Agenda
• General information
• Overall objective of capacity levelling
• Planning table in tabular form
• Capacity levelling procedure
• Current issues
General information
• Functionality available on DE1 100 with CR
DE1K968808 INC0187705: FMM Capacity
levelling
• A couple of issues in place to have a basic
functionality
• Business reference is Vittorio Bossio –
Production planner in FFI
Overall objective of capacity levelling
• The overall objective of this function is
leveling overloads and underloads at work
centers
Planning table in tabular form
• Select custom overall profile ZFOX_FMM
designed togheter with Vittorio Bossio with T-
code CM25
In such a case wc available capacity = 540 MIN and requirements are 1637,6 MIN
OVERLOAD
Planning table in tabular form: requirements area
Production of 100 PC of item 110.0285.791 with PO 2670202 will take 445 MIN
Capacity levelling
• Since MRP propose requirements without
taking into account limited capacity of a work
center (e.g. 8H), it can be OVERLOAD
Capacity levelling
• Select the list of requirements to be «dispatched»,
start date and press «Dispatch» button
Capacity levelling
• After dispatching scheduled time will be
always less then 540 MIN (available capacity)
Capacity Levelling
• It can be required to assign a user defined
sequence
Capacity Levelling
Capacity levelling
• Custom Dispatch sequence is: sequence/start
date/prod.order
Capacity Levelling
Desiderata sequence
Scheduling according
to the sequence
Current issues
Today only 2 issues. After those are fixed it’s
possible to release a basic capacity levelling
functionality
• Entire capacity is not saturate
• Automatic sequence assignment based on
production start date with user exit (oldest
production order with 001 etc.)
Entire capacity is not saturate