STANDARD
STANDARD COST 1
PENGERTIAN
STANDARD COST 2
JENIS STANDARD
1. STANDARD TEORITIS
2. STANDARD NORMAL
3. RATA RATA BIAYA MASA LALU
4. PELAKSANAAN TERBAIK
STANDARD COST 3
STANDARD BIAYA
PRODUKSI
1. STANDARD BIAYA BAHAN BAKU
2. STANDARD BIAYA TENAGA KERJA
3. STANDARD BOP
STANDARD COST 4
HARGA POKOK STANDARD
PER UNIT
BOP:
tetap 0,5 jam @ Rp1.000
variabel 0,5 jam @Rp 3.000 Rp 2.000
Rp 8.000
STANDARD COST 5
DATA REALISASI
Rp 159.330.000
STANDARD COST 6
ANALISIS SELISIH
STANDARD COST 7
SELISIH BIAYA BAHAN
STANDARD COST 9
SELISIH BIAYA OVERHEAD PABRIK
SELISIH BOP=
1. SELISIH TERKENDALI
2. SELISIH VOLUME
SV= (KN-KST).TT
STANDARD COST 10
PEMBAHASAN KASUS
BIAYA BAHAN
STANDARD COST 11
PEMBAHASAN KASUS
STANDARD COST 12
PEMBAHASAN KASUS
STANDARD COST 13