HYBRID POWER PLANT

PLANNING
IN NUSA PENIDA (DEC)

OLEH:

DEWA AYU NANCY CAHYANI (0991761004)


DAILY LOAD
AT NUSA PENIDA

ON THE DAY ON THE NIGHT


PEAK LOAD 1300 KW 1800 KW
MIN LOAD 620 KW 640 KW
DIESEL POWER PLANT

- Diesel Genset 1: “Komatsu” installed electrical capacity 700 kW


- Diesel Genset 2: “Komatsu” installed electrical capacity 700 kW
- Diesel Genset 3: “Komatsu” installed electrical capacity 450 kW
- Diesel Genset 4: “Mercedes” installed electrical capacity 200 kW
- Diesel Genset 5: “DAF” installed electrical capacity 200 kW
- Diesel Genset 6: “Deutz” installed electrical capacity 150 kW
- Diesel Genset 7: “Volvo” installed electrical capacity 80 kW
- Diesel Genset 8: “Volvo” installed electrical capacity 80 kW

TOTAL = 2560 Kw
DIESEL POWER PLANT

NO Type Capacity of Generator Capacity of


(kW) Generator
100% (kW)
85 %
1 Komatsu 700 595 

2 Komatsu 700 595


We can not use 100%
3 Komatsu 450 382.5 
capacity genset
4 Mercedes 200 170 

5 DAF 200 170 

6 DEUTZ 150 127.5 

7 VOLVO 80 68 

8 VOLVO 80 68 

TOTAL   2560 KW  2176.KW


Capacity
MUNDI HILL WIND TURBIN

1 m/s = 10 h
2 m/s = 40 h No
electricity Wind speed  20 m/s
3 m/s = 140 h

The operating wind speed range is 3 m/s (cut-in) to 20 m/s (cut-out).


MUNDI HILL WIND TURBIN

From the chart we can see that the best power


that mundi hill wind turbin can generate is 27.3 kW
But that just for 4 or 5 hour.
And we also get 2.9 kW for 55 hours.
In this case we use 2.9 kW as energy
that we can expected from the wind
From 9 wind turbin we will get 9 x 2.9 = 5.8 kW
MUNDI HILL solar generator

1 solar power plant has 32 kW (peak)


1 solar power plant has 35 kW (peak)
Global Radiation per day kWh /
Month Global Radiation
m2 per day
Month
kWh / m2
January 3.8 @solar power plant 32 kW in peak
January
February
3.8
3.6 It means that solar power plant
February
March 3.6
3.6 will generate 32m kW in 1000 W/m2
2

April
March 4.0
3.6 In Dec global radiation = 4.0 kWh/m2
May
April 4.1
4.0
Its mean :
June 4.3 4000 Wh/m2 = 4.0 h with 1000Wh/ m2
May 4.1
July 4.5 In July we will have 32 kW for 4.0 hour
June
August
4.3
4.4 = 128 kWh in each day
July
September 4.5
4.2
October
August 4.1
4.4 @solar power plant 35 kW in peak
November 4.0 It means that solar power plant
September 4.2
December 4.0 will generate 35 kW in 1000 W/m2
October 4.1 In Dec global radiation = 4.0 kWh/m2
November 4.0 Its mean :
December 4.0 4000 Wh/m2 = 4.0 h with 1000Wh/ m2
In July we will have 35 kW for 4.0 hour
= 140 kWh in each day = ENERGY
TABLE PLANNING

Hours operation : 8.00 Hours operation :17.00-


Hours operation: 1.00-8.00 -17.00 1.00
Power energy that energy energy energy
plant  generate consumption remarks consumption remarks consumption remarks
G.1 595 595 On 595 On 595 On

G.2 595 Off Stand by 595 On


G.3 382.5 382.50 On Stand by 382.5 On

G.4 170   Stand by 170  On 170 On


G.5 170   Off   Off   Off

G.6 127.5 127.5 On Stand by  127..5 Stand by


G.7 68   Off   Off   Off
G.8 68   Off   Off   Off
SOLAR 67 67 On 67 On 67 On
wind 5.8 5.8 On 5.8 On 5.8 On
Total all   1177.8 1100 837.8 800 1942.8 1800
Total diesel   1105   765   1870  