ITEM REMARK WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8
1. MEKANIK SUHU
PADAT - CAIR - GAS TEKANAN
FLOW METER
2 DATA TEKNIK & SPESIFIKASI PERALATAN Termasuk data design bila ada
UTAMA Data hasil individual test peralatan utama
3 FACTORY TEST
5 LOGIC DIAGRAM
C TIM OWNER NN
HEAT RATE POINTERS
NO URAIAN
1 PADA DASARNYA MONITOR HEAT BALANCE PADA SETIAP SUB SYSTEM SEMUA ENERGI MASUK HARUS DAPAT
2 PENGUKURAN DILAKAN SETIAP 15 MENIT PERIODE , DILAKUKAN 9 X UNTUK SETIAP GENERATOR OUTPUT
1 Boiler steam drum water drop level equivalent flow Gbl Data Ton/hr 0,000
2 Deaerator tank water drop level equivalent flow G dl Data (0,258)
3 Hot well water drop level equivalent flow G cl Data -3,823
4 System measurable leakage G ml Data 1,570
5 System unaccounted for leakage dG Eq.(1) -5,651
6 Rear shaft gland leakoff of HP turbine Ggn1 Data 4,161
7 HP Heater #1, #2, #3 & deaer steam flow G he Data 187,270
8 Feed pump leakge G fpl Data 0,000
9 Deaerator discharge flow G dv Data 0,000
10 Reheat spray water flow G rhs Data 0,589
3 Packing leakage from high pressure side of HP turbine Ggl Data 10,224
4 Packing leakage from low pressure side of HP turbine Ggn Data 4,161
5 #1, #2 quantity steam extraction Gex Data 129,930
6 Steam from cold reheat steam to the packing Ggh Data 0,000
steam header
7 Cold reheat Steam Flow Grch Eq.(3) 794,235
dilanjutkan
Catatan
Justifikasi
Performance test
Beban
Tanggal
Jam pelaksanaan
Dilanjutkan
(Eq-5) G fw = Gcw + Ghe + Gdl - Gfpl - Gdv - Grhs
of HP turbine
of HP turbine