Analisa
perhitungan hasil pengujian
SONDIR untuk mencari Q ultimit 1
tiang
Data Hasil Pengujian
SONDIR
Analisa Perhitungan Data
Pengujian
Manometer
Cone Resistance Local Side Friction Side Fraction Total side friction
Kedalaman Meter Friction Ratio (%)
Bacaan 1 (kg/cm²) Bacaan 2 (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²) (kg/cm²)
1-2
2-3 1,50 0,120 8,000% Organik Clay 0,188 0,019 1,178 R1P1 100,0 200,0 0,5 12,00 100,000 706,500 0,707
3-4 1,40 0,100 7,333% Organik Clay 0,175 0,018 1,179 R1P1 200,0 200,0 1,0 10,00 100,000 1179,000 1,179
5-5 1,90 0,093 5,556% Organik Clay 0,238 0,024 1,172 R1P1 399,0 200,0 2,0 9,33 100,000 1093,400 1,093
5-6 2,90 0,153 5,276% Organik Clay 0,363 0,036 1,157 R1P2 400,0 200,0 2,0 15,33 100,000 1773,300 1,773
6-7 3,80 0,133 3,571% Organik Clay 0,475 0,048 1,143 R1P2 500,0 200,0 2,5 13,33 100,000 1524,000 1,524
7-8 6,10 0,333 6,000% Organik Clay 0,763 0,076 1,109 R1P2 600,0 200,0 3,0 33,33 100,000 3695,000 3,695
98,00
8-9 11,40 0,960 8,704% Organik Clay 1,425 0,143 1,029 R1P2 700,0 200,0 3,5 96,00 100,000 9878,400 9,878
9-10 9,60 1,573 16,367% Organik Clay 1,200 0,120 1,056 R1P2 800,0 200,0 4,0 157,33 100,000 16614,400 16,614
10-11 9,80 1,653 16,852% Organik Clay 1,225 0,123 1,053 R1P2 900,0 200,0 4,5 165,33 100,000 17409,600 17,410
11-12 27,00 2,600 11,444% Clay Clay 3,375 0,338 0,795 R1P2 1000,0 200,0 5,0 260,00 100,000 20670,000 20,670
12-13 14,40 1,707 11,933% Clay Clay 1,800 0,180 0,984 R1P2 1100,0 200,0 5,5 170,67 100,000 16793,600 16,794
12-14 6,00 0,600 10,000% Clay Clay 0,750 0,075 1,110 R1P3 1101,0 200,0 5,5 60,00 100,000 6660,000 6,660
Data Yang di dapat setelah dilakukan analisa perhitungan
Data Pile
L (Panjang pile) = 12 m
Sf = 2,5
Q total = 512,855
3.Menghitung Q ultimit grup
H galian abutment = 2m
L pile = 12 m
B pile = 25 cm = 0,25 m θ = tan-1(B/S)
= = 11,31
S pile = 5*B 1,25 m n x Eg x Qult 1
SF = 2,5 Qult grup = tiang
= 1336,47 ton
n pile (asumsi) = 16 buah
m =2 Qallowabel = Qult grup
n =8 = 534,59 ton
SF
Qult grup = 'n x Eg x Qult Qallowabel grp = 534,59 ton
1 tiang Qtotal = 512,86 ton
Q ult 1 tiang = 100,978 ton
n = 16 buah Qallowabel -
Eg (Efesiensi) = 1- θ((m-1)n + Faktor Efesiensi = Qtotal
(n-1)m) 90 x m x n Qallowabel
Eg (Efesiensi) = 0,8272
= 4,07% < 5%
EFISIEN
Qultimit grup =
1282,520 ton
4. Menghitung nilai Pmax
Diketahui: ΣS = 7,00
Lg = 1/2 D + SS x S + 1/2 D
Cn rata-rata = 6,07 kg/cm2 = 900 cm
I= 1- Lg
Wtotal = 512,8553974 ton 512855 kg (8 x Bg)
= 0,25
Wpile = 29,16 ton 29160 kg
q= Wtotal - Wpile
L= 12,00 m 1200 cm
Bg x Lg
= 3,58292887 kg/cm2
S= 125 cm
B= 25 cm
Bg = Lebar Rata-rata = Pile group
Gambar
Dimensi Abutmen
Lokasi
Jembatan Sungai Bengkalis
2 2
Nama Tugas
Perencanaan Struktur
Bawah Jembatan
Gambar
Pola Perletakan
Tiang Pancang
Lokasi
Jembatan Sungai Bengkalis
Perancangan
4 Bangunan
Jembatan
Oprit Nama Tugas
Perencanaan Struktur
Bawah Jembatan
Tanah Timbunan Abutmen
Gambar
Tanah Asli
Struktur Bawah
Jembatan
Lokasi
Jembatan Sungai
Bengkalis
Perancangan
4 Bangunan
Jembatan
Gambar Tampak Samping Jembatan Komposit