DAFTAR

SUMBER DATA
D A E R A H

:
:

SEWA

P E R A L A T AN

PASARAN BEBAS
KOTA SEMARANG
EDISI JANUARI 2013

NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

PERALATAN

Dump Truck
3 ton
Dump Truck
5 ton
Truk Bak Terbuka
Truk Tanki Air
Bulldozer
Motor Grader
Wheel Loader
Excavator
Crane
Trailler
Mesin Gilas Tandem 6 - 10 ton
Mesin Gilas 3 roda 6 - 10 ton
Mesin Gilas Roda Karet 8 - 10 ton
Vibratory Roller
Vibro roller 1 ton
Water Pump
Asphalt Sprayer
Pick Up
AMP
Asphalt Finisher
Concrete Vibrator
Compressor
Concrete Mixer
Stamper
Genset
Alat Pengecat Marka

SATUAN

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam

MINIMUM
(Rp)

HARGA
MAKSIMUM
(Rp)

110,000
160,000
100,000
140,000
380,000
170,000
190,000
420,000
1,450,000
280,000
140,000
150,000
170,000
40,000
40,000
15,000
35,000
40,000
3,500,000
520,000
40,000
100,000
65,000
30,000
150,000
75,000

125,000
180,000
130,000
160,000
410,000
190,000
200,000
440,000
1,500,000
300,000
160,000
160,000
190,000
55,000
55,000
25,000
45,000
55,000
3,750,000
580,000
46,000
115,000
75,000
40,000
180,000
80,000

KET.

DAFTAR
SUMBER DATA
D A E R A H

:
:

UPAH PEKERJA
PASARAN BEBAS
KOTA SEMARANG
EDISI JANUARI 2013
HARGA

NO.

JENIS

BAHAN

SATUAN

MINIMUM
(Rp)

MAKSIMUM
(Rp)

Pekerja

Hr

40,000

42,000

Mandor

Hr

55,000

60,000

Tukang listrik

Hr

55,000

60,000

Tukang kayu

Hr

55,000

60,000

tukang kayu

Hr

70,000

65,000

Tukang batu

Hr

55,000

60,000

Kep. tk. batu

Hr

60,000

65,000

Tukang besi

Hr

55,000

60,000

Kep. tk. besi

Hr

60,000

65,000

10

Tukang cat

Hr

55,000

60,000

11

Kep. tk. cat

Hr

60,000

65,000

12

Tukang plitur

Hr

55,000

60,000

13

Tukang jalan

Hr

40,000

42,000

14

Tukang gali

Hr

40,000

42,000

15

Tukang masak aspal

Hr

40,000

42,000

16

Tk. leideng

Hr

55,000

60,000

17

Masinis

Hr

100,000

125,000

18

Pemb. Masinis

Hr

40,000

50,000

19

Penjaga api

Hr

45,000

50,000

20

Penjaga malam

Hr

40,000

42,000

21

Sopir

Hr

60,000

70,000

22

Pembantu Sopir

Hr

40,000

42,000

149235156.xlsx.ms_office

83

KET.

daftar upah tenaga kerja

DAFTAR

SUMBER

HARGA

SATUAN BAHAN

DATA

D A E R A H

BANGUNAN

PASARAN

KOTA SEMARANG

BEBAS

EDISI JANUARI 2013


HARGA
NO.

J E N I S

BAHAN
1

B A H A N

MINIMUM

MAKSIMUM

(Rp)

(Rp)

DASAR

BATU KALI

Bulat Utuh

m3

120,000

140,000

Bulat Belah

m3

150,000

160,000

10/15

m3

160,000

170,000

batu pecah

5/7

m3

165,000

180,000

batu pecah

3/5

m3

155,000

175,000

Timbun

m3

95,000

110,000

Sawur / Koral

m3

160,000

175,000

Batu pecah

SATUAN

KERIKIL

Beton

0,5/1

m3

185,000

200,000

Beton

,1/2

m3

180,000

200,000

Beton

,2/3

m3

180,000

190,000

Biasa

m3

120,000

135,000

Tras Giling

m3

205,000

215,000

ex lokal

bh

450

500

PASIR

Urug

m3

100,000

125,000

pasir muntilan

Pasang

m3

135,000

170,000

pasir gunung merapi

Beton

m3

195,000

210,000

TANAH

Padas

m3

50,000

60,000

Liat

m3

40,000

55,000

Pasang

m3

210,000

225,000

Semen Merah

m3

150,000

170,000

portland cement holcim

zak

49,000

51,000

portland cement cibinong

zak

48,500

50,500

portland cement tiga roda

zak

48,000

50,000

portland cement gresik

zak

48,500

50,000

portland semen padang

zak

50,000

52,000

semen putih

zak

78,000

82,000

semen warna

kg

10,000

15,000

BATU BATA
batu bata maron

KAPUR

PORTLAND CEMENT

II

BAHAN

PENUTUP ATAP

SIRAP

(100 lbr)

pak

155,000

165,000

GENTENG BETON

Genteng Beton Warna standard

bh

3,000

3,500

GENTENG BETON

Genteng Beton Warna Special

bh

4,200

4,700

GENTENG BETON

Genteng Beton Warna Khusus

bh

4,700

5,100

GENTENG BETON

Kerpus Beton Warna Standard

bh

3,750

4,200

GENTENG BETON

Kerpus Beton Warna Special

bh

4,500

4,800

GENTENG BETON

Kerpus Beton Warna Khusus

bh

8,700

10,000

GENTENG TANAH LIAT

Vlaam

bh

1,200

1,300

GENTENG TANAH LIAT

Kodok

bh

1,500

1,800

GENTENG TANAH LIAT

Kodok Glasur

bh

2,750

3,000

GENTENG TANAH LIAT

Nok kerpus Kodok

bh

5,000

5,500

GENTENG TANAH LIAT

Nok kerpus Kodok Glasur

bh

7,000

8,000

GENTENG TANAH LIAT

Plentong super besar 18 bh/m2

bh

3,000

4,500

Nok kerpus plentong super

bh

8,000

8,500

149235156.xlsx.ms_office

GENTENG TANAH LIAT

3/83

daftar harga bahan

HARGA
NO.

J E N I S

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

GENTENG KACA
genteng kacaVlaam tebal 2 mm

Vlaam tebal 2 mm

bh

8,500

9,000

genteng kacaVlaam tebal 3 mm

Vlaam tebal 3 mm

bh

11,500

12,000

genteng kacaKodok tebal 2 mm

Kodok tebal 2 mm

bh

9,000

10,000

genteng kacaKodok tebal 3 mm

Kodok tebal 3 mm

bh

12,000

12,500

Asbes Gelombang besar . 200 cm X 102 cm X 5 mm

. 200 cm X 102 cm X 5 mm

bh

70,000

72,000

Asbes Gelombang besar . 250 cm X 102 cm X 5 mm

. 250 cm X 102 cm X 5 mm

bh

70,000

81,000

Asbes Gelombang besar . 225 cm X 102 cm X 5 mm

. 225 cm X 102 cm X 5 mm

bh

73,500

78,000

Asbes Gelombang besar . 200 cm X 102 cm X 6 mm

. 200 cm X 102 cm X 6 mm

bh

65,000

72,000

Asbes Gelombang besar . 225 cm X 102 cm X 6 mm

. 225 cm X 102 cm X 6 mm

bh

62,500

65,000

Asbes Gelombang besar . 250 cm X 102 cm X 6 mm

. 250 cm X 102 cm X 6 mm

bh

66,500

73,500

ASBES GELOMBANG BESAR

Asbes Gelombang Kecil


Asbes Gelombang Kecil . 150 cm X 105 cm X 4 mm

. 150 cm X 105 cm X 4 mm

bh

37,000

40,000

Asbes Gelombang Kecil . 180 cm X 105 cm X 4 mm

. 180 cm X 105 cm X 4 mm

bh

42,000

47,000

Asbes Gelombang Kecil . 210 cm X 105 cm X 4 mm

. 210 cm X 105 cm X 4 mm

bh

51,000

55,000

Asbes Gelombang Kecil . 240 cm X 105 cm X 4 mm

. 240 cm X 105 cm X 4 mm

bh

60,000

62,500

Asbes Gelombang Kecil . 270 cm X 105 cm X 4 mm

. 270 cm X 105 cm X 4 mm

bh

68,000

72,000

Asbes Gelombang Kecil . 300 cm X 105 cm X 4 mm

. 300 cm X 105 cm X 4 mm

bh

70,000

76,000

NOK

Jabes nok
. Kerpus Genteng

bh

22,500

25,000

. Stel Besar

bh

42,000

45,000

. Paten Besar

bh

39,000

43,500

. Stel Besar

bh

37,500

44,000

. Patent Besar

bh

17,300

21,000

. Plat besar

bh

47,000

51,000

. 100cm X 100 cm X 3 mm

bh

15,000

17,000

. 100cm X 100 cm X 4 mm

bh

16,000

18,500

. 50 cm X 200 cm X 3 mm

bh

12,000

13,000

. 40 cm X 200 cm X 3 mm

bh

12,000

13,000

180 X 92 cm

bh

36,000

45,000

200 X 92 cm

bh

42,000

48,000

250 X 92 cm

bh

53,000

65,000

180 X 105 cm

bh

57,000

60,000

210 X 105 cm

bh

50,000

66,500

250 X 105 cm

bh

60,000

76,000

BJLS 0,18 lebar 55 cm

m'

20,000

22,000

BJLS 0,20 lebar 55 cm

m'

23,000

28,000

BJLS 0,28 lebar 55 cm

m'

33,000

36,000

BJLS 0,30 lebar 55 cm

m'

38,000

41,000

BJLS 0,18 panjang 180 cm

lbr

52,000

57,000

BJLS 0,20 panjang 180 cm

lbr

57,000

60,000

BJLS 0,30 panjang 180 cm

lbr

65,000

67,000

BJLS 0,40 panjang 180 cm

lbr

73,000

75,000

Papan

m3

21,000,000

22,000,000

Balok/pesagen

m3

19,000,000

20,000,000

Nokstel gelombang harflex

ASBES PLAT

FIBRE GLASS (JABES)

SENG PLAT

SENG GELOMBANG

III . B A H A N K A Y U
1

149235156.xlsx.ms_office

JATI

4/83

daftar harga bahan

HARGA
NO.

J E N I S

B A H A N

KAMPER

KRUING

MERANTI

LANAN

BENGKIRAI

DOLKEN

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

Papan

m3

7,300,000

7,500,000

Balok/pesagen

m3

6,700,000

7,100,000

Papan

m3

5,000,000

5,400,000

Balok/pesagen

m3

4,800,000

5,200,000

Papan

m3

4,700,000

4,800,000

Balok/pesagen

m3

4,400,000

4,600,000

Papan

m3

1,950,000

2,100,000

Balok/pesagen

m3

1,700,000

1,750,000

Papan

m3

9,500,000

9,600,000

Balok/pesagen

m3

8,800,000

9,000,000

Sedang 8 x 10 x 400 cm

bt

18,000

20,000

Kecil 6 x 7 x 400 cm

bt

15,000

16,000

Besar 10 x 12 x 400 cm

bt

26,000

28,000

Kayu cetakan

m3

1,050,000

1,100,000

Kayu bakar

m3

150,000

165,000

Bambu

bt

10,000

15,000

30 X 30 cm

m2

34,000

34,000

20 X 20 cm

m2

32,000

35,000

30 X 30 cm

m2

32,000

36,000

20 X 20 cm

m2

32,000

34,000

30 X 30 cm

m2

39,000

42,000

IV . BAHAN PENUTUP DINDING / LANTAI


1

UBIN (TEGEL BIASA)


PC polos

PC warna

Teraso
2

TEGEL PLINT
PC warna

10 X 20 cm

bh

5,000

5,500

PC abu-abu

15 x 20

bh

4,500

6,000

POLIS UBIN

Lantai/badan

m'

Plint

m'

Trap

m'

11 X 11 putih

dos

30,000

33,000

11 X 11 warna

dos

30,000

34,000

15 X 15 putih

dos

34,000

36,000

15 X 15 warna

dos

37,000

38,000

10 X 20 cm

m2

37,000

38,000

15 X 15 cm

m2

36,000

42,000

20 X 20 cm

m2

38,000

41,000

20 X 25 cm

m2

35,000

42,000

30 X 30 cm

m2

36,500

42,000

20 X 20 cm

m2

35,000

39,500

33 x 33 cm

m2

34,000

42,000

25 x 25 cm

m2

35,000

41,500

15 x 20 cm

m2

35,000

42,000

UBIN PORSELIN
Lokal

Lokal

MOZAIK PORSELIN

Keramik

Parquet Jati

m2

160,000

175,000

Batu Paros

m2

75,000

78,000

Batu Tempel Hitam

m2

72,500

80,000

149235156.xlsx.ms_office

5/83

daftar harga bahan

HARGA
NO.

J E N I S

B A H A N

10 GRANITO

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

40 x 40 cm

m2

195,000

210,000

30 x 30 cm

m2

230,000

250,000

m2

300,000

325,000

11 Marmer

V.BAHAN CETAK
1

BUIS BETON

10 cm - 100 cm

bh

22,000

28,000

20 cm - 100 cm

bh

30,000

33,000

30 cm - 100 cm

bh

38,000

42,000

50 cm - 100 cm

bh

70,000

80,000

60 cm - 100 cm

bh

75,000

95,000

70 cm - 100 cm

bh

110,000

130,000

10 cm - 100 cm

bh

17,000

18,000

15 cm - 100 cm

bh

22,000

25,000

20 cm - 100 cm

bh

30,000

32,000

30 cm - 100 cm

bh

35,000

37,000

50 cm - 100 cm

bh

10 X 20 cm

bh

5,000

5,400

20 X 20 cm

bh

5,500

6,200

25 X 25 cm

bh

6,250

6,700

30 X 30 cm

bh

6,300

7,200

15 X 25 cm

bh

6,500

7,500

15 X 30 cm

bh

7,000

7,600

besi beton polos

kg

10,000

10,500

besi beton prestress

kg

15,500

17,200

besi beton ulir

kg

12,300

13,000

LUBANG ANGIN (ROSTER) PC + PASIR

VI . B A H A N B E S I
1

BESI BETON

BESI PLAT

Besi Strip

kg

13,000

14,000

BESI PROFIL

Besi Profil

kg

13,500

14,250

JARING - JARING BAJA

Diameter

4 - 15

kg

14,000

15,500

Diameter

6 - 15

kg

14,000

15,500

Kawat Bronjong

kg

15,000

17,000

40 X 40 X 4

btg

130,000

135,000

50 X 50 X 5

btg

205,000

210,000

60 X 60 X 6

btg

299,000

310,000

KAWAT - Ikat beton/bendrat

kg

15,000

17,000

- Harmonika 12 X 45 mm

m2

20,000

21,000

- Harmonika 12 X 24 mm

m2

22,000

22,500

- Harmonika 14 X 30 mm

m2

19,000

20,000

- Harmonika 14 X 35 mm

m2

17,500

19,000

- Kawat Nyamuk Nylon

m2

9,000

10,000

- Kawat Kasa

m2

12,000

13,000

- Saringan pasir

m2

10,500

15,000

- Kawat loket

m2

10,500

12,000

- Kawat duri

rol

70,000

75,000

- Kawat bronjong

kg

15,000

17,000

Pipa PVC DN 20 ( " ) AW JIS

btg

18,000

20,000

Pipa PVC DN 25 ( " ) AW JIS

btg

22,500

24,000

Pipa PVC DN 32 ( 1" ) AW JIS

btg

27,500

29,000

Pipa PVC DN 40 ( 1" )

btg

35,000

40,000

BESI SIKU

VII . B A H A N P I P A
1

149235156.xlsx.ms_office

Pipa PVC SII SCJ , S - 12,5 (10 bar)

6/83

daftar harga bahan

HARGA
NO.

J E N I S

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

Pipa PVC DN 63 ( 2" )

btg

60,000

76,400

Pipa PVC DN 90 ( 3" )

btg

122,500

125,000

Pipa PVC DN 110 ( 4" )

btg

150,000

170,000

Pipa PVC DN 160 ( 6" )

btg

325,000

423,000

Pipa PVC DN 200 ( 8" )

btg

590,000

660,000

Pipa PVC DN 250 ( 10" )

btg

1,010,000

1,025,000

Pipa PVC DN 315 ( 12" )

btg

1,380,000

1,390,000

Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN "

btg

75,000

80,000

Pipa Medium B Galvanis DN 25 ( " )

btg

117,000

122,000

Pipa Medium B Galvanis DN 32 ( 1" )

btg

130,000

135,000

Pipa Medium B Galvanis DN 50 ( 1" )

btg

190,000

195,000

Pipa Medium B Galvanis DN 63 ( 2" )

btg

225,000

245,000

Pipa Medium B Galvanis DN 2"

btg

380,000

400,000

Pipa Medium B Galvanis DN 90 ( 3" )

btg

470,000

500,000

Pipa Medium B Galvanis DN 110 ( 4" )

btg

585,000

610,000

Pipa Medium B Galvanis DN 160 ( 6" )

btg

Pipa Medium B Galvanis DN 200 ( 8" )

btg

Pipa Medium B Galvanis DN 250 ( 10")

btg

VIII . B A H A N L A N G I T - L A N G I T
1

AKUSTIK-uk :

30 X 30

lbr

4,700

5,000

30 X 60

lbr

11,000

12,000

60 X 120

lbr

37,000

38,000

m'

4,200

5,000

List Kayu Profil


2

SOFT BOARD-uk:

4'X 8'
lbr

45,000

55,000

4'X 8'

lbr

60,000

62,000

Gypsum tebal 9 mm
3

HARD BOARD-uk:

PLY WOOD
Teak wood
90 X 210

X 3 mm

lbr

40,000

45,000

. 120 X 240

X 3 mm

lbr

75,000

87,500

. 90 X 210

X 4 mm

lbr

55,000

60,000

. 90 X 210

X 9 mm

lbr

145,000

160,000

. 90 X 210

X 12 mm

lbr

170,000

180,000

. 90 X 210

X 15 mm

lbr

220,000

245,000

. 90 X 210

X 18 mm

lbr

270,000

290,000

. 120 X 240

X 3 mm

lbr

45,000

46,000

. 120 X 240

X 4 mm

lbr

55,000

57,000

. 120 X 240

X 6 mm

lbr

65,000

75,000

. 120 X 240

X 9 mm

lbr

105,000

110,000

. 120 X 240

X 12 mm

lbr

135,000

145,000

. 120 X 240

X 15 mm

lbr

160,000

170,000

. 120 X 240

X 18 mm

lbr

195,000

205,000

lbr

45,000

60,000

Menie

kg

15,000

16,000

Dempul plamur

kg

14,000

15,000

Ambril/amplas

lbr

3,500

3,700

Batu Apung

kg

5,500

6,500

Cat dasar

kg

13,200

16,000

. Emco

kg

42,000

46,500

. Yunior 66 (nippon paint)

kg

42,000

48,000

Tripleks

Multipleks

Formika ukuran pintu

IX . B A H A N F I N I S H I N G
1

149235156.xlsx.ms_office

KAYU

7/83

daftar harga bahan

HARGA
NO.

J E N I S

B A H A N

SATUAN

MAKSIMUM

(Rp)

(Rp)

. Deculux

kg

45,000

47,000

. Siralax

ons

8,000

10,500

. Spiritus

ltr

9,000

11,000

. Plitur jadi

ltr

52,000

62,000

Kalkarium

kg

4,000

4,200

Kapur sirih

kg

4,500

4,750

Plamur

kg

10,500

12,000

TEMBOK

kg

15,000

19,000

Sintex

5 kg

65,000

68,000

Danabride

5 kg

80,000

90,000

Catylac

5 kg

90,000

98,000

Mowilex

5 kg

210,000

225,000

Cat Tembok

MINIMUM

BESI
Menie

kg

15,000

20,000

Cat mengkilat

kg

48,000

52,000

Cat

kg

13,000

16,000

Thinner A

ltr

8,000

11,000

Minyak cat

ltr

7,000

11,250

Thinner Super

ltr

8,000

12,000

37,500

60,000

Residu (teer/aspal)

drum

Fibre glass (tanki air)


kapasitas 550 liter.

bh

575,000

675,000

kapasitas 1100 liter.

bh

1,050,000

1,200,000

Lem Aica Aibon

kg

32,000

35,000

3 mm

m2

55,000

60,000

5 mm

m2

65,000

72,500

3 mm

m2

70,000

78,000

5 mm

m2

80,000

88,000

3 mm

m2

60,000

68,000

5 mm

m2

70,000

78,000

X.BAHAN KACA
1

POLOS

ES KABUR

RAY BAND

XI . BAHAN INSTALASI LISTRIK


1

KABEL LISTRIK
NYA : .

1 X 1 1/2

mm2

m'

3,050

3,400

SPLN LMK

1 X 2 1/2

mm2

m'

3,200

3,500

1X4

mm2

m'

4,700

5,500

1X6

mm2

m'

6,900

7,200

NYY :.

2 X 1 1/2

mm2

m'

9,300

9,800

PRIMA

2 X 2 1/2

mm2

m'

10,250

11,000

2X4

mm2

m'

16,650

17,000

2X6

mm2

m'

20,100

22,000

3 X 1 1/2

mm2

m'

11,450

12,200

3 X 2 1/2

mm2

m'

15,400

16,000

3X4

mm2

m'

20,500

21,000

3X6

mm2

m'

27,800

29,000

NYM :.

2 X 1 1/2

mm2

m'

6,800

7,200

PRIMA

2 X 2 1/2

mm2

m'

9,700

10,200

2X4

mm2

m'

13,500

14,250

3 X 1 1/2

mm2

m'

8,750

9,200

149235156.xlsx.ms_office

8/83

daftar harga bahan

HARGA
NO.

J E N I S

B A H A N

12,400

13,000

3X4

mm2

m'

17,600

18,200

3X6

mm2

m'

23,900

25,000

Seri

bh

15,000

20,000

Engkel

bh

12,000

15,000

Seri

bh

11,500

16,500

Engkel

bh

9,500

12,000

1 group

bh

20,000

30,000

2 group

bh

30,100

40,000

3 group

bh

50,000

70,000

SKAKELAR

(Rp)

m'

In bauw .

MAKSIMUM

(Rp)

mm2

MINIMUM

3 X 2 1/2

Out bauw .

SATUAN

FUSE BOX (SEKERING KASA)

STEKER -

FITING

Biasa

bh

9,500

12,000

Arde

bh

14,000

16,000

T Biasa

bh

11,000

13,000

T dengan Arde

bh

15,000

17,500

Flaon

bh

7,500

9,000

Gantung

bh

7,500

9,500

Kap

bh

11,000

16,000

Kombinasi

bh

10,000

14,500
15,000

bh

12,500

Arde Outbow hitam

bh

5,000

6,000

Arde IB

bh

10,000

15,000

Arde Putar

bh

31,000

42,000

1 X slag

bh

50,000

55,000

2 X slag

bh

60,000

70,000

1 X slag

bh

75,000

85,000

2 X slag

bh

125,000

140,000

1 X slag

bh

45,000

55,000

2 X slag

bh

60,000

75,000

STOP KONTAK - Arde Outbow putih

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG


1

KUNCI TANAM

Union :

Yale :

Kuda :

ENGSEL DAN GERENDEL


Engsel Angin

bh

15,000

16,000

Kupu-kupu biasa

bh

2,250

2,500

Nylon kupu-kupu

bh

5,000

9,000

bh

30,000

32,000

Grendel Tanam luar negeri

bh

7,500

8,250

Grendel biasa

bh

7,500

10,000

Kait Angin

bh

5,000

15,000

Door Stop

bh

250,000

350,000

bh

950,000

1,450,000

bh

105,000

150,000

bh

625,000

750,000

Espagnoled -

dalam negeri

XIII . BAHAN SANITAIR


1

KLOSET DUDUK

KLOSET JONGKOK

149235156.xlsx.ms_office

WASTAFEL PEDESTAL

9/83

daftar harga bahan

HARGA
NO.

J E N I S

MINIMUM

MAKSIMUM

(Rp)

(Rp)

bh

700,000

800,000

bh

275,000

310,000

bh

240,000

270,000

bh

210,000

240,000

bh

145,000

170,000

bh

27,500

30,000

bh

20,000

25,000

5 Pemakai 500 liter

unit

10 Pemakai 1.000 liter

unit

Kran Air

bh

7,500

15,000

Seal tape

bh

2,000

3,000

Floor drain

bh

22,500

25,000

WASTAFEL GANTUNG BULAT

WASTAFEL GANTUNG SUDUT

WASTAFEL GANTUNG SUDUT KECIL

WASTAFEL BAK CUCI

TEMPAT SABUN GANTUNG

11

SATUAN

WASTAFEL MEJA OVAL

10

B A H A N

TEMPAT SABUN TANAM

SEPTIC TANK (ETERNIT GRESIK)

12 LAIN - LAIN

XIV . ALAT PENGIKAT KAYU


1

PAKU - ukuran 1" s/d 4"

kg

12,500

14,500

PAKU - payung

kg

16,000

18,000

PAKU - sekrup

doos

12,000

13,500

PAKU - beton

bh

17,000

18,000

MUR BAUT (kuda-kuda)

kg

13,000

14,000

ANGKUR BAUT

bh

12,800

13,000

LEM KAYU

bh

18,000

20,000

Tali Ijuk

kg

6,000

7,200

bh

250,000

300,000

XV . POMPA AIR.
1

POMPA AIR TANGAN

POMPA AIR LISTRIK

Dragon buatan Indonesia

Sanyo

100 watt

bh

975,000

1,050,000

Fuji

250 watt

bh

1,450,000

1,500,000

. 100 watt

bh

380,000

470,000

. 90 watt

bh

350,000

360,000

. 125 watt

bh

300,000

320,000

. 175 watt

bh

400,000

425,000

Abu-abu

m2

42,000

49,000

Merah/hitam

m2

38,000

51,000

Abu-abu

m2

35,000

49,000

Merah/hitam

m2

39,000

51,000

Abu-abu

m2

30,500

49,000

Merah/hitam

m2

33,000

51,000

Abu-abu

m2

35,000

49,000

Merah/hitam

m2

40,000

51,000

Abu-abu

m2

30,000

49,000

Merah/hitam

m2

33,000

51,000

Shimizu

Dab

X VI . PAVING BLOCK
1

149235156.xlsx.ms_office

SQUARE

HOLLAND

UNIDECOR

UNI

TRIHEX

10/83

daftar harga bahan

HARGA
NO.

J E N I S

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

OLYMPIA HEXA

Abu-abu

m2

31,000

49,000

HEXAGONAL

Abu-abu

m2

40,000

51,000

Merah/hitam

m2

40,000

49,000

CASTLE

Abu-abu

m2

40,000

51,000

TRAPEZ

Abu-abu

m2

40,000

49,000

Abu-abu

10

TRAPEZ GRASS BLOCK


m2

41,000

45,000

11

STANDARD GRASS BLOCK ABU-ABU

bh

7,000

9,000

12

BATACO

m2

3,000

3,250

13

KANSTEEN

m'

22,500

28,500

XVII. L A I N - L A I N
1

KREI 25 MM

m2

40,000

45,000

Sliding Pintu J4

bh

110,000

200,000

Naco per Daun

bh

10,500

11,000

Rolling door Besi

m2

225,000

245,000

Rolling door Almunium

m2

210,000

230,000

Awning Almunium

m2

75,000

85,000

Kusen Almunium 4" Putih

m'

68,000

75,000

WIDE FLANGE BEAM


btg

1,350,000

1,430,000

drum

1,300,000

1,400,000

150 X 75 X 5 X 7 X 12

ASPAL.
Aspal Ex Pertamina isi Net 160 kg

10

Hotmix Tebal = 4 Cm

m2

60,000

65,000

Hotmix Tebal = 5 Cm

m2

70,000

80,000

Hotmix Tebal = 6 Cm

m2

85,000

95,000

Hotmix Tebal = 7 Cm

m2

100,000

110,000

Binder Course

ton

215,000

230,000

Wearing Course

ton

125,000

150,000

Hot Roller Sheet

ton

115,000

130,000

Sand Sheet

ton

125,000

140,000

Sand Sheet Emulsi

ton

145,000

160,000

Cold Mix

ton

175,000

190,000

Prime / Tack Coard RC

liter

8,200

8,500

Prime Coat MC

liter

8,200

8,500

Prime / Tack Coat Emulsi

liter

8,200

8,500

m2

180,000

210,000

Pagar BRC 90 A2

/lb

500,000

550,000

Pagar BRC 120 A2

/lb

600,000

650,000

KACA
Cermin tebal 5 mm

11

12

PAGAR BRC.

LAIN-LAIN
Minyak Beton & bekisting

ltr

8,000

10,000

Pintu Lipat Besi

m2

350,000

400,000

Sunscreen Allumunim

m2

265,000

310,000

Allumunium Foil

m2

6,500

7,100

Soda api

kg

12,000

13,000

Sabun

kg

11,000

13,000

Air

m3

8,000

8,500

Koas Alang-alang

ikat

1,250

1,500

11,250

11,300

Solar (Industri)

149235156.xlsx.ms_office

ltr

Premium (Industri)

ltr

8,900

8,950

Pelumas

ltr

31,500

35,000

11/83

daftar harga bahan

NGUNAN

EDISI JANUARI 2013

KETERANGAN

149235156.xlsx.ms_office

12/83

daftar harga bahan

KETERANGAN

149235156.xlsx.ms_office

13/83

daftar harga bahan

KETERANGAN

149235156.xlsx.ms_office

14/83

daftar harga bahan

KETERANGAN

panjang 4 m
panjang 4 m
panjang 4 m
panjang 6 m

149235156.xlsx.ms_office

15/83

daftar harga bahan

KETERANGAN

panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m

panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m

149235156.xlsx.ms_office

16/83

daftar harga bahan

KETERANGAN

149235156.xlsx.ms_office

17/83

daftar harga bahan

KETERANGAN

149235156.xlsx.ms_office

18/83

daftar harga bahan

KETERANGAN

149235156.xlsx.ms_office

19/83

daftar harga bahan

KETERANGAN

149235156.xlsx.ms_office

20/83

daftar harga bahan

DAFTAR
SUMBER

DATA

D A E R A H

HARGA SATUAN PEKERJAAN

PASARAN

KOTA SEMARANG

BEBAS
EDISI JANUARI 2013
HARGA SATUAN PEKERJAAN

NO.

II

SNI

KODE

481,205.00

517,360.00

m'

103,225.00

111,640.00

6.5 Pembuatan Kantor Sementara dg Lantai Plesteran

m2

773,550.00

824,625.00

6.6 Pembuatan Gudang Semen dan Alat-alat

m2

676,250.00

709,325.00

6.8 Membersihkan Lapangan dan Perataan

m2

6,750.00

7,200.00

6.11 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm

m2

31,041.50

37,708.00

6.13 Bongkaran Beton Bertulang

m3

284,995.00

299,994.00

6.14 Bongkaran Dinding Tembok Bata Merah

m3

268,495.00

281,994.00

PEKERJAAN TANAH
m3

31,375.00

33,000.00

6.2 Menggali Tanah Biasa Sedalam 2 m

m3

38,475.00

40,500.00

6.3 Menggali Tanah Biasa Sedalam 3 m

m3

45,685.00

48,120.00

6.4

Menggali Tanah Keras Sedalam 1 m

m3

41,760.00

43,920.00

6.5

Menggali Tanah Cadas Sedalam 1 m

m3

63,300.00

66,600.00

6.6

Menggali Tanah Lumpur Sedalam 1 m

m3

50,475.00

53,100.00

6.7

Mengerjakan Striping Tebing Setinggi 1 m

m2

2,275.00

2,400.00

6.8

MembuangTanah sejauh 30 m'

m3

2,275.00

2,400.00

6.9

Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)

m3

Menggali Tanah Biasa Sedalam 1 m

Pemadatan Tanah (per 20 cm)

m3

22,750.00

24,000.00

Urugan Pasir

m3

132,550.00

163,200.00

6.12

Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL

m3

181,070.00

215,515.00

6.14

Pemasangan Lapisan Ijuk tebal 10 cm

m2

42,825.00

50,400.00

m3

203,375.00

222,000.00

PEKERJAAN PONDASI
m3

597,750.00

644,325.00

6.2 Memasang Pondasi Batu Kali 1Pc : 4 PP

m3

555,675.00

601,525.00

6.3

m3

526,515.00

571,855.00

6.4 Memasang Pondasi Batu Kali 1Pc : 6 PP

m3

506,010.00

550,995.00

6.5 Memasang Pondasi Batu Kali 1Pc : 8 PP

m3

477,915.00

522,405.00

6.6 Memasang Pondasi Batu Kali 1Kp : 1Sm : 2Pp

m3

396,975.00

434,325.00

6.7

m3

460,365.00

502,340.00

6.8 Memasang Pondasi Batu Kali, Pc : 1Kp : 4 PP

m3

433,005.00

473,740.00

6.9

Pasang Pondasi Batu Kosong

m3

280,335.00

307,035.00

Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah

m3

1,932,980.00

2,035,665.00

Pasang Pondasi Sumuran diameter 100 cm

m3

596,725.00

630,080.00

6.1 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2Pp

m2

163,850.00

178,275.00

6.2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP

m2

152,675.00

166,957.50

6.3 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4PP

m2

145,265.00

159,297.50

6.4 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP

m2

141,260.00

155,390.00

6.5 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP

m2

139,520.00

154,165.00

6.6 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3 KP :10PP

m2

131,208.50

144,812.50

6.7

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 2PP

m2

78,295.00

85,297.50

6.8

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3PP

m2

73,069.00

79,912.50

6.9 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 4PP

m2

70,030.00

76,835.00

6.10 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 5PP

m2

68,116.00

74,900.00

6.11 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 6PP

m2

67,024.00

73,880.00

6.12 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 8PP

m2

64,975.00

71,775.00

6.13

m2

65,725.00

72,650.00

6.20 Memasang Dinding HB/CB 10, speci camp. 1PC : 3PP

m2

126,557.00

144,545.00

6.21 Memasang Dinding HB/CB 10, speci camp. 1PC : 4PP

m2

126,161.00

144,837.50

6.22 Memasang Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1Pc : 2PP

m2

235,045.00

268,090.00

6.23 Memasang Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1Pc : 4PP

m2

231,850.00

264,850.00

6.10
6.11

149235156.xlsx.ms_office

1/3 x Gal.tanah

6.11

6.1

03-6897-2008

(Rp)

m'

6.15 Mengurug Sirtu Padat untuk Peninggian Lantai Bangunan

IV

MAKSIMUM

(Rp)

6.4 Pengukuran dan Pemasangan Bouwplank

6.10

03-2836-2008

MINIMUM

6.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

6.1

III

SAT

6 PEKERJAAN PERSIAPAN

03-2835-2002

03-2835-2008

URAIAN PEKERJAAN

Memasang Pondasi Batu Kali 1Pc : 3 PP

Memasang Pondasi Batu Kali 1Pc : 5 PP

Memasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 PP

PEKERJAAN DINDING

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3KP : 10PP

21/83

sat.pekerjaan

HARGA SATUAN PEKERJAAN


NO.
V

VI

SNI
03-2837-2008

03-3434-2008

KODE
6

URAIAN PEKERJAAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

PEKERJAAN PLESTERAN

6.1 Memasang Plesteran 1 Pc : 1 Pp Tebal 15 mm

m2

42,739.80

45,575.00

6.2 Memasang Plesteran 1 Pc : 2 Pp Tebal 15 mm

m2

36,943.80

39,655.00

6.3

m2

34,411.20

37,105.00

6.4 Memasang Plesteran 1 Pc : 4 Pp Tebal 15 mm

m2

32,703.00

35,355.00

6.5 Memasang Plesteran 1 Pc : 5 Pp Tebal 15 mm

m2

31,705.80

34,375.00

6.6 Memasang Plesteran 1 Pc : 6 Pp Tebal 15 mm

m2

30,919.20

33,585.00

6.7 Memasang Plesteran 1 Pc : 7 Pp Tebal 15 mm

m2

30,478.20

33,155.00

6.8 Memasang Plesteran 1 Pc : 8 Pp Tebal 15 mm

m2

30,037.20

32,725.00

6.9 Memasang Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm

m2

32,007.00

34,265.00

6.10 Memasang Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm

m2

30,060.00

32,455.00

6.11 Memasang Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm

m2

27,165.00

29,265.00

6.12 Memasang Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm

m2

27,255.00

29,495.00

6.13 Memasang Plesteran 1 Pc : 2 Pp Tebal 20 mm

m2

49,413.40

53,050.00

6.14

Memasang Plesteran 1Pc : 3Pp Tebal 20 mm

m2

39,941.60

43,230.00

6.15 Memasang Plesteran 1 Pc : 4 Pp Tebal 20 mm

m2

43,714.00

47,260.00

6.16 Memasang Plesteran 1Pc : 5Pp Tebal 20 mm

m2

42,429.40

46,010.00

6.17 Memasang Plesteran 1Pc : 6Pp Tebal 20 mm

m2

41,335.60

44,900.00

6.18 Memasang Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm

m2

37,900.00

41,045.00

6.19

Memasang Berapen 1 Pc : 5Pp Tebal 15 mm

m2

20,775.80

22,700.00

6.20

Memasang Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm

m'

30,175.00

33,035.00

6.23

Memasang Plesteran Ciprat 1Pc : 2 Pp

m2

24,919.00

26,570.00

6.24 Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m')

m2

14,774.60

15,685.00

6.25 Memasang Finishing Siar Pasangan Dinding Conblock ekspose (=8 m')

m2

7,105.00

7,540.00

6.26

Memasang Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp

m2

31,203.00

33,440.00

6.27

Memasang Acian

m2

18,550.00

19,712.50

Memasang Plesteran 1 Pc : 3 Pp Tebal 15 mm

PEKERJAAN KAYU

6.1

Membuat Kosen Pintu & Jendela Kayu klas I

m3

22,513,875.00

23,749,625.00

6.2

Membuat Kosen Pintu & Jendela Kayu klas II atau III

m3

9,428,125.00

10,025,125.00

6.3

Membuat Pintu KlampStandard Kayu Klas II (Kayu Kamfer)

m2

371,665.00

386,330.00

6.5

Membuat Daun Pintu Panel Kayu Klas I atau II

m2

518,650.00

545,500.00

6.6

Membuat Pintu & Jendela Kaca Kayu Klas I atau II

m2

361,200.00

381,600.00

6.7

Membuat Pintu & Jendela Jalusi Kayu Klas I atau II

m2

1,578,750.00

1,662,500.00

6.8

Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)

m2

404,900.00

429,085.00

6.9

Membuat Pintu Plywood rangkap, rangka expose kayu klas I atau II

m2

431,855.00

458,035.00

6.10

Membuat Jalusi mati Kosen Kayu Klas I atau II

m2

1,429,100.00

1,503,415.00

6.11

Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I

m2

766,375.00

812,035.00

6.12

Membuat Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II

m2

453,730.00

487,390.00

6.13

Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter

m3

8,538,000.00

9,079,200.00

6.14

Memasang Konstruksi Kuda-kuda Expose, Kayu Klas I

m3

24,577,525.00

25,929,350.00

6.15

Memasang konstruksi Gording, Kayu Klas II

m3

8,144,300.00

8,650,300.00

6.16

Memasang Rangka Atap Genteng Keramik, Kayu Klas II

m2

131,420.00

139,735.00

6.17

Memasang Rangka Atap Genteng Beton, Kayu Klas II

m2

155,540.00

165,295.00

6.18

Memasang Rangka Atap Sirap, Kayu Klas II

m2

1,120,450.00

1,187,780.00

6.19

Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II atau III

m2

134,105.00

142,990.00

6.20

Memasang Rangka Langit-langit (60x60) cm, kayu Klas II atau III

m2

139,185.00

148,305.00

6.21

Memasang Listplank Uk. (3x20)cm Kayu klas I atau II

m'

244,525.00

256,850.00

6.22

Memasang Listplank Uk. (3x30)cm Kayu klas I atau klas II

m'

97,400.00

101,025.00

6.23

Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III

m2

223,365.00

237,680.00

6.24

Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II

m2

280,745.00

300,480.00

6.26

Memasang Dinding Lambriziring dari Papan klas I

m2

285,500.00

304,175.00

6.27

Memasang Dinding Lambriziring dari Plywood ukuran (120x240) cm

m2

28,285.00

30,855.00

m2

103,287.60

112,714.00

6.28 Memasang Dinding Bilik, Rangka Kayu Klas III atau IV

149235156.xlsx.ms_office

SAT

22/83

sat.pekerjaan

HARGA SATUAN PEKERJAAN


NO.
VII

SNI
03-7394-2008

KODE
6

URAIAN PEKERJAAN

IX

03-3436-2002

03-2839-2008

MAKSIMUM

(Rp)

(Rp)

6.1

Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87

m3

639,729.29

674,127.50

6.2

Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78

m3

670,551.90

706,057.13

6.3

Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72

m3

694,779.29

731,160.83

6.4

Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

m3

599,445.48

631,750.74

6.5

Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66

m3

723,347.14

760,749.72

6.6

Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61

m3

750,774.52

789,181.20

6.7

Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58

m3

771,111.43

810,233.06

6.8

Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56

m3

784,809.05

824,457.13

m3

808,361.43

848,927.50

6.10

Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm, w/c = 0,52

m3

815,676.90

856,523.80

6.11

Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm, w/c = 0,49

m3

867,099.76

910,437.69

6.12

Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48

m3

876,681.90

920,393.24

6.17

Pembesian dg Besi Polos atau Besi Ulir

10 Kg

114,540.00

120,635.00

6.18

Kabel Presstresed Polos/strand

10 Kg

169,465.00

187,905.00

6.19

Jaring Kawat baja/Wire Mesh

1 Kg

17,580.00

19,400.00

6.20

Memasang Bekisting untuk Pondasi

m2

84,640.00

90,040.00

6.21

Memasang Bekisting untuk Sloof

m2

89,890.00

95,540.00

6.22

Memasang Bekisting untuk Kolom

m2

258,695.00

280,445.00

6.23

Memasang Bekisting untuk Balok

m2

273,695.00

296,645.00

6.24

Memasang Bekisting untuk Lantai

m2

330,695.00

360,445.00

6.25

Memasang Bekisting untuk Dinding

m2

319,195.00

350,445.00

6.26

Memasang Bekisting untuk Tangga

m2

247,795.00

268,945.00

6.27

Memasang Jembatan Cor

m2

53,710.00

57,845.00

6.28

Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)

m3

2,851,375.00

3,005,150.00

6.29

Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)

m3

3,516,525.00

3,706,700.00

6.30 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)

m3

6,522,270.00

6,944,275.00

6.31 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)

m3

5,056,445.00

5,388,625.00

6.32 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)

m3

4,620,700.00

4,942,925.00

6.33 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)

m3

4,592,520.00

4,910,730.00

6.34 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

m3

4,687,270.00

4,990,175.00

6.35 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm

m'

51,845.00

54,670.00

6.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm

m'

69,955.00

73,819.00

PEKERJAAN PENUTUP ATAP

6.1

Pasang Atap Genteng Plentong Kecil

m2

48,545.00

56,800.00

6.2

Pasang Atap Genteng Kodok / Glasur

m2

79,795.00

86,800.00

6.3

Pasang Atap Genteng Plentong Super / Besar

m2

64,100.00

91,770.00

6.4

Pasang Genteng Bubung Plentong

m'

67,230.00

73,160.00

6.5

Pasang Genteng Bubung Kodok / Glasur

m'

77,230.00

85,660.00

6.6

Pasang Genteng Bubung Plentong Besar

m'

74,230.00

79,660.00

6.9

Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm

m2

56,665.00

60,340.00

6.10

Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm

m2

56,275.00

59,915.00

6.12

Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm

m2

36,675.00

39,715.00

6.15

Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm

m2

38,020.00

40,985.00

6.30

Pasang Atap Genteng Beton

m2

48,025.00

54,585.00

6.33

Pasang Atap Sirap

m2

117,830.00

125,977.00

6.34

Pasang Nok Genteng Beton

m'

31,030.00

34,365.00

6.37

Pasang Nok Sirap

m'

69,980.00

74,755.00

6.38

Pasang Atap Seng Gelombang

m2

54,540.00

56,580.00

6.39

Pasang Atap Nok Seng

m'

30,660.00

32,060.00

6.42

Pasang Allumunium Foil / Sisalation

m2

16,315.00

17,560.00

PEKERJAAN LANGIT-LANGIT

6.1

Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

m2

23,415.00

26,650.00

6.2

Memasang Langit-langit Akustik Ukuran (30x30) cm

m2

69,475.00

74,105.00

6.3

Memasang Langit-langit Akustik Ukuran (30x60) cm

m2

74,800.00

81,475.00

6.5

Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm

m2

31,375.00

34,085.00

6.6

Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm

m2

398,125.00

419,345.00

6.7

Memasng Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm

m2

25,025.00

29,330.00

6.9

Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium

m2

149,750.00

161,500.00

List Langit-Langit Kayu Profil

m'

9,750.00

11,000.00

6.10

149235156.xlsx.ms_office

MINIMUM

PEKERJAAN BETON

6.9 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53

VIII

SAT

23/83

sat.pekerjaan

HARGA SATUAN PEKERJAAN


NO.

SNI

XI

KODE

03-7393-2008

XII

149235156.xlsx.ms_office

URAIAN PEKERJAAN

SAT

MINIMUM

MAKSIMUM

(Rp)

(Rp)

PEKERJAAN SANITASI

6.1

Memasang Closet Duduk / Mono Blok

Unit

1,208,360.00

1,751,265.00

6.2

Memasang Closet Jongkok Porselen

Unit

334,850.00

398,300.00

6.4

Memasang Urinoir

Unit

472,550.00

526,700.00

6.5

Memasang Wastafel

Unit

989,025.00

1,124,050.00

6.8

Memasang Bak Mandi Batu Bata Vol. 0,30 m3

1,030,500.00

Unit

928,090.91

6.14

Memasang Pipa Beton, 15 cm - 20 cm

m'

63,143.50

70,750.00

6.15

Memasang Pipa Beton, 30 cm - 100 cm

m'

282,755.00

314,055.00

6.20

Memasang Pipa Galvanis "

m'

39,360.00

41,389.67

6.23

Memasang Pipa Galvanis 3"

m'

137,013.67

145,996.67

6.24

Memasang Pipa Galvanis 4"

m'

170,624.00

178,623.83

6.25

Memasang Pipa PVC type AW "

m'

12,174.00

13,360.00

6.29

Memasang Pipa PVC type AW 2"

m'

23,298.50

28,151.67

6.31

Memasang Pipa PVC type AW 3"

m'

43,346.33

44,849.67

6.33

Memasang Bak Cuci Piring Stainles Steel

Buah

309,582.50

361,300.00

6.35

Memasang Kran " atau "

Buah

14,325.00

22,395.00

6.36

Memasang Floor Drain

Buah

29,275.00

32,370.00

PEKERJAAN BESI & ALLUMUNIUM

6.1

Memasang Besi Profil

Kg

22,650.00

24,277.50

6.2

Memasang Rangka Kuda-kuda Baja IWF

kg

21,750.00

23,077.50

6.3

Mengerjakan Pekerjaan Perakitan (Kuda-kuda Baja)

100 kg

24,835.00

26,005.00

6.4

Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku

m2

740,810.00

793,495.00

6.5

Mengerjakan Pengelasan dengan Las Listrik

10 cm

18,543.50

20,009.00

6.7

Memasang Pintu Rolling Door Besi

m2

346,530.00

375,560.00

6.8

Memasang Pintu Lipat (Folding Door)

m2

395,650.00

449,060.00

6.9

Sunscreen Allumunium

m2

317,220.00

366,800.00

6.10

Memasang Rolling Door Allumunium

m2

313,750.00

341,500.00

6.11

Memasang Kusen Pintu Allumunium

m'

84,458.50

93,191.50

6.12

Memasang Pintu Allumunium Strip Lebar 8 cm

m2

1,038,016.00

1,142,474.50

6.13

Memasang Pintu Kaca Rangka Allumunium

m2

288,740.00

323,105.00

6.14 Memasang Venetions Blinds & Vertical Blinds

m2

161,340.00

189,055.00

6.15 Memasang Terali Besi Strip (2x3) cm

m2

303,751.80

326,837.37

6.16 Memasang Kawat Nyamuk

m2

63,184.83

68,404.00

6.17 Memasang Jendela Nako & Tralis

m2

39,805.00

119,360.00

6.18 Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

m'

156,187.50

163,842.50

6.19 Memasang Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30 Lebar 45 cm

m'

71,265.00

76,925.00

171,370.00

PEKERJAAN KUNCI & KACA

6.2

Memasang Kunci Tanam Biasa

Buah

153,775.00

6.3

Memasang Kunci Kamar Mandi

Buah

78,137.50

85,685.00

6.4

Memasang Kunci Selinder

Buah

153,137.50

170,685.00

6.5

Memasang Engsel Pintu

Buah

15,162.50

20,055.00

6.6

Pasang Engsel Jendela Kupu-kupu

Buah

9,025.00

9,870.00

6.7

Pasang Engsel Angin

Buah

28,550.00

30,740.00

6.9

Pasang Kait Angin

Buah

14,791.25

25,650.00

6.10

Pasang Door Closer

Buah

282,637.50

385,500.00

6.11

Pasang Kunci Selot

Buah

20,555.00

24,200.00

6.13

Pasang Door Stop

Buah

256,527.50

357,100.00

6.14

Pasang Rel Pintu Dorong

Buah

149,165.00

242,600.00

6.15

Pasang Kunci Lemari

Buah

23,818.75

27,750.00

6.16

Pasang Kaca tebal 3 mm

m2

70,291.25

76,650.00

6.17

Pasang Kaca tebal 5 mm

m2

81,291.25

90,400.00

6.20

Pasang Kaca Cermin tebal 5 mm

m2

207,791.25

241,650.00

24/83

sat.pekerjaan

HARGA SATUAN PEKERJAAN


NO.
XIII

SNI
03-7395-2008

XIV 03-24

KODE
6

URAIAN PEKERJAAN

SAT

MINIMUM

MAKSIMUM

(Rp)

(Rp)

PEKERJAAN PENUTUP LANTAI & DINDING

6.3

Memasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm

m2

72,310.00

78,940.00

6.9

Memasang lantai Ubin Granito Uk. 40 x 40 cm

m2

256,061.00

281,793.00

6.19

Pasang Plint Ubin PC Warna Uk. 10 x 20 cm

m'

38,638.00

42,650.00

6.34

Memasang Lantai Keramik 33 x 33 cm

m2

121,155.78

143,629.17

6.35

Memasang Lantai Keramik 30 x 30 cm

m2

121,039.09

142,746.82

6.36

Pasang Lantai Keramik 20 x 20 cm

m2

126,310.00

143,185.00

6.39

Memasang Plint Keramik Ukuran 10x20 cm

m'

16,843.88

18,922.06

6.40

Memasang Plint Keramik Ukuran 10x10 cm

m'

22,549.76

25,844.12

6.43

Memasang Lantai Marmer Ukuran 1.00x1.00 cm

m2

391,678.00

426,912.50

6.44 Memasang Lantai Karpet

m2

81,365.00

88,110.00

6.46 Memasang Lantai Parquet Jati

m2

238,475.00

259,525.00

6.53 Memasang Dinding Keramik 10x20 cm,

m2

146,235.00

166,640.00

6.54 Memasang Dinding Keramik 20x20 cm,

m2

136,015.00

158,730.00

6.55 Memasang Dinding Marmer Ukuran 1.00x1.00 cm

m2

438,133.11

475,880.11

6.57 Memasang Dinding Batu Paros / Batu Tempel Hitam

m2

152,600.00

161,212.50

6.60 Memasang Wall Paper Lebar 50 cm

m2

120,755.00

134,175.00

6.63 Memasang Plint Kayu Klas II Ukuran 2x10 cm

m'

34,355.00

35,885.50

PEKERJAAN PENGECATAN

6.1

Mengikis / Mengerok Permukaan Cat Tembok Lama

m2

6,737.50

7,100.00

6.2

Mencuci Bidang Permukaan Tembok yang Pernah dicat

m2

6,687.50

7,100.00

6.3

Mengerok Karat Cat Lama permukaan Baja dg cara manual

m2

6,687.50

7,100.00

6.4

Penyabun Permukaan Tembok Lama

m2

6,687.50

7,100.00

6.6

Mendempul dan Menggosok Kayu

m2

5,787.50

6,285.00

6.7

Pengecatan Bidang Lama

m2

19,302.50

20,952.50

6.8

Pengecatan Bidang Kayu Baru (1 lap.Plamir)

m2

22,056.50

24,280.00

m2

30,996.50

34,095.00

1 lap.Cat Dasar & 2 lap.Cat Penutup


6.9

Pengecatan Bidang Kayu Baru (1 lap.Plamir)


1 lap.Cat Dasar & 3 lap.Cat Penutup

6.10

Pelaburan Bidang Kayu dg Teak Oil

m2

27,702.50

32,025.00

6.11

Pelaburan Bidang Kayu dg Politur

m2

38,541.50

44,554.00

6.12

Pelaburan Bidang Kayu dg Cat Residu & Ter

m2

4,986.25

5,610.00

6.13

Pelaburan Bidang Kayu dg Vernis

m2

25,162.50

27,955.00

6.14

Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar

m2

12,010.50

13,375.50

m2

8,559.50

9,547.00

2 lap. Cat Penutup)


6.15

149235156.xlsx.ms_office

Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)

25/83

sat.pekerjaan

DAFTAR
SUMBER DATA
D A E R A H

:
:

ANALISA

PEKERJAAN

PASARAN BEBAS
KOTA SEMARANG
EDISI JANUARI 2013

HARGA BAHAN/UPAH
No.

SNI

03-2835-2002

KODE

KOEF

URAIAN PEKERJAAN

SAT.

MAKSIMUM
Rp

MINIMUM
Rp

MAKSIMUM
Rp

PEKERJAAN PERSIAPAN
6.2

m'

6.2.1
1.25

6.4

490,405.00

518,360.00

Bahan

451,905.00

486,060.00
25,000.00

2.5

Kg Portalnd Semen

1.2

Lbr Seng Gelombang 3" - 5"

18,000.00

20,000.00

22,500.00

1,200.00

1,250.00

3,000.00

3,125.00

65,000.00

67,000.00

78,000.00

80,400.00
1,050.00

0.005

m3 Pasir Beton

195,000.00

210,000.00

975.00

0.009

m3 Koral Beton

120,000.00

135,000.00

1,080.00

1,215.00

0.072

m3 Kayu 5/7X4m Kayu Kruing

4,800,000.00

5,200,000.00

345,600.00

374,400.00

0.06

Kg Paku Biasa 2" - 5"

12,500.00

14,500.00

750.00

870.00

0.45

Kg Meni Besi

15,000.00

20,000.00

6,750.00

9,000.00

38,500.00

32,300.00

0.2

OH Tukang Kayu

Tenaga
70,000.00

65,000.00

14,000.00

13,000.00

0.4

OH Pekerja

55,000.00

42,000.00

22,000.00

16,800.00

0.02

OH Kepala Tukang

70,000.00

65,000.00

1,400.00

1,300.00

0.02

OH Mandor

55,000.00

60,000.00

1,100.00

1,200.00

103,225.00

111,640.00

92,850.00

100,490.00
62,400.00

6.4.1

m'

Pengukuran dan Pemasangan Bouwplank


Bahan

0.012
0.02
0.007
6.4.2

m3 Kayu 5/7x 4m Kayu Kruing


Kg Paku Biasa 2" - 5"
m3 Kayu Papan 3/20 Kruing

4,800,000.00

5,200,000.00

57,600.00

12,500.00

14,500.00

250.00

290.00

5,000,000.00

5,400,000.00

35,000.00

37,800.00

10,375.00

11,150.00

0.1

OH Tukang Kayu

Tenaga
55,000.00

60,000.00

5,500.00

6,000.00

0.1

OH Pekerja

40,000.00

42,000.00

4,000.00

4,200.00

OH Kepala Tukang

60,000.00

65,000.00

600.00

650.00

OH Mandor

55,000.00

60,000.00

275.00

300.00

773,550.00

824,625.00

507,800.00

538,125.00

0.01
0.005
6.5

Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

Btg Kayu Dolken diameter 8 - 10 / 400 cm

6.2.2

6.5.1

m2 Pembuatan Kantor Sementara dg Lantai Plesteran


Bahan

1.25

Btg Kayu Dolken 8 - 10 / 4 m

0.18

m3 Kayu

0.85

18,000.00

20,000.00

22,500.00

25,000.00

1,700,000.00

1,750,000.00

306,000.00

315,000.00

Kg Paku Biasa 2" - 5"

12,500.00

14,500.00

10,625.00

12,325.00

1.1

Kg Besi Strip

13,000.00

14,000.00

14,300.00

15,400.00

35

Kg Portland Sement

1,200.00

1,250.00

42,000.00

43,750.00

m3 Pasir pasang

135,000.00

170,000.00

20,250.00

25,500.00

0.1

m3 Pasir Beton

195,000.00

210,000.00

19,500.00

21,000.00

0.15

m3 Koral Beton

120,000.00

135,000.00

18,000.00

20,250.00

450.00

500.00

13,500.00

15,000.00

Lbr Seng Plat

20,000.00

22,000.00

5,000.00

5,500.00

2 buah Jendela Naco

10,500.00

11,000.00

21,000.00

22,000.00

55,000.00

60,000.00

4,400.00

4,800.00

45,000.00

55,000.00

6,750.00

8,250.00

2,250.00

2,500.00

675.00

750.00

55,000.00

60,000.00

3,300.00

3,600.00

0.15

30 buah Batu bata Merah


0.25
0.08

m2 Kaca Polos

0.15 buah Kunci Tanam


0.3 buah Engsel
0.06
6.5.2

Lbr Plywood 4 mm

265,750.00

286,500.00

OH Tukang Kayu

Tenaga
55,000.00

60,000.00

110,000.00

120,000.00

OH Tukang Batu

55,000.00

60,000.00

55,000.00

60,000.00

OH Pekerja

40,000.00

42,000.00

80,000.00

84,000.00

OH Kepala Tukang

60,000.00

65,000.00

18,000.00

19,500.00

OH Mandor

55,000.00

60,000.00

2,750.00

3,000.00

0.3
0.05

149235156.xlsx.ms_office

MINIMUM
Rp

JUMLAH

gery 1-14-26

HARGA BAHAN/UPAH
No.

SNI

KODE
6.6

KOEF
1

0.21
0.3

Btg Kayu Dolken diameter 8 - 10 / 400 cm


m3 Kayu
Kg Paku Biasa 2" - 5"

511,500.00

531,325.00

18,000.00

20,000.00

30,600.00

34,000.00

1,700,000.00

1,750,000.00

357,000.00

367,500.00

12,500.00

14,500.00

3,750.00

4,350.00

1,200.00

1,250.00

12,600.00

13,125.00
5,100.00

0.03

m3 Pasir Beton

135,000.00

170,000.00

4,050.00

0.05

m3 Koral Beton

120,000.00

135,000.00

6,000.00

6,750.00

65,000.00

67,000.00

97,500.00

100,500.00

Lbr Seng Gelombang BJLS 32

164,750.00

178,000.00

OH Tukang Kayu

Tenaga
55,000.00

60,000.00

110,000.00

120,000.00

OH Pekerja

40,000.00

42,000.00

40,000.00

42,000.00

OH Kepala Tukang

60,000.00

65,000.00

12,000.00

13,000.00

OH Mandor

55,000.00

60,000.00

2,750.00

3,000.00

6,750.00

7,200.00

6,750.00

7,200.00

0.2
0.05
1

m2 Membersihkan Lapangan dan Perataan

6.8.2

Tenaga
0.1

OH Pekerja

40,000.00

42,000.00

4,000.00

4,200.00

0.05

OH Mandor

55,000.00

60,000.00

2,750.00

3,000.00

Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm

31,041.50

37,708.00

Bahan

11,500.00

16,800.00

1 m2

6.11.1
1

Btg Bambu diameter 6 - 8 / 600 cm

10,000.00

15,000.00

10,000.00

15,000.00

6,000.00

7,200.00

1,500.00

1,800.00

0.25

Kg Tali Ijuk

19,541.50

20,908.00

0.17

OH Tukang Kayu

55,000.00

60,000.00

9,350.00

10,200.00

0.25

OH Pekerja

40,000.00

42,000.00

10,000.00

10,500.00

OH Kepala Tukang

60,000.00

65,000.00

120.00

130.00

OH Mandor

55,000.00

60,000.00

71.50

78.00

284,995.00

299,994.00

284,995.00

299,994.00

6.11.2

Tenaga

0.002
0.0013
1

6.13.2

m3 Bongkaran Beton Bertulang


Tenaga

6.667

OH Pekerja

40,000.00

42,000.00

266,680.00

280,014.00

0.333

OH Mandor

55,000.00

60,000.00

18,315.00

19,980.00

268,495.00

281,994.00

268,495.00

281,994.00

6.14.2

149235156.xlsx.ms_office

MAKSIMUM
Rp
709,325.00

Kg Portland Semen

6.6.2

6.14

JUMLAH
MINIMUM
Rp
676,250.00

10.5

1.5

6.13

MAKSIMUM
Rp

Bahan
1.7

6.11

MINIMUM
Rp

m2 Pembuatan Gudang Semen dan Alat-alat

6.6.1

6.8

URAIAN PEKERJAAN

SAT.

m3 Bongkaran Dinding Tembok Bata Merah


Tenaga

6.667

OH Pekerja

40,000.00

42,000.00

266,680.00

280,014.00

0.033

OH Mandor

55,000.00

60,000.00

1,815.00

1,980.00

gery 1-14-27

HARGA BAHAN/UPAH
No.

SNI

II

03-2835 - 2008

KODE

KOEF

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

PEKERJAAN TANAH
6.1

m3

6.1.2

6.2

6.3

Pekerja

40,000.00

42,000.00

30,000.00

0.025

OH

Mandor

55,000.00

60,000.00

1,375.00

m3

Menggali Tanah Biasa Sedalam 2 m

OH

Pekerja

40,000.00

42,000.00

36,000.00

0.045

OH

Mandor

55,000.00

60,000.00

2,475.00

m3

Menggali Tanah Biasa Sedalam 3 m

45,685.00

Tenaga

45,685.00

1.05

OH

Pekerja

40,000.00

42,000.00

42,000.00

0.067

OH

Mandor

55,000.00

60,000.00

3,685.00

m3

Menggali Tanah Keras Sedalam 1 m

41,760.00

Tenaga

41,760.00

1.000

OH

Pekerja

40,000.00

42,000.00

40,000.00

0.032

OH

Mandor

55,000.00

60,000.00

1,760.00

m3

Menggali Tanah Cadas Sedalam 1 m

63,300.00

Tenaga

63,300.00

1.50

OH

Pekerja

40,000.00

42,000.00

60,000.00

0.060

OH

Mandor

55,000.00

60,000.00

3,300.00

m3

Menggali Tanah Lumpur Sedalam 1 m

50,475.00

Tenaga

50,475.00

1.200

OH

Pekerja

40,000.00

42,000.00

48,000.00

0.045

OH

Mandor

55,000.00

60,000.00

2,475.00

m2

Mengerjakan Striping Tebing Setinggi 1 m

6.7.2

6.8

38,475.00

0.90

6.6.2

6.7

38,475.00

Tenaga

6.5.2

6.6

31,375.00

OH

6.4.2

6.5

31,375.00

0.75

6.3.2

6.4

Menggali Tanah Biasa Sedalam 1 m


Tenaga

6.2.2

2,275.00

Tenaga

2,275.00

0.05

OH

Pekerja

40,000.00

42,000.00

2,000.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

m3

MembuangTanah sejauh 30 m'

6.8.2

13,750.00

Tenaga

13,750.00

0.330

OH

Pekerja

40,000.00

42,000.00

13,200.00

0.010

OH

Mandor

55,000.00

60,000.00

550.00

6.9

m3

Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)

6.10

m3

Pemadatan Tanah (per 20 cm)

6.10.2

6.11

22,750.00

0.5

OH

Pekerja

40,000.00

42,000.00

20,000.00

0.05

OH

Mandor

55,000.00

60,000.00

2,750.00

m3

Urugan Pasir

132,550.00

Bahan
1.2

m3

0.3

OH

0.01
1

120,000.00
100,000.00

125,000.00

Pekerja

40,000.00

42,000.00

12,000.00

OH

Mandor

55,000.00

60,000.00

550.00

m3

Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL

6.11.2

6.12

22,750.00

Tenaga

6.11.1

Pasir Urug
Tenaga

6.12.1

120,000.00
12,550.00

181,070.00

Bahan

120,270.00

0.40

m3

Pasir Pasang

135,000.00

170,000.00

54,000.00

0.135

m3

Kapur Padam

210,000.00

225,000.00

28,350.00

0.948

m3

Tanah Liat

40,000.00

55,000.00

37,920.00

0.800

OH

Pekerja

40,000.00

42,000.00

32,000.00

0.400

OH

Tukang Batu

55,000.00

60,000.00

22,000.00

0.04

OH

Kepala Tukang

60,000.00

65,000.00

2,400.00

0.080

OH

Mandor

55,000.00

60,000.00

4,400.00

6.12.2

149235156.xlsx.ms_office

URAIAN PEKERJAAN

SAT.

Tenaga

60,800.00

83/28

gery 2-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.14

KOEF
1

m2

6.0

kg

0.15

OH

0.015
1

6.14.1

MAKSIMUM
Rp

Pemasangan Lapisan Ijuk tebal 10 cm

JUMLAH
MINIMUM
Rp
42,825.00
36,000.00

6,000.00

7,200.00

Ijuk

Pekerja

40,000.00

42,000.00

6,000.00

OH

Mandor

55,000.00

60,000.00

825.00

m3

Mengurug Sirtu Padat untuk Peninggian Lantai Bangunan

Tenaga

6.15.1
1.2

m3

0.25

OH

0.025

OH

36,000.00
6,825.00

203,375.00

Bahan

6.15.2

149235156.xlsx.ms_office

MINIMUM
Rp

Bahan

6.14.2

6.15

URAIAN PEKERJAAN

SAT.

192,000.00

Sirtu

160,000.00

175,000.00

Pekerja

40,000.00

42,000.00

10,000.00

Mandor

55,000.00

60,000.00

1,375.00

Tenaga

192,000.00
11,375.00

83/29

gery 2-14

JUMLAH
MAKSIMUM
Rp

33,000.00
33,000.00
31,500.00
1,500.00
40,500.00
40,500.00
37,800.00
2,700.00
48,120.00
48,120.00
44,100.00
4,020.00
43,920.00
43,920.00
42,000.00
1,920.00
66,600.00
66,600.00
63,000.00
3,600.00
53,100.00
53,100.00
50,400.00
2,700.00
2,400.00
2,400.00
2,100.00
300.00
14,460.00
14,460.00
13,860.00
600.00

24,000.00
24,000.00
21,000.00
3,000.00
163,200.00
150,000.00
150,000.00
13,200.00
12,600.00
600.00
215,515.00
150,515.00
68,000.00
30,375.00
52,140.00
65,000.00
33,600.00
24,000.00
2,600.00
4,800.00

149235156.xlsx.ms_office

83/30

gery 2-14

JUMLAH
MAKSIMUM
Rp
50,400.00
43,200.00
43,200.00
7,200.00
6,300.00
900.00
222,000.00
210,000.00
210,000.00
12,000.00
10,500.00
1,500.00

149235156.xlsx.ms_office

83/31

gery 2-14

HARGA BAHAN/UPAH
No.

SNI

III

03-2835 - 2008

KODE

KOEF

URAIAN PEKERJAAN

SAT.

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

PEKERJAAN PONDASI
6.1

m3

6.1.1

150,000.00

160,000.00

180,000.00

192,000.00

202

Kg

Portland Sement

1,200.00

1,250.00

242,400.00

252,500.00

0.485

m3

Pasir Pasang

135,000.00

170,000.00

65,475.00

82,450.00

109,875.00

117,375.00

1.5

OH

Pekerja

40,000.00

42,000.00

60,000.00

63,000.00

0.750

OH

Tukang Batu

55,000.00

60,000.00

41,250.00

45,000.00

0.075

OH

Kepala Tukang

60,000.00

65,000.00

4,500.00

4,875.00

0.075

OH

Mandor

55,000.00

60,000.00

4,125.00

4,500.00

m3

Memasang Pondasi Batu Kali 1Pc : 4 PP

555,675.00

601,525.00

Bahan

445,800.00

484,150.00

Tenaga

1.2

m3

Batu Belah 15/20

150,000.00

160,000.00

180,000.00

192,000.00

163

Kg

Portland Sement

1,200.00

1,250.00

195,600.00

203,750.00

0.52

m3

Pasir Pasang

135,000.00

170,000.00

70,200.00

88,400.00

109,875.00

117,375.00

1.5

OH

Pekerja

40,000.00

42,000.00

60,000.00

63,000.00

0.750

OH

Tukang Batu

55,000.00

60,000.00

41,250.00

45,000.00

0.075

OH

Kepala Tukang

60,000.00

65,000.00

4,500.00

4,875.00

0.075

OH

Mandor

55,000.00

60,000.00

4,125.00

4,500.00

m3

Memasang Pondasi Batu Kali 1Pc : 5 PP

526,515.00

571,855.00

Bahan

416,640.00

454,480.00

Tenaga

6.3.1
1.2

m3

Batu Belah 15/20

150,000.00

160,000.00

180,000.00

192,000.00

136

Kg

Portland Sement

1,200.00

1,250.00

163,200.00

170,000.00

0.544

m3

Pasir Pasang

135,000.00

170,000.00

73,440.00

92,480.00

109,875.00

117,375.00

1.5

OH

Pekerja

40,000.00

42,000.00

60,000.00

63,000.00

0.750

OH

Tukang Batu

55,000.00

60,000.00

41,250.00

45,000.00

0.075

OH

Kepala Tukang

60,000.00

65,000.00

4,500.00

4,875.00

0.075

OH

Mandor

55,000.00

60,000.00

4,125.00

4,500.00

m3

Memasang Pondasi Batu Kali 1Pc : 6 PP

506,010.00

550,995.00

Bahan

396,135.00

433,620.00

6.3.2

Tenaga

6.4.1
1.2

m3

Batu Belah 15/20

150,000.00

160,000.00

180,000.00

192,000.00

117

Kg

Portland Sement

1,200.00

1,250.00

140,400.00

146,250.00

0.561

m3

Pasir Pasang

135,000.00

170,000.00

75,735.00

95,370.00

109,875.00

117,375.00

1.5

OH

Pekerja

40,000.00

42,000.00

60,000.00

63,000.00

0.750

OH

Tukang Batu

55,000.00

60,000.00

41,250.00

45,000.00

0.075

OH

Kepala Tukang

60,000.00

65,000.00

4,500.00

4,875.00

0.075

OH

Mandor

55,000.00

60,000.00

4,125.00

4,500.00

m3

Memasang Pondasi Batu Kali 1Pc : 8 PP

477,915.00

522,405.00

Bahan

368,040.00

405,030.00

6.4.2

6.5

Tenaga

6.5.1
1.2

m3

Batu Belah 15/20

150,000.00

160,000.00

180,000.00

192,000.00

91

Kg

Portland Sement

1,200.00

1,250.00

109,200.00

113,750.00

0.584

m3

Pasir Pasang

135,000.00

170,000.00

78,840.00

99,280.00

109,875.00

117,375.00

1.5

OH

Pekerja

40,000.00

42,000.00

60,000.00

63,000.00

0.750

OH

Tukang Batu

55,000.00

60,000.00

41,250.00

45,000.00

0.075

OH

Kepala Tukang

60,000.00

65,000.00

4,500.00

4,875.00

0.075

OH

Mandor

55,000.00

60,000.00

4,125.00

4,500.00

6.5.2

149235156.xlsx.ms_office

526,950.00

Batu Belah 15/20

6.2.2

6.4

644,325.00

487,875.00

m3

6.2.1

6.3

597,750.00

Bahan
1.2

6.1.2

6.2

Memasang Pondasi Batu Kali 1Pc : 3 PP

Tenaga

83/32

gery 3-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.6

KOEF
1

m3

6.6.1

316,950.00
192,000.00

m3

Kapur Pasang (KP)

210,000.00

225,000.00

35,700.00

38,250.00

0.17

Kg

Semen Merah (SM)

150,000.00

170,000.00

25,500.00

28,900.00

0.340

m3

Pasir Pasang

135,000.00

170,000.00

45,900.00

57,800.00

109,875.00

117,375.00

1.5

OH

Pekerja

40,000.00

42,000.00

60,000.00

63,000.00

0.750

OH

Tukang Batu

55,000.00

60,000.00

41,250.00

45,000.00

0.075

OH

Kepala Tukang

60,000.00

65,000.00

4,500.00

4,875.00

0.075

OH

Mandor

55,000.00

60,000.00

4,125.00

4,500.00

m3

Memasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 PP

460,365.00

502,340.00

Bahan

350,490.00

384,965.00

Tenaga

1.2 m3

Batu Belah 15/20

150,000.00

160,000.00

180,000.00

192,000.00

61 kg

Portland Sement

1,200.00

1,250.00

73,200.00

76,250.00

0.147 m3

Kapur Pasang

210,000.00

225,000.00

30,870.00

33,075.00

0.492 m3

Pasir

135,000.00

170,000.00

66,420.00

83,640.00

109,875.00

117,375.00

1.5

OH

Tenaga
Pekerja

40,000.00

42,000.00

60,000.00

63,000.00

0.750

OH

Tukang Batu

55,000.00

60,000.00

41,250.00

45,000.00

0.075

OH

Kepala Tukang

60,000.00

65,000.00

4,500.00

4,875.00

0.075

OH

Mandor

55,000.00

60,000.00

4,125.00

4,500.00

m3

Memasang Pondasi Batu Kali, Pc : 1Kp : 4 PP

433,005.00

473,740.00

Bahan

323,130.00

356,365.00

1.2 m3

Batu Belah 15/20

150,000.00

160,000.00

180,000.00

192,000.00

41 kg

Portland Sement

1,200.00

1,250.00

49,200.00

51,250.00

0.131 m3

Kapur Pasang

210,000.00

225,000.00

27,510.00

29,475.00

0.492 m3

Pasir

135,000.00

170,000.00

66,420.00

83,640.00

109,875.00

117,375.00

1.5

OH

Tenaga
Pekerja

40,000.00

42,000.00

60,000.00

63,000.00

0.750

OH

Tukang Batu

55,000.00

60,000.00

41,250.00

45,000.00

0.075

OH

Kepala Tukang

60,000.00

65,000.00

4,500.00

4,875.00

0.075

OH

Mandor

55,000.00

60,000.00

4,125.00

4,500.00

m3

Pasang Pondasi Batu Kosong

280,335.00

307,035.00

Bahan

223,200.00

246,000.00

1.2

m3

Batu Belah 15/20

150,000.00

160,000.00

180,000.00

192,000.00

0.432

m3

Pasir Urug

100,000.00

125,000.00

43,200.00

54,000.00

57,135.00

61,035.00

0.78

OH

Pekerja

40,000.00

42,000.00

31,200.00

32,760.00

0.39

OH

Tukang Batu

55,000.00

60,000.00

21,450.00

23,400.00

0.039

OH

Kepala Tukang

60,000.00

65,000.00

2,340.00

2,535.00

0.039

OH

Mandor

55,000.00

60,000.00

2,145.00

2,340.00

m3

Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah

1,932,980.00

2,035,665.00

Bahan

1,736,880.00

1,827,340.00

Tenaga

6.10.1
0.480

m3

Batu Belah 15/20 cm

126

Kg

Besi Beton

150,000.00

160,000.00

72,000.00

76,800.00

10,000.00

10,500.00

1,260,000.00

1,323,000.00

194

Kg

Portland Semen

1,200.00

1,250.00

232,800.00

242,500.00

0.312

m3

Pasir Beton

195,000.00

210,000.00

60,840.00

65,520.00

0.468

m3

Koral Beton

180,000.00

190,000.00

84,240.00

88,920.00

1.8

Kg

Kawat Beton

15,000.00

17,000.00

27,000.00

30,600.00

196,100.00

208,325.00

3.4

OH

Pekerja

40,000.00

42,000.00

136,000.00

142,800.00

0.85

OH

Tukang Batu

55,000.00

60,000.00

46,750.00

51,000.00

0.085

OH

Kepala Tukang

60,000.00

65,000.00

5,100.00

5,525.00

0.15

OH

Mandor

55,000.00

60,000.00

8,250.00

9,000.00

6.10.2

149235156.xlsx.ms_office

434,325.00

287,100.00

0.17

6.9.2

6.10

396,975.00

Bahan

180,000.00

6.9.1

Memasang Pondasi Batu Kali 1Kp : 1Sm : 2Pp

160,000.00

6.8.2

6.9

MAKSIMUM
Rp

150,000.00

6.8.1

JUMLAH
MINIMUM
Rp

Batu Belah 15/20

6.7.2

6.8

MAKSIMUM
Rp

m3

6.7.1

MINIMUM
Rp

1.2

6.6.2

6.7

URAIAN PEKERJAAN

SAT.

Tenaga

83/33

gery 3-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.11

KOEF
1

m3

6.11.1

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

Pasang Pondasi Sumuran diameter 100 cm

596,725.00

630,080.00

Bahan

445,380.00

468,940.00

0.45

m3

Batu Belah 15/20 cm

150,000.00

160,000.00

67,500.00

194

Kg

Portland Semen

72,000.00

1,200.00

1,250.00

232,800.00

242,500.00

0.312

m3

0.468

m3

Pasir Beton

195,000.00

210,000.00

60,840.00

65,520.00

Koral Beton

180,000.00

190,000.00

84,240.00

88,920.00

2.40

OH

151,345.00

161,140.00

Pekerja

40,000.00

42,000.00

96,000.00

0.8

100,800.00

OH

Tukang Batu

55,000.00

60,000.00

44,000.00

48,000.00

0.08

OH

Kepala Tukang

60,000.00

65,000.00

4,800.00

5,200.00

0.119

OH

Mandor

55,000.00

60,000.00

6,545.00

7,140.00

6.11.2

149235156.xlsx.ms_office

URAIAN PEKERJAAN

SAT.

Tenaga

83/34

gery 3-14

HARGA BAHAN/UPAH
No.

SNI

IV

03-6897 - 2008

KODE

KOEF

URAIAN PEKERJAAN

SAT.

PEKERJAAN
6.1

1 m2

6.1.1

163,850.00

178,275.00

126,000.00

137,975.00

63,000.00

43.5

Kg

Portland Semen (PC)

70,000.00

1,200.00

1,250.00

52,200.00

0.08

m3

Pasir Pasang (PP)

54,375.00

135,000.00

170,000.00

10,800.00

13,600.00

0.6

OH

Bata Merah

37,850.00

40,300.00

Pekerja

40,000.00

42,000.00

24,000.00

0.2

25,200.00

OH

Tukang Batu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang Batu

60,000.00

65,000.00

1,200.00

1,300.00

0.03

OH

Mandor

55,000.00

60,000.00

1,650.00

1,800.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP

152,675.00

166,957.50

Bahan

114,825.00

126,657.50

Tenaga

Buah

Bata Merah

450.00

500.00

63,000.00

70,000.00

1,200.00

1,250.00

39,540.00

41,187.50

135,000.00

170,000.00

12,285.00

15,470.00

32.95

Kg

Portland Semen (PC)

0.091

m3

Pasir Pasang (PP)

37,850.00

40,300.00

0.6

OH

Pekerja

40,000.00

42,000.00

24,000.00

25,200.00

0.2

OH

Tukang Batu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang Batu

60,000.00

65,000.00

1,200.00

1,300.00

0.03

OH

Mandor

55,000.00

60,000.00

1,650.00

1,800.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4PP

145,265.00

159,297.50

Bahan

107,415.00

118,997.50

Tenaga

6.3.1
140

Buah

Bata Merah

450.00

500.00

63,000.00

70,000.00

1,200.00

1,250.00

31,860.00

33,187.50

135,000.00

170,000.00

12,555.00

15,810.00

26.55

Kg

Portland Semen (PC)

0.093

m3

Pasir Pasang (PP)

37,850.00

40,300.00

0.6

OH

Pekerja

40,000.00

42,000.00

24,000.00

25,200.00

0.2

OH

Tukang Batu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang Batu

60,000.00

65,000.00

1,200.00

1,300.00

0.03

OH

Mandor

55,000.00

60,000.00

1,650.00

1,800.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP

141,260.00

155,390.00

Bahan

103,410.00

115,090.00

6.3.2

Tenaga

6.4.1
140

Buah

450.00

500.00

63,000.00

22.2

Kg

Portland Semen (PC)

70,000.00

1,200.00

1,250.00

26,640.00

0.102

m3

Pasir Pasang (PP)

27,750.00

135,000.00

170,000.00

13,770.00

17,340.00

0.6

OH

37,850.00

40,300.00

Pekerja

40,000.00

42,000.00

24,000.00

0.2

25,200.00

OH

Tukang Batu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang Batu

60,000.00

65,000.00

1,200.00

1,300.00

0.03

OH

Mandor

55,000.00

60,000.00

1,650.00

1,800.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP

139,520.00

154,165.00

Bahan

101,670.00

113,865.00

6.4.2

Bata Merah

Tenaga

6.5.1
140

Buah

450.00

500.00

63,000.00

18.5

Kg

Portland Semen (PC)

70,000.00

1,200.00

1,250.00

22,200.00

0.122

m3

Pasir Pasang (PP)

23,125.00

135,000.00

170,000.00

16,470.00

20,740.00

0.6

OH

37,850.00

40,300.00

Pekerja

40,000.00

42,000.00

24,000.00

0.2

25,200.00

OH

Tukang Batu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang Batu

60,000.00

65,000.00

1,200.00

1,300.00

0.03

OH

Mandor

55,000.00

60,000.00

1,650.00

1,800.00

6.5.2

149235156.xlsx.ms_office

DINDING

500.00

6.2.2

6.5

MAKSIMUM
Rp

450.00

140

6.4

JUMLAH
MINIMUM
Rp

Bahan
Buah

6.2.1

6.3

MAKSIMUM
Rp

Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2Pp

140

6.1.2

6.2

MINIMUM
Rp

Bata Merah

Tenaga

83/35

gery 4-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.6

KOEF
1

m2

6.6.1
Buah

144,812.50

93,358.50

104,512.50

450.00

500.00

63,000.00

70,000.00

1,200.00

1,250.00

12,096.00

12,600.00

m3

Pasir Pasang (PP)

135,000.00

170,000.00

12,487.50

15,725.00

0.0275

m3

Kapur Pasang (KP)

210,000.00

225,000.00

5,775.00

6,187.50

37,850.00

40,300.00

0.6

OH

Pekerja

40,000.00

42,000.00

24,000.00

25,200.00

0.2

OH

Tukang Batu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang Batu

60,000.00

65,000.00

1,200.00

1,300.00

0.03

OH

Mandor

55,000.00

60,000.00

1,650.00

1,800.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 2PP

78,295.00

85,297.50

Bahan

59,370.00

65,147.50

Tenaga

Buah

Bata Merah 5 x 11 x 22

450.00

500.00

31,500.00

35,000.00

1,200.00

1,250.00

22,740.00

23,687.50

135,000.00

170,000.00

5,130.00

6,460.00

18.95

Kg

Portland Semen

0.038

m3

Pasir Pasang

18,925.00

20,150.00

0.30

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3PP

73,069.00

79,912.50

Bahan

54,144.00

59,762.50

Tenaga

6.8.1
70

Buah

Bata Merah 5 x 11 x 22

450.00

500.00

31,500.00

35,000.00

1,200.00

1,250.00

17,244.00

17,962.50

135,000.00

170,000.00

5,400.00

6,800.00

14.37

Kg

Portland Semen

0.04

m3

Pasir Pasang

18,925.00

20,150.00

0.30

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 4PP

70,030.00

76,835.00

Bahan

51,105.00

56,685.00

6.8.2

Tenaga

6.9.1
70

Buah

Bata Merah 5 x 11 x 22

450.00

500.00

31,500.00

35,000.00

1,200.00

1,250.00

13,800.00

14,375.00

135,000.00

170,000.00

5,805.00

7,310.00

11.50

Kg

Portland Semen

0.043

m3

Pasir Pasang

18,925.00

20,150.00

0.30

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 5PP

68,116.00

74,900.00

Bahan

49,191.00

54,750.00

6.9.2

Tenaga

70

Buah

Bata Merah 5 x 11 x 22

450.00

500.00

31,500.00

35,000.00

1,200.00

1,250.00

11,616.00

12,100.00

135,000.00

170,000.00

6,075.00

7,650.00

9.68

Kg

Portland Semen

0.045

m3

Pasir Pasang

18,925.00

20,150.00

0.30

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

6.10.2

149235156.xlsx.ms_office

131,208.50

0.0925

6.7.2

6.10.1

Bata Merah

MAKSIMUM
Rp

Portland Semen (PC)

70

6.10

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3 KP :10PP

JUMLAH
MINIMUM
Rp

Kg

6.7.1

6.9

MAKSIMUM
Rp

10.08

6.6.2

6.8

MINIMUM
Rp

Bahan
140

6.7

URAIAN PEKERJAAN

SAT.

Tenaga

83/36

gery 4-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.11

KOEF
1

m2

6.11.1
70

Buah

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 6PP

67,024.00

73,880.00

Bahan

48,099.00

53,730.00

Bata Merah 5 x 11 x 22

450.00

500.00

31,500.00

35,000.00

1,200.00

1,250.00

9,984.00

10,400.00

135,000.00

170,000.00

6,615.00

8,330.00

m3

Pasir Pasang

18,925.00

20,150.00

0.30

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 8PP

64,975.00

71,775.00

Bahan

46,050.00

51,625.00

Tenaga

Buah

Bata Merah 5 x 11 x 22

450.00

500.00

31,500.00

35,000.00

1,200.00

1,250.00

7,800.00

8,125.00

135,000.00

170,000.00

6,750.00

8,500.00

6.50

Kg

Portland Semen

0.05

m3

Pasir Pasang

18,925.00

20,150.00

0.30

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3KP : 10PP

65,725.00

72,650.00

Bahan

46,800.00

52,500.00

Tenaga

6.13.1
70

Buah

450.00

500.00

31,500.00

4.5

Kg

Portland Semen

35,000.00

1,200.00

1,250.00

5,400.00

0.05

m3

5,625.00

Pasir Pasang

135,000.00

170,000.00

6,750.00

0.015

m3

8,500.00

Kapur Padam

210,000.00

225,000.00

3,150.00

3,375.00

0.30

OH

18,925.00

20,150.00

Pekerja

40,000.00

42,000.00

12,000.00

0.1

12,600.00

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 1SM : 1PP

59,335.00

65,320.00

Bahan

40,410.00

45,170.00

6.13.2

Bata Merah 5 x 11 x 22

Tenaga

6.14.1
70

Buah

Bata Merah 5 x 11 x 22

450.00

500.00

31,500.00

35,000.00

0.018

m3

Semen Merah

150,000.00

170,000.00

2,700.00

3,060.00

0.018

m3

Pasir Pasang

135,000.00

170,000.00

2,430.00

3,060.00

0.018

m3

Kapur Padam

210,000.00

225,000.00

3,780.00

4,050.00

18,925.00

20,150.00

0.30

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1KP : 1SM : 2PP

59,245.00

65,440.00

Bahan

40,320.00

45,290.00

6.14.2

Tenaga

6.15.1
70

Buah

Bata Merah 5 x 11 x 22

450.00

500.00

31,500.00

35,000.00

0.014

m3

Semen Merah

150,000.00

170,000.00

2,100.00

2,380.00

0.028

m3

Pasir Pasang

135,000.00

170,000.00

3,780.00

4,760.00

0.014

m3

Kapur Padam

210,000.00

225,000.00

2,940.00

3,150.00

18,925.00

20,150.00

0.30

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

6.15.2

149235156.xlsx.ms_office

MAKSIMUM
Rp

0.049

6.12.2

6.15

JUMLAH
MINIMUM
Rp

Portland Semen

70

6.14

MAKSIMUM
Rp

Kg

6.12.1

6.13

MINIMUM
Rp

8.32

6.11.2

6.12

URAIAN PEKERJAAN

SAT.

Tenaga

83/37

gery 4-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.20

KOEF
1

m2

6.20.1
12.500

buah

15.160

MINIMUM
Rp

MAKSIMUM
Rp

Memasang Dinding HB/CB 10, speci camp. 1PC : 3PP

126,557.00

144,545.00

Bahan

107,632.00

124,395.00

3,250.00

37,500.00

40,625.00

kg

PC

1,200.00

1,250.00

18,192.00

18,950.00

0.364

m3

Pasir Pasang

135,000.00

170,000.00

49,140.00

61,880.00

0.280

kg

Besi Angkur 8 mm

10,000.00

10,500.00

2,800.00

2,940.00

18,925.00

20,150.00

0.300

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.100

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.010

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Dinding HB/CB 10, speci camp. 1PC : 4PP

126,161.00

144,837.50

Bahan

107,236.00

124,687.50

Tenaga

12.500

buah

Batako

3,000.00

3,250.00

37,500.00

12.130

40,625.00

kg

PC

1,200.00

1,250.00

14,556.00

15,162.50

0.388

m3

Pasir Pasang

135,000.00

170,000.00

52,380.00

65,960.00

0.280

kg

Besi Angkur 8 mm

10,000.00

10,500.00

2,800.00

2,940.00

18,925.00

20,150.00

0.300

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.100

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.010

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1Pc : 2PP

235,045.00

268,090.00

Bahan

216,120.00

247,940.00

Tenaga

6.22.1
30

Buah

6,500.00

7,500.00

195,000.00

225,000.00

1,200.00

1,250.00

16,800.00

17,500.00

135,000.00

170,000.00

4,320.00

5,440.00

kg

Portland Semen

0.032

m3

Pasir Pasang

18,925.00

20,150.00

0.30

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1Pc : 4PP

231,850.00

264,850.00

Bahan

212,925.00

244,700.00

Tenaga

6.23.1
30

Buah

Terawang / Roster

6,500.00

7,500.00

195,000.00

225,000.00

1,200.00

1,250.00

13,200.00

13,750.00

135,000.00

170,000.00

4,725.00

5,950.00

11

kg

Portland Semen

0.035

m3

Pasir Pasang

18,925.00

20,150.00

0.30

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

6.23.2

149235156.xlsx.ms_office

Terawang / Roster

14

6.22.2

6.23

MAKSIMUM
Rp

3,000.00

6.21.1

6.22

JUMLAH
MINIMUM
Rp

Batako

6.20.2

6.21

URAIAN PEKERJAAN

SAT.

Tenaga

83/38

gery 4-14

HARGA BAHAN/UPAH
No.

SNI

03-2837 - 2008

KODE

KOEF

PEKERJAAN
6.1

m2

6.1.1

6.2

42,739.80

45,575.00

20,764.80

22,100.00

1,250.00

18,604.80

0.016

m3

Pasir Pasang

19,380.00

135,000.00

170,000.00

2,160.00

2,720.00

0.3

OH

21,975.00

23,475.00

Pekerja

40,000.00

42,000.00

12,000.00

0.15

12,600.00

OH

Tukang batu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Plesteran 1 Pc : 2 Pp Tebal 15 mm

36,943.80

39,655.00

Bahan

14,968.80

16,180.00

Tenaga

10.224

Kg

Portland Semen

1,200.00

1,250.00

12,268.80

0.020

m3

Pasir Pasang

12,780.00

135,000.00

170,000.00

2,700.00

3,400.00

0.3

OH

21,975.00

23,475.00

Pekerja

40,000.00

42,000.00

12,000.00

0.15

12,600.00

OH

Tukang batu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Plesteran 1 Pc : 3 Pp Tebal 15 mm

34,411.20

37,105.00

Bahan

12,436.20

13,630.00

Tenaga

7.776

Kg

Portland Semen

1,200.00

1,250.00

9,331.20

0.023

m3

Pasir Pasang

9,720.00

135,000.00

170,000.00

3,105.00

3,910.00

0.3

OH

21,975.00

23,475.00

Pekerja

40,000.00

42,000.00

12,000.00

0.15

12,600.00

OH

Tukang batu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Plesteran 1 Pc : 4 Pp Tebal 15 mm

32,703.00

35,355.00

Bahan

10,728.00

11,880.00

Tenaga

6.3.2

6.4.1
6.240

Kg

Portland Semen

1,200.00

1,250.00

7,488.00

0.024

m3

Pasir Pasang

7,800.00

135,000.00

170,000.00

3,240.00

4,080.00

0.3

OH

21,975.00

23,475.00

Pekerja

40,000.00

42,000.00

12,000.00

0.15

12,600.00

OH

Tukang batu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Plesteran 1 Pc : 5 Pp Tebal 15 mm

31,705.80

34,375.00

9,730.80

10,900.00

6.4.2

Tenaga

6.5.1

Bahan
5.184

Kg

Portland Semen

1,200.00

1,250.00

6,220.80

0.026

m3

Pasir Pasang

6,480.00

135,000.00

170,000.00

3,510.00

4,420.00

0.3

OH

21,975.00

23,475.00

Pekerja

40,000.00

42,000.00

12,000.00

0.15

12,600.00

OH

Tukang batu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Plesteran 1 Pc : 6 Pp Tebal 15 mm

30,919.20

33,585.00

8,944.20

10,110.00

6.5.2

6.6

MAKSIMUM
Rp

1,200.00

6.3.1

6.5

JUMLAH
MINIMUM
Rp

Bahan
Portland Semen

6.2.2

6.4

MAKSIMUM
Rp

Memasang Plesteran 1 Pc : 1 Pp Tebal 15 mm

Kg

6.2.1

6.3

MINIMUM
Rp

PLESTERAN

15.504

6.1.2

Tenaga

6.6.1

Bahan
4.416

Kg

Portland Semen

0.027

m3

Pasir Pasang

0.3

OH

6.6.2

149235156.xlsx.ms_office

URAIAN PEKERJAAN

SAT.

1,200.00

1,250.00

5,299.20

5,520.00

135,000.00

170,000.00

3,645.00

4,590.00

21,975.00

23,475.00

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

Tenaga
0.15

OH

Tukang batu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

83/39

abk 5-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.7

KOEF
1

m2

6.7.1
Kg

Portland Semen

0.028

m3

Pasir Pasang

0.3

OH

0.15

33,155.00

8,503.20

9,680.00
4,920.00

135,000.00

170,000.00

3,780.00

4,760.00

21,975.00

23,475.00

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

OH

Tukang batu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Plesteran 1 Pc : 8 Pp Tebal 15 mm

30,037.20

32,725.00

8,062.20

9,250.00

Tenaga

Bahan
3.456

Kg

Portland Semen

1,200.00

1,250.00

4,147.20

0.029

m3

Pasir Pasang

4,320.00

135,000.00

170,000.00

3,915.00

4,930.00

0.30

OH

21,975.00

23,475.00

Pekerja

40,000.00

42,000.00

12,000.00

0.15

12,600.00

OH

Tukang batu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm

32,007.00

34,265.00

9,297.00

10,085.00
7,200.00

Tenaga

Bahan
5.760

Kg

Portland Semen

1,200.00

1,250.00

6,912.00

0.003

m3

Kapur Pasang

210,000.00

225,000.00

630.00

0.013

m3

675.00

Pasir Pasang

135,000.00

170,000.00

1,755.00

2,210.00

0.36

OH

22,710.00

24,180.00

Pekerja

40,000.00

42,000.00

14,400.00

0.12

15,120.00

OH

Tukang batu

55,000.00

60,000.00

6,600.00

7,200.00

0.012

OH

Kepala Tukang

60,000.00

65,000.00

720.00

780.00

0.018

OH

Mandor

55,000.00

60,000.00

990.00

1,080.00

m2

Memasang Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm

30,060.00

32,455.00

7,350.00

8,275.00

Tenaga

6.10.1

Bahan
3

kg

Portland Semen

1,200.00

1,250.00

3,600.00

0.005

m3

3,750.00

Kapur Padam

210,000.00

225,000.00

1,050.00

0.020

m3

1,125.00

Pasir Pasang

135,000.00

170,000.00

2,700.00

3,400.00

0.36

OH

22,710.00

24,180.00

Pekerja

40,000.00

42,000.00

14,400.00

0.12

15,120.00

OH

Tukang batu

55,000.00

60,000.00

6,600.00

7,200.00

0.012

OH

Kepala Tukang

60,000.00

65,000.00

720.00

780.00

0.018

OH

Mandor

55,000.00

60,000.00

990.00

1,080.00

m2

Memasang Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm

27,165.00

29,265.00

4,455.00

5,085.00

6.10.2

Tenaga

6.11.1

Bahan
0.009

m3

Semen Merah

150,000.00

170,000.00

1,350.00

1,530.00

0.009

m3

Kapur Padam

210,000.00

225,000.00

1,890.00

2,025.00

0.009

m3

Pasir Pasang

135,000.00

170,000.00

1,215.00

1,530.00

22,710.00

24,180.00

0.36

OH

Pekerja

40,000.00

42,000.00

14,400.00

15,120.00

0.12

OH

Tukang batu

55,000.00

60,000.00

6,600.00

7,200.00

0.012

OH

Kepala Tukang

60,000.00

65,000.00

720.00

780.00

0.018

OH

Mandor

55,000.00

60,000.00

990.00

1,080.00

m2

Memasang Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm

27,255.00

29,495.00

4,545.00

5,315.00

6.11.2

Tenaga

6.12.1

Bahan
0.007

m3

Semen Merah

150,000.00

170,000.00

1,050.00

1,190.00

0.007

m3

Kapur Padam

210,000.00

225,000.00

1,470.00

1,575.00

0.015

m3

Pasir Pasang

135,000.00

170,000.00

2,025.00

2,550.00

22,710.00

24,180.00

0.36

OH

Pekerja

40,000.00

42,000.00

14,400.00

15,120.00

0.12

OH

Tukang batu

55,000.00

60,000.00

6,600.00

7,200.00

0.012

OH

Kepala Tukang

60,000.00

65,000.00

720.00

780.00

0.018

OH

Mandor

55,000.00

60,000.00

990.00

1,080.00

6.12.2

149235156.xlsx.ms_office

30,478.20
4,723.20

6.9.2

6.12

MAKSIMUM
Rp

1,250.00

6.9.1

6.11

JUMLAH
MINIMUM
Rp

1,200.00

6.8.2

6.10

MAKSIMUM
Rp

Memasang Plesteran 1 Pc : 7 Pp Tebal 15 mm

3.936

6.8.1

6.9

MINIMUM
Rp

Bahan

6.7.2

6.8

URAIAN PEKERJAAN

SAT.

Tenaga

83/40

abk 5-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.13

KOEF
1

m2

6.13.1
0.027

m3

Pasir Pasang

17,040.00

135,000.00

170,000.00

3,645.00

4,590.00

0.40

OH

29,410.00

31,420.00

Pekerja

40,000.00

42,000.00

16,000.00

0.20

16,800.00

OH

Tukang batu

55,000.00

60,000.00

11,000.00

12,000.00

0.020

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.022

OH

Mandor

55,000.00

60,000.00

1,210.00

1,320.00

m2

Memasang Plesteran 1Pc : 3Pp Tebal 20 mm

39,941.60

43,230.00

Bahan

16,626.60

18,230.00

Tenaga

10.368

Kg

Portland Semen

1,200.00

1,250.00

12,441.60

0.031

m3

Pasir Pasang

12,960.00

135,000.00

170,000.00

4,185.00

5,270.00

0.26

OH

23,315.00

25,000.00

Pekerja

40,000.00

42,000.00

10,400.00

0.2

10,920.00

OH

Tukang batu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.013

OH

Mandor

55,000.00

60,000.00

715.00

780.00

m2

Memasang Plesteran 1 Pc : 4 Pp Tebal 20 mm

43,714.00

47,260.00

Bahan

14,304.00

15,840.00

Tenaga

8.320

kg

Portland Semen

1,200.00

1,250.00

9,984.00

0.032

m3

Pasir Pasang

10,400.00

135,000.00

170,000.00

4,320.00

5,440.00

0.40

OH

29,410.00

31,420.00

Pekerja

40,000.00

42,000.00

16,000.00

0.20

16,800.00

OH

Tukang batu

55,000.00

60,000.00

11,000.00

12,000.00

0.020

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.022

OH

Mandor

55,000.00

60,000.00

1,210.00

1,320.00

m2

Memasang Plesteran 1Pc : 5Pp Tebal 20 mm

42,429.40

46,010.00

Bahan

13,019.40

14,590.00

Tenaga

6.912

Kg

Portland Semen

1,200.00

1,250.00

8,294.40

0.035

m3

Pasir Pasang

8,640.00

135,000.00

170,000.00

4,725.00

5,950.00

0.400

OH

29,410.00

31,420.00

Pekerja

40,000.00

42,000.00

16,000.00

0.200

16,800.00

OH

Tukang batu

55,000.00

60,000.00

11,000.00

12,000.00

0.020

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.022

OH

Mandor

55,000.00

60,000.00

1,210.00

1,320.00

m2

Memasang Plesteran 1Pc : 6Pp Tebal 20 mm

41,335.60

44,900.00

Bahan

11,925.60

13,480.00

6.16.2

Tenaga

6.17.1
5.888

Kg

Portland Semen

1,200.00

1,250.00

7,065.60

0.036

m3

Pasir Pasang

7,360.00

135,000.00

170,000.00

4,860.00

6,120.00

0.40

OH

29,410.00

31,420.00

Pekerja

40,000.00

42,000.00

16,000.00

0.2

16,800.00

OH

Tukang batu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.022

OH

Mandor

55,000.00

60,000.00

1,210.00

1,320.00

m2

Memasang Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm

37,900.00

41,045.00

5,670.00

6,615.00

6.17.2

Tenaga

6.18.1

Bahan
0.009

m3

Semen Merah

150,000.00

170,000.00

1,350.00

1,530.00

0.009

m3

Kapur Padam

210,000.00

225,000.00

1,890.00

2,025.00

0.018

m3

Pasir Pasang

135,000.00

170,000.00

2,430.00

3,060.00

32,230.00

34,430.00

0.440

OH

Pekerja

40,000.00

42,000.00

17,600.00

18,480.00

0.22

OH

Tukang batu

55,000.00

60,000.00

12,100.00

13,200.00

0.022

OH

Kepala Tukang

60,000.00

65,000.00

1,320.00

1,430.00

0.022

OH

Mandor

55,000.00

60,000.00

1,210.00

1,320.00

m2

Memasang Berapen 1 Pc : 5Pp Tebal 15 mm

20,775.80

22,700.00

9,730.80

10,900.00

6.18.2

Tenaga

6.19.1

149235156.xlsx.ms_office

21,630.00

16,358.40

6.16.1

6.19

53,050.00

20,003.40
1,250.00

6.15.2

6.18

MAKSIMUM
Rp

1,200.00

6.15.1

6.17

JUMLAH
MINIMUM
Rp
49,413.40

Portland Semen

6.14.2

6.16

MAKSIMUM
Rp

Bahan
kg

6.14.1

6.15

MINIMUM
Rp

Memasang Plesteran 1 Pc : 2 Pp Tebal 20 mm

13.632

6.13.2

6.14

URAIAN PEKERJAAN

SAT.

Bahan
5.184

Kg

Portland Semen

0.026

m3

Pasir Pasang

83/41

1,200.00

1,250.00

6,220.80

6,480.00

135,000.00

170,000.00

3,510.00

4,420.00

abk 5-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

6.19.2

6.20

Tenaga

11,045.00

11,800.00

42,000.00

6,000.00

6,300.00

0.075

OH

Tukang batu

55,000.00

60,000.00

4,125.00

4,500.00

0.008

OH

Kepala Tukang

60,000.00

65,000.00

480.00

520.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

m'

Memasang Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm

30,175.00

33,035.00

2,355.00

2,835.00

Bahan
0.5

Kg

Portland Semen

1,200.00

1,250.00

600.00

0.013

m3

Pasir Pasang

625.00

135,000.00

170,000.00

1,755.00

2,210.00

0.080

OH

27,820.00

30,200.00

Pekerja

40,000.00

42,000.00

3,200.00

0.40

3,360.00

OH

Tukang batu

55,000.00

60,000.00

22,000.00

24,000.00

0.040

OH

Kepala Tukang

60,000.00

65,000.00

2,400.00

2,600.00

0.004

OH

Mandor

55,000.00

60,000.00

220.00

240.00

m2

Memasang Plesteran Ciprat 1Pc : 2 Pp

24,919.00

26,570.00

5,994.00

6,420.00

Tenaga

Bahan
4.32

Kg

Portland Semen

1,200.00

1,250.00

5,184.00

0.006

m3

Pasir Pasang

5,400.00

135,000.00

170,000.00

810.00

1,020.00

0.30

OH

18,925.00

20,150.00

Pekerja

40,000.00

42,000.00

12,000.00

0.1

12,600.00

OH

Tukang batu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m')

14,774.60

15,685.00

3,729.60

3,885.00

3,729.60

3,885.00

Tenaga

6.24.1

Bahan
3.108

Kg

1,200.00

1,250.00

0.15

OH

11,045.00

11,800.00

Pekerja

40,000.00

42,000.00

6,000.00

0.075

6,300.00

OH

Tukang batu

55,000.00

60,000.00

4,125.00

4,500.00

0.008

OH

Kepala Tukang

60,000.00

65,000.00

480.00

520.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

m2

Memasang Finishing Siar Pasangan Dinding Conblock ekspose (=8 m')

7,105.00

7,540.00

Bahan

1,920.00

2,000.00

1,920.00

2,000.00

6.24.2

1.600

Kg

1,200.00

1,250.00

0.070

OH

5,185.00

5,540.00

Pekerja

40,000.00

42,000.00

2,800.00

0.035

2,940.00

OH

Tukang batu

55,000.00

60,000.00

1,925.00

2,100.00

0.004

OH

Kepala Tukang

60,000.00

65,000.00

240.00

260.00

0.004

OH

Mandor

55,000.00

60,000.00

220.00

240.00

m2

Memasang Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp

31,203.00

33,440.00

9,228.00

9,965.00

6.25.2

Portland Semen
Tenaga

6.26.1

Bahan
6.34

Kg

Pc

1,200.00

1,250.00

7,608.00

7,925.00

0.012

m3

PP

135,000.00

170,000.00

1,620.00

2,040.00

21,975.00

23,475.00

0.3

OH

Pekerja

40,000.00

42,000.00

12,000.00

12,600.00

0.15

OH

Tukang batu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

m2

Memasang Acian

18,550.00

19,712.50

3,900.00

4,062.50

3,900.00

4,062.50

6.26.2

Tenaga

6.27.1

Bahan
3.25

Kg

1,200.00

1,250.00

0.20

OH

14,650.00

15,650.00

Pekerja

40,000.00

42,000.00

8,000.00

0.10

8,400.00

OH

Tukang batu

55,000.00

60,000.00

5,500.00

6,000.00

0.010

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.010

OH

Mandor

55,000.00

60,000.00

550.00

600.00

6.27.2

149235156.xlsx.ms_office

Portland Semen
Tenaga

6.25.1

6.27

MAKSIMUM
Rp

40,000.00

6.23.2

6.26

JUMLAH
MINIMUM
Rp

Pekerja

6.23.1

6.25

MAKSIMUM
Rp

OH

6.20.2

6.24

MINIMUM
Rp

0.15

6.20.1

6.23

URAIAN PEKERJAAN

SAT.

Portland Semen
Tenaga

83/42

abk 5-14

HARGA BAHAN/UPAH
No.

SNI

VI

03-3434 - 2008

KODE

6.1

KOEF

m3

6.1.2

22,038,125.00

20,900,000.00

1.25

kg

22,000,000.00

Paku Biasa 2" - 5 "

12,500.00

14,500.00

15,625.00

kg

18,125.00

Lem Kayu

18,000.00

20,000.00

18,000.00

20,000.00

OH

1,580,250.00

1,711,500.00

Pekerja

40,000.00

42,000.00

280,000.00

21

294,000.00

OH

Tukang Kayu

55,000.00

60,000.00

1,155,000.00

1,260,000.00

2.10

OH

Kepala Tukang

60,000.00

65,000.00

126,000.00

136,500.00

0.35

OH

Mandor

55,000.00

60,000.00

19,250.00

21,000.00

m3

Membuat Kosen Pintu & Jendela Kayu klas II atau III

9,428,125.00

10,025,125.00

Bahan

8,073,625.00

8,558,125.00

Tenaga

1.2

m3

Kayu Klas II (Kamfer) , Balok

6,700,000.00

7,100,000.00

8,040,000.00

1.25

kg

8,520,000.00

Paku Biasa 2" - 5 "

12,500.00

14,500.00

15,625.00

kg

18,125.00

Lem Kayu

18,000.00

20,000.00

18,000.00

20,000.00

6.00

OH

1,354,500.00

1,467,000.00

Pekerja

40,000.00

42,000.00

240,000.00

18.00

252,000.00

OH

Tukang Kayu

55,000.00

60,000.00

990,000.00

1,080,000.00

1.80

OH

Kepala Tukang

60,000.00

65,000.00

108,000.00

117,000.00

0.30

OH

Mandor

55,000.00

60,000.00

16,500.00

18,000.00

m2

Membuat Pintu KlampStandard Kayu Klas II (Kayu Kamfer)

371,665.00

386,330.00

Bahan

292,625.00

300,725.00

Tenaga

0.040

m3

Kayu Klas II (Kamfer), papan

7,300,000.00

7,500,000.00

292,000.00

0.05

Kg

Paku Biasa 2" - 5 "

300,000.00

12,500.00

14,500.00

625.00

725.00

0.35

OH

79,040.00

85,605.00

Pekerja

40,000.00

42,000.00

14,000.00

1.05

14,700.00

OH

Tukang Kayu

55,000.00

60,000.00

57,750.00

63,000.00

0.105

OH

Kepala Tukang

60,000.00

65,000.00

6,300.00

6,825.00

0.018

OH

Mandor

55,000.00

60,000.00

990.00

1,080.00

m2

Membuat Daun Pintu Panel Kayu Klas I atau II

518,650.00

545,500.00

Bahan

292,900.00

301,000.00

Tenaga

6.5.1
0.04

m3

Kayu Klas II (Kamfer), papan

7,300,000.00

7,500,000.00

292,000.00

0.050

kg

Lem Kayu

300,000.00

18,000.00

20,000.00

900.00

1,000.00

OH

225,750.00

244,500.00

Pekerja

40,000.00

42,000.00

40,000.00

3.0

42,000.00

OH

Tukang Kayu

55,000.00

60,000.00

165,000.00

180,000.00

0.30

OH

Kepala Tukang

60,000.00

65,000.00

18,000.00

19,500.00

0.05

OH

Mandor

55,000.00

60,000.00

2,750.00

3,000.00

m2

Membuat Pintu & Jendela Kaca Kayu Klas I atau II

361,200.00

381,600.00

Bahan

180,600.00

186,000.00

6.5.2

Tenaga

6.6.1
0.024

m3

Kayu Klas II (Kamfer), papan

7,300,000.00

7,500,000.00

175,200.00

0.300

kg

Lem Kayu

180,000.00

18,000.00

20,000.00

5,400.00

6,000.00

0.800

OH

180,600.00

195,600.00

Pekerja

40,000.00

42,000.00

32,000.00

2.400

33,600.00

OH

Tukang Kayu

55,000.00

60,000.00

132,000.00

144,000.00

0.240

OH

Kepala Tukang

60,000.00

65,000.00

14,400.00

15,600.00

0.040

OH

Mandor

55,000.00

60,000.00

2,200.00

2,400.00

m2

Membuat Pintu & Jendela Jalusi Kayu Klas I atau II

1,578,750.00

1,662,500.00

Bahan

1,353,000.00

1,418,000.00

6.6.2

Tenaga

6.7.1
0.064

m3

Kayu Klas I (Jati), papan

21,000,000.00

22,000,000.00

1,344,000.00

0.5

kg

Lem Kayu

1,408,000.00

18,000.00

20,000.00

9,000.00

10,000.00

OH

225,750.00

244,500.00

Pekerja

40,000.00

42,000.00

40,000.00

42,000.00

OH

Tukang Kayu

55,000.00

60,000.00

165,000.00

180,000.00

0.3

OH

Kepala Tukang

60,000.00

65,000.00

18,000.00

19,500.00

0.05

OH

Mandor

55,000.00

60,000.00

2,750.00

3,000.00

6.7.2

149235156.xlsx.ms_office

23,749,625.00

20,933,625.00
20,000,000.00

6.3.2

6.7

MAKSIMUM
Rp

19,000,000.00

6.3.1

6.6

JUMLAH
MINIMUM
Rp

22,513,875.00

Kayu Klas I (Jati) , Balok

6.2.2

6.5

MAKSIMUM
Rp

Bahan
m3

6.2.1

6.3

MINIMUM
Rp

PEKERJAAN K A Y U
Membuat Kosen Pintu & Jendela Kayu klas I

1.1

6.1.2

6.2

URAIAN PEKERJAAN

SAT.

Tenaga

83/43

abk 6-14

HARGA BAHAN/UPAH
No.

SNI

KODE

6.8

KOEF

m2

6.8.1

257,935.00
187,500.00

182,500.00

0.030

Kg

Paku Biasa 1/2" - 1"

12,500.00

14,500.00

375.00

0.500

435.00

Ltr

Lem Kayu

18,000.00

20,000.00

9,000.00

10,000.00

1.000

Lbr

Plywood tebal 4 mm uk.90x220cm

55,000.00

60,000.00

55,000.00

60,000.00

158,025.00

171,150.00

0.700

OH

Pekerja

40,000.00

42,000.00

28,000.00

29,400.00

2.100

OH

Tukang Kayu

55,000.00

60,000.00

115,500.00

126,000.00

0.210

OH

Kepala Tukang

60,000.00

65,000.00

12,600.00

13,650.00

0.035

OH

Mandor

55,000.00

60,000.00

1,925.00

2,100.00

m2

Membuat Pintu Plywood rangkap, rangka expose kayu klas I atau II

431,855.00

458,035.00

Bahan

251,255.00

262,435.00
192,000.00

Tenaga

0.0256

m3

Kayu Klas II (Kamfer), papan

7,300,000.00

7,500,000.00

186,880.00

0.03

Kg

Paku Biasa 1/2" - 1"

12,500.00

14,500.00

375.00

0.5

435.00

Ltr

Lem Kayu

18,000.00

20,000.00

9,000.00

10,000.00

Lbr

Plywood tebal 4 mm uk.90x220cm

55,000.00

60,000.00

55,000.00

60,000.00

180,600.00

195,600.00

0.800

OH

Pekerja

40,000.00

42,000.00

32,000.00

33,600.00

2.400

OH

Tukang Kayu

55,000.00

60,000.00

132,000.00

144,000.00

0.240

OH

Kepala Tukang

60,000.00

65,000.00

14,400.00

15,600.00

0.040

OH

Mandor

55,000.00

60,000.00

2,200.00

2,400.00

m2

Membuat Jalusi mati Kosen Kayu Klas I atau II

1,429,100.00

1,503,415.00

Bahan

1,261,875.00

1,322,175.00

Tenaga

0.06

m3

Kayu Klas I (Jati), papan

21,000,000.00

22,000,000.00

1,260,000.00

0.15

Kg

Paku Biasa 1/2" - 1"

1,320,000.00

12,500.00

14,500.00

1,875.00

2,175.00

0.670

OH

167,225.00

181,240.00

Pekerja

40,000.00

42,000.00

26,800.00

2.000

28,140.00

OH

Tukang Kayu

55,000.00

60,000.00

110,000.00

120,000.00

0.200

OH

Kepala Tukang

60,000.00

65,000.00

12,000.00

13,000.00

0.335

OH

Mandor

55,000.00

60,000.00

18,425.00

20,100.00

m2

Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I

766,375.00

812,035.00

Bahan

585,775.00

616,435.00
550,000.00

Tenaga

6.11.1
0.025

m3

Kayu Klas I (Jati), papan

21,000,000.00

22,000,000.00

525,000.00

0.03

Kg

Paku Biasa 1/2" - 1"

12,500.00

14,500.00

375.00

0.3

435.00

kg

Lem Kayu

18,000.00

20,000.00

5,400.00

6,000.00

Lbr

Teakwood (90 x 220) cm x 4 mm

55,000.00

60,000.00

55,000.00

60,000.00

180,600.00

195,600.00

0.80

OH

Pekerja

40,000.00

42,000.00

32,000.00

33,600.00

2.40

OH

Tukang Kayu

55,000.00

60,000.00

132,000.00

144,000.00

0.24

OH

Kepala Tukang

60,000.00

65,000.00

14,400.00

15,600.00

0.04

OH

Mandor

55,000.00

60,000.00

2,200.00

2,400.00

m2

Membuat Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II

453,730.00

487,390.00

Bahan

261,815.00

279,535.00
187,500.00

6.11.2

Tenaga

6.12.1
0.025

m3

Kayu Klas II (Kamfer), papan

7,300,000.00

7,500,000.00

182,500.00

0.03

Kg

Paku Biasa 1/2" - 1"

12,500.00

14,500.00

375.00

0.08

435.00

kg

Lem Kayu

18,000.00

20,000.00

1,440.00

1,600.00

Lbr

Teakwood (90 x 220) cm x 4 mm

55,000.00

60,000.00

55,000.00

60,000.00

0.5

Lbr

Formika

45,000.00

60,000.00

22,500.00

30,000.00

191,915.00

207,855.00

0.850

OH

Pekerja

40,000.00

42,000.00

34,000.00

35,700.00

2.550

OH

Tukang Kayu

55,000.00

60,000.00

140,250.00

153,000.00

0.255

OH

Kepala Tukang

60,000.00

65,000.00

15,300.00

16,575.00

0.043

OH

Mandor

55,000.00

60,000.00

2,365.00

2,580.00

m3

Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter

8,538,000.00

9,079,200.00

Bahan

7,635,000.00

8,101,200.00

6.12.2

Tenaga

6.13.1

149235156.xlsx.ms_office

429,085.00

246,875.00
7,500,000.00

6.10.2

6.13

MAKSIMUM
Rp

7,300,000.00

6.10.1

6.12

JUMLAH
MINIMUM
Rp
404,900.00

Kayu Klas II (Kamfer), papan

6.9.2

6.11

MAKSIMUM
Rp

Bahan
m3

6.9.1

6.10

MINIMUM
Rp

Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)

0.025

6.8.2

6.9

URAIAN PEKERJAAN

SAT.

1.1

m3

Kayu Kamfer, balok

6,700,000.00

7,100,000.00

7,370,000.00

15

Kg

7,810,000.00

Besi Strip

13,000.00

14,000.00

195,000.00

5.6

Kg

210,000.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

70,000.00

81,200.00

83/44

abk 6-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

6.13.2

6.14

Tenaga

903,000.00

978,000.00

42,000.00

160,000.00

168,000.00

12

OH

Tukang Kayu

55,000.00

60,000.00

660,000.00

720,000.00

1.2

OH

Kepala Tukang

60,000.00

65,000.00

72,000.00

78,000.00

0.2

OH

Mandor

55,000.00

60,000.00

11,000.00

12,000.00

m3

Memasang Konstruksi Kuda-kuda Expose, Kayu Klas I

24,577,525.00

25,929,350.00

Bahan

23,065,000.00

24,291,200.00

1.2

m3

Kayu Klas I (jati), balok

19,000,000.00

20,000,000.00

22,800,000.00

15

Kg

24,000,000.00

Besi Strip

13,000.00

14,000.00

195,000.00

5.6

Kg

210,000.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

70,000.00

81,200.00

6.7

OH

1,512,525.00

1,638,150.00

Pekerja

40,000.00

42,000.00

268,000.00

20.1

281,400.00

OH

Tukang Kayu

55,000.00

60,000.00

1,105,500.00

1,206,000.00

Tenaga

2.01

OH

Kepala Tukang

60,000.00

65,000.00

120,600.00

130,650.00

0.335

OH

Mandor

55,000.00

60,000.00

18,425.00

20,100.00

m3

Memasang konstruksi Gording, Kayu Klas II

8,144,300.00

8,650,300.00

Bahan

7,602,500.00

8,063,500.00

1.1

m3

Kayu Klas I (Kamfer), balok

6,700,000.00

7,100,000.00

7,370,000.00

15

Kg

7,810,000.00

Besi Strip

13,000.00

14,000.00

195,000.00

Kg

210,000.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

37,500.00

43,500.00

2.4

OH

541,800.00

586,800.00

Pekerja

40,000.00

42,000.00

96,000.00

7.2

100,800.00

OH

Tukang Kayu

55,000.00

60,000.00

396,000.00

432,000.00

0.72

OH

Kepala Tukang

60,000.00

65,000.00

43,200.00

46,800.00

0.12

OH

Mandor

55,000.00

60,000.00

6,600.00

7,200.00

m2

Memasang Rangka Atap Genteng Keramik, Kayu Klas II

131,420.00

139,735.00

Bahan

121,045.00

128,585.00

Tenaga

6.16.1
0.014

m3

Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm

6,700,000.00

7,100,000.00

93,800.00

99,400.00

0.0036

m3

Reng (2x3) cm

6,700,000.00

7,100,000.00

24,120.00

25,560.00

0.25

Kg

Paku Biasa 2" - 5"

12,500.00

14,500.00

3,125.00

3,625.00

10,375.00

11,150.00

0.1

OH

Pekerja

40,000.00

42,000.00

4,000.00

4,200.00

0.1

OH

Tukang Kayu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

m2

Memasang Rangka Atap Genteng Beton, Kayu Klas II

155,540.00

165,295.00

Bahan

145,165.00

154,145.00

6.16.2

Tenaga

6.17.1
0.014

m3

Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm

6,700,000.00

7,100,000.00

93,800.00

99,400.00

0.0072

m3

Reng (2x3) cm

6,700,000.00

7,100,000.00

48,240.00

51,120.00

0.25

Kg

Paku Biasa 2" - 5"

12,500.00

14,500.00

3,125.00

3,625.00

10,375.00

11,150.00

0.1

OH

Pekerja

40,000.00

42,000.00

4,000.00

4,200.00

0.1

OH

Tukang Kayu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

m2

Memasang Rangka Atap Sirap, Kayu Klas II

1,120,450.00

1,187,780.00

Bahan

1,108,000.00

1,174,400.00

6.17.2

Tenaga

6.18.1
0.165

m3

Kayu Klas II (Kamfer), balok

6,700,000.00

7,100,000.00

1,105,500.00

0.2

Kg

Paku Biasa 2" - 5"

1,171,500.00

12,500.00

14,500.00

2,500.00

2,900.00

0.12

OH

12,450.00

13,380.00

Pekerja

40,000.00

42,000.00

4,800.00

0.12

5,040.00

OH

Tukang Kayu

55,000.00

60,000.00

6,600.00

7,200.00

0.012

OH

Kepala Tukang

60,000.00

65,000.00

720.00

780.00

0.006

OH

Mandor

55,000.00

60,000.00

330.00

360.00

m2

Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II atau III

134,105.00

142,990.00

Bahan

105,680.00

112,240.00

6.18.2

6.19

Tenaga

6.19.1

149235156.xlsx.ms_office

MAKSIMUM
Rp

40,000.00

6.15.2

6.18

JUMLAH
MINIMUM
Rp

Pekerja

6.15.1

6.17

MAKSIMUM
Rp

OH

6.14.2

6.16

MINIMUM
Rp

6.14.1

6.15

URAIAN PEKERJAAN

SAT.

0.0154

m3

Kayu Klas II (Kamfer), balok

0.2

Kg

Paku Biasa 2" - 5"

83/45

6,700,000.00

7,100,000.00

103,180.00

109,340.00

12,500.00

14,500.00

2,500.00

2,900.00

abk 6-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

6.19.2

6.20

Tenaga

6,000.00

6,300.00

0.30

OH

Tukang Kayu

55,000.00

60,000.00

16,500.00

18,000.00

0.030

OH

Kepala Tukang

60,000.00

65,000.00

1,800.00

1,950.00

0.075

OH

Mandor

55,000.00

60,000.00

4,125.00

4,500.00

m2

Memasang Rangka Langit-langit (60x60) cm, kayu Klas II atau III

139,185.00

148,305.00

Bahan

112,335.00

119,355.00

0.0163

m3

Kayu Klas II (Kamfer), balok

6,700,000.00

7,100,000.00

109,210.00

0.25

Kg

Paku Biasa 2" - 5"

115,730.00

12,500.00

14,500.00

3,125.00

3,625.00

0.2

OH

26,850.00

28,950.00

Pekerja

40,000.00

42,000.00

8,000.00

0.3

8,400.00

OH

Tukang Kayu

55,000.00

60,000.00

16,500.00

18,000.00

0.03

OH

Kepala Tukang

60,000.00

65,000.00

1,800.00

1,950.00

0.01

OH

Mandor

55,000.00

60,000.00

550.00

600.00

m'

Memasang Listplank Uk. (3x20)cm Kayu klas I atau II

244,525.00

256,850.00

Bahan

228,050.00

239,050.00

Tenaga

0.0108

m3

Kayu klas I (Jati), papan

21,000,000.00

22,000,000.00

226,800.00

0.10

Kg

Paku Biasa 2" - 5"

237,600.00

12,500.00

14,500.00

1,250.00

1,450.00

0.1

OH

16,475.00

17,800.00

Pekerja

40,000.00

42,000.00

4,000.00

0.2

4,200.00

OH

Tukang Kayu

55,000.00

60,000.00

11,000.00

12,000.00

0.020

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

m'

Memasang Listplank Uk. (3x30)cm Kayu klas I atau klas II

97,400.00

101,025.00

Bahan

80,925.00

83,225.00

Tenaga

0.011

m3

Kayu klas II (Kamfer), papan

7,300,000.00

7,500,000.00

80,300.00

0.05

Kg

Paku Biasa 2" - 5"

82,500.00

12,500.00

14,500.00

625.00

725.00

0.1

OH

16,475.00

17,800.00

Pekerja

40,000.00

42,000.00

4,000.00

0.2

4,200.00

OH

Tukang Kayu

55,000.00

60,000.00

11,000.00

12,000.00

6.22.2

Tenaga

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

m2

Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III

223,365.00

237,680.00

Bahan

189,475.00

200,975.00

6.23.1
0.028

m3

Kayu klas II (Kamfer), balok

6,700,000.00

7,100,000.00

187,600.00

0.15

Kg

Paku Biasa 2" - 5"

198,800.00

12,500.00

14,500.00

1,875.00

2,175.00

0.15

OH

33,890.00

36,705.00

Pekerja

40,000.00

42,000.00

6,000.00

0.45

6,300.00

OH

Tukang Kayu

55,000.00

60,000.00

24,750.00

27,000.00

0.045

OH

Kepala Tukang

60,000.00

65,000.00

2,700.00

2,925.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

m2

Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II

280,745.00

300,480.00

Bahan

246,855.00

263,775.00
198,800.00

6.23.2

Tenaga

6.24.1
0.028

m3

Kayu klas II (Kamfer), balok

6,700,000.00

7,100,000.00

187,600.00

0.15

Kg

Paku Biasa 2" - 5"

12,500.00

14,500.00

1,875.00

0.86

2,175.00

Lbr

Teakwood 120 x 240 cm tebal 4mm

55,000.00

60,000.00

47,300.00

51,600.00

0.56

Ltr

Lem

18,000.00

20,000.00

10,080.00

11,200.00

33,890.00

36,705.00

0.15

OH

Pekerja

40,000.00

42,000.00

6,000.00

6,300.00

0.45

OH

Tukang Kayu

55,000.00

60,000.00

24,750.00

27,000.00

0.045

OH

Kepala Tukang

60,000.00

65,000.00

2,700.00

2,925.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

m2

Memasang Dinding Lambriziring dari Papan klas I

285,500.00

304,175.00

Bahan

150,050.00

157,475.00

6.24.2

Tenaga

6.26.1

149235156.xlsx.ms_office

30,750.00

42,000.00

6.22.1

6.26

28,425.00

MAKSIMUM
Rp

40,000.00

6.21.2

6.24

JUMLAH
MINIMUM
Rp

Pekerja

6.21.1

6.23

MAKSIMUM
Rp

OH

6.20.2

6.22

MINIMUM
Rp

0.15

6.20.1

6.21

URAIAN PEKERJAAN

SAT.

0.007

m3

Kayu klas I (Jati), papan

21,000,000.00

22,000,000.00

147,000.00

0.1

Kg

154,000.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

1,250.00

0.15

Kg

1,450.00

Paku Sekrup 3,5"

12,000.00

13,500.00

1,800.00

2,025.00

83/46

abk 6-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

6.26.2

6.27

MAKSIMUM
Rp

Tenaga

JUMLAH
MINIMUM
Rp
135,450.00

MAKSIMUM
Rp
146,700.00

OH

Pekerja

40,000.00

42,000.00

24,000.00

25,200.00

1.8

OH

Tukang Kayu

55,000.00

60,000.00

99,000.00

108,000.00

0.18

OH

Kepala Tukang

60,000.00

65,000.00

10,800.00

11,700.00

0.03

OH

Mandor

55,000.00

60,000.00

1,650.00

1,800.00

m2

Memasang Dinding Lambriziring dari Plywood ukuran (120x240) cm

28,285.00

30,855.00

Bahan

22,625.00

24,725.00

0.4

Lbr

Plywood (120 X 240) cm x 4mm

55,000.00

60,000.00

22,000.00

24,000.00

0.05

Kg

Paku Biasa 1/2" - 1"

12,500.00

14,500.00

625.00

725.00

5,660.00

6,130.00

0.025

OH

Pekerja

40,000.00

42,000.00

1,000.00

1,050.00

0.075

OH

Tukang Kayu

55,000.00

60,000.00

4,125.00

4,500.00

0.0080

OH

Kepala Tukang

60,000.00

65,000.00

480.00

520.00

0.0010

OH

Mandor

55,000.00

60,000.00

55.00

60.00

m2

Memasang Dinding Bilik, Rangka Kayu Klas III atau IV

103,287.60

112,714.00

95,962.60

104,889.00

30,000.00

37,500.00

6.27.2

Tenaga

6.28.1

Bahan
1.500

m2

Bilik Bambu

0.014

m3

Kayu Klas III (Meranti)

0.012

Kg

Paku Biasa 1/2" - 1"

0.003

m'

List Kayu 2/4

0.1

OH

0.05

20,000.00

25,000.00

4,700,000.00

4,800,000.00

65,800.00

67,200.00

12,500.00

14,500.00

150.00

174.00

4,200.00

5,000.00

12.60

15.00

7,325.00

7,825.00

Pekerja

40,000.00

42,000.00

4,000.00

4,200.00

OH

Tukang Kayu

55,000.00

60,000.00

2,750.00

3,000.00

0.005

OH

Kepala Tukang

60,000.00

65,000.00

300.00

325.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

6.28.2

149235156.xlsx.ms_office

MINIMUM
Rp

0.6

6.27.1

6.28

URAIAN PEKERJAAN

SAT.

Tenaga

83/47

abk 6-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

URAIAN PEKERJAAN

m3

PEKERJAAN B E T O N
Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87

639,729.29

674,127.50

Bahan

552,359.29

581,527.50

VII 03-7394 - 2008


6.1

6.1.1
247

Kg

Portland Semen

869

Kg

999

308,750.00

139.29

150.00

121,039.29

130,350.00

Kg

Kerikil (maksimum 30 mm)

133.33

140.74

133,200.00

140,600.00

215

ltr

Air

8.00

8.50

1,720.00

1,827.50

87,370.00

92,600.00

1.65

OH

Pekerja

40,000.00

42,000.00

66,000.00

69,300.00

0.275

OH

Tukang Batu

55,000.00

60,000.00

15,125.00

16,500.00

0.028

OH

Kepala Tukang

60,000.00

65,000.00

1,680.00

1,820.00

0.083

OH

Mandor

55,000.00

60,000.00

4,565.00

4,980.00

m3

Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78

670,551.90

706,057.13

Bahan

583,181.90

613,457.13

Tenaga

276

Kg

Portland Semen

1,200.00

1,250.00

331,200.00

828

kg

345,000.00

Pasir Beton

139.29

150.00

115,328.57

1,012

124,200.00

kg

Kerikil (maksimum 30 mm)

133.33

140.74

134,933.33

142,429.63

215

ltr

Air

8.00

8.50

1,720.00

1,827.50

87,370.00

92,600.00

1.65

OH

Pekerja

40,000.00

42,000.00

66,000.00

69,300.00

0.275

OH

Tukang Batu

55,000.00

60,000.00

15,125.00

16,500.00

0.028

OH

Kepala Tukang

60,000.00

65,000.00

1,680.00

1,820.00

0.083

OH

Mandor

55,000.00

60,000.00

4,565.00

4,980.00

m3

Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72

694,779.29

731,160.83

Bahan

607,409.29

638,560.83

Tenaga

299

Kg

Portland Semen

799

kg

1,017
215

1,200.00

1,250.00

358,800.00

373,750.00

Pasir Beton

139.29

150.00

111,289.29

119,850.00

kg

Kerikil (maksimum 30 mm)

133.33

140.74

135,600.00

143,133.33

ltr

Air

8.00

8.50

1,720.00

1,827.50

6.3.2

87,370.00

92,600.00

1.65

OH

Tenaga
Pekerja

40,000.00

42,000.00

66,000.00

69,300.00

0.275

OH

Tukang Batu

55,000.00

60,000.00

15,125.00

16,500.00

0.028

OH

Kepala Tukang

60,000.00

65,000.00

1,680.00

1,820.00

0.083

OH

Mandor

55,000.00

60,000.00

4,565.00

4,980.00

m3

Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

599,445.48

631,750.74

Bahan

538,915.48

567,690.74

6.4.1
230

Kg

Portland Semen

1,200.00

1,250.00

276,000.00

893

kg

287,500.00

Pasir Beton

139.29

150.00

124,382.14

1,027

133,950.00

kg

Kerikil (maksimum 30 mm)

133.33

140.74

136,933.33

144,540.74

200

ltr

Air

8.00

8.50

1,600.00

1,700.00

60,530.00

64,060.00

1.2

OH

Pekerja

40,000.00

42,000.00

48,000.00

50,400.00

0.2

OH

Tukang Batu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.006

OH

Mandor

55,000.00

60,000.00

330.00

360.00

m3

Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66

723,347.14

760,749.72

Bahan

635,977.14

668,149.72

6.4.2

Tenaga

6.5.1
326

Kg

Portland Semen

760

Kg

1,029
215

1,200.00

1,250.00

391,200.00

407,500.00

Pasir Beton

139.29

150.00

105,857.14

114,000.00

Kg

Kerikil (maksimum 30 mm)

133.33

140.74

137,200.00

144,822.22

ltr

Air

8.00

8.50

1,720.00

1,827.50

6.5.2

149235156.xlsx.ms_office

MAKSIMUM
Rp

Pasir Beton

6.3.1

6.5

MINIMUM
Rp

296,400.00

6.2.2

6.4

MAKSIMUM
Rp

1,250.00

6.2.1

6.3

MINIMUM
Rp

1,200.00

6.1.2

6.2

JUMLAH

SAT.

87,370.00

92,600.00

1.65

OH

Tenaga
Pekerja

40,000.00

42,000.00

66,000.00

69,300.00

0.275

OH

Tukang Batu

55,000.00

60,000.00

15,125.00

16,500.00

0.028

OH

Kepala Tukang

60,000.00

65,000.00

1,680.00

1,820.00

0.083

OH

Mandor

55,000.00

60,000.00

4,565.00

4,980.00

83/48

abk 7-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.6

KOEF
1

SAT.

URAIAN PEKERJAAN

m3

Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61

6.6.1

663,404.52

696,581.20

422,400.00

440,000.00

Pasir Beton

139.29

150.00

101,817.86

109,650.00

Kg

Kerikil (maksimum 30 mm)

133.33

140.74

137,466.67

145,103.70

ltr

Air

8.00

8.50

1,720.00

1,827.50

731

Kg

1,031
215

87,370.00

92,600.00

1.650

OH

Tenaga
Pekerja

40,000.00

42,000.00

66,000.00

69,300.00

0.275

OH

Tukang Batu

55,000.00

60,000.00

15,125.00

16,500.00

0.028

OH

Kepala Tukang

60,000.00

65,000.00

1,680.00

1,820.00

0.083

OH

Mandor

55,000.00

60,000.00

4,565.00

4,980.00

m3

Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58

771,111.43

810,233.06

Bahan

683,741.43

717,633.06

371

Kg

Portland Semen

1,200.00

1,250.00

445,200.00

698

Kg

463,750.00

Pasir Beton

139.29

150.00

97,221.43

1,047

104,700.00

Kg

Kerikil (maksimum 30 mm)

133.33

140.74

139,600.00

147,355.56

ltr

Air

8.00

8.50

1,720.00

1,827.50

6.7.2

87,370.00

92,600.00

1.650

OH

Tenaga
Pekerja

40,000.00

42,000.00

66,000.00

69,300.00

0.275

OH

Tukang Batu

55,000.00

60,000.00

15,125.00

16,500.00

0.028

OH

Kepala Tukang

60,000.00

65,000.00

1,680.00

1,820.00

0.083

OH

Mandor

55,000.00

60,000.00

4,565.00

4,980.00

m3

Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56

784,809.05

824,457.13

Bahan

697,439.05

731,857.13

6.8.1
384

Kg

Portland Semen

1,200.00

1,250.00

460,800.00

692

Kg

480,000.00

Pasir Beton

139.29

150.00

96,385.71

1,039

103,800.00

Kg

Kerikil (maksimum 30 mm)

133.33

140.74

138,533.33

215

146,229.63

ltr

Air

8.00

8.50

1,720.00

1,827.50

6.8.2

87,370.00

92,600.00

1.650

OH

Tenaga
Pekerja

40,000.00

42,000.00

66,000.00

69,300.00

0.275

OH

Tukang Batu

55,000.00

60,000.00

15,125.00

16,500.00

0.028

OH

Kepala Tukang

60,000.00

65,000.00

1,680.00

1,820.00

0.083

OH

Mandor

55,000.00

60,000.00

4,565.00

4,980.00

m3

Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53

808,361.43

848,927.50

Bahan

720,991.43

756,327.50

6.9.1
406

Kg

Portland Semen

1,200.00

1,250.00

487,200.00

684

kg

507,500.00

Pasir Beton

139.29

150.00

95,271.43

1,026

102,600.00

kg

Kerikil (maksimum 30 mm)

133.33

140.74

136,800.00

215

144,400.00

ltr

Air

8.00

8.50

1,720.00

1,827.50

6.9.2

6.10

87,370.00

92,600.00

1.650

OH

Tenaga
Pekerja

40,000.00

42,000.00

66,000.00

69,300.00

0.275

OH

Tukang Batu

55,000.00

60,000.00

15,125.00

16,500.00

0.028

OH

Kepala Tukang

60,000.00

65,000.00

1,680.00

1,820.00

0.083

OH

Mandor

55,000.00

60,000.00

4,565.00

4,980.00

m3

Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm, w/c = 0,52

815,676.90

856,523.80

Bahan

728,306.90

763,923.80

6.10.1
413

Kg

Portland Semen

1,200.00

1,250.00

495,600.00

681

Kg

516,250.00

Pasir Beton

139.29

150.00

94,853.57

1,021

102,150.00

Kg

Kerikil (maksimum 30 mm)

133.33

140.74

136,133.33

215

143,696.30

ltr

Air

8.00

8.50

1,720.00

1,827.50

6.10.2

149235156.xlsx.ms_office

MAKSIMUM
Rp
789,181.20

1,250.00

Portland Semen

215

6.9

JUMLAH
MINIMUM
Rp
750,774.52

1,200.00

Kg

6.7.1

6.8

MAKSIMUM
Rp

Bahan
352

6.6.2

6.7

MINIMUM
Rp

87,370.00

92,600.00

1.650

OH

Tenaga
Pekerja

40,000.00

42,000.00

66,000.00

69,300.00

0.275

OH

Tukang Batu

55,000.00

60,000.00

15,125.00

16,500.00

0.028

OH

Kepala Tukang

60,000.00

65,000.00

1,680.00

1,820.00

0.083

OH

Mandor

55,000.00

60,000.00

4,565.00

4,980.00

83/49

abk 7-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.11

KOEF
1

SAT.

URAIAN PEKERJAAN

m3

Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm, w/c = 0,49

6.11.1

755,974.76

792,662.69

526,800.00

548,750.00

Pasir Beton

139.29

150.00

93,321.43

100,500.00

Kg

Kerikil (maksimum 30 mm)

133.33

140.74

134,133.33

141,585.19

215

ltr

Air

8.00

8.50

1,720.00

1,827.50

111,125.00

117,775.00

2.1

OH

Pekerja

40,000.00

42,000.00

84,000.00

88,200.00

0.35

OH

Tukang Batu

55,000.00

60,000.00

19,250.00

21,000.00

0.035

OH

Kepala Tukang

60,000.00

65,000.00

2,100.00

2,275.00

0.105

OH

Mandor

55,000.00

60,000.00

5,775.00

6,300.00

m3

Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48

876,681.90

920,393.24

Bahan

765,556.90

802,618.24

670

Kg

1,006

Tenaga

448

Kg

Portland Semen

1,200.00

1,250.00

537,600.00

667

Kg

560,000.00

Pasir Beton

139.29

150.00

92,903.57

1,000

100,050.00

Kg

Kerikil (maksimum 30 mm)

133.33

140.74

133,333.33

140,740.74

215

ltr

Air

8.00

8.50

1,720.00

1,827.50

111,125.00

117,775.00

2.10

OH

Pekerja

40,000.00

42,000.00

84,000.00

88,200.00

0.350

OH

Tukang Batu

55,000.00

60,000.00

19,250.00

21,000.00

0.035

OH

Kepala Tukang

60,000.00

65,000.00

2,100.00

2,275.00

0.105

OH

Mandor

55,000.00

60,000.00

5,775.00

6,300.00

Kg

Pembesian dg Besi Polos atau Besi Ulir

114,540.00

120,635.00

Bahan

107,250.00

112,800.00

Tenaga

10

6.17.1
10.50

Kg

Besi Beton (polos/ulir)

10,000.00

10,500.00

105,000.00

110,250.00

0.150

Kg

Kawat Beton

15,000.00

17,000.00

2,250.00

2,550.00

7,290.00

7,835.00

0.07

OH

Pekerja

40,000.00

42,000.00

2,800.00

2,940.00

0.07

OH

Tukang Besi

55,000.00

60,000.00

3,850.00

4,200.00

0.007

OH

Kepala Tukang

60,000.00

65,000.00

420.00

455.00

0.004

OH

Mandor

55,000.00

60,000.00

220.00

240.00

Kg

Kabel Presstresed Polos/strand

169,465.00

187,905.00

Bahan

164,250.00

182,300.00

6.17.2

Tenaga

10

6.18.1
10.5

Kg

Besi presstred polos

15,500.00

17,200.00

162,750.00

180,600.00

0.1

Kg

Kawat Beton

15,000.00

17,000.00

1,500.00

1,700.00

5,215.00

5,605.00

0.05

OH

Pekerja

40,000.00

42,000.00

2,000.00

2,100.00

0.05

OH

Tukang Besi

55,000.00

60,000.00

2,750.00

3,000.00

0.005

OH

Kepala Tukang

60,000.00

65,000.00

300.00

325.00

0.003

OH

Mandor

55,000.00

60,000.00

165.00

180.00

Kg

Jaring Kawat baja/Wire Mesh

17,580.00

19,400.00

Bahan

15,030.00

16,660.00

6.18.2

6.19

Tenaga

6.19.1
1.02

Kg

Jaring Kawat Baja dilas

14,000.00

15,500.00

14,280.00

15,810.00

0.05

Kg

Kawat Beton

15,000.00

17,000.00

750.00

850.00

6.19.2

6.20

2,550.00

2,740.00

0.025

OH

Tenaga
Pekerja

40,000.00

42,000.00

1,000.00

1,050.00

0.025

OH

Tukang Besi

55,000.00

60,000.00

1,375.00

1,500.00

0.002

OH

Kepala Tukang

60,000.00

65,000.00

120.00

130.00

0.001

OH

Mandor

55,000.00

60,000.00

55.00

60.00

m2

Memasang Bekisting untuk Pondasi

84,640.00

90,040.00

Bahan

46,550.00

49,350.00

6.20.1
0.04

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

42,000.00

0.3

Kg

44,000.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

3,750.00

0.1

Ltr

4,350.00

Minyak Bekisting

8,000.00

10,000.00

800.00

1,000.00

0.52

OH

38,090.00

40,690.00

Pekerja

40,000.00

42,000.00

20,800.00

0.26

21,840.00

OH

Tukang Kayu

55,000.00

60,000.00

14,300.00

15,600.00

0.026

OH

Kepala Tukang

60,000.00

65,000.00

1,560.00

1,690.00

0.026

OH

Mandor

55,000.00

60,000.00

1,430.00

1,560.00

6.20.2

149235156.xlsx.ms_office

MAKSIMUM
Rp
910,437.69

1,250.00

Portland Semen

6.12.2

6.18

JUMLAH
MINIMUM
Rp
867,099.76

1,200.00

Kg

6.12.1

6.17

MAKSIMUM
Rp

Bahan
439

6.11.2

6.12

MINIMUM
Rp

Tenaga

83/50

abk 7-14

HARGA BAHAN/UPAH
No.

SNI

KODE

6.21

KOEF

m2

6.21.1

95,540.00

51,800.00

54,850.00

1,100,000.00

47,250.00

0.3

Kg

49,500.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

3,750.00

0.1

Ltr

4,350.00

Minyak Bekisting

8,000.00

10,000.00

800.00

1,000.00

0.52

OH

38,090.00

40,690.00

Pekerja

40,000.00

42,000.00

20,800.00

0.26

21,840.00

OH

Tukang Kayu

55,000.00

60,000.00

14,300.00

15,600.00

0.026

OH

Kepala Tukang

60,000.00

65,000.00

1,560.00

1,690.00

0.026

OH

Mandor

55,000.00

60,000.00

1,430.00

1,560.00

m2

Memasang Bekisting untuk Kolom

258,695.00

280,445.00

Bahan

210,350.00

228,800.00

Tenaga

0.04

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

42,000.00

0.4

Kg

44,000.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

5,000.00

0.2

5,800.00

Ltr

Minyak Bekisting

8,000.00

10,000.00

1,600.00

0.015

2,000.00

m3

Balok Kayu Klas II

5,000,000.00

5,400,000.00

75,000.00

81,000.00

0.35

Lbr

Plywood tebal 9mm

145,000.00

160,000.00

50,750.00

56,000.00

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

18,000.00

20,000.00

36,000.00

40,000.00

48,345.00

51,645.00

0.66

OH

Pekerja

40,000.00

42,000.00

26,400.00

27,720.00

0.33

OH

Tukang Kayu

55,000.00

60,000.00

18,150.00

19,800.00

0.033

OH

Kepala Tukang

60,000.00

65,000.00

1,980.00

2,145.00

0.033

OH

Mandor

55,000.00

60,000.00

1,815.00

1,980.00

m2

Memasang Bekisting untuk Balok

273,695.00

296,645.00

Bahan

225,350.00

245,000.00

Tenaga

0.04

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

42,000.00

0.4

Kg

44,000.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

5,000.00

0.2

5,800.00

Ltr

Minyak Bekisting

8,000.00

10,000.00

1,600.00

0.018

2,000.00

m3

Balok Kayu Klas II

5,000,000.00

5,400,000.00

90,000.00

97,200.00

0.35

Lbr

Plywood tebal 9mm

145,000.00

160,000.00

50,750.00

56,000.00

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

18,000.00

20,000.00

36,000.00

40,000.00

48,345.00

51,645.00

0.66

OH

Pekerja

40,000.00

42,000.00

26,400.00

27,720.00

0.33

OH

Tukang Kayu

55,000.00

60,000.00

18,150.00

19,800.00

0.033

OH

Kepala Tukang

60,000.00

65,000.00

1,980.00

2,145.00

0.033

OH

Mandor

55,000.00

60,000.00

1,815.00

1,980.00

m2

Memasang Bekisting untuk Lantai

330,695.00

360,445.00

Bahan

282,350.00

308,800.00

6.23.2

Tenaga

6.24.1
0.04

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

42,000.00

0.4

Kg

44,000.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

5,000.00

0.2

5,800.00

Ltr

Minyak Bekisting

8,000.00

10,000.00

1,600.00

0.015

2,000.00

m3

Balok Kayu Klas II (Borneo)

5,000,000.00

5,400,000.00

75,000.00

81,000.00

0.35

Lbr

Plywood tebal 9mm

145,000.00

160,000.00

50,750.00

56,000.00

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

18,000.00

20,000.00

108,000.00

120,000.00

48,345.00

51,645.00

0.66

OH

Pekerja

40,000.00

42,000.00

26,400.00

27,720.00

0.33

OH

Tukang Kayu

55,000.00

60,000.00

18,150.00

19,800.00

0.033

OH

Kepala Tukang

60,000.00

65,000.00

1,980.00

2,145.00

0.033

OH

Mandor

55,000.00

60,000.00

1,815.00

1,980.00

m2

Memasang Bekisting untuk Dinding

319,195.00

350,445.00

Bahan

270,850.00

298,800.00

6.24.2

Tenaga

6.25.1

149235156.xlsx.ms_office

MAKSIMUM
Rp

1,050,000.00

6.23.1

6.25

JUMLAH
MINIMUM
Rp
89,890.00

Kayu Klas III (Terentang)

6.22.2

6.24

MAKSIMUM
Rp

Bahan
m3

6.22.1

6.23

MINIMUM
Rp

Memasang Bekisting untuk Sloof

0.045

6.21.2

6.22

URAIAN PEKERJAAN

SAT.

0.03

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

31,500.00

0.4

Kg

33,000.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

5,000.00

0.2

5,800.00

Ltr

Minyak Bekisting

8,000.00

10,000.00

1,600.00

0.02

2,000.00

m3

Balok Kayu Klas II

5,000,000.00

5,400,000.00

100,000.00

108,000.00

0.35

Lbr

Plywood tebal 9mm

145,000.00

160,000.00

50,750.00

56,000.00

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

18,000.00

20,000.00

54,000.00

60,000.00

Buah

7,000.00

8,500.00

28,000.00

34,000.00

Formite/Penjaga jarak / Spacer (alat bantu)

83/51

abk 7-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

6.25.2

6.26

URAIAN PEKERJAAN

SAT.

MINIMUM
Rp

MAKSIMUM
Rp

Tenaga

48,345.00

51,645.00

OH

Pekerja

40,000.00

42,000.00

26,400.00

27,720.00

0.33

OH

Tukang Kayu

55,000.00

60,000.00

18,150.00

19,800.00

0.033

OH

Kepala Tukang

60,000.00

65,000.00

1,980.00

2,145.00

0.033

OH

Mandor

55,000.00

60,000.00

1,815.00

1,980.00

m2

Memasang Bekisting untuk Tangga

247,795.00

268,945.00

Bahan

199,450.00

217,300.00

0.03

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

31,500.00

0.4

Kg

33,000.00

Paku Biasa 2" - 5"

12,500.00

14,500.00

5,000.00

0.15

5,800.00

Ltr

Minyak Bekisting

8,000.00

10,000.00

1,200.00

0.015

1,500.00

m3

Balok Kayu Klas II

5,000,000.00

5,400,000.00

75,000.00

81,000.00

0.35

Lbr

Plywood tebal 9mm

145,000.00

160,000.00

50,750.00

56,000.00

Btg

Dolken Kayu Galam diameter 8 - 10 cm / 4 m

18,000.00

20,000.00

36,000.00

40,000.00

48,345.00

51,645.00

0.66

OH

Pekerja

40,000.00

42,000.00

26,400.00

27,720.00

0.33

OH

Tukang Kayu

55,000.00

60,000.00

18,150.00

19,800.00

0.033

OH

Kepala Tukang

60,000.00

65,000.00

1,980.00

2,145.00

0.033

OH

Mandor

55,000.00

60,000.00

1,815.00

1,980.00

m2

Memasang Jembatan Cor

53,710.00

57,845.00

Bahan

44,220.00

47,740.00
29,040.00

6.26.2

6.27.1
0.0264

m3

Kayu Terentang

1,050,000.00

1,100,000.00

27,720.00

0.6

kg

Paku Biasa 2" - 5"

12,500.00

14,500.00

7,500.00

0.5

m3

8,700.00

Dolken Kayu Galam diameter 8 - 10 / 4 m

18,000.00

20,000.00

9,000.00

10,000.00

0.15

OH

9,490.00

10,105.00

Pekerja

40,000.00

42,000.00

6,000.00

0.05

6,300.00

OH

Tukang Kayu

55,000.00

60,000.00

2,750.00

3,000.00

0.005

OH

Kepala Tukang

60,000.00

65,000.00

300.00

325.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

m3

Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)

2,851,375.00

3,005,150.00

Bahan

2,495,000.00

2,625,050.00

6.27.2

6.28

Tenaga

6.28.1
0.2

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

210,000.00

1.5

Kg

Paku Biasa 2" - 5"

220,000.00

12,500.00

14,500.00

18,750.00

0.4

Ltr

21,750.00

Minyak Bekisting

8,000.00

10,000.00

3,200.00

157.5

4,000.00

Kg

Besi Beton Polos

10,000.00

10,500.00

1,575,000.00

1,653,750.00

2.25

Kg

Kawat Beton

15,000.00

17,000.00

33,750.00

38,250.00

336

Kg

Portland Semen

1,200.00

1,250.00

403,200.00

420,000.00

0.54

m3

Pasir Beton

195,000.00

210,000.00

105,300.00

113,400.00

0.81

m3

Kerikil Beton

180,000.00

190,000.00

145,800.00

153,900.00

356,375.00

380,100.00

5.3

OH

Pekerja

40,000.00

42,000.00

212,000.00

222,600.00

0.275

OH

Tukang batu

55,000.00

60,000.00

15,125.00

16,500.00

1.30

OH

Tukang Kayu

55,000.00

60,000.00

71,500.00

78,000.00

1.05

OH

Tukang Besi

55,000.00

60,000.00

57,750.00

63,000.00

0.262

OH

Kepala Tukang

60,000.00

65,000.00

15,720.00

17,030.00

0.265

OH

Mandor

55,000.00

60,000.00

14,575.00

15,900.00

m3

Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)

3,516,525.00

3,706,700.00

Bahan

3,112,600.00

3,275,300.00

6.28.2

6.29

Tenaga

6.29.1
0.27

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

283,500.00

Kg

Paku Biasa 2" - 5"

297,000.00

12,500.00

14,500.00

25,000.00

0.6

Ltr

29,000.00

Minyak Bekisting

8,000.00

10,000.00

4,800.00

210

6,000.00

Kg

Besi Beton Polos

10,000.00

10,500.00

2,100,000.00

2,205,000.00

15,000.00

17,000.00

45,000.00

51,000.00

1,200.00

1,250.00

403,200.00

420,000.00

Kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

195,000.00

210,000.00

105,300.00

113,400.00

0.81

m3

Kerikil Beton

180,000.00

190,000.00

145,800.00

153,900.00

403,925.00

431,400.00

5.65

OH

Pekerja

40,000.00

42,000.00

226,000.00

237,300.00

0.275

OH

Tukang batu

55,000.00

60,000.00

15,125.00

16,500.00

1.56

OH

Tukang Kayu

55,000.00

60,000.00

85,800.00

93,600.00

1.4

OH

Tukang Besi

55,000.00

60,000.00

77,000.00

84,000.00

0.323

OH

Kepala Tukang

60,000.00

65,000.00

19,380.00

20,995.00

0.283

OH

Mandor

55,000.00

60,000.00

15,565.00

16,980.00

6.29.2

149235156.xlsx.ms_office

MAKSIMUM
Rp

0.66

6.26.1

6.27

JUMLAH
MINIMUM
Rp

Tenaga

83/52

abk 7-14

HARGA BAHAN/UPAH
No.

SNI

KODE

6.30

KOEF

m3

6.30.1

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

6,522,270.00

6,944,275.00

5,975,300.00

6,359,300.00

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

420,000.00

Kg

Paku Biasa 2" - 5"

440,000.00

12,500.00

14,500.00

50,000.00

Ltr

58,000.00

Minyak Bekisting

8,000.00

10,000.00

16,000.00

315

20,000.00

kg

Besi Beton Polos

10,000.00

10,500.00

3,150,000.00

3,307,500.00

15,000.00

17,000.00

67,500.00

76,500.00

1,200.00

1,250.00

403,200.00

420,000.00

4.5

kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

195,000.00

210,000.00

105,300.00

113,400.00

0.81

m3

Kerikil Beton

180,000.00

190,000.00

145,800.00

153,900.00

0.15

m3

Kayu Klas II Balok

5,000,000.00

5,400,000.00

750,000.00

810,000.00

3.5

Lbr

Plywood 9 mm

145,000.00

160,000.00

507,500.00

560,000.00

20

Btg

Dolken diameter 8 / 4rm

18,000.00

20,000.00

360,000.00

400,000.00

546,970.00

584,975.00

7.05

OH

Pekerja

40,000.00

42,000.00

282,000.00

296,100.00

0.275

OH

Tukang batu

55,000.00

60,000.00

15,125.00

16,500.00

1.65

OH

Tukang Kayu

55,000.00

60,000.00

90,750.00

99,000.00

2.1

OH

Tukang Besi

55,000.00

60,000.00

115,500.00

126,000.00

0.403

OH

Kepala Tukang

60,000.00

65,000.00

24,180.00

26,195.00

0.353

OH

Mandor

55,000.00

60,000.00

19,415.00

21,180.00

m3

Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)

5,056,445.00

5,388,625.00

Bahan

4,582,100.00

4,881,700.00

Tenaga

0.32

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

336,000.00

3.2

Kg

Paku Biasa 2" - 5"

352,000.00

12,500.00

14,500.00

40,000.00

1.6

Ltr

46,400.00

Minyak Bekisting

8,000.00

10,000.00

12,800.00

210

16,000.00

Kg

Besi Beton Polos

10,000.00

10,500.00

2,100,000.00

2,205,000.00

15,000.00

17,000.00

45,000.00

51,000.00

1,200.00

1,250.00

403,200.00

420,000.00

Kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

195,000.00

210,000.00

105,300.00

113,400.00

0.81

m3

Kerikil Beton

180,000.00

190,000.00

145,800.00

153,900.00

0.14

m3

Kayu Klas II Balok

5,000,000.00

5,400,000.00

700,000.00

756,000.00

2.8

Lbr

Plywood 9 mm

145,000.00

160,000.00

406,000.00

448,000.00

16

Btg

Dolken diameter 8 / 4rm

18,000.00

20,000.00

288,000.00

320,000.00

474,345.00

506,925.00

6.35

OH

Pekerja

40,000.00

42,000.00

254,000.00

266,700.00

0.275

OH

Tukang batu

55,000.00

60,000.00

15,125.00

16,500.00

1.65

OH

Tukang Kayu

55,000.00

60,000.00

90,750.00

99,000.00

1.4

OH

Tukang Besi

55,000.00

60,000.00

77,000.00

84,000.00

0.333

OH

Kepala Tukang

60,000.00

65,000.00

19,980.00

21,645.00

0.318

OH

Mandor

55,000.00

60,000.00

17,490.00

19,080.00

m3

Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)

4,620,700.00

4,942,925.00

Bahan

4,233,850.00

4,529,700.00

6.31.2

Tenaga

6.32.1
0.32

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

336,000.00

3.2

Kg

Paku Biasa 2" - 5"

352,000.00

12,500.00

14,500.00

40,000.00

1.6

Ltr

46,400.00

Minyak Bekisting

8,000.00

10,000.00

12,800.00

157.5

16,000.00

Kg

Besi Beton Polos

10,000.00

10,500.00

1,575,000.00

1,653,750.00

2.25

Kg

Kawat Beton

15,000.00

17,000.00

33,750.00

38,250.00

336

Kg

Portland Semen

1,200.00

1,250.00

403,200.00

420,000.00

0.54

m3

Pasir Beton

195,000.00

210,000.00

105,300.00

113,400.00

0.81

m3

Kerikil Beton

180,000.00

190,000.00

145,800.00

153,900.00

0.12

m3

Kayu Klas II Balok

5,000,000.00

5,400,000.00

600,000.00

648,000.00

2.8

Lbr

Plywood 9 mm

145,000.00

160,000.00

406,000.00

448,000.00

32

Btg

Dolken diameter 8 / 4rm

18,000.00

20,000.00

576,000.00

640,000.00

386,850.00

413,225.00

5.3

OH

Pekerja

40,000.00

42,000.00

212,000.00

222,600.00

0.275

OH

Tukang batu

55,000.00

60,000.00

15,125.00

16,500.00

1.3

OH

Tukang Kayu

55,000.00

60,000.00

71,500.00

78,000.00

1.05

OH

Tukang Besi

55,000.00

60,000.00

57,750.00

63,000.00

0.265

OH

Kepala Tukang

60,000.00

65,000.00

15,900.00

17,225.00

0.265

OH

Mandor

55,000.00

60,000.00

14,575.00

15,900.00

6.32.2

149235156.xlsx.ms_office

MAKSIMUM
Rp

Bahan
m3

6.31.1

6.32

MINIMUM
Rp

Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)

0.4

6.30.2

6.31

URAIAN PEKERJAAN

SAT.

Tenaga

83/53

abk 7-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.33

KOEF
1

m3

6.33.1

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

4,592,520.00

4,910,730.00

4,205,850.00

4,497,700.00

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

252,000.00

3.2

Kg

Paku Biasa 2" - 5"

264,000.00

12,500.00

14,500.00

40,000.00

1.6

Ltr

46,400.00

Minyak Bekisting

8,000.00

10,000.00

12,800.00

157.5

16,000.00

Kg

Besi Beton Polos

10,000.00

10,500.00

1,575,000.00

1,653,750.00

2.25

Kg

Kawat Beton

15,000.00

17,000.00

33,750.00

38,250.00

336

Kg

Portland Semen

1,200.00

1,250.00

403,200.00

420,000.00

0.54

m3

Pasir Beton

195,000.00

210,000.00

105,300.00

113,400.00

0.81

m3

Kerikil Beton

180,000.00

190,000.00

145,800.00

153,900.00

0.16

m3

Kayu Klas II Balok

5,000,000.00

5,400,000.00

800,000.00

864,000.00

2.8

Lbr

Plywood 9 mm

145,000.00

160,000.00

406,000.00

448,000.00

24

Btg

Dolken diameter 8 / 4rm

18,000.00

20,000.00

432,000.00

480,000.00

386,670.00

413,030.00

5.3

OH

Pekerja

40,000.00

42,000.00

212,000.00

222,600.00

0.275

OH

Tukang batu

55,000.00

60,000.00

15,125.00

16,500.00

1.3

OH

Tukang Kayu

55,000.00

60,000.00

71,500.00

78,000.00

1.05

OH

Tukang Besi

55,000.00

60,000.00

57,750.00

63,000.00

0.262

OH

Kepala Tukang

60,000.00

65,000.00

15,720.00

17,030.00

0.265

OH

Mandor

55,000.00

60,000.00

14,575.00

15,900.00

m3

Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

4,687,270.00

4,990,175.00

Bahan

4,248,400.00

4,520,800.00

Tenaga

0.25

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

262,500.00

Kg

Paku Biasa 2" - 5"

275,000.00

12,500.00

14,500.00

37,500.00

1.2

Ltr

43,500.00

Minyak Bekisting

8,000.00

10,000.00

9,600.00

210

12,000.00

Kg

Besi Beton Polos

10,000.00

10,500.00

2,100,000.00

2,205,000.00

15,000.00

17,000.00

45,000.00

51,000.00

1,200.00

1,250.00

403,200.00

420,000.00

Kg

Kawat Beton

336

Kg

Portland Semen

0.54

m3

Pasir Beton

195,000.00

210,000.00

105,300.00

113,400.00

0.81

m3

Kerikil Beton

180,000.00

190,000.00

145,800.00

153,900.00

0.105

m3

Kayu Klas II Balok

5,000,000.00

5,400,000.00

525,000.00

567,000.00

2.5

Lbr

Plywood 9 mm

145,000.00

160,000.00

362,500.00

400,000.00

14

Btg

Dolken diameter 8 / 4rm

18,000.00

20,000.00

252,000.00

280,000.00

438,870.00

469,375.00

5.65

OH

Pekerja

40,000.00

42,000.00

226,000.00

237,300.00

0.275

OH

Tukang batu

55,000.00

60,000.00

15,125.00

16,500.00

1.56

OH

Tukang Kayu

55,000.00

60,000.00

85,800.00

93,600.00

1.4

OH

Tukang Besi

55,000.00

60,000.00

77,000.00

84,000.00

0.323

OH

Kepala Tukang

60,000.00

65,000.00

19,380.00

20,995.00

0.283

OH

Mandor

55,000.00

60,000.00

15,565.00

16,980.00

m'

Membuat Kolom Penguat Beton Bertulang (11 x 11) cm

51,845.00

54,670.00

Bahan

40,490.00

42,580.00
2,200.00

6.34.2

Tenaga

6.35.1
0.002

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

2,100.00

0.01

Kg

Paku Biasa 2" - 5"

12,500.00

14,500.00

125.00

145.00

Ltr

Besi Beton Polos

10,000.00

10,500.00

30,000.00

31,500.00

0.045

Kg

Kawat Beton

15,000.00

17,000.00

675.00

765.00

Kg

Portland Semen

1,200.00

1,250.00

4,800.00

5,000.00

0.006

m3

Pasir Beton

195,000.00

210,000.00

1,170.00

1,260.00

0.009

m3

Kerikil Beton

180,000.00

190,000.00

1,620.00

1,710.00

11,355.00

12,090.00

0.18

OH

Pekerja

40,000.00

42,000.00

7,200.00

7,560.00

0.02

OH

Tukang batu

55,000.00

60,000.00

1,100.00

1,200.00

0.02

OH

Tukang Kayu

55,000.00

60,000.00

1,100.00

1,200.00

0.02

OH

Tukang Besi

55,000.00

60,000.00

1,100.00

1,200.00

0.006

OH

Kepala Tukang

60,000.00

65,000.00

360.00

390.00

0.009

OH

Mandor

55,000.00

60,000.00

495.00

540.00

6.35.2

149235156.xlsx.ms_office

MAKSIMUM
Rp

Bahan
m3

6.34.1

6.35

MINIMUM
Rp

Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)

0.24

6.33.2

6.34

URAIAN PEKERJAAN

SAT.

Tenaga

83/54

abk 7-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.36

KOEF
1

m'

6.36.1

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

Membuat Ring Balok Beton Bertulang (10 x 15) cm

69,955.00

73,819.00

Bahan

51,205.00

53,855.00
3,300.00

0.003

m3

Kayu Klas III (Terentang)

1,050,000.00

1,100,000.00

3,150.00

0.02

Kg

Paku Biasa 2" - 5"

12,500.00

14,500.00

250.00

3.6

290.00

Ltr

Besi Beton Polos

10,000.00

10,500.00

36,000.00

37,800.00

0.05

Kg

Kawat Beton

15,000.00

17,000.00

750.00

850.00

5.5

Kg

Portland Semen

1,200.00

1,250.00

6,600.00

6,875.00

0.009

m3

Pasir Beton

195,000.00

210,000.00

1,755.00

1,890.00

0.015

m3

Kerikil Beton

180,000.00

190,000.00

2,700.00

2,850.00

18,750.00

19,964.00

0.297

OH

Pekerja

40,000.00

42,000.00

11,880.00

12,474.00

0.033

OH

Tukang batu

55,000.00

60,000.00

1,815.00

1,980.00

0.033

OH

Tukang Kayu

55,000.00

60,000.00

1,815.00

1,980.00

0.033

OH

Tukang Besi

55,000.00

60,000.00

1,815.00

1,980.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.015

OH

Mandor

55,000.00

60,000.00

825.00

900.00

6.36.2

149235156.xlsx.ms_office

URAIAN PEKERJAAN

SAT.

Tenaga

83/55

abk 7-14

HARGA BAHAN/UPAH
No.

SNI

VIII

03-3436-2002

KODE

KOEF

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

PEKERJAAN PENUTUP ATAP


6.1

m2

6.1.1
25

Buah

0.15

OH

0.075

6.2

45,000.00

11,045.00

11,800.00

40,000.00

42,000.00

6,000.00

6,300.00

OH

Tukang Kayu

55,000.00

60,000.00

4,125.00

4,500.00

0.008

OH

Kepala Tukang

60,000.00

65,000.00

480.00

520.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

m2

Pasang Atap Genteng Kodok / Glasur

79,795.00

86,800.00

Bahan

68,750.00

75,000.00

68,750.00

75,000.00

25

Buah

Genteng Plentong

2,750.00

3,000.00

0.15

OH

0.075

Genteng Kodok / Glasur

11,045.00

11,800.00

Pekerja

40,000.00

42,000.00

6,000.00

6,300.00

OH

Tukang Kayu

55,000.00

60,000.00

4,125.00

4,500.00

0.008

OH

Kepala Tukang

60,000.00

65,000.00

480.00

520.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

m2

Pasang Atap Genteng Plentong Super / Besar

64,100.00

91,770.00

Bahan

54,000.00

81,000.00

54,000.00

81,000.00

Tenaga

18

Buah

3,000.00

4,500.00

0.15

OH

10,100.00

10,770.00

Pekerja

40,000.00

42,000.00

6,000.00

0.06

6,300.00

OH

Tukang Kayu

55,000.00

60,000.00

3,300.00

3,600.00

0.006

OH

Kepala Tukang

60,000.00

65,000.00

360.00

390.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

m'

Pasang Genteng Bubung Plentong

67,230.00

73,160.00

Bahan

38,920.00

42,940.00

6.3.2

Genteng Plentong Super / Besar


Tenaga

6.4.1
5

Buah

Genteng Bubung Plentong

5,000.00

5,500.00

25,000.00

27,500.00

Kg

Portland Semen

1,200.00

1,250.00

9,600.00

0.032

10,000.00

m3

Pasir Pasang

135,000.00

170,000.00

4,320.00

5,440.00

6.4.2

28,310.00

30,220.00

0.4

OH

Tenaga
Pekerja

40,000.00

42,000.00

16,000.00

16,800.00

0.2

OH

Tukang Kayu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.002

OH

Mandor

55,000.00

60,000.00

110.00

120.00

m'

Pasang Genteng Bubung Kodok / Glasur

77,230.00

85,660.00

Bahan

48,920.00

55,440.00

6.5.1
5

Buah

Genteng Bubung Kodok / Glasur

7,000.00

8,000.00

35,000.00

40,000.00

Kg

Portland Semen

1,200.00

1,250.00

9,600.00

0.032

10,000.00

m3

Pasir Pasang

135,000.00

170,000.00

4,320.00

5,440.00

6.5.2

6.6

45,000.00

37,500.00

Pekerja

6.3.1

6.5

56,800.00

37,500.00

Tenaga

6.2.2

6.4

48,545.00

Bahan
1,800.00

6.2.1

6.3

Pasang Atap Genteng Plentong Kecil

1,500.00

6.1.2

28,310.00

30,220.00

0.4

OH

Tenaga
Pekerja

40,000.00

42,000.00

16,000.00

16,800.00

0.2

OH

Tukang Kayu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.002

OH

Mandor

55,000.00

60,000.00

110.00

120.00

m'

Pasang Genteng Bubung Plentong Besar

74,230.00

79,660.00

Bahan

45,920.00

49,440.00

6.6.1
4

Buah

Genteng Bubung Plentong Besar

8,000.00

8,500.00

32,000.00

34,000.00

Kg

Portland Semen

1,200.00

1,250.00

9,600.00

0.032

10,000.00

m3

Pasir Pasang

135,000.00

170,000.00

4,320.00

5,440.00

6.6.2

149235156.xlsx.ms_office

URAIAN PEKERJAAN

SAT.

28,310.00

30,220.00

0.4

OH

Tenaga
Pekerja

40,000.00

42,000.00

16,000.00

16,800.00

0.2

OH

Tukang Kayu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.002

OH

Mandor

55,000.00

60,000.00

110.00

120.00

83/56

abk 8-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.9

KOEF
1

m2

6.9.1

Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm

56,665.00

60,340.00

Bahan

46,020.00

48,960.00

78,000.00

44,100.00

46,800.00

0.12

Kg

Paku Pancing 60 x 230

16,000.00

18,000.00

1,920.00

2,160.00

10,645.00

11,380.00

0.14

OH

Pekerja

40,000.00

42,000.00

5,600.00

5,880.00

0.075

OH

Tukang Kayu

55,000.00

60,000.00

4,125.00

4,500.00

0.008

OH

Kepala Tukang

60,000.00

65,000.00

480.00

520.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

m2

Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm

56,275.00

59,915.00

Bahan

46,020.00

48,960.00

Tenaga

0.6

Lbr

Asbes Gelombang

73,500.00

78,000.00

44,100.00

46,800.00

0.12

Kg

Paku Pancing 60 x 230

16,000.00

18,000.00

1,920.00

2,160.00

10,255.00

10,955.00

0.14

OH

Pekerja

40,000.00

42,000.00

5,600.00

5,880.00

0.07

OH

Tukang Kayu

55,000.00

60,000.00

3,850.00

4,200.00

0.007

OH

Kepala Tukang

60,000.00

65,000.00

420.00

455.00

0.007

OH

Mandor

55,000.00

60,000.00

385.00

420.00

m2

Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm

36,675.00

39,715.00

Bahan

26,420.00

28,760.00

Tenaga

6.12.1
0.35

Lbr

Asbes Gelombang

70,000.00

76,000.00

24,500.00

26,600.00

0.12

Kg

Paku Pancing 60 x 230

16,000.00

18,000.00

1,920.00

2,160.00

10,255.00

10,955.00

0.14

OH

Pekerja

40,000.00

42,000.00

5,600.00

5,880.00

0.07

OH

Tukang Kayu

55,000.00

60,000.00

3,850.00

4,200.00

0.007

OH

Kepala Tukang

60,000.00

65,000.00

420.00

455.00

0.007

OH

Mandor

55,000.00

60,000.00

385.00

420.00

m2

Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm

38,020.00

40,985.00

Bahan

27,930.00

30,210.00

6.12.2

Tenaga

6.15.1
0.51

Lbr

Asbes Gelombang

51,000.00

55,000.00

26,010.00

28,050.00

0.12

Kg

Paku Pancing 60 x 230

16,000.00

18,000.00

1,920.00

2,160.00

10,090.00

10,775.00

0.14

OH

Pekerja

40,000.00

42,000.00

5,600.00

5,880.00

0.067

OH

Tukang Kayu

55,000.00

60,000.00

3,685.00

4,020.00

0.007

OH

Kepala Tukang

60,000.00

65,000.00

420.00

455.00

0.007

OH

Mandor

55,000.00

60,000.00

385.00

420.00

m2

Pasang Atap Genteng Beton

48,025.00

54,585.00

Bahan

33,375.00

38,935.00

6.15.2

Tenaga

6.30.1
11

Lbr

Genteng Beton Standrad

3,000.00

3,500.00

33,000.00

0.03

Kg

Paku Biasa 2" - 5"

38,500.00

12,500.00

14,500.00

375.00

435.00

0.2

OH

14,650.00

15,650.00

Pekerja

40,000.00

42,000.00

8,000.00

0.1

8,400.00

OH

Tukang Kayu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.01

OH

Mandor

55,000.00

60,000.00

550.00

600.00

m2

Pasang Atap Sirap

117,830.00

125,977.00

95,500.00

101,900.00

6.30.2

Tenaga

6.33.1

Bahan
60

Lbr

Genteng Sirap

1,550.00

1,650.00

93,000.00

0.2

Kg

Paku Biasa 1/2" - 1"

99,000.00

12,500.00

14,500.00

2,500.00

2,900.00

0.166

OH

22,330.00

24,077.00

Pekerja

40,000.00

42,000.00

6,640.00

0.25

6,972.00

OH

Tukang Kayu

55,000.00

60,000.00

13,750.00

15,000.00

0.025

OH

Kepala Tukang

60,000.00

65,000.00

1,500.00

1,625.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

6.33.2

149235156.xlsx.ms_office

MAKSIMUM
Rp

73,500.00

6.10.2

6.33

JUMLAH
MINIMUM
Rp

Asbes Gelombang

6.10

6.30

MAKSIMUM
Rp

Lbr

6.10.1

6.15

MINIMUM
Rp

0.6

6.9.2

6.12

URAIAN PEKERJAAN

SAT.

Tenaga

83/57

abk 8-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.34

KOEF
1

m'

6.34.1

31,030.00

34,365.00

31,030.00

34,365.00
14,700.00

13,125.00

0.05

Kg

Paku Biasa 2" - 5"

12,500.00

14,500.00

625.00

10.8

Kg

Portland Semen

725.00

1,200.00

1,250.00

12,960.00

13,500.00

0.032

m3

Kg

Pasir Pasang

135,000.00

170,000.00

4,320.00

5,440.00

Semen Warna

10,000.00

15,000.00

10,000.00

15,000.00

0.4

OH

Nok Genteng Beton

29,300.00

31,300.00

Pekerja

40,000.00

42,000.00

16,000.00

0.2

16,800.00

OH

Tukang Kayu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.02

OH

Mandor

55,000.00

60,000.00

1,100.00

1,200.00

m'

Pasang Nok Sirap

69,980.00

74,755.00

Bahan

49,400.00

52,520.00
14,400.00

Tenaga

0.4

Lbr

Seng Plaat 3" x 6" BJLS 28

33,000.00

36,000.00

13,200.00

0.06

Kg

Paku Biasa 1/2" - 1"

12,500.00

14,500.00

750.00

870.00

0.5

Kg

Paku Biasa 2" - 5"

12,500.00

14,500.00

6,250.00

7,250.00

0.004

m3

Kayu Kamfer Papan Tebal 3 cm

7,300,000.00

7,500,000.00

29,200.00

30,000.00

20,580.00

22,235.00

0.125

OH

Pekerja

40,000.00

42,000.00

5,000.00

5,250.00

0.25

OH

Tukang Kayu

55,000.00

60,000.00

13,750.00

15,000.00

0.025

OH

Kepala Tukang

60,000.00

65,000.00

1,500.00

1,625.00

0.006

OH

Mandor

55,000.00

60,000.00

330.00

360.00

m2

Pasang Atap Seng Gelombang

54,540.00

56,580.00

Bahan

45,750.00

47,190.00

Tenaga

0.7

Lbr

Seng Gelombang 3" x 6" BJLS 28

65,000.00

67,000.00

45,500.00

46,900.00

0.02

Kg

Paku Biasa 1/2" - 1"

12,500.00

14,500.00

250.00

290.00

8,790.00

9,390.00

0.12

OH

Pekerja

40,000.00

42,000.00

4,800.00

5,040.00

0.06

OH

Tukang Kayu

55,000.00

60,000.00

3,300.00

3,600.00

0.006

OH

Kepala Tukang

60,000.00

65,000.00

360.00

390.00

0.006

OH

Mandor

55,000.00

60,000.00

330.00

360.00

m'

Pasang Atap Nok Seng

30,660.00

32,060.00

Bahan

20,000.00

20,680.00

6.38.2

Tenaga

6.39.1
0.3

Lbr

Seng Plaat 3" x 6" BJLS 28

65,000.00

67,000.00

19,500.00

20,100.00

0.04

Kg

Paku Biasa 1/2" - 1"

12,500.00

14,500.00

500.00

580.00

10,660.00

11,380.00

0.15

OH

Pekerja

40,000.00

42,000.00

6,000.00

6,300.00

0.07

OH

Tukang Kayu

55,000.00

60,000.00

3,850.00

4,200.00

0.008

OH

Kepala Tukang

60,000.00

65,000.00

480.00

520.00

0.006

OH

Mandor

55,000.00

60,000.00

330.00

360.00

m2

Pasang Allumunium Foil / Sisalation

16,315.00

17,560.00

6,825.00

7,455.00

6,825.00

7,455.00

6.39.2

Tenaga

6.42.1

Bahan
1.05

m2

6,500.00

7,100.00

0.15

OH

9,490.00

10,105.00

Pekerja

40,000.00

42,000.00

6,000.00

0.05

6,300.00

OH

Tukang Kayu

55,000.00

60,000.00

2,750.00

3,000.00

0.005

OH

Kepala Tukang

60,000.00

65,000.00

300.00

325.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

480.00

6.42.2

149235156.xlsx.ms_office

MAKSIMUM
Rp

4,200.00

6.38.1

6.42

JUMLAH
MINIMUM
Rp

3,750.00

6.37.2

6.39

MAKSIMUM
Rp

Bahan
Buah

6.37.1

6.38

MINIMUM
Rp

Pasang Nok Genteng Beton

3.5

6.34.2

6.37

URAIAN PEKERJAAN

SAT.

Sisalation / Allumunium Foil


Tenaga

83/58

abk 8-14

HARGA BAHAN/UPAH
No.

SNI

IX

03-2839 - 2008

KODE

KOEF

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

PEKERJAAN LANGIT - LANGIT


6.1

m2

6.1.1

6.2

18,500.00

17,600.00

20,350.00

0.01

Kg

Paku

12,500.00

14,500.00

125.00

145.00

5,690.00

6,155.00

0.03

OH

Tenaga
Pekerja

40,000.00

42,000.00

1,200.00

1,260.00

0.07

OH

Tukang Kayu

55,000.00

60,000.00

3,850.00

4,200.00

0.007

OH

Kepala Tukang

60,000.00

65,000.00

420.00

455.00

0.004

OH

Mandor

55,000.00

60,000.00

220.00

240.00

m2

Memasang Langit-langit Akustik Ukuran (30x30) cm

69,475.00

74,105.00

Bahan

57,025.00

60,725.00

12.0

Lbr

Akustik Uk.30 x 30 cm

0.05

Kg

Paku

4,700.00

5,000.00

56,400.00

60,000.00

12,500.00

14,500.00

625.00

725.00

12,450.00

13,380.00

0.12

OH

Tenaga
Pekerja

40,000.00

42,000.00

4,800.00

5,040.00

0.12

OH

Tukang Kayu

55,000.00

60,000.00

6,600.00

7,200.00

0.012

OH

Kepala Tukang

60,000.00

65,000.00

720.00

780.00

0.006

OH

Mandor

55,000.00

60,000.00

330.00

360.00

m2

Memasang Langit-langit Akustik Ukuran (30x60) cm

74,800.00

81,475.00

Bahan

64,425.00

70,325.00

5.80

Lbr

Akustik

11,000.00

12,000.00

63,800.00

69,600.00

0.05

Kg

Paku

12,500.00

14,500.00

625.00

725.00

6.3.2

10,375.00

11,150.00

0.10

OH

Tenaga
Pekerja

40,000.00

42,000.00

4,000.00

4,200.00

0.10

OH

Tukang Kayu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

m2

Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm

31,375.00

34,085.00

Bahan

21,000.00

22,935.00

6.5.1
0.375

Lbr

Tripleks (4 mm)

55,000.00

60,000.00

20,625.00

22,500.00

0.03

Kg

Paku Tripleks

12,500.00

14,500.00

375.00

435.00

6.5.2

10,375.00

11,150.00

0.10

OH

Tenaga
Pekerja

40,000.00

42,000.00

4,000.00

4,200.00

0.10

OH

Tukang Kayu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

m2

Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm

398,125.00

419,345.00

Bahan

315,125.00

330,145.00

6.6.1
0.015

m3

Kayu Jati,Papan

21,000,000.00

22,000,000.00

315,000.00

0.01

Kg

Paku

330,000.00

12,500.00

14,500.00

125.00

145.00

0.8

OH

83,000.00

89,200.00

Pekerja

40,000.00

42,000.00

32,000.00

0.8

33,600.00

OH

Tukang Kayu

55,000.00

60,000.00

44,000.00

48,000.00

0.08

OH

Kepala Tukang

60,000.00

65,000.00

4,800.00

5,200.00

0.04

OH

Mandor

55,000.00

60,000.00

2,200.00

2,400.00

m2

Memasng Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm

25,025.00

29,330.00

Bahan

17,700.00

21,505.00

6.6.2

6.7

20,495.00

16,000.00

6.3.1

6.6

26,650.00

17,725.00

Plat Asbes

6.2.2

6.5

23,415.00

Bahan
Lbr

6.2.1

6.3

Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

1.1

6.1.2

Tenaga

6.7.1
0.364

Lbr

Gypsum Board

45,000.00

55,000.00

16,380.00

20,020.00

0.11

Kg

Paku Sekrup

12,000.00

13,500.00

1,320.00

1,485.00

7,325.00

7,825.00

0.1

OH

Pekerja

40,000.00

42,000.00

4,000.00

4,200.00

0.05

OH

Tukang Kayu

55,000.00

60,000.00

2,750.00

3,000.00

0.005

OH

Kepala Tukang

60,000.00

65,000.00

300.00

325.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

6.7.2

149235156.xlsx.ms_office

URAIAN PEKERJAAN

SAT.

Tenaga

83/59

abk 9-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.9

KOEF
1

m2

6.9.1

MAKSIMUM
Rp

Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium

3.6

m'

Profil Allumunium "T"

0.15

kg

1.05

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

149,750.00

161,500.00

97,875.00

105,750.00
23,400.00

5,000.00

6,500.00

18,000.00

Kawat 4 mm

12,000.00

15,000.00

1,800.00

2,250.00

bh

Ramset

21,500.00

22,000.00

22,575.00

23,100.00

1.5

lmb

Akuatik 60 x 120 cm

55,500.00

57,000.00

0.5

OH

0.5

37,000.00

38,000.00

51,875.00

55,750.00

Pekerja

40,000.00

42,000.00

20,000.00

21,000.00

OH

Tukang Kayu

55,000.00

60,000.00

27,500.00

30,000.00

0.05

OH

Kepala Tukang

60,000.00

65,000.00

3,000.00

3,250.00

0.025

OH

Mandor

55,000.00

60,000.00

1,375.00

1,500.00

m1

List Langit-Langit Kayu Profil

9,750.00

11,000.00

Bahan

4,535.00

5,395.00

Tenaga

6.10.1
1.05

m1

List Kayu Profil

4,200.00

5,000.00

4,410.00

0.01

Kg

Paku

5,250.00

12,500.00

14,500.00

125.00

145.00

0.05

OH

5,215.00

5,605.00

Pekerja

40,000.00

42,000.00

2,000.00

0.05

2,100.00

OH

Tukang Kayu

55,000.00

60,000.00

2,750.00

3,000.00

0.005

OH

Kepala Tukang

60,000.00

65,000.00

300.00

325.00

0.003

OH

Mandor

55,000.00

60,000.00

165.00

180.00

6.10.2

149235156.xlsx.ms_office

MINIMUM
Rp

Bahan

6.9.2

6.10

URAIAN PEKERJAAN

SAT.

Tenaga

83/60

abk 9-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

PEKERJAAN SANITASI
6.1

1 Unit

Memasang Closet Duduk / Mono Blok

1 Buah
0.06

950,000.00

1,450,000.00

57,000.00
201,360.00

40,000.00

42,000.00

132,000.00

1.1

OH

Tukang Batu

55,000.00

60,000.00

60,500.00

0.001

OH

Kepala Tukang

60,000.00

65,000.00

60.00

0.16

OH

Mandor

55,000.00

60,000.00

8,800.00

1 Unit

Memasang Closet Jongkok Porselen

334,850.00

Bahan
1

Buah

Kloset Jongkok

Kg

Portland Semen

0.01

m3

Pasir Pasang

OH

1.5

113,550.00
105,000.00

150,000.00

105,000.00

1,200.00

1,250.00

7,200.00

135,000.00

170,000.00

1,350.00

Pekerja

40,000.00

42,000.00

40,000.00

OH

Tukang Batu

55,000.00

60,000.00

82,500.00

1.5

OH

Kepala Tukang

60,000.00

65,000.00

90,000.00

0.16

OH

Mandor

55,000.00

60,000.00

8,800.00

Tenaga

1 Unit

221,300.00

Memasang Urinoir

472,550.00

Bahan
1

Buah

0.3

366,050.00

Urinoir

275,000.00

310,000.00

275,000.00

Perlengkapan 30% Harga Urinoir

275,000.00

310,000.00

82,500.00

1,200.00

1,250.00

7,200.00

135,000.00

170,000.00

1,350.00

Kg

Portland Semen

0.01

m3

Pasir Pasang

OH

Pekerja

40,000.00

42,000.00

40,000.00

OH

Tukang Batu

55,000.00

60,000.00

55,000.00

0.1

OH

Kepala Tukang

60,000.00

65,000.00

6,000.00

0.1

OH

Mandor

55,000.00

60,000.00

5,500.00

Tenaga

6.4.1

1 Unit

106,500.00

Memasang Wastafel

989,025.00

Bahan

6.5.1

Buah

0.3

918,550.00

Wastafel Meja Oval

700,000.00

800,000.00

700,000.00

Perlengkapan 30% Harga Wastafel

700,000.00

800,000.00

210,000.00

1,200.00

1,250.00

7,200.00

135,000.00

170,000.00

1,350.00

Kg

Portland Semen

0.01

m3

Pasir Pasang

1.2

OH

Pekerja

40,000.00

42,000.00

48,000.00

0.145

OH

Tukang Batu

55,000.00

60,000.00

7,975.00

0.15

OH

Kepala Tukang

60,000.00

65,000.00

9,000.00

0.1

OH

Mandor

55,000.00

60,000.00

5,500.00

Tenaga

6.5.2

1 Unit

70,475.00

Memasang Bak Mandi Batu Bata Vol. 0,30 m3

928,090.91

Bahan

6.8.1

0.4

m3

Batu Bata

120

Kg

Portland Semen

0.3

m3

Pasir Pasang

360

buah

Porselen 11 x 11 cm
Semen Nat

488,590.91
337,500.00

375,000.00

135,000.00

1,200.00

1,250.00

144,000.00

135,000.00

170,000.00

40,500.00

303.03

333.33

109,090.91

10,000.00

15,000.00

60,000.00

Kg

OH

Pekerja

40,000.00

42,000.00

240,000.00

OH

Tukang Batu

55,000.00

60,000.00

165,000.00

0.3

OH

Kepala Tukang

60,000.00

65,000.00

18,000.00

0.3

OH

Mandor

55,000.00

60,000.00

16,500.00

m'

Memasang Pipa Beton, 15 cm - 20 cm

Tenaga

6.8.2

6.14

950,000.00

Kelengkapan 6% dari harga Kloset

Pekerja

6.4.1

6.8

1,450,000.00

OH

6.2.2

6.5

950,000.00

3.3

6.2.1

6.4

1,007,000.00

Kloset Duduk / Monoblok

Tenaga

6.1.2

6.2

1,208,360.00

Bahan

6.1.1

439,500.00

63,143.50

Bahan

6.14.1

1.1

149235156.xlsx.ms_office83/61

URAIAN PEKERJAAN

SAT.

52,888.50

Buah

Pipa Beton

30,000.00

33,000.00

33,000.00

0.027

m3

Batu Bata

337,500.00

375,000.00

9,112.50

0.68

Kg

Portland Semen

1,200.00

1,250.00

816.00

0.056

m3

Pasir Pasang

135,000.00

170,000.00

7,560.00

0.024

m3

Pasir Urug

100,000.00

125,000.00

2,400.00

abk 10-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

40,000.00

42,000.00

5,600.00

0.07

OH

Tukang Batu

55,000.00

60,000.00

3,850.00

0.007

OH

Kepala Tukang

60,000.00

65,000.00

420.00

0.007

OH

Mandor

55,000.00

60,000.00

385.00

m'

Memasang Pipa Beton, 30 cm - 100 cm

Buah

Pipa Beton

38,000.00

42,000.00

41,800.00

0.55

m3

Batu Bata

337,500.00

375,000.00

185,625.00

10.3

Kg

Portland Semen

1,200.00

1,250.00

12,360.00

0.061

m3

Pasir Pasang

135,000.00

170,000.00

8,235.00

0.069

m3

Pasir Urug

100,000.00

125,000.00

6,900.00

0.38

OH

Pekerja

40,000.00

42,000.00

15,200.00

0.19

OH

Tukang Batu

55,000.00

60,000.00

10,450.00

0.019

OH

Kepala Tukang

60,000.00

65,000.00

1,140.00

0.019

OH

Mandor

55,000.00

60,000.00

1,045.00

Tenaga

1 m'

27,835.00

Memasang Pipa Galvanis "

39,360.00

Bahan
m'

30,225.00

Pipa Galvanis

19,500.00

20,333.33

23,400.00

Perlengkapan 35% Harga Pipa

19,500.00

20,333.33

6,825.00

Tenaga

6.20.2

9,135.00

0.054

OH

Pekerja

40,000.00

42,000.00

2,160.00

0.09

OH

Tukang Ledeng

55,000.00

60,000.00

4,950.00

0.009

OH

Kepala Tukang

60,000.00

65,000.00

540.00

0.027

OH

Mandor

55,000.00

60,000.00

1,485.00

1 m'

Memasang Pipa Galvanis 3"

137,013.67

Bahan

6.23.1

1.2

m'

0.35

121,416.67

Pipa Galvanis

78,333.33

83,333.33

94,000.00

Perlengkapan 35% Harga Pipa

78,333.33

83,333.33

27,416.67

Tenaga

6.23.2

15,597.00

0.108

OH

Pekerja

40,000.00

42,000.00

4,320.00

0.18

OH

Tukang Ledeng

55,000.00

60,000.00

9,900.00

0.018

OH

Kepala Tukang

60,000.00

65,000.00

1,080.00

0.0054

OH

Mandor

55,000.00

60,000.00

297.00

1 m'

Memasang Pipa Galvanis 4"

170,624.00

Bahan

6.24.1

1.2

m'

0.35

151,125.00

Pipa Galvanis

97,500.00

101,666.67

117,000.00

Perlengkapan 35% Harga Pipa

97,500.00

101,666.67

34,125.00

Tenaga

6.24.2

19,499.00

0.135

OH

Pekerja

40,000.00

42,000.00

5,400.00

0.225

OH

Tukang Ledeng

55,000.00

60,000.00

12,375.00

0.0225

OH

Kepala Tukang

60,000.00

65,000.00

1,350.00

0.0068

OH

Mandor

55,000.00

60,000.00

374.00

1 m'

Memasang Pipa PVC type AW "

12,174.00

Bahan

6.25.1

1.2

m'

0.35

6,975.00

Pipa PVC

4,500.00

5,000.00

5,400.00

Perlengkapan 35% Harga Pipa

4,500.00

5,000.00

1,575.00

Tenaga

6.25.2

5,199.00

0.036

OH

Pekerja

40,000.00

42,000.00

1,440.00

0.06

OH

Tukang Ledeng

55,000.00

60,000.00

3,300.00

0.006

OH

Kepala Tukang

60,000.00

65,000.00

360.00

0.0018

OH

Mandor

55,000.00

60,000.00

99.00

1 m'

Memasang Pipa PVC type AW 2"

23,298.50

Bahan

6.29.1

1.2
0.35

149235156.xlsx.ms_office83/62

254,920.00

1.1

0.35

6.29

282,755.00

Bahan

1.2

6.25

10,255.00

Pekerja

6.20.1

6.24

JUMLAH
MINIMUM
Rp

OH

6.15.2

6.23

MAKSIMUM
Rp

0.14

6.15.1

6.20

MINIMUM
Rp

Tenaga

6.14.2

6.15

URAIAN PEKERJAAN

SAT.

m'

15,500.00

Pipa PVC

10,000.00

12,733.33

12,000.00

Perlengkapan 35% Harga Pipa

10,000.00

12,733.33

3,500.00

abk 10-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

40,000.00

42,000.00

2,160.00

0.09

OH

Tukang Ledeng

55,000.00

60,000.00

4,950.00

0.009

OH

Kepala Tukang

60,000.00

65,000.00

540.00

0.0027

OH

Mandor

55,000.00

60,000.00

148.50

1 m'

Memasang Pipa PVC type AW 3"

43,346.33

Bahan
m'

31,645.83

Pipa PVC

20,416.67

20,833.33

24,500.00

Perlengkapan 35% Harga Pipa

20,416.67

20,833.33

7,145.83

Tenaga

6.31.2

11,700.50

0.081

OH

Pekerja

40,000.00

42,000.00

3,240.00

0.135

OH

Tukang Ledeng

55,000.00

60,000.00

7,425.00

0.014

OH

Kepala Tukang

60,000.00

60,000.00

810.00

0.0041

OH

Mandor

55,000.00

60,000.00

225.50

1 Buah

Memasang Bak Cuci Piring Stainles Steel

309,582.50

Bahan

6.33.1

Buah

Set

0.03

OH

0.3

290,000.00

Bak Cuci Stainles Steel

145,000.00

170,000.00

145,000.00

Water Drain & assesories

145,000.00

170,000.00

145,000.00

Pekerja

40,000.00

42,000.00

1,200.00

OH

Tukang Ledeng

55,000.00

60,000.00

16,500.00

0.03

OH

Kepala Tukang

60,000.00

65,000.00

1,800.00

0.0015

OH

Mandor

55,000.00

60,000.00

82.50

Tenaga

6.33.2

1 Buah

19,582.50

Memasang Kran " atau "

14,325.00

Bahan

6.35.1

Buah

7,550.00

Kran Air

7,500.00

15,000.00

7,500.00

Seal Tape

2,000.00

3,000.00

50.00

0.025

Set

0.01

OH

Pekerja

40,000.00

42,000.00

400.00

0.1

OH

Tukang Ledeng

55,000.00

60,000.00

5,500.00

0.01

OH

Kepala Tukang

60,000.00

60,000.00

600.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

Tenaga

6.35.2

1 Buah

6,775.00

Memasang Floor Drain

29,275.00

Bahan

6.36.1

Buah

Floor Drain

22,500.00
22,500.00

25,000.00

Tenaga

6.36.2

149235156.xlsx.ms_office83/63

7,798.50

Pekerja

0.35

6.36

JUMLAH
MINIMUM
Rp

OH

1.2

6.35

MAKSIMUM
Rp

0.054

6.31.1

6.33

MINIMUM
Rp

Tenaga

6.29.2

6.31

URAIAN PEKERJAAN

SAT.

22,500.00
6,775.00

0.01

OH

Pekerja

40,000.00

42,000.00

400.00

0.1

OH

Tukang Batu

55,000.00

60,000.00

5,500.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

abk 10-14

JUMLAH
MAKSIMUM
Rp

1,751,265.00
1,537,000.00
1,450,000.00
87,000.00
214,265.00
138,600.00
66,000.00
65.00
9,600.00
398,300.00
159,200.00
150,000.00
7,500.00
1,700.00
239,100.00
42,000.00
90,000.00
97,500.00
9,600.00
526,700.00
412,200.00
310,000.00
93,000.00
7,500.00
1,700.00
114,500.00
42,000.00
60,000.00
6,500.00
6,000.00
1,124,050.00
1,049,200.00
800,000.00
240,000.00
7,500.00
1,700.00
74,850.00
50,400.00
8,700.00
9,750.00
6,000.00
1,030,500.00
561,000.00
150,000.00
150,000.00
51,000.00
120,000.00
90,000.00
469,500.00
252,000.00
180,000.00
19,500.00
18,000.00
70,750.00
59,795.00
36,300.00
10,125.00
850.00
9,520.00
3,000.00

149235156.xlsx.ms_office83/64

abk 10-14

JUMLAH
MAKSIMUM
Rp
10,955.00
5,880.00
4,200.00
455.00
420.00
314,055.00
284,320.00
46,200.00
206,250.00
12,875.00
10,370.00
8,625.00
29,735.00
15,960.00
11,400.00
1,235.00
1,140.00
41,389.67
31,516.67
24,400.00
7,116.67
9,873.00
2,268.00
5,400.00
585.00
1,620.00
145,996.67
129,166.67
100,000.00
29,166.67
16,830.00
4,536.00
10,800.00
1,170.00
324.00
178,623.83
157,583.33
122,000.00
35,583.33
21,040.50
5,670.00
13,500.00
1,462.50
408.00
13,360.00
7,750.00
6,000.00
1,750.00
5,610.00
1,512.00
3,600.00
390.00
108.00
28,151.67
19,736.67
15,280.00
4,456.67

149235156.xlsx.ms_office83/65

abk 10-14

JUMLAH
MAKSIMUM
Rp
8,415.00
2,268.00
5,400.00
585.00
162.00
44,849.67
32,291.67
25,000.00
7,291.67
12,558.00
3,402.00
8,100.00
810.00
246.00
361,300.00
340,000.00
170,000.00
170,000.00
21,300.00
1,260.00
18,000.00
1,950.00
90.00
22,395.00
15,075.00
15,000.00
75.00
7,320.00
420.00
6,000.00
600.00
300.00
32,370.00
25,000.00
25,000.00
7,370.00
420.00
6,000.00
650.00
300.00

149235156.xlsx.ms_office83/66

abk 10-14

HARGA BAHAN/UPAH
No.

SNI

XI

03-7393 - 2008

KODE

KOEF

URAIAN PEKERJAAN

SAT.

MINIMUM
Rp

MAKSIMUM
Rp

PEKERJAAN BESI & ALLUMUNIUM


6.1

Kg

Besi Profil

13,500.00

14,250.00

15,525.00

0.06

Kg

Meni Besi

15,000.00

20,000.00

900.00

0.06

OH

Pekerja

40,000.00

42,000.00

2,400.00

0.06

OH

Tukang Besi

55,000.00

60,000.00

3,300.00

0.006

OH

Kepala Tukang

60,000.00

65,000.00

360.00

0.003

OH

Mandor

55,000.00

60,000.00

165.00

kg

Memasang Rangka Kuda-kuda Baja IWF

Tenaga

1.15

kg

0.06

OH

0.06

15,525.00
14,250.00

Besi Baja IWF

Pekerja

40,000.00

42,000.00

2,400.00

OH

Tukang Besi

55,000.00

60,000.00

3,300.00

0.006

OH

Kepala Tukang

60,000.00

65,000.00

360.00

0.003

OH

Mandor

55,000.00

60,000.00

165.00

kg

Mengerjakan Pekerjaan Perakitan (Kuda-kuda Baja)

Tenaga

100

24,835.00
14,400.00

ltr

Solar

11,250.00

11,300.00

11,250.00

0.1

ltr

Minyak Pelumas

31,500.00

35,000.00

3,150.00

Tenaga

10,435.00

0.100

OH

Pekerja

40,000.00

42,000.00

4,000.00

0.100

OH

Tukang Besi

55,000.00

60,000.00

5,500.00

0.001

OH

Kepala Tukang

60,000.00

65,000.00

60.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

0.008

Jam

Sewa Alat

75,000.00

80,000.00

600.00

m2

Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku

6.4.1

740,810.00

Bahan

631,900.00

15

Kg

Besi Siku L.30.30.3

13,500.00

14,250.00

202,500.00

32.8

Kg

Besi Plat Baja

13,000.00

14,000.00

426,400.00

0.05

Kg

Kawat Las

60,000.00

70,000.00

3,000.00

1.05

OH

Pekerja

40,000.00

42,000.00

42,000.00

1.05

OH

Tukang Besi

55,000.00

60,000.00

57,750.00

0.105

OH

Kepala Tukang

60,000.00

65,000.00

6,300.00

0.052

OH

Mandor

55,000.00

60,000.00

2,860.00

10

cm

Mengerjakan Pengelasan dengan Las Listrik

6.4.2

Tenaga

6.5.1

108,910.00

18,543.50

Bahan

2,863.50

0.04

kg

Kawat Las

60,000.00

70,000.00

2,400.00

0.03

ltr

Solar

11,250.00

11,300.00

337.50

0.004

ltr

Minyak Pelumas

31,500.00

35,000.00

126.00

0.04

OH

Pekerja

40,000.00

42,000.00

1,600.00

0.02

OH

Tukang Besi

55,000.00

60,000.00

1,100.00

0.002

OH

Kepala Tukang

60,000.00

65,000.00

120.00

0.002

OH

Mandor

55,000.00

60,000.00

0.17

Jam

Sewa Alat

m2

Memasang Pintu Rolling Door Besi

6.5.2

Tenaga

15,680.00

75,000

80,000

m2

1.2

OH

1.2

110.00
12,750.00
346,530.00

Bahan
6.7.1

15,525.00
6,225.00

Bahan

6.3.2

6.7

21,750.00

13,500.00

6.3.1

6.5

6,225.00

Bahan

6.2.2

6.4

16,425.00

Kg

6.2.1

6.3

22,650.00

1.15

6.1.2

6.2

Memasang Besi Profil


Bahan

6.1.1

225,000.00
225,000.00

245,000.00

Pekerja

40,000.00

42,000.00

48,000.00

OH

Tukang Besi

55,000.00

60,000.00

66,000.00

0.12

OH

Kepala Tukang

60,000.00

65,000.00

7,200.00

0.006

OH

Mandor

55,000.00

60,000.00

330.00

6.7.2

149235156.xlsx.ms_office

JUMLAH
MINIMUM
Rp

Pintu Gulung Besi


Tenaga

225,000.00
121,530.00

83/67

abk 11-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.8

KOEF
1

m2

6.8.1
1

m2

0.44

OH

0.44

40,000.00

42,000.00

17,600.00

OH

Tukang Besi

55,000.00

60,000.00

24,200.00

0.044

OH

Kepala Tukang

60,000.00

65,000.00

2,640.00

0.022

OH

Mandor

55,000.00

60,000.00

1,210.00

m2

Sunscreen Allumunium

m2

0.08

OH

0.8

350,000.00
45,650.00

317,220.00
265,000.00

Sunscreen Allumunium

265,000.00

310,000.00

Pekerja

40,000.00

42,000.00

3,200.00

OH

Tukang Besi

55,000.00

60,000.00

44,000.00

Tenaga

265,000.00
52,220.00

0.08

OH

Kepala Tukang

60,000.00

65,000.00

4,800.00

0.004

OH

Mandor

55,000.00

60,000.00

220.00

m2

Memasang Rolling Door Allumunium

313,750.00

Bahan
1

m2

OH

210,000.00
210,000.00

230,000.00

Rolling Allumunium

Pekerja

40,000.00

42,000.00

40,000.00

OH

Tukang Besi

55,000.00

60,000.00

55,000.00

0.1

OH

Kepala Tukang

60,000.00

65,000.00

6,000.00

0.05

OH

Mandor

55,000.00

60,000.00

2,750.00

m'

Memasang Kusen Pintu Allumunium

Tenaga

m'

210,000.00
103,750.00

84,458.50

Bahan
1.1

80,000.00

Profil Allumunium

68,000.00

75,000.00

74,800.00

950.00

1,000.00

1,900.00

55,000.00

65,000.00

3,300.00

buah

Skrup Fixer

0.06

Tube

Sealant

0.043

OH

Pekerja

40,000.00

42,000.00

1,720.00

0.043

OH

Tukang Besi

55,000.00

60,000.00

2,365.00

0.0043

OH

Kepala Tukang

60,000.00

65,000.00

258.00

0.0021

OH

Mandor

55,000.00

60,000.00

115.50

m2

Memasang Pintu Allumunium Strip Lebar 8 cm

6.11.2

Tenaga

6.12.1

4,458.50

1,038,016.00

Bahan

1,029,200.00

4.4

m'

Profil Allumunium

68,000.00

75,000.00

299,200.00

14.6

m'

Allumunium Strip

50,000.00

55,000.00

730,000.00

0.085

OH

Pekerja

40,000.00

42,000.00

3,400.00

0.085

OH

Tukang Besi

55,000.00

60,000.00

4,675.00

0.0085

OH

Kepala Tukang

60,000.00

65,000.00

510.00

0.0042

OH

Mandor

55,000.00

60,000.00

231.00

m2

Memasang Pintu Kaca Rangka Allumunium

6.12.2

Tenaga

6.13.1

8,816.00

288,740.00

Bahan

279,850.00

4.4

m'

Pintu Allumunium

50,000.00

55,000.00

220,000.00

4.5

m'

Profil Kaca

10,000.00

12,000.00

45,000.00

0.27

tube

Sealant

55,000.00

65,000.00

14,850.00

0.085

OH

Pekerja

40,000.00

42,000.00

3,400.00

0.085

OH

Tukang Besi

55,000.00

60,000.00

4,675.00

0.009

OH

Kepala Tukang

60,000.00

65,000.00

540.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

m2

Memasang Venetions Blinds & Vertical Blinds

6.13.2

Tenaga

6.14.1

8,890.00

161,340.00

Bahan
1

149235156.xlsx.ms_office

Pintu Lipat

Bahan

6.11.1

6.14

350,000.00

Pekerja

6.10.2

6.13

395,650.00

Tenaga

6.10.1

6.12

Memasang Pintu Lipat (Folding Door)

JUMLAH
MINIMUM
Rp

400,000.00

6.9.2

6.11

MAKSIMUM
Rp

350,000.00

6.9.1

6.10

MINIMUM
Rp

Bahan

6.8.2

6.9

URAIAN PEKERJAAN

SAT.

m2

125,000.00

Venetions Blinds atau Vertical Blinds (tirai)

83/68

125,000.00

150,000.00

125,000.00

abk 11-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

6.14.2

6.15

Tenaga
42,000.00

14,000.00

0.35

OH

Tukang Besi

55,000.00

60,000.00

19,250.00

0.035

OH

Kepala Tukang

60,000.00

65,000.00

2,100.00

0.018

OH

Mandor

55,000.00

60,000.00

990.00

m2

Memasang Terali Besi Strip (2x3) cm

303,751.80

Bahan
6.177

m'

Besi Strip 2x3

27.08

cm

Pengelasan

1.67

OH

1.67

130,516.80
13,000.00

14,000.00

80,301.00

1,854.35

2,000.90

50,215.80

Pekerja

40,000.00

42,000.00

66,800.00

OH

Tukang Las

55,000.00

60,000.00

91,850.00

0.167

OH

Kepala Tukang

60,000.00

65,000.00

10,020.00

0.083

OH

Mandor

55,000.00

60,000.00

4,565.00

m2

Memasang Kawat Nyamuk

Tenaga

173,235.00

63,184.83

Bahan

52,809.83

1.1

m2

Kawat Nyamuk nylon

9,000.00

10,000.00

9,900.00

11.11

cm

Pengelasan

1,854.35

2,000.90

20,601.83

1.716

kg

Baja Strip (0,2x2) cm

13,000.00

14,000.00

22,308.00

0.1

OH

Pekerja

40,000.00

42,000.00

4,000.00

0.1

OH

Tukang Kayu

55,000.00

60,000.00

5,500.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

0.0050

OH

Mandor

55,000.00

60,000.00

275.00

m2

Memasang Jendela Nako & Tralis

Tenaga

6.17.1

10,375.00

39,805.00

Bahan
1.1

m2

10

buah

m'

0.2

OH

0.2

19,550.00
10,500.00

11,000.00

11,550.00

100.00

150.00

1,000.00

1,000.00

12,000.00

7,000.00

Pekerja

40,000.00

42,000.00

8,000.00

OH

Tukang Kayu

55,000.00

60,000.00

11,000.00

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

0.001

OH

Mandor

55,000.00

60,000.00

55.00

m'

Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

6.17.2

Jendela Nako
Paku Skrup 1 - 2,5 cm
Besi Strip
Tenaga

6.18.1

20,255.00

156,187.50

Bahan

124,137.50

1.05

Lbr

Seng Plaat

33,000.00

36,000.00

0.015

Kg

Paku Biasa 1 - 2,5 cm

12,500.00

14,500.00

187.50

0.019

m3

Kayu Papan Klas II atau III

4,700,000.00

4,800,000.00

89,300.00

0.20

OH

Pekerja

40,000.00

42,000.00

8,000.00

0.4

OH

Tukang Kayu

55,000.00

60,000.00

22,000.00

0.025

OH

Kepala Tukang

60,000.00

65,000.00

1,500.00

0.01

OH

Mandor

55,000.00

60,000.00

550.00

m'

Memasang Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30 Lebar 45 cm

6.18.2

Tenaga

6.19.1

34,650.00

32,050.00

71,265.00

Bahan

46,525.00

1.05

Lbr

Seng Plaat

38,000.00

41,000.00

0.01

Kg

Paku Biasa 1 - 2,5 cm

12,500.00

14,500.00

125.00

0.5

Kg

Besi strip

13,000.00

14,000.00

6,500.00

0.15

OH

Pekerja

40,000.00

42,000.00

6,000.00

0.3

OH

Tukang Kayu

55,000.00

60,000.00

16,500.00

0.03

OH

Kepala Tukang

60,000.00

65,000.00

1,800.00

0.008

OH

Mandor

55,000.00

60,000.00

440.00

6.19.2

149235156.xlsx.ms_office

36,340.00
40,000.00

6.16.2

6.19

JUMLAH
MINIMUM
Rp

Pekerja

6.16.1

6.18

MAKSIMUM
Rp

OH

6.15.2

6.17

MINIMUM
Rp

0.35

6.15.1

6.16

URAIAN PEKERJAAN

SAT.

Tenaga

39,900.00

24,740.00

83/69

abk 11-14

JUMLAH
MAKSIMUM
Rp

24,277.50
17,587.50
16,387.50
1,200.00
6,690.00
2,520.00
3,600.00
390.00
180.00
23,077.50
16,387.50
16,387.50
6,690.00
2,520.00
3,600.00
390.00
180.00
26,005.00
14,800.00
11,300.00
3,500.00
11,205.00
4,200.00
6,000.00
65.00
300.00
640.00
793,495.00
676,450.00
213,750.00
459,200.00
3,500.00
117,045.00
44,100.00
63,000.00
6,825.00
3,120.00
20,009.00
3,279.00
2,800.00
339.00
140.00
16,730.00
1,680.00
1,200.00
130.00
120.00
13,600.00
375,560.00
245,000.00
245,000.00
130,560.00
50,400.00
72,000.00
7,800.00
360.00

149235156.xlsx.ms_office

83/70

abk 11-14

JUMLAH
MAKSIMUM
Rp
449,060.00
400,000.00
400,000.00
49,060.00
18,480.00
26,400.00
2,860.00
1,320.00
366,800.00
310,000.00
310,000.00
56,800.00
3,360.00
48,000.00
5,200.00
240.00
341,500.00
230,000.00
230,000.00
111,500.00
42,000.00
60,000.00
6,500.00
3,000.00
93,191.50
88,400.00
82,500.00
2,000.00
3,900.00
4,791.50
1,806.00
2,580.00
279.50
126.00
1,142,474.50
1,133,000.00
330,000.00
803,000.00
9,474.50
3,570.00
5,100.00
552.50
252.00
323,105.00
313,550.00
242,000.00
54,000.00
17,550.00
9,555.00
3,570.00
5,100.00
585.00
300.00
189,055.00
150,000.00
150,000.00

149235156.xlsx.ms_office

83/71

abk 11-14

JUMLAH
MAKSIMUM
Rp
39,055.00
14,700.00
21,000.00
2,275.00
1,080.00
326,837.37
140,662.37
86,478.00
54,184.37
186,175.00
70,140.00
100,200.00
10,855.00
4,980.00
68,404.00
57,254.00
11,000.00
22,230.00
24,024.00
11,150.00
4,200.00
6,000.00
650.00
300.00
119,360.00
97,600.00
12,100.00
1,500.00
84,000.00
21,760.00
8,400.00
12,000.00
1,300.00
60.00
163,842.50
129,217.50
37,800.00
217.50
91,200.00
34,625.00
8,400.00
24,000.00
1,625.00
600.00
76,925.00
50,195.00
43,050.00
145.00
7,000.00
26,730.00
6,300.00
18,000.00
1,950.00
480.00

149235156.xlsx.ms_office

83/72

abk 11-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

XII

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

PEKERJAAN KUNCI dan KACA


6.2

1 Buah

6.2..1
1

Buah

6.2.2

6.3

28,775.00

31,370.00

140,000.00

42,000.00

400.00

420.00

0.5

OH

Tukang Kayu

55,000.00

60,000.00

27,500.00

30,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

Memasang Kunci Kamar Mandi

78,137.50

85,685.00

Bahan

50,000.00

55,000.00

50,000.00

55,000.00

28,137.50

30,685.00

1 Buah

Kunci Tanam Kamar Mandi

50,000.00

55,000.00

Tenaga
0.005

OH

Pekerja

40,000.00

42,000.00

200.00

210.00

0.5

OH

Tukang Kayu

55,000.00

60,000.00

27,500.00

30,000.00

0.005

OH

Kepala Tukang

60,000.00

65,000.00

300.00

325.00

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

Memasang Kunci Selinder

153,137.50

170,685.00

Bahan

125,000.00

140,000.00

125,000.00

140,000.00

28,137.50

30,685.00

1 Buah

6.4.2

Kunci Selinder

125,000.00

140,000.00

Tenaga
0.005

OH

Pekerja

40,000.00

42,000.00

200.00

210.00

0.5

OH

Tukang Kayu

55,000.00

60,000.00

27,500.00

30,000.00

0.005

OH

Kepala Tukang

60,000.00

65,000.00

300.00

325.00

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

15,162.50

20,055.00

5,000.00

9,000.00

5,000.00

9,000.00

10,162.50

11,055.00

1 Buah

6.5.1

Memasang Engsel Pintu


Bahan

1 Buah
6.5.2

Engsel pintu

5,000.00

9,000.00

Tenaga
0.015

OH

Pekerja

40,000.00

42,000.00

600.00

630.00

0.15

OH

Tukang Kayu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.0075

OH

Mandor

55,000.00

60,000.00

412.50

450.00

Pasang Engsel Jendela Kupu-kupu

9,025.00

9,870.00

Bahan

2,250.00

2,500.00

2,250.00

2,500.00

6,775.00

7,370.00

Buah

6..6.1

Buah

Engsel Jendela

2,250.00

2,500.00

Tenaga

6.6.2

0.01

OH

Pekerja

40,000.00

42,000.00

400.00

420.00

0.1

OH

Tukang Kayu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

Pasang Engsel Angin

28,550.00

30,740.00

Bahan

15,000.00

16,000.00

15,000.00

16,000.00

13,550.00

14,740.00

Buah

6.7.1

Buah

Engsel Angin

15,000.00

16,000.00

Tenaga

6.7.2

6.9

140,000.00

125,000.00

40,000.00

1 Buah

6.7

140,000.00

125,000.00

Kunci Tanam Biasa

Pekerja

6.4.1

6.6

171,370.00

125,000.00

Tenaga

6.3..2

6.5

153,775.00

Bahan

OH

1 Buah

6.4

Memasang Kunci Tanam Biasa

0.01

6.3.1

0.02

OH

Pekerja

40,000.00

42,000.00

800.00

840.00

0.2

OH

Tukang Kayu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.01

OH

Mandor

55,000.00

60,000.00

550.00

600.00

14,791.25

25,650.00

5,000.00

15,000.00

5,000.00

15,000.00

Buah

Pasang Kait Angin


Bahan

6.9.1

149235156.xlsx.ms_office

URAIAN PEKERJAAN

SAT.

Buah

Kait Angin

5,000.00

83/73

15,000.00

abk 12-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

42,000.00

600.00

630.00

0.15

OH

Tukang Kayu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.00075

OH

Mandor

55,000.00

60,000.00

41.25

45.00

Pasang Door Closer

282,637.50

385,500.00

Bahan

250,000.00

350,000.00

250,000.00

350,000.00

32,637.50

35,500.00

Buah

Buah

350,000.00

Tenaga
Pekerja

40,000.00

42,000.00

2,000.00

2,100.00

0.5

OH

Tukang Kayu

55,000.00

60,000.00

27,500.00

30,000.00

0.05

OH

Kepala Tukang

60,000.00

65,000.00

3,000.00

3,250.00

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

20,555.00

24,200.00

7,500.00

10,000.00

7,500.00

10,000.00

13,055.00

14,200.00

Buah

Pasang Kunci Selot


Bahan

Buah

Kunci Selot

7,500.00

10,000.00

Tenaga
0.02

OH

Pekerja

40,000.00

42,000.00

800.00

840.00

0.2

OH

Tukang Kayu

55,000.00

60,000.00

11,000.00

12,000.00

0.02

OH

Kepala Tukang

60,000.00

65,000.00

1,200.00

1,300.00

0.001

OH

Mandor

55,000.00

60,000.00

55.00

60.00

Pasang Door Stop

256,527.50

357,100.00

Bahan

250,000.00

350,000.00

250,000.00

350,000.00

6,527.50

7,100.00

Buah

6.12.1

Buah

Door Stop

250,000.00

350,000.00

Tenaga

6.12.2

0.01

OH

Pekerja

40,000.00

42,000.00

400.00

420.00

0.1

OH

Tukang Kayu

55,000.00

60,000.00

5,500.00

6,000.00

0.01

OH

Kepala Tukang

60,000.00

65,000.00

600.00

650.00

0.0005

OH

Mandor

55,000.00

60,000.00

27.50

30.00

Pasang Rel Pintu Dorong

149,165.00

242,600.00

Bahan

110,000.00

200,000.00

110,000.00

200,000.00

39,165.00

42,600.00

Buah

6.14.1

Buah

Rel Pintu Dorong

110,000.00

200,000.00

Tenaga

6.14.2

0.06

OH

Pekerja

40,000.00

42,000.00

2,400.00

2,520.00

0.6

OH

Tukang Kayu

55,000.00

60,000.00

33,000.00

36,000.00

0.06

OH

Kepala Tukang

60,000.00

65,000.00

3,600.00

3,900.00

0.003

OH

Mandor

55,000.00

60,000.00

165.00

180.00

23,818.75

27,750.00

7,500.00

10,000.00

7,500.00

10,000.00

16,318.75

17,750.00

Buah

Pasang Kunci Lemari


Bahan

6.15.1

Buah

Kunci Lemari

7,500.00

10,000.00

Tenaga

6.15.2

0.025

OH

Pekerja

40,000.00

42,000.00

1,000.00

1,050.00

0.25

OH

Tukang Kayu

55,000.00

60,000.00

13,750.00

15,000.00

0.025

OH

Kepala Tukang

60,000.00

65,000.00

1,500.00

1,625.00

0.00125

OH

Mandor

55,000.00

60,000.00

68.75

75.00

m2

Pasang Kaca tebal 3 mm

70,291.25

76,650.00

Bahan

60,500.00

66,000.00

60,500.00

66,000.00

9,791.25

10,650.00

6.16.1

1.1

m2

55,000.00

60,000.00

0.015

OH

0.15

Kaca tebal 3mm

Pekerja

40,000.00

42,000.00

600.00

630.00

OH

Tukang Kayu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.00075

OH

Mandor

55,000.00

60,000.00

41.25

45.00

m2

Pasang Kaca tebal 5 mm

81,291.25

90,400.00

Bahan

71,500.00

79,750.00

71,500.00

79,750.00

Tenaga

6.16.2

6.17.1

1.1

149235156.xlsx.ms_office

250,000.00

OH

6.11.2

6.17

Door Closer

0.05

6.16

10,650.00

40,000.00

6.11.1

6.15

9,791.25

MAKSIMUM
Rp

Pekerja

6.10.2

6.14

JUMLAH
MINIMUM
Rp

OH

6.13

MAKSIMUM
Rp

0.015

6.10.1

6.11

MINIMUM
Rp

Tenaga

6.9.2

6.10

URAIAN PEKERJAAN

SAT.

m2

Kaca tebal 5mm

65,000.00

83/74

72,500.00

abk 12-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp
9,791.25

MAKSIMUM
Rp
10,650.00

0.015

OH

Pekerja

40,000.00

42,000.00

600.00

630.00

0.15

OH

Tukang Kayu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.00075

OH

Mandor

55,000.00

60,000.00

41.25

45.00

m2

Pasang Kaca Cermin tebal 5 mm

207,791.25

241,650.00

Bahan

198,000.00

231,000.00

198,000.00

231,000.00

9,791.25

10,650.00

6.20.1

1.1

m2

180,000.00

210,000.00

0.015

OH

0.15

Kaca Cermin

Pekerja

40,000.00

42,000.00

600.00

630.00

OH

Tukang Kayu

55,000.00

60,000.00

8,250.00

9,000.00

0.015

OH

Kepala Tukang

60,000.00

65,000.00

900.00

975.00

0.00075

OH

Mandor

55,000.00

60,000.00

41.25

45.00

Tenaga

6.20.2

149235156.xlsx.ms_office

MINIMUM
Rp

Tenaga

6.17.2

6.20

URAIAN PEKERJAAN

SAT.

83/75

abk 12-14

HARGA BAHAN/UPAH
No.

XIII

SNI

KODE

KOEF

03-7395 - 2008

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

PEKERJAAN PENUTUP LANTAI dan DINDING


6.3

m2

6.3.1
26.5

Buah

10.4

6.9

57,750.00

33,920.00

37,100.00

Kg

Portland Semen

1,200.00

1,250.00

12,480.00

13,000.00

0.0450

m3

Pasir Pasang

135,000.00

170,000.00

6,075.00

7,650.00

19,835.00

21,190.00

0.27

OH

Pekerja

40,000.00

42,000.00

10,800.00

11,340.00

0.135

OH

Tukang Batu

55,000.00

60,000.00

7,425.00

8,100.00

0.014

OH

Kepala Tukang

60,000.00

65,000.00

840.00

910.00

0.014

OH

Mandor

55,000.00

60,000.00

770.00

840.00

m2

Memasang lantai Ubin Granito Uk. 40 x 40 cm

256,061.00

281,793.00

Bahan

237,691.00

262,168.00

Tenaga

6.63

Buah

31,200.00

33,600.00

206,856.00

9.8

Kg

Portland Semen

222,768.00

1,200.00

1,250.00

11,760.00

0.045

m3

12,250.00

Pasir Pasang

135,000.00

170,000.00

6,075.00

1.300

Kg

7,650.00

Semen Warna

10,000.00

15,000.00

13,000.00

19,500.00

0.250

OH

Ubin Granito 40x40 cm

18,370.00

19,625.00

Pekerja

40,000.00

42,000.00

10,000.00

0.125

10,500.00

OH

Tukang Batu

55,000.00

60,000.00

6,875.00

7,500.00

0.013

OH

Kepala Tukang

60,000.00

65,000.00

780.00

845.00

0.013

OH

Mandor

55,000.00

60,000.00

715.00

780.00

m'

Pasang Plint Ubin PC Warna Uk. 10 x 20 cm

38,638.00

42,650.00

Bahan

29,273.00

32,585.00

Tenaga

6.19.1
5.3

Buah

Plint Ubin PC Warna 10 x 20 cm

5,000.00

5,500.00

26,500.00

1.14

29,150.00

Kg

Portland Semen

1,200.00

1,250.00

1,368.00

1,425.00

0.003

m3

Pasir Pasang

135,000.00

170,000.00

405.00

510.00

0.1

Kg

Semen Warna

10,000.00

15,000.00

1,000.00

1,500.00

9,365.00

10,065.00

0.09

OH

Pekerja

40,000.00

42,000.00

3,600.00

3,780.00

0.09

OH

Tukang Batu

55,000.00

60,000.00

4,950.00

5,400.00

0.009

OH

Kepala Tukang

60,000.00

65,000.00

540.00

585.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

m2

Memasang Lantai Keramik 33 x 33 cm

121,155.78

143,629.17

69,880.78

88,854.17

6.19.2

Tenaga

6.34.1

Bahan
10

Buah

Ubin Keramik 33 x 33 cm

3,777.78

4,666.67

37,777.78

46,666.67

1,200.00

1,250.00

9,828.00

10,237.50

8.19

Kg

Portland Semen

0.045

m3

Pasir Pasang

135,000.00

170,000.00

6,075.00

7,650.00

1.62

Kg

Semen Warna

10,000.00

15,000.00

16,200.00

24,300.00

51,275.00

54,775.00

0.70

OH

Pekerja

40,000.00

42,000.00

28,000.00

29,400.00

0.35

OH

Tukang Batu

55,000.00

60,000.00

19,250.00

21,000.00

0.035

OH

Kepala Tukang

60,000.00

65,000.00

2,100.00

2,275.00

0.035

OH

Mandor

55,000.00

60,000.00

1,925.00

2,100.00

m2

Memasang Lantai Keramik 30 x 30 cm

121,039.09

142,746.82

69,764.09

87,971.82

6.34.2

6.35

78,940.00

52,475.00
1,400.00

6.9.2

6.34

72,310.00

Bahan
1,280.00

6.9.1

6.19

Memasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm

Ubin Abu-abu 20x20 cm

6.3.2

Tenaga

6.35.1

Bahan
11.87

Buah

Ubin Keramik 30 x 30 cm

3,090.91

3,818.18

36,689.09

10.00

45,321.82

Kg

Portland Semen

1,200.00

1,250.00

12,000.00

12,500.00

0.045

m3

Pasir Pasang

135,000.00

170,000.00

6,075.00

7,650.00

1.50

Kg

Semen Warna

10,000.00

15,000.00

15,000.00

22,500.00

51,275.00

54,775.00

0.70

OH

Pekerja

40,000.00

42,000.00

28,000.00

29,400.00

0.35

OH

Tukang Batu

55,000.00

60,000.00

19,250.00

21,000.00

0.035

OH

Kepala Tukang

60,000.00

65,000.00

2,100.00

2,275.00

0.035

OH

Mandor

55,000.00

60,000.00

1,925.00

2,100.00

6.35.2

149235156.xlsx.ms_office

URAIAN PEKERJAAN

SAT.

Tenaga

83/76

abk 13-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.36

KOEF
1

m2

6.36.1
26.5

Buah

MAKSIMUM
Rp

Pasang Lantai Keramik 20 x 20 cm

10.40

88,410.00
43,460.00

Kg

Portland Semen

1,200.00

1,250.00

12,480.00

13,000.00

0.045

m3

Pasir Pasang

135,000.00

170,000.00

6,075.00

7,650.00

1.62

Kg

Semen Warna

10,000.00

15,000.00

16,200.00

24,300.00

51,275.00

54,775.00

0.70

OH

Pekerja

40,000.00

42,000.00

28,000.00

29,400.00

0.35

OH

Tukang Batu

55,000.00

60,000.00

19,250.00

21,000.00

0.035

OH

Kepala Tukang

60,000.00

65,000.00

2,100.00

2,275.00

0.035

OH

Mandor

55,000.00

60,000.00

1,925.00

2,100.00

16,843.88

18,922.06

7,478.88

8,857.06

Tenaga

1 m'

Memasang Plint Keramik Ukuran 10x20 cm


Bahan

5.3

Buah

Ubin Keramik

1,029.41

1,235.29

5,455.88

1.14

6,547.06

Kg

Portland Semen

1,200.00

1,250.00

1,368.00

1,425.00

0.003

m3

Pasir Pasang

135,000.00

170,000.00

405.00

510.00

0.025

Kg

Semen Warna

10,000.00

15,000.00

250.00

375.00

9,365.00

10,065.00

0.09

OH

Pekerja

40,000.00

42,000.00

3,600.00

3,780.00

0.09

OH

Tukang Batu

55,000.00

60,000.00

4,950.00

5,400.00

0.009

OH

Kepala Tukang

60,000.00

65,000.00

540.00

585.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

Memasang Plint Keramik Ukuran 10x10 cm

22,549.76

25,844.12

Bahan

13,184.76

15,779.12

Tenaga

1 m'

10.6

Buah

Ubin Keramik

1,029.41

1,235.29

10,911.76

1.14

13,094.12

Kg

Portland Semen

1,200.00

1,250.00

1,368.00

1,425.00

0.003

m3

Pasir Pasang

135,000.00

170,000.00

405.00

510.00

0.05

Kg

Semen Warna

10,000.00

15,000.00

500.00

750.00

9,365.00

10,065.00

0.09

OH

Pekerja

40,000.00

42,000.00

3,600.00

3,780.00

0.09

OH

Tukang Batu

55,000.00

60,000.00

4,950.00

5,400.00

0.009

OH

Kepala Tukang

60,000.00

65,000.00

540.00

585.00

0.005

OH

Mandor

55,000.00

60,000.00

275.00

300.00

m2

Memasang Lantai Marmer Ukuran 1.00x1.00 cm

391,678.00

426,912.50

Bahan

340,403.00

372,137.50

6.43.1
1.06

buah

Marmer

300,000.00

325,000.00

318,000.00

8.19

kg

Portland Semen

344,500.00

1,200.00

1,250.00

9,828.00

0.045

m3

10,237.50

Pasir Pasang

135,000.00

170,000.00

6,075.00

0.65

kg

7,650.00

Semen Warna

10,000.00

15,000.00

6,500.00

9,750.00

0.7

OH

51,275.00

54,775.00

Pekerja

40,000.00

42,000.00

28,000.00

0.35

29,400.00

OH

Tukang Batu

55,000.00

60,000.00

19,250.00

21,000.00

0.035

OH

Kepala Tukang

60,000.00

65,000.00

2,100.00

2,275.00

0.035

OH

Mandor

55,000.00

60,000.00

1,925.00

2,100.00

m2

Memasang Lantai Karpet

81,365.00

88,110.00

Bahan

63,700.00

69,125.00

Tenaga

6.44.1
1.05

m2

Karpet

50,000.00

54,166.67

52,500.00

56,875.00

0.35

kg

Lem

32,000.00

35,000.00

11,200.00

12,250.00

17,665.00

18,985.00

0.17

OH

Pekerja

40,000.00

42,000.00

6,800.00

7,140.00

0.17

OH

Tukang Batu

55,000.00

60,000.00

9,350.00

10,200.00

0.017

OH

Kepala Tukang

60,000.00

65,000.00

1,020.00

1,105.00

0.009

OH

Mandor

55,000.00

60,000.00

495.00

540.00

m2

Memasang Lantai Parquet Jati

238,475.00

259,525.00

Bahan

187,200.00

204,750.00

6.44.2

Tenaga

6.46.1

149235156.xlsx.ms_office

143,185.00

75,035.00
40,280.00

Tenaga

6.46

126,310.00

1,640.00

6.40.1

6.44

MAKSIMUM
Rp

1,520.00

6.39.2

6.43

JUMLAH
MINIMUM
Rp

Ubin Keramik 20 x 20 cm

6.39.1

6.40

MINIMUM
Rp

Bahan

6.36.2

6.39

URAIAN PEKERJAAN

SAT.

1.05

m2

Parquet Jati

0.6

Kg

Lem Vynil

83/77

160,000.00

175,000.00

168,000.00

183,750.00

32,000.00

35,000.00

19,200.00

21,000.00

abk 13-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

Tenaga

51,275.00

54,775.00

42,000.00

28,000.00

29,400.00

0.35

OH

Tukang Batu

55,000.00

60,000.00

19,250.00

21,000.00

0.035

OH

Kepala Tukang

60,000.00

65,000.00

2,100.00

2,275.00

0.035

OH

Mandor

55,000.00

60,000.00

1,925.00

2,100.00

m2

Memasang Dinding Keramik 10x20 cm,

146,235.00

166,640.00

80,310.00

96,215.00

Bahan
53

Buah

740.00

760.00

39,220.00

9.3

Kg

Portland Semen

40,280.00

1,200.00

1,250.00

11,160.00

0.018

m3

11,625.00

Pasir Pasang

135,000.00

170,000.00

2,430.00

2.75

Kg

3,060.00

Semen Warna

10,000.00

15,000.00

27,500.00

41,250.00

0.9

OH

65,925.00

70,425.00

Pekerja

40,000.00

42,000.00

36,000.00

0.45

37,800.00

OH

Tukang Batu

55,000.00

60,000.00

24,750.00

27,000.00

0.045

OH

Kepala Tukang

60,000.00

65,000.00

2,700.00

2,925.00

0.045

OH

Mandor

55,000.00

60,000.00

2,475.00

2,700.00

m2

Memasang Dinding Keramik 20x20 cm,

136,015.00

158,730.00

70,090.00

88,305.00

Bahan
26.5

Buah

Keramik

1,400.00

1,680.00

37,100.00

9.3

44,520.00

Kg

Portland Semen

1,200.00

1,250.00

11,160.00

11,625.00

0.018

m3

Pasir Pasang

135,000.00

170,000.00

2,430.00

3,060.00

1.94

Kg

Semen Warna

10,000.00

15,000.00

19,400.00

29,100.00

65,925.00

70,425.00

0.9

OH

Pekerja

40,000.00

42,000.00

36,000.00

37,800.00

0.45

OH

Tukang Batu

55,000.00

60,000.00

24,750.00

27,000.00

0.045

OH

Kepala Tukang

60,000.00

65,000.00

2,700.00

2,925.00

0.045

OH

Mandor

55,000.00

60,000.00

2,475.00

2,700.00

m2

Memasang Dinding Marmer Ukuran 1.00x1.00 cm

438,133.11

475,880.11

Bahan

342,908.11

374,155.11

318,000.00

344,500.00

Tenaga

6.55.1
1.06

buah

Marmer

3.003

buah

Paku 12 cm

12.44

kg

Portlan Semen

0.025

m3

0.65

kg

1.3

OH

0.65

300,000.00
35.00

325,000.00
35.00

105.11

105.11

1,200.00

1,250.00

14,928.00

15,550.00

Pasir Pasang

135,000.00

170,000.00

3,375.00

4,250.00

Semen Warna

10,000.00

15,000.00

6,500.00

9,750.00

95,225.00

101,725.00

Pekerja

40,000.00

42,000.00

52,000.00

54,600.00

OH

Tukang Batu

55,000.00

60,000.00

35,750.00

39,000.00

0.065

OH

Kepala Tukang

60,000.00

65,000.00

3,900.00

4,225.00

0.065

OH

Mandor

55,000.00

60,000.00

3,575.00

3,900.00

m2

Memasang Dinding Batu Paros / Batu Tempel Hitam

152,600.00

161,212.50

Bahan

101,325.00

106,437.50

6.55.2

Tenaga

6.57.1

1.10

m2

Batu Paros

75,000.00

78,000.00

82,500.00

11.75

Kg

Portland Semen

85,800.00

1,200.00

1,250.00

14,100.00

0.035

m3

Pasir Pasang

14,687.50

135,000.00

170,000.00

4,725.00

5,950.00

0.70

OH

51,275.00

54,775.00

Pekerja

40,000.00

42,000.00

28,000.00

0.35

29,400.00

OH

Tukang Batu

55,000.00

60,000.00

19,250.00

21,000.00

0.035

OH

Kepala Tukang

60,000.00

65,000.00

2,100.00

2,275.00

0.035

OH

Mandor

55,000.00

60,000.00

1,925.00

2,100.00

m2

Memasang Wall Paper Lebar 50 cm

120,755.00

134,175.00

96,000.00

107,750.00

88,000.00

99,000.00

8,000.00

8,750.00

Tenaga

6.57.2

6.60.1

Bahan
2.2

m'

Wall Paper

0.25

kg

Lem

0.35

OH

0.175

40,000.00

45,000.00

32,000.00

35,000.00

24,755.00

26,425.00

Pekerja

40,000.00

42,000.00

14,000.00

14,700.00

OH

Tukang Batu

55,000.00

60,000.00

9,625.00

10,500.00

0.017

OH

Kepala Tukang

60,000.00

65,000.00

1,020.00

1,105.00

0.002

OH

Mandor

55,000.00

60,000.00

110.00

120.00

6.60.2

149235156.xlsx.ms_office

Keramik

Tenaga

6.54.2

6.60

MAKSIMUM
Rp

40,000.00

6.54.1

6.57

JUMLAH
MINIMUM
Rp

Pekerja

6.53.2

6.55

MAKSIMUM
Rp

OH

6.53.1

6.54

MINIMUM
Rp

0.70

6.46.2

6.53

URAIAN PEKERJAAN

SAT.

Tenaga

83/78

abk 13-14

HARGA BAHAN/UPAH
No.

SNI

KODE
6.63

KOEF
1

m'

6.63.1

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

Memasang Plint Kayu Klas II Ukuran 2x10 cm

34,355.00

35,885.50

Bahan

21,905.00

22,505.50

0.003

m3

Papan Kayu Klas II

7,300,000.00

7,500,000.00

21,900.00

22,500.00

0.05

kg

Paku Sekrup 5 cm

100.00

110.00

5.00

5.50

12,450.00

13,380.00

0.12

OH

Pekerja

40,000.00

42,000.00

4,800.00

5,040.00

0.12

OH

Tukang Batu

55,000.00

60,000.00

6,600.00

7,200.00

0.012

OH

Kepala Tukang

60,000.00

65,000.00

720.00

780.00

0.006

OH

Mandor

55,000.00

60,000.00

330.00

360.00

6.61.2

149235156.xlsx.ms_office

URAIAN PEKERJAAN

SAT.

Tenaga

83/79

abk 13-14

HARGA BAHAN/UPAH
No.

XIV 03-

SNI

KODE

KOEF

URAIAN PEKERJAAN

SAT.

MINIMUM
Rp

MAKSIMUM
Rp

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

PEKERJAAN PENGECATAN

-2002

6.1

m2

0.05

Kg

0.15

OH

0.0025

6,137.50

6,450.00

42,000.00

6,000.00

6,300.00

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Mencuci Bidang Permukaan Tembok yang Pernah dicat

6,687.50

7,100.00

550.00

650.00

550.00

650.00

0.05

Kg

11,000.00

13,000.00

0.15

OH

0.0025

6,137.50

6,450.00

Pekerja

40,000.00

42,000.00

6,000.00

6,300.00

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Mengerok Karat Cat Lama permukaan Baja dg cara manual

6,687.50

7,100.00

550.00

650.00

550.00

650.00

Bahan

6.3.1

0.05

Kg

11,000.00

13,000.00

0.15

OH

0.0025

6,137.50

6,450.00

Pekerja

40,000.00

42,000.00

6,000.00

6,300.00

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Penyabun Permukaan Tembok Lama

6,687.50

7,100.00

550.00

650.00

550.00

650.00

Bahan

6.4.1

0.05

Kg

11,000.00

13,000.00

0.15

OH

0.0025

6,137.50

6,450.00

Pekerja

40,000.00

42,000.00

6,000.00

6,300.00

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Mendempul dan Menggosok Kayu

5,787.50

6,285.00

Bahan

1,610.00

1,795.00

6.6.1

0.08

Kg

Dempul Jadi

14,000.00

15,000.00

1,120.00

0.02

Kg

1,200.00

Minyak Cat

7,000.00

11,250.00

140.00

0.1

lbr

225.00

Amplas

3,500.00

3,700.00

350.00

370.00

0.04

OH

4,177.50

4,490.00

Pekerja

40,000.00

42,000.00

1,600.00

0.04

1,680.00

OH

Tukang Cat

55,000.00

60,000.00

2,200.00

2,400.00

0.004

OH

Kepala Tukang

60,000.00

65,000.00

240.00

260.00

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Pengecatan Bidang Lama

19,302.50

20,952.50

Bahan

11,790.00

12,875.00

Tenaga

6.6.2

6.7.1

0.15

Kg

Plamir

14,000.00

15,000.00

2,100.00

2,250.00

0.17

Kg

Cat Dasar

15,000.00

16,000.00

2,550.00

2,720.00

0.17

Kg

Cat Penutup

42,000.00

46,500.00

7,140.00

7,905.00

7,512.50

8,077.50

0.07

OH

Pekerja

40,000.00

42,000.00

2,800.00

2,940.00

0.075

OH

Tukang Cat

55,000.00

60,000.00

4,125.00

4,500.00

0.0075

OH

Kepala Tukang

60,000.00

65,000.00

450.00

487.50

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Pengecatan Bidang Kayu Baru (1 lap.Plamir)

22,056.50

24,280.00

Tenaga

6.7.2

6.8

Sabun
Tenaga

6.4.2

6.7

Sabun
Tenaga

6.3.2

6.6

Sabun
Tenaga

6.2.2

6.4

650.00

40,000.00

Bahan

650.00

600.00

Pekerja

Tenaga

7,100.00

600.00
13,000.00

6.2.1

6.3

Soda Api

6,737.50

12,000.00

6.1.2

6.2

Mengikis / Mengerok Permukaan Cat Tembok Lama


Bahan

6.1.1

1 lap.Cat Dasar & 2 lap.Cat Penutup


18,264.00

20,260.00

0.2

Kg

Bahan
Cat Meni

15,000.00

16,000.00

3,000.00

3,200.00

0.15

Kg

Plamir

14,000.00

15,000.00

2,100.00

2,250.00

0.17

Kg

Cat Dasar

13,200.00

16,000.00

2,244.00

2,720.00

0.26

Kg

Cat Penutup 2 kali

42,000.00

46,500.00

10,920.00

12,090.00

6.8.1

149235156.xlsx.ms_office

83/80

abk 14-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

MINIMUM
Rp

MAKSIMUM
Rp

Tenaga

JUMLAH
MINIMUM
Rp

MAKSIMUM
Rp

3,792.50

4,020.00

0.07

OH

Pekerja

40,000.00

42,000.00

2,800.00

2,940.00

0.009

OH

Tukang Cat

55,000.00

60,000.00

495.00

540.00

0.006

OH

Kepala Tukang

60,000.00

65,000.00

360.00

390.00

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Pengecatan Bidang Kayu Baru (1 lap.Plamir)

30,996.50

34,095.00

6.8.2

6.9

URAIAN PEKERJAAN

SAT.

1 lap.Cat Dasar & 3 lap.Cat Penutup


22,044.00

24,445.00

0.2

Kg

Bahan
Cat Meni

15,000.00

16,000.00

3,000.00

3,200.00

0.15

Kg

Plamir

14,000.00

15,000.00

2,100.00

2,250.00

0.17

Kg

Cat Dasar

13,200.00

16,000.00

2,244.00

2,720.00

0.35

Kg

Cat Penutup 2 kali

42,000.00

46,500.00

14,700.00

16,275.00

8,952.50

9,650.00

0.07

OH

Pekerja

40,000.00

42,000.00

2,800.00

2,940.00

0.105

OH

Tukang Cat

55,000.00

60,000.00

5,775.00

6,300.00

0.004

OH

Kepala Tukang

60,000.00

65,000.00

240.00

260.00

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Pelaburan Bidang Kayu dg Teak Oil

27,702.50

32,025.00

Bahan

18,720.00

22,320.00

18,720.00

22,320.00

6.9.1

Tenaga

6.9.2

6.10

6.10.1

0.36

Ltr

0.04

OH

0.063

52,000.00

62,000.00

8,982.50

9,705.00

Pekerja

40,000.00

42,000.00

1,600.00

1,680.00

OH

Tukang Cat

55,000.00

60,000.00

3,465.00

3,780.00

0.063

OH

Kepala Tukang

60,000.00

65,000.00

3,780.00

4,095.00

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Pelaburan Bidang Kayu dg Politur

38,541.50

44,554.00

Bahan

34,144.00

39,764.00

Tenaga

6.10.2

6.11

6.11.1

0.15

Ltr

Politur

52,000.00

62,000.00

7,800.00

9,300.00

0.372

Ltr

Politur Jadi

52,000.00

62,000.00

19,344.00

23,064.00

Lbr

Ampelas

3,500.00

3,700.00

7,000.00

7,400.00

4,397.50

4,790.00

Tenaga

6.11.2

6.12

0.06

OH

Tukang Cat

55,000.00

60,000.00

3,300.00

3,600.00

0.016

OH

Kepala Tukang

60,000.00

65,000.00

960.00

1,040.00

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Pelaburan Bidang Kayu dg Cat Residu & Ter

4,986.25

5,610.00

656.25

1,050.00

656.25

1,050.00

Bahan

6.12.1

0.35

Ltr

1,875.00

3,000.00

0.1

OH

0.006

4,330.00

4,560.00

Pekerja

40,000.00

42,000.00

4,000.00

4,200.00

OH

Mandor

55,000.00

60,000.00

330.00

360.00

m2

Pelaburan Bidang Kayu dg Vernis

25,162.50

27,955.00

8,865.00

10,445.00

Bahan

6.13.1

0.15

Ltr

Vernis

52,000.00

62,000.00

7,800.00

9,300.00

0.05

Ltr

Dempul

14,000.00

15,000.00

700.00

750.00

0.1

Lbr

Ampelas

3,500.00

3,700.00

350.00

370.00

1,500.00

2,500.00

15.00

25.00

0.01

Buah Kuas

16,297.50

17,510.00

0.16

OH

Tenaga
Pekerja

40,000.00

42,000.00

6,400.00

6,720.00

0.16

OH

Tukang Cat

55,000.00

60,000.00

8,800.00

9,600.00

0.016

OH

Kepala Tukang

60,000.00

65,000.00

960.00

1,040.00

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar

12,010.50

13,375.50

6.13.2

6.14

Residu atau Ter


Tenaga

6.12.2

6.13

Teak Oil

2 lap. Cat Penutup)


7,230.00

8,196.00

0.1

Kg

Bahan
Plamir

10,500.00

12,000.00

1,050.00

1,200.00

0.1

Kg

Cat Dasar

15,000.00

19,000.00

1,500.00

1,900.00

0.26

Kg

Cat Penutup 2 kali

18,000.00

19,600.00

4,680.00

5,096.00

6.14.1

149235156.xlsx.ms_office

83/81

abk 14-14

HARGA BAHAN/UPAH
No.

SNI

KODE

KOEF

4,780.50

MAKSIMUM
Rp
5,179.50

Pekerja

40,000.00

42,000.00

800.00

840.00

0.063

OH

Tukang Cat

55,000.00

60,000.00

3,465.00

3,780.00

0.0063

OH

Kepala Tukang

60,000.00

65,000.00

378.00

409.50

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)

8,559.50

9,547.00

Bahan

4,740.00

5,428.00

0.1

Kg

Cat Dasar

15,000.00

19,000.00

1,500.00

1,900.00

0.18

Kg

Cat Penutup 2 kali

18,000.00

19,600.00

3,240.00

3,528.00

3,819.50

4,119.00

0.028

OH

Tenaga
Pekerja

40,000.00

42,000.00

1,120.00

1,176.00

0.042

OH

Tukang Cat

55,000.00

60,000.00

2,310.00

2,520.00

0.0042

OH

Kepala Tukang

60,000.00

65,000.00

252.00

273.00

0.0025

OH

Mandor

55,000.00

60,000.00

137.50

150.00

m2

Pengecatan Permukaan Baja dg Meni Besi

14,290.00

15,920.00

1,820.00

2,350.00

Bahan

6.20.1

0.1

Kg

Meni Besi

15,000.00

20,000.00

1,500.00

2,000.00

0.01

Kg

Perekat / Lem

32,000.00

35,000.00

320.00

350.00

12,470.00

13,570.00

0.02

OH

Pekerja

40,000.00

42,000.00

800.00

840.00

0.2

OH

Tukang Cat

55,000.00

60,000.00

11,000.00

12,000.00

0.002

OH

Kepala Tukang

60,000.00

65,000.00

120.00

130.00

0.01

OH

Mandor

55,000.00

60,000.00

550.00

600.00

m2

Pengecatan Permukaan Baja dg Meni Besi & Perancah

28,057.50

30,462.50

3,920.00

4,550.00
2,000.00

Tenaga

6.20.2

Bahan

6.21.1

0.1

Kg

Meni Besi

15,000.00

20,000.00

1,500.00

0.01

Kg

Perekat / Lem

32,000.00

35,000.00

320.00

350.00

0.002

m3

Perancah Kayu

1,050,000.00

1,100,000.00

2,100.00

2,200.00

24,137.50

25,912.50

0.25

OH

Pekerja

40,000.00

42,000.00

10,000.00

10,500.00

0.225

OH

Tukang Cat

55,000.00

60,000.00

12,375.00

13,500.00

0.0225

OH

Kepala Tukang

60,000.00

65,000.00

1,350.00

1,462.50

0.0075

OH

Mandor

55,000.00

60,000.00

412.50

450.00

m2

Pengecatan Permukaan Baja lapis Seng (Galvanis) secara

100,480.00

109,140.00

Tenaga

6.21.2

6.24

JUMLAH
MINIMUM
Rp

OH

6.15.2

6.21

MAKSIMUM
Rp

0.02

6.15.1

6.20

MINIMUM
Rp

Tenaga

6.14.2

6.15

URAIAN PEKERJAAN

SAT.

Manual sistem 3 lap. Cat Konvensional dg Tebal 200 m


7,480.00

8,640.00

0.11

Kg

Bahan
Cat dasar

13,000.00

16,000.00

1,430.00

1,760.00

0.17

Kg

Cat Antara

13,000.00

16,000.00

2,210.00

2,720.00

0.08

Kg

Cat Penutup

48,000.00

52,000.00

3,840.00

4,160.00

93,000.00

100,500.00

0.50

OH

Pekerja

40,000.00

42,000.00

20,000.00

21,000.00

0.80

OH

Tukang Cat

55,000.00

60,000.00

44,000.00

48,000.00

0.30

OH

Kepala Tukang

60,000.00

65,000.00

18,000.00

19,500.00

0.20

OH

Mandor

55,000.00

60,000.00

11,000.00

12,000.00

6.24.1

Tenaga

6.24.2

149235156.xlsx.ms_office

83/82

abk 14-14

0818 9586 2979


0852 6121 2192
email
yurisiswanto@gmail.com
kata kunci
ia&egi

Anda mungkin juga menyukai