October:
(Project) 10
September: marks November: 1
1 Marked CW 10 1 Marked CW 10 1 Marked CW 10
1 CT 15 marks(in CT 15 marks (in
marks 1 CT 15 marks marks
NB/WB/AB/PB) NB/WB/AB/PB)
marks(in
NB/WB/AB/PB)
Plan 2:
• Fixed • Flexible
First CT CT
(Sep) (NB/PB/AB/W
B)
(30) (30)
Project Marked
(Oct) CW
(10) (30)
• Project • Flexible
work
Plan 3:
1st CT CT CT
30 marks 15 marks 15 marks
October
• CT 15 marks
• Marked CW 15 marks
November
• Preparatory Test/ Worksheet 20 marks
Checking of the tests and review
Fair and just planning of the test contents will
lead to positive learning.
Fear factor must be eliminated at all costs.
All tests must be checked within three days to
ensure smooth flow of regular work in NBs.
It is solely the subject/substitute teacher’s
responsibility to collect the Test worksheets or NBs for
checking.
Blame cannot be placed on the student for not
submitting the NB, incharges must be made from
within the class for these tasks.
Test index will be made, however, marked CW will not
be shared with the students.
Test Indices
Marks will be entered in test indices side by side on
regular basis with DATE.
No delays in marks entry.
September tests will be pasted/stapled in the NB.
Test index to be update immediately after the tests are
checked.