Pekerjaan Tanah
Pekerjaan Tanah
Oleh:
Irawan (171121044)
Novia Soraya (171121056)
2B-KSI
DATA PROYEK
1
• DATA UMUM
• DATA TEKNIS
• VOLUME PEKERJAAN
• LOKASI PROYEK
DATA UMUM
3
DATA TEKNIS
4
VOLUME PEKERJAAN
Keterangan :
Bobot isi gembur : 1,25 ton/m3
Waktu rencana kerja 960 jam (120 hari, waktu kerja 8
jam/hari)
5
LOKASI PROYEK
8
ALAT BERAT
YANG
DIGUNAKAN
9
EXCAVATOR BULLDOZER
Compaction
Menggali tanah sesuai
Menghamparkan material Vibrator Roller
timbunan
volume pekerjaan
DUMP TRUCK
Memadatkan material
timbunanan sesuai
spesifikasi
Mengangkut tanah hasil
galian 10
PEKERJAAN GALIAN
BUANG SEJAUH 1 KM
11
“
Mulai
F
L
Pekerjaan Galian
Pemotongan
Tidak
O
W
permukaan lereng
Dokumen Spesifikasi Umum
yang telah selesai
2010 Seksi 3.1
tidak boleh berbeda
dari garis profil yang
disyaratkan C
Ya
H
A
Penyiapan Tempat Kerja
R
Selesai
T
12
Tahapan Pekerjaan
PROJECT SITE PROJECT SITE DISPOSAL AREA PROJECT SITE
1. Penggalian di project site dilaksanakan menurut kelandaian garis dan elevasi yang ditentukan pada gambar kerja
dan pembuangan semua material atau bahan dalam bentuk apapun.
2. Pada saat pekerjaan galian, material yang terekspos pada garis formasi atau pondasi dalam keadaan lepas maka
bahan yang terlepas tersebut harus seluruhnya dipadatkan atau dibuang dan diganti dengan timbunan yang
memenuhi syarat.
3. Lapisan keras atau bahan yang sukar dibongkar dijumpai pada garis formasi, maka bahan tersebut harus digali
15cm lebih dalam sampai permukaan yang merata.
4. Hasil galian yang tidak memenuhi syarat diangkut menuju disposal area sedangkan hasil yang memenuhi syarat
diangkut dengan menggunakan dump truck menuju disposal area .
13
PEKERJAAN TIMBUNAN
MENGGUNKAN
MATERIAL PILIHAN
14
Mulai
16
B. PENGHAMPARAN TIMBUNAN
Project Site
17
C. PEMADATAN TIMBUNAN BIASA
Project Site
1. Setelah penempatan dan penghamparan selesai, setiap
lapis dipadatkan dengan menggunakan vibrator roller.
18
Material
yang Timbunan biasa digunakan
sebagai bahan timbunan. Spek
untuk
tidak mengandung plastisitas
yang tinggi, dan CBR setelah
perendaman 4 hari bila
19
ANALISIS
PRODUKTIVITAS
20
1.PRODUKTIVITAS EXCAVATOR
1. Spesifikasi Excavator
Time Motion (CT)
CT = Standar siklus waktu x factor kedalaman
22
Desktop
project Place your screenshot here
23
24
In two or three
columns
Yellow Blue Red
Is the color of gold, butter Is the colour of the clear Is the color of blood, and
and ripe lemons. In the sky and the deep sea. It is because of this it has
spectrum of visible light, located between violet historically been
yellow is found between and green on the optical associated with sacrifice,
green and orange. spectrum. danger and courage.
25
And tables to compare data
A B C
Yellow 10 20 7
Blue 30 15 10
Orange 5 24 16
26
89,526,124$
That’s a lot of money
185,244 users
And a lot of users
100%
Total success!
27
89,526,124
Whoa! That’s a big number, aren’t you proud?
28
Our process is
easy
first second third last
Lorem ipsum dolor sit amet, Lorem ipsum dolor sit amet, Lorem ipsum dolor sit amet, Lorem ipsum dolor sit amet,
consectetur adipiscing. consectetur adipiscing. consectetur adipiscing. consectetur adipiscing.
29
You can insert graphs from Google Sheets
30
Android
project Place your screenshot
here
31
iPhone
project Place your screenshot
here
Show and explain your web,
app or software projects
using these gadget
templates.
32
Tablet
project Place your screenshot here
33
Thanks!
Any questions?
You can find me at @username & user@mail.me
34
Credits
Special thanks to all the people who made and
released these awesome resources for free:
● Presentation template by SlidesCarnival
● Photographs by Unsplash
35
Presentation design
This presentation uses the following typographies:
● Titles: Raleway ExtraBold
● Body copy: Raleway Light
You can download the fonts at
https://www.fontsquirrel.com/fonts/raleway
You don’t need to keep this slide in your presentation. It’s only here to serve you as a design
guide if you need to create new slides or download the fonts to edit the presentation in
PowerPoint®
36