PEMBEBANAN
A Beban Mati
a Beban Mati Bentang 1
1 Girder
2 Diafragma
3 Rangka
4 Pelat
5 Langit langit lengkap
6 R1
7 Canal
8 Bracing
9 Atap
0.823
=
=
=
=
=
=
=
=
=
8*0,3167*23*2,6
7*(2*0,6+0,3)*1,9*1,25*2,5
0,15*23*1,5*2,5
23*15/0,707*0,015*2
15/0,707*9*0,0182
24*23*0,00576
8*7*2*3/0,5*0,0015800
23*15/0,707*0,020
=
=
=
=
=
=
=
151.509
62.344
60.000
12.938
14.639
3.475
3.180
1.062
9.760
318.906
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
Ton
318.906 Ton
Pier head
Kolom
Footing
Tie beam
=
=
=
=
15*0,7*1,25*2,5
(0,6*0,6+0,6*1,2)/2*5,050*3*2,5
2,1*2,4*0,9*3*2,5
0,6*0,6*12*2,5
c Beban Tanah
1 Beban tanah footing = 2,1*2,4*1*3*1,8
2 Beban Tanah tie beam 0,6*0,6*12*1,8
=
=
=
=
=
32.813
20.453
34.020
10.800
98.085
Ton
Ton
Ton
Ton
Ton
=
=
27.216
7.776
34.992
Ton
Ton
Ton
=
=
103.500
0.000
Ton
Ton
103.500
Ton
B Beban Hidup
Beban merata
0.300
Ton/m2
Beban Titik
Faktor Kejut
=
=
0.000
0.000
Ton/m1
= 15*23*0,3
= 0.000
Beban Hidup Bentang 1
Beban Total
318.906 Ton
98.085 Ton
34.992 Ton
103.500 Ton
555.483 Ton
Ton
Ton