METODE KERJA – PELAKSANAAN PIPA CHILLER

No. Dokumen : No. Dok :


Bidang Pekerjaan : (HVAC) PIPA CHILLER
Tanggal Pengajuan : 04 April 2020

Diketahui oleh, Diperiksa dan Disetujui oleh, Diajukan oleh,


Satker PT. Angkasa Pura I Konsultan PMSC Kontraktor
Proyek Pengembangan Bandara Sultan Hasanuddin Makassar KSO Jaya CM – Virama Karya PT. Wijaya Karya (Persero), Tbk

( ……………………………………. ) ( ……………………………………. ) ( ……………………………………. )

PEKERJAAN DESIGN & BUILD PENGEMBANGAN BANDAR UDARA SULTAN HASANUDDIN, MAKASSAR SULAWESI SELATAN TAHAP
1-STAGE 1-PAKET 1

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
01 DIAGRAM ALUR PEKERJAAN PELAKSANAAN PIPA CHILLER

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
DIAGRAM ALUR PEKERJAAN PEMASANGAN PIPA CHILLER

START
A. REFERENSI
1. SMACNA Time Schedule & Shopdrawing & Approval Material
2. SNI
Cek NO
3. ASTM OK / NO
Revisi

OK
Persiapan Material Persiapan Alat Kerja
B. OPERASI
Marking Jalur instalasi
4. PEMBUATAN STRUKTUR & elevasi
ORGANISASI
5. PEMBUATAN TIME SCHEDULE Fabrikasi Pipa

6. PEMBUATAN SHOPDRAWING
Instalasi Pipa
7. PENGAJUAN APPROVAL MATERIAL
Repair
No
Cek

FINISH

Referensi : PT. Wijaya Karya Bangunan Gedung, Tbk

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
02 PEKERJAAN PEKERJAAN PELAKSANAAN PIPA CHILLER

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
A. PERALATAN & MATERIAL

Peralatan

Gurinda Mesin Senai Meteran Las Bor Tangga/ PCH Tang Kunci Pas

Material

Fitting Las / Cat Merah &


Pipa BS SCH 40 Longdrat UNP U-bolt Klem
Screew Zincromate

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
B. PROSES PELAKSANAAN
PASANG ACESSORIS ( VALVE,
Marking jalur instalasi & elevasi
STRAINER DLL)

Jika dipastikan tidak ada kebocoran, Lakukan full insulasi


Fabrikasi support sesuai gambar & Lakukan insulasi pada sambungan
support di beri cat zincromate dengan ketebalan sesuai table
standart GENERAL TESTING
Pemasangan support dengan
OK
melubangi plat atau balok dengan Lakukan partial test tekan / NO
bor, mengikuti gambar hydrotest (OK / NO)

Erection / Install pipa dengan Pasang insulasi pada pipa sesuai


ukuran mengikuti gambar dan table standart tetapi jangan REPAIR
pastikan slooping untuk pipa drain dipasang di tiap-tiap sambungan

Lakukan pengelasan, Pipa screew di


Joint fit-up pipa sebelum pasang dengan menggunakan seal
pengelasan dengan gap Max 2.6mm tape atau lem epoxy.

Referensi : PT. Wijaya Karya Bangunan Gedung, Tbk

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
PROSES PELAKSANAAN

Referensi : PT. Wijaya Karya Bangunan Gedung, Tbk

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
PROSES PELAKSANAAN

Referensi : PT. Wijaya Karya Bangunan Gedung, Tbk

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
PROSES PELAKSANAAN

Referensi : PT. Wijaya Karya Bangunan Gedung, Tbk


This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
PROSES PELAKSANAAN

Referensi : PT. Wijaya Karya Bangunan Gedung, Tbk


This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
PROSES PELAKSANAAN
DIAMETER PIPA JARAK ANTAR
PENGANTUNG

<Ø20 mm Maksimal 1 meter

Ø25-40 mm Maksimal 1.5 meter

Ø50-80 mm Maksimal 2 meter

Ø100-150 mm Maksimal 3 meter

Ø200 mm lebih Maksimal 4 meter

Referensi : PT. Wijaya Karya Bangunan Gedung, Tbk

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
PROSES PELAKSANAAN
FABRIKASI SUPPORT
a. Penyangga Pipa
- Marking kebutuhan UNP / Siku. Sesuaikan dengan drawing standart detail pipe support
- Potong UNP / Siku dan lubangi sesuai dengan yg diperlukan untuk masing-masing dimensi pipa
b. Sadle Support
- Potong UNP dengan Panjang kurang lebih 100mm
- Potong pipa yg akan dipasang dengan ukuran 100-150mm kemudian potong 1/8 dari diameter
pipa yg akan dipasang
- Potong Rubber Gasket dengan ukuran sama seperti potongan pipa
c. Pemasangan
- Sambungkan setiap UNP / Siku yg sudah dipotong sesuai ukuran mengikuti drawing standart
detail pipe support.
- Sambungkan potongan UNP dengan Panjang 100mm ke UNP penyangga pipa.
- Sambungkan potongan pipa 1/3 diameter dengan potongan UNP Panjang 100mm (sambung /
las diatasnya)
- Pasang karet packing diatas potongan pipa 1/3 diameter
- Install pipa diatas karet packing
- Pasang Insulasi dengan ketebalan mengikuti table standart
- Setelah prosess pemasangan insulasi selesai, pasang u-bolt pada sisi terluar insulasi lalu
kencangkan
Referensi : PT. Wijaya Karya Bangunan Gedung, Tbk

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
ASPEK K3L

IDENTIFIKASI BAHAYA PENGENDALI RESIKO


BAHAYA KEBAKARAN PROTEKSI / PERLINDUNGAN DARI JATUH
DEBU DAN PARTIKEL PENGGUNAAN APD
KEGAGALAN PERALATAN PEMADAM API
PAPARAN BAHAN KIMIA SELIMUT PENGHAMBAT API
TERSENGAT LISTRIK PINTU MASUK / KELUAR
KESELEO PENYANGGA
GAS SAFETY BRIEFING
TERJEPIT PENYEDIAAN KOTAK P3K
SALAH PENYETELAN PAGAR / BARICADE
TERSANDUNG PENGECEKAN SCAFOLDING
TERJATUH DARI KETINGGIAN RAMBU-RAMBU
KEJATUHAN MATERIAL KOORDINASI PIHAK TERKAIT
LINGKUNGAN SESAK PENERANGAN AREA KERJA
BEBAN BERAT
PERCIKAN API
SALAH KOORDINASI
TERHANTAM BENDA
KEBISINGAN

Referensi : PT. Wijaya Karya Bangunan Gedung, Tbk

This presentation is copyright by PT. Wijaya Karya (Persero), Tbk. Don’t copy or duplicate any content of this presentation without a permission from WIKA
TERIMA KASIH