Analisa Harga Satuan S.N.I
Analisa Harga Satuan S.N.I
Analisa Harga Satuan S.N.I
I
NO.
A
I
ANALISA 001
URAIAN
B
PEKERJAAN PERSIAPAN
1 m' Pagar Sementara dari Kayu tinggi 2 m
Bahan
Dolken Kayu 8 - 10/400 cm
Semen Portland
Pasir Beton
Koral Beton
Kaso 5 / 7 ( albasiah )
Paku Biasa 2" - 5"
Residu
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor
ANALISA 002
ANALISA 003
ANALISA 004
JUMLAH matrial
JUMLAH upah
TOTAL harga
G=(CXE)
H = (C X F )
I=(G+H)
0.00
1.250
2.500
0.005
0.009
0.072
0.060
0.400
btg
Kg
m3
m3
m3
Kg
Lt
0.200
0.400
0.020
0.020
Oh
Oh
Oh
Oh
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
0.00
1.250
2.500
1.200
0.009
0.072
0.060
0.450
btg
Kg
m3
m3
m3
Kg
Lt
0.200
0.400
0.020
0.020
Oh
Oh
Oh
Oh
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
65,734.00
55,798.00
75,671.00
85,607.00
btg
Kg
Kg
m3
m3
Kg
0.200
0.300
0.020
0.020
Oh
Oh
Oh
Oh
Rp
Rp
Rp
Rp
Rp
Rp
m3
Kg
m3
Rp
Rp
Rp
Rp
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
1.250
0.180
0.850
1.100
35.000
0.150
0.100
0.150
30.000
0.250
2.000
0.080
0.150
0.060
btg
m3
Kg
Kg
Kg
m3
m3
m3
bh
lbr
bh
m2
bh
lbr
2.000
1.000
2.000
Oh
Oh
Oh
Rp
Rp
Rp
65,734.00
55,798.00
75,671.00
85,607.00
13,146.80
22,319.20
1,513.42
1,712.14
33,111.76
33,111.76
13,147
16,739
1,513
1,712
13,337.95
13,337.95
0.00
0.00
0.00
Rp
Rp
Rp
Rp
65,734.00
55,798.00
75,671.00
85,607.00
6,573
5,580
757
428
0.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
38,691.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.012
0.020
0.007
13,146.80
22,319.20
1,513.42
1,712.14
38,691.56
Rp
Rp
Rp
Rp
0.00
1.000
2.000
25.000
0.005
0.009
0.060
38,691.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38,691.56
65,734.00
55,798.00
75,671.00
85,607.00
ANALISA 005
KOEF
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp
Rp
Rp
0.00
Kepala Tukang
Mandor
ANALISA 006
ANALISA 009
Tali Ijuk
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor
ANALISA 012
btg
m3
Kg
Kg
m3
m3
lbr
2.000
1.000
0.200
0.050
Oh
Oh
Oh
Oh
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
btg
m3
Kg
lbr
1.500
1.000
0.150
0.050
Oh
Oh
Oh
Oh
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Oh
Oh
btg
m3
Kg
Kg
m3
m3
lbr
lbr
2.000
1.000
0.200
0.050
Oh
Oh
Oh
Oh
27,500.00
55,000.00
8,800.00
1,815,000.00
34,100.00
1,100.00
215,000.00
275,000.00
60,500.00
42,900.00
m3
Kg
btg
2.000
0.050
Oh
Oh
btg
Kg
2.000
1.000
0.200
0.050
Oh
Oh
Oh
Oh
38,500.00
27,500.00
44,000.00
55,000.00
m3
m3
m3
1.000
0.050
Oh
Oh
1,540,000.00
34,100.00
2,035,000.00
38,500.00
55,000.00
Oh
Oh
79,750.00
2,411,420.00
77,000
2,750
13,200.00
17,600.00
116,050.00
133,650.00
13,200.00
4,400.00
38,500.00
27,500.00
44,000.00
55,000.00
77,000
27,500
8,800
2,750
209,000.00
242,000.00
215,000.00
30,250.00
85,530.00
31,350.00
21,780.00
2,150.00
27,500.00
55,000.00
27,500
2,750
0.00
6.667
0.333
663,535.00
286,440.00
10,230.00
2,035,000.00
116,050.00
77,000
27,500
8,800
2,750
55,280.00
0.150
0.090
0.010
5,500.00
11,000.00
337,590.00
10,230.00
19,800.00
6,450.00
13,750.00
90,750.00
57,915.00
17,600.00
1.000
0.250
5,500.00
2,750
2,750
2,331,670.00
0.186
0.300
1.000
0.00
547,485.00
1.250
0.186
0.300
18.000
0.030
0.050
1.500
1.350
0.00
0.00
0.00
0.00
0.00
0.00
0.100
0.050
0.00
0.00
3.000
0.276
0.700
1.500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ANALISA 013
1.700
0.210
0.300
10.500
0.030
0.050
1.500
0.00
ANALISA 011
ANALISA 010
Rp
Rp
ANALISA 008
Oh
Oh
ANALISA 007
0.300
0.050
27,500.00
55,000.00
201,657.50
183,343
18,315
201,657.50
ANALISA 014
II
ANALISA 015
ANALISA 016
ANALISA 017
ANALISA 018
ANALISA 019
ANALISA 020
ANALISA 021
PEKERJAAN TANAH
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
1 m3 Pek. Galian Tanah Keras Max Kedalaman 1 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 024
ANALISA 025
Oh
Oh
27,500.00
55,000.00
0.400
0.040
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
0.052
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
0.823
0.083
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
27,500.00
33,000.00
44,000.00
55,000.00
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
m3
0.300
0.010
Oh
Oh
Oh
Oh
88,000.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
105,600.00
27,500.00
33,000.00
44,000.00
55,000.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
13,750
#VALUE!
#VALUE!
2,750
105,600.00
1.200
#VALUE!
5,280
#VALUE!
#VALUE!
1,045
0.00
0.500
0.050
#VALUE!
5,280
#VALUE!
#VALUE!
2,750
0.00
0.192
0.019
#VALUE!
1,375
#VALUE!
#VALUE!
275
0.00
0.192
0.050
#VALUE!
22,633
#VALUE!
#VALUE!
4,565
0.00
Oh
Oh
Oh
Oh
17,297.50
34,375
#VALUE!
#VALUE!
6,875
0.00
0.050
0.005
17,297.50
17,188
#VALUE!
#VALUE!
3,410
0.00
1 m Pek. Stripping 1 m
13,200.00
20,213
#VALUE!
#VALUE!
4,015
0.00
0.625
0.062
13,200.00
14,438
2,860
0.00
0.735
0.073
185,157.50
11,000
2,200
0.00
0.525
185,157.50
183,343
1,815
0.00
1.250
0.125
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 023
6.667
0.033
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 022
0.00
8,250
#VALUE!
#VALUE!
550
#VALUE!
ANALISA 026
III
ANALISA 027
ANALISA 029
IV
ANALISA 030
ANALISA 031
ANALISA 032
1.200
m3
0.150
0.015
Oh
Oh
Oh
Oh
16,500.00
27,500.00
33,000.00
44,000.00
55,000.00
m3
m3
m3
Kg
Kg
Kg
m3
Kg
lt
Kg
0.800
0.500
0.050
0.040
Oh
Oh
Oh
Oh
35,750.00
215,000.00
275,000.00
1,100.00
16,000.00
21,450.00
2,035,000.00
34,100.00
4,950.00
19,800.00
m3
Kg
m3
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
1.100
136.000
0.544
m3
Kg
m3
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
192,500.00
1,100.00
215,000.00
0.650
0.200
0.020
0.030
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
0.650
0.200
0.020
0.030
Oh
Oh
Oh
Oh
192,500.00
1,100.00
215,000.00
bh
Kg
m3
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
69,465.00
547,775.00
211,750.00
149,600.00
116,960.00
27,500.00
35,750.00
44,000.00
55,000.00
41,250
21,450
2,640
4,125
605.00
1,100.00
215,000.00
27,555.00
168,065.00
84,700.00
36,245.00
19,565.00
27,500.00
35,750.00
44,000.00
55,000.00
17,875
7,150
880
1,650
605.00
1,100.00
215,000.00
27,555.00
158,605.00
84,700.00
24,420.00
21,930.00
27,500.00
35,750.00
44,000.00
55,000.00
17,875
7,150
880
1,650
66,757.00
70.000
14.370
0.040
779,925.00
41,250
21,450
2,640
4,125
131,050.00
140.000
22.200
0.102
69,465.00
211,750.00
431,200.00
67,510.00
140,510.00
bh
Kg
m3
1,275,284.50
22,000
17,875
2,200
2,200
478,310.00
140.000
32.950
0.091
44,275.00
572.00
17,200.00
34,375.00
53,900.00
552,000.00
15,015.00
549,450.00
4,092.00
445.50
3,960.00
710,460.00
1.100
392.000
0.314
#VALUE!
4,125
#VALUE!
#VALUE!
825
1,231,009.50
0.016
0.080
0.125
49.000
34.500
0.700
0.270
0.120
0.090
0.200
#VALUE!
19,800.00
PEKERJAAN PONDASI
1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang
Bahan
Pasir Urug Darat
Pasir Beton
Koral Beton
Semen Portland
Besi Beton
Kawat Beton
Kayu Kaso 5 / 7 (borneo)
Paku
Minyak Bekisting
Plamuur Tembok
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 028
19,800.00
605.00
1,100.00
215,000.00
13,640.00
42,350.00
15,807.00
8,600.00
27,500.00
35,750.00
44,000.00
55,000.00
8,800
3,575
440
825
80,397.00
ANALISA 033
V
ANALISA 032
ANALISA 033
ANALISA 034
ANALISA 035
ANALISA 036
ANALISA 037
ANALISA 038
62,673.00
70.000
9.680
0.045
bh
Kg
m3
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
6.480
0.019
Kg
m3
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
4.320
0.022
Kg
m3
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
605.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
8,800
3,575
440
825
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
Oh
Oh
Oh
Oh
1,100.00
215,000.00
Kg
m3
m3
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
m3
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
1,100.00
176,000.00
215,000.00
Kg
m3
m3
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
0.007
0.007
0.015
Kg
m3
m3
0.200
Oh
12,072.50
20,147.50
4,752.00
528.00
2,795.00
27,500.00
35,750.00
44,000.00
55,000.00
5,500
5,363
660
550
1,100.00
176,000.00
215,000.00
12,072.50
18,162.50
2,024.00
1,056.00
3,010.00
27,500.00
35,750.00
44,000.00
55,000.00
5,500
5,363
660
550
1,100.00
176,000.00
215,000.00
12,072.50
20,337.50
3,300.00
880.00
4,085.00
27,500.00
35,750.00
44,000.00
55,000.00
5,500
5,363
660
550
3,529.89
0.009
0.009
0.009
21,554.50
5,500
5,363
660
550
8,265.00
3.000
0.005
0.019
12,072.50
4,752.00
4,730.00
6,090.00
1.840
0.006
0.014
23,285.50
5,500
5,363
660
550
8,075.00
0.200
0.150
0.015
0.010
12,072.50
7,128.00
4,085.00
9,482.00
Kg
m3
m3
76,313.00
42,350.00
10,648.00
9,675.00
11,213.00
4.320
0.003
0.013
13,640.00
1,210.00
176,000.00
215,000.00
12,072.50
15,602.39
10.89
1,584.00
1,935.00
27,500.00
35,750.00
44,000.00
55,000.00
5,500
5,363
660
550
4,465.47
1,210.00
176,000.00
215,000.00
12,072.50
8.47
1,232.00
3,225.00
27,500.00
5,500
16,537.97
Tukang Batu
Kepala Tukang
Mandor
ANALISA 039
ANALISA 040
ANALISA 041
ANALISA 042
7.29
ANALISA 043
ANALISA 044
ANALISA 045
ANALISA 046
0.150
0.015
0.010
Oh
Oh
Oh
14.280
0.023
Kg
m3
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
10.800
0.026
Kg
m3
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
35,750.00
44,000.00
55,000.00
5,363
660
550
20,653.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
1,100.00
215,000.00
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
1,100.00
215,000.00
Kg
m3
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
m3
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
1,100.00
215,000.00
Kg
m3
0.300
0.200
0.020
0.013
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
0.300
0.200
0.020
0.013
Oh
Oh
Oh
Oh
29,631.50
6,875
7,150
880
688
1,100.00
215,000.00
15,592.50
28,906.50
6,864.00
6,450.00
27,500.00
35,750.00
44,000.00
55,000.00
6,875
7,150
880
688
1,210.00
176,000.00
215,000.00
15,592.50
21,057.39
10.89
1,584.00
3,870.00
27,500.00
35,750.00
44,000.00
55,000.00
6,875
7,150
880
688
1,100.00
215,000.00
16,995.00
36,840.00
17,050.00
2,795.00
27,500.00
35,750.00
44,000.00
55,000.00
8,250
7,150
880
715
20,450.00
11.750
0.035
15,592.50
8,019.00
6,020.00
19,845.00
15.500
0.013
31,160.50
6,875
7,150
880
688
5,464.89
0.009
0.009
0.018
15,592.50
9,548.00
6,020.00
13,314.00
6.240
0.030
33,062.50
6,875
7,150
880
688
14,039.00
7.290
0.028
15,592.50
11,880.00
5,590.00
15,568.00
Kg
m3
36,245.50
6,875
7,150
880
688
17,470.00
8.680
0.028
15,592.50
15,708.00
4,945.00
1,100.00
215,000.00
16,995.00
12,925.00
7,525.00
27,500.00
35,750.00
44,000.00
55,000.00
8,250
7,150
880
715
37,445.00
ANALISA 047
ANALISA 048
ANALISA 049
ANALISA 050
ANALISA 051
ANALISA 052
ANALISA 053
ANALISA 054
ANALISA 055
18,598.00
9.480
0.038
Kg
m3
0.300
0.200
0.020
0.013
Oh
Oh
Oh
Oh
1,100.00
215,000.00
Kg
m3
0.300
0.200
0.020
0.013
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
8,250
7,150
880
715
1,100.00
215,000.00
Kg
m3
0.320
0.250
0.025
0.015
Oh
Oh
Oh
Oh
14.150
0.039
Kg
m3
0.320
0.250
0.025
0.015
Oh
Oh
Oh
Oh
11.380
0.042
Kg
m3
0.320
0.250
0.025
0.015
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
Oh
Oh
Oh
Oh
1,100.00
215,000.00
Kg
m3
0.150
0.070
0.007
0.008
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
0.150
0.070
0.007
0.008
Oh
Oh
Oh
Oh
1,100.00
215,000.00
Kg
27,500.00
35,750.00
44,000.00
55,000.00
1,100.00
215,000.00
41,210.50
8,800
8,938
1,100
825
19,662.50
38,346.50
9,009.00
9,675.00
27,500.00
35,750.00
44,000.00
55,000.00
1,100.00
215,000.00
8,800
8,938
1,100
825
7,375.50
19,667.50
7,777.00
4,515.00
27,500.00
35,750.00
44,000.00
55,000.00
1,100.00
215,000.00
4,125
2,503
308
440
7,375.50
18,557.50
6,237.00
4,945.00
27,500.00
35,750.00
44,000.00
55,000.00
1,100.00
19,662.50
12,518.00
9,030.00
4,125
2,503
308
440
14,100.00
9.300
43,612.50
8,800
8,938
1,100
825
11,182.00
5.670
0.023
19,662.50
15,565.00
8,385.00
12,292.00
7.070
0.021
47,702.50
8,800
8,938
1,100
825
18,684.00
0.320
0.250
0.025
0.015
19,662.50
20,515.00
7,525.00
21,548.00
Kg
m3
34,114.00
8,250
7,150
880
715
23,950.00
8.190
0.045
16,995.00
8,734.00
8,385.00
28,040.00
18.650
0.035
35,593.00
10,428.00
8,170.00
17,119.00
7.940
0.039
16,995.00
10,230.00
15,895.00
29,995.00
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 056
ANALISA 057
ANALISA 058
ANALISA 059
ANALISA 060
ANALISA 061
ANALISA 062
ANALISA 063
0.018
m3
0.260
0.200
0.020
0.013
Oh
Oh
Oh
Oh
215,000.00
3,870.00
27,500.00
35,750.00
44,000.00
55,000.00
7,150
7,150
880
715
12,292.00
7.070
0.021
Kg
m3
0.260
0.200
0.020
0.013
Oh
Oh
Oh
Oh
1,100.00
215,000.00
Kg
m3
0.057
0.038
0.038
0.002
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
7,150
7,150
880
715
1,100.00
215,000.00
Kg
Kg
0.050
0.020
0.002
0.005
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
Kg
Kg
0.450
0.200
0.020
0.025
Oh
Oh
Oh
Oh
1,320.00
22,000.00
Kg
m3
0.250
0.100
0.010
0.015
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
0.150
0.070
0.007
0.008
Oh
Oh
Oh
Oh
0.500
2.900
0.006
Kg
Kg
m3
0.300
0.200
0.020
0.015
Oh
Oh
Oh
Oh
1,320.00
17,600.00
27,500.00
35,750.00
44,000.00
55,000.00
0.2250
org
224,760.80
12,375
7,150
880
1,375
1,100.00
215,000.00
11,715.00
19,907.00
4,752.00
3,440.00
27,500.00
35,750.00
44,000.00
55,000.00
6,875
3,575
440
825
1,100.00
215,000.00
7,375.50
15,567.50
4,752.00
3,440.00
27,500.00
35,750.00
44,000.00
55,000.00
4,125
2,503
308
440
1,100.00
19,800.00
215,000.00
17,105.00
76,365.00
550.00
57,420.00
1,290.00
27,500.00
35,750.00
44,000.00
55,000.00
8,250
7,150
880
825
14,390.00
kg
m3
21,780.00
580.80
202,400.00
59,260.00
8.0000
0.0260
332,643.08
1,375
715
88
275
8,192.00
4.320
0.016
2,453.00
190.08
330,000.00
8,192.00
4.320
0.016
5,688.00
1,568
1,359
1,672
110
202,980.80
0.440
11.500
4,708.00
550.00
430.00
330,190.08
0.144
15.000
28,187.00
7,777.00
4,515.00
980.00
0.500
0.002
15,895.00
1,100.00
215,000.00
12,519.38
26,909.38
6,188
0.00
8,800.00
5,590.00
27,500.00
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran Dinding 1 : 5 + ACIAN
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
III
0.1525
0.0100
0.0080
org
org
org
5.4000
0.0280
kg
m3
0.2250
0.1525
0.0100
0.0080
org
org
org
org
35,750.00
44,000.00
55,000.00
11,960.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
30,250,000.00
1.100
m3
6.000
20.000
2.000
0.300
Oh
Oh
Oh
Oh
27,500,000.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
6.000
18.000
2.000
0.300
Oh
Oh
Oh
Oh
1,815,000.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
6.000
18.000
2.000
0.300
Oh
Oh
Oh
Oh
2,035,000.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.350
1.050
0.105
0.018
Oh
Oh
Oh
Oh
2,035,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.350
1.050
0.105
0.018
Oh
Oh
Oh
Oh
2,035,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
1.000
2.500
0.250
0.050
Oh
Oh
Oh
Oh
27,500,000.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
1.000
2.500
0.250
0.050
Oh
Oh
Oh
Oh
2,035,000.00
Bahan
Papan Kayu Jati
Tenaga
m3
27,500,000.00
130,625.00
137,500.00
1,512,500.00
137,500.00
218,900.00
27,500
96,250
11,000
2,750
962,500.00
0.035
55,660.00
81,400.00
27,500.00
38,500.00
44,000.00
55,000.00
130,625.00
27,500
96,250
11,000
2,750
81,400.00
0.040
55,660.00
1,375,000.00
3,404,500.00
9,625
40,425
4,620
990
1,375,000.00
0.050
962,500.00
73,260.00
1,705.00
3,140,500.00
9,625
40,425
4,620
990
74,965.00
0.036
0.050
962,500.00
73,260.00
1,705.00
31,289,500.00
165,000
693,000
88,000
16,500
74,965.00
0.036
0.050
1,039,500.00
2,442,000.00
0.00
0.00
0.00
0.00
165,000
693,000
88,000
16,500
2,442,000.00
1.200
6,188
5,452
440
440
2,178,000.00
24,479.38
165,000
770,000
88,000
16,500
2,178,000.00
1.200
12,519.38
30,250,000.00
0.00
0.00
0.00
5,940.00
6,020.00
PEKERJAAN KAYU
1m Pasang Kusen Pintu dan Jendela Kayu Jati
Bahan
Kayu Balok Jati
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
5,452
440
440
962,500.00
110,000.00
1,072,500.00
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.800
2.000
0.200
0.040
Oh
Oh
Oh
Oh
0.035
m3
0.800
2.000
0.200
0.040
Oh
Oh
Oh
Oh
0.035
m3
0.800
2.000
0.200
0.040
Oh
Oh
Oh
Oh
0.064
m3
1.000
3.000
0.300
0.300
Oh
Oh
Oh
Oh
0.064
m3
1.000
3.000
0.300
0.500
Oh
Oh
Oh
Oh
0.0196
0.030
0.300
1.000
m3
Kg
Lt
Lbr
0.600
2.000
0.200
0.030
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
71,225.00
2,035,000.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500.00
38,500.00
44,000.00
55,000.00
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
27,500.00
38,500.00
44,000.00
55,000.00
2,035,000.00
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
27,500.00
38,500.00
44,000.00
55,000.00
Oh
Oh
Oh
Oh
27,500,000.00
34,100.00
9,900.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00
0.0600
0.150
m3
Kg
0.500
2.000
0.200
0.025
Oh
Oh
Oh
Oh
27,500,000.00
34,100.00
9,900.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00
0.0600
0.150
m3
Kg
0.500
2.000
0.200
0.025
Oh
Oh
Oh
Oh
689,843.00
16,500
77,000
8,800
1,650
27,500,000.00
34,100.00
100,925.00
1,756,040.00
1,650,000.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
13,750
77,000
8,800
1,375
1,655,115.00
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
103,950.00
539,000.00
1,023.00
2,970.00
42,900.00
689,843.00
16,500
77,000
8,800
1,650
1,655,115.00
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
103,950.00
539,000.00
1,023.00
2,970.00
42,900.00
313,940.00
27,500
115,500
13,200
27,500
585,893.00
0.600
2.000
0.200
0.030
183,700.00
130,240.00
585,893.00
m3
Kg
Lt
Lbr
302,940.00
27,500
115,500
13,200
16,500
130,240.00
0.0196
0.030
0.300
1.000
172,700.00
130,240.00
181,225.00
22,000
77,000
8,800
2,200
130,240.00
2,035,000.00
110,000.00
71,225.00
181,225.00
22,000
77,000
8,800
2,200
71,225.00
2,035,000.00
110,000.00
71,225.00
22,000
77,000
8,800
2,200
27,500,000.00
34,100.00
100,925.00
1,650,000.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
13,750
77,000
8,800
1,375
1,756,040.00
86,779.00
0.0196
0.030
0.300
1.000
m3
Kg
Lt
lbr
0.600
2.000
0.200
0.030
Oh
Oh
Oh
Oh
0.0196
0.300
0.300
1.000
m3
Kg
Lt
lbr
0.600
2.000
0.200
0.030
Oh
Oh
Oh
Oh
2,035,000.00
34,100.00
9,900.00
42,900.00
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
27,500.00
38,500.00
44,000.00
55,000.00
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
Lt
lbr
0.600
2.000
0.200
0.030
Oh
Oh
Oh
Oh
27,500,000.00
34,100.00
9,900.00
42,900.00
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
m3
Kg
Lt
lbr
lbr
0.800
2.500
0.250
0.040
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
0.0196
0.300
0.800
1.000
0.500
m3
Kg
Lt
lbr
lbr
0.800
2.500
0.250
0.040
Oh
Oh
Oh
Oh
27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
m3
Kg
Lt
lbr
lbr
0.800
2.500
0.250
0.040
Oh
Oh
Oh
Oh
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
0.0196
0.300
0.800
0.500
0.500
27,500.00
38,500.00
44,000.00
55,000.00
27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00
265,386.00
131,450.00
764,500.00
539,000.00
10,230.00
7,920.00
42,900.00
33,000.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00
131,450.00
22,000
96,250
11,000
2,200
22,000
96,250
11,000
2,200
611,600.00
m3
Kg
Lt
lbr
lbr
764,500.00
39,886.00
10,230.00
7,920.00
42,900.00
33,000.00
633,050.00
0.0196
0.300
0.800
1.000
0.500
131,450.00
22,000
96,250
11,000
2,200
133,936.00
2,035,000.00
34,100.00
9,900.00
42,900.00
66,000.00
16,500
77,000
8,800
1,650
27,500.00
38,500.00
44,000.00
55,000.00
699,050.00
539,000.00
10,230.00
7,920.00
42,900.00
33,000.00
103,950.00
539,000.00
10,230.00
2,970.00
42,900.00
633,050.00
0.0196
0.300
0.800
1.000
0.500
699,050.00
16,500
77,000
8,800
1,650
595,100.00
0.0196
0.300
0.300
1.000
103,950.00
539,000.00
10,230.00
2,970.00
42,900.00
16,500
77,000
8,800
1,650
595,100.00
27,500,000.00
34,100.00
9,900.00
42,900.00
190,729.00
39,886.00
1,023.00
2,970.00
42,900.00
103,950.00
539,000.00
10,230.00
7,920.00
21,450.00
33,000.00
131,450.00
743,050.00
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.800
2.500
0.250
0.040
Oh
Oh
Oh
Oh
0.0196
0.300
1.200
1.000
1.000
m3
Kg
Lt
lbr
lbr
1.000
2.600
0.260
0.050
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
670,010.00
27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00
27,500.00
38,500.00
44,000.00
55,000.00
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
m3
Kg
Lt
lbr
lbr
1.000
2.600
0.260
0.050
Oh
Oh
Oh
Oh
1.100
15.000
0.800
m3
4.000
12.000
1.200
0.200
Oh
Oh
Oh
Oh
2,035,000.00
34,100.00
9,900.00
42,900.00
66,000.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500,000.00
11,550.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
Kg
4.000
12.000
1.200
0.200
Oh
Oh
Oh
Oh
1,650,000.00
11,550.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
Kg
4.000
12.000
1.200
0.200
Oh
Oh
Oh
Oh
1,600,000.00
11,550.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
Kg
4.000
12.000
1.200
0.200
Oh
Oh
Oh
Oh
1,485,000.00
11,550.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
2,469,830.00
110,000
462,000
52,800
11,000
24,915.00
0.012
0.150
635,800.00
1,633,500.00
173,250.00
27,280.00
2,596,330.00
110,000
462,000
52,800
11,000
1,834,030.00
1.100
15.000
0.800
635,800.00
1,760,000.00
173,250.00
27,280.00
2,651,330.00
110,000
462,000
52,800
11,000
1,960,530.00
1.100
15.000
0.800
635,800.00
1,815,000.00
173,250.00
27,280.00
31,086,330.00
110,000
462,000
52,800
11,000
2,015,530.00
1.100
15.000
0.800
635,800.00
30,250,000.00
173,250.00
27,280.00
312,686.00
27,500
100,100
11,440
2,750
30,450,530.00
Kg
141,790.00
39,886.00
10,230.00
11,880.00
42,900.00
66,000.00
811,800.00
27,500
100,100
11,440
2,750
170,896.00
0.0196
0.300
1.200
1.000
1.000
141,790.00
539,000.00
10,230.00
11,880.00
42,900.00
66,000.00
22,000
96,250
11,000
2,200
1,650,000.00
34,100.00
7,315.00
19,800.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
2,750
3,850
440
275
32,230.00
24,315.00
0.012
0.150
m3
Kg
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
1,600,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
27,500,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
0.014
0.150
m3
Kg
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
0.165
0.200
m3
Kg
0.120
0.120
0.012
0.006
Oh
Oh
Oh
Oh
1,650,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500.00
38,500.00
44,000.00
55,000.00
1,650,000.00
34,100.00
0.120
0.120
0.012
0.006
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
1,650,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.150
0.250
0.025
0.075
Oh
Oh
Oh
Oh
27,500,000.00
34,100.00
m3
Kg
0.100
0.200
0.025
0.005
Oh
Oh
Oh
Oh
m3
2,035,000.00
34,100.00
352,385.00
11,825.00
28,182.00
14,652.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
1,650,000.00
18,975.00
4,125
9,625
1,100
4,125
2,750
7,700
1,100
275
23,210.00
0.012
287,848.00
330,000.00
3,410.00
16,357.00
0.0072
0.050
8,778.00
3,300
4,620
528
330
27,500.00
38,500.00
44,000.00
55,000.00
3,300
4,620
528
330
333,410.00
0.012
0.100
287,848.00
272,250.00
6,820.00
8,778.00
272,250.00
6,820.00
279,070.00
m3
Kg
34,830.00
2,750
3,850
440
275
279,070.00
0.165
0.200
7,315.00
22,400.00
5,115.00
35,530.00
2,750
3,850
440
275
27,515.00
1,600,000.00
34,100.00
7,315.00
23,100.00
5,115.00
397,430.00
2,750
3,850
440
275
28,215.00
0.014
0.150
7,315.00
385,000.00
5,115.00
2,750
3,850
440
275
390,115.00
0.014
0.150
31,630.00
19,200.00
5,115.00
7,315.00
19,800.00
18,975.00
42,185.00
0.100
Kg
0.150
0.250
0.025
0.075
Oh
Oh
Oh
Oh
34,100.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00
23,210.00
0.012
0.100
m3
Kg
0.150
0.250
0.025
0.075
Oh
Oh
Oh
Oh
1,650,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.200
0.300
0.030
0.010
Oh
Oh
Oh
Oh
27,500,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.200
0.300
0.030
0.010
Oh
Oh
Oh
Oh
1,650,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.200
0.300
0.030
0.010
Oh
Oh
Oh
Oh
1,600,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.250
0.350
0.035
0.0125
Oh
Oh
Oh
Oh
27,500,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.250
0.350
0.035
0.0125
Oh
Oh
Oh
Oh
0.027
0.200
m3
Kg
0.250
0.350
0.035
0.0125
Oh
Oh
Oh
Oh
0.0072
0.050
m3
Kg
0.100
0.200
Oh
Oh
1,650,000.00
34,100.00
22,577.50
73,947.50
44,550.00
6,820.00
27,500.00
38,500.00
44,000.00
55,000.00
771,897.50
6,875
13,475
1,540
688
51,370.00
0.027
0.200
22,577.50
742,500.00
6,820.00
60,835.00
5,500
11,550
1,320
550
749,320.00
0.027
0.200
18,920.00
36,800.00
5,115.00
61,985.00
5,500
11,550
1,320
550
41,915.00
0.023
0.150
18,920.00
37,950.00
5,115.00
656,535.00
5,500
11,550
1,320
550
43,065.00
0.023
0.150
18,920.00
632,500.00
5,115.00
42,185.00
4,125
9,625
1,100
4,125
637,615.00
0.023
0.150
18,975.00
19,800.00
3,410.00
4,125
9,625
1,100
4,125
6,875
13,475
1,540
688
50,020.00
1,600,000.00
34,100.00
22,577.50
72,597.50
43,200.00
6,820.00
27,500.00
38,500.00
44,000.00
55,000.00
6,875
13,475
1,540
688
199,705.00
27,500,000.00
34,100.00
11,825.00
198,000.00
1,705.00
27,500.00
38,500.00
2,750
7,700
211,530.00
Kepala Tukang
Mandor
1m' Pasang Lisplank ( 3 x 20 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank ( 3 x 30 )cm Kayu Jati
Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank ( 3 x 30 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank 2 x( 3 x 20 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Borneo
Bahan
Papan Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.025
0.005
Oh
Oh
44,000.00
55,000.00
16,357.00
0.0072
0.050
m3
Kg
0.100
0.200
0.025
0.005
Oh
Oh
Oh
Oh
0.0110
0.050
m3
Kg
0.110
0.220
0.022
0.005
Oh
Oh
Oh
Oh
0.0110
0.050
m3
Kg
0.110
0.220
0.022
0.005
Oh
Oh
Oh
Oh
2,035,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
Oh
Oh
Oh
Oh
2,035,000.00
34,100.00
m3
Kg
0.100
0.100
0.010
0.050
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
0.100
0.100
0.010
0.050
Oh
Oh
Oh
Oh
2,035,000.00
34,100.00
m3
m3
Kg
0.150
0.450
0.045
0.075
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
2,035,000.00
34,100.00
4,125
9,625
1,100
4,125
27,500.00
38,500.00
44,000.00
55,000.00
m3
m3
Kg
0.150
0.450
0.045
0.075
Oh
Oh
Oh
Oh
9,790.00
29,337.00
2,750
3,850
440
2,750
2,035,000.00
34,100.00
9,790.00
29,744.00
17,908.00
2,046.00
27,500.00
38,500.00
44,000.00
55,000.00
2,750
3,850
440
2,750
1,650,000.00
2,035,000.00
34,100.00
27,555.00
77,385.00
32,175.00
14,245.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00
4,125
17,325
1,980
4,125
48,855.00
0.0195
0.007
0.100
50,528.50
17,501.00
2,046.00
18,975.00
29,507.50
2,046.00
49,830.00
0.0195
0.007
0.100
36,828.00
3,025
8,470
968
275
19,954.00
0.0088
0.060
12,738.00
22,385.00
1,705.00
19,547.00
0.0086
0.060
316,943.00
3,025
8,470
968
275
31,553.50
0.150
0.250
0.025
0.075
12,738.00
302,500.00
1,705.00
24,090.00
m3
Kg
28,182.00
2,750
7,700
1,100
275
304,205.00
0.0145
0.060
11,825.00
14,652.00
1,705.00
1,100
275
1,600,000.00
2,035,000.00
34,100.00
27,555.00
31,200.00
14,245.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00
4,125
17,325
1,980
4,125
76,410.00
49,830.00
0.0195
0.007
0.100
m3
m3
Kg
0.150
0.450
0.045
0.075
Oh
Oh
Oh
Oh
1,650,000.00
2,035,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
m3
Kg
0.150
0.450
0.045
0.075
Oh
Oh
Oh
Oh
1,650,000.00
2,035,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
m3
Kg
lt
lbr
0.200
0.600
0.060
0.010
Oh
Oh
Oh
Oh
1,650,000.00
2,035,000.00
34,100.00
9,900.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
Kg
0.600
1.800
0.180
0.030
Oh
Oh
Oh
Oh
27,500,000.00
34,100.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
0.400
0.050
lbr
Kg
0.025
0.075
0.0075
0.0013
Oh
Oh
Oh
Oh
42,900.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m'
0.021
0.021
0.0020
0.0010
Oh
Oh
Oh
Oh
10.000
0.026
0.044
Kg
m3
m3
1.150
0.020
0.002
0.006
Oh
Oh
Oh
Oh
218.000
0.520
0.870
Kg
m3
m3
17,600.00
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
32,758.00
61,448.00
11,000.00
5,590.00
12,100.00
27,500.00
35,750.00
44,000.00
55,000.00
31,625
715
88
330
590,850.00
1,100.00
215,000.00
275,000.00
20,009.00
578
809
88
55
28,690.00
1,100.00
215,000.00
275,000.00
1,529.00
18,480.00
27,500.00
38,500.00
44,000.00
55,000.00
PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
22,841.50
688
2,888
330
72
18,480.00
1.050
3,976.50
17,160.00
1,705.00
296,395.00
16,500
69,300
7,920
1,650
18,865.00
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
95,370.00
192,500.00
3,410.00
5,115.00
130,064.00
5,500
23,100
2,640
550
201,025.00
0.007
0.100
0.150
31,790.00
32,175.00
14,245.00
3,410.00
5,544.00
42,900.00
77,385.00
4,125
17,325
1,980
4,125
98,274.00
0.0195
0.007
0.100
0.560
1.000
27,555.00
32,175.00
14,245.00
3,410.00
4,125
17,325
1,980
4,125
49,830.00
0.0195
0.007
0.100
77,385.00
32,175.00
14,245.00
3,410.00
27,555.00
239,800.00
111,800.00
239,250.00
59,812.50
650,662.50
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
197.000
0.470
0.940
Kg
m3
m3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
576,250.00
1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
m3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
m3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
m3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
352.000
0.560
0.700
Kg
m3
m3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
m3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
1,100.00
215,000.00
275,000.00
45,375
8,938
1,100
4,400
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
m3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
59,812.50
691,312.50
45,375
8,938
1,100
4,400
740,150.00
386.000
0.470
0.780
759,912.50
392,700.00
90,300.00
148,500.00
59,812.50
387,200.00
120,400.00
192,500.00
631,500.00
357.000
0.420
0.540
712,062.50
45,375
8,938
1,100
4,400
700,100.00
1,100.00
215,000.00
275,000.00
59,812.50
308,000.00
96,750.00
247,500.00
641,312.50
45,375
8,938
1,100
4,400
652,250.00
280.000
0.450
0.900
59,812.50
255,200.00
111,800.00
214,500.00
611,912.50
45,375
8,938
1,100
4,400
581,500.00
232.000
0.520
0.780
59,812.50
190,300.00
122,550.00
239,250.00
1 m Membuat Beton 1 Pc : 2 Ps : 3 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
636,062.50
45,375
8,938
1,100
4,400
552,100.00
173.000
0.570
0.870
59,812.50
216,700.00
101,050.00
258,500.00
45,375
8,938
1,100
4,400
1,100.00
215,000.00
275,000.00
59,812.50
799,962.50
424,600.00
101,050.00
214,500.00
27,500.00
35,750.00
44,000.00
55,000.00
45,375
8,938
1,100
4,400
809,950.00
59,812.50
869,762.50
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
479.000
0.370
0.740
Kg
m3
m3
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
1,100.00
215,000.00
275,000.00
526,900.00
79,550.00
203,500.00
27,500.00
35,750.00
44,000.00
55,000.00
828,892.00
479.000
0.370
0.740
2.460
Kg
m3
m3
gln
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
336.000
0.540
0.810
Kg
m3
m3
2.000
0.350
0.035
1.000
Oh
Oh
Oh
Oh
1,100.00
215,000.00
275,000.00
7,700.00
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
m3
2.000
0.350
0.035
1.000
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
44,000.00
55,000.00
Kg
m3
m3
2.000
0.350
0.035
1.000
Oh
Oh
Oh
Oh
1,100.00
215,000.00
275,000.00
Kg
m3
m3
2.000
0.350
0.035
1.000
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
1,100.00
215,000.00
275,000.00
Kg
m3
m3
2.000
0.350
0.035
1.000
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
400.000
0.480
0.800
1.200
Kg
m3
m3
Kg
1,100.00
215,000.00
275,000.00
Bahan
Semen Portland
Pasir Beton
Koral Beton
Strorox - 100
Tenaga
887,252.50
124,052.50
1,055,352.50
676,500.00
111,800.00
143,000.00
55,000
12,513
1,540
55,000
769,140.00
1,100.00
215,000.00
275,000.00
4,950.00
124,052.50
55,000
12,513
1,540
55,000
27,500.00
35,750.00
44,000.00
55,000.00
864,352.50
55,000
12,513
1,540
55,000
931,300.00
615.000
0.520
0.520
124,052.50
440,000.00
103,200.00
220,000.00
800,952.50
55,000
12,513
1,540
55,000
763,200.00
400.000
0.480
0.800
124,052.50
403,700.00
94,600.00
242,000.00
55,000
12,513
1,540
55,000
740,300.00
367.000
0.440
0.880
832,502.50
320,100.00
101,050.00
255,750.00
124,052.50
369,600.00
116,100.00
222,750.00
676,900.00
291.000
0.470
0.930
888,704.50
45,375
8,938
1,100
4,400
708,450.00
1,100.00
215,000.00
275,000.00
59,812.50
526,900.00
79,550.00
203,500.00
18,942.00
45,375
8,938
1,100
4,400
440,000.00
103,200.00
220,000.00
5,940.00
124,052.50
893,192.50
Perkerja
Tukang Batu
Kepala Tukang
Mandor
2.000
0.350
0.035
1.000
Oh
Oh
Oh
Oh
1.050
m'
0.050
0.030
0.003
0.002
Oh
Oh
Oh
Oh
1.050
m'
0.050
0.030
0.0035
0.002
Oh
Oh
Oh
Oh
1.050
m'
0.550
0.350
0.003
Oh
Oh
Oh
1.050
m'
0.550
0.350
0.003
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
36,960.00
35,200.00
27,500.00
35,750.00
44,000.00
55,000.00
27,500.00
35,750.00
44,000.00
55,000.00
27,500.00
35,750.00
55,000.00
m'
Oh
Oh
Oh
45,100.00
27,500.00
35,750.00
55,000.00
m'
0.550
0.350
0.003
Oh
Oh
Oh
50,600.00
Kg
Kg
0.007
0.007
0.0007
0.0003
Oh
Oh
Oh
Oh
Kg
Kg
0.005
0.005
0.0005
0.0003
Oh
Oh
Oh
Oh
71,500.00
Kg
Kg
0.025
0.025
0.0025
0.0015
Oh
Oh
Oh
Oh
27,802.50
102,877.50
75,075.00
27,500.00
35,750.00
55,000.00
15,125
12,513
165
16,500.00
21,450.00
490.05
18,136.80
17,325.00
321.75
27,500.00
35,750.00
44,000.00
55,000.00
193
250
31
17
16,500.00
21,450.00
354.75
17,894.25
17,325.00
214.50
27,500.00
35,750.00
44,000.00
55,000.00
138
179
22
17
39,707.25
1.020
0.805
80,932.50
15,125
12,513
165
17,539.50
1.050
0.010
27,802.50
53,130.00
27,500.00
35,750.00
55,000.00
17,646.75
1.050
0.015
75,157.50
15,125
12,513
165
75,075.00
1.050
27,802.50
47,355.00
70,537.50
15,125
12,513
165
53,130.00
0.550
0.350
0.003
27,802.50
42,735.00
47,355.00
1.050
43,136.50
1,375
1,073
154
110
42,735.00
40,700.00
2,711.50
40,425.00
39,649.50
1,375
1,073
132
110
40,425.00
38,500.00
2,689.50
36,960.00
55,000
12,513
1,540
55,000
22,000.00
21,450.00
1,773.75
22,440.00
17,267.25
27,500.00
35,750.00
44,000.00
55,000.00
688
894
110
83
41,481.00
1 m2 Pasang Bekisting
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
0.040
0.400
0.200
0.350
2.000
m3
Kg
Lt
lbr
btg
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.300
0.330
0.0330
0.0060
Oh
Oh
Oh
Oh
108,955.00
1,540,000.00
34,100.00
4,950.00
49,500.00
7,700.00
m3
kg
0.1500
0.2000
0.2000
0.0170
org
org
org
org
27,500.00
38,500.00
44,000.00
55,000.00
8,250
12,705
1,452
330
2,035,000.00
34,100.00
m3
Kg
Lt
0.300
0.260
0.0260
0.0050
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
Lt
0.300
0.260
0.0260
0.0050
Oh
Oh
Oh
Oh
0.040
0.400
0.200
0.015
0.350
2.000
m3
Kg
Lt
m3
lbr
btg
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.300
0.330
0.0330
0.0060
Oh
Oh
Oh
Oh
1,540,000.00
34,100.00
4,950.00
0.040
0.400
0.200
0.018
0.350
2.000
m3
Kg
Lt
m3
lbr
btg
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.320
0.330
0.0330
0.0060
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
0.040
0.400
0.200
0.015
0.350
6.000
m3
Kg
Lt
m3
lbr
btg
Tenaga
Perkerja
0.320
Oh
92,004.00
8,250
10,010
1,144
275
1,540,000.00
34,100.00
4,950.00
19,679.00
92,004.00
61,600.00
10,230.00
495.00
27,500.00
38,500.00
44,000.00
55,000.00
8,250
10,010
1,144
275
1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00
22,737.00
155,692.00
61,600.00
13,640.00
990.00
24,000.00
17,325.00
15,400.00
27,500.00
38,500.00
44,000.00
55,000.00
8,250
12,705
1,452
330
137,755.00
19,679.00
61,600.00
10,230.00
495.00
132,955.00
218,097.00
4,125
7,700
8,800
935
72,325.00
0.040
0.300
0.100
21,560.00
179,487.00
17,050.00
72,325.00
0.040
0.300
0.100
131,692.00
61,600.00
13,640.00
990.00
17,325.00
15,400.00
196,537.00
0.0882
0.5000
22,737.00
1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00
23,287.00
161,042.00
61,600.00
13,640.00
990.00
28,800.00
17,325.00
15,400.00
27,500.00
38,500.00
44,000.00
55,000.00
8,800
12,705
1,452
330
163,755.00
1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00
22,379.50
61,600.00
13,640.00
990.00
24,000.00
17,325.00
46,200.00
27,500.00
8,800
186,134.50
Tukang Batu
Kepala Tukang
Mandor
1 m2 Pasang Bekisting untuk Dinding
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Formtie / penjaga jarak bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.330
0.033
0.006
Oh
Oh
Oh
0.040
0.400
0.200
0.015
0.350
6.000
4.000
m3
Kg
Lt
m3
lbr
btg
bh
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
35,750.00
44,000.00
55,000.00
449,755.00
0.030
0.400
0.150
0.015
0.350
2.000
m3
Kg
Lt
m3
lbr
btg
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00
71,500.00
27,500.00
38,500.00
44,000.00
55,000.00
1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00
3.900
0.350
1.040
1.050
0.245
0.165
Oh
Oh
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
m3
Kg
Lt
Kg
Kg
Kg
m3
m3
4.850
0.350
1.560
1.400
0.331
0.170
Oh
Oh
Oh
Oh
Oh
Oh
1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
Tenaga
Perkerja
m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg
7.300
Oh
3,708,187.50
107,250
12,513
40,040
37,538
10,780
9,075
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
279,911.50
4,712,831.50
133,375
12,513
60,060
50,050
14,564
9,350
6,961,925.00
0.400
4.000
2.000
300.000
4.500
323.000
0.520
0.780
0.150
3.500
20.000
217,195.00
415,800.00
68,200.00
2,970.00
3,200,000.00
64,350.00
355,300.00
111,800.00
214,500.00
8,800
12,705
1,452
330
4,432,920.00
0.270
2.000
0.600
200.000
3.000
323.000
0.520
0.780
140,594.50
308,000.00
51,150.00
1,980.00
2,400,000.00
48,262.50
355,300.00
111,800.00
214,500.00
23,287.00
46,200.00
13,640.00
742.50
24,000.00
17,325.00
15,400.00
3,490,992.50
m3
Kg
Lt
Kg
Kg
Kg
m3
m3
473,042.00
8,800
12,705
1,452
330
117,307.50
0.200
1.500
0.400
150.000
2.250
323.000
0.520
0.780
23,287.00
61,600.00
13,640.00
990.00
24,000.00
17,325.00
46,200.00
286,000.00
11,798
1,452
330
1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00
454,217.50
616,000.00
136,400.00
9,900.00
4,800,000.00
96,525.00
355,300.00
111,800.00
214,500.00
272,250.00
173,250.00
176,000.00
27,500.00
200,750
7,416,142.50
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
0.350
3.300
2.100
0.570
0.250
Oh
Oh
Oh
Oh
Oh
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
5,089,290.00
0.320
3.200
1.600
200.000
3.000
323.000
0.520
0.780
0.140
2.800
16.000
m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg
5.960
0.350
2.800
1.400
0.455
0.208
Oh
Oh
Oh
Oh
Oh
Oh
1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg
5.800
0.350
2.800
1.050
0.420
0.185
Oh
Oh
Oh
Oh
Oh
Oh
1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg
5.600
0.350
2.640
1.050
0.400
0.193
Oh
Oh
Oh
Oh
Oh
Oh
1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
Tenaga
Perkerja
m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg
5.600
Oh
4,590,607.50
154,000
12,513
101,640
37,538
17,600
10,615
4,876,715.00
0.250
3.000
1.200
200.000
3.000
323.000
0.520
0.780
0.105
2.500
14.000
333,905.00
369,600.00
109,120.00
7,920.00
2,400,000.00
48,262.50
355,300.00
111,800.00
214,500.00
290,400.00
138,600.00
211,200.00
4,723,707.50
159,500
12,513
107,800
37,538
18,480
10,175
4,256,702.50
0.240
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.160
2.800
24.000
346,005.00
492,800.00
109,120.00
7,920.00
2,400,000.00
48,262.50
355,300.00
111,800.00
214,500.00
217,800.00
138,600.00
281,600.00
5,455,012.50
163,900
12,513
107,800
50,050
20,020
11,440
4,377,702.50
0.320
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.120
2.800
32.000
365,722.50
492,800.00
109,120.00
7,920.00
3,200,000.00
64,350.00
355,300.00
111,800.00
214,500.00
254,100.00
138,600.00
140,800.00
12,513
127,050
75,075
25,080
13,750
1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00
334,042.50
385,000.00
102,300.00
5,940.00
3,200,000.00
64,350.00
355,300.00
111,800.00
214,500.00
190,575.00
123,750.00
123,200.00
27,500.00
154,000
5,210,757.50
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
0.350
2.300
1.400
0.405
0.202
Oh
Oh
Oh
Oh
Oh
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
69,238.50
0.002
0.010
3.000
0.450
4.000
0.006
0.009
m3
Kg
Kg
Kg
Kg
m3
m3
0.060
0.020
0.020
0.020
0.006
0.003
Oh
Oh
Oh
Oh
Oh
Oh
0.003
0.200
3.600
0.050
5.500
0.009
0.015
m3
Kg
Kg
Kg
Kg
m3
m3
0.100
0.330
0.033
0.033
0.010
0.005
Oh
Oh
Oh
Oh
Oh
Oh
25.000
bh
0.150
0.075
0.008
0.008
Oh
Oh
Oh
Oh
25.000
bh
0.150
0.075
0.008
0.008
Oh
Oh
Oh
Oh
12.000
bh
0.150
0.060
0.006
0.008
Oh
Oh
Oh
Oh
5.000
8.000
0.032
bh
Kg
m3
0.400
0.200
0.020
0.002
Oh
Oh
Oh
Oh
1,540,000.00
34,100.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
27,500.00
38,500.00
44,000.00
55,000.00
5,060.00
7,804.50
134,304.50
126,500.00
27,500.00
38,500.00
44,000.00
55,000.00
2,420.00
4,125
2,888
352
440
7,139.00
36,179.00
29,040.00
27,500.00
38,500.00
44,000.00
55,000.00
4,125
2,310
264
440
40,430.00
4,950.00
1,100.00
215,000.00
19,690.00
60,120.00
24,750.00
8,800.00
6,880.00
27,500.00
38,500.00
44,000.00
55,000.00
11,000
7,700
880
110
54,180.00
7,700.00
1,100.00
215,000.00
49,054.50
4,125
2,888
352
440
29,040.00
bh
Kg
m3
7,804.50
41,250.00
126,500.00
5.000
8.000
0.032
96,800.25
2,750
11,798
1,271
1,180
440
275
41,250.00
1,650.00
17,712.75
1,485.00
6,820.00
57,600.00
1,072.50
6,050.00
1,935.00
4,125.00
73,517.50
1,650
715
770
715
264
165
79,087.50
495,000.00
34,100.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
4,279.00
3,080.00
341.00
48,000.00
9,652.50
4,400.00
1,290.00
2,475.00
12,513
88,550
50,050
17,820
11,110
38,500.00
8,800.00
6,880.00
19,690.00
73,870.00
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Genteng Bubung Palentong Besar
Bahan
Genteng Bubung Palentong
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm
Bahan
Roof Light Fiberglass
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.400
0.200
0.020
0.002
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
35,480.00
4.000
8.000
0.032
bh
Kg
m3
0.400
0.200
0.020
0.002
Oh
Oh
Oh
Oh
4,950.00
1,100.00
215,000.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.140
0.067
0.007
0.007
Oh
Oh
Oh
Oh
385,000.00
34,100.00
lbr
Kg
0.140
0.075
0.008
0.008
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.140
0.075
0.008
0.008
Oh
Oh
Oh
Oh
19,800.00
34,100.00
lbr
Kg
0.140
0.070
0.007
0.007
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.140
0.070
0.007
0.007
Oh
Oh
Oh
Oh
0.350
0.120
lbr
Kg
0.140
0.070
0.007
0.007
Oh
Oh
Oh
Oh
19,800.00
34,100.00
0.420
0.120
lbr
Kg
0.140
0.070
Oh
Oh
7,529.50
23,501.50
11,880.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
19,800.00
34,100.00
3,850
2,888
352
440
7,238.00
23,210.00
11,880.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
19,800.00
34,100.00
3,850
2,695
308
385
7,238.00
26,180.00
14,850.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
3,850
2,695
308
385
11,022.00
19,800.00
34,100.00
7,238.00
18,260.00
6,930.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
21,521.50
3,850
2,888
352
440
18,942.00
0.750
0.120
7,529.50
9,900.00
4,092.00
15,972.00
0.600
0.120
239,827.50
3,850
2,580
308
385
15,972.00
0.600
0.120
7,122.50
231,000.00
1,705.00
13,992.00
0.500
0.120
55,170.00
11,000
7,700
880
110
232,705.00
0.600
0.050
19,690.00
19,800.00
8,800.00
6,880.00
11,000
7,700
880
110
3,850
2,695
308
385
12,408.00
19,800.00
34,100.00
7,238.00
8,316.00
4,092.00
27,500.00
38,500.00
3,850
2,695
19,646.00
Kepala Tukang
Mandor
0.007
0.007
Oh
Oh
44,000.00
55,000.00
12,804.00
0.440
0.120
lbr
Kg
0.140
0.067
0.007
0.007
Oh
Oh
Oh
Oh
0.510
0.120
lbr
Kg
0.140
0.067
0.007
0.007
Oh
Oh
Oh
Oh
0.800
0.120
lbr
Kg
0.140
0.067
0.007
0.007
Oh
Oh
Oh
Oh
19,800.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500.00
38,500.00
44,000.00
55,000.00
19,800.00
34,100.00
0.140
0.067
0.007
0.007
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
19,800.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.140
0.067
0.007
0.007
Oh
Oh
Oh
Oh
19,800.00
34,100.00
lbr
Kg
0.140
0.067
0.007
0.007
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
19,800.00
34,100.00
lbr
Kg
0.140
0.067
0.007
0.007
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
19,800.00
34,100.00
lbr
Kg
0.140
0.067
0.007
0.007
Oh
Oh
Oh
Oh
20,322.50
3,850
2,580
308
385
27,500.00
38,500.00
44,000.00
55,000.00
7,122.50
20,916.50
3,850
2,580
308
385
15,378.00
0.570
0.120
7,122.50
9,702.00
4,092.00
18,738.50
3,850
2,580
308
385
13,794.00
0.490
0.120
7,122.50
9,108.00
4,092.00
18,540.50
3,850
2,580
308
385
13,200.00
0.460
0.120
7,122.50
7,524.00
4,092.00
3,850
2,580
308
385
11,616.00
0.380
0.120
27,054.50
7,326.00
4,092.00
7,122.50
15,840.00
4,092.00
11,418.00
lbr
Kg
21,312.50
3,850
2,580
308
385
19,932.00
0.370
0.120
7,122.50
10,098.00
4,092.00
19,926.50
3,850
2,580
308
385
14,190.00
19,800.00
34,100.00
7,122.50
8,712.00
4,092.00
308
385
19,800.00
34,100.00
7,122.50
22,500.50
11,286.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
3,850
2,580
308
385
252,120.00
7,914.50
260,034.50
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel Gelombang 0.92m
Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel Gelombang 1.05m
Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel Gelombang 1.08m
Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Paten 0.92m
Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Paten 1.05m
Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Paten 1.08m
Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel rata 0.92m
Bahan
Nok Stel rata
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel rata 1.05m
Bahan
Nok Stel rata
Paku Skrup 3.5"
Tenaga
2.400
6.000
lbr
Kg
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
19,800.00
34,100.00
47,520.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
2,310
4,813
572
220
252,120.00
2.400
6.000
lbr
bh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
19,800.00
34,100.00
lbr
bh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
2,310
4,813
572
220
19,800.00
34,100.00
lbr
bh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
lbr
bh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
1.200
6.000
lbr
bh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
1.200
6.000
lbr
bh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
19,800.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
3,300.00
34,100.00
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
lbr
bh
3,300.00
34,100.00
7,914.50
216,474.50
3,960.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
3,300.00
34,100.00
2,310
4,813
572
220
7,914.50
216,474.50
3,960.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
4,400.00
34,100.00
2,310
4,813
572
220
9,317.00
218,757.00
4,840.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
4,400.00
34,100.00
216,474.50
2,310
4,813
572
220
2,750
5,775
572
220
209,440.00
1.100
6.000
7,914.50
3,960.00
204,600.00
209,440.00
0.100
0.150
0.013
0.004
253,104.50
2,310
4,813
572
220
208,560.00
lbr
bh
7,914.50
40,590.00
204,600.00
208,560.00
1.100
6.000
254,094.50
2,310
4,813
572
220
208,560.00
1.200
6.000
7,914.50
41,580.00
204,600.00
245,190.00
2.050
6.000
260,034.50
47,520.00
204,600.00
246,180.00
2.100
6.000
7,914.50
4,840.00
204,600.00
7,914.50
217,354.50
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
11.000
0.030
lbr
bh
0.200
0.100
0.010
0.010
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
92,983.00
8,360.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
lbr
Kg
Bh
0.200
0.300
0.003
0.010
Oh
Oh
Oh
Oh
11,000.00
42,900.00
34,100.00
880.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.200
0.100
0.010
0.001
Oh
Oh
Oh
Oh
43,780.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.166
0.250
0.025
0.008
Oh
Oh
Oh
Oh
lbr
Kg
Kg
m3
Kg
0.400
0.200
0.020
0.020
Oh
Oh
Oh
Oh
2.000
0.050
0.0035
lbr
Kg
Kg
0.125
0.250
0.025
0.006
Oh
Oh
Oh
Oh
1.100
0.050
lbr
Kg
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.250
0.150
0.015
0.013
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
8,360.00
34,100.00
1,100.00
215,000.00
1,320.00
27,500.00
38,500.00
44,000.00
55,000.00
11,000.00
34,100.00
1,600,000.00
71,725.00
11,000
7,700
880
1,100
14,492.50
43,797.50
22,000.00
1,705.00
5,600.00
27,500.00
38,500.00
44,000.00
55,000.00
38,500.00
34,100.00
3,438
9,625
1,100
330
14,025.00
58,080.00
42,350.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
38,500.00
20,680.00
29,260.00
1,705.00
11,880.00
6,880.00
1,320.00
6,875
5,775
660
715
44,055.00
lbr
50,050.00
4,565
9,625
1,100
440
44,055.00
1.100
15,730.00
27,500.00
6,820.00
29,305.00
458.33
34,100.00
51,045.00
3.500
0.050
10.800
0.032
1.000
61,320.60
5,500
3,850
440
55
34,320.00
60.000
0.200
9,845.00
44,655.60
6,820.00
110,110.00
5,500
11,550
132
550
51,475.60
1.020
0.200
17,732.00
75,900.00
15,015.00
1,023.00
440.00
103,323.00
5,500
3,850
440
550
92,378.00
6.900
0.350
0.030
0.500
10,340.00
91,960.00
1,023.00
2,310
4,813
572
220
42,350.00
14,025.00
58,080.00
0.050
Kg
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.250
0.150
0.015
0.013
Oh
Oh
Oh
Oh
34,100.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
27,291.00
0.400
0.060
0.050
0.004
Lbr
Kg
Kg
m3
0.125
0.250
0.025
0.006
Oh
Oh
Oh
Oh
38,500.00
34,100.00
34,100.00
2,035,000.00
27,500.00
38,500.00
44,000.00
55,000.00
0.700
0.020
Lbr
Kg
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.120
0.060
0.006
0.006
Oh
Oh
Oh
Oh
49,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
0.300
0.040
Lbr
Kg
0.015
0.070
0.008
0.006
Oh
Oh
Oh
Oh
38,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
0.015
0.075
0.008
0.006
Oh
Oh
Oh
Oh
1.200
0.040
m2
Kg
0.100
1.000
0.010
0.010
Oh
Oh
Oh
Oh
1.050
m2
0.150
0.050
0.005
0.008
Oh
Oh
Oh
Oh
44,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
VII
27,500.00
38,500.00
44,000.00
55,000.00
0.1875
0.2250
0.0375
0.0105
org
org
org
org
3,850.00
Bahan
Pelat Asbes tebal 5 mm
Paku
Tenaga
lbr
Kg
1,815,000.00
34,100.00
16,046.25
61,663.25
5,156
8,663
1,650
578
0.00
0.00
0.00
0.00
3,910.50
52,651.50
38,115.00
7,502.00
27,500.00
38,500.00
44,000.00
55,000.00
44,000.00
34,100.00
10,752.50
4,125
1,925
220
440
48,741.00
1.100
0.010
6,710.00
4,042.50
27,500.00
38,500.00
44,000.00
55,000.00
51,524.00
2,750
38,500
440
550
45,617.00
m3
kg
42,240.00
7,920.00
1,364.00
4,042.50
0.0210
0.2200
50,864.00
413
2,888
352
330
9,284.00
6,600.00
34,100.00
3,982.00
46,200.00
682.00
16,703.50
413
2,695
352
330
46,882.00
m2
Kg
3,789.50
11,550.00
1,364.00
41,536.00
3,300
2,310
264
330
12,914.00
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
6,204.00
34,650.00
682.00
41,783.50
3,438
9,625
1,100
330
35,332.00
Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa " - 1"
14,492.50
15,400.00
2,046.00
1,705.00
8,140.00
Bahan
Atap Alluminium Gelombang tebal 0.55
Paku Hak Pnjang 15 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
6,875
5,775
660
715
48,400.00
341.00
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
0.030
0.070
0.007
0.0015
Oh
Oh
Oh
Oh
1.100
0.010
lbr
Kg
0.030
0.070
0.007
0.0015
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
42,691.00
38,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.030
0.070
0.007
0.0015
Oh
Oh
Oh
Oh
38,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.060
0.120
0.012
0.0030
Oh
Oh
Oh
Oh
49,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.060
0.100
0.010
0.0030
Oh
Oh
Oh
Oh
53,900.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.060
0.100
0.010
0.0030
Oh
Oh
Oh
Oh
66,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.070
0.100
0.010
0.0035
Oh
Oh
Oh
Oh
42,900.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.070
0.100
0.010
0.0035
Oh
Oh
Oh
Oh
42,900.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.070
0.100
0.010
0.0035
Oh
Oh
Oh
Oh
22,874.50
1,925
3,850
440
193
16,467.00
0.360
0.030
6,407.50
15,444.00
1,023.00
22,874.50
1,925
3,850
440
193
16,467.00
0.360
0.030
6,407.50
15,444.00
1,023.00
106,810.00
1,650
3,850
440
165
16,467.00
0.360
0.030
6,105.00
99,000.00
1,705.00
320,430.00
1,650
3,850
440
165
100,705.00
1.500
0.050
6,105.00
312,620.00
1,705.00
577,918.00
1,650
4,620
528
165
314,325.00
5.800
0.050
6,963.00
569,250.00
1,705.00
46,601.50
825
2,695
308
83
570,955.00
11.500
0.050
3,910.50
42,350.00
341.00
46,601.50
825
2,695
308
83
42,691.00
1.100
0.010
3,910.50
42,350.00
341.00
825
2,695
308
83
42,900.00
34,100.00
6,407.50
15,444.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00
1,925
3,850
440
193
22,874.50
16,467.00
0.360
0.030
lbr
Kg
0.070
0.100
0.010
0.0035
Oh
Oh
Oh
Oh
42,900.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.070
0.100
0.010
0.0035
Oh
Oh
Oh
Oh
82,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
0.070
0.100
0.010
0.0035
Oh
Oh
Oh
Oh
0.360
0.030
lbr
Kg
0.070
0.100
0.010
0.0035
Oh
Oh
Oh
Oh
0.024
0.010
0.050
m3
Kg
Kg
0.200
0.600
0.060
0.0100
Oh
Oh
Oh
Oh
82,500.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500,000.00
34,100.00
34,100.00
0.200
0.600
0.060
0.0100
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
73,260.00
34,100.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
lbr
Kg
Kg
0.200
0.600
0.060
0.0100
Oh
Oh
Oh
Oh
2,035,000.00
34,100.00
34,100.00
lbr
Kg
0.600
0.100
0.010
0.0030
Oh
Oh
Oh
Oh
35,594.24
5,500
23,100
2,640
550
27,500.00
38,500.00
44,000.00
55,000.00
31,790.00
82,676.00
5,500
23,100
2,640
550
33,748.00
0.350
0.030
31,790.00
48,840.00
341.00
1,705.00
5,500
23,100
2,640
550
50,886.00
0.024
0.010
0.050
693,836.00
1,758.24
341.00
1,705.00
31,790.00
660,000.00
341.00
1,705.00
3,804.24
lbr
Kg
Kg
34,430.50
1,925
3,850
440
193
662,046.00
0.024
0.010
0.050
6,407.50
27,000.00
1,023.00
37,130.50
1,925
3,850
440
193
28,023.00
75,000.00
34,100.00
6,407.50
29,700.00
1,023.00
37,130.50
1,925
3,850
440
193
30,723.00
0.360
0.030
6,407.50
29,700.00
1,023.00
1,925
3,850
440
193
30,723.00
0.360
0.030
22,874.50
15,444.00
1,023.00
6,407.50
93,500.00
34,100.00
20,955.00
32,725.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00
16,500
3,850
440
165
54,703.00
379,885.00
3.600
0.150
1.000
1.500
m'
Kg
bh
lbr
0.150
0.500
0.050
0.0075
Oh
Oh
Oh
Oh
71,500.00
20,900.00
12,100.00
71,500.00
27,500.00
38,500.00
44,000.00
55,000.00
m'
Kg
0.050
0.050
0.005
0.0030
Oh
Oh
Oh
Oh
14,300.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
lbr
0.270
0.400
0.040
0.0135
Oh
Oh
Oh
Oh
1,600,000.00
34,100.00
42,900.00
0.012
0.060
1.100
m3
Kg
lbr
0.180
0.320
0.032
0.0090
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
1,600,000.00
34,100.00
19,800.00
m3
Kg
lbr
0.260
0.400
0.040
0.0130
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
1,600,000.00
34,100.00
53,900.00
IX
PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok
Bahan
Kloset Duduk / Monoblok
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Kloset Jongkok Porselen
Bahan
Kloset Jongkok Porselen
Semen Portland
Pasir Pasang
Tenaga
Perkerja
4,950
12,320
1,408
495
27,500.00
38,500.00
44,000.00
55,000.00
m3
Kg
lbr
0.310
0.470
0.047
0.0155
Oh
Oh
Oh
Oh
1,600,000.00
34,100.00
49,500.00
3.300
1.100
0.001
0.1600
Oh
Oh
Oh
Oh
1.000
6.000
0.010
bh
Kg
m3
1.000
Oh
376,491.00
29,540.50
644,036.50
43,200.00
2,046.00
569,250.00
27,500.00
38,500.00
44,000.00
55,000.00
8,525
18,095
2,068
853
1,859,000.00
1.000
bh
30% Dari bahan
25,025.00
7,150
15,400
1,760
715
614,496.00
0.027
0.060
11.500
62,199.00
36,800.00
2,046.00
312,620.00
19,173.00
19,200.00
2,046.00
21,780.00
351,466.00
0.023
0.060
5.800
80,904.50
7,425
15,400
1,760
743
43,026.00
25,327.50
36,800.00
2,046.00
16,731.00
1 m Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo
Bahan
Balok Kayu Borneo
Paku
Asbes
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
19,756.00
1,375
1,925
220
165
55,577.00
0.023
0.060
0.390
3,685.00
15,730.00
341.00
4,125
19,250
2,200
413
16,071.00
1.100
0.010
405,872.50
257,400.00
3,135.00
12,100.00
107,250.00
25,987.50
1,430,000.00
429,000.00
138,919.00
1,997,919.00
1,430,000.00
429,000.00
27,500.00
35,750.00
44,000.00
55,000.00
90,750
39,325
44
8,800
173,750.00
165,000.00
1,100.00
215,000.00
155,925.00
165,000.00
6,600.00
2,150.00
27,500.00
27,500
329,675.00
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Kloset Jongkok Teraso
Bahan
Kloset Jongkok Teraso
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Urinoir
Bahan
Urinoir
Perlengkapan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Wastafel
Bahan
Urinoir
Perlengkapan
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1.500
1.500
0.1600
Oh
Oh
Oh
1.000
7.000
6.000
0.010
bh
bh
Kg
m3
1.000
1.500
0.300
0.1100
Oh
Oh
Oh
Oh
35,750.00
44,000.00
55,000.00
117,485.00
104,500.00
605.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
1.000
1.000
0.100
0.1000
495,000.00
148,500.00
1,100.00
215,000.00
Oh
Oh
Oh
Oh
1.000
1.450
0.150
0.1000
Oh
Oh
Oh
Oh
1.000
6.000
0.010
bh
Kg
m3
2.100
0.750
0.070
0.1100
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
495,000.00
59,400.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
132,000.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
198,000.00
35,640.00
Oh
Oh
Oh
Oh
m3
Kg
m3
bh
Kg
6.000
3.000
0.300
0.3000
Oh
Oh
Oh
Oh
0.075
0.750
0.2500
Oh
Oh
Oh
Oh
234,442.50
175,835.00
409,475.00
198,000.00
35,640.00
27,500.00
35,750.00
44,000.00
55,000.00
49,500
96,525
23,760
6,050
605.00
1,100.00
215,000.00
598.95
1,320.00
301,950.00
722,234.00
242.00
132,000.00
64,500.00
215,622.00
7,920.00
27,500.00
35,750.00
44,000.00
55,000.00
165,000
107,250
13,200
16,500
858,000.00
1.000
bh
20% harga Badkip
93,692.50
57,750
26,813
3,080
6,050
420,284.00
0.400
120.000
0.300
360.000
6.000
654,587.50
27,500
51,838
6,600
5,500
233,640.00
1.800
2.700
0.540
0.1100
91,437.50
132,000.00
6,600.00
2,150.00
27,500
35,750
4,400
5,500
140,750.00
1.000
bh
18% Harga Bak
725,400.00
495,000.00
59,400.00
6,600.00
2,150.00
73,150.00
495,000.00
148,500.00
6,600.00
2,150.00
563,150.00
1.000
bh
12% Harga Urinoir
6.000
Kg
0.010
m3
217,860.00
27,500
53,625
13,200
6,050
652,250.00
1.000
bh
30% Harga Urinoir
6.000
Kg
0.010
m3
100,375.00
104,500.00
4,235.00
6,600.00
2,150.00
53,625
66,000
8,800
715,000.00
143,000.00
#VALUE!
715,000.00
143,000.00
27,500.00
35,750.00
44,000.00
55,000.00
#VALUE!
2,681
33,000
13,750
#VALUE!
221,760.00
1.000
bh
12% Harga Bak
3.000
4.500
0.900
0.9000
198,000.00
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
m3
0.060
0.030
0.003
0.0025
Oh
Oh
Oh
Oh
93,500.00
1,100.00
215,000.00
88,000.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
m3
0.080
0.040
0.004
0.0070
Oh
Oh
Oh
Oh
93,500.00
1,100.00
215,000.00
88,000.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
m3
Kg
m3
m3
0.140
0.070
0.007
0.0070
Oh
Oh
Oh
Oh
88,000.00
605.00
1,100.00
215,000.00
88,000.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
m3
Kg
m3
m3
0.380
0.190
0.019
0.0190
Oh
Oh
Oh
Oh
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm
Bahan
Bata merah kelas I
0.145
m3
Semen Portland
44.000
Kg
Pasir Pasang
0.070
m3
Batu Kerikil
0.070
m3
Besi Beton
1.600
Kg
Pasir Beton
0.060
m3
Tenaga
Perkerja
3.200
Oh
Tukang Batu
1.015
Oh
Kepala Tukang
0.0015
Oh
Mandor
0.0160
Oh
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
Bahan
Bata merah kelas I
0.250
m3
Semen Portland
77.000
Kg
Pasir Pasang
0.130
m3
Batu Kerikil
0.020
m3
Besi Beton
2.600
Kg
Pasir Beton
0.090
m3
Tenaga
88,000.00
605.00
1,100.00
215,000.00
88,000.00
19,123.50
146,773.25
96,800.00
332.75
11,330.00
13,115.00
6,072.00
27,500.00
35,750.00
44,000.00
55,000.00
10,450
6,793
836
1,045
121,287.73
605.00
1,100.00
215,000.00
275,000.00
16,000.00
215,000.00
125,232.25
246,519.98
87.73
48,400.00
15,050.00
19,250.00
25,600.00
12,900.00
27,500.00
35,750.00
44,000.00
55,000.00
88,000
36,286
66
880
179,251.25
605.00
1,100.00
215,000.00
275,000.00
16,000.00
215,000.00
122,472.85
3,850
2,503
308
385
127,649.75
1.100
0.550
10.300
0.061
0.069
7,045.50
96,800.00
163.35
4,312.00
12,040.00
2,112.00
158,990.00
2,200
1,430
176
385
115,427.35
1.100
0.270
3.920
0.056
0.024
4,191.00
149,600.00
957.00
3,010.00
1,232.00
157,103.00
1,650
1,073
132
138
154,799.00
1.600
0.870
0.014
0.014
2,992.00
149,600.00
748.00
2,795.00
968.00
82,500
160,875
39,600
49,500
154,111.00
1.600
0.680
0.013
0.011
554,235.00
198,000.00
23,760.00
332,475.00
151.25
84,700.00
27,950.00
5,500.00
41,600.00
19,350.00
61,932.75
241,184.00
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1.420
0.473
0.0470
0.0710
Oh
Oh
Oh
Oh
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm
Bahan
Bata merah kelas I
0.371
m3
Semen Portland
114.000
Kg
Pasir Pasang
0.184
m3
Batu Koral
0.033
m3
Besi Beton
4.850
Kg
Pasir Beton
0.120
m3
Tenaga
Perkerja
2.160
Oh
Tukang Batu
0.720
Oh
Kepala Tukang
0.0720
Oh
Mandor
0.1080
Oh
Tukang Gali
0.1000
Oh
27,500.00
35,750.00
44,000.00
55,000.00
277,659.46
605.00
1,100.00
215,000.00
275,000.00
16,000.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
33,000.00
0.054
0.090
0.0090
0.0270
130,000.00
45,500.00
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.054
0.090
0.0090
0.0270
130,000.00
45,500.00
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.054
0.090
0.0090
0.0270
130,000.00
45,500.00
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.108
0.180
0.0180
0.0054
130,000.00
45,500.00
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.108
0.180
0.0180
0.0054
130,000.00
45,500.00
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.135
0.225
0.0225
0.0068
18,333.33
6,416.67
Oh
Oh
Oh
Oh
Bahan
Pipa PVC D 1/2"
Perlengkapan
2,524.50
883.58
41,536.92
3,713
8,044
990
374
3,912.98
1.200
m'
35% Harga Pipa
13,120.25
22,000.00
6,416.67
27,500.00
35,750.00
44,000.00
55,000.00
#VALUE!
2,970
6,435
792
297
28,416.67
1.200
m'
35% Harga Pipa
10,494.00
156,000.00
#VALUE!
211,994.00
2,970
6,435
792
297
#VALUE!
1.200
m'
35% Harga Pipa
10,494.00
156,000.00
45,500.00
208,083.50
1,485
3,218
396
1,485
201,500.00
1.200
m'
35% Harga Pipa
6,583.50
156,000.00
45,500.00
208,083.50
1,485
3,218
396
1,485
201,500.00
1.200
m'
35% Harga Pipa
6,583.50
156,000.00
45,500.00
208,083.50
1,485
3,218
396
1,485
201,500.00
1.200
m'
35% Harga Pipa
6,583.50
156,000.00
45,500.00
375,207.46
59,400
25,740
3,168
5,940
3,300
201,500.00
1.200
m'
35% Harga Pipa
97,548.00
224.46
125,400.00
39,560.00
9,075.00
77,600.00
25,800.00
39,050
16,910
2,068
3,905
3,029.40
883.58
3,498.00
7,410.98
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.036
0.060
0.0060
0.0018
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
6,146.53
1.200
m'
35% Harga Pipa
0.036
0.060
0.0060
0.0018
3,965.50
1,387.93
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.036
0.060
0.0060
0.0018
5,445.00
1,905.75
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.036
0.060
0.0060
0.0018
18,469.00
6,464.15
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.054
0.090
0.0090
0.0027
20,047.50
7,016.63
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.036
0.060
0.0060
0.0018
33,000.00
11,550.00
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.081
0.135
0.0135
0.0041
39,847.50
13,946.63
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
0.081
0.135
0.0135
0.0041
58,300.00
20,405.00
Oh
Oh
Oh
Oh
bh
set
0.030
0.300
0.0300
Oh
Oh
Oh
7,873.25
98,238.25
69,960.00
20,405.00
27,500.00
35,750.00
44,000.00
55,000.00
2,228
4,826
594
226
566,500.00
1.000
1.000
69,636.88
2,228
4,826
594
226
90,365.00
1.200
m'
35% Harga Pipa
7,873.25
47,817.00
13,946.63
54,648.00
990
2,145
264
99
61,763.63
1.200
m'
35% Harga Pipa
3,498.00
39,600.00
11,550.00
36,320.63
1,485
3,218
396
149
51,150.00
1.200
m'
35% Harga Pipa
5,247.00
24,057.00
7,016.63
32,124.95
990
2,145
264
99
31,073.63
1.200
m'
35% Harga Pipa
3,498.00
22,162.80
6,464.15
11,937.75
990
2,145
264
99
28,626.95
1.200
m'
35% Harga Pipa
3,498.00
6,534.00
1,905.75
9,644.53
990
2,145
264
99
8,439.75
1.200
m'
35% Harga Pipa
3,498.00
4,758.60
1,387.93
990
2,145
264
99
495,000.00
71,500.00
12,952.50
495,000.00
71,500.00
27,500.00
35,750.00
44,000.00
825
10,725
1,320
579,452.50
Mandor
Memasang 1 bh Bak Cuci Piring Teraso
Bahan
Bak cuci Teraso
Water Drain + Asesories
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0015
Oh
55,000.00
489,250.00
1.000
1.000
20.000
0.050
bh
set
Kg
m3
0.050
0.500
0.0500
0.0025
Oh
Oh
Oh
Oh
1.000
0.025
bh
bh
0.010
0.100
0.0100
0.0050
Oh
Oh
Oh
Oh
385,000.00
71,500.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
VII
33,000.00
4,950.00
0.010
0.100
0.0100
0.0050
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
Kg
Kg
0.006
0.060
0.0060
0.0003
Oh
Oh
Oh
Oh
33,000.00
27,500.00
35,750.00
44,000.00
55,000.00
m2
0.650
0.650
0.0650
0.0320
Oh
Oh
Oh
Oh
19,800.00
16,500.00
27,500.00
35,750.00
44,000.00
55,000.00
m2
1.050
1.050
0.1050
0.00525
Oh
Oh
Oh
Oh
495,000.00
27,500.00
38,500.00
44,000.00
55,000.00
m2
1.022
1.200
0.1200
0.0060
Oh
Oh
Oh
Oh
495,000.00
27,500.00
38,500.00
44,000.00
55,000.00
m2
1.200
1.200
0.1200
0.0060
Oh
Oh
Oh
Oh
715,000.00
Bahan
Pintu Lipat
Tenaga
m2
495,000.00
84,810.00
579,810.00
495,000.00
27,500.00
38,500.00
44,000.00
55,000.00
715,000.00
794,915.00
28,105
46,200
5,280
330
33,000
46,200
5,280
330
715,000.00
1.000
79,915.00
715,000.00
27,500.00
38,500.00
44,000.00
55,000.00
569,208.75
28,875
40,425
4,620
289
495,000.00
1.000
74,208.75
495,000.00
542,520.00
17,875
25,025
2,860
1,760
715,000.00
1.000
47,520.00
495,000.00
25,690.50
165
2,145
264
17
495,000.00
1.000
2,590.50
21,780.00
1,320.00
37,565.00
275
3,575
440
275
495,000.00
1.000
4,565.00
33,000.00
37,688.75
275
3,575
440
275
23,100.00
1.100
0.080
4,565.00
33,000.00
123.75
33,000.00
bh
510,837.50
1,375
17,875
2,200
138
33,123.75
1.000
21,587.50
385,000.00
71,500.00
22,000.00
10,750.00
83
715,000.00
74,206.00
789,206.00
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
1.050
1.050
0.1050
0.0052
Oh
Oh
Oh
Oh
1.000
m2
0.080
0.800
0.080
0.004
Oh
Oh
Oh
Oh
1.000
m2
1.050
1.500
0.105
0.0052
Oh
Oh
Oh
Oh
1.000
m2
1.050
1.050
0.105
0.0052
Oh
Oh
Oh
Oh
1.000
m2
0.350
0.350
0.035
0.00175
Oh
Oh
Oh
Oh
1.000
m2
0.350
0.350
0.035
0.00175
Oh
Oh
Oh
Oh
11.500
m'
1.200
1.200
0.012
0.0006
Oh
Oh
Oh
Oh
1.100
0.020
0.0018
m2
Kg
m3
0.100
0.100
0.010
0.0005
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
385,000.00
385,000.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500.00
38,500.00
44,000.00
55,000.00
143,000.00
27,500.00
38,500.00
44,000.00
55,000.00
17,600.00
79,761.00
282,161.00
202,400.00
27,500.00
38,500.00
44,000.00
55,000.00
33,000
46,200
528
33
176,000.00
34,100.00
2,035,000.00
7,067.50
205,012.50
193,600.00
682.00
3,663.00
27,500.00
38,500.00
44,000.00
55,000.00
2,750
3,850
440
28
52,745.00
Oh
Oh
Oh
Oh
167,736.25
9,625
13,475
1,540
96
197,945.00
0.100
0.100
0.010
0.0005
24,736.25
143,000.00
202,400.00
m2
Kg
m3
167,736.25
9,625
13,475
1,540
96
143,000.00
1.100
0.020
0.0018
24,736.25
143,000.00
459,206.00
28,875
40,425
4,620
286
143,000.00
143,000.00
74,206.00
385,000.00
806,531.00
28,875
57,750
4,620
286
385,000.00
385,000.00
91,531.00
715,000.00
421,740.00
2,200
30,800
3,520
220
715,000.00
715,000.00
36,740.00
385,000.00
28,875
40,425
4,620
286
44,000.00
34,100.00
2,035,000.00
7,067.50
59,812.50
48,400.00
682.00
3,663.00
27,500.00
38,500.00
44,000.00
55,000.00
2,750
3,850
440
28
76,945.00
7,067.50
84,012.50
Kawat Kassa
Paku Biasa " - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1.100
0.020
0.0018
m2
Kg
m3
0.100
0.100
0.010
0.0005
Oh
Oh
Oh
Oh
66,000.00
34,100.00
2,035,000.00
72,600.00
682.00
3,663.00
27,500.00
38,500.00
44,000.00
55,000.00
46,695.00
1.100
0.020
0.0018
m2
Kg
m3
0.100
0.100
0.010
0.0005
Oh
Oh
Oh
Oh
38,500.00
34,100.00
2,035,000.00
Besi Strip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
27,500.00
38,500.00
44,000.00
55,000.00
m2
Kg
m2
0.200
0.200
0.020
0.0010
Oh
Oh
Oh
Oh
0.500
0.015
0.0096
0.2500
Lbr
Kg
m3
Kg
0.150
0.400
0.025
0.00125
Oh
Oh
Oh
Oh
9,900.00
34,100.00
11,550.00
27,500.00
38,500.00
44,000.00
55,000.00
Lbr
Kg
m3
Kg
0.040
0.400
0.025
0.00125
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
38,500.00
34,100.00
2,035,000.00
28,600.00
27,500.00
38,500.00
44,000.00
55,000.00
Lbr
Kg
m3
Kg
0.150
0.250
0.025
0.00125
Oh
Oh
Oh
Oh
0.300
0.100
0.0190
0.5000
Lbr
Kg
m3
Kg
0.150
0.250
0.025
0.00125
Oh
Oh
Oh
Oh
49,500.00
34,100.00
2,035,000.00
11,550.00
27,500.00
38,500.00
44,000.00
55,000.00
33,000.00
34,100.00
2,035,000.00
11,550.00
77,618.75
14,918.75
72,668.75
9,900.00
3,410.00
38,665.00
5,775.00
27,500.00
38,500.00
44,000.00
55,000.00
220,000.00
14,918.75
4,125
9,625
1,100
69
4,125
9,625
1,100
69
220,000.00
Bh
84,675.25
1,100
15,400
1,100
69
57,750.00
1.000
17,668.75
14,850.00
3,410.00
38,665.00
5,775.00
4,125
15,400
1,100
69
62,700.00
0.300
0.100
0.0190
0.5000
67,141.25
19,250.00
511.50
38,665.00
8,580.00
20,693.75
19,250.00
511.50
19,536.00
7,150.00
67,006.50
0.500
0.015
0.0190
0.3000
25,995.75
5,500
7,700
880
55
46,447.50
38,500.00
34,100.00
2,035,000.00
28,600.00
14,135.00
10,890.00
682.00
288.75
53,762.50
2,750
3,850
440
28
11,860.75
1.100
0.020
0.0250
7,067.50
42,350.00
682.00
3,663.00
2,750
3,850
440
28
220,000.00
27,555.00
247,555.00
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunsi Tanam Biasa
Bahan
Kunsi Tanam Biasa
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunsi Tanam Kamar Mandi
Bahan
Kunsi Tanam Kamar Mandi
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunsi Silinder
Bahan
Kunsi Silinder
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Engsel Pintu
Bahan
Engsel Pintu
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Engsel Jendela Kupu - kupu
Bahan
Engsel Jendela
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Engsel Angin
Bahan
Engsel Angin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Spring Knip
Bahan
Spring Knip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kait angin
Bahan
Kait Angin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Door Closer
Bahan
Door Closer
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
0.060
0.600
0.060
0.003
Oh
Oh
Oh
Oh
1.000
Bh
0.010
0.500
0.010
0.005
Oh
Oh
Oh
Oh
1.000
Bh
0.005
0.500
0.005
0.0025
Oh
Oh
Oh
Oh
1.000
Bh
0.005
0.500
0.005
0.00025
Oh
Oh
Oh
Oh
1.000
Bh
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
1.000
Bh
0.010
0.100
0.010
0.00050
Oh
Oh
Oh
Oh
1.000
Bh
0.020
0.200
0.020
0.01000
Oh
Oh
Oh
Oh
1.000
Bh
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
1.000
Bh
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
1.000
Bh
0.050
0.500
0.050
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
1,650
23,100
2,640
165
99,000.00
99,000.00
20,240.00
119,240.00
99,000.00
27,500.00
38,500.00
44,000.00
55,000.00
275
19,250
440
275
132,000.00
132,000.00
19,745.00
151,745.00
132,000.00
27,500.00
38,500.00
44,000.00
55,000.00
138
19,250
220
138
165,000.00
165,000.00
19,621.25
184,621.25
165,000.00
27,500.00
38,500.00
44,000.00
55,000.00
138
19,250
220
14
30,250.00
30,250.00
6,888.75
37,138.75
30,250.00
27,500.00
38,500.00
44,000.00
55,000.00
413
5,775
660
41
27,500.00
27,500.00
4,592.50
32,092.50
27,500.00
27,500.00
38,500.00
44,000.00
55,000.00
275
3,850
440
28
33,000.00
33,000.00
9,680.00
42,680.00
33,000.00
27,500.00
38,500.00
44,000.00
55,000.00
550
7,700
880
550
3,850.00
3,850.00
6,888.75
10,738.75
3,850.00
27,500.00
38,500.00
44,000.00
55,000.00
413
5,775
660
41
38,500.00
38,500.00
6,888.75
45,388.75
38,500.00
27,500.00
38,500.00
44,000.00
55,000.00
413
5,775
660
41
165,000.00
165,000.00
22,962.50
165,000.00
27,500.00
38,500.00
44,000.00
1,375
19,250
2,200
187,962.50
Mandor
1 Buah Pasang Kunci Selot
Bahan
Kunci Selot
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Pegangan Pintu / Door Holder
Bahan
Door Holder
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Door Stop
Bahan
Door Stop
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Rel Pintu Dorong
Bahan
Rel Pintu Dorong
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunci Lemari
Bahan
Kunci Lemari
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca tebal 3 mm
Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca tebal 5 mm
Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca tebal 8 mm
Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Buram tebal 12 mm
Bahan
Kaca Buram
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Cermin tebal 5 mm
0.00250
Oh
55,000.00
138
22,000.00
1.000
Bh
0.020
0.200
0.020
0.001
Oh
Oh
Oh
Oh
22,000.00
Bh
0.050
0.500
0.050
0.0025
Oh
Oh
Oh
Oh
550
7,700
880
55
231,000.00
Bh
0.010
0.100
0.010
0.0005
Oh
Oh
Oh
Oh
Bh
0.060
0.600
0.060
0.0030
Oh
Oh
Oh
Oh
165,000.00
Bh
0.025
0.250
0.025
0.00125
Oh
Oh
Oh
Oh
m2
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
275,000.00
m2
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
1.100
m2
Oh
Oh
Oh
Oh
27,500.00
m2
0.0250
0.250
0.0250
0.00125
Oh
Oh
Oh
Oh
11,481.25
38,981.25
27,500.00
27,500.00
38,500.00
44,000.00
55,000.00
688
9,625
1,100
69
71,500.00
6,888.75
85,538.75
78,650.00
27,500.00
38,500.00
44,000.00
55,000.00
413
5,775
660
41
71,500.00
6,888.75
85,538.75
78,650.00
27,500.00
38,500.00
44,000.00
55,000.00
413
5,775
660
41
71,500.00
7,576.25
86,226.25
78,650.00
27,500.00
38,500.00
44,000.00
55,000.00
454
6,353
726
44
102,850.00
1.100
302,555.00
1,650
23,100
2,640
165
78,650.00
0.0165
0.165
0.0165
0.00080
27,555.00
275,000.00
27,500.00
38,500.00
44,000.00
55,000.00
78,650.00
1.100
169,592.50
275
3,850
440
28
78,650.00
1.100
4,592.50
165,000.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500.00
1.000
253,962.50
1,375
19,250
2,200
138
275,000.00
1.000
22,962.50
231,000.00
27,500.00
38,500.00
44,000.00
55,000.00
165,000.00
1.000
31,185.00
22,000.00
27,500.00
38,500.00
44,000.00
55,000.00
231,000.00
1.000
9,185.00
93,500.00
11,481.25
114,331.25
102,850.00
27,500.00
38,500.00
44,000.00
55,000.00
688
9,625
1,100
69
96,800.00
6,888.75
103,688.75
Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Cermin tebal 6 mm
Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Cermin tebal 8 mm
Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Wireglass tebal 5 mm
Bahan
Kaca Wireglass
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Patri tebal 5 mm
Bahan
Kaca Patri
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
VI
1.100
m2
0.0150
0.150
0.0150
0.00075
Oh
Oh
Oh
Oh
88,000.00
96,800.00
27,500.00
38,500.00
44,000.00
55,000.00
96,800.00
1.100
m2
0.0150
0.150
0.0150
0.00075
Oh
Oh
Oh
Oh
88,000.00
27,500.00
38,500.00
44,000.00
55,000.00
m2
0.0165
0.165
0.0165
0.00080
Oh
Oh
Oh
Oh
88,000.00
m2
0.0150
0.150
0.0150
0.00075
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
m2
0.0150
0.150
0.0150
0.00075
Oh
Oh
Oh
Oh
132,000.00
6.630
9.800
0.0215
bh
Kg
m3
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
Oh
Oh
Oh
Oh
27,500.00
38,500.00
44,000.00
55,000.00
385,000.00
413
5,775
660
41
27,500.00
38,500.00
44,000.00
55,000.00
bh
Kg
m3
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.125
0.0125
0.0130
Oh
Oh
Oh
Oh
6,160.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2700
0.130
0.0130
0.0135
Oh
Oh
Oh
Oh
3,465.00
1,100.00
215,000.00
bh
1,540.00
1,100.00
215,000.00
69,635.80
13,387.00
68,539.50
40,810.00
11,440.00
2,902.50
27,500.00
35,750.00
44,000.00
55,000.00
6,160.00
12,883.75
7,150
4,469
550
715
7,425
4,648
572
743
55,949.80
6.630
68,623.80
41,129.55
11,000.00
4,622.50
27,500.00
35,750.00
44,000.00
55,000.00
12,380.50
6,875
4,290
528
688
55,152.50
26.500
10.400
0.0135
430,388.75
40,840.80
10,780.00
4,622.50
6,888.75
413
5,775
660
41
56,752.05
11.870
10.000
0.0215
152,088.75
423,500.00
6,888.75
145,200.00
56,243.30
Bahan
Ubin Abu -abu 40 x40 cm
Semen Portland
Pasir Pasang
104,376.25
454
6,353
726
44
423,500.00
1.100
7,576.25
96,800.00
145,200.00
1.100
103,688.75
413
5,775
660
41
96,800.00
1.100
6,888.75
96,800.00
Bahan
Ubin Warna 40 x 40 cm
413
5,775
660
41
40,840.80
12,380.50
68,330.30
Semen Portland
Pasir Pasang
Semen Warna
8.160
0.0230
0.9000
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
Oh
Oh
Oh
Oh
1,100.00
215,000.00
1,320.00
8,976.00
4,945.00
1,188.00
27,500.00
35,750.00
44,000.00
55,000.00
6,875
4,290
528
688
56,458.55
Bahan
Ubin Warna 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
11.870
8.360
0.0230
0.9000
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
Oh
Oh
Oh
Oh
Bahan
Ubin Warna 20 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
26.500
8.760
0.0230
0.9000
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2700
0.130
0.0130
0.0135
Oh
Oh
Oh
Oh
3,465.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
6,875
4,290
528
688
56,579.00
1,540.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
Oh
Oh
Oh
Oh
Bahan
Ubin Teraso 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
1.870
10.000
0.0215
1.5400
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.125
0.0125
0.0130
Oh
Oh
Oh
Oh
5,280.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
2,970.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
0.2500
0.120
0.0125
0.0125
Oh
Oh
Oh
Oh
29,920.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
0.2600
Oh
236,866.60
6,875
4,290
550
688
217,374.60
11.870
10.000
0.0215
1.5000
12,402.50
207,345.60
10,780.00
4,622.50
1,716.00
36,092.95
7,150
4,469
550
715
224,464.10
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
12,883.75
5,553.90
11,000.00
4,622.50
2,032.80
60,871.00
6,875
4,290
528
688
23,209.20
6.930
9.800
0.0215
1.3000
12,380.50
33,000.00
9,680.00
4,622.50
1,188.00
Bahan
Ubin Granito 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
69,966.00
7,425
4,648
572
743
48,490.50
bh
Kg
m3
Kg
13,387.00
40,810.00
9,636.00
4,945.00
1,188.00
68,839.05
41,129.55
9,196.00
4,945.00
1,188.00
Bahan
Ubin Teraso 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
12,380.50
16,830.00
1,100.00
215,000.00
1,320.00
12,883.75
199,772.10
11,000.00
4,622.50
1,980.00
27,500.00
7,150
230,258.35
Tukang Batu
Kepala Tukang
Mandor
0.125
0.0125
0.0130
Oh
Oh
Oh
Bahan
Ubin Teralux Kerang 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
6.250
8.800
0.0215
1.3000
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
Oh
Oh
Oh
Oh
35,750.00
44,000.00
55,000.00
98,518.50
13,200.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
11.807
10.000
0.0215
1.1250
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
Oh
Oh
Oh
Oh
7,425.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.120
0.0120
0.0125
Oh
Oh
Oh
Oh
47,520.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6720
0.224
0.0220
0.0340
Oh
Oh
Oh
Oh
21,120.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.7000
0.340
0.0340
0.0350
Oh
Oh
Oh
Oh
11,880.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
Oh
Oh
Oh
Oh
1,155.00
1,100.00
215,000.00
bh
1,155.00
11,717.00
1,650
1,073
132
165
6,438.15
3.530
3,019.50
6,121.50
1,716.00
860.00
27,500.00
35,750.00
44,000.00
55,000.00
193,444.10
19,250
12,155
1,496
1,925
8,697.50
5.300
1.560
0.0040
34,826.00
141,015.60
11,000.00
4,622.50
1,980.00
177,344.50
18,480
8,008
968
1,870
158,618.10
11.870
10.000
0.0215
1.5000
29,326.00
132,000.00
9,680.00
4,622.50
1,716.00
298,496.50
6,875
4,290
528
688
148,018.50
6.250
8.800
0.0215
1.3000
12,380.50
266,112.00
9,009.00
9,675.00
1,320.00
117,154.98
6,875
4,290
528
688
286,116.00
5.600
8.190
0.0450
1.0000
12,380.50
87,666.98
11,000.00
4,622.50
1,485.00
110,899.00
6,875
4,290
528
688
104,774.48
Bahan
Ubin Teralux Kerang 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
12,380.50
82,500.00
9,680.00
4,622.50
1,716.00
Bahan
Plint Ubin PC Abu -abu 10 x 30 cm
4,469
550
715
4,077.15
3,019.50
9,457.65
Semen Portland
Pasir Pasang
1.560
0.0030
Kg
m3
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
Oh
Oh
Oh
Oh
1,100.00
215,000.00
1,716.00
645.00
27,500.00
35,750.00
44,000.00
55,000.00
1,650
1,073
132
165
5,859.00
Bahan
Plint Ubin PC Abu - abu 10 x 40 cm
Semen Portland
Pasir Pasang
2.650
1.560
0.0030
bh
Kg
m3
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
Oh
Oh
Oh
Oh
1,320.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
1,650
1,073
132
165
6,879.80
5.300
1.200
0.0030
0.1900
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
Oh
Oh
Oh
Oh
880.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
Oh
Oh
Oh
Oh
1,320.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0800
0.040
0.0040
0.0040
Oh
Oh
Oh
Oh
1,760.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0800
0.040
0.0040
0.0040
Oh
Oh
Oh
Oh
1,155.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
0.0800
0.040
0.0040
Oh
Oh
Oh
10,714.95
2,200
1,430
176
220
6,178.00
2.650
1.200
0.0030
0.1000
4,026.00
4,077.15
1,716.00
645.00
250.80
10,787.00
2,200
1,430
176
220
6,688.95
3.530
1.560
0.0030
0.1900
4,026.00
4,664.00
1,320.00
645.00
132.00
10,050.10
1,650
1,073
132
165
6,761.00
2.650
1.200
0.0030
0.1000
3,019.50
4,395.60
1,815.00
688.00
132.00
9,899.30
1,650
1,073
132
165
7,030.60
3.330
1.650
0.0032
0.1000
3,019.50
4,664.00
1,320.00
645.00
250.80
8,878.50
3,498.00
1,716.00
645.00
3,019.50
1,540.00
1,100.00
215,000.00
1,320.00
4,026.00
4,081.00
1,320.00
645.00
132.00
27,500.00
35,750.00
44,000.00
2,200
1,430
176
10,204.00
Mandor
0.0040
Oh
55,000.00
21,919.00
Bahan
Plint Ubin Granito 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
2.650
1.200
0.0030
0.1000
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0600
0.030
0.0030
0.0030
Oh
Oh
Oh
Oh
7,480.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
3.330
1.650
0.0032
0.1000
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
5,610.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
Bahan
Plint Ubin Teralux Kerang 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
3.330
1.650
0.0032
0.1000
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
3,300.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
2,475.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
0.9000
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
Bahan
Plint Ubin Teralux Marmer 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
2.500
1.650
0.0032
0.1000
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
7,920.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
3,960.00
1,100.00
28,611.00
44,446.00
13,200.00
1,815.00
688.00
132.00
24,750
3,218
396
248
15,821.80
bh
Kg
44,710.00
24,750
3,218
396
248
15,835.00
3.330
1.650
28,611.00
13,464.00
1,815.00
688.00
132.00
27,500.00
35,750.00
44,000.00
55,000.00
39,487.75
24,750
3,218
396
248
16,099.00
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
28,611.00
8,241.75
1,815.00
688.00
132.00
39,496.00
24,750
3,218
396
248
10,876.75
1.700
1.650
0.0032
0.1000
28,611.00
8,250.00
1,815.00
688.00
132.00
Bahan
Plint Ubin Teralux Marmer 10 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna
49,927.30
24,750
3,218
396
248
10,885.00
2.500
1.650
0.0032
0.1000
28,611.00
18,681.30
1,815.00
688.00
132.00
24,938.50
1,650
1,073
132
165
21,316.30
Bahan
Plint Ubin Granito 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
3,019.50
19,822.00
1,320.00
645.00
132.00
Bahan
Plint Ubin Teralux Marmer 10 x 30 cm
Semen Portland
220
13,186.80
1,815.00
28,611.00
44,432.80
Pasir Pasang
Semen Warna
0.0032
0.1000
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
215,000.00
1,320.00
688.00
132.00
27,500.00
35,750.00
44,000.00
55,000.00
118.80
Bahan
Bahan Teraso Cor
0.0036
m3
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
33,000.00
27,500.00
35,750.00
44,000.00
55,000.00
0.0036
m3
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.9000
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
33,000.00
27,500.00
35,750.00
44,000.00
55,000.00
m2
Kg
m3
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.2700
0.150
0.0150
0.0135
Oh
Oh
Oh
Oh
Bahan
Ubin Keramik Artistik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
5.0000
11.3800
0.0420
1.5000
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
143,000.00
1,430.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0900
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
5.000
1.650
0.0032
0.1200
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0900
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
1,716.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
1,320.00
1,100.00
215,000.00
1,320.00
6,336.00
15,571.00
6,600.00
1,815.00
688.00
132.00
27,500.00
35,750.00
44,000.00
55,000.00
6,600.00
1,100.00
215,000.00
1,320.00
2,475
3,218
396
248
6,336.00
41,997.40
33,000.00
1,815.00
688.00
158.40
27,500.00
35,750.00
44,000.00
55,000.00
2,475
3,218
396
248
4,813.60
660.00
1,100.00
64,860.50
17,050
12,513
1,540
1,650
35,661.40
bh
Kg
32,752.50
8,580.00
12,518.00
9,030.00
1,980.00
9,235.00
5.000
0.850
193,160.20
7,425
5,363
660
743
32,108.00
5.000
1.650
0.0032
0.1000
14,190.00
150,150.00
20,220.20
8,600.00
28,729.80
24,750
3,218
396
248
178,970.20
1.0500
14.1400
0.0400
28,611.00
118.80
28,729.80
24,750
3,218
396
248
118.80
Bahan
Bahan Teraso Cor
28,611.00
118.80
24,750
3,218
396
248
3,300.00
935.00
6,336.00
11,149.60
Pasir Pasang
Semen Warna
0.0022
0.0800
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0900
0.090
0.0090
0.0045
Oh
Oh
Oh
Oh
3.500
0.080
bh
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.0800
0.080
0.0080
0.0040
Oh
Oh
Oh
Oh
215,000.00
1,320.00
473.00
105.60
27,500.00
35,750.00
44,000.00
55,000.00
2,475
3,218
396
248
15,620.00
2,200.00
99,000.00
27,500.00
35,750.00
44,000.00
55,000.00
2,200
2,860
352
220
62,028.00
50.000
11.380
0.042
1.500
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
770.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
1,113.75
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
1,980.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
3,093.75
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
0.6200
0.350
0.0350
Oh
Oh
Oh
105,780.50
17,050
12,513
1,540
1,650
75,503.00
35.000
11.380
0.042
1.500
32,752.50
49,500.00
12,518.00
9,030.00
1,980.00
105,780.50
17,050
12,513
1,540
1,650
73,028.00
16.000
11.380
0.042
1.500
32,752.50
49,500.00
12,518.00
9,030.00
1,980.00
105,285.50
17,050
12,513
1,540
1,650
73,028.00
25.000
11.380
0.042
1.500
32,752.50
49,005.00
12,518.00
9,030.00
1,980.00
94,780.50
17,050
12,513
1,540
1,650
72,533.00
44.000
11.380
0.042
1.500
32,752.50
38,500.00
12,518.00
9,030.00
1,980.00
21,252.00
7,700.00
7,920.00
5,632.00
1,485.00
1,100.00
215,000.00
1,320.00
32,752.50
51,975.00
12,518.00
9,030.00
1,980.00
27,500.00
35,750.00
44,000.00
17,050
12,513
1,540
108,255.50
Mandor
0.0300
Oh
55,000.00
77,433.50
Bahan
Ubin Keramik 33 x 33 cm
Semen Portland
Pasir Pasang
Semen Warna
10.000
11.380
0.042
1.500
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
5,390.55
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
10.000
11.380
0.042
1.500
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
6,588.45
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
Bahan
Mozaik 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
12.000
14.150
0.039
2.000
bh
Kg
m3
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
1,633.50
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
5,500.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
Bahan
Feltex 100% Wool - T - 21
Lem Vinyl
1.050
0.350
m2
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.1700
0.170
0.0170
0.0085
Oh
Oh
Oh
Oh
1.050
0.350
m2
Kg
143,000.00
1,100.00
215,000.00
1,320.00
Tenaga
209,778.50
17,050
12,513
1,540
1,650
219,450.00
176,000.00
99,000.00
11,968.00
231,418.00
184,800.00
34,650.00
27,500.00
35,750.00
44,000.00
55,000.00
4,675
6,078
748
468
127,050.00
88,000.00
99,000.00
32,752.50
150,436.00
15,565.00
8,385.00
2,640.00
27,500.00
35,750.00
44,000.00
55,000.00
125,342.50
17,050
12,513
1,540
1,650
177,026.00
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
32,752.50
66,000.00
15,565.00
8,385.00
2,640.00
110,186.00
17,050
12,513
1,540
1,650
92,590.00
1.052
14.150
0.039
2.000
32,752.50
53,905.50
12,518.00
9,030.00
1,980.00
Bahan
Marmer
Semen Portland
Pasir Pasang
Semen Warna
122,165.00
17,050
12,513
1,540
1,650
77,433.50
33.000
11.380
0.042
1.500
32,752.50
65,884.50
12,518.00
9,030.00
1,980.00
110,186.00
17,050
12,513
1,540
1,650
89,412.50
Bahan
Ubin Keramik 33 x 33 cm anti slip
Semen Portland
Pasir Pasang
Semen Warna
32,752.50
53,905.50
12,518.00
9,030.00
1,980.00
Bahan
Carpet 80% Wool, 20% Nylon
Lem Vinyl
1,650
92,400.00
34,650.00
11,968.00
139,018.00
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.1700
0.170
0.0170
0.0085
Oh
Oh
Oh
Oh
Bahan
Underlyer, tebal 6 mm / Rubber Corrugated
1.050
m2
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.1200
0.120
0.0120
0.0060
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
99,330.00
94,600.00
27,500.00
35,750.00
44,000.00
55,000.00
1.050
0.350
m2
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.1700
0.170
0.0170
0.0085
Oh
Oh
Oh
Oh
27,500.00
99,000.00
27,500.00
35,750.00
44,000.00
55,000.00
m2
Kg
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.6500
0.350
0.0350
0.0325
Oh
Oh
Oh
Oh
176,000.00
99,000.00
27,500.00
35,750.00
44,000.00
55,000.00
0.6200
0.500
0.0500
0.0300
Oh
Oh
Oh
Oh
83.000
9.300
0.018
1.500
Bh
Kg
m3
Kg
0.6200
0.500
0.0500
0.0300
Oh
Oh
Oh
Oh
495.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
Bh
Kg
m3
Kg
0.6000
0.450
0.0450
0.0300
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
1,113.75
1,100.00
215,000.00
1,320.00
17,050
17,875
2,200
1,650
27,500.00
35,750.00
44,000.00
55,000.00
Bh
Kg
m3
Kg
0.6000
0.450
0.0450
Oh
Oh
Oh
36,217.50
102,416.25
16,500
16,088
1,980
1,650
77,336.25
45.000
9.300
0.018
1.500
105,070.00
50,118.75
10,230.00
3,870.00
1,980.00
38,775.00
50,215.00
10,230.00
3,870.00
1,980.00
66,198.75
45.000
9.300
0.018
1.500
95,940.00
17,050
17,875
2,200
1,650
66,295.00
605.00
1,100.00
215,000.00
1,320.00
38,775.00
41,085.00
10,230.00
3,870.00
1,980.00
277,915.00
17,875
12,513
1,540
1,788
57,165.00
Bh
Kg
m3
Kg
33,715.00
184,800.00
59,400.00
75,493.00
4,675
6,078
748
468
244,200.00
1.050
0.600
11,968.00
28,875.00
34,650.00
107,778.00
3,300
4,290
528
330
63,525.00
Bahan
Carpet
Lem Vinyl
8,448.00
99,330.00
Bahan
Porselen 11 x 11 cm putih
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
4,675
6,078
748
468
1,361.25
1,100.00
215,000.00
1,320.00
36,217.50
61,256.25
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
16,500
16,088
1,980
113,553.75
Mandor
0.0300
Oh
55,000.00
76,580.00
50.000
9.300
0.018
1.500
Bh
Kg
m3
Kg
0.6000
0.450
0.0450
0.0300
Oh
Oh
Oh
Oh
25.000
9.300
0.018
1.500
Bh
Kg
m3
Kg
0.6000
0.450
0.0450
0.0300
Oh
Oh
Oh
Oh
1,210.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
Bh
Kg
m3
Kg
0.6000
0.450
0.0450
0.0300
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
7,700.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
Bh
Kg
m3
Kg
0.6000
0.450
0.0450
0.0300
Oh
Oh
Oh
Oh
50.000
9.300
0.018
1.500
Bh
Kg
m3
Kg
0.6000
0.450
0.0450
0.0300
Oh
Oh
Oh
Oh
7,150.00
1,100.00
215,000.00
1,320.00
3,850.00
1,100.00
215,000.00
1,320.00
0.6000
0.450
0.0450
0.0300
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
3,850.00
1,100.00
215,000.00
1,320.00
Bh
Kg
m3
Kg
0.6000
0.100
0.0450
Oh
Oh
Oh
244,797.50
16,500
16,088
1,980
1,650
27,500.00
35,750.00
44,000.00
55,000.00
36,217.50
225,547.50
16,500
16,088
1,980
1,650
112,330.00
25.000
9.300
0.018
1.500
36,217.50
173,250.00
10,230.00
3,870.00
1,980.00
767,297.50
192,500.00
10,230.00
3,870.00
1,980.00
189,330.00
Bh
Kg
m3
Kg
36,217.50
16,500
16,088
1,980
1,650
208,580.00
45.000
9.300
0.018
1.500
822,297.50
16,500
16,088
1,980
1,650
27,500.00
35,750.00
44,000.00
55,000.00
36,217.50
715,000.00
10,230.00
3,870.00
1,980.00
16,500
16,088
1,980
1,650
731,080.00
100.000
9.300
0.018
1.500
112,797.50
770,000.00
10,230.00
3,870.00
1,980.00
36,217.50
60,500.00
10,230.00
3,870.00
1,980.00
786,080.00
100.000
9.300
0.018
1.500
112,797.50
16,500
16,088
1,980
1,650
76,580.00
2,420.00
1,100.00
215,000.00
1,320.00
36,217.50
60,500.00
10,230.00
3,870.00
1,980.00
1,650
3,850.00
1,100.00
215,000.00
1,320.00
23,705.00
96,250.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
16,500
3,575
1,980
136,035.00
Mandor
0.0300
Oh
55,000.00
208,580.00
50.000
9.300
0.018
1.500
Bh
Kg
m3
Kg
0.6000
0.125
0.0125
0.0300
Oh
Oh
Oh
Oh
1.020
12.440
0.025
1.500
M2
Kg
m3
Kg
0.7200
0.650
0.0650
0.0350
Oh
Oh
Oh
Oh
3,850.00
1,100.00
215,000.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
Bh
Kg
m3
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
1,100.00
1,100.00
215,000.00
27,500.00
35,750.00
44,000.00
55,000.00
Bh
Kg
m3
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
1.050
11.750
0.035
Bh
Kg
m3
0.6200
0.350
0.0350
0.0300
Oh
Oh
Oh
Oh
275,000.00
1,100.00
215,000.00
88,000.00
1,100.00
215,000.00
0.1500
0.150
0.0150
0.0075
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
9,900.00
99,000.00
Bh
Kg
0.1500
0.150
0.0150
0.0075
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
8,800.00
99,000.00
Bahan
Vinyl Asbes 30 x 30 cm
Lem Vinyl
Bh
Kg
6,600.00
99,000.00
154,605.00
10,560.00
142,450.00
97,240.00
34,650.00
4,125
5,363
660
413
107,580.00
11.050
0.350
10,560.00
4,125
5,363
660
413
27,500.00
35,750.00
44,000.00
55,000.00
145,602.50
17,050
12,513
1,540
1,650
131,890.00
11.050
0.350
32,752.50
109,395.00
34,650.00
341,952.50
92,400.00
12,925.00
7,525.00
144,045.00
Bh
Kg
32,752.50
17,050
12,513
1,540
1,650
112,850.00
11.050
0.350
139,811.50
17,050
12,513
1,540
1,650
27,500.00
35,750.00
44,000.00
55,000.00
32,752.50
288,750.00
12,925.00
7,525.00
19,800
23,238
2,860
1,925
309,200.00
1.050
11.750
0.035
214,721.50
88,000.00
13,684.00
5,375.00
47,822.50
145,860.00
13,684.00
5,375.00
1,980.00
107,059.00
80.000
12.440
0.025
231,748.75
16,500
4,469
550
1,650
166,899.00
143,000.00
1,100.00
215,000.00
1,320.00
23,168.75
192,500.00
10,230.00
3,870.00
1,980.00
1,650
72,930.00
34,650.00
10,560.00
118,140.00
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
0.1500
0.150
0.0150
0.0075
Oh
Oh
Oh
Oh
27,500.00
35,750.00
44,000.00
55,000.00
125,812.50
11.050
0.350
Bh
Kg
0.1500
0.150
0.0150
0.0075
Oh
Oh
Oh
Oh
8,250.00
99,000.00
27,500.00
35,750.00
44,000.00
55,000.00
m2
Kg
0.7500
0.170
0.0170
0.0085
Oh
Oh
Oh
Oh
19,580.00
6,600.00
27,500.00
35,750.00
44,000.00
55,000.00
Kg
0.1200
0.120
0.0120
0.0060
Oh
Oh
Oh
Oh
30,800.00
27,500.00
35,750.00
44,000.00
55,000.00
Kg
0.1200
0.120
0.0120
0.0060
Oh
Oh
Oh
Oh
30,800.00
27,500.00
35,750.00
44,000.00
55,000.00
VI
m3
Kg
0.1200
0.120
0.0120
0.0060
Oh
Oh
Oh
Oh
27,500,000.00
34,100.00
27,500.00
38,500.00
44,000.00
55,000.00
Kg
0.1500
0.0025
Oh
Oh
Oh
Oh
7,150.00
27,500.00
33,000.00
44,000.00
55,000.00
Kg
0.1500
0.0025
Oh
Oh
Oh
Oh
3,850.00
27,500.00
33,000.00
44,000.00
55,000.00
Kg
0.1500
0.0025
Oh
Oh
Oh
Oh
#VALUE!
4,125
#VALUE!
#VALUE!
138
192.50
0.050
#VALUE!
192.50
#VALUE!
4,125
#VALUE!
#VALUE!
138
192.50
0.050
#VALUE!
357.50
76,483.00
3,300
4,620
528
330
357.50
0.050
8,778.00
66,000.00
1,705.00
PEKERJAAN PENGECATAN
1 m Mengikis / Mengerok Permukaan Cat Tembok Lama
Bahan
Soda Api
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
162,448.00
3,300
4,290
528
330
67,705.00
0.002
0.050
8,448.00
154,000.00
1 m Plint Kayu 2 x 10 cm
Bahan
Papan Kayu Jati
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
100,848.00
3,300
4,290
528
330
154,000.00
5.000
8,448.00
92,400.00
51,106.00
20,625
6,078
748
468
92,400.00
3.000
27,918.00
21,538.00
1,650.00
136,372.50
4,125
5,363
660
413
23,188.00
1.100
0.250
10,560.00
91,162.50
34,650.00
4,125
5,363
660
413
3,850.00
#VALUE!
#VALUE!
192.50
27,500.00
33,000.00
44,000.00
55,000.00
4,125
#VALUE!
#VALUE!
138
192.50
#VALUE!
#VALUE!
Sabun
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
0.050
Kg
0.1500
0.0025
Oh
Oh
Oh
Oh
3,850.00
192.50
27,500.00
33,000.00
44,000.00
55,000.00
1 m Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2 .
Bahan
Pasir Silika
BBM
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
40.000
10.000
Kg
Ltr
13,200.00
4,950.00
1.6000
1.600
0.8000
0.5000
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
737,000.00
44,000
52,800
35,200
27,500
2,464.00
0.080
0.020
0.010
Kg
Kg
Kg
0.0400
0.040
0.0040
0.0025
Oh
Oh
Oh
Oh
23,100.00
27,500.00
6,600.00
27,500.00
33,000.00
44,000.00
55,000.00
Kg
Kg
Kg
0.0700
0.075
0.0075
0.0025
Oh
Oh
Oh
Oh
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
0.200
0.150
0.170
0.260
Kg
Kg
Kg
Kg
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
0.0700
0.009
0.0060
0.0025
Oh
Oh
Oh
Oh
19,800.00
11,000.00
13,200.00
0.200
0.150
0.170
0.350
Kg
Kg
Kg
Kg
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
0.0700
0.105
0.0040
0.0025
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
0.200
0.150
0.170
0.350
Kg
Kg
Kg
Kg
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
0.0700
0.105
0.0040
0.0025
Oh
Oh
Oh
Oh
Ltr
17,765.00
16,500.00
19,800.00
11,000.00
27,500.00
5,703.50
23,468.50
3,300.00
2,970.00
1,870.00
9,625.00
27,500.00
33,000.00
44,000.00
55,000.00
1,925
3,465
176
138
17,765.00
16,500.00
19,800.00
11,000.00
27,500.00
5,703.50
23,468.50
3,300.00
2,970.00
1,870.00
9,625.00
27,500.00
33,000.00
44,000.00
55,000.00
22,000.00
17,913.50
1,925
297
264
138
1,925
3,465
176
138
7,920.00
0.360
2,623.50
3,300.00
2,970.00
1,870.00
7,150.00
27,500.00
33,000.00
44,000.00
55,000.00
11,951.50
1,925
2,475
330
138
15,290.00
16,500.00
19,800.00
11,000.00
27,500.00
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
4,867.50
2,970.00
1,870.00
2,244.00
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
5,197.50
1,100
1,320
176
138
7,084.00
0.150
0.170
0.170
2,733.50
1,848.00
550.00
66.00
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
Teak Oil
Tenaga
159,500.00
sewa / Hr
577,500.00
528,000.00
49,500.00
4,125
#VALUE!
#VALUE!
138
7,920.00
6,088.50
14,008.50
Perkerja
Tukang Cat
Kepala Tukang
Mandor
0.0400
0.063
0.0630
0.0025
Oh
Oh
Oh
Oh
0.150
0.372
2.000
Ltr
Ltr
Lbr
0.0400
0.063
0.0630
0.0025
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
49,511.00
38,500.00
88,000.00
5,500.00
27,500.00
33,000.00
44,000.00
55,000.00
Ltr
0.1000
0.0060
Oh
Oh
Oh
Oh
15,400.00
27,500.00
33,000.00
44,000.00
55,000.00
Ltr
Kg
Lbr
Bh
0.1600
0.160
0.0160
0.0025
Oh
Oh
Oh
Oh
34,100.00
23,100.00
5,500.00
7,700.00
0.100
0.100
0.260
Kg
Kg
Kg
0.0200
0.063
0.0063
0.0025
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
19,800.00
11,000.00
13,200.00
Lbr
ikat
m3
Kg
0.1500
0.001
0.0001
0.0025
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
5,500.00
6,600.00
1,485,000.00
880.00
27,500.00
33,000.00
44,000.00
55,000.00
m3
Kg
0.0400
0.005
0.0005
0.0025
Oh
Oh
Oh
Oh
1,485,000.00
880.00
m3
Kg
0.0200
0.200
0.0020
0.0025
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
38,500.00
8,800.00
Bahan
Meni Besi
Kuas
Kg
Bh
16,500.00
7,700.00
4,658.50
7,375.50
55,335.50
46,200.00
1,760.00
550
6,600
88
138
1,727.00
0.100
0.010
1,424.50
1,100
165
22
138
27,500.00
33,000.00
44,000.00
55,000.00
9,601.90
4,125
33
4
138
47,960.00
1.200
0.200
4,299.90
2,970.00
264.00
550
2,079
277
138
3,234.00
0.002
0.300
9,555.70
550.00
1,650.00
2,970.00
132.00
3,043.70
1,980.00
1,100.00
3,432.00
5,302.00
0.100
0.250
0.002
0.150
17,418.50
4,400
5,280
704
138
6,512.00
10,521.50
5,115.00
1,155.00
550.00
77.00
1 m Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Bahan
Plamir
Cat Dasar
Cat Tembok vinilex
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
#VALUE!
2,750
#VALUE!
#VALUE!
330
6,897.00
0.150
0.050
0.100
0.010
#VALUE!
5,390.00
55,599.50
1,100
2,079
2,772
138
5,390.00
0.350
6,088.50
5,775.00
32,736.00
11,000.00
1,100
2,079
2,772
138
1,650.00
77.00
8,580.00
10,307.00
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
0.0200
0.200
0.0200
0.0100
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
4,697.00
0.100
0.010
0.002
Kg
Bh
m3
0.2500
0.225
0.0225
0.0075
Oh
Oh
Oh
Oh
16,500.00
7,700.00
1,485,000.00
0.100
0.100
0.040
0.040
0.010
0.002
Kg
Kg
Kg
Kg
Ltr
m3
0.0060
0.006
0.0225
0.0075
Oh
Oh
Oh
Oh
27,500.00
33,000.00
44,000.00
55,000.00
9,900.00
12,100.00
27,500.00
29,700.00
6,600.00
1,485,000.00
0.300
Kg
0.0060
0.060
0.0120
0.0060
Oh
Oh
Oh
Oh
0.110
0.170
0.080
Kg
Kg
Kg
0.5000
0.800
0.3000
0.2000
Oh
Oh
Oh
Oh
6,875
7,425
990
413
7,524.00
27,500.00
33,000.00
44,000.00
55,000.00
0.300
Kg
0.4000
0.700
0.2000
0.2000
Oh
Oh
Oh
Oh
9,289.50
3,003.00
7,953.00
4,950.00
27,500.00
33,000.00
44,000.00
55,000.00
11,000.00
11,000.00
13,200.00
165
1,980
528
330
4,136.00
64,350.00
68,486.00
1,210.00
1,870.00
1,056.00
27,500.00
33,000.00
44,000.00
55,000.00
13,750
26,400
13,200
11,000
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um3,300.00
Bahan
Cat Dasar
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1,765.50
165
198
990
413
4,950.00
16,500.00
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um
Bahan
Cat Dasar
Cat Antara
Cat Penutup
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
20,399.50
990.00
1,210.00
1,100.00
1,188.00
66.00
2,970.00
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um
Bahan
Meni Besi
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
15,702.50
1,650.00
77.00
2,970.00
1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um
Bahan
Meni ( Read Lead ) A
Meni ( Read Lead ) B
Alluminium C
Alluminium B
Pengencer
Perancah Kayu
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
550
6,600
880
550
11,000.00
53,900.00
3,300.00
27,500.00
33,000.00
44,000.00
55,000.00
11,000
23,100
8,800
11,000
57,200.00
NO
JENIS UPAH
SPESIFIKASI
Pekerja / knek
Tukang gali
Kepala tukang batu
Tukang batu
Kepala tukang kayu
Tukang kayu
Kepala tukang besi
Tukang besi
Kepala tukang cat
Tukang Cat
Tukang aspalt
Mandor/ pengawas
Instalator
Pembantu instalator
Tukang babat rumput
Tukang taman
Kepala tukang pasang pipa
Tukang pasang pipa
Operator alat besar
Pembantu operator alat besar
Tukang las
NO
JENIS BAHAN
Akustik 30 x 30 cm
Akustik 30 x 60 cm
Akustik Arm Strong Ukuran 30 x 120 cm
Akustik Armstrom 60 x 120cm
Alang - alang
Alluminium B
Alluminium C
Ampelas
Asbes
Asbes Gelombang
Atap Alluminium Gelombang tebal 0.55
Badkip
Bahan Teraso Cor
Bak Teraso
Bak cuci Stainless steel
Bak cuci Teraso
Bak Fiberglass
Balok Kayu Borneo
Balok Kayu Jati
Balok Kayu Kamper
Balok Kayu Kruing
harga real
SATUAN
Rp
55,798.00 Oh
Rp
65,734.00 Oh
Rp
75,671.00 Oh
Rp
65,734.00 Oh
Rp
75,671.00 Oh
Rp
65,734.00 Oh
Rp
75,671.00 Oh
Rp
65,718.00 Oh
Rp
75,671.00 Oh
Rp
65,734.00 Oh
Rp
65,734.00 Oh
Rp
85,607.00 Oh
Rp
75,671.00 Oh
Rp
65,718.00 Oh
Rp
55,798.00 Oh
Rp
65,734.00 Oh
Rp
65,734.00 Oh
Rp
55,798.00 Oh
Rp
85,607.00 Oh
Rp
65,734.00 Oh
Rp
65,734.00 Oh
SPESIFIKASI
harga real
SATUAN
Rp
lbr
Rp
lbr
Rp
lbr
Rp
lbr
Rp
ikat
Rp
Kg
Rp
Kg
Rp
Lbr
Rp
lbr
Rp
lbr
Rp
m2
Rp
bh
Rp
m3
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
m3
Rp
m3
Rp
m3
Rp
m3
Bambu 6 - 8 / 600 cm
Rp
btg
Rp
bh
Rp
Bh
Rp
Kg
Rp
Kg
Rp
m3
Rp
m3
Rp
m3
Rp
Kg
Rp
m3
Rp
m3
Rp
Bh
Rp
Bh
Rp
Kg
Rp
Ltr
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
m2
Rp
m2
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
btg
Rp
btg
Rp
btg
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
m2
Rp
Kg
Rp
Kg
Rp
lbr
Rp
bh
Rp
lbr
Rp
lbr
Rp
bh
Rp
bh
Rp
lbr
Rp
bh
Rp
lbr
Rp
bh
Rp
bh
Door Closer
Door Holder
Door Stop
Engsel Angin
Engsel Jendela
Engsel Pintu
Feltex 100% Wool - T - 21
Flincote / Meni Besi
Floor Hardener Ferrovax
Formika 4' x 3'
Formtie / penjaga jarak bekisting
Genteng Aspal
Genteng Beton
Genteng Bubung Kodok
Genteng Bubung Palentong
Genteng Decra Bond
Genteng Kodok
Genteng Metal
Genteng Palentong
Genteng Palentong Super
vinilex
Genteng Sirap
Gypsum
Ijuk
Jendela Besi
Jendela Besi Tahan Api
Jendela Nako
Kaca Buram
Kaca Cermin
Kaca Patri
Kaca Polos
Kaca Wireglass
Kait Angin
Kapur Padam
Kapur Sirih
Kaso 5 / 7 ( albasiah )
Kawat Beton
Kawat Burung
Kawat Duri
Kawat Harmonika
Kawat Kassa
Kawat Nyamuk
Kawat seng polos
Kayu Albasiah
Kayu Balok Borneo
Kayu Balok Damar Laut
Kayu Balok Jati
Kayu Kaso 5 / 7 (borneo)
Kayu Papan 3 / 20 borneo
Kayu Profil
Kayu Terentang
Keramik 10 x 20 cm
Keramik 15 x 15 cm
Keramik 20 x 20 cm
Keramik Artistik 10 x 20 cm
Keramik Artistik 5 x 20 cm
Kloset Duduk / Monoblok
Kloset Jongkok Porselen
Kloset Jongkok Teraso
Kompresor, Blasting Pot , Selang Dan Nozzle
Koral Beton
Kran Air
Kuas
Kunci Lemari
Kunci Selot
Kunci Tanam
Kunsi Silinder
Kunsi Tanam Antik
Kunsi Tanam Biasa
Kunsi Tanam Kamar Mandi
Lem
Lem Kayu
Lem Vinyl
List Kayu Profil
Lt. Vinyl Karet 30 x 30 kwl I
Rp
lbr
Rp
lbr
Rp
m3
Rp
m2
Rp
m2
Rp
bh
Rp
m2
Rp
m2
Rp
m2
Rp
m2
Rp
m2
Rp
Bh
Rp
m3
Rp
Kg
Rp
m3
Rp
Kg
Rp
m2
Rp
Kg
Rp
m2
Rp
m2
Rp
m2
Rp
Kg
Rp
m3
Rp
m3
Rp
m3
Rp
m3
Rp
m3
Rp
m3
Rp
m'
Rp
m3
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
bh
Rp
bh
Rp
bh
Rp
hr
Rp
m3
Rp
bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Kg
Rp
Lt
Rp
Kg
Rp
m'
Rp
bh
Marmer
Meni ( Read Lead ) A
Meni ( Read Lead ) B
Meni Besi
Minyak Bekisting
Minyak Cat
Mozaik 30 x 30 cm
Nok Paten
Nok standar 40 cm 18, swg 22
Nok Stel rata
Paku
Paku Biasa " - 1"
Paku Biasa " - 1" atau Sekrup
Rp
M2
Rp
Kg
Rp
Kg
Rp
Lt
Rp
lt
Rp
Kg
Rp
bh
Rp
lbr
Rp
m2
Rp
lbr
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
m3
Rp
m3
Rp
m3
Rp
m3
Rp
lbr
Rp
m2
Rp
m3
Rp
m3
Rp
Kg
Rp
m3
Rp
m3
Rp
Kg
Rp
lbr
Rp
lbr
Rp
Ltr
Rp
Ltr
Rp
Ltr
Rp
m3
Rp
Kg
Rp
m2
Rp
m2
Rp
m2
Rp
m2
Rp
bh
Rp
m'
Rp
bh
Rp
Kg
Rp
Kg
Rp
Bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
lbr
Rp
lbr
Rp
bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Bh
Rp
m'
Rp
bh
Rp
gln
Rp
Bh
Rp
Lt
Rp
Ltr
Rp
m2
Rp
lbr
Rp
Kg
Rp
bh
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Kg
Rp
Lbr
Rp
lbr
Rp
lbr
Rp
Lbr
Rp
Lbr
Rp
m2
Rp
Kg
Rp
lbr
Rp
Bh
Rp
Kg
Rp
m2
Rp
Kg
Rp
Ltr
Rp
lbr
Rp
m'
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
m2
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
bh
Rp
m2
Rp
bh
Rp
m2
Rp
Ltr
Rp
Bh
Rp
Bh
Rp
Bh
Rp
Rp
Bh
m2
Rp
m3
Rp
set
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'
Rp
m'