History of dishwashers
1. 2. 3. 4. 5. Introduced under Videocon brand in 1999. Model was VD1200. A lot of 2000 dishwashers was made and sold through dealer network. MRP was fixed at Rs. 19900. Most of the dishwashers either lying in the warehouses unsold or have come back as sales returns. Dishwasher line shifted from Videocon Appliances to Millennium in 2002.
6.
Strategic Focus
Enablers
Increased awareness
Changing lifestyle
Increase in affluence
Creation of Need
Emotional costs
Form a Team
The dishwasher team consists of the following: 1. Members of Millennium Appliances 2. Vendors working on the project 3. Existing users of dishwashers (VD1200) 4. Our prospective patrons 5. Who worked on the project earlier 6. Our critiques, admirers and sources of encouragement and inspirations
Team
S. No. Name Designation Education Exp. Total Exp. Videocon Exp. Dishwasher Contribution
Madhusudan Jhunjhunwala
15 yrs.
16 mths.
16 mths.
Team building, goal setting & leadership Validation of teams efforts & technical guidance
Teodoro Aparicio
HA specialist
40 yrs.
S. D. Jahangirdar
B. Tech (Mech.)
25 yrs.
25 yrs.
10 yrs.
B. Tech (Mech.)
5 yrs.
13 mths.
13 mths.
Team
S. No. Name Designation Education Exp. Total Exp. Videocon Exp. Dishwasher Contribution
Ramakrishna
B. Tech (E&EC)
6 yrs.
13 mths.
13 mths.
K. Abhimanyu
MPACM, (Symbiosis)
10 mths.
10 mths.
10 mths.
Beginning of marketing efforts with a new approach Rectification and dev. Of tools and dies Dev. Of plastic components
Milind Kulkarni
Diploma (Mech.)
6 mths.
6 mths.
Arun Kumar
Diploma (Plastics)
4 yrs.
2 yrs.
13 mths.
Team
S. No. Name Designation Education Exp. Total Exp. Videocon Exp. Dishwasher Contribution 9 Avinash Deshmukh Dy. Manager (Purchase) B. E. (Mech.) 14 yrs. 14 yrs. 13 mths. Vendor dev.
10
Ranga Rao
Diploma (Elect.)
7 yrs.
13 mths.
13 mths.
Rectification of machines
11
U. N. Chittal
B.E. (Mech.)
17 yrs.
17 yrs.
5 mths.
Development of injection moulds for front panel, top board, kick plate & control panel
12
Team
S. No. Vendor Contributions 1 Infodynamic, Pune Product concept development, renderings, prototype, display material, electronic brochures, product CD, and help in advertising material Design, development and manufacture of electronic control board
REPL, Hyderabad
Development of baskets
S. S. Enterprises
Imported components
Team
S. No. Vendor Contributions 7 Ganage Pressing Pvt. Ltd., Pune Press tool rectification and reconditioning, manufacture of press parts and components Design, development and manufacture of membrane switch
Mahavir, Pune
Injection mold for dishwashers - design, development and manufacturing Press tools and components
10
Durga Engg.
11
12
Paramount Engineers
Team
S. No. Vendor Contributions 13 Shree Precoated Steel, Pune Precoated MS sheets
14
Ilex, Pune
Limit switches
15
16
Ravi Vykhole
17
Stainless Steel
Stainless steel sheets for tub band, counter doors and side parts
18
Innovative Engineering
Team
S. No. Vendor Contributions 19
20
21
22
23
24
3. 4.
5.
Inexperience is an advantage.
6. They worked against many odds such as nonnonavailability of drawings, documents, procedures and nono-knowledge of product. They fought the odds and ignorance courageously. They built a team and with the team they worked to create the complete infrastructure that will not only create the product in its new avatara but also they will create a need and fulfill that need in Indian households.
7. 8.
Organize Resources
1. 2. 3. 4. 5. 6. 7. 8. 9. A motivated team with a clearly defined goal has been put in place. Team has been trained rigorously in all aspects product design, manufacturing, service and application. All sources of supplies have been identified and orders for trial lot have been placed. Production set up has been streamlined after effecting necessary corrections and modification in machines and tools. All missing tools, dies, molds and machineries have been rebuilt. Set up can produce 3000 dishwashers in a month with single shift operation. All machines and raw material have been shifted to MAIL. Machines and components that were good have been salvaged for use, while the remainder have been disposed off. Expert help of M/s Teo and S. D. Jahangirdar has been made available to the team. A well defined market plan is in place to achieve a sale target of 1000 dishwashers per month.
4.
5. 6.
Affordable Product
6. Affordable dishwasher 5. Create high volumes 4. Low marketing expense 3. Maintenance free 2. Low manufacturing cost 1. Modular and simple design
Affordable Dishwasher
1. 2. 3. 4. 5. 6. 7. Affordable dishwasher @ Rs. 20,000/- (MRP). 20,000/Present RMC @ Rs. 10,000/- is same as the old RMC despite 10,000/incorporation of new features and increased input costs. It will be reduced to Rs. 8000/- for lot size of 1000 sets. 8000/Cheaper, yet effective, ways of advertisements like door-todoor-todoor awareness campaigns. 75% of people who showed interest to buy the product priced it in Rs. 18000/- to Rs. 30,000/- range. 18000/30,000/Modular design, import substitution will reduce cost of manufacturing, service and imports substantially. 8 out of 12 imported components have been indigenized.
Service Excellence
6. Consumer delight 5. Train consumer 4. Provide service within 24 hrs. 3. Depute them in target cities 2. Train them on the mfg. line 1. Recruit diploma/ITI
Consumer Awareness
8. 7. 6. 5. 4. 3. 2. 1. An informed customer Providing correct information Dishwasher & convenience Dishwasher & hygiene Education on features Test marketing Involving the VD1200 users Door-to-door campaign
Innovative Marketing
1. Door-to-door selling like Aquaguard 3. Tie up with a good kitchenware brands 2. Existing users as selling network 4. Sell the dishwashing solution 5. Use of internet for marketing and awareness 6. Focus on positives, no negatives 7. Road shows, demonstrations and display 8. Sale as a result of positive image
Acknowledgement
Without the courage and mistakes of those who worked on this product earlier it would not have been possible to come this far; it would still be impossible to proceed further from here. It is on the foundation of mistakes made by them we are trying to build the structure of knowledge and success.