Indonesia Emas 2045
Definisi :
Membangun Generasi Emas Bangsa Indonesia pada 100 Tahun Emas
Indonesia Merdeka 1945 – 2045
MAPING
PROBLEM
Over Head Cost (OHC) & Operational Cost (OPC) = Harga Pokok Produksi = HPP = Modal
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021-Sep
HPP 12,628 13,756 14,714 15,002 16,658 16,303 16,312 19,400 19,200 19,285 21,530
HARGA 13,712 13,189 15,474 15,843 18,872 18,048 17,263 20,980 17,420 19,430 19,260
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021-Sep
Kenaikan HPP Tiap Tahun 8.93% 6.96% 1.96% 11.04% -2.13% 0.05% 18.93% -1.03% 0.44% 11.64%