


5S/ Visual Factory QUIZ

155 NOS Learning Center


PDCA
Problem Solving

156 NOS Learning Center


Stability Academy

Problem Solving
Objectives
Understand and explain steps in PDCA
problem solving

Identify, investigate, solve, track simple


problem

157 NOS Learning Center


PDCA FOUR-PHASE PROBLEM
SOLVING PROCESS

The PDCA Problem Solving


Process involves four
phases:
 Plan
ACTION PLAN
 Do

 Check

 Action
CHECK DO

158 NOS Learning Center


Module Objectives

 Provide a (Plan-Do-Check-Action) user


friendly problem solving process to establish
a systematic approach of working through
problems.
 Introduce the Problem Solving Process and
the Problem Solving Format.
 Provide practice using the Problem Solving
Process and preparing Problem Solving
Reports.

159 NOS Learning Center


Module Objectives

 Write a clear problem statement based on


known facts.
 Set attainable problem solving targets/goals.
 Identify the facts needed to determine the root
cause(s) of a problem.
 Generate and select countermeasure(s) to
deal with the root cause(s).
 Write/develop a plan to implement the
countermeasure(s).
 Use Progress Management Charts to check
the progress of implementation and the results.
160 NOS Learning Center
PDCA FOUR-PHASE PROBLEM
SOLVING PROCESS
The PDCA Problem Solving Process involves four
phases:
Plan-Do-Check-Action
STEPS: STEPS:
I. Evaluate Results I. Identify Problem
II. Standardize effective II. Analyze Cause
ACTION PLAN III. Formulate Countermeasures
Countermeasure(s) OR
III. Start PDCA again PURPOSE: PURPOSE:
Do II. & III. if Results Take action based on Gain thorough
are uneven results of check understanding of
problem so it can be
systematically addressed

CHECK DO
PURPOSE: PURPOSE:
STEPS: Check progress of Take action to ensure
I. Monitor Progress of STEPS:
implementation and countermeasures are
Implementation Plan I. Develop Implementation Plan
check effectiveness effectively and
II. Modify Plan if Necessary II. Communicate Plan
of results efficiently
III. Monitor Results III. Execute Plan
implemented
(Effectiveness)
161 NOS Learning Center
PDCA REPORT FORMAT

Theme

Present Situation Countermeasure(s)


Short Term
Standard Long Term
Current Situation Recurrence Prevention
Discrepancy Why Recommended
Extent
Rationale
Implementation
Target What Where Who When
Do What
To What
How Much
By When
Follow-Up
Analysis What Where Who When
Target
Potential Causes/ Investigation Actual
5-Why Root Cause Analysis

162 NOS Learning Center


PDCA REPORT FORMAT

ADVANTAGES of the PDCA Format:


•Systematic, standardized approach (recognizable to all)
•Format is designed to present FACTS and DATA, not feelings
•History - leaves a paper trail so others can understand your effort
•Simple - anyone can do it, with a little practice.

163 NOS Learning Center


PDCA REPORT FORMAT

Theme PLAN

Problem Situation PLAN Countermeasure(s) PLAN


Standard Short Term
Current Situation Long Term
Discrepancy Why Recommended
Extent
Rationale
Implementation DO
Target PLAN What Where Who When
Do What
To What
How Much
By When
Follow-Up CHECK
Cause Analysis What Where Who When
PLAN Target
Potential Causes/ Investigation Actual
5-Why Root Cause Analysis

164 NOS Learning Center


PDCA FOUR-PHASE PROBLEM SOLVING
PROCESS (EFFORT)

ACTION

CHECK

PLAN
DO

165 NOS Learning Center


PDCA REPORT FORMAT

Theme

Present Situation Countermeasure(s)


Short Term
Standard Long Term
Current Situation Recurrence Prevention
Discrepancy Why Recommended
Extent
Rationale
Implementation
Target What Where Who When
Do What
To What
How Much
By When
Follow-Up
Analysis What Where Who When
Target
Potential Causes/ Investigation Actual
5-Why Root Cause Analysis

166 NOS Learning Center


PDCA REPORT FORMAT
PLAN - PRESENT SITUATION
(Should be DETAILED and FACT-FILLED)
•Standard (What should be happening/ what is the standard or
standard way)
•Current Situation (What is actually happening)
•Discrepancy (What is difference between standard and actual?)
•Extent (What is trend/ when did it start/ who is affected/ how
often does it occur/ where does it happen/ etc...?)
•Rationale (Why should this problem be addressed/ what would
happen if it weren’t addressed?)

167 NOS Learning Center


Evaluate the Problem
 The criteria you use to guide this evaluation include:
 Importance: how serious is the problem in light of cost,
safety, or quality, etc.?
 Urgency: how soon should it be solved to avoid more
serious problems
 Tendency: is the problem getting worse, staying the
same, or getting better?
 Problems may have high, medium, or low importance,
urgency, or tendency. All of these factors need to be
considered when several problems arise at the same time
and priorities must be set

168 NOS Learning Center


Evaluating the Problem

Problems Important Urgency Tendency


1.

2.

3.

4.

169 NOS Learning Center


Obtain Relevant
Facts Relating to the Standard
Extent:
 Seek facts relating to when the standard is
achieved and when it is not
 Define important details about the current
situation vs. the standard situation
Where is the problem located
What’s different?
(not located)? Find the POC
How often? (point of cause)
When is the problem What’s changed?
occurring (not occurring)?
When did it start?
What is the trend?
170 NOS Learning Center
PDCA REPORT FORMAT
PLAN - PRESENT SITUATION
(Should be DETAILED and FACT-FILLED)
•Standard PU shift changeover time target is 15 minutes
•Current Situation Changeover time has averaged 25 minutes
•Discrepancy Changeover is 10 minutes longer than the target
•Extent Both shifts for at least 45 days (Oct. 15 – Nov. 30),
different operators, different machines
45days3shifts  3machines = 68 hrs  3days lost production
•Rationale Productivity, Delivery, Cost– can not meet needs of
Stockfit (internal customer)

171 NOS Learning Center


Time (minutes)

172
10
/1

0
10
20
30
40
5/
20
10 02
/1
7/
20
10 02
/1
9/
20
10 02
/2
1/
20
10 02
/2
3/
20
10 02
/2
5/
20
10 02
/2
7/
20
10 02
/2
9/
20
10 02
/3
1/
20
11 02
/0
2/

Week of
20
11 02
/0

NOS Learning Center


4/
20
11 02
/0
6/
20
11 02
/0
PU Shift Changeover Time

8/
20
PLAN - PRESENT SITUATION

11 02
/1
0/
20
11 02
/1
2/
20
02
PDCA REPORT FORMAT

Actual
Target
PDCA REPORT FORMAT

PRESENT SITUATION
ACTIVITY

173 NOS Learning Center


PDCA REPORT FORMAT

Theme

Present Situation Countermeasure(s)


Short Term
Standard Long Term
Current Situation Recurrence Prevention
Discrepancy Why Recommended
Extent
Rationale
Implementation
Target What Where Who When
Do What
To What
How Much
By When
Follow-Up
Analysis What Where Who When
Target
Potential Causes/ Investigation Actual
5-Why Root Cause Analysis

174 NOS Learning Center


PDCA REPORT FORMAT
PLAN - TARGET
(Should be QUANTIFIABLE, MEASUREABLE,
ACHIEVEABLE, TIME-BOUND )
•Do What: (Action word - Increase, Reduce, Decrease)
•To What: (Object of the action - Focus Area)
•How Much: (Quantifiable measurement - relates to STANDARD)
•By When: (Specific date - month, day, year)

175 NOS Learning Center


PDCA REPORT FORMAT
PLAN - TARGET

(Should be QUANTIFIABLE, MEASUREABLE,


ACHIEVEABLE, TIME-BOUND )
•Do What: Reduce
•To What: PU shift changeover time
•How Much: To 15 minutes (per changeover)
•By When: 12/15/2003

176 NOS Learning Center


PDCA REPORT FORMAT

TARGET
ACTIVITY

177 NOS Learning Center


PDCA REPORT FORMAT

Theme

Present Situation Countermeasure(s)


Short Term
Standard Long Term
Current Situation Recurrence Prevention
Discrepancy Why Recommended
Extent
Rationale
Implementation
Target What Where Who When
Do What
To What
How Much
By When
Follow-Up
Analysis What Where Who When
Target
Potential Causes/ Investigation Actual
5-Why Root Cause Analysis

178 NOS Learning Center


PDCA REPORT FORMAT
PLAN - THEME
(General “Grasp the Situation” - One Sentence/ Phrase )
•Theme: (What do you REALLY want to accomplish -
Do What - To What)

179 NOS Learning Center


PDCA REPORT FORMAT
PLAN - THEME
(General “Grasp the Situation” - One Sentence/ Phrase )
•Theme: Reduce PU shift changeover time to 15 minutes

180 NOS Learning Center


PDCA REPORT FORMAT

THEME
ACTIVITY

181 NOS Learning Center


PDCA REPORT FORMAT

Theme

Present Situation Countermeasure(s)


Short Term
Standard Long Term
Current Situation Recurrence Prevention
Discrepancy Why Recommended
Extent
Rationale
Implementation
Target What Where Who When
Do What
To What
How Much
By When
Follow-Up
Analysis What Where Who When
Target
Potential Causes/ Investigation Actual
5-Why Root Cause Analysis

182 NOS Learning Center


PDCA REPORT FORMAT
PLAN - ANALYSIS
(Based on FACTS)
•Potential Causes: (List of all possible causes/ source of problem
- fishbone diagram is useful tool)
•How Checked? (Method to confirm reasonableness of potential
cause(s) )
•Result? (Result of check - Go and See!)
•Most Likely Cause: (Based on FACT, investigation results,
reasonable assumptions)

183 NOS Learning Center


PDCA REPORT FORMAT
FISHBONE DIAGRAM (Cause & Effect)
•Describes relationship between variables
•Used in brainstorming sessions to identify possible causes
of a problem or condition
•Focuses on causes, not symptoms

EFFECT
(Undesirable
Outcome)

184 NOS Learning Center


PDCA REPORT FORMAT
FISHBONE DIAGRAM (Cause & Effect)
Major Major
CAUSE CAUSE
category category

EFFECT
(Undesirable
Outcome)

Major Major Major


CAUSE CAUSE CAUSE
category category category

185 NOS Learning Center


PDCA REPORT FORMAT
FISHBONE DIAGRAM (Cause & Effect)

Major CAUSE Categories can generally be classified as:

MAN METHOD MACHINE


-Skill Level -Work Sequence -Function
-Individual Morale -Takt Time Properly
-Training -Posture -Capable
-Ability

MATERIAL ENVIRONMENT
-Available as Needed -Group/Team Morale
-Meets Standard -Area Lighting
-Climate
-Work Area Arrangement

186 NOS Learning Center


PDCA REPORT FORMAT
FISHBONE DIAGRAM (Cause & Effect)

Man Method
Skill Level Work Sequence
Training Posture
Individual Morale Cycle Time Long
Ability Inconsistent Long shift
Method changeover
Malfunction Not Capable Area time
Lighting
Not
Machine available Work Area
Arrangement

Environment
Material

187 NOS Learning Center


PDCA REPORT FORMAT
PLAN - ANALYSIS
(Based on FACTS)

Potential Causes How Checked Result?


Operator cycle time longer Observe (check cycle time) Operator skill OK
than standard cycle time

Inconsistent method Check operator method to Missing some standardized


SWS (standardized work work at some operations
sheet)
Equipment not working Check equipment check Equipment operating
properly sheet to actual operating conditions consistent with
conditions check sheet

•Most Likely Cause: Inconsistent method

188 NOS Learning Center


PDCA REPORT FORMAT
PLAN - ANALYSIS
•Problem: Problem Statement (direct cause)
•5-Whys?: Method to confirm potential cause - go and see/ first
hand investigation is a MUST
•Problem Statement – one phrase stating problem
•Why? (investigate - get facts)
•Why? (investigate - get facts)
•Why? (investigate - get facts)
•Why? (investigate - get facts)
•Why? (investigate - get facts)
•ROOT CAUSE
189 NOS Learning Center
PDCA REPORT FORMAT
PLAN - ANALYSIS
•Root cause: Root cause has been found when:
•It can be dealt with directly
•An effective countermeasure can be applied directly to
prevent recurrence
•If the analysis is taken further, another problem will be
encountered
•When addressed, the discrepancy returns to standard
•Confirm using the “therefore” test

190 NOS Learning Center


PDCA REPORT FORMAT
PLAN - ANALYSIS

Therefore test:
•ROOT CAUSE…
-Therefore Why5 –
-Therefore… Why 4-
-Therefore… Why 3-
-Therefore… Why 2-
-Therefore… Why 1-
Therefore…Problem Statement.

191 NOS Learning Center


PDCA REPORT FORMAT
PLAN - ANALYSIS
•Problem: Problem Statement (direct cause)
•5-Whys?: Method to confirm potential cause - go and see/ first
hand investigation is a MUST
•Problem Statement - Changeover time has averaged 25 minutes
•Why? Inconsistent method
•Why? Operator doesn’t follow work instruction
•Why? Work instruction not communicated with operators
•Why? Standardized work not completed for operation
•Why? No system for approving and posting STW
•ROOT CAUSE No system for approving and posting STW

192 NOS Learning Center


PDCA REPORT FORMAT
PLAN - ANALYSIS

Therefore test:
No system for approving and posting STW
-Therefore… Standardized work not completed for operation
-Therefore… Work instruction not communicated with operators
-Therefore… Operator doesn’t follow work instruction
-Therefore… Inconsistent method
-Therefore… Changeover time has
averaged 25 minutes .

193 NOS Learning Center


PDCA REPORT FORMAT

ANALYSIS
ACTIVITY

194 NOS Learning Center


PDCA REPORT FORMAT

Theme

Present Situation Countermeasure(s)


Short Term
Standard Long Term
Current Situation Recurrence Prevention
Discrepancy Why Recommended
Extent
Rationale
Implementation
Target What Where Who When
Do What
To What
How Much
By When
Follow-Up
Analysis What Where Who When
Target
Potential Causes/ Investigation Actual
5-Why Root Cause Analysis

195 NOS Learning Center


PDCA REPORT FORMAT
PLAN - COUNTERMEASURE
•Short term: Contains the problem/ stops the bleeding
•Long term: Addresses root cause
•Recurrence prevention: Prevents problem from ever happening
again for same root cause
•Why recommended: Evaluate based on cost, timeliness,
feasibility, effectiveness, impact

196 NOS Learning Center


Impact

 Consider the impact on others


 Ask what effects the countermeasure
will have on:
 My job?
 My team?
 Other operations?
 Other departments?
 The company as a whole?

197 NOS Learning Center


Impact

 Try to consider the extent (positive OR negative) to


which others will be affected as you use the High-
Medium-Low rating:

 High = It will likely have a great impact on others

 Medium = It will likely have a moderate impact on others

 Low = It will likely have a small impact on others

198 NOS Learning Center


Extent

 Then you consider the probable magnitude


of the impact – how many people,
departments, operations will the
countermeasure affect?

199 NOS Learning Center


Extent

 Try to consider the extent to which others will be


affected as you use the High-Medium-Low rating:

 High = It will likely impact many other people, operations, departments

 Medium = It will likely affect some other people, operations, departments

 Low = It will likely impact very few or no other people, operations,


departments

200 NOS Learning Center


PDCA REPORT FORMAT

PLAN - COUNTERMEASURE
•Short term: Team leader for all shifts prepare and present work instruction
(standardized work) to all team members

•Long term: Develop and post new standardized work with input from team members
•Recurrence prevention: Set up system to approve and post standardized work
•Why recommended: Positive impact on all areas (clarifies standard for how, when
to implement and post standardized work); prevents problem from happening for same
root cause; low cost

201 NOS Learning Center


PDCA REPORT FORMAT

Theme

Present Situation Countermeasure(s)


Short Term
Standard Long Term
Current Situation Recurrence Prevention
Discrepancy Why Recommended
Extent
Rationale
Implementation
Target What Where Who When
Do What
To What
How Much
By When
Follow-Up
Analysis What Where Who When
Target
Potential Causes/ Investigation Actual
5-Why Root Cause Analysis

202 NOS Learning Center


PDCA REPORT FORMAT
DO - IMPLEMENTATION
•Action Plan: What, Where, Who, When, Status

•Communication: All affected people understand (and support) plan

•Execution: Do it!

203 NOS Learning Center


PDCA REPORT FORMAT
DO - IMPLEMENTATION
•Action Plan
WHAT WHERE WHO WHEN STATUS


Team Leader for PU work station Team Leader 11/18/2002
operations determine STW (S. Nguyen)


Team Leader share STW PU work stations Team Leader 11/19/2002
with all operators (S. Nguyen)


Determine procedure for Factory Manager – ABC 12/31/2002
creating, updating STW Dept.


Follow procedure for PU work station Team Leader 1/31/2003
updating STW (S. Nguyen)

204 NOS Learning Center


PDCA REPORT FORMAT
Theme

Present Situation Countermeasure(s)


Short Term
Standard Long Term
Current Situation Recurrence Prevention
Discrepancy Why Recommended
Extent
Rationale
Implementation
Target What Where Who When
Do What
To What
How Much
By When
Follow-Up
Analysis What Where Who When
Target
Potential Causes/ Investigation Actual
5-Why Root Cause Analysis

205 NOS Learning Center


PDCA REPORT FORMAT
CHECK - FOLLOW-UP
•How check: Method (visual, with tool, etc.)
•When check: When/how often
•Who check: Responsible person
•Graph: Quick visual: Target vs. actual - relates back to standard
•Implementation progress: On schedule?
•Countermeasure effectiveness: Has problem recurred? Is situation
brought back to standard?

206 NOS Learning Center


PDCA REPORT FORMAT
CHECK - FOLLOW-UP
•How check: Stopwatch – last good part shift 1 to first good part shift 2
•When check: Daily at shift change
•Who check: Team leader (S. Nguyen)
PU Shift Changeover Time 40
•Graph: Target
Actual 30

Time (minutes)
20

10

0
12-Nov 19-Nov 26-Nov 03-Dec 10-Dec 17-Dec 24-Dec 31-Dec 07-Jan 14-Jan 21-Jan 28-Jan 05-Feb

Week of
207 NOS Learning Center
PDCA REPORT FORMAT
CHECK - FOLLOW-UP
•Implementation progress:
WHAT WHERE WHO WHEN STATUS
Team Leader for PU work station Team Leader 11/18/2002
operations determine STW (S. Nguyen)

Team Leader share STW PU work stations Team Leader 11/19/2002
with all operators (S. Nguyen)

Determine procedure for Factory Manager – ABC 12/31/2002
creating, updating STW Dept.

Follow procedure for PU work station Team Leader 1/31/2003
updating STW (S. Nguyen)

208 NOS Learning Center
PDCA REPORT FORMAT

CHECK - FOLLOW-UP
•Countermeasure effectiveness: Meeting target? Yes!

PU Shift Changeover Time 40


Target
Actual 30

Time (minutes)
20

10

0
12-Nov 19-Nov 26-Nov 03-Dec 10-Dec 17-Dec 24-Dec 31-Dec 07-Jan 14-Jan 21-Jan 28-Jan 05-Feb

Week of

209 NOS Learning Center


PDCA REPORT FORMAT

ACTION - FOLLOW-UP
•Based on results of CHECK phase
•Meet target: Standardize countermeasure(s)
•Meet target (but problem could recur): Repeat PDCA
•Not meeting target: Repeat PDCA
•Mixed results: Standardize effective countermeasure(s) and
repeat PDCA

210 NOS Learning Center


Problem Solving Summary

211 NOS Learning Center


Problem Consciousness: Triggers
Where can I find a Problem?

 Quality:  Safety:
 Review data on defects  Review injury data reports
 Check process/product at  Check safety wear
startup/breaks  Observe whether
 Observe complete process or standardized work is being
product followed
 Review standardized work charts

 Cost:
 Overtime
 Operating supply cost

212 NOS Learning Center


Problem Consciousness: Triggers (cont.)

 Personnel:  Production (Quantity):


 Attendance chart  Number of pairs of shoes off
 Job rotation chart line
 Training and development  Andon
chart  Productivity rate
 Review suggestions from  Regrouping tasks for even
team members distribution
 Review scrap reports

 Other:
 Maintenance check sheet

213 NOS Learning Center


Problem Solving Application
Questions

 What do you think is a problem?

 What is actually happening?


 What do you actually know?
 Do you know enough to decide what it makes sense to do?
 Can you see what is happening?
 What should be happening?
 Can you break the problem down into smaller problems?

214 NOS Learning Center


Problem Solving Application
Questions

 Can you see the point/area of cause?


 Do you need to track back to the point/area of cause?
 What is the pattern/tendency of the problem?
 Where and when is it happening?
 Who and what is involved?
 How much, how long, and how often is it happening?

 Why is this problem occurring? What is its root cause?


 Can you find and confirm the direct cause of the problem?
 Can you find and confirm the next level of cause?
 Can you prevent recurrence of the problem by addressing
the next level of cause

215 NOS Learning Center


Problem Solving Application
Questions

 What action(s) should you take to address the problem?


 What temporary measures will eliminate the problem until you can
address the root cause?
 What countermeasures are needed to address root cause and
prevent recurrence of the problem

 How will you check when you follow up to confirm results?

216 NOS Learning Center


Problem Solving Quiz

217 NOS Learning Center


Simulation Round Two

218 NOS Learning Center


Round 2

Address problems from Round 1

What improvements can we make?

219 NOS Learning Center


Constraints - Round 2
• Because of our performance in Round One, we:

• Cannot change layout

• Cannot change job descriptions

• Cannot change process

• Cannot expedite materials

• Cannot add or eliminate people

220 NOS Learning Center


Round 2

221 NOS Learning Center


Round 2

Any changes from Round 1?

What is your “one word” description?

222 NOS Learning Center


Learning Points - Round 2

• Reducing batch size also reduces cycle time and inventory


levels.

• Early detection of quality problems smoothes the process flow


and enables easier batch size reduction.

• “Push” production allows inventory to build, hiding problems


and creating additional work.

• What types of waste are still obvious?

223 NOS Learning Center


Material Flow

224 NOS Learning Center


Stability Academy

225 NOS Learning Center


Stability Academy

Material Flow
Objective
•Define synchronous material flow
•Explain Push versus Pull Systems
•Explain benefits compared to current practices

226 NOS Learning Center


Synchronous Material Flow

 Traditional – stop and go through the entire


value stream

Lamination Cutting Stitching Assembly


I I
1Shift I 1Shift I C/T= 9sec I
1Shift
33 204 1Shift

227 NOS Learning Center


Synchronous Material Flow

 Lean – flow through the factory with minimum interruption

Lamination Cutting Stitching Assembly

1Shift
1Shift
FIFO 1Shift FIFO C/T= 9sec I
I
33 204 1Shift

228 NOS Learning Center


What is Synchronous Material Flow?

 A flexible system that enables


continuous flow of material and
products driven by a fixed, sequenced,
leveled production schedule using lean
manufacturing concepts

Flexible = the ability to rapidly adjust


to customer demand
229 NOS Learning Center
What is Synchronous Material Flow?

 A flexible system that enables


continuous flow of material and
products driven by a fixed, sequenced,
leveled production schedule using lean
manufacturing concepts

Continuous flow = smooth movement of


material through the value stream with few or
no interruptions or stoppages

230 NOS Learning Center


What is Synchronous Material Flow?

 A flexible system that enables


continuous flow of material and
products driven by a fixed, sequenced,
leveled production schedule using lean
manufacturing concepts

Fixed, sequenced, leveled production schedule =


consistent, stable schedule (needed to build
product to customer demand)

231 NOS Learning Center


What is Synchronous Material Flow?

 A flexible system that enables


continuous flow of material and
products driven by a fixed, sequenced,
leveled production schedule using lean
manufacturing concepts

Lean manufacturing concepts


center around the identification
and elimination of waste
232 NOS Learning Center
Synchronous Material Flow

 Lean – flow through the factory with minimum interruption

Lamination Cutting Stitching Assembly

1Shift
1Shift
FIFO 1Shift FIFO C/ T= 9sec I
I
33 204 1Shift

Flow where you can, Pull where you can’t

233 NOS Learning Center


The Two Steps toward SMF

1. Determine where is the interruption in flow

2. Determine how to make it flow

234 NOS Learning Center


Step1: Determine where is the
interruption in flow

Lamination Cutting Stitching Assembly


I I
1Shift I 1Shift I C/T= 9sec I
1Shift
33 204 1Shift

235 NOS Learning Center


Synchronous Material Flow

 Lean – flow through the factory with minimum interruption

Lamination Cutting Stitching Assembly

1Shift
1Shift
FIFO 1Shift FIFO C/ T= 9sec I
I
33 204 1Shift

Flow where you can, Pull where you can’t

236 NOS Learning Center


1. Pull Systems Material
Movement

 In traditional manufacturing, all process


departments receive schedules and
produce to it.
 Each process produces their parts and
forwards them to the next process.
 This is commonly referred to as the Push
System.

237 NOS Learning Center


Material Movement (cont..)

 The Push System makes adapting to


change very difficult.

 The result is extra inventories of parts not


needed accumulating in the producing
departments….

 And shortages of parts that are needed in


the downstream processes.
238 NOS Learning Center
Material Movement (cont...)

 In contrast, a “Pull System” provides that


only the downstream process receives the
schedule.
 Each upstream process maintains a
standard “in-process” stock level that the
subsequent process withdraws from.
 This “pull” triggers the department to
produce parts to replenish the stock level.
 The department withdraws stock from its
supplying operations’ stock level, thereby
initiating an additional “pull”...
239 NOS Learning Center
Example of a Schedule

Pull System
Schedule is
provided to final
production
department

Each process upstream


maintains standard stock levels.

Process Process Process Process


A B C D

Customer
Example of a Schedule

Pull System The final production


department withdraws
needed materials from
its supplier operation

Process Process Process Pull Process


A B C D

Customer
Example of a Schedule

Pull System
The supplying department now produces
to fill up its stock level. It withdraws the
supplies it needs from the upstream
process.

Process Process Pull Process Process


A B C D

The units are produced


and shipped to the
customer.

Customer
Example of a Schedule

Pull System
The customer’s needs are filled long
before the initial department even knows
about the request.

Process Pull Process Process


A B C D

Customer
Step 2 – Determine how to make it flow
Central Market Area

 Set up central market areas


 Create a detailed delivery
strategy plan
 Establish standard material
handling routes and times
 Use a packaging plan:
disposable, returnable

Min/Max Level
Stability Academy
Develop a replenishment plan for parts and materials

245 NOS Learning Center


Step 2 – Determine how to make it flow

 Questions to ask at the Line.

1.How will the part or component

be packaged?

2. How will the component be

presented to the operator?

3. What is the maximum quantity that


can be stored beside the line?

4. Can component be delivered

directly to “point of use?”

Min/Max
246 NOS Learning Center
Stability Academy
Use of Flow Racks

247 NOS Learning Center


Stability Academy

Flow racks promote FIFO and can limit the


amount of inventory at a station

248 NOS Learning Center


Step 2 – Determine how to make it flow

 Factory Level Questions

 Where will returnable containers be stored?


 Do current racks or equipment need to be modified?
 Are new racks or equipment needed?
 Capital expenses required

249 NOS Learning Center


Stability Academy
 How will the operator inform material handler of need for more parts?

250 NOS Learning Center


Stability Academy
Where will the components be stored?

How much storage area does it need?


251 NOS Learning Center


Stability Academy

Finished Goods Inventory. Should


include posted Min/Max levels
252 NOS Learning Center
Step 2 – Determine how to make it flow

 Schedule component production to match the


main assembly line.

A disciplined process is used to ensure:


 production in the factory is coordinated to support
customer requirements
 inventory is maintained at minimum required
levels
 material is ordered to support production

253 NOS Learning Center


Step 2 – Determine how to make it flow

 Use Visual Factory techniques


 Involve both production workers and
material handlers in replenishment
 Monitor the process for continuous
improvement

254 NOS Learning Center


Standardized Work

255 NOS Learning Center


Stability Academy

Standardized Work
Objective
•Explain benefits of standardized work
•Understand elements and documents of standardized
work
•Develop standardized work

256 NOS Learning Center


Stability Academy

Standardized Work

Classroom Simulation

257 NOS Learning Center


Standardized Work

A P
C D

Standardize Improve
A P
C D

Standardize Improve
A P
C D
258 NOS Learning Center
STW Definition

 Standardized Work…
 is a method of STANDARDIZING and
IMPROVING process steps

 is a method for the work team to organize their


tasks in a manner that will provide for Continuous
Improvement through the elimination of waste

 documents current best method to safely make a


quality product, efficiently.
259 NOS Learning Center
Benefits of Using STW

 Assures safety-we don’t standardize unsafe operations


 Avoids unnecessary motion and wasted effort
 Maintains quality
 Prevents equipment damage
 Foundation or baseline for improvement
 Reduces cost
 Provides workers a means to define their jobs
 Maintains consistency between operators/shifts

260 NOS Learning Center


What Is Standardized Work (STW)?

 Breakdown of work into it’s elements


 Work Steps
 Safety points
 Visual Representation
 Timing
 Takt Time
 Tool for making quality products
 Visual control for waste identification
 Document of current best method (standard) for completing
work
 Owned by the Work Group
 Training tool
 Basis for Continuous Improvement
261 NOS Learning Center
STW Is NOT . . .

 A document created by a supervisor or


engineering group.
 Static; it changes as workers continually improve
the operation
 Buried in some desk, never to be seen again!
 Just worksheets or job descriptions.

It is a system for closely checking the actual


performance of the production operations

262 NOS Learning Center


Pre-Requisites for STW

 Work sequence consistency: good work practices


 Stable and consistent quality: repeatability
 Efficient equipment/resources: dependability
 Overall stability/ predictability in the
process. Some place to start!

263 NOS Learning Center


Standardized Work
Points of view

 Work point of view


 Centered around human movements
 Work done the same way each time
 Equipment point of view
 Minimal trouble with machinery or equipment
 Minimal fluctuation in the operation of
equipment or production time
 Quality point of view
 Minimal trouble in processing quality
264 NOS Learning Center
Three Components of
Standardized Work

3 - Standard In-
Process Stock

Quality Work

Standardized
Work

1 - Work Equipment 2 - Takt


Sequence Time

265 NOS Learning Center


Three Documents
of Standardized Work

Our Focus
Standardized
Work
Standard In-
Sheet
Process Stock

Production
Capacity Quality Work
Sheet Standardized
Work Standardized
Work
Combination
Work Equipment Takt Table
Sequence Time

266 NOS Learning Center


Production Capacity Sheet Date Group

Part No. Line name Name


Manager Supervisor Produciton
Capacity Sheet Part Name Max Daily Current Output
Output Person / Day Pcs
Step Base Time Tools
Processing
No. Process Name Machine No. Manual Machine Time To Change Time to Remarks
Time Time Complete frequency change
Capacity

Used in processes that incorporate machines

Lists the production capacity of each process

Shows the bottleneck process

Provides the focus for continuous improvement activities

Becomes the basis for Standardized Work Combination Tables

Totals

267 NOS Learning Center


Work Combination Table
Part No. Required Manual
& Name Work Date Per Shift Automatic
Process Analysis Sheet Takt Walking
Name Dept. Time
Time
No. Operation Man. Auto Walk 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

Used in processes that incorporate workers

Indicates the range of work for which a worker is responsible

Shows the work sequence

Shows the times for each work step

Shows the bottleneck process

Provides the focus for continuous improvement activities


Totals

268 NOS Learning Center


Version 3.0
The Steps to Implementing STW

1. Determine the takt time!


2. Analyze the job steps and times.
(use job analysis data sheet)
3. Fill out the production capacity sheet.
4. Fill out the standardized work combination
table.
5. Fill out the standardized work sheet.

270 NOS Learning Center


Step1: Determine Takt Time

“Takt Time”
Is Defined as:
The pace (how often) you should produce a
part to meet customer demand.

271 NOS Learning Center


1. Determine Takt Time
Divide the available time to produce by the actual customer demand
Your available work time
Takt time =
Daily customer demand
27,000 seconds/day
Example: = 59 seconds/piece
455 pieces/day

Results:
•The customer is buying this product at a rate of one
piece every 59 seconds.
•This is out Target rate for producing a product and its
components. This is called “Takt Time”

272 NOS Learning Center


Cycle Time

Cycle Time
The time it actually takes to process 1 unit.

This includes human & machine work and


walking & waiting time.

Measured by taking the average time measured


over a representative sample size.

273 NOS Learning Center


Takt & Cycle Time Relationship

 If Takt Time and Cycle Time are not equivalent, an


imbalance exists in the operating system.
 When Takt Time and Cycle Time are equivalent,
overproduction is prevented by maintaining the cycle.

60 seconds Takt Time (60 seconds)

Cycle
Time

A B C D E
Operators

274 NOS Learning Center


Step2: Analyze the Job Steps

• A “work element” is a small step toward


completing an entire job.
• It should have a defined start and stop point
• It should always be performed the same way
• Work elements make up a worker’s “cycle”

275 NOS Learning Center


Step2: Analyze Job Steps

Work Sequence refers to the series of steps in a


single process that are the safest, most efficient,
quickest, and produce acceptable quality.

When the work sequence is carefully followed, the


cycle time will be constant, no steps will be
forgotten, and the chance of equipment damage,
injury, or other major problems will be minimized.

276 NOS Learning Center


2. Analyze Job Steps
Job Analysis Data Sheet Y our N a me :

Job D e scription: D a te :
W orke r N a me : S hift:

R e p e ti ti o n : Time in Seconds
W ork E le me nt 1 2 3 4 5 6 7 8 9 10

10

11
Total for One Cycle

277 NOS Learning Center


2. Analyze Job Steps
Job Analysis Data Sheet Y our N a me : S. Kim

Job D e scription: Pre-bonding process D a te : 2/22/2002


W orke r N a me : S. Nguyen S hift: First

R e p e ti ti o n : Time in Seconds
W ork E le me nt 1 2 3 4 5 6 7 8 9 10

1 Pick up upper 3 1. Fill in cumulative


2 Place in fixture 5 8 running time
first.
3 Add adhesive to front 6 14
4 Rotate fixture 3 17

5 Add adhesive to back 6 23 2. Then calculate the


element time by
Remove part from Fixture 3 subtraction.
6 26
Inspect & set aside 5
7 31
8

10

11
Total for One Cycle 31

278 NOS Learning Center


Standardized Work

Job Analysis
Demonstration
and
Exercise

279 NOS Learning Center


Standardized Worksheet Template

Version 3.0
Standardized Worksheet Example
Department/
Standardized Work Sheet Section
Process
Takt Time
Part Name
Cycle Time Part #

Version 3.0
Step
#

KEY DELTA QUALITY QUICK Total


KEY:
IN- SAFETY/ CRITICAL CHECK CHANGE
Q Prod.
ERROR
PROOFI D
OTHER
PROCESSERGO C OVER C Maint. NG
STOCK TPM

Version 3.0
Date:

Worksheet #

Opr WGL Sup Maint Eng Safety

Version 3.0
Date:

Worksheet #

Opr WGL Sup Maint Eng Safety

Version 3.0
Move Your Information to the Standardized
Worksheet

Job Analysis Standardized


Data Sheet Worksheet
Date: Work Sequence Layout
Process

Job Analysis Data Sheet Your Na me :


Standardized Worksheet

Department/
Worksheet #

Plant Name Section Page____ of____

Takt Time Part Name T/M 1st T/M 2nd T/L 1st T/L 2nd Sup. 1st Sup. 2nd

Job De scription: Da te : Cycle Time Part #

IN-PROCESS

Worke r Na me : Shift: KEY: STOCK SAFETY QUALITY

Time Elements “Key Points”


Step Safety, Quality, Cost,
Work Steps
# Technique
Manual Auto Walk Wait
R e p e ti ti o n : Time in Seconds
Work Ele me nt 1 2 3 4 5 6 7 8 9 10

10

11
Total for One Cycle Totals

Safety Safety
Lock(s) Gloves Earplugs Other
Glasses Shoes

 Work elements
 Best repeatable time
286 NOS Learning Center
STW Is A Baseline

 STW serves as a foundation for Continuous


Improvements
 Supervisors promote Continuous Improvement
whenever a problem is discovered
 All workers use STW once it is implemented
 Post at the line, naming the best method for
Visual Factory
 We cannot improve unless we have a defined
starting place!
287 NOS Learning Center
Step # Work Steps

Version 3.0
Department/ Work Sequence Layout
Date:
Standardized Work Sheet Section
Time Elements
Process Worksheet #

Takt Time Part Name Manual Auto Walk


Opr WGL Sup Maint Eng Safety
Cycle Time Part #

KEY:
IN-PROCESS
KEY
DELTA
C QUALITY
QUICK Q VISUAL
FACTORY
Total Prod.Maint.
ERROR
PROOFING
D
OTHER
SAFETY/ CHANGE
STOCK
ERGO
CRITICAL CHECK
OVER C TPM
Time Elements Possible Recommended
Step Safe Job
Work Steps Hazards
# Procedures
Manual Auto Walk

TOTALS
Totals

Version 3.0
Safety Safety
Lock(s) Glasses Shoes Gloves Earplugs Other
Possible Recommended
Hazards Safe Job
Procedures

Version 3.0
Work Sequence Layout

Version 3.0
Safety Safety
Lock(s) Glasses Shoes Gloves Earplugs Other

Version 3.0
STW Sheets

STW should also be used to:


 Show the steps necessary in line processes:

 Operator performed Periodic Quality Checks

 Operator performed Preventive Maintenance


Activities such as Cleaning/Lubrication.
 Operator performed Start-Up and Shut-Down
Procedures
 Operator performed Tool Change Procedures

 List necessary tools and equipment at the


workstation; and
 Visibly post standards at the workstation.

293 NOS Learning Center


Roles and Responsibilities

 As with any NOS tool, roles and


responsibilities are necessary to insure
successful implementation.

294 NOS Learning Center


Role of Work Team Members

 Define “best way”, and complete STW forms.


 Update STW forms following any Continuous
Improvement activities.
 Maintain STW forms in the workplace.
 Own the STW forms: Use them; they are here for
you.

295 NOS Learning Center


Role of Production
Team/Group leaders

 Coordinate between work team members.


 Provide guidance and support to the
operators.
 Resolve questions and concerns.
 Provide coaching and training.

296 NOS Learning Center


Role of Plant Management

 Supports work teams in their quest to achieve


targets.
 Accepts responsibility to improve productivity
by supporting the “best way”.
 Acknowledges the importance of, and supports
the needs of work teams developing and
maintaining their STW forms.

297 NOS Learning Center


STW is a Living Document

 Standardized work can change…

 When supervisor/worker finds problems or room for


improvements.

 If equipment is moved.

 If the process is modified.

 If the product changes

 If TAKT time changes


298 NOS Learning Center
Standardized Work

Exercise

300 NOS Learning Center


Standardized Work QUIZ

301 NOS Learning Center


Quick Change Over
(QCO)

302 NOS Learning Center


Quick Change Over
(QCO)

Objective:
•Explain benefits of quick change over
•Perform a quick change over activity

303 NOS Learning Center


QUICK CHANGE OVER (QCO)

Flexibility
Flexibility

304 NOS Learning Center


What is “CHANGE OVER TIME”?
 Changeover is the process of setting up production line for a different

process or product.

 Change Over time is the net time from the last good part to the first

good part is produced, after the Change Over.

A A B B B

CHANGE OVER TIME !

305 NOS Learning Center


What is Quick Change Over (QCO)?

 QCO is a systematic process used to


continually reduce set up and change
over time within a plant.
 QCO is a key enabler in reducing batch
size which in turn shortens lead time.

306 NOS Learning Center


Quick Change Over

QCO can be applied to ….

1. Product : Models, Sizes, Genders, Musical Size Run, Line

2. Material: Leather, Mesh, Synthetics, Bobbins, Needles….

3. Tooling : Molds, Press pads, Gauges, Toner, Painting gun….

4. Machines/Equipment : Change Sandpaper in buffing machine,


change Stitching machines when changing models.

307 NOS Learning Center


The Benefits of Quick Change Over

 Enables smaller batch production


 Less Inventory
 Reduce Lead Time
 Greater flexibility (Supports Sequential
Production)

308 NOS Learning Center


Steps to Reduce Change Over Time

1. Select a Team
2. Observe and Record the Current Change
over Process
3. Reduce the current Change over Time
4. Develop new process and standardize

309 NOS Learning Center


Step 1 - Select a TEAM

 Identify the necessary members


 Include key contact personnel
 Divide into full-time or support personnel

Examples of Who To Include


Dept. manager
Team / Group leaders
Operators
Set-up Personnel
Maintenance people
Engineering
310 NOS Learning Center
Step 2 – Document current process

Observe and Record


Current Change-over Process.

 Introduce Change-over Chart


 Record Current Change-over Process
 Videotaping
 Divide into steps
 Time the steps
 Gather facts

311 NOS Learning Center


Step 2 – Document current process (Cont.)

Change-over Study Observation Worksheet


SEQUENC CHANGEOVER Elapsed Element INDIVIDUAL ELEMENT TIME
E NO. ELEMENT Time Time 20 40 60 80 100 120 140 160 180 200 220

1 Collect tools 50

2 Remove nuts 285


and washers

3 330
Remove platen

4 Store platen 445


Install new
5 535
platen
Replace nuts
6 765
and washers

7 795
Plug in heater

8 Get new cards 845

9 Adjust 1050

10 Return tools 1100

11 Heat up 1285

Make first 1320


12
good piece

13
TOTAL TIME

312 NOS Learning Center


Change-over STUDY OBSERVATION WORKSHEET Example

Changeover Study Observation Worksheet


SEQUENCE CHANGEOVER ELAPSED ELEMENT INDIVIDUAL ELEMENT TIME
NO. ELEMENT TIME TIME 20 40 60 80 100 120 140 160 180 200 220

1 Collect tools 50 50

Remove nuts
2 and washers 285 235

3 Remove platen 330 45

4 Store platen 445 115

Install new
5 platen 535 90
Replace nuts
6 765
and washers 230

7 Plug in heater 30
795

8 Get new cards 845 50

9 Adjust 1050 205

10 Return tools 1100 50

11 Heat up 1285 185

Make first good 1320 35


12 piece

13
TOTAL TIME 1320

313 NOS Learning Center


Step 2 – Document current process (Cont.)

The FIVE STAGES of Change-over

1. Pre-stage/Preset (preparation)
2. Remove the old set-up
3. Insert the new set-up
4. Perform any necessary adjustments
5. Clean- up and replace the outgoing equipment

314 NOS Learning Center


Step 3 - Reduce Change Over Time

A. Distinguish Internal From External Time

B. Shift Internal Activities to External Activities

C. Make more efficient Internal and External


Activities

D. Prioritize and Select Improvement Ideas

315 NOS Learning Center


Step 3 - Reduce Change Over Time (Cont.)

A. INTERNAL & EXTERNAL Set Up Activities

 Internal:
 Activities that must be performed while the

machine is shut-down.

 External:
 Activities that can be performed while the

machine is producing.

316 NOS Learning Center


Step 3 - Reduce Change Over Time (Cont.)

B. Shifting From Internal To External

 Prepare in advance any operational conditions currently


performed in Internal set-up.
 Do as much as possible before the machine stops:
 Have everything organized

 Kit Tools together- check their operation

 Kit Necessary Parts together

 Develop checklists:
 List up necessary tools, specs, special checking requirements
etc.
 Identify the number of workers needed
 Verify set-up conditions such as pressures, times and volumes
 Clarify Measurement dimensions
317 NOS Learning Center
Step 3 - Reduce Change Over Time (Cont.)

C. Streamlining Internal Activities

Identify what needs to be controlled.


How can all necessary items for Change-over best be
organized?
Where can tools, parts, people best be located?
How can we control change-over process? ( Who, How…. )
How will tools be maintained in perfect condition?
How many tools and parts need to be kept in stock?
 Can we run Parallel Operations:

 Use Functional Clamps:

 Eliminate of simplify Adjustment:

 Use Mechanization and Automation

318 NOS Learning Center


Step 3 - Reduce Change Over Time (Cont.)

C. Streamlining Internal Activities (Cont.)

 Can we improve the time?

 Can any part of the process be error- proofed?


 Pins, slots, jigs, one-way installation

 Where can visual factory be applied?

319 NOS Learning Center


Step 3 - Reduce Change Over Time (Cont.)

D. Prioritize and Select Improvement Ideas

 Use Priority Table to evaluate Improvement


Ideas.
 Brainstorm and organize your thoughts

 Create New Change-over Procedure beginning


with Quadrant One Ideas from table.
 Use the ideas that are easiest to implement, but offer
the greatest benefit.
 Always consider lowest cost improving the ideas.

320 NOS Learning Center


Step 3 - Reduce Change Over Time (Cont.)

D. Prioritize and Select Improvement Ideas (Cont.)

BENEFIT
PRIORITY TABLE SMALL LARGE

2 1
IMPLEMENTATION

EASY
EASE OF

(Medium Priority) (High Priority)

4 3
HARD
(Low Priority) (Medium Priority)

321 NOS Learning Center


Check (test the improved method)

 Obtain Approval for New Procedure


 Select Time and Date of Test
 Notify Key Personnel
 Acquire Needed Tools, Jigs, Fixtures, Etc.
 Review New Procedure with Operators and Train
 Decide Roles for Change-over Test and Test

PREPARE FOR TEST

322 NOS Learning Center


4. Document new process (Develop new STW)

Department/ Date: Work Sequence


Section Layout
Standardised
Takt
Process
Part
Worksheet
# WGL Sup Maint EngSafety
Opr
Work
Cycle
Time Sheet Part #
Name
QC ChangeoverTimes
Times ----Actual Vs. Vs.
Target
Time
KE IN-
Y: PROC
KEY DEL C
SAFE TA
QU
ALI
QUI
CK
VISU
AL
Total
TPM R
Prod.Maint
ERROD OTHER Changeover Actual Target
StepESS Time . Possible Recommend
TY/ Work
CRI StepsTY CHA FAC PROO
# STOC ERG NGE
Manua
TORAuto
Walk
Elements HazardsFING ed
TIC CHE
K O AL CK OVE Yl Safe Job
R Procedures

Time
Time
(seconds)

Date
Date

Totals
Lock(s Safety Safety Gloves Earplug Other
) Glasse Shoes s
s

PLAN
Continuous
Improvement

ACT DO

CHECK

323 NOS Learning Center


QCO Example
Mold Change

 

 

324 NOS Learning Center


QCO Example
Mold Change

 

325 NOS Learning Center


326 NOS Learning Center
327 NOS Learning Center
PU Spray Color change

20 minutes 0 minutes

328 NOS Learning Center


Press pad change

16 seconds 3 seconds

329 NOS Learning Center


H/F weld mold change

100 – 140 seconds 30 – 50 seconds

330 NOS Learning Center


SET-UP HINTS

 Avoid studying a set-up reduction project to death.

 Don’t be satisfied with early successes (easy reductions in set-


up time).

 Don’t get tangled up in techniques; get started now.

 Strive for continuous improvements; 50% improvement at a time.

 Post problems, goals, accomplishments, and measurements


where they are visible to all.

 Document all steps of you current set-up process (videotape)

 Seek simplicity in solutions-no cost/low cost.


331 NOS Learning Center
Quick Change Over Quiz

332 NOS Learning Center


Simulation Round Three

 Improvement Ideas for round three.

333 NOS Learning Center


Constraints - Round 3

You will be allowed:

• Limited budget to make minor changes

• Can move one operation (but not cut & form winding)

• Cannot change process

• Cannot add or eliminate people

334 NOS Learning Center


Pull System - Implementation Guidelines

• As operators use up the parts in a basket they should PULL


the next basket into the “Working Stock” location, exposing
the “FEED ME” signal

• Material handler and truck driver should deliver the required


parts as the “FEED ME” visual signals are exposed.

• If “FEED ME” signal is not visible, parts are not needed:


therefore no parts should be delivered, even if they are ready

• If “MAKE MORE” signal is not visible, production should


stop.

335 NOS Learning Center


Round 3

336 NOS Learning Center


Learning Points - Round 3

• Low levels of inventory make bottlenecks and other problems


easy to spot
• Set up reduction enables batch size reduction
• Lower inventory levels simplify workplace organization which
reduces non-value added work
• “Pull” production system enables greater control over inventory
levels
• “Pull” production simplifies workplace organization which
reduces non-value added work
• Dramatic improvements are possible without major capital
investment

337 NOS Learning Center


TPM

338 NOS Learning Center


Stability Academy

TPM-Cleaning is Inspecting
Objective:
Understand the benefits of TPM and be able
to implement the first steps of an autonomous
maintenance program.

339 NOS Learning Center


Cleaning is Inspecting!

Module Agenda
 Overview of TPM
 Introduction to OEE
 Steps 1—3 of Autonomous Maintenance
 Steps 4—7 of Autonomous Maintenance
 Team Exercises and Presentations
 Review and Summary

340 NOS Learning Center


Attention Exercise

“Just Imagine…..”
 Yourself……
 Your workplace……
 Your product………
The Concept of Zero
What’s in it for me…..?

341 NOS Learning Center


Just Imagine…..

Here is Your Opportunity To Experience Excellence

Those of us who work are often defined by what we do.

How many times have you been asked by a new acquaintance,


“…and what do you do?”

It is the intent of this course to introduce you to TOTAL


PRODUCTIVE MAINTENANCE. The key concept, “Cleaning
is Inspecting,” when properly implemented, can make “what
you do” an experience in excellence!

342 NOS Learning Center


Concept of Zero

Current Year - Goal Setting


Defect Rate Goal
Company A 1% 0%
Company B .5% 50% reduction

Results After One Year


Defect Rate Goal New Defect Rate
Company A 1% 0% .01%
Company B .5% 50% reduction .25%

How would achieving this goal make you feel?


343 NOS Learning Center
Cleaning is Inspecting!

Expectations—WIIFM
(What’s In It For Me?)!!
 What am I going to get out of this from a
business perspective?
 What am I going to get out of this
personally?

344 NOS Learning Center


An Overview of TPM

 Definition of TPM
 Key Attributes of TPM
 The Concept of Zero
 The History of TPM
 The 12 Steps of TPM

345 NOS Learning Center


Form the Team

 Form the teams that will be together for the


remainder of the class.
 Your team should:
 Determine Team Name
 Who is spokesperson?
 Team CHEER (rah rah rah)

346 NOS Learning Center


Definition of TPM

TPM is a plant improvement


methodology which enables continuous
and rapid improvement of the
manufacturing process through use of
employee involvement, employee
empowerment, and closed-loop
measurement of results.

347 NOS Learning Center


Key Attributes of TPM

 Plant improvement methodology


 Enables continuous and rapid improvement
 Companies must improve faster than their competition
 Employee involvement
 Employee empowerment
 Closed-loop measurement of results
 Production-driven (NOT maintenance-driven)
 Strategic focus
 Concept of zero

Why are these so critical?


348 NOS Learning Center
The Concept of Zero

Can you envision your plant with:


 zero breakdowns
 zero accidents
 zero defects

For one hour?

For five or six hours?

For one week?

349 NOS Learning Center


The History of TPM

 Japan’s Experience

 Competitive Market Pressure


_________________________________
 How are we going to be different?

 Why do we need to be different?


350 NOS Learning Center
The 12 Steps of TPM

The Preparatory Stage


1: Launch an educational campaign to introduce TPM to
the organization
2: Create an organizational structure to promote TPM
3: Announce upper management’s decision to introduce
TPM
4: Establish basic TPM policies and goals
5: Form a master plan for implementing TPM
6: Kick off TPM

351 NOS Learning Center


The 12 Steps of TPM
The Implementation Stage
7: Improve the effectiveness of each critical piece of
equipment
8: Set up and implement autonomous maintenance
9: Establish a planned maintenance system in the
maintenance department
10: Provide training to improve operator and
maintenance skills
11: Develop an early equipment management program
12: Perfect TPM implementation and raise TPM levels

352 NOS Learning Center


Floor Exercise

 Go to the floor in your teams to begin equipment


inspection (use Initial Performance Check Sheet)
 You will be introduced to the equipment we’ll use
during this class.
 Experience an empowered, learning environment.
 Teams return with an overall rating
 Make notes of any questions, concerns, or
problems you find.

353 NOS Learning Center


TPM Initial Performance Check
Sheet Exercise

354 NOS Learning Center


Initial Check Sheet
NOS Machine Cleaning Assessment Check Sheet
Plant: ____ Line: ____ Equipment Description: ___________________________________________
Date: ____________________ Checked By: ___________________________________________
___________________________________________

Activity Items to Check Possible Actual Notes or Remarks


Points Points
Cleaning 1. Any process excess or external contamination?
of a) Moving parts, rotating parts
Machine b) Guides, fixtures
Exterior c) Frame, surfaces 10
2. Any nuts, bolts, etc., loose, wobbly, missing? 5
3. Any play in moving parts, mounting sections? 10
4. Any unneeded objects on body of machine? 3
5. Is the machine firmly seated to the floor? 3
Cleaning 1. Any dirt, dust, excess oil, damage, foreign objects?
of a) Cylinders, solenoid valves, air
Machine b) Limit switches
Interior c) Motors, gears, shafts, belts
d) Hoses 10
2. Any nuts, bolts, etc., loose, wobbly, missing? 5
3. Any leaks of oil, water, air, steam, product? 5
4. Any indicator lamps or switches damaged or not 3
working?
Lubricat 1. Does oil and/or grease reach all appropriate moving
10
ion parts?
2. Is there the right amount of oil in reservoirs, etc.? 5
3. Do oil reservoirs have covers with gaskets? 3
4. Are oil supply lines clean, no leaks or seepage? 5
The 5 1. SEIRI-orderliness (discard what you don't need) 3
S's
Around 2. SEITON-neatness (needed items are accessible) 3
the 3. SEIKETU-cleanliness (well-organized, clean) 3
Machine 3
4. SEISOU-cleaning (and inspection)
5. SITUKE-discipline (following proper procedures) 3
Status of 1. Are the cleaning and lubrication procedures posted? 3
Cleaning 2. Are cleaning tools adequate and available for the
Process 3
operators
3. Are daily checks properly performed? 2
Total Points Possible 100 Actual Points Earned

Safety
yes*/no
Items 1. Any damage to safety devices, enclosures, shields?
2. Any other unsafe conditions? yes*/no
*A "yes" answer to any Safety Item requires immediate repair.

Scoring Guidelines: Better than new condition – full points


Opportunity, but not currently effecting performance – mid-range
Potentially effecting performance or quality – low range
Currently effecting performance or quality – no points
OEE

( Overall Equipment Effectiveness )

356 NOS Learning Center


Overall Equipment Effectiveness

 A composite measure of the availability,


performance efficiency, and quality rate of a
given piece of equipment
 Key Requirements
 Stable processes - maximize OEE on
constraints
 Balance OEE levels on other equipment

357 NOS Learning Center


OEE

Overall
Performance
Equipment = Availability x Efficiency
x Quality
Effectiveness

Identifiable Minor
Stoppages
Equipment Breakdowns Reduced speed losses Quality defects in
process losses

Setup and Adjustment Idling and minor stoppage


Losses losses

Tooling Losses
Startup Losses
OEE
Overall equipment effectiveness (OEE) is the primary measure of performance
in TPM. OEE views losses from the eyes of the operator, from the eyes of the
machine, and from the eyes of the material.
It measures the effective utilization of capital assets by expressing the impact
of equipment-related losses. Seven types of equipment loss are tracked:

 OEE Element  Major Losses


 Availability  Equipment Breakdowns
 Set up and adjustment losses
 Start-up losses
 Minor Stoppages
 Tooling losses
 Performance Efficiency
 Reduced Speed losses

 Quality  Defective Parts

359 NOS Learning Center


Equipment Losses

Quality
Defects in
Tooling
Process
Losses
Startup
Losses
Equipment
Reduced Breakdowns
Speed
Idling Setup
& Minor & Adjustments
Stoppage
OEE Definitions Tables

Refer to OEE DEFINITIONS TABLE for


detailed explanations of each
element of OEE
These are for your reference ONLY.

361 NOS Learning Center


OEE Definitions Tables
Lean Term Traditional Term Formula Definition

Overall Availability,
Equipm Performan
ce OEE = Availability x
ent
Efficiency, Performance
Efficien Quality Efficiency x Quality
cy Rate Machine Efficiency Rate Equipment performance measurement

Lean Term Traditional Term Formula Definition

Availability = Operating Time/ Percent of time equipment should be making


Availability Machine Utilization Net Available Time product

Net Available Time = Total


Net Available Available Time -
Time Planned Downtime Time equipment is planned (scheduled) to operate

Total Available Total Available Time = Shift Time equipment could run during a shift (or other
Time operating hours time period)

Planned Downtime = Breaks +


Lunch + Planned
Meetings + Planned
Planned Training + Preventive Planned activities during which time equipment is
Downtime Maintenance not scheduled to make product

Operating Time = Total


Available Time -
Operating Time Unplanned Downtime Actual time equipment operates (uptime)

Unplanned Downtime =
Machine stoppages +
Unplanned Machine breakdown + Unplanned time equipment is not operating
Downtime Setups + Adjustments (downtime)

362 NOS Learning Center


OEE Definitions Tables (cont)

Lean Term Traditional Term Formula Definition

Speed Ratio or
Equipment Performance Efficiency =
Performance Performance (Ideal Cycle Time x Total
Efficiency Efficiency Parts Run)/ Operating Time

Optimal operating speed to produce best quality


product. Could be determined by best cycle time
achieved by machine, manual work standard, or
Ideal Cycle Time = Best estimation based on experience with similar
Ideal Cycle Time Design Speed machine cycle time machines.

Total Parts Run = Good parts


Total Parts Run + Rework parts + Reject parts

Lean Term Traditional Term Formula Definition

First Run Capability; Quality Rate = (Total Parts


Quality Throughput; Run - Total Defects)/Total
Rate Process Throughput Parts Run

Total Defects = Total Rework


Total Defects + Total Scrap

Touch-up; re- Total rework is number of parts processed more


Total Rework process; finesse than once - touched up, re-processed, fixed, etc.

Total scrap is the number of parts processed but


Total Scrap not able to be used - thrown away

363 NOS Learning Center


When to Use OEE

 In a production limiting situation (you can sell


everything you make), OEE is an excellent
Productivity Measure. WHY?

 In a market limiting situation (you have capacity to


make more than you can sell), OEE is not a good
measure of productivity. WHY?

364 NOS Learning Center


Overall Equipment Effectiveness
Calculation Example

OEE = (Availability) x (Performance Efficiency) x (Quality Rate)

Availability = operating time


net available time

Performance [(ideal cycle time) x (total parts run)]


Efficiency = operating time

Quality [total parts run - (total scrap + total rework)]


Rate = total parts run

365 NOS Learning Center


Overall Equipment Effectiveness

Availability = operating time


net available time
Net available time:
Working hours 7:30 – 4:30 9 hrs
Lunch 12-1 - 1 hr
Net available time = 8 hrs x 60 min/hr
= 480 minutes
Operating time:
Available time 480 minutes
Downtime (total) -57 minutes
Operating time = 423 minutes

Availability: = operating time / net available time


= 423 minutes/480 minutes
= 0.88

366 NOS Learning Center


Overall Equipment Effectiveness

Performance efficiency = [(ideal cycle time) x (total parts run)]


operating time
Ideal cycle time (Best machine performance): (52 sec/part x min/60 sec)
Total parts run (good + rework + scrap) x 470 parts
= 0.867 x 470
= 407
Operating time:
Available time 480 minutes
Downtime -57 minutes
Operating time = 423 minutes
Performance efficiency: = 407 / 423
= 0.96

367 NOS Learning Center


Overall Equipment Effectiveness

OEE = (Availability) x (Performance Efficiency) x (Quality Rate)

Availability: 0.88
Performance efficiency: 0.96
Quality rate: 0.91

OEE = Availability x Performance efficiency x Quality rate


= 0.88 x 0.96 x 0.91
= 0.77
= 77%

368 NOS Learning Center


OEE
Exercise

369 NOS Learning Center


OEE Quiz

370 NOS Learning Center


Session Objectives

 You will use job aids, performance checklists,


sample tags, and the handouts

 Working in your teams, you’ll perform the first


three steps of autonomous maintenance as they
relate to the Total Productive Maintenance (TPM)
methodology.

 Your team performance will be measured against


performance checklists.

371 NOS Learning Center


Definition of Autonomous Maintenance

Autonomous maintenance (AM) is more than the


simple transfer of maintenance responsibilities to
production operators. It is a teaming of production
operators and maintenance personnel. AM relies on
production operators to take on increased
responsibility for the day-to-day maintenance of their
equipment, relying on maintenance personnel for
non-routine work. The overall intent is to increase
production operators’ awareness of their equipment
and physical environment.

372 NOS Learning Center


Key Elements of Autonomous Maintenance

 Cleaning is inspecting!
 Improving equipment cleanliness
 Developing cleaning and lubrication standards
 Developing inspection procedures
 Organizing work areas
 Continuously improving the work process

 Can you explain why these concepts are so


critical?

373 NOS Learning Center


The Seven Steps of Autonomous Maintenance

1: Initial cleaning

2: Preventive cleaning measures

3: Development of cleaning and lubrication standards

4: General inspection

5: Autonomous inspection

6: Process discipline

7: Independent autonomous maintenance


374 NOS Learning Center
The Seven Steps of Autonomous Maintenance

1:Initial cleaning
2: Preventive cleaning measures

3: Development of cleaning and lubrication standards

4: General inspection

5: Autonomous inspection

6: Process discipline

7: Independent autonomous maintenance

375 NOS Learning Center


Step One-Initial Cleaning

Purpose:
 Small work groups are able to join together in
accomplishing a common goal.
 Promotes a better understanding of, and familiarity
with, the machine or process area.
 The actual machine cleaning regularly uncovers
hidden defects that, when corrected, have a positive
effect on equipment performance. Cleaning is
inspecting!

376 NOS Learning Center


Initial Cleaning Guidelines

 Initial Cleaning Checklist


 Machine/ Equipment Problem List
 Problem Tags

377 NOS Learning Center


Initial Cleaning Checklist
Initials Activity

 Perform all activities necessary to shut down, isolate, and make the equipment or process area totally safe.

 Obtain copies of equipment drawings, documentation, histories, and other relevant information. (This documentation is used in successive
levels of autonomous maintenance to develop standards for lubrication and autonomous inspections.)

 Document initial condition of the equipment through photographs. Prepare forms for documenting equipment problems and tags for marking
items needing further inspection.

 Segment portions of the machine or process area, and plan how to clean the machine or area with maximum efficiency and effectiveness.

 Obtain hand tools, rags, brushes, solvents, mops, brooms, scrapers, and any other tools required to perform the cleaning tasks.

 Clean each machine segment in a methodical manner. Return the equipment to an “as new” condition.

 Remove all dirt, grime, dust, grease, oil, sludge, chips, trash, and excess materials. Note any equipment abnormalities. Cleaning is inspecting!

 Tag and document all equipment abnormalities.

 Re-torque all bolts including hold-down, fastener, adjustment, and structural bolts. Mark all bolts by painting a stripe across both the stud head
and the bolt to indicate the relative positions of both when properly torqued.

 Repaint areas if necessary according to predetermined repaint specifications. Color-code piping, utilities, and guards for ease of observation.

 Note and mark all lubrication points. Again, use color coding.

 Photograph the clean machine or process area and compare with a “before” photograph to verify progress.

 Formally turn the equipment or process area back to production for startup and operation.

378 NOS Learning Center


Problem Tag
Tag No.: Date:

Machine:

Problem:

Correction requested by:


Due by:

Tag No.: Date:

Machine:

Problem:

Correction requested by:


Due by:

379 NOS Learning Center


Machine Problem/ Problem Tag/ Leak
Tag Log

Item Description Repair Completed Defect Tagged Initials Date


(Tag #)

380 NOS Learning Center


The Seven Steps of Autonomous Maintenance

1: Initial cleaning

2:Preventive cleaning measures


3: Development of cleaning and lubrication standards

4: General inspection

5: Autonomous inspection

6: Process discipline

7: Independent autonomous maintenance

381 NOS Learning Center


Step Two-Preventive Cleaning Measures

 Overview
 Definition
 Purpose
 Process Leaks
 Floor Exercise
 Controlling Process Excess
 External Environmental Factors
 Floor Exercise

382 NOS Learning Center


Step Two Overview

Basic elements of this step


 Process Leaks
 Process Excess
 External Environmental Factors

383 NOS Learning Center


Step Two-Preventive Cleaning Measures

Definition
Preventive cleaning measures are designed to
“engineer” a solution for maintaining
cleanliness. This is similar to preventive
maintenance activities that are designed to
prevent equipment failures and ensure
reliability.

How does preventive cleaning differ from


initial cleaning?

384 NOS Learning Center


Step Two-Preventive Cleaning Measures

Purpose
Sources of contamination are identified,
isolated, and controlled. Basic types of
contaminants are process leaks, process
excess, and external environmental
contaminants. These include leaking process
fluids, leaking lubricants, dust, corrosion,
process scrap, material handling scrap,
worker-generated trash, and other external
pollutants.

385 NOS Learning Center


Process Leaks Checklist
Initials Activity

Locate the leak and identify its source, the type of fluid leaking, and the severity of the leak

 Fill out leak tag form noting this information as well as your name and date

 Detach the two-part form and, affix one portion to the leak or in near proximity of the leak

 Send or hand the other part of the form to the group responsible for backlogging work orders

 Document the abnormality of the Machine/Equipment Problem Listing, and record the tag information
on the Tag Log

386 NOS Learning Center


Sample Leak Tag

LEAK TAG Tag No.:

Name: Date:
Fluid: Priority:
Area: Equip No:
Description:

LEAK TAG Tag No.:

Name: Date:
Fluid: Priority:
Area: Equip No:
Description:

387 NOS Learning Center


Machine Problem/ Problem Tag/ Leak
Tag Log

Item Description Repair Completed Defect Tagged Initials Date


(Tag #)

388 NOS Learning Center


Floor Exercise

 Experience “ Cleaning is Inspecting”


 Experience Process Leak Checking

Deliverables
-Initial Cleaning Checklist
-Process Leak Checklist
-Tag Log - Use Machine Problem Tags and
Process Leak Tags for all abnormalities and
record on tag log
389 NOS Learning Center
Step Two-Controlling Process Excess

Description: Process excess is that


production material that is scrapped or
recycled. This includes shavings, chips, dust,
scraps, or any other material that may be
harmful to machinery parts.

Firm preventive cleaning measures are the


most economical way to control process
excess.

390 NOS Learning Center


Controlling Process Excess

 Identify the source of the process excess


 Measure the amount of process excess
generated
 Measure the direction of movement of the
process excess as it is separated from the
end product
 Design a controlling mechanism that absorbs
the process excess or redirects it to an
appropriate removal method.

391 NOS Learning Center


Step Two-External Environmental Factors

What type of external factors are


contributing?
 Dust
 Trash, pollution
 Moisture,corrosion

392 NOS Learning Center


Step Two-External Environmental Factors

How might these contaminants be


controlled?
 Attack the source
 Control the results

393 NOS Learning Center


Controlling Process Excess and External
Environment Checklist

Controlling Process Excess


Initials Activity
 Identify the source of the process excess.

 Measure the amount of process excess that is generated.

 Measure the direction of movement of the process excess as it is separated from the end product.

 Design a controlling mechanism that absorbs the process excess or redirects it to an appropriate
removal vehicle.

Controlling External Environment Factors


Initials Activity
 Attack the source.

 Control the results.

394 NOS Learning Center


Preventive Cleaning Measures Worksheet

PROBLEM DESCRIPTION POSSIBLE SOLUTIONS

395 NOS Learning Center


Floor Exercise

 Experience “ Preventive Cleaning Measures”

Deliverables
-Controlling Process Excess and External
Environment Checklist
-Preventive Cleaning Measures Worksheet

396 NOS Learning Center


The Seven Steps of Autonomous Maintenance

1: Initial cleaning

2: Preventive cleaning measures

3: Development of cleaning and


lubrication standards
4: General inspection

5: Autonomous inspection

6: Process discipline

7: Independent autonomous maintenance


397 NOS Learning Center
Step Three Overview

Picture the equipment in a “better than new”


condition
Capture this vision by documenting a
thorough description of the “new” equipment
Identify and document steps to achieve this
vision

398 NOS Learning Center


Step Three --Purpose

The goal is to combine inspections for cleanliness


with lubrication checks, so that both activities can
be performed together as efficiently as possible.
This should be accomplished by small groups,
keeping in mind that both of these activities are
forms of inspection.

Let’s remember how the concept of “cleaning is


inspecting” supports preventive maintenance
goals.

399 NOS Learning Center


Step Three Guidelines

We will discuss:
 Cleaning and Lubrication Standards Checklist
 Lubrication Standards Diagram
 “Better than New” Standards
 Frequency of Cleaning/Inspection Requirements
 Lubrication Standards Worksheet

400 NOS Learning Center


Development of Cleaning & Lubrication Standards
Checklist

Initials Activity
Convene small groups under the guidance of a facilitator, and create a vision of the equipment’s condition as
“better than new.” Gather and review all relevant materials such as manufacturers’ manuals, drawings, existing
PM check sheets, or historical operational data.
Describe what each component of the equipment would look like if it were in a “better than new” condition
Use existing drawings or develop new ones that visually show the equipment. Label each component of the
equipment, and identify each lubrication point on the picture.
For each component, document the “better than new” condition, using terms such as: free of all oil; painted;
free of all dust buildup; and free of process excess.
Establish and document the frequency of cleaning or inspection required to maintain this “better than new”
condition.
 For each lubrication point, document the following:
 Lubricant required
 Reservoir capacity
 Filter requirements
 Frequency of checks
 Frequency of sampling
 Frequency of change
 Safety considerations
 All machine lubrication points should be physically marked, using color codes corresponding to the type
lubricant to be used at that lubrication point.

401 NOS Learning Center


Lubrication Standards Diagram

 Department Name______________
 Machine Name and Number______
 Drawing of machine
 Label components
 Identify/Number Lubrication Points

402 NOS Learning Center


Lubrication Standards Diagram

Department___________________________
Machine/Equipment____________________

(Drawing of machine or piece of equipment with components labeled and lubrication points numbered.)

403 NOS Learning Center


Frequency of Cleaning/Inspection
Requirements
# On Diagram Frequency of Cleaning Time Required Frequency of Inspection Time Required

404 NOS Learning Center


Lubrication Standards Worksheet
# on Lubricant Color Reservoir Filter Frequency of Frequency of Frequency of Safety
Diagra Required Code Capacity Requirement Checks Sampling Change Consideratio
m ns

405 NOS Learning Center


“Better Than New” Standards
# on Diagram Description

406 NOS Learning Center


Floor Exercise

 Experience “Cleaning and Lubrication


Standards”

Deliverables
-Cleaning and Lubrication Standards Checklist
-Lubrication Standards Diagram (Pictorial)
-Frequency of Cleaning/ Inspection Requirements
-Lubrication Standards Worksheet
408 NOS Learning Center
The Seven Steps of Autonomous Maintenance

1: Initial cleaning

2: Preventive cleaning measures

3: Development of cleaning and lubrication standards

4: General inspection

5: Autonomous inspection

6: Process discipline

7: Independent autonomous maintenance


409 NOS Learning Center
Team Exercise #4-Preparing for Steps 4
through 7

Study steps four through seven of the


autonomous maintenance process.
As a team, prepare a short single point lesson.
 Provide an overview of the topic
 Reasons why the material is important.
 A definition of the topic.
 Performance guidelines/checklists that should
be followed when conducting each step.
 A brief summary of lessons learned.
410 NOS Learning Center
The Seven Steps of Autonomous Maintenance

1: Initial cleaning

2: Preventive cleaning measures

3: Development of cleaning and lubrication standards

4: General inspection

5: Autonomous inspection

6: Process discipline

7: Independent autonomous maintenance

411 NOS Learning Center


Step 4-General Inspection

 Overview of General Inspection


 Definition
 Purpose
 “Who”
 Guidelines

412 NOS Learning Center


Definition of General
Inspection

Although cleaning and lubrication comprise the bulk of


routine inspections, additional inspections and
adjustments may be necessary. General inspection
activities include:

 Bolt torque down or tightening


 Minor calibrations
 Adjustments
 Replacement of worn parts
 Other process-related visual, temperature, pressure, or
flow checks

413 NOS Learning Center


Purpose of General Inspection

 Raise the level of operator


understanding of the equipment and its
maintenance requirements.
 Provide a sense of “ownership” in the
process and the equipment.

414 NOS Learning Center


Who?

Small groups should develop the


standards for general inspections, with
the inspections being carried out by the
equipment operators.

Who is in our groups? Why?

415 NOS Learning Center


Guidelines-General Inspection Checklist
Initials Activity
 Collect all available equipment data including preventive and predictive maintenance procedures, historical operational data,
historical failure data, vendor/manufacturers’ recommendations, and all design drawings/specifications.

 Review existing preventive maintenance, predictive maintenance, and inspection procedures for accuracy and
completeness.

 Review all equipment failures and isolate their root causes.

 Review manufacturers’ and vendors’ recommended checks and maintenance procedures.

 Document the general inspection standards in a format similar to that used for the lubrication and cleaning standards.

 Categorize all inspection procedures into those that can be performed presently by production operators, those that can be performed by
production operators with training, and those that should be performed by craftspeople.

 Categorize inspections by:


 The function or craftsperson performing the inspection
 Whether the equipment must be operational or shut down while the inspection is being performed
 Whether disassembly is required
 Ease of performance
 Develop check sheets for the above inspections.

 Identify all training required to educate production operators in the safe performance of designated tasks.
416 NOS Learning Center
The Seven Steps of Autonomous Maintenance

1: Initial cleaning

2: Preventive cleaning measures

3: Development of cleaning and lubrication standards

4: General inspection

5: Autonomous inspection

6: Process discipline

7: Independent autonomous maintenance

417 NOS Learning Center


Step Five-Autonomous Inspection

 Definition of Autonomous Inspection


 Purpose
 Who
 Guidelines

418 NOS Learning Center


Definition of Autonomous
Inspection

Autonomous inspection involves the actual transfer of


responsibility for equipment inspection. It relies on two
specific activities:

1. The previously-developed lubrication, cleaning, and


general inspection standards must be institutionalized into
a system.

2. Production operators must be trained in that system and in


the technical aspects of the inspections and maintenance.
On-the-job training and/or single-point lessons can be used
to train operators.
419 NOS Learning Center
Purpose of Autonomous Inspection

The production operator takes on greater


responsibility for the operation of his or her
equipment. He or she is in an excellent position to
understand to relationship of inspection data with
the performance of the machine. This will open up
new opportunities for improving operating
procedures and maintenance practices.

420 NOS Learning Center


Who?
Small groups develop the standards and
guidelines and conduct the single-point
lessons. Trained production operators
perform on-going autonomous inspections.

421 NOS Learning Center


Guidelines-Autonomous Inspection Checklist

Initials Activity

 Develop checklists for each operator position; and organize them by performance interval,
e.g., daily, weekly, monthly.

 Distribute to various personnel and/or shifts so that the workload is spread evenly across
workers and variances in operating conditions.

 Use pictorials to illustrate the tasks to be performed.

 The maintenance management system should be used to schedule checks that occur at
intervals of one week or greater. This will provide an electronic record of the check and
related performance.

422 NOS Learning Center


The Seven Steps of Autonomous Maintenance

1: Initial cleaning

2: Preventive cleaning measures

3: Development of cleaning and lubrication standards

4: General inspection

5: Autonomous inspection

6: Process discipline

7: Independent autonomous maintenance

423 NOS Learning Center


Step Six-Process Discipline

 Definition of Process Discipline


 Purpose
 Who
 Guidelines

424 NOS Learning Center


Definition of Process
Discipline
Process discipline is the establishment or improvement of methods and
procedures that enable efficiency and repeatability. It involves the detailed
examination and documentation of existing procedures and methods used by the
group to collectively contribute to the manufacturing process.
The following procedures or work methods should be examined:
 Manufacturing setup procedures
 Shutdown procedures
 Startup procedures
 Material handling procedures
 Defective product handling
 Workplace layout and organization
 Tool, die, and jig layout and organization
 Data gathering and reporting procedures

Process discipline is designed to take TPM beyond equipment management to the


entire plant function, looking for and addressing improvement potential.
Requires interfaces with other plant areas, organizations, processes and
procedures. Expands the concept of zero waste to mean zero waste in business as
well as in production.

425 NOS Learning Center


Purpose of Process Discipline

The goal of process discipline is to reduce variations in the


manufacturing process so that consistency, efficiency, and
quality are improved. This includes:

 Reducing setup times


 Decreasing manufacturing cycle times
 Standardizing procedures for handling raw materials
 Reducing work-in-progress
 Instituting visual control and inspection methods

426 NOS Learning Center


Who?

The institutionalization of process


discipline is a small group activity.

427 NOS Learning Center


Process Discipline Checklist

Initials Activity

 List potential work processes that are perceived to be less than optimal in terms of effort
or resource.

 Map the present method of performing work in terms of activities, decisions, and
interactions with equipment, people, and other systems.

 Examine the work flow diagram to identify multiple ways of accomplishing the same task.

 Develop the most effective procedure by eliminating redundant, non-value-added steps,


and reducing time and resource requirements.

 Modify current, documented, work flow diagrams to reflect upgraded methods of


performing the work.

 Verify that the upgraded method is superior to historical methods by testing it on the plant
floor.

 Train all appropriate workers in the new methods.

 Repeat the entire process as required until all work procedures in the plant have been
evaluated.
428 NOS Learning Center
The Seven Steps of Autonomous Maintenance

1: Initial cleaning

2: Preventive cleaning measures

3: Development of cleaning and lubrication standards

4: General inspection

5: Autonomous inspection

6: Process discipline

7: Independent autonomous maintenance

429 NOS Learning Center


Step Seven—Independent Autonomous
Maintenance

 Definition
 Purpose
 Who

430 NOS Learning Center


Definition of Independent
Autonomous Maintenance

This is the point at which the autonomous


maintenance process become self-
sustaining. Outside forces are no longer
necessary to maintain the concept of zero.

431 NOS Learning Center


Purpose of Independent Autonomous
Maintenance

 The result of autonomous maintenance,


and sustaining force behind TPM should
be…………..

SUSTAINMENT!!

432 NOS Learning Center


Who?

Empowered small groups are capable


of managing their respective teams and
working toward the strategic goals of
the organization.

433 NOS Learning Center


TPM Activity
Single Point Lesson

 All Teams should pick out one key


learning point that the team feels is
important, and prepare a five minute
lesson to explain this point to the class.
 Remember your “Cheer”!

434 NOS Learning Center


TPM Wrap-up

 What are some of the benefits of


implementing TPM?
 What are some of the key motivators for TPM
implementation?
 Where do we go from here?
 Next steps?
 What support mechanisms need to be in place to
insure success of implementation?
 What additional support do we need?

435 NOS Learning Center


TPM Quiz

436 NOS Learning Center


Simulation Round Four

 Improvement ideas for round four.

437 NOS Learning Center


Constraints - Round 4

• Everyone must have a meaningful job

• If production is made on multiple lines, each line must make


both longs and shorts

438 NOS Learning Center


Learning Points - Round 4

• Continuous flow enables batch of 1 capability

• Inventory levels can be dramatically reduced with batch of


1 production

• Problems are easiest to spot and act on when internal


customers and suppliers have little or no inventory between
their operations

• Time to respond to changes in demand is driven by


inventory, and is at its minimum with batch of 1

439 NOS Learning Center


Current State Mapping

440 NOS Learning Center


Module Objectives

Understand basic concept

Draw current state map

441 NOS Learning Center


Introduction

Value Stream Analysis is an effective tool in initiating


process improvements. The tool provides an
overview of the current manufacturing operation,
noting constraints and areas of concern. It provides
for a system-wide approach to identifying areas that
need attention and developing plans for that effort.

442 NOS Learning Center


Current State Mapping

Production Control
Suppliers Purchasing Scheduling Customer

? Materials
? Manpower
? Priority
Need
Parts

Make
Material Manpower
Parts
Available Available

Paint
Dept

443 NOS Learning Center


Process Mapping Benefits

 Obtain current plant operating information


 Obtain current metrics information
 Identifies inventory and where it is stored
 Shows material flow
 Gives you a baseline on where the factory is and a tool
to chart progress after implementing improvements
within the plant

444 NOS Learning Center


Example of a Current State Map
Production Control Weekly
Daily Production Plan Customer

R.M
Cutting Stitching
W/H
Lead Time Lead Time

Quality R Quality R Stockfit F.G


Lamination Down Time Down Time Assembly W/H
Lead Time

Quality R
Mixing Down Time

Airbag Airbag
Pouring PU Spray
washing Spray
Lead Time Lead Time Lead Time Lead Time

Quality R Quality R Quality R Quality R

Down Time Down Time Down Time Down Time

Material
Roll Pressing
Mixing
Lead Time Lead Time Lead Time

Quality R Quality R Quality R

Down Time Down Time Down Time

6 sec VAT 1500 sec VAT 900 sec VAT


3.5 days 3 day 1 day 3 days
25 sec 25 sec 480 sec 22 sec 920 sec
4.5 days 1 day 0.5 day 0.5 day 0.5 day 3 days
480 sec 300 sec 300 sec 1020 sec
5 days 0.8 day 0.5 day 0.5 day 3 days
Definition

A Value Stream is the collection of all activities


required to produce a product. This includes all
activities, including those that add value and those
that do not.

446 NOS Learning Center


The BIG Picture
Using the value stream analysis means working on the
big picture, not just the individual processes;
improving the whole, not just optimizing the parts.

447 NOS Learning Center


Our Scope

For this lesson, we will be focusing on the “door-


to-door” production flow inside our factory,
including Receiving and Shipping.

Our Focus

Suppliers Our Factory Customer

Total Value Stream

448 NOS Learning Center


Our Scope (cont’d)

As your experience grows, you can expand outward


to include the flow from suppliers to customers.

Likewise, our efforts will not get into the details of


each departments’ specifics of operation.

449 NOS Learning Center


This is not a computer process

Value Stream Mapping is a pencil and paper tool that


helps you to see and understand the flows of material
and information as a product makes its way through
the value stream.

450 NOS Learning Center


Material and Information Flow

information

Production Flow

material

The movement of material is usually what comes to mind


when we discuss “production flow”.
But there is another flow - of information - which tells each
process what to make or do next.
You must map both of them.

451 NOS Learning Center


Using the Mapping Tool

Product Family
First, we draw the current
Current State
state map by gathering Drawing

information directly from


Future State
Drawing
the shop floor.
Work
Plan

452 NOS Learning Center


Using the Mapping Tool

Product Family

Current State
From this, we begin to Drawing

draw our ideal, or Future State


Drawing
improved, operation; our
Work
Future State Map. Plan

453 NOS Learning Center


Using the Mapping Tool

Product Family

Current State
Drawing

The final step is to


Future State
implement a plan to Drawing

transition the plant from Work


Plan
the current state to the
future state.

454 NOS Learning Center


Focus on one Product Family

Drawing all your product flows on one map will too


complicated.

Value Stream Mapping means walking and drawing


the process steps (material and information) for one
product family from door to door in the plant.

455 NOS Learning Center


Drawing a Current State Map

Mapping begins at the level of door-to-door flow in


your factory.

Processing categories are identified rather than


recording each and every step.
“Cutting,” “Stitching,” “Stock Fit,” “Assembly”

456 NOS Learning Center


The Icons Used

We use symbols, or icons, to represent processes and flow.

Process Box Movement of finished goods to


Movement of Production Materials the Customer

Assembly

Material Queue (sequenced) Inventory tombstone

FIFO
ABC Corp.
__pcs
__day

Data Box
Pull of Material from one Truck Shipment
process to next
__/wk
_ hour

457 NOS Learning Center


The Icons Used (cont’d)

Manual Information Flow

Marketplace
A Signal Production Card

B
Electronic Information Flow C

Production Instruction Flow

Production Schedule
Production Instruction Card
weekly Indicates path of Production Instruction Card

Material Withdraw Card

Sequential Production Schedule Indicates path of Material with withdraw card

458 NOS Learning Center


Data Box Description

Shift
O/P’s Operators

L/T Lead time or Dock to Dock

D/T Downtime

C/T Cycle Time


Quality R Quality Rate

C/O Changeover Time


Mapping Tips

Value Added Time- the amount of time to physically change


the form, fit or function of a part
Takt Time- The available working time divided by the
customer requirement
Cycle Time- The actual time for an operator to complete a
process
Note: We will calculate Cycle Time in our Data box and will
calculate Value Added Time for the Value Added Timeline.

460 NOS Learning Center


How to collect Value Added time?

Cutting H/F Welding Embroidery

461 NOS Learning Center


Mapping Tips

Collect data from the actual floor.

Walk the entire door-to-door value stream.

Do not rely on information that you do not obtain yourself.

Even if several people are involved, map the whole value


stream yourself.

Resist the temptation to use a computer.

462 NOS Learning Center


Drawing the Current State Map

An Example:

VJ line 8 produces shoes. The shoes are

produced in two styles: “Atom” and “Babel”.

The A style is woman’s and the B style is man’s.

463 NOS Learning Center


Begin with the customer’s requirements.

WH 65

3,000 prs/day
The customer’s warehouse is - 2,000 “A”
represented with a factory icon - 1,000 “B”

placed in the upper right-hand Box = 12 prs


2 shifts
portion of the map. Underneath,
draw a data box recording the
requirements of the customer.

WH65 on two shifts and requires


daily shipments. Typically 2,000 A
and 1,000 B are needed every day.
WH65 requests 12prs in each carton
box

464 NOS Learning Center


Show Processes in our plant

The next step is to draw the basic production WH 65


processes. To indicate a process we use a
process box. Under each processing step, we 3,000 prs/day
write within the data box key information: the - 2,000 “A”
- 1,000 “B”
cycle time, the changeover time, and the uptime.
Box = 12 prs
2 shifts
As you walk the material flow you will find places
where inventory accumulates. These points are
where the flow is stopping. We indicate this with
tombstones to indicate “dead” flow.

R.M
W/H
I
Cutting Stitching Assembly
I
7500 C/T= 10sec I C/T= 2100secc I C/T= 1320sec
Lamination 1Shift 1Shift 8114
4000 2032 2448 1Shift
33 204
VAT= 45sec
1Shift

465 NOS Learning Center


Include the suppliers

CSI WH 65

3,000 prs/day
At the other end, we represent the - 2,000 “A”
material supplier with another factory - 1,000 “B”
icon. We use the truck icon and Box = 12 prs

Tues &
broad arrow to show movement of 2 shifts
Thurs material from the supplier to our plant.
1x
Daily

R.M
W/H
I
Cutting Stitching Assembly
I
7500
C/T= 10sec
I C/T= 2100sec
I C/T= 1320sec
Lamination
4000 1Shift 2032 1Shift 2448 1Shift 8114
33 204
VAT= 45sec
1Shift

466 NOS Learning Center


But how does the in-plant processes know
what to make?

What to make?

How much to make?

How much to purchase?

We need to add the second aspect of our


value stream map: the information flow.

467 NOS Learning Center


The Information Flow

•The Production Control Department is drawn with a


process box.

•Production Control collects information from its customers


and sends specific instructions to each manufacturing
process about what it should produce.

468 NOS Learning Center


The Information Flow
WH 65
Forecast Production Control
Forecast
CSI 3,000 prs/day
Weekly Weekly - 2,000 “A”
- 1,000 “B”
Box = 12 prs
2 shifts

Weekly Schedule
Tues &
Thurs

1x
Daily Ship Daily
Schedule

I
Cutting Stitching Assembly
I
R.M
W/H C/T= 10sec
I C/T= 2100sec I C/T= 1320sec
4000 1Shift 2032 1Shift
2448 1Shift 8114
33 204

469 NOS Learning Center


Value Add & Non Value Add Time
WH 65
Forecast Production Control
Forecast
CSI 3,000 prs/day
Weekly Weekly - 2,000 “A”
- 1,000 “B”
Box = 12 prs
2 shifts

Weekly Schedule
Tues &
Thurs

1x
Daily Ship Daily
Schedule

I
Cutting Stitching Assembly
I
R.M
W/H C/T= 10sec
I C/T= 2100sec I C/T= 1320sec
1Shift 1Shift 1Shift 8114
4000 33
2032 204 2448

6 Sec VAT 1500 Sec VAT 900 Sec VAT


3.5 days 0.7 day 0.75 day 2.7 days

470 NOS Learning Center


How to collect Lead Time
* Customer Daily demand : 5 pairs / day

Cutting Stitching

10 pairs 15 pairs 45 pairs

11 10 9 8 7 6 5 4 3 2 1

1 day 1 day

471 NOS Learning Center


How to collect Lead time?
* Customer Daily demand : 5 pairs / day

Stitching

10 pairs 15 pairs

5 pairs = 1 day

Lead Time 1 day


Quality R

Down Time

472 NOS Learning Center


Example of a Current State Map
Production Control

Daily Production Plan Customer

R.M
Cutting Stitching
W/H
Lead Time Lead Time

Quality R Quality R Stockfit F.G


Lamination Down Time Down Time Assembly W/H
Lead Time

Quality R
Mixing Down Time

Airbag Airbag
Pouring PU Spray
washing Spray
Lead Time Lead Time Lead Time Lead Time

Quality R Quality R Quality R Quality R

Down Time Down Time Down Time Down Time

Material
Roll Pressing
Mixing
Lead Time Lead Time Lead Time

Quality R Quality R Quality R

Down Time Down Time Down Time

6 sec VAT 1500 sec VAT 900 sec VAT


3.5 days 3 day 1 day 3 days
25 sec 25 sec 480 sec 22 sec 920 sec
4.5 days 1 day 1 day 0.5 day 0.5 day 0.5 day 3 days
480 sec 300 sec 300 sec 1020 sec
5 days 1 day 0.5 day 0.5 day
0.8 day 3 days

473 NOS Learning Center


Example of a
Production Control
Current State Map Daily Production Plan
Cust
omer
R.M
Cutting Stitching
W/H
Lead Lead
Stockfit F.G VA= %VA=
Lamination Time
Qualit
y R
Down
Time
Qualit
yR
Down Assembly W/H
Time Time Lead

Mixing
Time
Qualit
y R
Down
L/T or NVA
Airbag Airbag Time
Pouring PU Spray
washing Spray
Lead Lead Lead Lead
Time
Qualit Time
Qualit Time
Qualit Time
Qualit
yR
Down yR
Down yR
Down yR
Down
Time Time Time Time
Material
Mixing
Roll Pressing VA= 2406 Sec %VA=
Lead
Time
Qualit
Lead
Time
Qualit
Lead
Time
Qualit
L/T = 10.5 Days 0.80%
yR
Down yR
Down yR
Down
Time Time Time

6 1500 sec 900 sec


3.5 3 day 1 day 3 days
25
days sec
25 480 sec 22 920 sec
4.5 sec sec 1 day 0.5 sec 0.5 0.5 3 days VA= 1472 Sec %VA=
days 480 sec 300 300 day day day 1020
5 days sec 0.8 day sec 0.5 0.5 sec 3 days L/T = 11 Days 0.46%
day day

VA= 2100 Sec %VA=0.68


L/T = 10.8 Days %

VA= 7002 Sec %VA=


Total Plant L/T = 11 Days 1.89%
What have we accomplished?

Hopefully, you can now see the Value Stream and begin
to recognize areas of opportunity. However, a
“current state map” and the effort required to create it
are wasted unless it is used to quickly create and
implement a “future state map” and work plan.

475 NOS Learning Center


Current State Map

Exercise

476 NOS Learning Center


Current State Map QUIZ

477 NOS Learning Center


Future State Mapping

478 NOS Learning Center


Stability Academy

Future State Mapping


Objective
•Explain benefits of future state mapping
•Construct a future state map

479 NOS Learning Center


Process Mapping Benefits

 Obtain current plant operating information


 Obtain current metrics information
 Identifies inventory and where it is stored
 Shows material flow
 Gives you a baseline on where you are
 Incentive to reach a better state (future state)
 Clearly identifies where improvements can be made Used as
a tool to chart your progress after implementing
improvements within the factory
480 NOS Learning Center
Definition

A Value Stream is the collection of all activities


required to produce a product. This includes all
activities, including those that add value and those
that do not.

481 NOS Learning Center


The BIG Picture
Using the value stream analysis means working on the
big picture, not just the individual processes;
improving the whole, not just optimizing the parts.

482 NOS Learning Center


Using the Mapping Tool

Product Family
First, we drew the current
Current State
state map by gathering Drawing

information directly from


Future State
Drawing
the shop floor.
Work
Plan

483 NOS Learning Center


Example of a Current State Map
Production Control

Daily Production Plan Customer

R.M
Cutting Stitching
W/H
Lead Time Lead Time

Quality R Quality R Stockfit F.G


Lamination Down Time Down Time Assembly W/H
Lead Time

Quality R
Mixing Down Time

Airbag Airbag
Pouring PU Spray
washing Spray
Lead Time Lead Time Lead Time Lead Time

Quality R Quality R Quality R Quality R

Down Time Down Time Down Time Down Time

Material
Roll Pressing
Mixing
Lead Time Lead Time Lead Time

Quality R Quality R Quality R

Down Time Down Time Down Time

6 sec VAT 1500 sec VAT 900sec VAT


3.5 days 3 day 1 day 3 days
25 sec 25 sec 480 sec 22 sec 920 sec
4.5 days 1 day 0.5 day 0.5 day 0.5 day 3 days
480 sec 300 sec 300 sec 1020 sec
5 days 0.8 day 0.5 day 0.5 day 3 days

484 NOS Learning Center


Using the Mapping Tool

Product Family

Current State
From this, we begin to Drawing

draw our ideal, or Future State


Drawing
improved, operation; our
Work
Future State Map. Plan

485 NOS Learning Center


Using the Mapping Tool

Product Family

Current State
Drawing

The final step is to


Future State
implement a plan to Drawing

transition the plant from Work


Plan
the current state to the
future state.

486 NOS Learning Center


Some of the waste in the value stream
cannot be eliminated right away:

 Product design
 Processing machinery
 Remote locations of some activities.

Take these as given and seek to remove all


sources of waste not caused by these features.

487 NOS Learning Center


Begin developing the future state by
asking key questions:

1. What is takt time?


2. Where can we use continuous flow?
3. What is the pacemaker process?
4. Where will a Market Pull System be used?
5. What process improvements will be necessary to
achieve the future state?

488 NOS Learning Center


Example of a Current State Map
Production Control

Daily Production Plan Customer

R.M
Cutting Stitching
W/H
Lead Time Lead Time

Quality R Quality R Stockfit F.G


Lamination Down Time Down Time Assembly W/H
Lead Time

Quality R
Mixing Down Time

Airbag Airbag
Pouring PU Spray
washing Spray
Lead Time Lead Time Lead Time Lead Time

Quality R Quality R Quality R Quality R

Down Time Down Time Down Time Down Time

Material
Roll Pressing
Mixing
Lead Time Lead Time Lead Time

Quality R Quality R Quality R

Down Time Down Time Down Time

6 sec VAT 1500 sec VAT 900 sec VAT


3.5 days 3 day 1 day 3 days
25 sec 25 sec 480 sec 22 sec 920 sec
4.5 days 1 day 0.5 day 0.5 day 0.5 day 3 days
480 sec 300 sec 300 sec 1020 sec
5 days 0.8 day 0.5 day 0.5 day 3 days

489 NOS Learning Center


Drawing the Future State Map

 When we look our value stream, what problems


do we see?
 Large amounts of inventory

 Unconnected processes pushing their output forward


 Long lead times compared to short value-added time

490 NOS Learning Center


Example of a Current State Map
Production Control

Daily Production Plan Customer


Inventory

R.M
Cutting Stitching
W/H
Lead Time Lead Time

Quality R Quality R Stockfit F.G


Lamination Down Time Down Time Lack of Flow Assembly W/H
Lead Time

Quality R
Mixing Down Time

Airbag Airbag
Pouring PU Spray
washing Spray
Lead Time

Quality R
Lead Time

Quality R
Lead Time

Quality R
Lead Time

Quality R
Down time
Down Time Down Time Down Time Down Time

Quality rate
Material
Roll Pressing
Mixing
Lead Time Lead Time Lead Time

Quality R Quality R Quality R

Down Time Down Time Inventory Down Time

6 sec VAT 1500 sec VAT 900 sec VAT


3.5 days 3 day 1 day 3 days
25 sec 25 sec 480 sec 22 sec 920 sec
4.5 days 1 day 0.5 day 0.5 day 0.5 day 3 days
480 sec 300 sec 300 sec 1020 sec
5 days 0.8 day 0.5 day 0.5 day 3 days

491 NOS Learning Center


1. What is takt time?
 Begin with available working time for one shift which is
28,800 seconds (8 hours).
 Subtract any non-work time, which is two 15 minute breaks.
 The customer demand of 460 units per shift is then divided
into the available working time.

Available working time: 28,800 - 1800 = 27,000 seconds per shift


Available working time: 27,000 sec.
Customer Demand: 460 units

Takt Time = 58.6 seconds (= 58 seconds)

492 NOS Learning Center


2. Where can we introduce Continuous Flow?

The stack chart summarizes the current


total cycle time for each process.
Takt Time
55 s 58 seconds

30 s

Stitching
20 s
H/F welding
Cutting

493 NOS Learning Center


Let’s see Current State Map
Production Control

Daily Production Plan

Cutting H/F Welding Stitching

C/T=20 sec C/T=30 sec C/T=55 sec


C/T=61
C/O = 0.5 hr C/O = 0 hr C/O=10 min
Uptime: 65% Uptime: 95% Uptime: 100%

494 NOS Learning Center


Continuous Flow

Examining Cutting and H/F Welding, work can


pass directly from one to the other.

Takt Time
50 s 55 s 58.6 seconds
H/F welding

Stitching
Cutting

495 NOS Learning Center


3. Where is the pacemaker process?

•Remember, all process steps downstream of the


pacemaker process need to occur in a flow.

•The scheduling point would clearly be the cutting/


HF Welding process.

•All process downstream would work on the product


as it arrives and move it downstream.

496 NOS Learning Center


View with Cutting/HF Welding as
Pacemaker
Production Control

Daily Production Plan

Cutting & H/F Stitching

FIFO
C/T=50 sec C/T=55 sec
C/T=61
C/O = 0.5 hr C/O=10 min
Uptime: 80% Uptime: 100%

497 NOS Learning Center


However….

 The cutting/HF welding process have to produce


parts for one of assembly line at our sister factory.
( 3 hours far from here )

 Another strategy must be found.

498 NOS Learning Center


4. Introduce Market-based Pull Systems.

 Because the cutting/HF welding process must be a


batch process, we can use a signal pull system to
control that process.
 A market will be set up between Stitching and
Assembly.
 Stitching will no longer receive a schedule.

499 NOS Learning Center


Pull System
Production Control

Daily Production Plan

Cutting & H/F Assembly


A (Sister Factory)
B
C/T=50 sec C C/T=55
C/T=61 sec
C/O = 0.5 hr D C/O=10 min
Uptime: 80% Uptime: 100%

500 NOS Learning Center


Lastly, what improvements are
needed to reach the Future State?

 Reduction in changeover time and batch size at the


cutting process to allow faster response time.
 Improvements in uptime at the cutting and HF
welding process
 Improvement in quality rate

501 NOS Learning Center


The Icons Used

We use symbols, or icons, to represent processes and flow.

Process Box Movement of finished goods to


Movement of Production Materials the Customer

Assembly

Material Queue (sequenced) Inventory tombstone

FIFO
ABC Corp.
__pcs
__day

Data Box
Pull of Material from one Truck Shipment
process to next
__/wk
_ hour

502 NOS Learning Center


The Icons Used (cont’d)

Manual Information Flow


Marketplace
A
B Signal Production Card
C

Electronic Information Flow Buffer or Emergency Stock


A
B
Production Instruction Flow
C

Production Schedule

weekly Indicates path of Production Instruction Card


Production Instruction Card

Sequential Production Schedule Material Withdraw Card Indicates path of Material with withdraw card

503 NOS Learning Center


Future State Map
Production Control

Supplier
Customer

W
Lamination Cutting Stitching Assembly
X FIFO
1Shift 1Shift 1Shift FIFO C/T= 1320sec I
I Y 33 204 1Shift

504 NOS Learning Center


Future State Map

Mapping Exercise

505 NOS Learning Center


Create the Value Stream Plan

 Your future state map shows where you


want to go.

 Now you need to create a plan to get there.

506 NOS Learning Center


Create the Value Stream Plan
(cont.)

The plan should show:


 what you plan to do by when, step by step
 measurable goals
 clear checkpoints with real deadlines.

507 NOS Learning Center


Create the Value Stream Plan
(cont.)

Pick a starting point:


 where the process is well understood by
the people.
 where success is likely
 you can predict a high return on cost and
effort

508 NOS Learning Center


Future State Map - Do

IMPLEMENTATION
What Where Who When Status

509 NOS Learning Center


Future State Map

Planning Exercise

510 NOS Learning Center


Conclusions

Lean value streams must be developed


with respect for people. But respect for
people should not be confused with
“respect for old habits.”
Developing lean value streams can be
hard work, often with one step back for
every two forward.

511 NOS Learning Center


Conclusions (continued)

Everyone should feel the benefits of the


work done by value stream analysis.
These benefits can come in many forms:

 increased competitiveness for the company


 better working environment
 greater trust between management and
employees
 a sense of accomplishment in serving your
customer
512 NOS Learning Center
Current/ Future State Map QUIZ

513 NOS Learning Center


Stability Academy

Next Steps…

514 NOS Learning Center