Vide directorate letter No . F18 ( I- 49) IWMP/WDSC/2010-11/ 1025- 1064 Dated : 15.7.

2010 the broad indicative out lines for DPR preparation chapter wise were sent to all PM DWDUs

Location General features of watershed Present status of land use and water storage. soil erosion Socio economic status Problems and scope of improvement goods / objectives. Institutional arrangements (SLNA,DWDU,PIA,WDT,WC,Secretary

CHAPTER II
I. a) Basic Features : Socio economic and Infrastructure Land use and land classification map , land capability map, Present land use - arable, non arable land , Govt. land, pasture land. Agriculture and Horticulture status and fuel availability. Livestock status - animals/milk production / average yield and Fodder availability. On-farm and Off-farm other income generating activities. Demography -Total Population, BPL, SC,ST,SF,MF, land less (a) Other infrastructure facilities available. Co-operative Societies and their activities. Banks, Post office, Schools. Roads, Connectivity Any other

b) c)
d) e) f)

CHAPTER II.

g)NREGA Status . h)Development indicators i) Land holding details - SF, MF, SC, ST, Others j) Other Development Schemes in the project area

II. a) b)

c)
d) e)

f) g) h)

Technical Features Revenue maps Topo maps/ watershed maps with drainage line / Survey maps Hydro-Geological maps / Ground water status and prospect maps Slope details. (i) Available surface runoff (ii) Surface runoff tapped in existing structures (iii) Balance available runoff Soil Map and Soil details Climate details Erosion details

CHAPTER II.

CHAPTER II.

III Problems, Demand (based on PRA) and scope (as per CG)for comprehensive area development a) NRM b) Agriculture and Horticulture productivity gap analysis c) Live-stock - gap of fodder availability d) Livelihood e) Micro-enterprises.

CHAPTER - III - Proposed Development Plan A Preparatory phase activities Capacity Building Trainings and EPA

NRM
Conservation measures for arable lands

Conservation measures non-arable lands Drainage line treatment Gully Control Structures Runoff management structures- WHS - Anicut/Tanks Ground water recharge structures if any. Production measures for non arable lands i) Silvi pasture works on Govt. waste / Pasture land ii) Fuel and fodder production on private non arable lands)

CHAPTER III.

C i) ii) iii) iv)

Production System and micro enterprise Production measures for arable lands Crop Demonstration IPM,INM,Vermicompost,organic arming Sprinklers and Drip irrigation - with Target groups Agriculture implements - with target groups Diversification in Agriculture, Horticulture and Flori Culture medicinal plants, area to be covered Hi tech Agriculture

CHAPTER III.

D Production systems & Micro Enterprise Agriculture based ( on farm) &Non-Agriculture (off farm) i) Seed Bank ii) Post harvest activities iii) Storage of grain and seed iv) Value addition i) Any other E Livelihood activities particularly for asset less person i) Individuals ii) SHG Activities i) Agriculture based( on farm) ii) Non Agriculture land (off farm)

Livestock based activities a) Milk collection booth b) Dairy c) Poultry d) Fishery


Off Farm i) Local craft if any ii) Repair shops for cycle / two wheelers iii) Grocery shops iv) Any other specific carpentry / Tailoring etc. F) Consolidation phaseActivities proposed (common guidelines)

CHAPTER IV
Technical designs and estimates for proposed activities. NRM - Conservation measures - arable , non arable,Drainage line - gully control structures, Run-off management structures WHS - Hydrological Hydraulic and structure designs Silvi Pasture Development Agriculture, Horticulture, Flori culture, Estimate, Unit cost Livelihood Micro enterprise Convergence NRM (NREGA / Others) Agriculture / Horticulture with Agriculture Deptt. Livelihood / micro enterprise with ICDS / RUIDP

ii) iii) iv) v) i) ii) iii)

CHAPTER - V Activity wise Total Abstract of cost Total abstract cost through project funds Total abstract of cost through convergence by other schemes NREGA/Agriculture/ICDS etc CHAPTER - VI Annual Action Plan A) Project funds B) Convergence

CHAPTER - VII Project outcomes a) NRM b) Agriculture production measures c) Horticulture / flori culture additional income d) Livestock e) Livelihood f) Micro Enterprises g) Overall average income of families CHAPTER - VIII Year wise Break up

CHAPTER - IX Enclosures : Various GIS thematic layers Base map having basic details with drainage line and khasra details. Slope Map Land Use and Land Cover Map

Scientific Planning for the preparation of DPRs Based on the thematic layers like contours, Drainage line, land use and land cover received from SRSAC Jodhpur, priority areas for the construction of structures like field bunds, LSCDS, WHS,tankas,etc have been identified. Production measures for non arable lands i) Silvi pasture works on Govt. waste / Pasture land ii) Fuel and fodder production on private non arable lands.
Activities to be taken up and location are finalized by unison of GIS and PRA exercise.

Location. ______________ Project is located in _____________________ Block, of _____________district. The project area is between the latitudes _________ & longitudes. It is at a distance of _______ km from its Block head quarters and _________ Kms from the district head quarters. This watershed is located at an elevation of ______ m above the MSL. Highest point in the watershed is _______ m above the MSL at ____________ hillock /ridge. The lowest point is _________ m above MSL at ______________. The total geographical area of the Micro watershed is _________ hectares and net treatable area is _________ hectares. The average annual rainfall (5 years) in the area is _________ mm. The temperatures in the area are in the range between __________ centigrade during summer and _________ centigrade during winter. There are __________ no. of habitations in the Micro watershed and other details are given below. The Major streams in the Watershed are _____________, __________________, _________. The major festivals in the village are __________________, ___________________ & _________. . At present this village is having _______________________ population with all Communities like _________, ________ and ________.

General features of watershed


S.No. Name of Project9as per GOI)

(a) (b)
(d) e) f) g) h) i)

j)

k)
l) m) n)

Name of Catchment Name of watershed area(local name) Project Area Net treatable Area Cost of Project cost/hectare Year of Sanction Watershed Code No. of Gram Panchayatsin project area No. of villages in project area Type of Project
Elevation (metres) Major streams Slope range (%)

Hilly/Dese rt/other

Present status of land use


Land Use Agriculture Land Temporary fallow Permanent Fallow Total area in Ha. Govt. Pvt. Community Total

Cultivated Rainfed
Cultivated irrigated Net Sown Area Net Area sown more than once Forest Land Waste Land Pastures Others Total

1 2 EXPECTED OUT COMES 1.Summarize in the table given below S. Item No.

1 2 3 4 5 6 7

Status of water table (Depth to Ground water level) Ground water structures repaired/ rejuvenated Quality of drinking water Availability of drinking water Increase in irrigation potential (Ayakut) Change in cropping/ land use pattern Area under agricultural crop I Ii Iii Area under single crop Area under double crop Area under multiple crop

Unit of Premeasurem project ent Status Meters No. Description Description Ha Description Ha Ha Ha Ha Ha Ha

Expected Postproject Status

Remarks

8 9

Net increase in crop production area Increase in area under vegetation

10
11 12 13 14 15 16 17 18 19 20 21

Increase in area under horticulture


Increase in area under fuel Increase in area under Fodder Increase in milk production No. of SHGs Promoted Increase in no. of livelihoods Increase in income Migration SHG Federations formed Credit linkage with banks Resource use agreements

Ha
Ha Ha Litres/day No. No. Rs.in la No. No. Rs.in la

Cropping Status 1 2 3 S.N Seas Cr o. on op so wn 4 Rain fed 5 Irrigated 6 Total

Area( Production(T Producti Area( Production(T Producti Area( Production(T ha) on) ha) on) ha) on) vity vity (kg/ha) (kg/ha) 1 Khari f

2 Rabi

3 Zaid

Total

Tabel no. 2.9.1 NREGA Status


Activity taken in plan 2011-12 Categary 4 25 Nadi Anicut Name of Total no.of Project Project Project village job cards Total area Total area Total area Gotan 1499 25 6 2 Nill 4 2 Talanpur 511 9 4 12 2 Nill Nill Dhanapa 413 11 3 2 Nill Nill Nill Tunkliya 270 8 3 4 Nill 1 Nill Ramnaga r 242 1 Nill Nill Nill 1 Nill

Sr. no. 1 2 3 4 5

Sl.No Problem area I 1 2 Soil Soil Depth Slope

Problem analysis

Demand based on PRA

Scope

3
4 5 6 A B C D E

Erosion
Problematic soils Rock out crops Fertility status Organic matter content Nitrogen Phosphorous Potash Micro nutrients