Agenda
‡ Background Information
‡ Problem Description
‡ Strategy For Completion
‡ Unexpected Difficulties
‡ Final Design
‡ Conclusion
    Y   

Yordco provides many


products and services to
help keep the railroad
industry running
Milwaukee area Yordco
- Assembly
- Rebuild
- Update
ï  

R 
 R

¢ 
- Spikes are loaded by
 
 
R 
hand by a single ¢R   ¢

individual
- Up to 40 spikes per
minute need to be GUY
PERAT R
GUY
PERAT R
loaded SPIKE

- Individual must load 4 L ADER

slides, feeding each


side of both rails
SPIKE SPIKE
GUY GUY
ï  
 
Scope:
- Develop a process to automate loading of spikes to spiker gun.
- Requires sorting of spikes from bulk random orientations to a
uniform, upright orientation.
Considerations:
- Possibility of rearranging tractor for implementation of process
   

 
 Y

! "Y !Y ! "Y !Y

#
$
! "Y !Y  % "& !Y

! "Y !Y
  '  ! 
- Spikes start in bulk bin
- Spikes delivered via
existing hydraulic ram
- Quantity of spikes
delivered controlled by
surface area of ram
head
- Idea of process is to
allow the body of the
spike fall through a slot
while catching the head
 ( ' 
!   ï 

- Push bulk of spikes by


ram to fall onto slotted
channel
- Vibration and gravity
help spikes to fall into
slot
- Spikes ultimately finish
first process in upright
orientation
     
'  !  
% 
- Pegs catch spikes
and rotate heads
into 3 directions
- Eliminates 1
orientation
- Prepares spikes for
following process
%   # %
 
- A push fork is used
to push and twist the
pins in left and right
orientations
- Results in all pins
being in the down
position
 (    

- Timing of Push Fork is necessary


- Multiple Push Fork mechanisms to ensure success
for process
- Requires driving of spikes through process
- Riser pad to lift head slightly off rail
   

- Spikes could pass


through the first
stage sort
- Resulted in non-
oriented spikes
- Yon oriented spikes
will interfere with
further processes
  )

Failure was eliminated


- Spikes that are sorted ride channel to next process
- Unsorted spikes fall from channel to slide and back to
bulk bin
  
& 
- Working model for
each individual
process
- Concept to be
duplicated to supply
multiple spikers
- Throughput of single
track model was ~40
spikes per minute
- Exceed Requirement
for feed rate
ï      
   
- Twisted Vibration
slot
- Wouldn¶t rotate as
expected
- Slide and fall grove
sort
- Yo sliding nature to
geometry
& 
- Utilize existing components
- Kept process as simple as possible
- Process feed has capability of exceeding
requirements
- Working model of each process built and tested

* 