CPPA PER
Units Rcvd Units Billed ENERGY LOSS UNIT SALE
F.Y.
(MKWH) (MKWH) RATE
UNITS % COST (Rs)
2013-14 5010.3 3684.4 1325.9 26.5 14584.9 11.0
2019-20
1691.7 1148.3 543.4 32.1 6727.3 12.4
1ST QTR
ANALYSIS OF PERCENTAGE LOSS AS DEMANDED BY
HESCO, ALLOWED BY NEPRA AND ACTUAL LOSS
%AGE LOSS
F.Y.
DEMANDED BY
ALLOWED BY NEPRA ACTUAL
HESCO
2013-14 23.00 20.5 26.5
2019-20
27.50 -- 32.1
1ST QTR
ANALYSIS OF ACTUAL PERCENTAGE LOSS IN TERMS OF TECHNICAL
LOSS FOR PRIMARY TRANSMISSION (I.E.132, 66 AND 33 KV SYSTEM),
PRIMARY DISTRIBUTION (I.E. 11 KV) AND SECONDARY DISTRIBUTION
(I.E. 400/ 230 V) AND IN TERMS OF THEFT FOR EACH DISCO
TECHNICAL LOSSES
F.Y. SECONDARY
SECONDARY PRIMARY DISTRIBUTION
TOTAL
TRANSMISSION DISTRIBUTION CABLE
LT NETWORK
LOSSES
2018-19 3.831 10.095 4.453 0.841 19.220
2019-20
2.873 9.998 4.361 0.835 18.067
1ST QTR
HESCO’s technical loss calculated by 3rd party M/s Power Planner International is
18.45% excluding impact of coastal belt while according to HESCO GIS technical
losses are 19.2% with impact of coastal belt
Private Running Arrears Ending September 2019
Rs. in Million