Keselamatan Proses
Keselamatan Proses
Disusun oleh:
Hendri Amirudin Anwar ST, MKKK
PSM Major Incidents
1974 - Flixborough Works (UK)
Vapor cloud explosion killed 28 people
1976 - Icmessa Chemical Works (Seveso Italy)
Runaway reaction with a release of dioxin
1984 - Union Carbide (Bhopal India)
MIC leak killed 3000 people
1988 – Piper Alpha Platform (North Sea, UK)
Explosion killed 167 people
1989 - Pasadena Texas
Ethylene and isobutane leak killed 24 people
2001 - Toulouse France
Explosion killed 30 people
PIPER ALPHA (1988)
Keselamatan Kerja
(167 deaths) 3
PIPER ALPHA PLATFORM, UK NORTH SEA
8
SMK3
Jika anda bertindak sebagai seorang Safety dan
anda memikirkan bahaya seperti ini:
• First 5 years:
– 132 deaths avoided
– 767 injuries/illnesses
• Second 5 years:
– 264 deaths avoided
– 1534 injuries/illnesses
11
Scope and application (API 750)
2. PERALATAN - SARANA
• MATERIAL KONSTRUKSI
• DIAGRAM PIPA & INSTRUMEN (P&ID)
• KLASIFIKASI DAERAH LISTRIK
1. BAHAN BAKU BERBAHAYA
• RANCANGAN SISTEM PELEPAS TEKANAN
• DAYA RACUN (TOXICITY)
(PRESSURE RELIEF SYSTEMS)
• BATAS PAPARAN YANG DIIZINKAN
• RANCANGAN SISTEM VENTILASI
• DATA STABILITAS KIMIAWI - PANAS
• STANDAR YANG DIPAKAI
• DAYA KARAT
• SISTEM KESELAMATAN (SISTEM DETEKSI &
• BAHAYA JIKA BERCAMPUR DENGAN PEMADAM, INTERLOCK, DLL)
BAHAN LAIN
3. TEKNOLOGI PROSES
• DIAGRAM ALIRAN PROSES SEDERHANA
• KIMIAWI PROSES
• PERSEDIAAN MAKSIMUM YANG DIPERKENANKAN
• NERACA MASA - ENERGI
• BATAS AMAN DARI TEMPERATUR - TEKANAN -
ALIRAN ATAU KOMPOSISI
• DAMPAK PENYIMPANGAN KONDISI OPERASI
1. LEMBAR DATA KESELAMATAN BAHAN (MSDS)
2. MANUAL UNIT OPERASI
MANUAL DISKRIPSI PROSES (MDP)
MANUAL PROSEDUR NORMAL (MPN)
MANUAL PROSEDUR DARURAT (MPD)
3. ARSIP PENYELESAIAN PROYEK
4. ARSIP BIDANG TEKNIK
KLASIFIKASI
MSDS
PBB
PENERAPANINFORMASIKESELAMATANPROSES 20
KUMPULKAN INFORMASI KESELAMATAN PROSES
PEMUTAKHIRAN
• PERBAIKI INFORMASI KK SECARA BERKESINAMBUNGAN
• FORMALISASIKAN PERBAIKAN PERTAHUN, CATAT NOMOR PERBAIKAN, PARAF, DAN BERI TANGGAL SETIAP
DOKUMEN
• KALAU TIDAK ADA PERBAIKAN, DOKUMEN HARUS DISAHKAN SETIAP TAHUN
INFORMASI PROSEDUR
KESELAMATAN PROSES OPERASI DAN PELATIHAN
PERUBAHAN
RANCANGAN
TELAAH FILE
PROY. INVESTASI PERALATAN
KENDALI MUTU
PERUBAHAN PROSES
MANAJEMEN
DAN ABP
PERUBAHAN
ISMT/MKP
SUATU PENDEKATAN SISTEMATIS, TERTATA DAN
MENDALAM UNTUK MENGIDENTIFIKASI, MENILAI
DAN MENGANDALIKAN BAHAYA YANG TERKAIT
DENGAN PEMPROSESAN BAHAN KIMIA BERBAHAYA
SEJAK TAHAP PERANCANGAN.
• HAZOPS
• WHAT-IF
• FTA
• FMEA
• QRA
1. Sasaran, Batasan
PENJELASAN 2. Tata Letak, Rancangan
ALIRAN PROSES
TENTANG SISTIM 3. Spesifikasi, Acuan
ANALISIS RESIKO 4. P&ID, PFD, dll
Standar, Checklist, Review KK
IDENTIFIKASI
BAHAYA , ABP, Hazops, What If
1. Pengalaman Kualitatif/Kuantitatif
2. Analisa What ANALISA ANALISA
1. Pengalaman
If SEBAB INSIDEN AKIBAT INSIDEN 2. FMEA
3. FTA 3. Analisis Akibat
6. POMPA
REVIEW PERANCANGAN:
KESELAMATAN PAKET PERANCANGAN INFORMASI
PROYEK PERALATAN KESELAMATAN
PROSES
OPERASI:
- INSPEKSI FILE
ANALISA - PENGUJIAN MAINT. PEMELIHARAAN
BAHAYA - PERBAIKAN PENCEGAHAN PERALATAN
PROSES
MEMATIKAN PABRIK:
M OC
(DECOMMISSIONING)
PENYELIDIKAN
INSIDEN DEMOLISH LINK
MI UMUM
ISMT/MKP
35
PROSEDUR OPERASI
PEMUTAKHIRAN PROSEDUR
* Dilakukan 1 tahun sekali
PELATIHAN
(minimal)
* Disimpan dg baik
* Ada sistim Pengesahan
MANAJEMEN PERUBAHAN 40
SARANA/PERALATAN
TEKNOLOGI PROSES
PERUBAHAN
PROSEDUR
TENAGA KERJA
TIDAK
BERHENTI PERUBAHAN TERKAIT
PROSES?
YA
MODIFIKASI BERPOTENSI
MENIMBULKAN BAHAYA?
TIDAK
YA
ISI BLANKO PERUBAHAN DAN IKUTI
PROSEDUR MANAJEMEN PERUBAHAN
MUTAKHIRKAN UNSUR
PSSR PELATIHAN TERKAIT
ISMT/MKP
KK KONTRAKTOR
PEMILIHAN KONTRAKTOR
Masukkan pertimbangan kk dalam proses pemilihan
rekanan
PERSYARATAN PEKERJAAN
Lengkapi Checklist, Induction Course sebelum masuk kilang, sistim
peralatan agar bisa bekerja aman.
PERTEMUAN PASKAPEKERJAAN
DOKUMENTASI
* Pelatihan tambahan yang diperlukan.
* Perbaikan terhadap IKP dan prosedur Operasi
ISMT/MKP
7. PRE START UP SAFETY REVIEW
ISMT/MKP
Category N/A OK Tem- Req’d Remarks
porary For S/U
Documentation Items
Is EHS Documentation
Complete & Approved
Vant Permit Approved
C
“DO NOT TOUCH” Exception Required
O Test Authorization
H Instrumentation
Instrument Books & LSDS Updated
Pressure Gauges as Required
Temperature Gauges of Required
Fail Safe valve Position
Check Complated
Analysis Check Completed
Spare Parts Available
EHS Certificed
DCS Process Control Change Form
Mechanical Equipment
Guards Installed Modified for Vibration
if Applicable
Lubrication and Alignment Complete
Emergency Facilities
Correct Rotation
P.M. Records In Place
Spare Parts Available
Hydraulic Systems Installed for Design
and Checked Prior to Start-up.
JENIS PELATIHAN DASAR
PEKERJA BARU? PELATIHAN DASAR
YA * PERATURAN/PERUNDANGAN K3
TIDAK * MANUAL/PROSEDUR UMUM K3
* MANUAL/PROSEDUR
PELATIHAN AWAL UMUM KEDARURATAN
* BAHAYA DITEMPAT KERJA
PROGRAM FORMAL TTG PROSEDUR
OPERASI DAN K3 DI UNIT PROSES
* BAHAN BERBAHAYA
* PROSES SECARA UMUM
* PROSEDUR OPERASI
* BAHAYA DITEMPAT KERJA
* PRAKTEK KERJAAMAN
* OPERASI KEDARURATAN
* PEKERJAAN RUTIN DAN NON
RUTIN
PELATIHAN PENYEGARAN
YA TIDAK * TENTANG BAHAYADIUNIT
PROSES BARU/
PROSES
MODIFIKASI
* PROSEDUR OPERASI
3 TAHUN SEKALI
MATRIX TRAINING
Pengawas PEM
Pengawas Ops
Manajer
PERUSAHAAN WAJIB MEMILIKI SUATU
SISTIM IZIN KERJA BAGI PEKERJAAN
PANAS YANG DILAKUKAN DIDAERAH
PROSES, SEHINGGA MANAJEMEN
IZIN
MENGETAHUI SETIAP PEKERJAAN
YANG DILAKUKAN DAN TELAH
DISIAPKAN UPAYA PERLINDUNGAN KERJA
YANG MEMADAI SEBELUM DIMULAI AMAN
PEKERJAAN
- IZIN MASUK KERUANG TERBATAS
- HOT WORK
- LOCK OUT/TAG OUT
- PENGGUNAAN CRANE DAN ALAT BERAT
- DIDEFINISIKAN OTORISASI DAN TANGGUNG JAWAB
10. RESPON KEADAAN
DARURAT
ISMT/MKP
MANAJEMEN WAJIB MELAKUKAN PEMERIKSAAN
BAHWA UNIT OPERASI TELAH MEMENUHI
KETENTUAN TENTANG KESELAMATAN PROSES
SETIAP 3 TAHUN SEKALI DAN MENENTUKAN TINDAK
LANJUT HASIL AUDITTERSEBUT.
MANAJEMEN HARUS MENYIMPAN DUA HASILAUDIT
TERAKHIR.
References :
API 750
Management of Process Hazards
NFPA 1600
Standard on disaster/emergency
Management
OSHA 29 CFR 1910.119
Process Safety Management of Highly
Hazardous Chemicals
Materi Kuliah S2 K3 UI 2014 – Bpk Zulkifli dan Bpk Ismet
T h e following example d emo n s trates the interrelationship among
the elements:
• During a routine inspection of equipment (Mechanical
Integrity), the maintenance worker discovers a valve that no
longer me e t s the applicable code and must b e changed.
• Because the type of valve is no longer made, a different type
of valve must b e s ele c te d and installed (Management of
Change). T h e type of valve s e le c te d may mandate different
s t e p s for the operators (Operating Procedures ) who will
require training and verification in the new p r o c e dure s
(Training).
• When the new valve is installed by the supplier (Contractors),
it will involve shutting down part of the p r o c e s s ( P r e - s t a r t u p
Safety Review) a s well a s brazing s o me of the lines (Hot Work
Permit).
• T h e employer must review the r e s p o n s e plan
(Emergency Planning) to e n s u r e that pr ocedur es
a r e adequate for the installation hazards.
• Although (Management of Change) provisions cover
interim changes, after the new valve is in place the
( Pr oc e s s Safety Information) will have to be
updated before the ( Pr ocess Hazard Analysis) is
updated or revalidated, to account for potential
hazards associated with the new equipment. Also,
inspection and maintenance pr ocedur es and training
will ne e d to be updated (Mechanical Integrity).