Anda di halaman 1dari 1

St.

Martha’s Hospital Ecoparadigm DTS installation for treatment


of wastewater from hospital

History
Over last 133 years from treating victims of plague in the late 1870s, St. Martha’s Hospital, Bengaluru provide
compassionate medical and nursing care for the poorer section of Bangalore. The hospital currently treats over
2.50 lakh out-patients and 21,000 in-patients annually. Out of the 550 beds available, 410 are earmarked for
general ward patients, who are given free or concessional treatment.
Ecoparadigm DTS was installed to treat wastewater from the laundry, floor cleaning, toilets, and all other liquid
waste. It has commissioned in 2008 and has been working optimally since then.

Need for the project During construction of DTS

• To have legal compliance with CPCB, in 2009 Martha’s Hospital have installed DTS
with 850 KLD capacity
Why DTS • The treated water can be reused for flushing
• Need cost effective solutions  Charitable Hospital
• Aspires to be a Role Model ‘Green Sustainable Hospital’
Waste water Key Solutions
source challenges DTS
• Low maintenance, affordable
• Toilet • Waste water to be treated to
construction
• Flushing stringent Biomedical PCB
• Suitable for both domestic
• Canteens standards
and industrial wastewaters
• Cleaning • Efficient utilization of space
• Reliable, long lasting and
• Washing of as STP is a add-on entity
resistant to shock loads
infected • The water was required to be
• 100% pollution reduction
materials recycled for gardening.
• Reuse potential

Design Capacity Peak flow Inlet COD Inlet BOD Outlet BOD Outlet COD
parameters 850 KLD 8 hrs <1000 mg/l <500 mg/l <10 mg/l <250 mg/l After Construction
PSF & ACF

Settler Anaerobic Fluidized Bed Fixed Film Reactor Planted Gravel Filter
Reactor

Decision No power supply Low maintenance No motor, blowers or


factors required cost moving parts. ‘civil
Low operation cost Sludge removal only work’ only
once in 2 years
Treated water is Outflow from the Functions Saves
tertiary treatment
used for since 2008 Rs. 2,700,000
landscaping is routed for per annum
purpose irrigation
purpose Saving
Rs.250,000 310 ML
per month on water treated per
Benefits accrued water alone annum

info@ecoparadigm.com

Anda mungkin juga menyukai