CAMPO CUSIANA

MARIA PAULA ARIAS RIVERA


LEANDRO RODRIGUEZ

FACILIDADES DE SUPERFICIE 2018-2


SCHEDULE

Location

Stratigraphic column

Discovery and early life

General aspects

Pressure and production history


LOCATION
Cusiana Field is located in the Llanos Foothills, 150 miles northeast of Bogota,
Colombia. The true vertical depths for the hydrocarbon reservoirs discovered are
typically beyond 10,000 ft (TVD) with in-situ pressures and temperatures higher
than about 5,500 psi and 250 F, respectively.

https://bit.ly/2HaNsEc
STRATIGRAPHIC COLUMN
The geological setting is characterised by
high horizontal stresses, steeply dipping
beds, numerous faults and alternating
Measurament(ft) sand/shale sequences
Mirador Barco Guadalupe

Top of the formation 12160 12880


Mirador 13160

• The bottom part has better conditions to


Average thicknes of oil zone 400 be380
a reservoir rock. 380

Average thicknes of gas zone 330 230Barco 60


• Can be considered as a good reservoir
rock
Average thicknes of water zone 430 170 400
Guadalupe

• High permeabilities rock.


DISCOVERY AND EARLY LIFE

Discovered in 1988
• Assosiation contract Satiago de las Atalayas. Ecopetrol, BP, Total,
Triton.

1990
• the Cusiana-1 well tested significant volumes of condensate gas in the
Mirador formation

1991
• the Cusiana-2A well became the first in the deep Colombian Foothills
Belts to have penetrated the entire Mirador, Barco and Guadalupe
reservoir intervals.
DISCOVERY AND EARLY LIFE

1993

• Joint contract for explotation between BP and Ecopetrol

1993-1997

• High productions rates, the maximun was 300.000BOPD

1997-2004

• It was noticed that the production rate fell because of the high
depletion of pressure
DISCOVERY AND EARLY LIFE
1997-2004

• It was noticed that the production rate fell because of the high
depletion of pressure

A new sismic 3D
study revealed the Injection of water to
strcutural complexity mantain pressure
of the formation

Drillig of horizontal High production of


https://bit.ly/2TC6f0V and multilateral wells water
DISCOVERY AND EARLY LIFE
2004-2015
• The complex fluid behavior involved has an important bearing on the in-
place volume determination and on field development planning.

New strategy: Gas The gas market


injection keeps growing

In 2012 the gas unit


Contract Santiago de
started to work in the
Atalayas finished in
CPF of Cusiana and
2010, and began
began de production
https://bit.ly/2EOQwC6 Tauramena contract
of GLP
DISCOVERY AND EARLY LIFE
2016
• Ecopetrol received operation of Cusiana from Equion. Contract
Tauramena finished in 2016, and began Rio Chitamene

Cusiana y Cupiagua reach a


combined production of over 80
thousand barrels equivalent per day
and represent 41% of the production
and dispatch of natural gas consumed
in Colombia at the moment
GENERALIDADES
PRODUCCION HISTORICA