LOKASI PROYEK
• ZONA 1 ( NATAR – SUKARAME )
• ZONA 2 (BRANTY – NATAR )
• ZONA 3 ( MASGAR – METRO – TIGENENENG )
ZONA 3 STA 105 + 109
NO STRUKTUR IDENTIFIKASI K3L
2. PERTEMUAN JALAN NASIONAL DAN JALAN 2.1. 200 METER LAGI PERTEMUAN PINTU
LOKAL KELUAR MASUK KENDARAAN PROYEK
HARAP BERHATI HATI
28
ZONA 2 STA 95 + 105
27 NO STRUKTUR IDENTIFIKASI K3L
23
2. BOX CULVERT / BOX TRAFFIC 2.1. NAMA BANGUNAN
35
3. PERTEMUAN JALAN NASIONAL DAN 3.1. 200 METER LAGI PERTEMUAN PINTU
JALAN LOKAL KELUAR MASUK KENDARAAN PROYEK
34 HARAP BERHATI HATI
3.2. 100 METER LAGI PERTEMUAN PINTU
KELUAR MASUK KENDARAAN PROYEK
HARAP BERHATI HATI
3.3. DILARANG BERMAIN DI LOKASI
PROYEK
ZONA 1 STA 80+000 sd 95+000
18
NO STRUKTUR IDENTIFIKASI K3L
17 16
1. JEMBATAN 1.1. NAMA BANGUNAN
1.2. HATI-HATI KELUAR MASUK
15 KENDARAAN
1.3. DILARANG BERMAIN DI LOKASI
PROYEK
1.4. AWAS ALAT BERAT SEDANG
BEROPERASI
1.5. AWAS LOBANG GALIAN
1.6. AWAS BEKERJA DI KETINGGIAN
13
2. BOX CULVERT / BOX TRAFFIC 2.1. NAMA BANGUNAN
14 12
2.2. HATI-HATI KELUAR MASUK
KENDARAAN
13
2.3. DILARANG BERMAIN DI LOKASI
PROYEK
2.4. AWAS ALAT BERAT SEDANG
BEROPERASI
2.5. AWAS LOBANG GALIAN
11
2.6. AWAS BEKERJA DI KETINGGIAN
10
3. PERTEMUAN JALAN NASIONAL DAN 3.1. 200 METER LAGI PERTEMUAN PINTU
JALAN LOKAL KELUAR MASUK KENDARAAN
PROYEK HARAP BERHATI HATI
1000
“A”
Steal Pipe dia.75
500
Braching Joint
1000
1/5.L 1/5.L
“A”
20000
Ftalit 115-143 dia. 75
Permanent Red KF-43
Concrete Cover
“B” Uk. 300x300 Sub Grade
300
300
BAHAYA DI LOKASI PROJECT
1. Bahaya lalulintas
2. Bahaya debu
3. Bahaya akibat cuaca : longsor , licin, petir
TANGGAP DARURAT
TANGGAP
Pastikan kondisi Berteriak untuk
DARURAT
anda tidak paniK meminta tolong
KEBAKARAN