Gery
Gery
SUMBER DATA
D A E R A H
:
:
SEWA
P E R A L A T AN
PASARAN BEBAS
KOTA SEMARANG
EDISI JANUARI 2013
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PERALATAN
Dump Truck
3 ton
Dump Truck
5 ton
Truk Bak Terbuka
Truk Tanki Air
Bulldozer
Motor Grader
Wheel Loader
Excavator
Crane
Trailler
Mesin Gilas Tandem 6 - 10 ton
Mesin Gilas 3 roda 6 - 10 ton
Mesin Gilas Roda Karet 8 - 10 ton
Vibratory Roller
Vibro roller 1 ton
Water Pump
Asphalt Sprayer
Pick Up
AMP
Asphalt Finisher
Concrete Vibrator
Compressor
Concrete Mixer
Stamper
Genset
Alat Pengecat Marka
SATUAN
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
MINIMUM
(Rp)
HARGA
MAKSIMUM
(Rp)
110,000
160,000
100,000
140,000
380,000
170,000
190,000
420,000
1,450,000
280,000
140,000
150,000
170,000
40,000
40,000
15,000
35,000
40,000
3,500,000
520,000
40,000
100,000
65,000
30,000
150,000
75,000
125,000
180,000
130,000
160,000
410,000
190,000
200,000
440,000
1,500,000
300,000
160,000
160,000
190,000
55,000
55,000
25,000
45,000
55,000
3,750,000
580,000
46,000
115,000
75,000
40,000
180,000
80,000
KET.
DAFTAR
SUMBER DATA
D A E R A H
:
:
UPAH PEKERJA
PASARAN BEBAS
KOTA SEMARANG
EDISI JANUARI 2013
HARGA
NO.
JENIS
BAHAN
SATUAN
MINIMUM
(Rp)
MAKSIMUM
(Rp)
Pekerja
Hr
40,000
42,000
Mandor
Hr
55,000
60,000
Tukang listrik
Hr
55,000
60,000
Tukang kayu
Hr
55,000
60,000
tukang kayu
Hr
70,000
65,000
Tukang batu
Hr
55,000
60,000
Hr
60,000
65,000
Tukang besi
Hr
55,000
60,000
Hr
60,000
65,000
10
Tukang cat
Hr
55,000
60,000
11
Hr
60,000
65,000
12
Tukang plitur
Hr
55,000
60,000
13
Tukang jalan
Hr
40,000
42,000
14
Tukang gali
Hr
40,000
42,000
15
Hr
40,000
42,000
16
Tk. leideng
Hr
55,000
60,000
17
Masinis
Hr
100,000
125,000
18
Pemb. Masinis
Hr
40,000
50,000
19
Penjaga api
Hr
45,000
50,000
20
Penjaga malam
Hr
40,000
42,000
21
Sopir
Hr
60,000
70,000
22
Pembantu Sopir
Hr
40,000
42,000
149235156.xlsx.ms_office
83
KET.
DAFTAR
SUMBER
HARGA
SATUAN BAHAN
DATA
D A E R A H
BANGUNAN
PASARAN
KOTA SEMARANG
BEBAS
J E N I S
BAHAN
1
B A H A N
MINIMUM
MAKSIMUM
(Rp)
(Rp)
DASAR
BATU KALI
Bulat Utuh
m3
120,000
140,000
Bulat Belah
m3
150,000
160,000
10/15
m3
160,000
170,000
batu pecah
5/7
m3
165,000
180,000
batu pecah
3/5
m3
155,000
175,000
Timbun
m3
95,000
110,000
Sawur / Koral
m3
160,000
175,000
Batu pecah
SATUAN
KERIKIL
Beton
0,5/1
m3
185,000
200,000
Beton
,1/2
m3
180,000
200,000
Beton
,2/3
m3
180,000
190,000
Biasa
m3
120,000
135,000
Tras Giling
m3
205,000
215,000
ex lokal
bh
450
500
PASIR
Urug
m3
100,000
125,000
pasir muntilan
Pasang
m3
135,000
170,000
Beton
m3
195,000
210,000
TANAH
Padas
m3
50,000
60,000
Liat
m3
40,000
55,000
Pasang
m3
210,000
225,000
Semen Merah
m3
150,000
170,000
zak
49,000
51,000
zak
48,500
50,500
zak
48,000
50,000
zak
48,500
50,000
zak
50,000
52,000
semen putih
zak
78,000
82,000
semen warna
kg
10,000
15,000
BATU BATA
batu bata maron
KAPUR
PORTLAND CEMENT
II
BAHAN
PENUTUP ATAP
SIRAP
(100 lbr)
pak
155,000
165,000
GENTENG BETON
bh
3,000
3,500
GENTENG BETON
bh
4,200
4,700
GENTENG BETON
bh
4,700
5,100
GENTENG BETON
bh
3,750
4,200
GENTENG BETON
bh
4,500
4,800
GENTENG BETON
bh
8,700
10,000
Vlaam
bh
1,200
1,300
Kodok
bh
1,500
1,800
Kodok Glasur
bh
2,750
3,000
bh
5,000
5,500
bh
7,000
8,000
bh
3,000
4,500
bh
8,000
8,500
149235156.xlsx.ms_office
3/83
HARGA
NO.
J E N I S
B A H A N
SATUAN
MINIMUM
MAKSIMUM
(Rp)
(Rp)
GENTENG KACA
genteng kacaVlaam tebal 2 mm
Vlaam tebal 2 mm
bh
8,500
9,000
Vlaam tebal 3 mm
bh
11,500
12,000
Kodok tebal 2 mm
bh
9,000
10,000
Kodok tebal 3 mm
bh
12,000
12,500
. 200 cm X 102 cm X 5 mm
bh
70,000
72,000
. 250 cm X 102 cm X 5 mm
bh
70,000
81,000
. 225 cm X 102 cm X 5 mm
bh
73,500
78,000
. 200 cm X 102 cm X 6 mm
bh
65,000
72,000
. 225 cm X 102 cm X 6 mm
bh
62,500
65,000
. 250 cm X 102 cm X 6 mm
bh
66,500
73,500
. 150 cm X 105 cm X 4 mm
bh
37,000
40,000
. 180 cm X 105 cm X 4 mm
bh
42,000
47,000
. 210 cm X 105 cm X 4 mm
bh
51,000
55,000
. 240 cm X 105 cm X 4 mm
bh
60,000
62,500
. 270 cm X 105 cm X 4 mm
bh
68,000
72,000
. 300 cm X 105 cm X 4 mm
bh
70,000
76,000
NOK
Jabes nok
. Kerpus Genteng
bh
22,500
25,000
. Stel Besar
bh
42,000
45,000
. Paten Besar
bh
39,000
43,500
. Stel Besar
bh
37,500
44,000
. Patent Besar
bh
17,300
21,000
. Plat besar
bh
47,000
51,000
. 100cm X 100 cm X 3 mm
bh
15,000
17,000
. 100cm X 100 cm X 4 mm
bh
16,000
18,500
. 50 cm X 200 cm X 3 mm
bh
12,000
13,000
. 40 cm X 200 cm X 3 mm
bh
12,000
13,000
180 X 92 cm
bh
36,000
45,000
200 X 92 cm
bh
42,000
48,000
250 X 92 cm
bh
53,000
65,000
180 X 105 cm
bh
57,000
60,000
210 X 105 cm
bh
50,000
66,500
250 X 105 cm
bh
60,000
76,000
m'
20,000
22,000
m'
23,000
28,000
m'
33,000
36,000
m'
38,000
41,000
lbr
52,000
57,000
lbr
57,000
60,000
lbr
65,000
67,000
lbr
73,000
75,000
Papan
m3
21,000,000
22,000,000
Balok/pesagen
m3
19,000,000
20,000,000
ASBES PLAT
SENG PLAT
SENG GELOMBANG
III . B A H A N K A Y U
1
149235156.xlsx.ms_office
JATI
4/83
HARGA
NO.
J E N I S
B A H A N
KAMPER
KRUING
MERANTI
LANAN
BENGKIRAI
DOLKEN
SATUAN
MINIMUM
MAKSIMUM
(Rp)
(Rp)
Papan
m3
7,300,000
7,500,000
Balok/pesagen
m3
6,700,000
7,100,000
Papan
m3
5,000,000
5,400,000
Balok/pesagen
m3
4,800,000
5,200,000
Papan
m3
4,700,000
4,800,000
Balok/pesagen
m3
4,400,000
4,600,000
Papan
m3
1,950,000
2,100,000
Balok/pesagen
m3
1,700,000
1,750,000
Papan
m3
9,500,000
9,600,000
Balok/pesagen
m3
8,800,000
9,000,000
Sedang 8 x 10 x 400 cm
bt
18,000
20,000
Kecil 6 x 7 x 400 cm
bt
15,000
16,000
Besar 10 x 12 x 400 cm
bt
26,000
28,000
Kayu cetakan
m3
1,050,000
1,100,000
Kayu bakar
m3
150,000
165,000
Bambu
bt
10,000
15,000
30 X 30 cm
m2
34,000
34,000
20 X 20 cm
m2
32,000
35,000
30 X 30 cm
m2
32,000
36,000
20 X 20 cm
m2
32,000
34,000
30 X 30 cm
m2
39,000
42,000
PC warna
Teraso
2
TEGEL PLINT
PC warna
10 X 20 cm
bh
5,000
5,500
PC abu-abu
15 x 20
bh
4,500
6,000
POLIS UBIN
Lantai/badan
m'
Plint
m'
Trap
m'
11 X 11 putih
dos
30,000
33,000
11 X 11 warna
dos
30,000
34,000
15 X 15 putih
dos
34,000
36,000
15 X 15 warna
dos
37,000
38,000
10 X 20 cm
m2
37,000
38,000
15 X 15 cm
m2
36,000
42,000
20 X 20 cm
m2
38,000
41,000
20 X 25 cm
m2
35,000
42,000
30 X 30 cm
m2
36,500
42,000
20 X 20 cm
m2
35,000
39,500
33 x 33 cm
m2
34,000
42,000
25 x 25 cm
m2
35,000
41,500
15 x 20 cm
m2
35,000
42,000
UBIN PORSELIN
Lokal
Lokal
MOZAIK PORSELIN
Keramik
Parquet Jati
m2
160,000
175,000
Batu Paros
m2
75,000
78,000
m2
72,500
80,000
149235156.xlsx.ms_office
5/83
HARGA
NO.
J E N I S
B A H A N
10 GRANITO
SATUAN
MINIMUM
MAKSIMUM
(Rp)
(Rp)
40 x 40 cm
m2
195,000
210,000
30 x 30 cm
m2
230,000
250,000
m2
300,000
325,000
11 Marmer
V.BAHAN CETAK
1
BUIS BETON
10 cm - 100 cm
bh
22,000
28,000
20 cm - 100 cm
bh
30,000
33,000
30 cm - 100 cm
bh
38,000
42,000
50 cm - 100 cm
bh
70,000
80,000
60 cm - 100 cm
bh
75,000
95,000
70 cm - 100 cm
bh
110,000
130,000
10 cm - 100 cm
bh
17,000
18,000
15 cm - 100 cm
bh
22,000
25,000
20 cm - 100 cm
bh
30,000
32,000
30 cm - 100 cm
bh
35,000
37,000
50 cm - 100 cm
bh
10 X 20 cm
bh
5,000
5,400
20 X 20 cm
bh
5,500
6,200
25 X 25 cm
bh
6,250
6,700
30 X 30 cm
bh
6,300
7,200
15 X 25 cm
bh
6,500
7,500
15 X 30 cm
bh
7,000
7,600
kg
10,000
10,500
kg
15,500
17,200
kg
12,300
13,000
VI . B A H A N B E S I
1
BESI BETON
BESI PLAT
Besi Strip
kg
13,000
14,000
BESI PROFIL
Besi Profil
kg
13,500
14,250
Diameter
4 - 15
kg
14,000
15,500
Diameter
6 - 15
kg
14,000
15,500
Kawat Bronjong
kg
15,000
17,000
40 X 40 X 4
btg
130,000
135,000
50 X 50 X 5
btg
205,000
210,000
60 X 60 X 6
btg
299,000
310,000
kg
15,000
17,000
- Harmonika 12 X 45 mm
m2
20,000
21,000
- Harmonika 12 X 24 mm
m2
22,000
22,500
- Harmonika 14 X 30 mm
m2
19,000
20,000
- Harmonika 14 X 35 mm
m2
17,500
19,000
m2
9,000
10,000
- Kawat Kasa
m2
12,000
13,000
- Saringan pasir
m2
10,500
15,000
- Kawat loket
m2
10,500
12,000
- Kawat duri
rol
70,000
75,000
- Kawat bronjong
kg
15,000
17,000
btg
18,000
20,000
btg
22,500
24,000
btg
27,500
29,000
btg
35,000
40,000
BESI SIKU
VII . B A H A N P I P A
1
149235156.xlsx.ms_office
6/83
HARGA
NO.
J E N I S
B A H A N
SATUAN
MINIMUM
MAKSIMUM
(Rp)
(Rp)
btg
60,000
76,400
btg
122,500
125,000
btg
150,000
170,000
btg
325,000
423,000
btg
590,000
660,000
btg
1,010,000
1,025,000
btg
1,380,000
1,390,000
btg
75,000
80,000
btg
117,000
122,000
btg
130,000
135,000
btg
190,000
195,000
btg
225,000
245,000
btg
380,000
400,000
btg
470,000
500,000
btg
585,000
610,000
btg
btg
btg
VIII . B A H A N L A N G I T - L A N G I T
1
AKUSTIK-uk :
30 X 30
lbr
4,700
5,000
30 X 60
lbr
11,000
12,000
60 X 120
lbr
37,000
38,000
m'
4,200
5,000
SOFT BOARD-uk:
4'X 8'
lbr
45,000
55,000
4'X 8'
lbr
60,000
62,000
Gypsum tebal 9 mm
3
HARD BOARD-uk:
PLY WOOD
Teak wood
90 X 210
X 3 mm
lbr
40,000
45,000
. 120 X 240
X 3 mm
lbr
75,000
87,500
. 90 X 210
X 4 mm
lbr
55,000
60,000
. 90 X 210
X 9 mm
lbr
145,000
160,000
. 90 X 210
X 12 mm
lbr
170,000
180,000
. 90 X 210
X 15 mm
lbr
220,000
245,000
. 90 X 210
X 18 mm
lbr
270,000
290,000
. 120 X 240
X 3 mm
lbr
45,000
46,000
. 120 X 240
X 4 mm
lbr
55,000
57,000
. 120 X 240
X 6 mm
lbr
65,000
75,000
. 120 X 240
X 9 mm
lbr
105,000
110,000
. 120 X 240
X 12 mm
lbr
135,000
145,000
. 120 X 240
X 15 mm
lbr
160,000
170,000
. 120 X 240
X 18 mm
lbr
195,000
205,000
lbr
45,000
60,000
Menie
kg
15,000
16,000
Dempul plamur
kg
14,000
15,000
Ambril/amplas
lbr
3,500
3,700
Batu Apung
kg
5,500
6,500
Cat dasar
kg
13,200
16,000
. Emco
kg
42,000
46,500
kg
42,000
48,000
Tripleks
Multipleks
IX . B A H A N F I N I S H I N G
1
149235156.xlsx.ms_office
KAYU
7/83
HARGA
NO.
J E N I S
B A H A N
SATUAN
MAKSIMUM
(Rp)
(Rp)
. Deculux
kg
45,000
47,000
. Siralax
ons
8,000
10,500
. Spiritus
ltr
9,000
11,000
. Plitur jadi
ltr
52,000
62,000
Kalkarium
kg
4,000
4,200
Kapur sirih
kg
4,500
4,750
Plamur
kg
10,500
12,000
TEMBOK
kg
15,000
19,000
Sintex
5 kg
65,000
68,000
Danabride
5 kg
80,000
90,000
Catylac
5 kg
90,000
98,000
Mowilex
5 kg
210,000
225,000
Cat Tembok
MINIMUM
BESI
Menie
kg
15,000
20,000
Cat mengkilat
kg
48,000
52,000
Cat
kg
13,000
16,000
Thinner A
ltr
8,000
11,000
Minyak cat
ltr
7,000
11,250
Thinner Super
ltr
8,000
12,000
37,500
60,000
Residu (teer/aspal)
drum
bh
575,000
675,000
bh
1,050,000
1,200,000
kg
32,000
35,000
3 mm
m2
55,000
60,000
5 mm
m2
65,000
72,500
3 mm
m2
70,000
78,000
5 mm
m2
80,000
88,000
3 mm
m2
60,000
68,000
5 mm
m2
70,000
78,000
X.BAHAN KACA
1
POLOS
ES KABUR
RAY BAND
KABEL LISTRIK
NYA : .
1 X 1 1/2
mm2
m'
3,050
3,400
SPLN LMK
1 X 2 1/2
mm2
m'
3,200
3,500
1X4
mm2
m'
4,700
5,500
1X6
mm2
m'
6,900
7,200
NYY :.
2 X 1 1/2
mm2
m'
9,300
9,800
PRIMA
2 X 2 1/2
mm2
m'
10,250
11,000
2X4
mm2
m'
16,650
17,000
2X6
mm2
m'
20,100
22,000
3 X 1 1/2
mm2
m'
11,450
12,200
3 X 2 1/2
mm2
m'
15,400
16,000
3X4
mm2
m'
20,500
21,000
3X6
mm2
m'
27,800
29,000
NYM :.
2 X 1 1/2
mm2
m'
6,800
7,200
PRIMA
2 X 2 1/2
mm2
m'
9,700
10,200
2X4
mm2
m'
13,500
14,250
3 X 1 1/2
mm2
m'
8,750
9,200
149235156.xlsx.ms_office
8/83
HARGA
NO.
J E N I S
B A H A N
12,400
13,000
3X4
mm2
m'
17,600
18,200
3X6
mm2
m'
23,900
25,000
Seri
bh
15,000
20,000
Engkel
bh
12,000
15,000
Seri
bh
11,500
16,500
Engkel
bh
9,500
12,000
1 group
bh
20,000
30,000
2 group
bh
30,100
40,000
3 group
bh
50,000
70,000
SKAKELAR
(Rp)
m'
In bauw .
MAKSIMUM
(Rp)
mm2
MINIMUM
3 X 2 1/2
Out bauw .
SATUAN
STEKER -
FITING
Biasa
bh
9,500
12,000
Arde
bh
14,000
16,000
T Biasa
bh
11,000
13,000
T dengan Arde
bh
15,000
17,500
Flaon
bh
7,500
9,000
Gantung
bh
7,500
9,500
Kap
bh
11,000
16,000
Kombinasi
bh
10,000
14,500
15,000
bh
12,500
bh
5,000
6,000
Arde IB
bh
10,000
15,000
Arde Putar
bh
31,000
42,000
1 X slag
bh
50,000
55,000
2 X slag
bh
60,000
70,000
1 X slag
bh
75,000
85,000
2 X slag
bh
125,000
140,000
1 X slag
bh
45,000
55,000
2 X slag
bh
60,000
75,000
KUNCI TANAM
Union :
Yale :
Kuda :
bh
15,000
16,000
Kupu-kupu biasa
bh
2,250
2,500
Nylon kupu-kupu
bh
5,000
9,000
bh
30,000
32,000
bh
7,500
8,250
Grendel biasa
bh
7,500
10,000
Kait Angin
bh
5,000
15,000
Door Stop
bh
250,000
350,000
bh
950,000
1,450,000
bh
105,000
150,000
bh
625,000
750,000
Espagnoled -
dalam negeri
KLOSET DUDUK
KLOSET JONGKOK
149235156.xlsx.ms_office
WASTAFEL PEDESTAL
9/83
HARGA
NO.
J E N I S
MINIMUM
MAKSIMUM
(Rp)
(Rp)
bh
700,000
800,000
bh
275,000
310,000
bh
240,000
270,000
bh
210,000
240,000
bh
145,000
170,000
bh
27,500
30,000
bh
20,000
25,000
unit
unit
Kran Air
bh
7,500
15,000
Seal tape
bh
2,000
3,000
Floor drain
bh
22,500
25,000
11
SATUAN
10
B A H A N
12 LAIN - LAIN
kg
12,500
14,500
PAKU - payung
kg
16,000
18,000
PAKU - sekrup
doos
12,000
13,500
PAKU - beton
bh
17,000
18,000
kg
13,000
14,000
ANGKUR BAUT
bh
12,800
13,000
LEM KAYU
bh
18,000
20,000
Tali Ijuk
kg
6,000
7,200
bh
250,000
300,000
XV . POMPA AIR.
1
Sanyo
100 watt
bh
975,000
1,050,000
Fuji
250 watt
bh
1,450,000
1,500,000
. 100 watt
bh
380,000
470,000
. 90 watt
bh
350,000
360,000
. 125 watt
bh
300,000
320,000
. 175 watt
bh
400,000
425,000
Abu-abu
m2
42,000
49,000
Merah/hitam
m2
38,000
51,000
Abu-abu
m2
35,000
49,000
Merah/hitam
m2
39,000
51,000
Abu-abu
m2
30,500
49,000
Merah/hitam
m2
33,000
51,000
Abu-abu
m2
35,000
49,000
Merah/hitam
m2
40,000
51,000
Abu-abu
m2
30,000
49,000
Merah/hitam
m2
33,000
51,000
Shimizu
Dab
X VI . PAVING BLOCK
1
149235156.xlsx.ms_office
SQUARE
HOLLAND
UNIDECOR
UNI
TRIHEX
10/83
HARGA
NO.
J E N I S
B A H A N
SATUAN
MINIMUM
MAKSIMUM
(Rp)
(Rp)
OLYMPIA HEXA
Abu-abu
m2
31,000
49,000
HEXAGONAL
Abu-abu
m2
40,000
51,000
Merah/hitam
m2
40,000
49,000
CASTLE
Abu-abu
m2
40,000
51,000
TRAPEZ
Abu-abu
m2
40,000
49,000
Abu-abu
10
41,000
45,000
11
bh
7,000
9,000
12
BATACO
m2
3,000
3,250
13
KANSTEEN
m'
22,500
28,500
XVII. L A I N - L A I N
1
KREI 25 MM
m2
40,000
45,000
Sliding Pintu J4
bh
110,000
200,000
bh
10,500
11,000
m2
225,000
245,000
m2
210,000
230,000
Awning Almunium
m2
75,000
85,000
m'
68,000
75,000
1,350,000
1,430,000
drum
1,300,000
1,400,000
150 X 75 X 5 X 7 X 12
ASPAL.
Aspal Ex Pertamina isi Net 160 kg
10
Hotmix Tebal = 4 Cm
m2
60,000
65,000
Hotmix Tebal = 5 Cm
m2
70,000
80,000
Hotmix Tebal = 6 Cm
m2
85,000
95,000
Hotmix Tebal = 7 Cm
m2
100,000
110,000
Binder Course
ton
215,000
230,000
Wearing Course
ton
125,000
150,000
ton
115,000
130,000
Sand Sheet
ton
125,000
140,000
ton
145,000
160,000
Cold Mix
ton
175,000
190,000
liter
8,200
8,500
Prime Coat MC
liter
8,200
8,500
liter
8,200
8,500
m2
180,000
210,000
Pagar BRC 90 A2
/lb
500,000
550,000
/lb
600,000
650,000
KACA
Cermin tebal 5 mm
11
12
PAGAR BRC.
LAIN-LAIN
Minyak Beton & bekisting
ltr
8,000
10,000
m2
350,000
400,000
Sunscreen Allumunim
m2
265,000
310,000
Allumunium Foil
m2
6,500
7,100
Soda api
kg
12,000
13,000
Sabun
kg
11,000
13,000
Air
m3
8,000
8,500
Koas Alang-alang
ikat
1,250
1,500
11,250
11,300
Solar (Industri)
149235156.xlsx.ms_office
ltr
Premium (Industri)
ltr
8,900
8,950
Pelumas
ltr
31,500
35,000
11/83
NGUNAN
KETERANGAN
149235156.xlsx.ms_office
12/83
KETERANGAN
149235156.xlsx.ms_office
13/83
KETERANGAN
149235156.xlsx.ms_office
14/83
KETERANGAN
panjang 4 m
panjang 4 m
panjang 4 m
panjang 6 m
149235156.xlsx.ms_office
15/83
KETERANGAN
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
panjang 6 m
149235156.xlsx.ms_office
16/83
KETERANGAN
149235156.xlsx.ms_office
17/83
KETERANGAN
149235156.xlsx.ms_office
18/83
KETERANGAN
149235156.xlsx.ms_office
19/83
KETERANGAN
149235156.xlsx.ms_office
20/83
DAFTAR
SUMBER
DATA
D A E R A H
PASARAN
KOTA SEMARANG
BEBAS
EDISI JANUARI 2013
HARGA SATUAN PEKERJAAN
NO.
II
SNI
KODE
481,205.00
517,360.00
m'
103,225.00
111,640.00
m2
773,550.00
824,625.00
m2
676,250.00
709,325.00
m2
6,750.00
7,200.00
m2
31,041.50
37,708.00
m3
284,995.00
299,994.00
m3
268,495.00
281,994.00
PEKERJAAN TANAH
m3
31,375.00
33,000.00
m3
38,475.00
40,500.00
m3
45,685.00
48,120.00
6.4
m3
41,760.00
43,920.00
6.5
m3
63,300.00
66,600.00
6.6
m3
50,475.00
53,100.00
6.7
m2
2,275.00
2,400.00
6.8
m3
2,275.00
2,400.00
6.9
m3
m3
22,750.00
24,000.00
Urugan Pasir
m3
132,550.00
163,200.00
6.12
m3
181,070.00
215,515.00
6.14
m2
42,825.00
50,400.00
m3
203,375.00
222,000.00
PEKERJAAN PONDASI
m3
597,750.00
644,325.00
m3
555,675.00
601,525.00
6.3
m3
526,515.00
571,855.00
m3
506,010.00
550,995.00
m3
477,915.00
522,405.00
m3
396,975.00
434,325.00
6.7
m3
460,365.00
502,340.00
m3
433,005.00
473,740.00
6.9
m3
280,335.00
307,035.00
Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah
m3
1,932,980.00
2,035,665.00
m3
596,725.00
630,080.00
6.1 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2Pp
m2
163,850.00
178,275.00
6.2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP
m2
152,675.00
166,957.50
6.3 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4PP
m2
145,265.00
159,297.50
6.4 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP
m2
141,260.00
155,390.00
6.5 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP
m2
139,520.00
154,165.00
6.6 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3 KP :10PP
m2
131,208.50
144,812.50
6.7
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 2PP
m2
78,295.00
85,297.50
6.8
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3PP
m2
73,069.00
79,912.50
6.9 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 4PP
m2
70,030.00
76,835.00
6.10 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 5PP
m2
68,116.00
74,900.00
6.11 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 6PP
m2
67,024.00
73,880.00
6.12 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 8PP
m2
64,975.00
71,775.00
6.13
m2
65,725.00
72,650.00
m2
126,557.00
144,545.00
m2
126,161.00
144,837.50
6.22 Memasang Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1Pc : 2PP
m2
235,045.00
268,090.00
6.23 Memasang Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1Pc : 4PP
m2
231,850.00
264,850.00
6.10
6.11
149235156.xlsx.ms_office
1/3 x Gal.tanah
6.11
6.1
03-6897-2008
(Rp)
m'
IV
MAKSIMUM
(Rp)
6.10
03-2836-2008
MINIMUM
6.1
III
SAT
6 PEKERJAAN PERSIAPAN
03-2835-2002
03-2835-2008
URAIAN PEKERJAAN
PEKERJAAN DINDING
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3KP : 10PP
21/83
sat.pekerjaan
VI
SNI
03-2837-2008
03-3434-2008
KODE
6
URAIAN PEKERJAAN
MINIMUM
MAKSIMUM
(Rp)
(Rp)
PEKERJAAN PLESTERAN
m2
42,739.80
45,575.00
m2
36,943.80
39,655.00
6.3
m2
34,411.20
37,105.00
m2
32,703.00
35,355.00
m2
31,705.80
34,375.00
m2
30,919.20
33,585.00
m2
30,478.20
33,155.00
m2
30,037.20
32,725.00
m2
32,007.00
34,265.00
m2
30,060.00
32,455.00
m2
27,165.00
29,265.00
m2
27,255.00
29,495.00
m2
49,413.40
53,050.00
6.14
m2
39,941.60
43,230.00
m2
43,714.00
47,260.00
m2
42,429.40
46,010.00
m2
41,335.60
44,900.00
m2
37,900.00
41,045.00
6.19
m2
20,775.80
22,700.00
6.20
m'
30,175.00
33,035.00
6.23
m2
24,919.00
26,570.00
6.24 Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m')
m2
14,774.60
15,685.00
6.25 Memasang Finishing Siar Pasangan Dinding Conblock ekspose (=8 m')
m2
7,105.00
7,540.00
6.26
m2
31,203.00
33,440.00
6.27
Memasang Acian
m2
18,550.00
19,712.50
PEKERJAAN KAYU
6.1
m3
22,513,875.00
23,749,625.00
6.2
m3
9,428,125.00
10,025,125.00
6.3
m2
371,665.00
386,330.00
6.5
m2
518,650.00
545,500.00
6.6
m2
361,200.00
381,600.00
6.7
m2
1,578,750.00
1,662,500.00
6.8
Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)
m2
404,900.00
429,085.00
6.9
m2
431,855.00
458,035.00
6.10
m2
1,429,100.00
1,503,415.00
6.11
m2
766,375.00
812,035.00
6.12
m2
453,730.00
487,390.00
6.13
m3
8,538,000.00
9,079,200.00
6.14
m3
24,577,525.00
25,929,350.00
6.15
m3
8,144,300.00
8,650,300.00
6.16
m2
131,420.00
139,735.00
6.17
m2
155,540.00
165,295.00
6.18
m2
1,120,450.00
1,187,780.00
6.19
m2
134,105.00
142,990.00
6.20
m2
139,185.00
148,305.00
6.21
m'
244,525.00
256,850.00
6.22
m'
97,400.00
101,025.00
6.23
m2
223,365.00
237,680.00
6.24
m2
280,745.00
300,480.00
6.26
m2
285,500.00
304,175.00
6.27
m2
28,285.00
30,855.00
m2
103,287.60
112,714.00
149235156.xlsx.ms_office
SAT
22/83
sat.pekerjaan
SNI
03-7394-2008
KODE
6
URAIAN PEKERJAAN
IX
03-3436-2002
03-2839-2008
MAKSIMUM
(Rp)
(Rp)
6.1
Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
m3
639,729.29
674,127.50
6.2
Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78
m3
670,551.90
706,057.13
6.3
Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72
m3
694,779.29
731,160.83
6.4
Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
m3
599,445.48
631,750.74
6.5
Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
m3
723,347.14
760,749.72
6.6
Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61
m3
750,774.52
789,181.20
6.7
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
m3
771,111.43
810,233.06
6.8
Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56
m3
784,809.05
824,457.13
m3
808,361.43
848,927.50
6.10
Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm, w/c = 0,52
m3
815,676.90
856,523.80
6.11
Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm, w/c = 0,49
m3
867,099.76
910,437.69
6.12
Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48
m3
876,681.90
920,393.24
6.17
10 Kg
114,540.00
120,635.00
6.18
10 Kg
169,465.00
187,905.00
6.19
1 Kg
17,580.00
19,400.00
6.20
m2
84,640.00
90,040.00
6.21
m2
89,890.00
95,540.00
6.22
m2
258,695.00
280,445.00
6.23
m2
273,695.00
296,645.00
6.24
m2
330,695.00
360,445.00
6.25
m2
319,195.00
350,445.00
6.26
m2
247,795.00
268,945.00
6.27
m2
53,710.00
57,845.00
6.28
m3
2,851,375.00
3,005,150.00
6.29
m3
3,516,525.00
3,706,700.00
m3
6,522,270.00
6,944,275.00
m3
5,056,445.00
5,388,625.00
m3
4,620,700.00
4,942,925.00
m3
4,592,520.00
4,910,730.00
m3
4,687,270.00
4,990,175.00
m'
51,845.00
54,670.00
m'
69,955.00
73,819.00
6.1
m2
48,545.00
56,800.00
6.2
m2
79,795.00
86,800.00
6.3
m2
64,100.00
91,770.00
6.4
m'
67,230.00
73,160.00
6.5
m'
77,230.00
85,660.00
6.6
m'
74,230.00
79,660.00
6.9
m2
56,665.00
60,340.00
6.10
m2
56,275.00
59,915.00
6.12
m2
36,675.00
39,715.00
6.15
m2
38,020.00
40,985.00
6.30
m2
48,025.00
54,585.00
6.33
m2
117,830.00
125,977.00
6.34
m'
31,030.00
34,365.00
6.37
m'
69,980.00
74,755.00
6.38
m2
54,540.00
56,580.00
6.39
m'
30,660.00
32,060.00
6.42
m2
16,315.00
17,560.00
PEKERJAAN LANGIT-LANGIT
6.1
m2
23,415.00
26,650.00
6.2
m2
69,475.00
74,105.00
6.3
m2
74,800.00
81,475.00
6.5
m2
31,375.00
34,085.00
6.6
m2
398,125.00
419,345.00
6.7
m2
25,025.00
29,330.00
6.9
m2
149,750.00
161,500.00
m'
9,750.00
11,000.00
6.10
149235156.xlsx.ms_office
MINIMUM
PEKERJAAN BETON
6.9 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53
VIII
SAT
23/83
sat.pekerjaan
SNI
XI
KODE
03-7393-2008
XII
149235156.xlsx.ms_office
URAIAN PEKERJAAN
SAT
MINIMUM
MAKSIMUM
(Rp)
(Rp)
PEKERJAAN SANITASI
6.1
Unit
1,208,360.00
1,751,265.00
6.2
Unit
334,850.00
398,300.00
6.4
Memasang Urinoir
Unit
472,550.00
526,700.00
6.5
Memasang Wastafel
Unit
989,025.00
1,124,050.00
6.8
1,030,500.00
Unit
928,090.91
6.14
m'
63,143.50
70,750.00
6.15
m'
282,755.00
314,055.00
6.20
m'
39,360.00
41,389.67
6.23
m'
137,013.67
145,996.67
6.24
m'
170,624.00
178,623.83
6.25
m'
12,174.00
13,360.00
6.29
m'
23,298.50
28,151.67
6.31
m'
43,346.33
44,849.67
6.33
Buah
309,582.50
361,300.00
6.35
Buah
14,325.00
22,395.00
6.36
Buah
29,275.00
32,370.00
6.1
Kg
22,650.00
24,277.50
6.2
kg
21,750.00
23,077.50
6.3
100 kg
24,835.00
26,005.00
6.4
Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku
m2
740,810.00
793,495.00
6.5
10 cm
18,543.50
20,009.00
6.7
m2
346,530.00
375,560.00
6.8
m2
395,650.00
449,060.00
6.9
Sunscreen Allumunium
m2
317,220.00
366,800.00
6.10
m2
313,750.00
341,500.00
6.11
m'
84,458.50
93,191.50
6.12
m2
1,038,016.00
1,142,474.50
6.13
m2
288,740.00
323,105.00
m2
161,340.00
189,055.00
m2
303,751.80
326,837.37
m2
63,184.83
68,404.00
m2
39,805.00
119,360.00
m'
156,187.50
163,842.50
6.19 Memasang Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30 Lebar 45 cm
m'
71,265.00
76,925.00
171,370.00
6.2
Buah
153,775.00
6.3
Buah
78,137.50
85,685.00
6.4
Buah
153,137.50
170,685.00
6.5
Buah
15,162.50
20,055.00
6.6
Buah
9,025.00
9,870.00
6.7
Buah
28,550.00
30,740.00
6.9
Buah
14,791.25
25,650.00
6.10
Buah
282,637.50
385,500.00
6.11
Buah
20,555.00
24,200.00
6.13
Buah
256,527.50
357,100.00
6.14
Buah
149,165.00
242,600.00
6.15
Buah
23,818.75
27,750.00
6.16
m2
70,291.25
76,650.00
6.17
m2
81,291.25
90,400.00
6.20
m2
207,791.25
241,650.00
24/83
sat.pekerjaan
SNI
03-7395-2008
XIV 03-24
KODE
6
URAIAN PEKERJAAN
SAT
MINIMUM
MAKSIMUM
(Rp)
(Rp)
6.3
m2
72,310.00
78,940.00
6.9
m2
256,061.00
281,793.00
6.19
m'
38,638.00
42,650.00
6.34
m2
121,155.78
143,629.17
6.35
m2
121,039.09
142,746.82
6.36
m2
126,310.00
143,185.00
6.39
m'
16,843.88
18,922.06
6.40
m'
22,549.76
25,844.12
6.43
m2
391,678.00
426,912.50
m2
81,365.00
88,110.00
m2
238,475.00
259,525.00
m2
146,235.00
166,640.00
m2
136,015.00
158,730.00
m2
438,133.11
475,880.11
m2
152,600.00
161,212.50
m2
120,755.00
134,175.00
m'
34,355.00
35,885.50
PEKERJAAN PENGECATAN
6.1
m2
6,737.50
7,100.00
6.2
m2
6,687.50
7,100.00
6.3
m2
6,687.50
7,100.00
6.4
m2
6,687.50
7,100.00
6.6
m2
5,787.50
6,285.00
6.7
m2
19,302.50
20,952.50
6.8
m2
22,056.50
24,280.00
m2
30,996.50
34,095.00
6.10
m2
27,702.50
32,025.00
6.11
m2
38,541.50
44,554.00
6.12
m2
4,986.25
5,610.00
6.13
m2
25,162.50
27,955.00
6.14
m2
12,010.50
13,375.50
m2
8,559.50
9,547.00
149235156.xlsx.ms_office
25/83
sat.pekerjaan
DAFTAR
SUMBER DATA
D A E R A H
:
:
ANALISA
PEKERJAAN
PASARAN BEBAS
KOTA SEMARANG
EDISI JANUARI 2013
HARGA BAHAN/UPAH
No.
SNI
03-2835-2002
KODE
KOEF
URAIAN PEKERJAAN
SAT.
MAKSIMUM
Rp
MINIMUM
Rp
MAKSIMUM
Rp
PEKERJAAN PERSIAPAN
6.2
m'
6.2.1
1.25
6.4
490,405.00
518,360.00
Bahan
451,905.00
486,060.00
25,000.00
2.5
Kg Portalnd Semen
1.2
18,000.00
20,000.00
22,500.00
1,200.00
1,250.00
3,000.00
3,125.00
65,000.00
67,000.00
78,000.00
80,400.00
1,050.00
0.005
m3 Pasir Beton
195,000.00
210,000.00
975.00
0.009
m3 Koral Beton
120,000.00
135,000.00
1,080.00
1,215.00
0.072
4,800,000.00
5,200,000.00
345,600.00
374,400.00
0.06
12,500.00
14,500.00
750.00
870.00
0.45
Kg Meni Besi
15,000.00
20,000.00
6,750.00
9,000.00
38,500.00
32,300.00
0.2
OH Tukang Kayu
Tenaga
70,000.00
65,000.00
14,000.00
13,000.00
0.4
OH Pekerja
55,000.00
42,000.00
22,000.00
16,800.00
0.02
OH Kepala Tukang
70,000.00
65,000.00
1,400.00
1,300.00
0.02
OH Mandor
55,000.00
60,000.00
1,100.00
1,200.00
103,225.00
111,640.00
92,850.00
100,490.00
62,400.00
6.4.1
m'
0.012
0.02
0.007
6.4.2
4,800,000.00
5,200,000.00
57,600.00
12,500.00
14,500.00
250.00
290.00
5,000,000.00
5,400,000.00
35,000.00
37,800.00
10,375.00
11,150.00
0.1
OH Tukang Kayu
Tenaga
55,000.00
60,000.00
5,500.00
6,000.00
0.1
OH Pekerja
40,000.00
42,000.00
4,000.00
4,200.00
OH Kepala Tukang
60,000.00
65,000.00
600.00
650.00
OH Mandor
55,000.00
60,000.00
275.00
300.00
773,550.00
824,625.00
507,800.00
538,125.00
0.01
0.005
6.5
6.2.2
6.5.1
1.25
0.18
m3 Kayu
0.85
18,000.00
20,000.00
22,500.00
25,000.00
1,700,000.00
1,750,000.00
306,000.00
315,000.00
12,500.00
14,500.00
10,625.00
12,325.00
1.1
Kg Besi Strip
13,000.00
14,000.00
14,300.00
15,400.00
35
Kg Portland Sement
1,200.00
1,250.00
42,000.00
43,750.00
m3 Pasir pasang
135,000.00
170,000.00
20,250.00
25,500.00
0.1
m3 Pasir Beton
195,000.00
210,000.00
19,500.00
21,000.00
0.15
m3 Koral Beton
120,000.00
135,000.00
18,000.00
20,250.00
450.00
500.00
13,500.00
15,000.00
20,000.00
22,000.00
5,000.00
5,500.00
10,500.00
11,000.00
21,000.00
22,000.00
55,000.00
60,000.00
4,400.00
4,800.00
45,000.00
55,000.00
6,750.00
8,250.00
2,250.00
2,500.00
675.00
750.00
55,000.00
60,000.00
3,300.00
3,600.00
0.15
m2 Kaca Polos
Lbr Plywood 4 mm
265,750.00
286,500.00
OH Tukang Kayu
Tenaga
55,000.00
60,000.00
110,000.00
120,000.00
OH Tukang Batu
55,000.00
60,000.00
55,000.00
60,000.00
OH Pekerja
40,000.00
42,000.00
80,000.00
84,000.00
OH Kepala Tukang
60,000.00
65,000.00
18,000.00
19,500.00
OH Mandor
55,000.00
60,000.00
2,750.00
3,000.00
0.3
0.05
149235156.xlsx.ms_office
MINIMUM
Rp
JUMLAH
gery 1-14-26
HARGA BAHAN/UPAH
No.
SNI
KODE
6.6
KOEF
1
0.21
0.3
511,500.00
531,325.00
18,000.00
20,000.00
30,600.00
34,000.00
1,700,000.00
1,750,000.00
357,000.00
367,500.00
12,500.00
14,500.00
3,750.00
4,350.00
1,200.00
1,250.00
12,600.00
13,125.00
5,100.00
0.03
m3 Pasir Beton
135,000.00
170,000.00
4,050.00
0.05
m3 Koral Beton
120,000.00
135,000.00
6,000.00
6,750.00
65,000.00
67,000.00
97,500.00
100,500.00
164,750.00
178,000.00
OH Tukang Kayu
Tenaga
55,000.00
60,000.00
110,000.00
120,000.00
OH Pekerja
40,000.00
42,000.00
40,000.00
42,000.00
OH Kepala Tukang
60,000.00
65,000.00
12,000.00
13,000.00
OH Mandor
55,000.00
60,000.00
2,750.00
3,000.00
6,750.00
7,200.00
6,750.00
7,200.00
0.2
0.05
1
6.8.2
Tenaga
0.1
OH Pekerja
40,000.00
42,000.00
4,000.00
4,200.00
0.05
OH Mandor
55,000.00
60,000.00
2,750.00
3,000.00
31,041.50
37,708.00
Bahan
11,500.00
16,800.00
1 m2
6.11.1
1
10,000.00
15,000.00
10,000.00
15,000.00
6,000.00
7,200.00
1,500.00
1,800.00
0.25
Kg Tali Ijuk
19,541.50
20,908.00
0.17
OH Tukang Kayu
55,000.00
60,000.00
9,350.00
10,200.00
0.25
OH Pekerja
40,000.00
42,000.00
10,000.00
10,500.00
OH Kepala Tukang
60,000.00
65,000.00
120.00
130.00
OH Mandor
55,000.00
60,000.00
71.50
78.00
284,995.00
299,994.00
284,995.00
299,994.00
6.11.2
Tenaga
0.002
0.0013
1
6.13.2
6.667
OH Pekerja
40,000.00
42,000.00
266,680.00
280,014.00
0.333
OH Mandor
55,000.00
60,000.00
18,315.00
19,980.00
268,495.00
281,994.00
268,495.00
281,994.00
6.14.2
149235156.xlsx.ms_office
MAKSIMUM
Rp
709,325.00
Kg Portland Semen
6.6.2
6.14
JUMLAH
MINIMUM
Rp
676,250.00
10.5
1.5
6.13
MAKSIMUM
Rp
Bahan
1.7
6.11
MINIMUM
Rp
6.6.1
6.8
URAIAN PEKERJAAN
SAT.
6.667
OH Pekerja
40,000.00
42,000.00
266,680.00
280,014.00
0.033
OH Mandor
55,000.00
60,000.00
1,815.00
1,980.00
gery 1-14-27
HARGA BAHAN/UPAH
No.
SNI
II
03-2835 - 2008
KODE
KOEF
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
PEKERJAAN TANAH
6.1
m3
6.1.2
6.2
6.3
Pekerja
40,000.00
42,000.00
30,000.00
0.025
OH
Mandor
55,000.00
60,000.00
1,375.00
m3
OH
Pekerja
40,000.00
42,000.00
36,000.00
0.045
OH
Mandor
55,000.00
60,000.00
2,475.00
m3
45,685.00
Tenaga
45,685.00
1.05
OH
Pekerja
40,000.00
42,000.00
42,000.00
0.067
OH
Mandor
55,000.00
60,000.00
3,685.00
m3
41,760.00
Tenaga
41,760.00
1.000
OH
Pekerja
40,000.00
42,000.00
40,000.00
0.032
OH
Mandor
55,000.00
60,000.00
1,760.00
m3
63,300.00
Tenaga
63,300.00
1.50
OH
Pekerja
40,000.00
42,000.00
60,000.00
0.060
OH
Mandor
55,000.00
60,000.00
3,300.00
m3
50,475.00
Tenaga
50,475.00
1.200
OH
Pekerja
40,000.00
42,000.00
48,000.00
0.045
OH
Mandor
55,000.00
60,000.00
2,475.00
m2
6.7.2
6.8
38,475.00
0.90
6.6.2
6.7
38,475.00
Tenaga
6.5.2
6.6
31,375.00
OH
6.4.2
6.5
31,375.00
0.75
6.3.2
6.4
6.2.2
2,275.00
Tenaga
2,275.00
0.05
OH
Pekerja
40,000.00
42,000.00
2,000.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
m3
6.8.2
13,750.00
Tenaga
13,750.00
0.330
OH
Pekerja
40,000.00
42,000.00
13,200.00
0.010
OH
Mandor
55,000.00
60,000.00
550.00
6.9
m3
6.10
m3
6.10.2
6.11
22,750.00
0.5
OH
Pekerja
40,000.00
42,000.00
20,000.00
0.05
OH
Mandor
55,000.00
60,000.00
2,750.00
m3
Urugan Pasir
132,550.00
Bahan
1.2
m3
0.3
OH
0.01
1
120,000.00
100,000.00
125,000.00
Pekerja
40,000.00
42,000.00
12,000.00
OH
Mandor
55,000.00
60,000.00
550.00
m3
6.11.2
6.12
22,750.00
Tenaga
6.11.1
Pasir Urug
Tenaga
6.12.1
120,000.00
12,550.00
181,070.00
Bahan
120,270.00
0.40
m3
Pasir Pasang
135,000.00
170,000.00
54,000.00
0.135
m3
Kapur Padam
210,000.00
225,000.00
28,350.00
0.948
m3
Tanah Liat
40,000.00
55,000.00
37,920.00
0.800
OH
Pekerja
40,000.00
42,000.00
32,000.00
0.400
OH
Tukang Batu
55,000.00
60,000.00
22,000.00
0.04
OH
Kepala Tukang
60,000.00
65,000.00
2,400.00
0.080
OH
Mandor
55,000.00
60,000.00
4,400.00
6.12.2
149235156.xlsx.ms_office
URAIAN PEKERJAAN
SAT.
Tenaga
60,800.00
83/28
gery 2-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.14
KOEF
1
m2
6.0
kg
0.15
OH
0.015
1
6.14.1
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
42,825.00
36,000.00
6,000.00
7,200.00
Ijuk
Pekerja
40,000.00
42,000.00
6,000.00
OH
Mandor
55,000.00
60,000.00
825.00
m3
Tenaga
6.15.1
1.2
m3
0.25
OH
0.025
OH
36,000.00
6,825.00
203,375.00
Bahan
6.15.2
149235156.xlsx.ms_office
MINIMUM
Rp
Bahan
6.14.2
6.15
URAIAN PEKERJAAN
SAT.
192,000.00
Sirtu
160,000.00
175,000.00
Pekerja
40,000.00
42,000.00
10,000.00
Mandor
55,000.00
60,000.00
1,375.00
Tenaga
192,000.00
11,375.00
83/29
gery 2-14
JUMLAH
MAKSIMUM
Rp
33,000.00
33,000.00
31,500.00
1,500.00
40,500.00
40,500.00
37,800.00
2,700.00
48,120.00
48,120.00
44,100.00
4,020.00
43,920.00
43,920.00
42,000.00
1,920.00
66,600.00
66,600.00
63,000.00
3,600.00
53,100.00
53,100.00
50,400.00
2,700.00
2,400.00
2,400.00
2,100.00
300.00
14,460.00
14,460.00
13,860.00
600.00
24,000.00
24,000.00
21,000.00
3,000.00
163,200.00
150,000.00
150,000.00
13,200.00
12,600.00
600.00
215,515.00
150,515.00
68,000.00
30,375.00
52,140.00
65,000.00
33,600.00
24,000.00
2,600.00
4,800.00
149235156.xlsx.ms_office
83/30
gery 2-14
JUMLAH
MAKSIMUM
Rp
50,400.00
43,200.00
43,200.00
7,200.00
6,300.00
900.00
222,000.00
210,000.00
210,000.00
12,000.00
10,500.00
1,500.00
149235156.xlsx.ms_office
83/31
gery 2-14
HARGA BAHAN/UPAH
No.
SNI
III
03-2835 - 2008
KODE
KOEF
URAIAN PEKERJAAN
SAT.
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
PEKERJAAN PONDASI
6.1
m3
6.1.1
150,000.00
160,000.00
180,000.00
192,000.00
202
Kg
Portland Sement
1,200.00
1,250.00
242,400.00
252,500.00
0.485
m3
Pasir Pasang
135,000.00
170,000.00
65,475.00
82,450.00
109,875.00
117,375.00
1.5
OH
Pekerja
40,000.00
42,000.00
60,000.00
63,000.00
0.750
OH
Tukang Batu
55,000.00
60,000.00
41,250.00
45,000.00
0.075
OH
Kepala Tukang
60,000.00
65,000.00
4,500.00
4,875.00
0.075
OH
Mandor
55,000.00
60,000.00
4,125.00
4,500.00
m3
555,675.00
601,525.00
Bahan
445,800.00
484,150.00
Tenaga
1.2
m3
150,000.00
160,000.00
180,000.00
192,000.00
163
Kg
Portland Sement
1,200.00
1,250.00
195,600.00
203,750.00
0.52
m3
Pasir Pasang
135,000.00
170,000.00
70,200.00
88,400.00
109,875.00
117,375.00
1.5
OH
Pekerja
40,000.00
42,000.00
60,000.00
63,000.00
0.750
OH
Tukang Batu
55,000.00
60,000.00
41,250.00
45,000.00
0.075
OH
Kepala Tukang
60,000.00
65,000.00
4,500.00
4,875.00
0.075
OH
Mandor
55,000.00
60,000.00
4,125.00
4,500.00
m3
526,515.00
571,855.00
Bahan
416,640.00
454,480.00
Tenaga
6.3.1
1.2
m3
150,000.00
160,000.00
180,000.00
192,000.00
136
Kg
Portland Sement
1,200.00
1,250.00
163,200.00
170,000.00
0.544
m3
Pasir Pasang
135,000.00
170,000.00
73,440.00
92,480.00
109,875.00
117,375.00
1.5
OH
Pekerja
40,000.00
42,000.00
60,000.00
63,000.00
0.750
OH
Tukang Batu
55,000.00
60,000.00
41,250.00
45,000.00
0.075
OH
Kepala Tukang
60,000.00
65,000.00
4,500.00
4,875.00
0.075
OH
Mandor
55,000.00
60,000.00
4,125.00
4,500.00
m3
506,010.00
550,995.00
Bahan
396,135.00
433,620.00
6.3.2
Tenaga
6.4.1
1.2
m3
150,000.00
160,000.00
180,000.00
192,000.00
117
Kg
Portland Sement
1,200.00
1,250.00
140,400.00
146,250.00
0.561
m3
Pasir Pasang
135,000.00
170,000.00
75,735.00
95,370.00
109,875.00
117,375.00
1.5
OH
Pekerja
40,000.00
42,000.00
60,000.00
63,000.00
0.750
OH
Tukang Batu
55,000.00
60,000.00
41,250.00
45,000.00
0.075
OH
Kepala Tukang
60,000.00
65,000.00
4,500.00
4,875.00
0.075
OH
Mandor
55,000.00
60,000.00
4,125.00
4,500.00
m3
477,915.00
522,405.00
Bahan
368,040.00
405,030.00
6.4.2
6.5
Tenaga
6.5.1
1.2
m3
150,000.00
160,000.00
180,000.00
192,000.00
91
Kg
Portland Sement
1,200.00
1,250.00
109,200.00
113,750.00
0.584
m3
Pasir Pasang
135,000.00
170,000.00
78,840.00
99,280.00
109,875.00
117,375.00
1.5
OH
Pekerja
40,000.00
42,000.00
60,000.00
63,000.00
0.750
OH
Tukang Batu
55,000.00
60,000.00
41,250.00
45,000.00
0.075
OH
Kepala Tukang
60,000.00
65,000.00
4,500.00
4,875.00
0.075
OH
Mandor
55,000.00
60,000.00
4,125.00
4,500.00
6.5.2
149235156.xlsx.ms_office
526,950.00
6.2.2
6.4
644,325.00
487,875.00
m3
6.2.1
6.3
597,750.00
Bahan
1.2
6.1.2
6.2
Tenaga
83/32
gery 3-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.6
KOEF
1
m3
6.6.1
316,950.00
192,000.00
m3
210,000.00
225,000.00
35,700.00
38,250.00
0.17
Kg
150,000.00
170,000.00
25,500.00
28,900.00
0.340
m3
Pasir Pasang
135,000.00
170,000.00
45,900.00
57,800.00
109,875.00
117,375.00
1.5
OH
Pekerja
40,000.00
42,000.00
60,000.00
63,000.00
0.750
OH
Tukang Batu
55,000.00
60,000.00
41,250.00
45,000.00
0.075
OH
Kepala Tukang
60,000.00
65,000.00
4,500.00
4,875.00
0.075
OH
Mandor
55,000.00
60,000.00
4,125.00
4,500.00
m3
460,365.00
502,340.00
Bahan
350,490.00
384,965.00
Tenaga
1.2 m3
150,000.00
160,000.00
180,000.00
192,000.00
61 kg
Portland Sement
1,200.00
1,250.00
73,200.00
76,250.00
0.147 m3
Kapur Pasang
210,000.00
225,000.00
30,870.00
33,075.00
0.492 m3
Pasir
135,000.00
170,000.00
66,420.00
83,640.00
109,875.00
117,375.00
1.5
OH
Tenaga
Pekerja
40,000.00
42,000.00
60,000.00
63,000.00
0.750
OH
Tukang Batu
55,000.00
60,000.00
41,250.00
45,000.00
0.075
OH
Kepala Tukang
60,000.00
65,000.00
4,500.00
4,875.00
0.075
OH
Mandor
55,000.00
60,000.00
4,125.00
4,500.00
m3
433,005.00
473,740.00
Bahan
323,130.00
356,365.00
1.2 m3
150,000.00
160,000.00
180,000.00
192,000.00
41 kg
Portland Sement
1,200.00
1,250.00
49,200.00
51,250.00
0.131 m3
Kapur Pasang
210,000.00
225,000.00
27,510.00
29,475.00
0.492 m3
Pasir
135,000.00
170,000.00
66,420.00
83,640.00
109,875.00
117,375.00
1.5
OH
Tenaga
Pekerja
40,000.00
42,000.00
60,000.00
63,000.00
0.750
OH
Tukang Batu
55,000.00
60,000.00
41,250.00
45,000.00
0.075
OH
Kepala Tukang
60,000.00
65,000.00
4,500.00
4,875.00
0.075
OH
Mandor
55,000.00
60,000.00
4,125.00
4,500.00
m3
280,335.00
307,035.00
Bahan
223,200.00
246,000.00
1.2
m3
150,000.00
160,000.00
180,000.00
192,000.00
0.432
m3
Pasir Urug
100,000.00
125,000.00
43,200.00
54,000.00
57,135.00
61,035.00
0.78
OH
Pekerja
40,000.00
42,000.00
31,200.00
32,760.00
0.39
OH
Tukang Batu
55,000.00
60,000.00
21,450.00
23,400.00
0.039
OH
Kepala Tukang
60,000.00
65,000.00
2,340.00
2,535.00
0.039
OH
Mandor
55,000.00
60,000.00
2,145.00
2,340.00
m3
Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah
1,932,980.00
2,035,665.00
Bahan
1,736,880.00
1,827,340.00
Tenaga
6.10.1
0.480
m3
126
Kg
Besi Beton
150,000.00
160,000.00
72,000.00
76,800.00
10,000.00
10,500.00
1,260,000.00
1,323,000.00
194
Kg
Portland Semen
1,200.00
1,250.00
232,800.00
242,500.00
0.312
m3
Pasir Beton
195,000.00
210,000.00
60,840.00
65,520.00
0.468
m3
Koral Beton
180,000.00
190,000.00
84,240.00
88,920.00
1.8
Kg
Kawat Beton
15,000.00
17,000.00
27,000.00
30,600.00
196,100.00
208,325.00
3.4
OH
Pekerja
40,000.00
42,000.00
136,000.00
142,800.00
0.85
OH
Tukang Batu
55,000.00
60,000.00
46,750.00
51,000.00
0.085
OH
Kepala Tukang
60,000.00
65,000.00
5,100.00
5,525.00
0.15
OH
Mandor
55,000.00
60,000.00
8,250.00
9,000.00
6.10.2
149235156.xlsx.ms_office
434,325.00
287,100.00
0.17
6.9.2
6.10
396,975.00
Bahan
180,000.00
6.9.1
160,000.00
6.8.2
6.9
MAKSIMUM
Rp
150,000.00
6.8.1
JUMLAH
MINIMUM
Rp
6.7.2
6.8
MAKSIMUM
Rp
m3
6.7.1
MINIMUM
Rp
1.2
6.6.2
6.7
URAIAN PEKERJAAN
SAT.
Tenaga
83/33
gery 3-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.11
KOEF
1
m3
6.11.1
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
596,725.00
630,080.00
Bahan
445,380.00
468,940.00
0.45
m3
150,000.00
160,000.00
67,500.00
194
Kg
Portland Semen
72,000.00
1,200.00
1,250.00
232,800.00
242,500.00
0.312
m3
0.468
m3
Pasir Beton
195,000.00
210,000.00
60,840.00
65,520.00
Koral Beton
180,000.00
190,000.00
84,240.00
88,920.00
2.40
OH
151,345.00
161,140.00
Pekerja
40,000.00
42,000.00
96,000.00
0.8
100,800.00
OH
Tukang Batu
55,000.00
60,000.00
44,000.00
48,000.00
0.08
OH
Kepala Tukang
60,000.00
65,000.00
4,800.00
5,200.00
0.119
OH
Mandor
55,000.00
60,000.00
6,545.00
7,140.00
6.11.2
149235156.xlsx.ms_office
URAIAN PEKERJAAN
SAT.
Tenaga
83/34
gery 3-14
HARGA BAHAN/UPAH
No.
SNI
IV
03-6897 - 2008
KODE
KOEF
URAIAN PEKERJAAN
SAT.
PEKERJAAN
6.1
1 m2
6.1.1
163,850.00
178,275.00
126,000.00
137,975.00
63,000.00
43.5
Kg
70,000.00
1,200.00
1,250.00
52,200.00
0.08
m3
54,375.00
135,000.00
170,000.00
10,800.00
13,600.00
0.6
OH
Bata Merah
37,850.00
40,300.00
Pekerja
40,000.00
42,000.00
24,000.00
0.2
25,200.00
OH
Tukang Batu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
60,000.00
65,000.00
1,200.00
1,300.00
0.03
OH
Mandor
55,000.00
60,000.00
1,650.00
1,800.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP
152,675.00
166,957.50
Bahan
114,825.00
126,657.50
Tenaga
Buah
Bata Merah
450.00
500.00
63,000.00
70,000.00
1,200.00
1,250.00
39,540.00
41,187.50
135,000.00
170,000.00
12,285.00
15,470.00
32.95
Kg
0.091
m3
37,850.00
40,300.00
0.6
OH
Pekerja
40,000.00
42,000.00
24,000.00
25,200.00
0.2
OH
Tukang Batu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
60,000.00
65,000.00
1,200.00
1,300.00
0.03
OH
Mandor
55,000.00
60,000.00
1,650.00
1,800.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4PP
145,265.00
159,297.50
Bahan
107,415.00
118,997.50
Tenaga
6.3.1
140
Buah
Bata Merah
450.00
500.00
63,000.00
70,000.00
1,200.00
1,250.00
31,860.00
33,187.50
135,000.00
170,000.00
12,555.00
15,810.00
26.55
Kg
0.093
m3
37,850.00
40,300.00
0.6
OH
Pekerja
40,000.00
42,000.00
24,000.00
25,200.00
0.2
OH
Tukang Batu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
60,000.00
65,000.00
1,200.00
1,300.00
0.03
OH
Mandor
55,000.00
60,000.00
1,650.00
1,800.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP
141,260.00
155,390.00
Bahan
103,410.00
115,090.00
6.3.2
Tenaga
6.4.1
140
Buah
450.00
500.00
63,000.00
22.2
Kg
70,000.00
1,200.00
1,250.00
26,640.00
0.102
m3
27,750.00
135,000.00
170,000.00
13,770.00
17,340.00
0.6
OH
37,850.00
40,300.00
Pekerja
40,000.00
42,000.00
24,000.00
0.2
25,200.00
OH
Tukang Batu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
60,000.00
65,000.00
1,200.00
1,300.00
0.03
OH
Mandor
55,000.00
60,000.00
1,650.00
1,800.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP
139,520.00
154,165.00
Bahan
101,670.00
113,865.00
6.4.2
Bata Merah
Tenaga
6.5.1
140
Buah
450.00
500.00
63,000.00
18.5
Kg
70,000.00
1,200.00
1,250.00
22,200.00
0.122
m3
23,125.00
135,000.00
170,000.00
16,470.00
20,740.00
0.6
OH
37,850.00
40,300.00
Pekerja
40,000.00
42,000.00
24,000.00
0.2
25,200.00
OH
Tukang Batu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
60,000.00
65,000.00
1,200.00
1,300.00
0.03
OH
Mandor
55,000.00
60,000.00
1,650.00
1,800.00
6.5.2
149235156.xlsx.ms_office
DINDING
500.00
6.2.2
6.5
MAKSIMUM
Rp
450.00
140
6.4
JUMLAH
MINIMUM
Rp
Bahan
Buah
6.2.1
6.3
MAKSIMUM
Rp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2Pp
140
6.1.2
6.2
MINIMUM
Rp
Bata Merah
Tenaga
83/35
gery 4-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.6
KOEF
1
m2
6.6.1
Buah
144,812.50
93,358.50
104,512.50
450.00
500.00
63,000.00
70,000.00
1,200.00
1,250.00
12,096.00
12,600.00
m3
135,000.00
170,000.00
12,487.50
15,725.00
0.0275
m3
210,000.00
225,000.00
5,775.00
6,187.50
37,850.00
40,300.00
0.6
OH
Pekerja
40,000.00
42,000.00
24,000.00
25,200.00
0.2
OH
Tukang Batu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
60,000.00
65,000.00
1,200.00
1,300.00
0.03
OH
Mandor
55,000.00
60,000.00
1,650.00
1,800.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 2PP
78,295.00
85,297.50
Bahan
59,370.00
65,147.50
Tenaga
Buah
Bata Merah 5 x 11 x 22
450.00
500.00
31,500.00
35,000.00
1,200.00
1,250.00
22,740.00
23,687.50
135,000.00
170,000.00
5,130.00
6,460.00
18.95
Kg
Portland Semen
0.038
m3
Pasir Pasang
18,925.00
20,150.00
0.30
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3PP
73,069.00
79,912.50
Bahan
54,144.00
59,762.50
Tenaga
6.8.1
70
Buah
Bata Merah 5 x 11 x 22
450.00
500.00
31,500.00
35,000.00
1,200.00
1,250.00
17,244.00
17,962.50
135,000.00
170,000.00
5,400.00
6,800.00
14.37
Kg
Portland Semen
0.04
m3
Pasir Pasang
18,925.00
20,150.00
0.30
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 4PP
70,030.00
76,835.00
Bahan
51,105.00
56,685.00
6.8.2
Tenaga
6.9.1
70
Buah
Bata Merah 5 x 11 x 22
450.00
500.00
31,500.00
35,000.00
1,200.00
1,250.00
13,800.00
14,375.00
135,000.00
170,000.00
5,805.00
7,310.00
11.50
Kg
Portland Semen
0.043
m3
Pasir Pasang
18,925.00
20,150.00
0.30
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 5PP
68,116.00
74,900.00
Bahan
49,191.00
54,750.00
6.9.2
Tenaga
70
Buah
Bata Merah 5 x 11 x 22
450.00
500.00
31,500.00
35,000.00
1,200.00
1,250.00
11,616.00
12,100.00
135,000.00
170,000.00
6,075.00
7,650.00
9.68
Kg
Portland Semen
0.045
m3
Pasir Pasang
18,925.00
20,150.00
0.30
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
6.10.2
149235156.xlsx.ms_office
131,208.50
0.0925
6.7.2
6.10.1
Bata Merah
MAKSIMUM
Rp
70
6.10
Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3 KP :10PP
JUMLAH
MINIMUM
Rp
Kg
6.7.1
6.9
MAKSIMUM
Rp
10.08
6.6.2
6.8
MINIMUM
Rp
Bahan
140
6.7
URAIAN PEKERJAAN
SAT.
Tenaga
83/36
gery 4-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.11
KOEF
1
m2
6.11.1
70
Buah
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 6PP
67,024.00
73,880.00
Bahan
48,099.00
53,730.00
Bata Merah 5 x 11 x 22
450.00
500.00
31,500.00
35,000.00
1,200.00
1,250.00
9,984.00
10,400.00
135,000.00
170,000.00
6,615.00
8,330.00
m3
Pasir Pasang
18,925.00
20,150.00
0.30
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 8PP
64,975.00
71,775.00
Bahan
46,050.00
51,625.00
Tenaga
Buah
Bata Merah 5 x 11 x 22
450.00
500.00
31,500.00
35,000.00
1,200.00
1,250.00
7,800.00
8,125.00
135,000.00
170,000.00
6,750.00
8,500.00
6.50
Kg
Portland Semen
0.05
m3
Pasir Pasang
18,925.00
20,150.00
0.30
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3KP : 10PP
65,725.00
72,650.00
Bahan
46,800.00
52,500.00
Tenaga
6.13.1
70
Buah
450.00
500.00
31,500.00
4.5
Kg
Portland Semen
35,000.00
1,200.00
1,250.00
5,400.00
0.05
m3
5,625.00
Pasir Pasang
135,000.00
170,000.00
6,750.00
0.015
m3
8,500.00
Kapur Padam
210,000.00
225,000.00
3,150.00
3,375.00
0.30
OH
18,925.00
20,150.00
Pekerja
40,000.00
42,000.00
12,000.00
0.1
12,600.00
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 1SM : 1PP
59,335.00
65,320.00
Bahan
40,410.00
45,170.00
6.13.2
Bata Merah 5 x 11 x 22
Tenaga
6.14.1
70
Buah
Bata Merah 5 x 11 x 22
450.00
500.00
31,500.00
35,000.00
0.018
m3
Semen Merah
150,000.00
170,000.00
2,700.00
3,060.00
0.018
m3
Pasir Pasang
135,000.00
170,000.00
2,430.00
3,060.00
0.018
m3
Kapur Padam
210,000.00
225,000.00
3,780.00
4,050.00
18,925.00
20,150.00
0.30
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1KP : 1SM : 2PP
59,245.00
65,440.00
Bahan
40,320.00
45,290.00
6.14.2
Tenaga
6.15.1
70
Buah
Bata Merah 5 x 11 x 22
450.00
500.00
31,500.00
35,000.00
0.014
m3
Semen Merah
150,000.00
170,000.00
2,100.00
2,380.00
0.028
m3
Pasir Pasang
135,000.00
170,000.00
3,780.00
4,760.00
0.014
m3
Kapur Padam
210,000.00
225,000.00
2,940.00
3,150.00
18,925.00
20,150.00
0.30
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
6.15.2
149235156.xlsx.ms_office
MAKSIMUM
Rp
0.049
6.12.2
6.15
JUMLAH
MINIMUM
Rp
Portland Semen
70
6.14
MAKSIMUM
Rp
Kg
6.12.1
6.13
MINIMUM
Rp
8.32
6.11.2
6.12
URAIAN PEKERJAAN
SAT.
Tenaga
83/37
gery 4-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.20
KOEF
1
m2
6.20.1
12.500
buah
15.160
MINIMUM
Rp
MAKSIMUM
Rp
126,557.00
144,545.00
Bahan
107,632.00
124,395.00
3,250.00
37,500.00
40,625.00
kg
PC
1,200.00
1,250.00
18,192.00
18,950.00
0.364
m3
Pasir Pasang
135,000.00
170,000.00
49,140.00
61,880.00
0.280
kg
Besi Angkur 8 mm
10,000.00
10,500.00
2,800.00
2,940.00
18,925.00
20,150.00
0.300
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.100
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.010
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
126,161.00
144,837.50
Bahan
107,236.00
124,687.50
Tenaga
12.500
buah
Batako
3,000.00
3,250.00
37,500.00
12.130
40,625.00
kg
PC
1,200.00
1,250.00
14,556.00
15,162.50
0.388
m3
Pasir Pasang
135,000.00
170,000.00
52,380.00
65,960.00
0.280
kg
Besi Angkur 8 mm
10,000.00
10,500.00
2,800.00
2,940.00
18,925.00
20,150.00
0.300
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.100
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.010
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
235,045.00
268,090.00
Bahan
216,120.00
247,940.00
Tenaga
6.22.1
30
Buah
6,500.00
7,500.00
195,000.00
225,000.00
1,200.00
1,250.00
16,800.00
17,500.00
135,000.00
170,000.00
4,320.00
5,440.00
kg
Portland Semen
0.032
m3
Pasir Pasang
18,925.00
20,150.00
0.30
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
231,850.00
264,850.00
Bahan
212,925.00
244,700.00
Tenaga
6.23.1
30
Buah
Terawang / Roster
6,500.00
7,500.00
195,000.00
225,000.00
1,200.00
1,250.00
13,200.00
13,750.00
135,000.00
170,000.00
4,725.00
5,950.00
11
kg
Portland Semen
0.035
m3
Pasir Pasang
18,925.00
20,150.00
0.30
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
6.23.2
149235156.xlsx.ms_office
Terawang / Roster
14
6.22.2
6.23
MAKSIMUM
Rp
3,000.00
6.21.1
6.22
JUMLAH
MINIMUM
Rp
Batako
6.20.2
6.21
URAIAN PEKERJAAN
SAT.
Tenaga
83/38
gery 4-14
HARGA BAHAN/UPAH
No.
SNI
03-2837 - 2008
KODE
KOEF
PEKERJAAN
6.1
m2
6.1.1
6.2
42,739.80
45,575.00
20,764.80
22,100.00
1,250.00
18,604.80
0.016
m3
Pasir Pasang
19,380.00
135,000.00
170,000.00
2,160.00
2,720.00
0.3
OH
21,975.00
23,475.00
Pekerja
40,000.00
42,000.00
12,000.00
0.15
12,600.00
OH
Tukang batu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
36,943.80
39,655.00
Bahan
14,968.80
16,180.00
Tenaga
10.224
Kg
Portland Semen
1,200.00
1,250.00
12,268.80
0.020
m3
Pasir Pasang
12,780.00
135,000.00
170,000.00
2,700.00
3,400.00
0.3
OH
21,975.00
23,475.00
Pekerja
40,000.00
42,000.00
12,000.00
0.15
12,600.00
OH
Tukang batu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
34,411.20
37,105.00
Bahan
12,436.20
13,630.00
Tenaga
7.776
Kg
Portland Semen
1,200.00
1,250.00
9,331.20
0.023
m3
Pasir Pasang
9,720.00
135,000.00
170,000.00
3,105.00
3,910.00
0.3
OH
21,975.00
23,475.00
Pekerja
40,000.00
42,000.00
12,000.00
0.15
12,600.00
OH
Tukang batu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
32,703.00
35,355.00
Bahan
10,728.00
11,880.00
Tenaga
6.3.2
6.4.1
6.240
Kg
Portland Semen
1,200.00
1,250.00
7,488.00
0.024
m3
Pasir Pasang
7,800.00
135,000.00
170,000.00
3,240.00
4,080.00
0.3
OH
21,975.00
23,475.00
Pekerja
40,000.00
42,000.00
12,000.00
0.15
12,600.00
OH
Tukang batu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
31,705.80
34,375.00
9,730.80
10,900.00
6.4.2
Tenaga
6.5.1
Bahan
5.184
Kg
Portland Semen
1,200.00
1,250.00
6,220.80
0.026
m3
Pasir Pasang
6,480.00
135,000.00
170,000.00
3,510.00
4,420.00
0.3
OH
21,975.00
23,475.00
Pekerja
40,000.00
42,000.00
12,000.00
0.15
12,600.00
OH
Tukang batu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
30,919.20
33,585.00
8,944.20
10,110.00
6.5.2
6.6
MAKSIMUM
Rp
1,200.00
6.3.1
6.5
JUMLAH
MINIMUM
Rp
Bahan
Portland Semen
6.2.2
6.4
MAKSIMUM
Rp
Kg
6.2.1
6.3
MINIMUM
Rp
PLESTERAN
15.504
6.1.2
Tenaga
6.6.1
Bahan
4.416
Kg
Portland Semen
0.027
m3
Pasir Pasang
0.3
OH
6.6.2
149235156.xlsx.ms_office
URAIAN PEKERJAAN
SAT.
1,200.00
1,250.00
5,299.20
5,520.00
135,000.00
170,000.00
3,645.00
4,590.00
21,975.00
23,475.00
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
Tenaga
0.15
OH
Tukang batu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
83/39
abk 5-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.7
KOEF
1
m2
6.7.1
Kg
Portland Semen
0.028
m3
Pasir Pasang
0.3
OH
0.15
33,155.00
8,503.20
9,680.00
4,920.00
135,000.00
170,000.00
3,780.00
4,760.00
21,975.00
23,475.00
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
OH
Tukang batu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
30,037.20
32,725.00
8,062.20
9,250.00
Tenaga
Bahan
3.456
Kg
Portland Semen
1,200.00
1,250.00
4,147.20
0.029
m3
Pasir Pasang
4,320.00
135,000.00
170,000.00
3,915.00
4,930.00
0.30
OH
21,975.00
23,475.00
Pekerja
40,000.00
42,000.00
12,000.00
0.15
12,600.00
OH
Tukang batu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
32,007.00
34,265.00
9,297.00
10,085.00
7,200.00
Tenaga
Bahan
5.760
Kg
Portland Semen
1,200.00
1,250.00
6,912.00
0.003
m3
Kapur Pasang
210,000.00
225,000.00
630.00
0.013
m3
675.00
Pasir Pasang
135,000.00
170,000.00
1,755.00
2,210.00
0.36
OH
22,710.00
24,180.00
Pekerja
40,000.00
42,000.00
14,400.00
0.12
15,120.00
OH
Tukang batu
55,000.00
60,000.00
6,600.00
7,200.00
0.012
OH
Kepala Tukang
60,000.00
65,000.00
720.00
780.00
0.018
OH
Mandor
55,000.00
60,000.00
990.00
1,080.00
m2
30,060.00
32,455.00
7,350.00
8,275.00
Tenaga
6.10.1
Bahan
3
kg
Portland Semen
1,200.00
1,250.00
3,600.00
0.005
m3
3,750.00
Kapur Padam
210,000.00
225,000.00
1,050.00
0.020
m3
1,125.00
Pasir Pasang
135,000.00
170,000.00
2,700.00
3,400.00
0.36
OH
22,710.00
24,180.00
Pekerja
40,000.00
42,000.00
14,400.00
0.12
15,120.00
OH
Tukang batu
55,000.00
60,000.00
6,600.00
7,200.00
0.012
OH
Kepala Tukang
60,000.00
65,000.00
720.00
780.00
0.018
OH
Mandor
55,000.00
60,000.00
990.00
1,080.00
m2
27,165.00
29,265.00
4,455.00
5,085.00
6.10.2
Tenaga
6.11.1
Bahan
0.009
m3
Semen Merah
150,000.00
170,000.00
1,350.00
1,530.00
0.009
m3
Kapur Padam
210,000.00
225,000.00
1,890.00
2,025.00
0.009
m3
Pasir Pasang
135,000.00
170,000.00
1,215.00
1,530.00
22,710.00
24,180.00
0.36
OH
Pekerja
40,000.00
42,000.00
14,400.00
15,120.00
0.12
OH
Tukang batu
55,000.00
60,000.00
6,600.00
7,200.00
0.012
OH
Kepala Tukang
60,000.00
65,000.00
720.00
780.00
0.018
OH
Mandor
55,000.00
60,000.00
990.00
1,080.00
m2
27,255.00
29,495.00
4,545.00
5,315.00
6.11.2
Tenaga
6.12.1
Bahan
0.007
m3
Semen Merah
150,000.00
170,000.00
1,050.00
1,190.00
0.007
m3
Kapur Padam
210,000.00
225,000.00
1,470.00
1,575.00
0.015
m3
Pasir Pasang
135,000.00
170,000.00
2,025.00
2,550.00
22,710.00
24,180.00
0.36
OH
Pekerja
40,000.00
42,000.00
14,400.00
15,120.00
0.12
OH
Tukang batu
55,000.00
60,000.00
6,600.00
7,200.00
0.012
OH
Kepala Tukang
60,000.00
65,000.00
720.00
780.00
0.018
OH
Mandor
55,000.00
60,000.00
990.00
1,080.00
6.12.2
149235156.xlsx.ms_office
30,478.20
4,723.20
6.9.2
6.12
MAKSIMUM
Rp
1,250.00
6.9.1
6.11
JUMLAH
MINIMUM
Rp
1,200.00
6.8.2
6.10
MAKSIMUM
Rp
3.936
6.8.1
6.9
MINIMUM
Rp
Bahan
6.7.2
6.8
URAIAN PEKERJAAN
SAT.
Tenaga
83/40
abk 5-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.13
KOEF
1
m2
6.13.1
0.027
m3
Pasir Pasang
17,040.00
135,000.00
170,000.00
3,645.00
4,590.00
0.40
OH
29,410.00
31,420.00
Pekerja
40,000.00
42,000.00
16,000.00
0.20
16,800.00
OH
Tukang batu
55,000.00
60,000.00
11,000.00
12,000.00
0.020
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.022
OH
Mandor
55,000.00
60,000.00
1,210.00
1,320.00
m2
39,941.60
43,230.00
Bahan
16,626.60
18,230.00
Tenaga
10.368
Kg
Portland Semen
1,200.00
1,250.00
12,441.60
0.031
m3
Pasir Pasang
12,960.00
135,000.00
170,000.00
4,185.00
5,270.00
0.26
OH
23,315.00
25,000.00
Pekerja
40,000.00
42,000.00
10,400.00
0.2
10,920.00
OH
Tukang batu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.013
OH
Mandor
55,000.00
60,000.00
715.00
780.00
m2
43,714.00
47,260.00
Bahan
14,304.00
15,840.00
Tenaga
8.320
kg
Portland Semen
1,200.00
1,250.00
9,984.00
0.032
m3
Pasir Pasang
10,400.00
135,000.00
170,000.00
4,320.00
5,440.00
0.40
OH
29,410.00
31,420.00
Pekerja
40,000.00
42,000.00
16,000.00
0.20
16,800.00
OH
Tukang batu
55,000.00
60,000.00
11,000.00
12,000.00
0.020
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.022
OH
Mandor
55,000.00
60,000.00
1,210.00
1,320.00
m2
42,429.40
46,010.00
Bahan
13,019.40
14,590.00
Tenaga
6.912
Kg
Portland Semen
1,200.00
1,250.00
8,294.40
0.035
m3
Pasir Pasang
8,640.00
135,000.00
170,000.00
4,725.00
5,950.00
0.400
OH
29,410.00
31,420.00
Pekerja
40,000.00
42,000.00
16,000.00
0.200
16,800.00
OH
Tukang batu
55,000.00
60,000.00
11,000.00
12,000.00
0.020
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.022
OH
Mandor
55,000.00
60,000.00
1,210.00
1,320.00
m2
41,335.60
44,900.00
Bahan
11,925.60
13,480.00
6.16.2
Tenaga
6.17.1
5.888
Kg
Portland Semen
1,200.00
1,250.00
7,065.60
0.036
m3
Pasir Pasang
7,360.00
135,000.00
170,000.00
4,860.00
6,120.00
0.40
OH
29,410.00
31,420.00
Pekerja
40,000.00
42,000.00
16,000.00
0.2
16,800.00
OH
Tukang batu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.022
OH
Mandor
55,000.00
60,000.00
1,210.00
1,320.00
m2
37,900.00
41,045.00
5,670.00
6,615.00
6.17.2
Tenaga
6.18.1
Bahan
0.009
m3
Semen Merah
150,000.00
170,000.00
1,350.00
1,530.00
0.009
m3
Kapur Padam
210,000.00
225,000.00
1,890.00
2,025.00
0.018
m3
Pasir Pasang
135,000.00
170,000.00
2,430.00
3,060.00
32,230.00
34,430.00
0.440
OH
Pekerja
40,000.00
42,000.00
17,600.00
18,480.00
0.22
OH
Tukang batu
55,000.00
60,000.00
12,100.00
13,200.00
0.022
OH
Kepala Tukang
60,000.00
65,000.00
1,320.00
1,430.00
0.022
OH
Mandor
55,000.00
60,000.00
1,210.00
1,320.00
m2
20,775.80
22,700.00
9,730.80
10,900.00
6.18.2
Tenaga
6.19.1
149235156.xlsx.ms_office
21,630.00
16,358.40
6.16.1
6.19
53,050.00
20,003.40
1,250.00
6.15.2
6.18
MAKSIMUM
Rp
1,200.00
6.15.1
6.17
JUMLAH
MINIMUM
Rp
49,413.40
Portland Semen
6.14.2
6.16
MAKSIMUM
Rp
Bahan
kg
6.14.1
6.15
MINIMUM
Rp
13.632
6.13.2
6.14
URAIAN PEKERJAAN
SAT.
Bahan
5.184
Kg
Portland Semen
0.026
m3
Pasir Pasang
83/41
1,200.00
1,250.00
6,220.80
6,480.00
135,000.00
170,000.00
3,510.00
4,420.00
abk 5-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
6.19.2
6.20
Tenaga
11,045.00
11,800.00
42,000.00
6,000.00
6,300.00
0.075
OH
Tukang batu
55,000.00
60,000.00
4,125.00
4,500.00
0.008
OH
Kepala Tukang
60,000.00
65,000.00
480.00
520.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
m'
30,175.00
33,035.00
2,355.00
2,835.00
Bahan
0.5
Kg
Portland Semen
1,200.00
1,250.00
600.00
0.013
m3
Pasir Pasang
625.00
135,000.00
170,000.00
1,755.00
2,210.00
0.080
OH
27,820.00
30,200.00
Pekerja
40,000.00
42,000.00
3,200.00
0.40
3,360.00
OH
Tukang batu
55,000.00
60,000.00
22,000.00
24,000.00
0.040
OH
Kepala Tukang
60,000.00
65,000.00
2,400.00
2,600.00
0.004
OH
Mandor
55,000.00
60,000.00
220.00
240.00
m2
24,919.00
26,570.00
5,994.00
6,420.00
Tenaga
Bahan
4.32
Kg
Portland Semen
1,200.00
1,250.00
5,184.00
0.006
m3
Pasir Pasang
5,400.00
135,000.00
170,000.00
810.00
1,020.00
0.30
OH
18,925.00
20,150.00
Pekerja
40,000.00
42,000.00
12,000.00
0.1
12,600.00
OH
Tukang batu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
14,774.60
15,685.00
3,729.60
3,885.00
3,729.60
3,885.00
Tenaga
6.24.1
Bahan
3.108
Kg
1,200.00
1,250.00
0.15
OH
11,045.00
11,800.00
Pekerja
40,000.00
42,000.00
6,000.00
0.075
6,300.00
OH
Tukang batu
55,000.00
60,000.00
4,125.00
4,500.00
0.008
OH
Kepala Tukang
60,000.00
65,000.00
480.00
520.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
m2
7,105.00
7,540.00
Bahan
1,920.00
2,000.00
1,920.00
2,000.00
6.24.2
1.600
Kg
1,200.00
1,250.00
0.070
OH
5,185.00
5,540.00
Pekerja
40,000.00
42,000.00
2,800.00
0.035
2,940.00
OH
Tukang batu
55,000.00
60,000.00
1,925.00
2,100.00
0.004
OH
Kepala Tukang
60,000.00
65,000.00
240.00
260.00
0.004
OH
Mandor
55,000.00
60,000.00
220.00
240.00
m2
31,203.00
33,440.00
9,228.00
9,965.00
6.25.2
Portland Semen
Tenaga
6.26.1
Bahan
6.34
Kg
Pc
1,200.00
1,250.00
7,608.00
7,925.00
0.012
m3
PP
135,000.00
170,000.00
1,620.00
2,040.00
21,975.00
23,475.00
0.3
OH
Pekerja
40,000.00
42,000.00
12,000.00
12,600.00
0.15
OH
Tukang batu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
m2
Memasang Acian
18,550.00
19,712.50
3,900.00
4,062.50
3,900.00
4,062.50
6.26.2
Tenaga
6.27.1
Bahan
3.25
Kg
1,200.00
1,250.00
0.20
OH
14,650.00
15,650.00
Pekerja
40,000.00
42,000.00
8,000.00
0.10
8,400.00
OH
Tukang batu
55,000.00
60,000.00
5,500.00
6,000.00
0.010
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.010
OH
Mandor
55,000.00
60,000.00
550.00
600.00
6.27.2
149235156.xlsx.ms_office
Portland Semen
Tenaga
6.25.1
6.27
MAKSIMUM
Rp
40,000.00
6.23.2
6.26
JUMLAH
MINIMUM
Rp
Pekerja
6.23.1
6.25
MAKSIMUM
Rp
OH
6.20.2
6.24
MINIMUM
Rp
0.15
6.20.1
6.23
URAIAN PEKERJAAN
SAT.
Portland Semen
Tenaga
83/42
abk 5-14
HARGA BAHAN/UPAH
No.
SNI
VI
03-3434 - 2008
KODE
6.1
KOEF
m3
6.1.2
22,038,125.00
20,900,000.00
1.25
kg
22,000,000.00
12,500.00
14,500.00
15,625.00
kg
18,125.00
Lem Kayu
18,000.00
20,000.00
18,000.00
20,000.00
OH
1,580,250.00
1,711,500.00
Pekerja
40,000.00
42,000.00
280,000.00
21
294,000.00
OH
Tukang Kayu
55,000.00
60,000.00
1,155,000.00
1,260,000.00
2.10
OH
Kepala Tukang
60,000.00
65,000.00
126,000.00
136,500.00
0.35
OH
Mandor
55,000.00
60,000.00
19,250.00
21,000.00
m3
9,428,125.00
10,025,125.00
Bahan
8,073,625.00
8,558,125.00
Tenaga
1.2
m3
6,700,000.00
7,100,000.00
8,040,000.00
1.25
kg
8,520,000.00
12,500.00
14,500.00
15,625.00
kg
18,125.00
Lem Kayu
18,000.00
20,000.00
18,000.00
20,000.00
6.00
OH
1,354,500.00
1,467,000.00
Pekerja
40,000.00
42,000.00
240,000.00
18.00
252,000.00
OH
Tukang Kayu
55,000.00
60,000.00
990,000.00
1,080,000.00
1.80
OH
Kepala Tukang
60,000.00
65,000.00
108,000.00
117,000.00
0.30
OH
Mandor
55,000.00
60,000.00
16,500.00
18,000.00
m2
371,665.00
386,330.00
Bahan
292,625.00
300,725.00
Tenaga
0.040
m3
7,300,000.00
7,500,000.00
292,000.00
0.05
Kg
300,000.00
12,500.00
14,500.00
625.00
725.00
0.35
OH
79,040.00
85,605.00
Pekerja
40,000.00
42,000.00
14,000.00
1.05
14,700.00
OH
Tukang Kayu
55,000.00
60,000.00
57,750.00
63,000.00
0.105
OH
Kepala Tukang
60,000.00
65,000.00
6,300.00
6,825.00
0.018
OH
Mandor
55,000.00
60,000.00
990.00
1,080.00
m2
518,650.00
545,500.00
Bahan
292,900.00
301,000.00
Tenaga
6.5.1
0.04
m3
7,300,000.00
7,500,000.00
292,000.00
0.050
kg
Lem Kayu
300,000.00
18,000.00
20,000.00
900.00
1,000.00
OH
225,750.00
244,500.00
Pekerja
40,000.00
42,000.00
40,000.00
3.0
42,000.00
OH
Tukang Kayu
55,000.00
60,000.00
165,000.00
180,000.00
0.30
OH
Kepala Tukang
60,000.00
65,000.00
18,000.00
19,500.00
0.05
OH
Mandor
55,000.00
60,000.00
2,750.00
3,000.00
m2
361,200.00
381,600.00
Bahan
180,600.00
186,000.00
6.5.2
Tenaga
6.6.1
0.024
m3
7,300,000.00
7,500,000.00
175,200.00
0.300
kg
Lem Kayu
180,000.00
18,000.00
20,000.00
5,400.00
6,000.00
0.800
OH
180,600.00
195,600.00
Pekerja
40,000.00
42,000.00
32,000.00
2.400
33,600.00
OH
Tukang Kayu
55,000.00
60,000.00
132,000.00
144,000.00
0.240
OH
Kepala Tukang
60,000.00
65,000.00
14,400.00
15,600.00
0.040
OH
Mandor
55,000.00
60,000.00
2,200.00
2,400.00
m2
1,578,750.00
1,662,500.00
Bahan
1,353,000.00
1,418,000.00
6.6.2
Tenaga
6.7.1
0.064
m3
21,000,000.00
22,000,000.00
1,344,000.00
0.5
kg
Lem Kayu
1,408,000.00
18,000.00
20,000.00
9,000.00
10,000.00
OH
225,750.00
244,500.00
Pekerja
40,000.00
42,000.00
40,000.00
42,000.00
OH
Tukang Kayu
55,000.00
60,000.00
165,000.00
180,000.00
0.3
OH
Kepala Tukang
60,000.00
65,000.00
18,000.00
19,500.00
0.05
OH
Mandor
55,000.00
60,000.00
2,750.00
3,000.00
6.7.2
149235156.xlsx.ms_office
23,749,625.00
20,933,625.00
20,000,000.00
6.3.2
6.7
MAKSIMUM
Rp
19,000,000.00
6.3.1
6.6
JUMLAH
MINIMUM
Rp
22,513,875.00
6.2.2
6.5
MAKSIMUM
Rp
Bahan
m3
6.2.1
6.3
MINIMUM
Rp
PEKERJAAN K A Y U
Membuat Kosen Pintu & Jendela Kayu klas I
1.1
6.1.2
6.2
URAIAN PEKERJAAN
SAT.
Tenaga
83/43
abk 6-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.8
KOEF
m2
6.8.1
257,935.00
187,500.00
182,500.00
0.030
Kg
12,500.00
14,500.00
375.00
0.500
435.00
Ltr
Lem Kayu
18,000.00
20,000.00
9,000.00
10,000.00
1.000
Lbr
55,000.00
60,000.00
55,000.00
60,000.00
158,025.00
171,150.00
0.700
OH
Pekerja
40,000.00
42,000.00
28,000.00
29,400.00
2.100
OH
Tukang Kayu
55,000.00
60,000.00
115,500.00
126,000.00
0.210
OH
Kepala Tukang
60,000.00
65,000.00
12,600.00
13,650.00
0.035
OH
Mandor
55,000.00
60,000.00
1,925.00
2,100.00
m2
431,855.00
458,035.00
Bahan
251,255.00
262,435.00
192,000.00
Tenaga
0.0256
m3
7,300,000.00
7,500,000.00
186,880.00
0.03
Kg
12,500.00
14,500.00
375.00
0.5
435.00
Ltr
Lem Kayu
18,000.00
20,000.00
9,000.00
10,000.00
Lbr
55,000.00
60,000.00
55,000.00
60,000.00
180,600.00
195,600.00
0.800
OH
Pekerja
40,000.00
42,000.00
32,000.00
33,600.00
2.400
OH
Tukang Kayu
55,000.00
60,000.00
132,000.00
144,000.00
0.240
OH
Kepala Tukang
60,000.00
65,000.00
14,400.00
15,600.00
0.040
OH
Mandor
55,000.00
60,000.00
2,200.00
2,400.00
m2
1,429,100.00
1,503,415.00
Bahan
1,261,875.00
1,322,175.00
Tenaga
0.06
m3
21,000,000.00
22,000,000.00
1,260,000.00
0.15
Kg
1,320,000.00
12,500.00
14,500.00
1,875.00
2,175.00
0.670
OH
167,225.00
181,240.00
Pekerja
40,000.00
42,000.00
26,800.00
2.000
28,140.00
OH
Tukang Kayu
55,000.00
60,000.00
110,000.00
120,000.00
0.200
OH
Kepala Tukang
60,000.00
65,000.00
12,000.00
13,000.00
0.335
OH
Mandor
55,000.00
60,000.00
18,425.00
20,100.00
m2
766,375.00
812,035.00
Bahan
585,775.00
616,435.00
550,000.00
Tenaga
6.11.1
0.025
m3
21,000,000.00
22,000,000.00
525,000.00
0.03
Kg
12,500.00
14,500.00
375.00
0.3
435.00
kg
Lem Kayu
18,000.00
20,000.00
5,400.00
6,000.00
Lbr
55,000.00
60,000.00
55,000.00
60,000.00
180,600.00
195,600.00
0.80
OH
Pekerja
40,000.00
42,000.00
32,000.00
33,600.00
2.40
OH
Tukang Kayu
55,000.00
60,000.00
132,000.00
144,000.00
0.24
OH
Kepala Tukang
60,000.00
65,000.00
14,400.00
15,600.00
0.04
OH
Mandor
55,000.00
60,000.00
2,200.00
2,400.00
m2
453,730.00
487,390.00
Bahan
261,815.00
279,535.00
187,500.00
6.11.2
Tenaga
6.12.1
0.025
m3
7,300,000.00
7,500,000.00
182,500.00
0.03
Kg
12,500.00
14,500.00
375.00
0.08
435.00
kg
Lem Kayu
18,000.00
20,000.00
1,440.00
1,600.00
Lbr
55,000.00
60,000.00
55,000.00
60,000.00
0.5
Lbr
Formika
45,000.00
60,000.00
22,500.00
30,000.00
191,915.00
207,855.00
0.850
OH
Pekerja
40,000.00
42,000.00
34,000.00
35,700.00
2.550
OH
Tukang Kayu
55,000.00
60,000.00
140,250.00
153,000.00
0.255
OH
Kepala Tukang
60,000.00
65,000.00
15,300.00
16,575.00
0.043
OH
Mandor
55,000.00
60,000.00
2,365.00
2,580.00
m3
8,538,000.00
9,079,200.00
Bahan
7,635,000.00
8,101,200.00
6.12.2
Tenaga
6.13.1
149235156.xlsx.ms_office
429,085.00
246,875.00
7,500,000.00
6.10.2
6.13
MAKSIMUM
Rp
7,300,000.00
6.10.1
6.12
JUMLAH
MINIMUM
Rp
404,900.00
6.9.2
6.11
MAKSIMUM
Rp
Bahan
m3
6.9.1
6.10
MINIMUM
Rp
Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)
0.025
6.8.2
6.9
URAIAN PEKERJAAN
SAT.
1.1
m3
6,700,000.00
7,100,000.00
7,370,000.00
15
Kg
7,810,000.00
Besi Strip
13,000.00
14,000.00
195,000.00
5.6
Kg
210,000.00
12,500.00
14,500.00
70,000.00
81,200.00
83/44
abk 6-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
6.13.2
6.14
Tenaga
903,000.00
978,000.00
42,000.00
160,000.00
168,000.00
12
OH
Tukang Kayu
55,000.00
60,000.00
660,000.00
720,000.00
1.2
OH
Kepala Tukang
60,000.00
65,000.00
72,000.00
78,000.00
0.2
OH
Mandor
55,000.00
60,000.00
11,000.00
12,000.00
m3
24,577,525.00
25,929,350.00
Bahan
23,065,000.00
24,291,200.00
1.2
m3
19,000,000.00
20,000,000.00
22,800,000.00
15
Kg
24,000,000.00
Besi Strip
13,000.00
14,000.00
195,000.00
5.6
Kg
210,000.00
12,500.00
14,500.00
70,000.00
81,200.00
6.7
OH
1,512,525.00
1,638,150.00
Pekerja
40,000.00
42,000.00
268,000.00
20.1
281,400.00
OH
Tukang Kayu
55,000.00
60,000.00
1,105,500.00
1,206,000.00
Tenaga
2.01
OH
Kepala Tukang
60,000.00
65,000.00
120,600.00
130,650.00
0.335
OH
Mandor
55,000.00
60,000.00
18,425.00
20,100.00
m3
8,144,300.00
8,650,300.00
Bahan
7,602,500.00
8,063,500.00
1.1
m3
6,700,000.00
7,100,000.00
7,370,000.00
15
Kg
7,810,000.00
Besi Strip
13,000.00
14,000.00
195,000.00
Kg
210,000.00
12,500.00
14,500.00
37,500.00
43,500.00
2.4
OH
541,800.00
586,800.00
Pekerja
40,000.00
42,000.00
96,000.00
7.2
100,800.00
OH
Tukang Kayu
55,000.00
60,000.00
396,000.00
432,000.00
0.72
OH
Kepala Tukang
60,000.00
65,000.00
43,200.00
46,800.00
0.12
OH
Mandor
55,000.00
60,000.00
6,600.00
7,200.00
m2
131,420.00
139,735.00
Bahan
121,045.00
128,585.00
Tenaga
6.16.1
0.014
m3
6,700,000.00
7,100,000.00
93,800.00
99,400.00
0.0036
m3
Reng (2x3) cm
6,700,000.00
7,100,000.00
24,120.00
25,560.00
0.25
Kg
12,500.00
14,500.00
3,125.00
3,625.00
10,375.00
11,150.00
0.1
OH
Pekerja
40,000.00
42,000.00
4,000.00
4,200.00
0.1
OH
Tukang Kayu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
m2
155,540.00
165,295.00
Bahan
145,165.00
154,145.00
6.16.2
Tenaga
6.17.1
0.014
m3
6,700,000.00
7,100,000.00
93,800.00
99,400.00
0.0072
m3
Reng (2x3) cm
6,700,000.00
7,100,000.00
48,240.00
51,120.00
0.25
Kg
12,500.00
14,500.00
3,125.00
3,625.00
10,375.00
11,150.00
0.1
OH
Pekerja
40,000.00
42,000.00
4,000.00
4,200.00
0.1
OH
Tukang Kayu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
m2
1,120,450.00
1,187,780.00
Bahan
1,108,000.00
1,174,400.00
6.17.2
Tenaga
6.18.1
0.165
m3
6,700,000.00
7,100,000.00
1,105,500.00
0.2
Kg
1,171,500.00
12,500.00
14,500.00
2,500.00
2,900.00
0.12
OH
12,450.00
13,380.00
Pekerja
40,000.00
42,000.00
4,800.00
0.12
5,040.00
OH
Tukang Kayu
55,000.00
60,000.00
6,600.00
7,200.00
0.012
OH
Kepala Tukang
60,000.00
65,000.00
720.00
780.00
0.006
OH
Mandor
55,000.00
60,000.00
330.00
360.00
m2
134,105.00
142,990.00
Bahan
105,680.00
112,240.00
6.18.2
6.19
Tenaga
6.19.1
149235156.xlsx.ms_office
MAKSIMUM
Rp
40,000.00
6.15.2
6.18
JUMLAH
MINIMUM
Rp
Pekerja
6.15.1
6.17
MAKSIMUM
Rp
OH
6.14.2
6.16
MINIMUM
Rp
6.14.1
6.15
URAIAN PEKERJAAN
SAT.
0.0154
m3
0.2
Kg
83/45
6,700,000.00
7,100,000.00
103,180.00
109,340.00
12,500.00
14,500.00
2,500.00
2,900.00
abk 6-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
6.19.2
6.20
Tenaga
6,000.00
6,300.00
0.30
OH
Tukang Kayu
55,000.00
60,000.00
16,500.00
18,000.00
0.030
OH
Kepala Tukang
60,000.00
65,000.00
1,800.00
1,950.00
0.075
OH
Mandor
55,000.00
60,000.00
4,125.00
4,500.00
m2
139,185.00
148,305.00
Bahan
112,335.00
119,355.00
0.0163
m3
6,700,000.00
7,100,000.00
109,210.00
0.25
Kg
115,730.00
12,500.00
14,500.00
3,125.00
3,625.00
0.2
OH
26,850.00
28,950.00
Pekerja
40,000.00
42,000.00
8,000.00
0.3
8,400.00
OH
Tukang Kayu
55,000.00
60,000.00
16,500.00
18,000.00
0.03
OH
Kepala Tukang
60,000.00
65,000.00
1,800.00
1,950.00
0.01
OH
Mandor
55,000.00
60,000.00
550.00
600.00
m'
244,525.00
256,850.00
Bahan
228,050.00
239,050.00
Tenaga
0.0108
m3
21,000,000.00
22,000,000.00
226,800.00
0.10
Kg
237,600.00
12,500.00
14,500.00
1,250.00
1,450.00
0.1
OH
16,475.00
17,800.00
Pekerja
40,000.00
42,000.00
4,000.00
0.2
4,200.00
OH
Tukang Kayu
55,000.00
60,000.00
11,000.00
12,000.00
0.020
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
m'
97,400.00
101,025.00
Bahan
80,925.00
83,225.00
Tenaga
0.011
m3
7,300,000.00
7,500,000.00
80,300.00
0.05
Kg
82,500.00
12,500.00
14,500.00
625.00
725.00
0.1
OH
16,475.00
17,800.00
Pekerja
40,000.00
42,000.00
4,000.00
0.2
4,200.00
OH
Tukang Kayu
55,000.00
60,000.00
11,000.00
12,000.00
6.22.2
Tenaga
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
m2
223,365.00
237,680.00
Bahan
189,475.00
200,975.00
6.23.1
0.028
m3
6,700,000.00
7,100,000.00
187,600.00
0.15
Kg
198,800.00
12,500.00
14,500.00
1,875.00
2,175.00
0.15
OH
33,890.00
36,705.00
Pekerja
40,000.00
42,000.00
6,000.00
0.45
6,300.00
OH
Tukang Kayu
55,000.00
60,000.00
24,750.00
27,000.00
0.045
OH
Kepala Tukang
60,000.00
65,000.00
2,700.00
2,925.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
m2
280,745.00
300,480.00
Bahan
246,855.00
263,775.00
198,800.00
6.23.2
Tenaga
6.24.1
0.028
m3
6,700,000.00
7,100,000.00
187,600.00
0.15
Kg
12,500.00
14,500.00
1,875.00
0.86
2,175.00
Lbr
55,000.00
60,000.00
47,300.00
51,600.00
0.56
Ltr
Lem
18,000.00
20,000.00
10,080.00
11,200.00
33,890.00
36,705.00
0.15
OH
Pekerja
40,000.00
42,000.00
6,000.00
6,300.00
0.45
OH
Tukang Kayu
55,000.00
60,000.00
24,750.00
27,000.00
0.045
OH
Kepala Tukang
60,000.00
65,000.00
2,700.00
2,925.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
m2
285,500.00
304,175.00
Bahan
150,050.00
157,475.00
6.24.2
Tenaga
6.26.1
149235156.xlsx.ms_office
30,750.00
42,000.00
6.22.1
6.26
28,425.00
MAKSIMUM
Rp
40,000.00
6.21.2
6.24
JUMLAH
MINIMUM
Rp
Pekerja
6.21.1
6.23
MAKSIMUM
Rp
OH
6.20.2
6.22
MINIMUM
Rp
0.15
6.20.1
6.21
URAIAN PEKERJAAN
SAT.
0.007
m3
21,000,000.00
22,000,000.00
147,000.00
0.1
Kg
154,000.00
12,500.00
14,500.00
1,250.00
0.15
Kg
1,450.00
12,000.00
13,500.00
1,800.00
2,025.00
83/46
abk 6-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
6.26.2
6.27
MAKSIMUM
Rp
Tenaga
JUMLAH
MINIMUM
Rp
135,450.00
MAKSIMUM
Rp
146,700.00
OH
Pekerja
40,000.00
42,000.00
24,000.00
25,200.00
1.8
OH
Tukang Kayu
55,000.00
60,000.00
99,000.00
108,000.00
0.18
OH
Kepala Tukang
60,000.00
65,000.00
10,800.00
11,700.00
0.03
OH
Mandor
55,000.00
60,000.00
1,650.00
1,800.00
m2
28,285.00
30,855.00
Bahan
22,625.00
24,725.00
0.4
Lbr
55,000.00
60,000.00
22,000.00
24,000.00
0.05
Kg
12,500.00
14,500.00
625.00
725.00
5,660.00
6,130.00
0.025
OH
Pekerja
40,000.00
42,000.00
1,000.00
1,050.00
0.075
OH
Tukang Kayu
55,000.00
60,000.00
4,125.00
4,500.00
0.0080
OH
Kepala Tukang
60,000.00
65,000.00
480.00
520.00
0.0010
OH
Mandor
55,000.00
60,000.00
55.00
60.00
m2
103,287.60
112,714.00
95,962.60
104,889.00
30,000.00
37,500.00
6.27.2
Tenaga
6.28.1
Bahan
1.500
m2
Bilik Bambu
0.014
m3
0.012
Kg
0.003
m'
0.1
OH
0.05
20,000.00
25,000.00
4,700,000.00
4,800,000.00
65,800.00
67,200.00
12,500.00
14,500.00
150.00
174.00
4,200.00
5,000.00
12.60
15.00
7,325.00
7,825.00
Pekerja
40,000.00
42,000.00
4,000.00
4,200.00
OH
Tukang Kayu
55,000.00
60,000.00
2,750.00
3,000.00
0.005
OH
Kepala Tukang
60,000.00
65,000.00
300.00
325.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
6.28.2
149235156.xlsx.ms_office
MINIMUM
Rp
0.6
6.27.1
6.28
URAIAN PEKERJAAN
SAT.
Tenaga
83/47
abk 6-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
URAIAN PEKERJAAN
m3
PEKERJAAN B E T O N
Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
639,729.29
674,127.50
Bahan
552,359.29
581,527.50
6.1.1
247
Kg
Portland Semen
869
Kg
999
308,750.00
139.29
150.00
121,039.29
130,350.00
Kg
133.33
140.74
133,200.00
140,600.00
215
ltr
Air
8.00
8.50
1,720.00
1,827.50
87,370.00
92,600.00
1.65
OH
Pekerja
40,000.00
42,000.00
66,000.00
69,300.00
0.275
OH
Tukang Batu
55,000.00
60,000.00
15,125.00
16,500.00
0.028
OH
Kepala Tukang
60,000.00
65,000.00
1,680.00
1,820.00
0.083
OH
Mandor
55,000.00
60,000.00
4,565.00
4,980.00
m3
Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78
670,551.90
706,057.13
Bahan
583,181.90
613,457.13
Tenaga
276
Kg
Portland Semen
1,200.00
1,250.00
331,200.00
828
kg
345,000.00
Pasir Beton
139.29
150.00
115,328.57
1,012
124,200.00
kg
133.33
140.74
134,933.33
142,429.63
215
ltr
Air
8.00
8.50
1,720.00
1,827.50
87,370.00
92,600.00
1.65
OH
Pekerja
40,000.00
42,000.00
66,000.00
69,300.00
0.275
OH
Tukang Batu
55,000.00
60,000.00
15,125.00
16,500.00
0.028
OH
Kepala Tukang
60,000.00
65,000.00
1,680.00
1,820.00
0.083
OH
Mandor
55,000.00
60,000.00
4,565.00
4,980.00
m3
Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72
694,779.29
731,160.83
Bahan
607,409.29
638,560.83
Tenaga
299
Kg
Portland Semen
799
kg
1,017
215
1,200.00
1,250.00
358,800.00
373,750.00
Pasir Beton
139.29
150.00
111,289.29
119,850.00
kg
133.33
140.74
135,600.00
143,133.33
ltr
Air
8.00
8.50
1,720.00
1,827.50
6.3.2
87,370.00
92,600.00
1.65
OH
Tenaga
Pekerja
40,000.00
42,000.00
66,000.00
69,300.00
0.275
OH
Tukang Batu
55,000.00
60,000.00
15,125.00
16,500.00
0.028
OH
Kepala Tukang
60,000.00
65,000.00
1,680.00
1,820.00
0.083
OH
Mandor
55,000.00
60,000.00
4,565.00
4,980.00
m3
Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
599,445.48
631,750.74
Bahan
538,915.48
567,690.74
6.4.1
230
Kg
Portland Semen
1,200.00
1,250.00
276,000.00
893
kg
287,500.00
Pasir Beton
139.29
150.00
124,382.14
1,027
133,950.00
kg
133.33
140.74
136,933.33
144,540.74
200
ltr
Air
8.00
8.50
1,600.00
1,700.00
60,530.00
64,060.00
1.2
OH
Pekerja
40,000.00
42,000.00
48,000.00
50,400.00
0.2
OH
Tukang Batu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.006
OH
Mandor
55,000.00
60,000.00
330.00
360.00
m3
Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
723,347.14
760,749.72
Bahan
635,977.14
668,149.72
6.4.2
Tenaga
6.5.1
326
Kg
Portland Semen
760
Kg
1,029
215
1,200.00
1,250.00
391,200.00
407,500.00
Pasir Beton
139.29
150.00
105,857.14
114,000.00
Kg
133.33
140.74
137,200.00
144,822.22
ltr
Air
8.00
8.50
1,720.00
1,827.50
6.5.2
149235156.xlsx.ms_office
MAKSIMUM
Rp
Pasir Beton
6.3.1
6.5
MINIMUM
Rp
296,400.00
6.2.2
6.4
MAKSIMUM
Rp
1,250.00
6.2.1
6.3
MINIMUM
Rp
1,200.00
6.1.2
6.2
JUMLAH
SAT.
87,370.00
92,600.00
1.65
OH
Tenaga
Pekerja
40,000.00
42,000.00
66,000.00
69,300.00
0.275
OH
Tukang Batu
55,000.00
60,000.00
15,125.00
16,500.00
0.028
OH
Kepala Tukang
60,000.00
65,000.00
1,680.00
1,820.00
0.083
OH
Mandor
55,000.00
60,000.00
4,565.00
4,980.00
83/48
abk 7-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.6
KOEF
1
SAT.
URAIAN PEKERJAAN
m3
Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61
6.6.1
663,404.52
696,581.20
422,400.00
440,000.00
Pasir Beton
139.29
150.00
101,817.86
109,650.00
Kg
133.33
140.74
137,466.67
145,103.70
ltr
Air
8.00
8.50
1,720.00
1,827.50
731
Kg
1,031
215
87,370.00
92,600.00
1.650
OH
Tenaga
Pekerja
40,000.00
42,000.00
66,000.00
69,300.00
0.275
OH
Tukang Batu
55,000.00
60,000.00
15,125.00
16,500.00
0.028
OH
Kepala Tukang
60,000.00
65,000.00
1,680.00
1,820.00
0.083
OH
Mandor
55,000.00
60,000.00
4,565.00
4,980.00
m3
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
771,111.43
810,233.06
Bahan
683,741.43
717,633.06
371
Kg
Portland Semen
1,200.00
1,250.00
445,200.00
698
Kg
463,750.00
Pasir Beton
139.29
150.00
97,221.43
1,047
104,700.00
Kg
133.33
140.74
139,600.00
147,355.56
ltr
Air
8.00
8.50
1,720.00
1,827.50
6.7.2
87,370.00
92,600.00
1.650
OH
Tenaga
Pekerja
40,000.00
42,000.00
66,000.00
69,300.00
0.275
OH
Tukang Batu
55,000.00
60,000.00
15,125.00
16,500.00
0.028
OH
Kepala Tukang
60,000.00
65,000.00
1,680.00
1,820.00
0.083
OH
Mandor
55,000.00
60,000.00
4,565.00
4,980.00
m3
Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56
784,809.05
824,457.13
Bahan
697,439.05
731,857.13
6.8.1
384
Kg
Portland Semen
1,200.00
1,250.00
460,800.00
692
Kg
480,000.00
Pasir Beton
139.29
150.00
96,385.71
1,039
103,800.00
Kg
133.33
140.74
138,533.33
215
146,229.63
ltr
Air
8.00
8.50
1,720.00
1,827.50
6.8.2
87,370.00
92,600.00
1.650
OH
Tenaga
Pekerja
40,000.00
42,000.00
66,000.00
69,300.00
0.275
OH
Tukang Batu
55,000.00
60,000.00
15,125.00
16,500.00
0.028
OH
Kepala Tukang
60,000.00
65,000.00
1,680.00
1,820.00
0.083
OH
Mandor
55,000.00
60,000.00
4,565.00
4,980.00
m3
Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53
808,361.43
848,927.50
Bahan
720,991.43
756,327.50
6.9.1
406
Kg
Portland Semen
1,200.00
1,250.00
487,200.00
684
kg
507,500.00
Pasir Beton
139.29
150.00
95,271.43
1,026
102,600.00
kg
133.33
140.74
136,800.00
215
144,400.00
ltr
Air
8.00
8.50
1,720.00
1,827.50
6.9.2
6.10
87,370.00
92,600.00
1.650
OH
Tenaga
Pekerja
40,000.00
42,000.00
66,000.00
69,300.00
0.275
OH
Tukang Batu
55,000.00
60,000.00
15,125.00
16,500.00
0.028
OH
Kepala Tukang
60,000.00
65,000.00
1,680.00
1,820.00
0.083
OH
Mandor
55,000.00
60,000.00
4,565.00
4,980.00
m3
Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm, w/c = 0,52
815,676.90
856,523.80
Bahan
728,306.90
763,923.80
6.10.1
413
Kg
Portland Semen
1,200.00
1,250.00
495,600.00
681
Kg
516,250.00
Pasir Beton
139.29
150.00
94,853.57
1,021
102,150.00
Kg
133.33
140.74
136,133.33
215
143,696.30
ltr
Air
8.00
8.50
1,720.00
1,827.50
6.10.2
149235156.xlsx.ms_office
MAKSIMUM
Rp
789,181.20
1,250.00
Portland Semen
215
6.9
JUMLAH
MINIMUM
Rp
750,774.52
1,200.00
Kg
6.7.1
6.8
MAKSIMUM
Rp
Bahan
352
6.6.2
6.7
MINIMUM
Rp
87,370.00
92,600.00
1.650
OH
Tenaga
Pekerja
40,000.00
42,000.00
66,000.00
69,300.00
0.275
OH
Tukang Batu
55,000.00
60,000.00
15,125.00
16,500.00
0.028
OH
Kepala Tukang
60,000.00
65,000.00
1,680.00
1,820.00
0.083
OH
Mandor
55,000.00
60,000.00
4,565.00
4,980.00
83/49
abk 7-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.11
KOEF
1
SAT.
URAIAN PEKERJAAN
m3
Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm, w/c = 0,49
6.11.1
755,974.76
792,662.69
526,800.00
548,750.00
Pasir Beton
139.29
150.00
93,321.43
100,500.00
Kg
133.33
140.74
134,133.33
141,585.19
215
ltr
Air
8.00
8.50
1,720.00
1,827.50
111,125.00
117,775.00
2.1
OH
Pekerja
40,000.00
42,000.00
84,000.00
88,200.00
0.35
OH
Tukang Batu
55,000.00
60,000.00
19,250.00
21,000.00
0.035
OH
Kepala Tukang
60,000.00
65,000.00
2,100.00
2,275.00
0.105
OH
Mandor
55,000.00
60,000.00
5,775.00
6,300.00
m3
Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48
876,681.90
920,393.24
Bahan
765,556.90
802,618.24
670
Kg
1,006
Tenaga
448
Kg
Portland Semen
1,200.00
1,250.00
537,600.00
667
Kg
560,000.00
Pasir Beton
139.29
150.00
92,903.57
1,000
100,050.00
Kg
133.33
140.74
133,333.33
140,740.74
215
ltr
Air
8.00
8.50
1,720.00
1,827.50
111,125.00
117,775.00
2.10
OH
Pekerja
40,000.00
42,000.00
84,000.00
88,200.00
0.350
OH
Tukang Batu
55,000.00
60,000.00
19,250.00
21,000.00
0.035
OH
Kepala Tukang
60,000.00
65,000.00
2,100.00
2,275.00
0.105
OH
Mandor
55,000.00
60,000.00
5,775.00
6,300.00
Kg
114,540.00
120,635.00
Bahan
107,250.00
112,800.00
Tenaga
10
6.17.1
10.50
Kg
10,000.00
10,500.00
105,000.00
110,250.00
0.150
Kg
Kawat Beton
15,000.00
17,000.00
2,250.00
2,550.00
7,290.00
7,835.00
0.07
OH
Pekerja
40,000.00
42,000.00
2,800.00
2,940.00
0.07
OH
Tukang Besi
55,000.00
60,000.00
3,850.00
4,200.00
0.007
OH
Kepala Tukang
60,000.00
65,000.00
420.00
455.00
0.004
OH
Mandor
55,000.00
60,000.00
220.00
240.00
Kg
169,465.00
187,905.00
Bahan
164,250.00
182,300.00
6.17.2
Tenaga
10
6.18.1
10.5
Kg
15,500.00
17,200.00
162,750.00
180,600.00
0.1
Kg
Kawat Beton
15,000.00
17,000.00
1,500.00
1,700.00
5,215.00
5,605.00
0.05
OH
Pekerja
40,000.00
42,000.00
2,000.00
2,100.00
0.05
OH
Tukang Besi
55,000.00
60,000.00
2,750.00
3,000.00
0.005
OH
Kepala Tukang
60,000.00
65,000.00
300.00
325.00
0.003
OH
Mandor
55,000.00
60,000.00
165.00
180.00
Kg
17,580.00
19,400.00
Bahan
15,030.00
16,660.00
6.18.2
6.19
Tenaga
6.19.1
1.02
Kg
14,000.00
15,500.00
14,280.00
15,810.00
0.05
Kg
Kawat Beton
15,000.00
17,000.00
750.00
850.00
6.19.2
6.20
2,550.00
2,740.00
0.025
OH
Tenaga
Pekerja
40,000.00
42,000.00
1,000.00
1,050.00
0.025
OH
Tukang Besi
55,000.00
60,000.00
1,375.00
1,500.00
0.002
OH
Kepala Tukang
60,000.00
65,000.00
120.00
130.00
0.001
OH
Mandor
55,000.00
60,000.00
55.00
60.00
m2
84,640.00
90,040.00
Bahan
46,550.00
49,350.00
6.20.1
0.04
m3
1,050,000.00
1,100,000.00
42,000.00
0.3
Kg
44,000.00
12,500.00
14,500.00
3,750.00
0.1
Ltr
4,350.00
Minyak Bekisting
8,000.00
10,000.00
800.00
1,000.00
0.52
OH
38,090.00
40,690.00
Pekerja
40,000.00
42,000.00
20,800.00
0.26
21,840.00
OH
Tukang Kayu
55,000.00
60,000.00
14,300.00
15,600.00
0.026
OH
Kepala Tukang
60,000.00
65,000.00
1,560.00
1,690.00
0.026
OH
Mandor
55,000.00
60,000.00
1,430.00
1,560.00
6.20.2
149235156.xlsx.ms_office
MAKSIMUM
Rp
910,437.69
1,250.00
Portland Semen
6.12.2
6.18
JUMLAH
MINIMUM
Rp
867,099.76
1,200.00
Kg
6.12.1
6.17
MAKSIMUM
Rp
Bahan
439
6.11.2
6.12
MINIMUM
Rp
Tenaga
83/50
abk 7-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.21
KOEF
m2
6.21.1
95,540.00
51,800.00
54,850.00
1,100,000.00
47,250.00
0.3
Kg
49,500.00
12,500.00
14,500.00
3,750.00
0.1
Ltr
4,350.00
Minyak Bekisting
8,000.00
10,000.00
800.00
1,000.00
0.52
OH
38,090.00
40,690.00
Pekerja
40,000.00
42,000.00
20,800.00
0.26
21,840.00
OH
Tukang Kayu
55,000.00
60,000.00
14,300.00
15,600.00
0.026
OH
Kepala Tukang
60,000.00
65,000.00
1,560.00
1,690.00
0.026
OH
Mandor
55,000.00
60,000.00
1,430.00
1,560.00
m2
258,695.00
280,445.00
Bahan
210,350.00
228,800.00
Tenaga
0.04
m3
1,050,000.00
1,100,000.00
42,000.00
0.4
Kg
44,000.00
12,500.00
14,500.00
5,000.00
0.2
5,800.00
Ltr
Minyak Bekisting
8,000.00
10,000.00
1,600.00
0.015
2,000.00
m3
5,000,000.00
5,400,000.00
75,000.00
81,000.00
0.35
Lbr
145,000.00
160,000.00
50,750.00
56,000.00
Btg
18,000.00
20,000.00
36,000.00
40,000.00
48,345.00
51,645.00
0.66
OH
Pekerja
40,000.00
42,000.00
26,400.00
27,720.00
0.33
OH
Tukang Kayu
55,000.00
60,000.00
18,150.00
19,800.00
0.033
OH
Kepala Tukang
60,000.00
65,000.00
1,980.00
2,145.00
0.033
OH
Mandor
55,000.00
60,000.00
1,815.00
1,980.00
m2
273,695.00
296,645.00
Bahan
225,350.00
245,000.00
Tenaga
0.04
m3
1,050,000.00
1,100,000.00
42,000.00
0.4
Kg
44,000.00
12,500.00
14,500.00
5,000.00
0.2
5,800.00
Ltr
Minyak Bekisting
8,000.00
10,000.00
1,600.00
0.018
2,000.00
m3
5,000,000.00
5,400,000.00
90,000.00
97,200.00
0.35
Lbr
145,000.00
160,000.00
50,750.00
56,000.00
Btg
18,000.00
20,000.00
36,000.00
40,000.00
48,345.00
51,645.00
0.66
OH
Pekerja
40,000.00
42,000.00
26,400.00
27,720.00
0.33
OH
Tukang Kayu
55,000.00
60,000.00
18,150.00
19,800.00
0.033
OH
Kepala Tukang
60,000.00
65,000.00
1,980.00
2,145.00
0.033
OH
Mandor
55,000.00
60,000.00
1,815.00
1,980.00
m2
330,695.00
360,445.00
Bahan
282,350.00
308,800.00
6.23.2
Tenaga
6.24.1
0.04
m3
1,050,000.00
1,100,000.00
42,000.00
0.4
Kg
44,000.00
12,500.00
14,500.00
5,000.00
0.2
5,800.00
Ltr
Minyak Bekisting
8,000.00
10,000.00
1,600.00
0.015
2,000.00
m3
5,000,000.00
5,400,000.00
75,000.00
81,000.00
0.35
Lbr
145,000.00
160,000.00
50,750.00
56,000.00
Btg
18,000.00
20,000.00
108,000.00
120,000.00
48,345.00
51,645.00
0.66
OH
Pekerja
40,000.00
42,000.00
26,400.00
27,720.00
0.33
OH
Tukang Kayu
55,000.00
60,000.00
18,150.00
19,800.00
0.033
OH
Kepala Tukang
60,000.00
65,000.00
1,980.00
2,145.00
0.033
OH
Mandor
55,000.00
60,000.00
1,815.00
1,980.00
m2
319,195.00
350,445.00
Bahan
270,850.00
298,800.00
6.24.2
Tenaga
6.25.1
149235156.xlsx.ms_office
MAKSIMUM
Rp
1,050,000.00
6.23.1
6.25
JUMLAH
MINIMUM
Rp
89,890.00
6.22.2
6.24
MAKSIMUM
Rp
Bahan
m3
6.22.1
6.23
MINIMUM
Rp
0.045
6.21.2
6.22
URAIAN PEKERJAAN
SAT.
0.03
m3
1,050,000.00
1,100,000.00
31,500.00
0.4
Kg
33,000.00
12,500.00
14,500.00
5,000.00
0.2
5,800.00
Ltr
Minyak Bekisting
8,000.00
10,000.00
1,600.00
0.02
2,000.00
m3
5,000,000.00
5,400,000.00
100,000.00
108,000.00
0.35
Lbr
145,000.00
160,000.00
50,750.00
56,000.00
Btg
18,000.00
20,000.00
54,000.00
60,000.00
Buah
7,000.00
8,500.00
28,000.00
34,000.00
83/51
abk 7-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
6.25.2
6.26
URAIAN PEKERJAAN
SAT.
MINIMUM
Rp
MAKSIMUM
Rp
Tenaga
48,345.00
51,645.00
OH
Pekerja
40,000.00
42,000.00
26,400.00
27,720.00
0.33
OH
Tukang Kayu
55,000.00
60,000.00
18,150.00
19,800.00
0.033
OH
Kepala Tukang
60,000.00
65,000.00
1,980.00
2,145.00
0.033
OH
Mandor
55,000.00
60,000.00
1,815.00
1,980.00
m2
247,795.00
268,945.00
Bahan
199,450.00
217,300.00
0.03
m3
1,050,000.00
1,100,000.00
31,500.00
0.4
Kg
33,000.00
12,500.00
14,500.00
5,000.00
0.15
5,800.00
Ltr
Minyak Bekisting
8,000.00
10,000.00
1,200.00
0.015
1,500.00
m3
5,000,000.00
5,400,000.00
75,000.00
81,000.00
0.35
Lbr
145,000.00
160,000.00
50,750.00
56,000.00
Btg
18,000.00
20,000.00
36,000.00
40,000.00
48,345.00
51,645.00
0.66
OH
Pekerja
40,000.00
42,000.00
26,400.00
27,720.00
0.33
OH
Tukang Kayu
55,000.00
60,000.00
18,150.00
19,800.00
0.033
OH
Kepala Tukang
60,000.00
65,000.00
1,980.00
2,145.00
0.033
OH
Mandor
55,000.00
60,000.00
1,815.00
1,980.00
m2
53,710.00
57,845.00
Bahan
44,220.00
47,740.00
29,040.00
6.26.2
6.27.1
0.0264
m3
Kayu Terentang
1,050,000.00
1,100,000.00
27,720.00
0.6
kg
12,500.00
14,500.00
7,500.00
0.5
m3
8,700.00
18,000.00
20,000.00
9,000.00
10,000.00
0.15
OH
9,490.00
10,105.00
Pekerja
40,000.00
42,000.00
6,000.00
0.05
6,300.00
OH
Tukang Kayu
55,000.00
60,000.00
2,750.00
3,000.00
0.005
OH
Kepala Tukang
60,000.00
65,000.00
300.00
325.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
m3
2,851,375.00
3,005,150.00
Bahan
2,495,000.00
2,625,050.00
6.27.2
6.28
Tenaga
6.28.1
0.2
m3
1,050,000.00
1,100,000.00
210,000.00
1.5
Kg
220,000.00
12,500.00
14,500.00
18,750.00
0.4
Ltr
21,750.00
Minyak Bekisting
8,000.00
10,000.00
3,200.00
157.5
4,000.00
Kg
10,000.00
10,500.00
1,575,000.00
1,653,750.00
2.25
Kg
Kawat Beton
15,000.00
17,000.00
33,750.00
38,250.00
336
Kg
Portland Semen
1,200.00
1,250.00
403,200.00
420,000.00
0.54
m3
Pasir Beton
195,000.00
210,000.00
105,300.00
113,400.00
0.81
m3
Kerikil Beton
180,000.00
190,000.00
145,800.00
153,900.00
356,375.00
380,100.00
5.3
OH
Pekerja
40,000.00
42,000.00
212,000.00
222,600.00
0.275
OH
Tukang batu
55,000.00
60,000.00
15,125.00
16,500.00
1.30
OH
Tukang Kayu
55,000.00
60,000.00
71,500.00
78,000.00
1.05
OH
Tukang Besi
55,000.00
60,000.00
57,750.00
63,000.00
0.262
OH
Kepala Tukang
60,000.00
65,000.00
15,720.00
17,030.00
0.265
OH
Mandor
55,000.00
60,000.00
14,575.00
15,900.00
m3
3,516,525.00
3,706,700.00
Bahan
3,112,600.00
3,275,300.00
6.28.2
6.29
Tenaga
6.29.1
0.27
m3
1,050,000.00
1,100,000.00
283,500.00
Kg
297,000.00
12,500.00
14,500.00
25,000.00
0.6
Ltr
29,000.00
Minyak Bekisting
8,000.00
10,000.00
4,800.00
210
6,000.00
Kg
10,000.00
10,500.00
2,100,000.00
2,205,000.00
15,000.00
17,000.00
45,000.00
51,000.00
1,200.00
1,250.00
403,200.00
420,000.00
Kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
195,000.00
210,000.00
105,300.00
113,400.00
0.81
m3
Kerikil Beton
180,000.00
190,000.00
145,800.00
153,900.00
403,925.00
431,400.00
5.65
OH
Pekerja
40,000.00
42,000.00
226,000.00
237,300.00
0.275
OH
Tukang batu
55,000.00
60,000.00
15,125.00
16,500.00
1.56
OH
Tukang Kayu
55,000.00
60,000.00
85,800.00
93,600.00
1.4
OH
Tukang Besi
55,000.00
60,000.00
77,000.00
84,000.00
0.323
OH
Kepala Tukang
60,000.00
65,000.00
19,380.00
20,995.00
0.283
OH
Mandor
55,000.00
60,000.00
15,565.00
16,980.00
6.29.2
149235156.xlsx.ms_office
MAKSIMUM
Rp
0.66
6.26.1
6.27
JUMLAH
MINIMUM
Rp
Tenaga
83/52
abk 7-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.30
KOEF
m3
6.30.1
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
6,522,270.00
6,944,275.00
5,975,300.00
6,359,300.00
1,050,000.00
1,100,000.00
420,000.00
Kg
440,000.00
12,500.00
14,500.00
50,000.00
Ltr
58,000.00
Minyak Bekisting
8,000.00
10,000.00
16,000.00
315
20,000.00
kg
10,000.00
10,500.00
3,150,000.00
3,307,500.00
15,000.00
17,000.00
67,500.00
76,500.00
1,200.00
1,250.00
403,200.00
420,000.00
4.5
kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
195,000.00
210,000.00
105,300.00
113,400.00
0.81
m3
Kerikil Beton
180,000.00
190,000.00
145,800.00
153,900.00
0.15
m3
5,000,000.00
5,400,000.00
750,000.00
810,000.00
3.5
Lbr
Plywood 9 mm
145,000.00
160,000.00
507,500.00
560,000.00
20
Btg
18,000.00
20,000.00
360,000.00
400,000.00
546,970.00
584,975.00
7.05
OH
Pekerja
40,000.00
42,000.00
282,000.00
296,100.00
0.275
OH
Tukang batu
55,000.00
60,000.00
15,125.00
16,500.00
1.65
OH
Tukang Kayu
55,000.00
60,000.00
90,750.00
99,000.00
2.1
OH
Tukang Besi
55,000.00
60,000.00
115,500.00
126,000.00
0.403
OH
Kepala Tukang
60,000.00
65,000.00
24,180.00
26,195.00
0.353
OH
Mandor
55,000.00
60,000.00
19,415.00
21,180.00
m3
5,056,445.00
5,388,625.00
Bahan
4,582,100.00
4,881,700.00
Tenaga
0.32
m3
1,050,000.00
1,100,000.00
336,000.00
3.2
Kg
352,000.00
12,500.00
14,500.00
40,000.00
1.6
Ltr
46,400.00
Minyak Bekisting
8,000.00
10,000.00
12,800.00
210
16,000.00
Kg
10,000.00
10,500.00
2,100,000.00
2,205,000.00
15,000.00
17,000.00
45,000.00
51,000.00
1,200.00
1,250.00
403,200.00
420,000.00
Kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
195,000.00
210,000.00
105,300.00
113,400.00
0.81
m3
Kerikil Beton
180,000.00
190,000.00
145,800.00
153,900.00
0.14
m3
5,000,000.00
5,400,000.00
700,000.00
756,000.00
2.8
Lbr
Plywood 9 mm
145,000.00
160,000.00
406,000.00
448,000.00
16
Btg
18,000.00
20,000.00
288,000.00
320,000.00
474,345.00
506,925.00
6.35
OH
Pekerja
40,000.00
42,000.00
254,000.00
266,700.00
0.275
OH
Tukang batu
55,000.00
60,000.00
15,125.00
16,500.00
1.65
OH
Tukang Kayu
55,000.00
60,000.00
90,750.00
99,000.00
1.4
OH
Tukang Besi
55,000.00
60,000.00
77,000.00
84,000.00
0.333
OH
Kepala Tukang
60,000.00
65,000.00
19,980.00
21,645.00
0.318
OH
Mandor
55,000.00
60,000.00
17,490.00
19,080.00
m3
4,620,700.00
4,942,925.00
Bahan
4,233,850.00
4,529,700.00
6.31.2
Tenaga
6.32.1
0.32
m3
1,050,000.00
1,100,000.00
336,000.00
3.2
Kg
352,000.00
12,500.00
14,500.00
40,000.00
1.6
Ltr
46,400.00
Minyak Bekisting
8,000.00
10,000.00
12,800.00
157.5
16,000.00
Kg
10,000.00
10,500.00
1,575,000.00
1,653,750.00
2.25
Kg
Kawat Beton
15,000.00
17,000.00
33,750.00
38,250.00
336
Kg
Portland Semen
1,200.00
1,250.00
403,200.00
420,000.00
0.54
m3
Pasir Beton
195,000.00
210,000.00
105,300.00
113,400.00
0.81
m3
Kerikil Beton
180,000.00
190,000.00
145,800.00
153,900.00
0.12
m3
5,000,000.00
5,400,000.00
600,000.00
648,000.00
2.8
Lbr
Plywood 9 mm
145,000.00
160,000.00
406,000.00
448,000.00
32
Btg
18,000.00
20,000.00
576,000.00
640,000.00
386,850.00
413,225.00
5.3
OH
Pekerja
40,000.00
42,000.00
212,000.00
222,600.00
0.275
OH
Tukang batu
55,000.00
60,000.00
15,125.00
16,500.00
1.3
OH
Tukang Kayu
55,000.00
60,000.00
71,500.00
78,000.00
1.05
OH
Tukang Besi
55,000.00
60,000.00
57,750.00
63,000.00
0.265
OH
Kepala Tukang
60,000.00
65,000.00
15,900.00
17,225.00
0.265
OH
Mandor
55,000.00
60,000.00
14,575.00
15,900.00
6.32.2
149235156.xlsx.ms_office
MAKSIMUM
Rp
Bahan
m3
6.31.1
6.32
MINIMUM
Rp
0.4
6.30.2
6.31
URAIAN PEKERJAAN
SAT.
Tenaga
83/53
abk 7-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.33
KOEF
1
m3
6.33.1
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
4,592,520.00
4,910,730.00
4,205,850.00
4,497,700.00
1,050,000.00
1,100,000.00
252,000.00
3.2
Kg
264,000.00
12,500.00
14,500.00
40,000.00
1.6
Ltr
46,400.00
Minyak Bekisting
8,000.00
10,000.00
12,800.00
157.5
16,000.00
Kg
10,000.00
10,500.00
1,575,000.00
1,653,750.00
2.25
Kg
Kawat Beton
15,000.00
17,000.00
33,750.00
38,250.00
336
Kg
Portland Semen
1,200.00
1,250.00
403,200.00
420,000.00
0.54
m3
Pasir Beton
195,000.00
210,000.00
105,300.00
113,400.00
0.81
m3
Kerikil Beton
180,000.00
190,000.00
145,800.00
153,900.00
0.16
m3
5,000,000.00
5,400,000.00
800,000.00
864,000.00
2.8
Lbr
Plywood 9 mm
145,000.00
160,000.00
406,000.00
448,000.00
24
Btg
18,000.00
20,000.00
432,000.00
480,000.00
386,670.00
413,030.00
5.3
OH
Pekerja
40,000.00
42,000.00
212,000.00
222,600.00
0.275
OH
Tukang batu
55,000.00
60,000.00
15,125.00
16,500.00
1.3
OH
Tukang Kayu
55,000.00
60,000.00
71,500.00
78,000.00
1.05
OH
Tukang Besi
55,000.00
60,000.00
57,750.00
63,000.00
0.262
OH
Kepala Tukang
60,000.00
65,000.00
15,720.00
17,030.00
0.265
OH
Mandor
55,000.00
60,000.00
14,575.00
15,900.00
m3
4,687,270.00
4,990,175.00
Bahan
4,248,400.00
4,520,800.00
Tenaga
0.25
m3
1,050,000.00
1,100,000.00
262,500.00
Kg
275,000.00
12,500.00
14,500.00
37,500.00
1.2
Ltr
43,500.00
Minyak Bekisting
8,000.00
10,000.00
9,600.00
210
12,000.00
Kg
10,000.00
10,500.00
2,100,000.00
2,205,000.00
15,000.00
17,000.00
45,000.00
51,000.00
1,200.00
1,250.00
403,200.00
420,000.00
Kg
Kawat Beton
336
Kg
Portland Semen
0.54
m3
Pasir Beton
195,000.00
210,000.00
105,300.00
113,400.00
0.81
m3
Kerikil Beton
180,000.00
190,000.00
145,800.00
153,900.00
0.105
m3
5,000,000.00
5,400,000.00
525,000.00
567,000.00
2.5
Lbr
Plywood 9 mm
145,000.00
160,000.00
362,500.00
400,000.00
14
Btg
18,000.00
20,000.00
252,000.00
280,000.00
438,870.00
469,375.00
5.65
OH
Pekerja
40,000.00
42,000.00
226,000.00
237,300.00
0.275
OH
Tukang batu
55,000.00
60,000.00
15,125.00
16,500.00
1.56
OH
Tukang Kayu
55,000.00
60,000.00
85,800.00
93,600.00
1.4
OH
Tukang Besi
55,000.00
60,000.00
77,000.00
84,000.00
0.323
OH
Kepala Tukang
60,000.00
65,000.00
19,380.00
20,995.00
0.283
OH
Mandor
55,000.00
60,000.00
15,565.00
16,980.00
m'
51,845.00
54,670.00
Bahan
40,490.00
42,580.00
2,200.00
6.34.2
Tenaga
6.35.1
0.002
m3
1,050,000.00
1,100,000.00
2,100.00
0.01
Kg
12,500.00
14,500.00
125.00
145.00
Ltr
10,000.00
10,500.00
30,000.00
31,500.00
0.045
Kg
Kawat Beton
15,000.00
17,000.00
675.00
765.00
Kg
Portland Semen
1,200.00
1,250.00
4,800.00
5,000.00
0.006
m3
Pasir Beton
195,000.00
210,000.00
1,170.00
1,260.00
0.009
m3
Kerikil Beton
180,000.00
190,000.00
1,620.00
1,710.00
11,355.00
12,090.00
0.18
OH
Pekerja
40,000.00
42,000.00
7,200.00
7,560.00
0.02
OH
Tukang batu
55,000.00
60,000.00
1,100.00
1,200.00
0.02
OH
Tukang Kayu
55,000.00
60,000.00
1,100.00
1,200.00
0.02
OH
Tukang Besi
55,000.00
60,000.00
1,100.00
1,200.00
0.006
OH
Kepala Tukang
60,000.00
65,000.00
360.00
390.00
0.009
OH
Mandor
55,000.00
60,000.00
495.00
540.00
6.35.2
149235156.xlsx.ms_office
MAKSIMUM
Rp
Bahan
m3
6.34.1
6.35
MINIMUM
Rp
0.24
6.33.2
6.34
URAIAN PEKERJAAN
SAT.
Tenaga
83/54
abk 7-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.36
KOEF
1
m'
6.36.1
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
69,955.00
73,819.00
Bahan
51,205.00
53,855.00
3,300.00
0.003
m3
1,050,000.00
1,100,000.00
3,150.00
0.02
Kg
12,500.00
14,500.00
250.00
3.6
290.00
Ltr
10,000.00
10,500.00
36,000.00
37,800.00
0.05
Kg
Kawat Beton
15,000.00
17,000.00
750.00
850.00
5.5
Kg
Portland Semen
1,200.00
1,250.00
6,600.00
6,875.00
0.009
m3
Pasir Beton
195,000.00
210,000.00
1,755.00
1,890.00
0.015
m3
Kerikil Beton
180,000.00
190,000.00
2,700.00
2,850.00
18,750.00
19,964.00
0.297
OH
Pekerja
40,000.00
42,000.00
11,880.00
12,474.00
0.033
OH
Tukang batu
55,000.00
60,000.00
1,815.00
1,980.00
0.033
OH
Tukang Kayu
55,000.00
60,000.00
1,815.00
1,980.00
0.033
OH
Tukang Besi
55,000.00
60,000.00
1,815.00
1,980.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.015
OH
Mandor
55,000.00
60,000.00
825.00
900.00
6.36.2
149235156.xlsx.ms_office
URAIAN PEKERJAAN
SAT.
Tenaga
83/55
abk 7-14
HARGA BAHAN/UPAH
No.
SNI
VIII
03-3436-2002
KODE
KOEF
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
m2
6.1.1
25
Buah
0.15
OH
0.075
6.2
45,000.00
11,045.00
11,800.00
40,000.00
42,000.00
6,000.00
6,300.00
OH
Tukang Kayu
55,000.00
60,000.00
4,125.00
4,500.00
0.008
OH
Kepala Tukang
60,000.00
65,000.00
480.00
520.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
m2
79,795.00
86,800.00
Bahan
68,750.00
75,000.00
68,750.00
75,000.00
25
Buah
Genteng Plentong
2,750.00
3,000.00
0.15
OH
0.075
11,045.00
11,800.00
Pekerja
40,000.00
42,000.00
6,000.00
6,300.00
OH
Tukang Kayu
55,000.00
60,000.00
4,125.00
4,500.00
0.008
OH
Kepala Tukang
60,000.00
65,000.00
480.00
520.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
m2
64,100.00
91,770.00
Bahan
54,000.00
81,000.00
54,000.00
81,000.00
Tenaga
18
Buah
3,000.00
4,500.00
0.15
OH
10,100.00
10,770.00
Pekerja
40,000.00
42,000.00
6,000.00
0.06
6,300.00
OH
Tukang Kayu
55,000.00
60,000.00
3,300.00
3,600.00
0.006
OH
Kepala Tukang
60,000.00
65,000.00
360.00
390.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
m'
67,230.00
73,160.00
Bahan
38,920.00
42,940.00
6.3.2
6.4.1
5
Buah
5,000.00
5,500.00
25,000.00
27,500.00
Kg
Portland Semen
1,200.00
1,250.00
9,600.00
0.032
10,000.00
m3
Pasir Pasang
135,000.00
170,000.00
4,320.00
5,440.00
6.4.2
28,310.00
30,220.00
0.4
OH
Tenaga
Pekerja
40,000.00
42,000.00
16,000.00
16,800.00
0.2
OH
Tukang Kayu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.002
OH
Mandor
55,000.00
60,000.00
110.00
120.00
m'
77,230.00
85,660.00
Bahan
48,920.00
55,440.00
6.5.1
5
Buah
7,000.00
8,000.00
35,000.00
40,000.00
Kg
Portland Semen
1,200.00
1,250.00
9,600.00
0.032
10,000.00
m3
Pasir Pasang
135,000.00
170,000.00
4,320.00
5,440.00
6.5.2
6.6
45,000.00
37,500.00
Pekerja
6.3.1
6.5
56,800.00
37,500.00
Tenaga
6.2.2
6.4
48,545.00
Bahan
1,800.00
6.2.1
6.3
1,500.00
6.1.2
28,310.00
30,220.00
0.4
OH
Tenaga
Pekerja
40,000.00
42,000.00
16,000.00
16,800.00
0.2
OH
Tukang Kayu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.002
OH
Mandor
55,000.00
60,000.00
110.00
120.00
m'
74,230.00
79,660.00
Bahan
45,920.00
49,440.00
6.6.1
4
Buah
8,000.00
8,500.00
32,000.00
34,000.00
Kg
Portland Semen
1,200.00
1,250.00
9,600.00
0.032
10,000.00
m3
Pasir Pasang
135,000.00
170,000.00
4,320.00
5,440.00
6.6.2
149235156.xlsx.ms_office
URAIAN PEKERJAAN
SAT.
28,310.00
30,220.00
0.4
OH
Tenaga
Pekerja
40,000.00
42,000.00
16,000.00
16,800.00
0.2
OH
Tukang Kayu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.002
OH
Mandor
55,000.00
60,000.00
110.00
120.00
83/56
abk 8-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.9
KOEF
1
m2
6.9.1
56,665.00
60,340.00
Bahan
46,020.00
48,960.00
78,000.00
44,100.00
46,800.00
0.12
Kg
16,000.00
18,000.00
1,920.00
2,160.00
10,645.00
11,380.00
0.14
OH
Pekerja
40,000.00
42,000.00
5,600.00
5,880.00
0.075
OH
Tukang Kayu
55,000.00
60,000.00
4,125.00
4,500.00
0.008
OH
Kepala Tukang
60,000.00
65,000.00
480.00
520.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
m2
56,275.00
59,915.00
Bahan
46,020.00
48,960.00
Tenaga
0.6
Lbr
Asbes Gelombang
73,500.00
78,000.00
44,100.00
46,800.00
0.12
Kg
16,000.00
18,000.00
1,920.00
2,160.00
10,255.00
10,955.00
0.14
OH
Pekerja
40,000.00
42,000.00
5,600.00
5,880.00
0.07
OH
Tukang Kayu
55,000.00
60,000.00
3,850.00
4,200.00
0.007
OH
Kepala Tukang
60,000.00
65,000.00
420.00
455.00
0.007
OH
Mandor
55,000.00
60,000.00
385.00
420.00
m2
36,675.00
39,715.00
Bahan
26,420.00
28,760.00
Tenaga
6.12.1
0.35
Lbr
Asbes Gelombang
70,000.00
76,000.00
24,500.00
26,600.00
0.12
Kg
16,000.00
18,000.00
1,920.00
2,160.00
10,255.00
10,955.00
0.14
OH
Pekerja
40,000.00
42,000.00
5,600.00
5,880.00
0.07
OH
Tukang Kayu
55,000.00
60,000.00
3,850.00
4,200.00
0.007
OH
Kepala Tukang
60,000.00
65,000.00
420.00
455.00
0.007
OH
Mandor
55,000.00
60,000.00
385.00
420.00
m2
38,020.00
40,985.00
Bahan
27,930.00
30,210.00
6.12.2
Tenaga
6.15.1
0.51
Lbr
Asbes Gelombang
51,000.00
55,000.00
26,010.00
28,050.00
0.12
Kg
16,000.00
18,000.00
1,920.00
2,160.00
10,090.00
10,775.00
0.14
OH
Pekerja
40,000.00
42,000.00
5,600.00
5,880.00
0.067
OH
Tukang Kayu
55,000.00
60,000.00
3,685.00
4,020.00
0.007
OH
Kepala Tukang
60,000.00
65,000.00
420.00
455.00
0.007
OH
Mandor
55,000.00
60,000.00
385.00
420.00
m2
48,025.00
54,585.00
Bahan
33,375.00
38,935.00
6.15.2
Tenaga
6.30.1
11
Lbr
3,000.00
3,500.00
33,000.00
0.03
Kg
38,500.00
12,500.00
14,500.00
375.00
435.00
0.2
OH
14,650.00
15,650.00
Pekerja
40,000.00
42,000.00
8,000.00
0.1
8,400.00
OH
Tukang Kayu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.01
OH
Mandor
55,000.00
60,000.00
550.00
600.00
m2
117,830.00
125,977.00
95,500.00
101,900.00
6.30.2
Tenaga
6.33.1
Bahan
60
Lbr
Genteng Sirap
1,550.00
1,650.00
93,000.00
0.2
Kg
99,000.00
12,500.00
14,500.00
2,500.00
2,900.00
0.166
OH
22,330.00
24,077.00
Pekerja
40,000.00
42,000.00
6,640.00
0.25
6,972.00
OH
Tukang Kayu
55,000.00
60,000.00
13,750.00
15,000.00
0.025
OH
Kepala Tukang
60,000.00
65,000.00
1,500.00
1,625.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
6.33.2
149235156.xlsx.ms_office
MAKSIMUM
Rp
73,500.00
6.10.2
6.33
JUMLAH
MINIMUM
Rp
Asbes Gelombang
6.10
6.30
MAKSIMUM
Rp
Lbr
6.10.1
6.15
MINIMUM
Rp
0.6
6.9.2
6.12
URAIAN PEKERJAAN
SAT.
Tenaga
83/57
abk 8-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.34
KOEF
1
m'
6.34.1
31,030.00
34,365.00
31,030.00
34,365.00
14,700.00
13,125.00
0.05
Kg
12,500.00
14,500.00
625.00
10.8
Kg
Portland Semen
725.00
1,200.00
1,250.00
12,960.00
13,500.00
0.032
m3
Kg
Pasir Pasang
135,000.00
170,000.00
4,320.00
5,440.00
Semen Warna
10,000.00
15,000.00
10,000.00
15,000.00
0.4
OH
29,300.00
31,300.00
Pekerja
40,000.00
42,000.00
16,000.00
0.2
16,800.00
OH
Tukang Kayu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.02
OH
Mandor
55,000.00
60,000.00
1,100.00
1,200.00
m'
69,980.00
74,755.00
Bahan
49,400.00
52,520.00
14,400.00
Tenaga
0.4
Lbr
33,000.00
36,000.00
13,200.00
0.06
Kg
12,500.00
14,500.00
750.00
870.00
0.5
Kg
12,500.00
14,500.00
6,250.00
7,250.00
0.004
m3
7,300,000.00
7,500,000.00
29,200.00
30,000.00
20,580.00
22,235.00
0.125
OH
Pekerja
40,000.00
42,000.00
5,000.00
5,250.00
0.25
OH
Tukang Kayu
55,000.00
60,000.00
13,750.00
15,000.00
0.025
OH
Kepala Tukang
60,000.00
65,000.00
1,500.00
1,625.00
0.006
OH
Mandor
55,000.00
60,000.00
330.00
360.00
m2
54,540.00
56,580.00
Bahan
45,750.00
47,190.00
Tenaga
0.7
Lbr
65,000.00
67,000.00
45,500.00
46,900.00
0.02
Kg
12,500.00
14,500.00
250.00
290.00
8,790.00
9,390.00
0.12
OH
Pekerja
40,000.00
42,000.00
4,800.00
5,040.00
0.06
OH
Tukang Kayu
55,000.00
60,000.00
3,300.00
3,600.00
0.006
OH
Kepala Tukang
60,000.00
65,000.00
360.00
390.00
0.006
OH
Mandor
55,000.00
60,000.00
330.00
360.00
m'
30,660.00
32,060.00
Bahan
20,000.00
20,680.00
6.38.2
Tenaga
6.39.1
0.3
Lbr
65,000.00
67,000.00
19,500.00
20,100.00
0.04
Kg
12,500.00
14,500.00
500.00
580.00
10,660.00
11,380.00
0.15
OH
Pekerja
40,000.00
42,000.00
6,000.00
6,300.00
0.07
OH
Tukang Kayu
55,000.00
60,000.00
3,850.00
4,200.00
0.008
OH
Kepala Tukang
60,000.00
65,000.00
480.00
520.00
0.006
OH
Mandor
55,000.00
60,000.00
330.00
360.00
m2
16,315.00
17,560.00
6,825.00
7,455.00
6,825.00
7,455.00
6.39.2
Tenaga
6.42.1
Bahan
1.05
m2
6,500.00
7,100.00
0.15
OH
9,490.00
10,105.00
Pekerja
40,000.00
42,000.00
6,000.00
0.05
6,300.00
OH
Tukang Kayu
55,000.00
60,000.00
2,750.00
3,000.00
0.005
OH
Kepala Tukang
60,000.00
65,000.00
300.00
325.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
480.00
6.42.2
149235156.xlsx.ms_office
MAKSIMUM
Rp
4,200.00
6.38.1
6.42
JUMLAH
MINIMUM
Rp
3,750.00
6.37.2
6.39
MAKSIMUM
Rp
Bahan
Buah
6.37.1
6.38
MINIMUM
Rp
3.5
6.34.2
6.37
URAIAN PEKERJAAN
SAT.
83/58
abk 8-14
HARGA BAHAN/UPAH
No.
SNI
IX
03-2839 - 2008
KODE
KOEF
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
m2
6.1.1
6.2
18,500.00
17,600.00
20,350.00
0.01
Kg
Paku
12,500.00
14,500.00
125.00
145.00
5,690.00
6,155.00
0.03
OH
Tenaga
Pekerja
40,000.00
42,000.00
1,200.00
1,260.00
0.07
OH
Tukang Kayu
55,000.00
60,000.00
3,850.00
4,200.00
0.007
OH
Kepala Tukang
60,000.00
65,000.00
420.00
455.00
0.004
OH
Mandor
55,000.00
60,000.00
220.00
240.00
m2
69,475.00
74,105.00
Bahan
57,025.00
60,725.00
12.0
Lbr
Akustik Uk.30 x 30 cm
0.05
Kg
Paku
4,700.00
5,000.00
56,400.00
60,000.00
12,500.00
14,500.00
625.00
725.00
12,450.00
13,380.00
0.12
OH
Tenaga
Pekerja
40,000.00
42,000.00
4,800.00
5,040.00
0.12
OH
Tukang Kayu
55,000.00
60,000.00
6,600.00
7,200.00
0.012
OH
Kepala Tukang
60,000.00
65,000.00
720.00
780.00
0.006
OH
Mandor
55,000.00
60,000.00
330.00
360.00
m2
74,800.00
81,475.00
Bahan
64,425.00
70,325.00
5.80
Lbr
Akustik
11,000.00
12,000.00
63,800.00
69,600.00
0.05
Kg
Paku
12,500.00
14,500.00
625.00
725.00
6.3.2
10,375.00
11,150.00
0.10
OH
Tenaga
Pekerja
40,000.00
42,000.00
4,000.00
4,200.00
0.10
OH
Tukang Kayu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
m2
31,375.00
34,085.00
Bahan
21,000.00
22,935.00
6.5.1
0.375
Lbr
Tripleks (4 mm)
55,000.00
60,000.00
20,625.00
22,500.00
0.03
Kg
Paku Tripleks
12,500.00
14,500.00
375.00
435.00
6.5.2
10,375.00
11,150.00
0.10
OH
Tenaga
Pekerja
40,000.00
42,000.00
4,000.00
4,200.00
0.10
OH
Tukang Kayu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
m2
398,125.00
419,345.00
Bahan
315,125.00
330,145.00
6.6.1
0.015
m3
Kayu Jati,Papan
21,000,000.00
22,000,000.00
315,000.00
0.01
Kg
Paku
330,000.00
12,500.00
14,500.00
125.00
145.00
0.8
OH
83,000.00
89,200.00
Pekerja
40,000.00
42,000.00
32,000.00
0.8
33,600.00
OH
Tukang Kayu
55,000.00
60,000.00
44,000.00
48,000.00
0.08
OH
Kepala Tukang
60,000.00
65,000.00
4,800.00
5,200.00
0.04
OH
Mandor
55,000.00
60,000.00
2,200.00
2,400.00
m2
25,025.00
29,330.00
Bahan
17,700.00
21,505.00
6.6.2
6.7
20,495.00
16,000.00
6.3.1
6.6
26,650.00
17,725.00
Plat Asbes
6.2.2
6.5
23,415.00
Bahan
Lbr
6.2.1
6.3
1.1
6.1.2
Tenaga
6.7.1
0.364
Lbr
Gypsum Board
45,000.00
55,000.00
16,380.00
20,020.00
0.11
Kg
Paku Sekrup
12,000.00
13,500.00
1,320.00
1,485.00
7,325.00
7,825.00
0.1
OH
Pekerja
40,000.00
42,000.00
4,000.00
4,200.00
0.05
OH
Tukang Kayu
55,000.00
60,000.00
2,750.00
3,000.00
0.005
OH
Kepala Tukang
60,000.00
65,000.00
300.00
325.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
6.7.2
149235156.xlsx.ms_office
URAIAN PEKERJAAN
SAT.
Tenaga
83/59
abk 9-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.9
KOEF
1
m2
6.9.1
MAKSIMUM
Rp
3.6
m'
0.15
kg
1.05
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
149,750.00
161,500.00
97,875.00
105,750.00
23,400.00
5,000.00
6,500.00
18,000.00
Kawat 4 mm
12,000.00
15,000.00
1,800.00
2,250.00
bh
Ramset
21,500.00
22,000.00
22,575.00
23,100.00
1.5
lmb
Akuatik 60 x 120 cm
55,500.00
57,000.00
0.5
OH
0.5
37,000.00
38,000.00
51,875.00
55,750.00
Pekerja
40,000.00
42,000.00
20,000.00
21,000.00
OH
Tukang Kayu
55,000.00
60,000.00
27,500.00
30,000.00
0.05
OH
Kepala Tukang
60,000.00
65,000.00
3,000.00
3,250.00
0.025
OH
Mandor
55,000.00
60,000.00
1,375.00
1,500.00
m1
9,750.00
11,000.00
Bahan
4,535.00
5,395.00
Tenaga
6.10.1
1.05
m1
4,200.00
5,000.00
4,410.00
0.01
Kg
Paku
5,250.00
12,500.00
14,500.00
125.00
145.00
0.05
OH
5,215.00
5,605.00
Pekerja
40,000.00
42,000.00
2,000.00
0.05
2,100.00
OH
Tukang Kayu
55,000.00
60,000.00
2,750.00
3,000.00
0.005
OH
Kepala Tukang
60,000.00
65,000.00
300.00
325.00
0.003
OH
Mandor
55,000.00
60,000.00
165.00
180.00
6.10.2
149235156.xlsx.ms_office
MINIMUM
Rp
Bahan
6.9.2
6.10
URAIAN PEKERJAAN
SAT.
Tenaga
83/60
abk 9-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
PEKERJAAN SANITASI
6.1
1 Unit
1 Buah
0.06
950,000.00
1,450,000.00
57,000.00
201,360.00
40,000.00
42,000.00
132,000.00
1.1
OH
Tukang Batu
55,000.00
60,000.00
60,500.00
0.001
OH
Kepala Tukang
60,000.00
65,000.00
60.00
0.16
OH
Mandor
55,000.00
60,000.00
8,800.00
1 Unit
334,850.00
Bahan
1
Buah
Kloset Jongkok
Kg
Portland Semen
0.01
m3
Pasir Pasang
OH
1.5
113,550.00
105,000.00
150,000.00
105,000.00
1,200.00
1,250.00
7,200.00
135,000.00
170,000.00
1,350.00
Pekerja
40,000.00
42,000.00
40,000.00
OH
Tukang Batu
55,000.00
60,000.00
82,500.00
1.5
OH
Kepala Tukang
60,000.00
65,000.00
90,000.00
0.16
OH
Mandor
55,000.00
60,000.00
8,800.00
Tenaga
1 Unit
221,300.00
Memasang Urinoir
472,550.00
Bahan
1
Buah
0.3
366,050.00
Urinoir
275,000.00
310,000.00
275,000.00
275,000.00
310,000.00
82,500.00
1,200.00
1,250.00
7,200.00
135,000.00
170,000.00
1,350.00
Kg
Portland Semen
0.01
m3
Pasir Pasang
OH
Pekerja
40,000.00
42,000.00
40,000.00
OH
Tukang Batu
55,000.00
60,000.00
55,000.00
0.1
OH
Kepala Tukang
60,000.00
65,000.00
6,000.00
0.1
OH
Mandor
55,000.00
60,000.00
5,500.00
Tenaga
6.4.1
1 Unit
106,500.00
Memasang Wastafel
989,025.00
Bahan
6.5.1
Buah
0.3
918,550.00
700,000.00
800,000.00
700,000.00
700,000.00
800,000.00
210,000.00
1,200.00
1,250.00
7,200.00
135,000.00
170,000.00
1,350.00
Kg
Portland Semen
0.01
m3
Pasir Pasang
1.2
OH
Pekerja
40,000.00
42,000.00
48,000.00
0.145
OH
Tukang Batu
55,000.00
60,000.00
7,975.00
0.15
OH
Kepala Tukang
60,000.00
65,000.00
9,000.00
0.1
OH
Mandor
55,000.00
60,000.00
5,500.00
Tenaga
6.5.2
1 Unit
70,475.00
928,090.91
Bahan
6.8.1
0.4
m3
Batu Bata
120
Kg
Portland Semen
0.3
m3
Pasir Pasang
360
buah
Porselen 11 x 11 cm
Semen Nat
488,590.91
337,500.00
375,000.00
135,000.00
1,200.00
1,250.00
144,000.00
135,000.00
170,000.00
40,500.00
303.03
333.33
109,090.91
10,000.00
15,000.00
60,000.00
Kg
OH
Pekerja
40,000.00
42,000.00
240,000.00
OH
Tukang Batu
55,000.00
60,000.00
165,000.00
0.3
OH
Kepala Tukang
60,000.00
65,000.00
18,000.00
0.3
OH
Mandor
55,000.00
60,000.00
16,500.00
m'
Tenaga
6.8.2
6.14
950,000.00
Pekerja
6.4.1
6.8
1,450,000.00
OH
6.2.2
6.5
950,000.00
3.3
6.2.1
6.4
1,007,000.00
Tenaga
6.1.2
6.2
1,208,360.00
Bahan
6.1.1
439,500.00
63,143.50
Bahan
6.14.1
1.1
149235156.xlsx.ms_office83/61
URAIAN PEKERJAAN
SAT.
52,888.50
Buah
Pipa Beton
30,000.00
33,000.00
33,000.00
0.027
m3
Batu Bata
337,500.00
375,000.00
9,112.50
0.68
Kg
Portland Semen
1,200.00
1,250.00
816.00
0.056
m3
Pasir Pasang
135,000.00
170,000.00
7,560.00
0.024
m3
Pasir Urug
100,000.00
125,000.00
2,400.00
abk 10-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
40,000.00
42,000.00
5,600.00
0.07
OH
Tukang Batu
55,000.00
60,000.00
3,850.00
0.007
OH
Kepala Tukang
60,000.00
65,000.00
420.00
0.007
OH
Mandor
55,000.00
60,000.00
385.00
m'
Buah
Pipa Beton
38,000.00
42,000.00
41,800.00
0.55
m3
Batu Bata
337,500.00
375,000.00
185,625.00
10.3
Kg
Portland Semen
1,200.00
1,250.00
12,360.00
0.061
m3
Pasir Pasang
135,000.00
170,000.00
8,235.00
0.069
m3
Pasir Urug
100,000.00
125,000.00
6,900.00
0.38
OH
Pekerja
40,000.00
42,000.00
15,200.00
0.19
OH
Tukang Batu
55,000.00
60,000.00
10,450.00
0.019
OH
Kepala Tukang
60,000.00
65,000.00
1,140.00
0.019
OH
Mandor
55,000.00
60,000.00
1,045.00
Tenaga
1 m'
27,835.00
39,360.00
Bahan
m'
30,225.00
Pipa Galvanis
19,500.00
20,333.33
23,400.00
19,500.00
20,333.33
6,825.00
Tenaga
6.20.2
9,135.00
0.054
OH
Pekerja
40,000.00
42,000.00
2,160.00
0.09
OH
Tukang Ledeng
55,000.00
60,000.00
4,950.00
0.009
OH
Kepala Tukang
60,000.00
65,000.00
540.00
0.027
OH
Mandor
55,000.00
60,000.00
1,485.00
1 m'
137,013.67
Bahan
6.23.1
1.2
m'
0.35
121,416.67
Pipa Galvanis
78,333.33
83,333.33
94,000.00
78,333.33
83,333.33
27,416.67
Tenaga
6.23.2
15,597.00
0.108
OH
Pekerja
40,000.00
42,000.00
4,320.00
0.18
OH
Tukang Ledeng
55,000.00
60,000.00
9,900.00
0.018
OH
Kepala Tukang
60,000.00
65,000.00
1,080.00
0.0054
OH
Mandor
55,000.00
60,000.00
297.00
1 m'
170,624.00
Bahan
6.24.1
1.2
m'
0.35
151,125.00
Pipa Galvanis
97,500.00
101,666.67
117,000.00
97,500.00
101,666.67
34,125.00
Tenaga
6.24.2
19,499.00
0.135
OH
Pekerja
40,000.00
42,000.00
5,400.00
0.225
OH
Tukang Ledeng
55,000.00
60,000.00
12,375.00
0.0225
OH
Kepala Tukang
60,000.00
65,000.00
1,350.00
0.0068
OH
Mandor
55,000.00
60,000.00
374.00
1 m'
12,174.00
Bahan
6.25.1
1.2
m'
0.35
6,975.00
Pipa PVC
4,500.00
5,000.00
5,400.00
4,500.00
5,000.00
1,575.00
Tenaga
6.25.2
5,199.00
0.036
OH
Pekerja
40,000.00
42,000.00
1,440.00
0.06
OH
Tukang Ledeng
55,000.00
60,000.00
3,300.00
0.006
OH
Kepala Tukang
60,000.00
65,000.00
360.00
0.0018
OH
Mandor
55,000.00
60,000.00
99.00
1 m'
23,298.50
Bahan
6.29.1
1.2
0.35
149235156.xlsx.ms_office83/62
254,920.00
1.1
0.35
6.29
282,755.00
Bahan
1.2
6.25
10,255.00
Pekerja
6.20.1
6.24
JUMLAH
MINIMUM
Rp
OH
6.15.2
6.23
MAKSIMUM
Rp
0.14
6.15.1
6.20
MINIMUM
Rp
Tenaga
6.14.2
6.15
URAIAN PEKERJAAN
SAT.
m'
15,500.00
Pipa PVC
10,000.00
12,733.33
12,000.00
10,000.00
12,733.33
3,500.00
abk 10-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
40,000.00
42,000.00
2,160.00
0.09
OH
Tukang Ledeng
55,000.00
60,000.00
4,950.00
0.009
OH
Kepala Tukang
60,000.00
65,000.00
540.00
0.0027
OH
Mandor
55,000.00
60,000.00
148.50
1 m'
43,346.33
Bahan
m'
31,645.83
Pipa PVC
20,416.67
20,833.33
24,500.00
20,416.67
20,833.33
7,145.83
Tenaga
6.31.2
11,700.50
0.081
OH
Pekerja
40,000.00
42,000.00
3,240.00
0.135
OH
Tukang Ledeng
55,000.00
60,000.00
7,425.00
0.014
OH
Kepala Tukang
60,000.00
60,000.00
810.00
0.0041
OH
Mandor
55,000.00
60,000.00
225.50
1 Buah
309,582.50
Bahan
6.33.1
Buah
Set
0.03
OH
0.3
290,000.00
145,000.00
170,000.00
145,000.00
145,000.00
170,000.00
145,000.00
Pekerja
40,000.00
42,000.00
1,200.00
OH
Tukang Ledeng
55,000.00
60,000.00
16,500.00
0.03
OH
Kepala Tukang
60,000.00
65,000.00
1,800.00
0.0015
OH
Mandor
55,000.00
60,000.00
82.50
Tenaga
6.33.2
1 Buah
19,582.50
14,325.00
Bahan
6.35.1
Buah
7,550.00
Kran Air
7,500.00
15,000.00
7,500.00
Seal Tape
2,000.00
3,000.00
50.00
0.025
Set
0.01
OH
Pekerja
40,000.00
42,000.00
400.00
0.1
OH
Tukang Ledeng
55,000.00
60,000.00
5,500.00
0.01
OH
Kepala Tukang
60,000.00
60,000.00
600.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
Tenaga
6.35.2
1 Buah
6,775.00
29,275.00
Bahan
6.36.1
Buah
Floor Drain
22,500.00
22,500.00
25,000.00
Tenaga
6.36.2
149235156.xlsx.ms_office83/63
7,798.50
Pekerja
0.35
6.36
JUMLAH
MINIMUM
Rp
OH
1.2
6.35
MAKSIMUM
Rp
0.054
6.31.1
6.33
MINIMUM
Rp
Tenaga
6.29.2
6.31
URAIAN PEKERJAAN
SAT.
22,500.00
6,775.00
0.01
OH
Pekerja
40,000.00
42,000.00
400.00
0.1
OH
Tukang Batu
55,000.00
60,000.00
5,500.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
abk 10-14
JUMLAH
MAKSIMUM
Rp
1,751,265.00
1,537,000.00
1,450,000.00
87,000.00
214,265.00
138,600.00
66,000.00
65.00
9,600.00
398,300.00
159,200.00
150,000.00
7,500.00
1,700.00
239,100.00
42,000.00
90,000.00
97,500.00
9,600.00
526,700.00
412,200.00
310,000.00
93,000.00
7,500.00
1,700.00
114,500.00
42,000.00
60,000.00
6,500.00
6,000.00
1,124,050.00
1,049,200.00
800,000.00
240,000.00
7,500.00
1,700.00
74,850.00
50,400.00
8,700.00
9,750.00
6,000.00
1,030,500.00
561,000.00
150,000.00
150,000.00
51,000.00
120,000.00
90,000.00
469,500.00
252,000.00
180,000.00
19,500.00
18,000.00
70,750.00
59,795.00
36,300.00
10,125.00
850.00
9,520.00
3,000.00
149235156.xlsx.ms_office83/64
abk 10-14
JUMLAH
MAKSIMUM
Rp
10,955.00
5,880.00
4,200.00
455.00
420.00
314,055.00
284,320.00
46,200.00
206,250.00
12,875.00
10,370.00
8,625.00
29,735.00
15,960.00
11,400.00
1,235.00
1,140.00
41,389.67
31,516.67
24,400.00
7,116.67
9,873.00
2,268.00
5,400.00
585.00
1,620.00
145,996.67
129,166.67
100,000.00
29,166.67
16,830.00
4,536.00
10,800.00
1,170.00
324.00
178,623.83
157,583.33
122,000.00
35,583.33
21,040.50
5,670.00
13,500.00
1,462.50
408.00
13,360.00
7,750.00
6,000.00
1,750.00
5,610.00
1,512.00
3,600.00
390.00
108.00
28,151.67
19,736.67
15,280.00
4,456.67
149235156.xlsx.ms_office83/65
abk 10-14
JUMLAH
MAKSIMUM
Rp
8,415.00
2,268.00
5,400.00
585.00
162.00
44,849.67
32,291.67
25,000.00
7,291.67
12,558.00
3,402.00
8,100.00
810.00
246.00
361,300.00
340,000.00
170,000.00
170,000.00
21,300.00
1,260.00
18,000.00
1,950.00
90.00
22,395.00
15,075.00
15,000.00
75.00
7,320.00
420.00
6,000.00
600.00
300.00
32,370.00
25,000.00
25,000.00
7,370.00
420.00
6,000.00
650.00
300.00
149235156.xlsx.ms_office83/66
abk 10-14
HARGA BAHAN/UPAH
No.
SNI
XI
03-7393 - 2008
KODE
KOEF
URAIAN PEKERJAAN
SAT.
MINIMUM
Rp
MAKSIMUM
Rp
Kg
Besi Profil
13,500.00
14,250.00
15,525.00
0.06
Kg
Meni Besi
15,000.00
20,000.00
900.00
0.06
OH
Pekerja
40,000.00
42,000.00
2,400.00
0.06
OH
Tukang Besi
55,000.00
60,000.00
3,300.00
0.006
OH
Kepala Tukang
60,000.00
65,000.00
360.00
0.003
OH
Mandor
55,000.00
60,000.00
165.00
kg
Tenaga
1.15
kg
0.06
OH
0.06
15,525.00
14,250.00
Pekerja
40,000.00
42,000.00
2,400.00
OH
Tukang Besi
55,000.00
60,000.00
3,300.00
0.006
OH
Kepala Tukang
60,000.00
65,000.00
360.00
0.003
OH
Mandor
55,000.00
60,000.00
165.00
kg
Tenaga
100
24,835.00
14,400.00
ltr
Solar
11,250.00
11,300.00
11,250.00
0.1
ltr
Minyak Pelumas
31,500.00
35,000.00
3,150.00
Tenaga
10,435.00
0.100
OH
Pekerja
40,000.00
42,000.00
4,000.00
0.100
OH
Tukang Besi
55,000.00
60,000.00
5,500.00
0.001
OH
Kepala Tukang
60,000.00
65,000.00
60.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
0.008
Jam
Sewa Alat
75,000.00
80,000.00
600.00
m2
Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku
6.4.1
740,810.00
Bahan
631,900.00
15
Kg
13,500.00
14,250.00
202,500.00
32.8
Kg
13,000.00
14,000.00
426,400.00
0.05
Kg
Kawat Las
60,000.00
70,000.00
3,000.00
1.05
OH
Pekerja
40,000.00
42,000.00
42,000.00
1.05
OH
Tukang Besi
55,000.00
60,000.00
57,750.00
0.105
OH
Kepala Tukang
60,000.00
65,000.00
6,300.00
0.052
OH
Mandor
55,000.00
60,000.00
2,860.00
10
cm
6.4.2
Tenaga
6.5.1
108,910.00
18,543.50
Bahan
2,863.50
0.04
kg
Kawat Las
60,000.00
70,000.00
2,400.00
0.03
ltr
Solar
11,250.00
11,300.00
337.50
0.004
ltr
Minyak Pelumas
31,500.00
35,000.00
126.00
0.04
OH
Pekerja
40,000.00
42,000.00
1,600.00
0.02
OH
Tukang Besi
55,000.00
60,000.00
1,100.00
0.002
OH
Kepala Tukang
60,000.00
65,000.00
120.00
0.002
OH
Mandor
55,000.00
60,000.00
0.17
Jam
Sewa Alat
m2
6.5.2
Tenaga
15,680.00
75,000
80,000
m2
1.2
OH
1.2
110.00
12,750.00
346,530.00
Bahan
6.7.1
15,525.00
6,225.00
Bahan
6.3.2
6.7
21,750.00
13,500.00
6.3.1
6.5
6,225.00
Bahan
6.2.2
6.4
16,425.00
Kg
6.2.1
6.3
22,650.00
1.15
6.1.2
6.2
6.1.1
225,000.00
225,000.00
245,000.00
Pekerja
40,000.00
42,000.00
48,000.00
OH
Tukang Besi
55,000.00
60,000.00
66,000.00
0.12
OH
Kepala Tukang
60,000.00
65,000.00
7,200.00
0.006
OH
Mandor
55,000.00
60,000.00
330.00
6.7.2
149235156.xlsx.ms_office
JUMLAH
MINIMUM
Rp
225,000.00
121,530.00
83/67
abk 11-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.8
KOEF
1
m2
6.8.1
1
m2
0.44
OH
0.44
40,000.00
42,000.00
17,600.00
OH
Tukang Besi
55,000.00
60,000.00
24,200.00
0.044
OH
Kepala Tukang
60,000.00
65,000.00
2,640.00
0.022
OH
Mandor
55,000.00
60,000.00
1,210.00
m2
Sunscreen Allumunium
m2
0.08
OH
0.8
350,000.00
45,650.00
317,220.00
265,000.00
Sunscreen Allumunium
265,000.00
310,000.00
Pekerja
40,000.00
42,000.00
3,200.00
OH
Tukang Besi
55,000.00
60,000.00
44,000.00
Tenaga
265,000.00
52,220.00
0.08
OH
Kepala Tukang
60,000.00
65,000.00
4,800.00
0.004
OH
Mandor
55,000.00
60,000.00
220.00
m2
313,750.00
Bahan
1
m2
OH
210,000.00
210,000.00
230,000.00
Rolling Allumunium
Pekerja
40,000.00
42,000.00
40,000.00
OH
Tukang Besi
55,000.00
60,000.00
55,000.00
0.1
OH
Kepala Tukang
60,000.00
65,000.00
6,000.00
0.05
OH
Mandor
55,000.00
60,000.00
2,750.00
m'
Tenaga
m'
210,000.00
103,750.00
84,458.50
Bahan
1.1
80,000.00
Profil Allumunium
68,000.00
75,000.00
74,800.00
950.00
1,000.00
1,900.00
55,000.00
65,000.00
3,300.00
buah
Skrup Fixer
0.06
Tube
Sealant
0.043
OH
Pekerja
40,000.00
42,000.00
1,720.00
0.043
OH
Tukang Besi
55,000.00
60,000.00
2,365.00
0.0043
OH
Kepala Tukang
60,000.00
65,000.00
258.00
0.0021
OH
Mandor
55,000.00
60,000.00
115.50
m2
6.11.2
Tenaga
6.12.1
4,458.50
1,038,016.00
Bahan
1,029,200.00
4.4
m'
Profil Allumunium
68,000.00
75,000.00
299,200.00
14.6
m'
Allumunium Strip
50,000.00
55,000.00
730,000.00
0.085
OH
Pekerja
40,000.00
42,000.00
3,400.00
0.085
OH
Tukang Besi
55,000.00
60,000.00
4,675.00
0.0085
OH
Kepala Tukang
60,000.00
65,000.00
510.00
0.0042
OH
Mandor
55,000.00
60,000.00
231.00
m2
6.12.2
Tenaga
6.13.1
8,816.00
288,740.00
Bahan
279,850.00
4.4
m'
Pintu Allumunium
50,000.00
55,000.00
220,000.00
4.5
m'
Profil Kaca
10,000.00
12,000.00
45,000.00
0.27
tube
Sealant
55,000.00
65,000.00
14,850.00
0.085
OH
Pekerja
40,000.00
42,000.00
3,400.00
0.085
OH
Tukang Besi
55,000.00
60,000.00
4,675.00
0.009
OH
Kepala Tukang
60,000.00
65,000.00
540.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
m2
6.13.2
Tenaga
6.14.1
8,890.00
161,340.00
Bahan
1
149235156.xlsx.ms_office
Pintu Lipat
Bahan
6.11.1
6.14
350,000.00
Pekerja
6.10.2
6.13
395,650.00
Tenaga
6.10.1
6.12
JUMLAH
MINIMUM
Rp
400,000.00
6.9.2
6.11
MAKSIMUM
Rp
350,000.00
6.9.1
6.10
MINIMUM
Rp
Bahan
6.8.2
6.9
URAIAN PEKERJAAN
SAT.
m2
125,000.00
83/68
125,000.00
150,000.00
125,000.00
abk 11-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
6.14.2
6.15
Tenaga
42,000.00
14,000.00
0.35
OH
Tukang Besi
55,000.00
60,000.00
19,250.00
0.035
OH
Kepala Tukang
60,000.00
65,000.00
2,100.00
0.018
OH
Mandor
55,000.00
60,000.00
990.00
m2
303,751.80
Bahan
6.177
m'
27.08
cm
Pengelasan
1.67
OH
1.67
130,516.80
13,000.00
14,000.00
80,301.00
1,854.35
2,000.90
50,215.80
Pekerja
40,000.00
42,000.00
66,800.00
OH
Tukang Las
55,000.00
60,000.00
91,850.00
0.167
OH
Kepala Tukang
60,000.00
65,000.00
10,020.00
0.083
OH
Mandor
55,000.00
60,000.00
4,565.00
m2
Tenaga
173,235.00
63,184.83
Bahan
52,809.83
1.1
m2
9,000.00
10,000.00
9,900.00
11.11
cm
Pengelasan
1,854.35
2,000.90
20,601.83
1.716
kg
13,000.00
14,000.00
22,308.00
0.1
OH
Pekerja
40,000.00
42,000.00
4,000.00
0.1
OH
Tukang Kayu
55,000.00
60,000.00
5,500.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
0.0050
OH
Mandor
55,000.00
60,000.00
275.00
m2
Tenaga
6.17.1
10,375.00
39,805.00
Bahan
1.1
m2
10
buah
m'
0.2
OH
0.2
19,550.00
10,500.00
11,000.00
11,550.00
100.00
150.00
1,000.00
1,000.00
12,000.00
7,000.00
Pekerja
40,000.00
42,000.00
8,000.00
OH
Tukang Kayu
55,000.00
60,000.00
11,000.00
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
0.001
OH
Mandor
55,000.00
60,000.00
55.00
m'
6.17.2
Jendela Nako
Paku Skrup 1 - 2,5 cm
Besi Strip
Tenaga
6.18.1
20,255.00
156,187.50
Bahan
124,137.50
1.05
Lbr
Seng Plaat
33,000.00
36,000.00
0.015
Kg
12,500.00
14,500.00
187.50
0.019
m3
4,700,000.00
4,800,000.00
89,300.00
0.20
OH
Pekerja
40,000.00
42,000.00
8,000.00
0.4
OH
Tukang Kayu
55,000.00
60,000.00
22,000.00
0.025
OH
Kepala Tukang
60,000.00
65,000.00
1,500.00
0.01
OH
Mandor
55,000.00
60,000.00
550.00
m'
6.18.2
Tenaga
6.19.1
34,650.00
32,050.00
71,265.00
Bahan
46,525.00
1.05
Lbr
Seng Plaat
38,000.00
41,000.00
0.01
Kg
12,500.00
14,500.00
125.00
0.5
Kg
Besi strip
13,000.00
14,000.00
6,500.00
0.15
OH
Pekerja
40,000.00
42,000.00
6,000.00
0.3
OH
Tukang Kayu
55,000.00
60,000.00
16,500.00
0.03
OH
Kepala Tukang
60,000.00
65,000.00
1,800.00
0.008
OH
Mandor
55,000.00
60,000.00
440.00
6.19.2
149235156.xlsx.ms_office
36,340.00
40,000.00
6.16.2
6.19
JUMLAH
MINIMUM
Rp
Pekerja
6.16.1
6.18
MAKSIMUM
Rp
OH
6.15.2
6.17
MINIMUM
Rp
0.35
6.15.1
6.16
URAIAN PEKERJAAN
SAT.
Tenaga
39,900.00
24,740.00
83/69
abk 11-14
JUMLAH
MAKSIMUM
Rp
24,277.50
17,587.50
16,387.50
1,200.00
6,690.00
2,520.00
3,600.00
390.00
180.00
23,077.50
16,387.50
16,387.50
6,690.00
2,520.00
3,600.00
390.00
180.00
26,005.00
14,800.00
11,300.00
3,500.00
11,205.00
4,200.00
6,000.00
65.00
300.00
640.00
793,495.00
676,450.00
213,750.00
459,200.00
3,500.00
117,045.00
44,100.00
63,000.00
6,825.00
3,120.00
20,009.00
3,279.00
2,800.00
339.00
140.00
16,730.00
1,680.00
1,200.00
130.00
120.00
13,600.00
375,560.00
245,000.00
245,000.00
130,560.00
50,400.00
72,000.00
7,800.00
360.00
149235156.xlsx.ms_office
83/70
abk 11-14
JUMLAH
MAKSIMUM
Rp
449,060.00
400,000.00
400,000.00
49,060.00
18,480.00
26,400.00
2,860.00
1,320.00
366,800.00
310,000.00
310,000.00
56,800.00
3,360.00
48,000.00
5,200.00
240.00
341,500.00
230,000.00
230,000.00
111,500.00
42,000.00
60,000.00
6,500.00
3,000.00
93,191.50
88,400.00
82,500.00
2,000.00
3,900.00
4,791.50
1,806.00
2,580.00
279.50
126.00
1,142,474.50
1,133,000.00
330,000.00
803,000.00
9,474.50
3,570.00
5,100.00
552.50
252.00
323,105.00
313,550.00
242,000.00
54,000.00
17,550.00
9,555.00
3,570.00
5,100.00
585.00
300.00
189,055.00
150,000.00
150,000.00
149235156.xlsx.ms_office
83/71
abk 11-14
JUMLAH
MAKSIMUM
Rp
39,055.00
14,700.00
21,000.00
2,275.00
1,080.00
326,837.37
140,662.37
86,478.00
54,184.37
186,175.00
70,140.00
100,200.00
10,855.00
4,980.00
68,404.00
57,254.00
11,000.00
22,230.00
24,024.00
11,150.00
4,200.00
6,000.00
650.00
300.00
119,360.00
97,600.00
12,100.00
1,500.00
84,000.00
21,760.00
8,400.00
12,000.00
1,300.00
60.00
163,842.50
129,217.50
37,800.00
217.50
91,200.00
34,625.00
8,400.00
24,000.00
1,625.00
600.00
76,925.00
50,195.00
43,050.00
145.00
7,000.00
26,730.00
6,300.00
18,000.00
1,950.00
480.00
149235156.xlsx.ms_office
83/72
abk 11-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
XII
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
1 Buah
6.2..1
1
Buah
6.2.2
6.3
28,775.00
31,370.00
140,000.00
42,000.00
400.00
420.00
0.5
OH
Tukang Kayu
55,000.00
60,000.00
27,500.00
30,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
78,137.50
85,685.00
Bahan
50,000.00
55,000.00
50,000.00
55,000.00
28,137.50
30,685.00
1 Buah
50,000.00
55,000.00
Tenaga
0.005
OH
Pekerja
40,000.00
42,000.00
200.00
210.00
0.5
OH
Tukang Kayu
55,000.00
60,000.00
27,500.00
30,000.00
0.005
OH
Kepala Tukang
60,000.00
65,000.00
300.00
325.00
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
153,137.50
170,685.00
Bahan
125,000.00
140,000.00
125,000.00
140,000.00
28,137.50
30,685.00
1 Buah
6.4.2
Kunci Selinder
125,000.00
140,000.00
Tenaga
0.005
OH
Pekerja
40,000.00
42,000.00
200.00
210.00
0.5
OH
Tukang Kayu
55,000.00
60,000.00
27,500.00
30,000.00
0.005
OH
Kepala Tukang
60,000.00
65,000.00
300.00
325.00
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
15,162.50
20,055.00
5,000.00
9,000.00
5,000.00
9,000.00
10,162.50
11,055.00
1 Buah
6.5.1
1 Buah
6.5.2
Engsel pintu
5,000.00
9,000.00
Tenaga
0.015
OH
Pekerja
40,000.00
42,000.00
600.00
630.00
0.15
OH
Tukang Kayu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.0075
OH
Mandor
55,000.00
60,000.00
412.50
450.00
9,025.00
9,870.00
Bahan
2,250.00
2,500.00
2,250.00
2,500.00
6,775.00
7,370.00
Buah
6..6.1
Buah
Engsel Jendela
2,250.00
2,500.00
Tenaga
6.6.2
0.01
OH
Pekerja
40,000.00
42,000.00
400.00
420.00
0.1
OH
Tukang Kayu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
28,550.00
30,740.00
Bahan
15,000.00
16,000.00
15,000.00
16,000.00
13,550.00
14,740.00
Buah
6.7.1
Buah
Engsel Angin
15,000.00
16,000.00
Tenaga
6.7.2
6.9
140,000.00
125,000.00
40,000.00
1 Buah
6.7
140,000.00
125,000.00
Pekerja
6.4.1
6.6
171,370.00
125,000.00
Tenaga
6.3..2
6.5
153,775.00
Bahan
OH
1 Buah
6.4
0.01
6.3.1
0.02
OH
Pekerja
40,000.00
42,000.00
800.00
840.00
0.2
OH
Tukang Kayu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.01
OH
Mandor
55,000.00
60,000.00
550.00
600.00
14,791.25
25,650.00
5,000.00
15,000.00
5,000.00
15,000.00
Buah
6.9.1
149235156.xlsx.ms_office
URAIAN PEKERJAAN
SAT.
Buah
Kait Angin
5,000.00
83/73
15,000.00
abk 12-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
42,000.00
600.00
630.00
0.15
OH
Tukang Kayu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.00075
OH
Mandor
55,000.00
60,000.00
41.25
45.00
282,637.50
385,500.00
Bahan
250,000.00
350,000.00
250,000.00
350,000.00
32,637.50
35,500.00
Buah
Buah
350,000.00
Tenaga
Pekerja
40,000.00
42,000.00
2,000.00
2,100.00
0.5
OH
Tukang Kayu
55,000.00
60,000.00
27,500.00
30,000.00
0.05
OH
Kepala Tukang
60,000.00
65,000.00
3,000.00
3,250.00
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
20,555.00
24,200.00
7,500.00
10,000.00
7,500.00
10,000.00
13,055.00
14,200.00
Buah
Buah
Kunci Selot
7,500.00
10,000.00
Tenaga
0.02
OH
Pekerja
40,000.00
42,000.00
800.00
840.00
0.2
OH
Tukang Kayu
55,000.00
60,000.00
11,000.00
12,000.00
0.02
OH
Kepala Tukang
60,000.00
65,000.00
1,200.00
1,300.00
0.001
OH
Mandor
55,000.00
60,000.00
55.00
60.00
256,527.50
357,100.00
Bahan
250,000.00
350,000.00
250,000.00
350,000.00
6,527.50
7,100.00
Buah
6.12.1
Buah
Door Stop
250,000.00
350,000.00
Tenaga
6.12.2
0.01
OH
Pekerja
40,000.00
42,000.00
400.00
420.00
0.1
OH
Tukang Kayu
55,000.00
60,000.00
5,500.00
6,000.00
0.01
OH
Kepala Tukang
60,000.00
65,000.00
600.00
650.00
0.0005
OH
Mandor
55,000.00
60,000.00
27.50
30.00
149,165.00
242,600.00
Bahan
110,000.00
200,000.00
110,000.00
200,000.00
39,165.00
42,600.00
Buah
6.14.1
Buah
110,000.00
200,000.00
Tenaga
6.14.2
0.06
OH
Pekerja
40,000.00
42,000.00
2,400.00
2,520.00
0.6
OH
Tukang Kayu
55,000.00
60,000.00
33,000.00
36,000.00
0.06
OH
Kepala Tukang
60,000.00
65,000.00
3,600.00
3,900.00
0.003
OH
Mandor
55,000.00
60,000.00
165.00
180.00
23,818.75
27,750.00
7,500.00
10,000.00
7,500.00
10,000.00
16,318.75
17,750.00
Buah
6.15.1
Buah
Kunci Lemari
7,500.00
10,000.00
Tenaga
6.15.2
0.025
OH
Pekerja
40,000.00
42,000.00
1,000.00
1,050.00
0.25
OH
Tukang Kayu
55,000.00
60,000.00
13,750.00
15,000.00
0.025
OH
Kepala Tukang
60,000.00
65,000.00
1,500.00
1,625.00
0.00125
OH
Mandor
55,000.00
60,000.00
68.75
75.00
m2
70,291.25
76,650.00
Bahan
60,500.00
66,000.00
60,500.00
66,000.00
9,791.25
10,650.00
6.16.1
1.1
m2
55,000.00
60,000.00
0.015
OH
0.15
Pekerja
40,000.00
42,000.00
600.00
630.00
OH
Tukang Kayu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.00075
OH
Mandor
55,000.00
60,000.00
41.25
45.00
m2
81,291.25
90,400.00
Bahan
71,500.00
79,750.00
71,500.00
79,750.00
Tenaga
6.16.2
6.17.1
1.1
149235156.xlsx.ms_office
250,000.00
OH
6.11.2
6.17
Door Closer
0.05
6.16
10,650.00
40,000.00
6.11.1
6.15
9,791.25
MAKSIMUM
Rp
Pekerja
6.10.2
6.14
JUMLAH
MINIMUM
Rp
OH
6.13
MAKSIMUM
Rp
0.015
6.10.1
6.11
MINIMUM
Rp
Tenaga
6.9.2
6.10
URAIAN PEKERJAAN
SAT.
m2
65,000.00
83/74
72,500.00
abk 12-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
9,791.25
MAKSIMUM
Rp
10,650.00
0.015
OH
Pekerja
40,000.00
42,000.00
600.00
630.00
0.15
OH
Tukang Kayu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.00075
OH
Mandor
55,000.00
60,000.00
41.25
45.00
m2
207,791.25
241,650.00
Bahan
198,000.00
231,000.00
198,000.00
231,000.00
9,791.25
10,650.00
6.20.1
1.1
m2
180,000.00
210,000.00
0.015
OH
0.15
Kaca Cermin
Pekerja
40,000.00
42,000.00
600.00
630.00
OH
Tukang Kayu
55,000.00
60,000.00
8,250.00
9,000.00
0.015
OH
Kepala Tukang
60,000.00
65,000.00
900.00
975.00
0.00075
OH
Mandor
55,000.00
60,000.00
41.25
45.00
Tenaga
6.20.2
149235156.xlsx.ms_office
MINIMUM
Rp
Tenaga
6.17.2
6.20
URAIAN PEKERJAAN
SAT.
83/75
abk 12-14
HARGA BAHAN/UPAH
No.
XIII
SNI
KODE
KOEF
03-7395 - 2008
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
m2
6.3.1
26.5
Buah
10.4
6.9
57,750.00
33,920.00
37,100.00
Kg
Portland Semen
1,200.00
1,250.00
12,480.00
13,000.00
0.0450
m3
Pasir Pasang
135,000.00
170,000.00
6,075.00
7,650.00
19,835.00
21,190.00
0.27
OH
Pekerja
40,000.00
42,000.00
10,800.00
11,340.00
0.135
OH
Tukang Batu
55,000.00
60,000.00
7,425.00
8,100.00
0.014
OH
Kepala Tukang
60,000.00
65,000.00
840.00
910.00
0.014
OH
Mandor
55,000.00
60,000.00
770.00
840.00
m2
256,061.00
281,793.00
Bahan
237,691.00
262,168.00
Tenaga
6.63
Buah
31,200.00
33,600.00
206,856.00
9.8
Kg
Portland Semen
222,768.00
1,200.00
1,250.00
11,760.00
0.045
m3
12,250.00
Pasir Pasang
135,000.00
170,000.00
6,075.00
1.300
Kg
7,650.00
Semen Warna
10,000.00
15,000.00
13,000.00
19,500.00
0.250
OH
18,370.00
19,625.00
Pekerja
40,000.00
42,000.00
10,000.00
0.125
10,500.00
OH
Tukang Batu
55,000.00
60,000.00
6,875.00
7,500.00
0.013
OH
Kepala Tukang
60,000.00
65,000.00
780.00
845.00
0.013
OH
Mandor
55,000.00
60,000.00
715.00
780.00
m'
38,638.00
42,650.00
Bahan
29,273.00
32,585.00
Tenaga
6.19.1
5.3
Buah
5,000.00
5,500.00
26,500.00
1.14
29,150.00
Kg
Portland Semen
1,200.00
1,250.00
1,368.00
1,425.00
0.003
m3
Pasir Pasang
135,000.00
170,000.00
405.00
510.00
0.1
Kg
Semen Warna
10,000.00
15,000.00
1,000.00
1,500.00
9,365.00
10,065.00
0.09
OH
Pekerja
40,000.00
42,000.00
3,600.00
3,780.00
0.09
OH
Tukang Batu
55,000.00
60,000.00
4,950.00
5,400.00
0.009
OH
Kepala Tukang
60,000.00
65,000.00
540.00
585.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
m2
121,155.78
143,629.17
69,880.78
88,854.17
6.19.2
Tenaga
6.34.1
Bahan
10
Buah
Ubin Keramik 33 x 33 cm
3,777.78
4,666.67
37,777.78
46,666.67
1,200.00
1,250.00
9,828.00
10,237.50
8.19
Kg
Portland Semen
0.045
m3
Pasir Pasang
135,000.00
170,000.00
6,075.00
7,650.00
1.62
Kg
Semen Warna
10,000.00
15,000.00
16,200.00
24,300.00
51,275.00
54,775.00
0.70
OH
Pekerja
40,000.00
42,000.00
28,000.00
29,400.00
0.35
OH
Tukang Batu
55,000.00
60,000.00
19,250.00
21,000.00
0.035
OH
Kepala Tukang
60,000.00
65,000.00
2,100.00
2,275.00
0.035
OH
Mandor
55,000.00
60,000.00
1,925.00
2,100.00
m2
121,039.09
142,746.82
69,764.09
87,971.82
6.34.2
6.35
78,940.00
52,475.00
1,400.00
6.9.2
6.34
72,310.00
Bahan
1,280.00
6.9.1
6.19
6.3.2
Tenaga
6.35.1
Bahan
11.87
Buah
Ubin Keramik 30 x 30 cm
3,090.91
3,818.18
36,689.09
10.00
45,321.82
Kg
Portland Semen
1,200.00
1,250.00
12,000.00
12,500.00
0.045
m3
Pasir Pasang
135,000.00
170,000.00
6,075.00
7,650.00
1.50
Kg
Semen Warna
10,000.00
15,000.00
15,000.00
22,500.00
51,275.00
54,775.00
0.70
OH
Pekerja
40,000.00
42,000.00
28,000.00
29,400.00
0.35
OH
Tukang Batu
55,000.00
60,000.00
19,250.00
21,000.00
0.035
OH
Kepala Tukang
60,000.00
65,000.00
2,100.00
2,275.00
0.035
OH
Mandor
55,000.00
60,000.00
1,925.00
2,100.00
6.35.2
149235156.xlsx.ms_office
URAIAN PEKERJAAN
SAT.
Tenaga
83/76
abk 13-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.36
KOEF
1
m2
6.36.1
26.5
Buah
MAKSIMUM
Rp
10.40
88,410.00
43,460.00
Kg
Portland Semen
1,200.00
1,250.00
12,480.00
13,000.00
0.045
m3
Pasir Pasang
135,000.00
170,000.00
6,075.00
7,650.00
1.62
Kg
Semen Warna
10,000.00
15,000.00
16,200.00
24,300.00
51,275.00
54,775.00
0.70
OH
Pekerja
40,000.00
42,000.00
28,000.00
29,400.00
0.35
OH
Tukang Batu
55,000.00
60,000.00
19,250.00
21,000.00
0.035
OH
Kepala Tukang
60,000.00
65,000.00
2,100.00
2,275.00
0.035
OH
Mandor
55,000.00
60,000.00
1,925.00
2,100.00
16,843.88
18,922.06
7,478.88
8,857.06
Tenaga
1 m'
5.3
Buah
Ubin Keramik
1,029.41
1,235.29
5,455.88
1.14
6,547.06
Kg
Portland Semen
1,200.00
1,250.00
1,368.00
1,425.00
0.003
m3
Pasir Pasang
135,000.00
170,000.00
405.00
510.00
0.025
Kg
Semen Warna
10,000.00
15,000.00
250.00
375.00
9,365.00
10,065.00
0.09
OH
Pekerja
40,000.00
42,000.00
3,600.00
3,780.00
0.09
OH
Tukang Batu
55,000.00
60,000.00
4,950.00
5,400.00
0.009
OH
Kepala Tukang
60,000.00
65,000.00
540.00
585.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
22,549.76
25,844.12
Bahan
13,184.76
15,779.12
Tenaga
1 m'
10.6
Buah
Ubin Keramik
1,029.41
1,235.29
10,911.76
1.14
13,094.12
Kg
Portland Semen
1,200.00
1,250.00
1,368.00
1,425.00
0.003
m3
Pasir Pasang
135,000.00
170,000.00
405.00
510.00
0.05
Kg
Semen Warna
10,000.00
15,000.00
500.00
750.00
9,365.00
10,065.00
0.09
OH
Pekerja
40,000.00
42,000.00
3,600.00
3,780.00
0.09
OH
Tukang Batu
55,000.00
60,000.00
4,950.00
5,400.00
0.009
OH
Kepala Tukang
60,000.00
65,000.00
540.00
585.00
0.005
OH
Mandor
55,000.00
60,000.00
275.00
300.00
m2
391,678.00
426,912.50
Bahan
340,403.00
372,137.50
6.43.1
1.06
buah
Marmer
300,000.00
325,000.00
318,000.00
8.19
kg
Portland Semen
344,500.00
1,200.00
1,250.00
9,828.00
0.045
m3
10,237.50
Pasir Pasang
135,000.00
170,000.00
6,075.00
0.65
kg
7,650.00
Semen Warna
10,000.00
15,000.00
6,500.00
9,750.00
0.7
OH
51,275.00
54,775.00
Pekerja
40,000.00
42,000.00
28,000.00
0.35
29,400.00
OH
Tukang Batu
55,000.00
60,000.00
19,250.00
21,000.00
0.035
OH
Kepala Tukang
60,000.00
65,000.00
2,100.00
2,275.00
0.035
OH
Mandor
55,000.00
60,000.00
1,925.00
2,100.00
m2
81,365.00
88,110.00
Bahan
63,700.00
69,125.00
Tenaga
6.44.1
1.05
m2
Karpet
50,000.00
54,166.67
52,500.00
56,875.00
0.35
kg
Lem
32,000.00
35,000.00
11,200.00
12,250.00
17,665.00
18,985.00
0.17
OH
Pekerja
40,000.00
42,000.00
6,800.00
7,140.00
0.17
OH
Tukang Batu
55,000.00
60,000.00
9,350.00
10,200.00
0.017
OH
Kepala Tukang
60,000.00
65,000.00
1,020.00
1,105.00
0.009
OH
Mandor
55,000.00
60,000.00
495.00
540.00
m2
238,475.00
259,525.00
Bahan
187,200.00
204,750.00
6.44.2
Tenaga
6.46.1
149235156.xlsx.ms_office
143,185.00
75,035.00
40,280.00
Tenaga
6.46
126,310.00
1,640.00
6.40.1
6.44
MAKSIMUM
Rp
1,520.00
6.39.2
6.43
JUMLAH
MINIMUM
Rp
Ubin Keramik 20 x 20 cm
6.39.1
6.40
MINIMUM
Rp
Bahan
6.36.2
6.39
URAIAN PEKERJAAN
SAT.
1.05
m2
Parquet Jati
0.6
Kg
Lem Vynil
83/77
160,000.00
175,000.00
168,000.00
183,750.00
32,000.00
35,000.00
19,200.00
21,000.00
abk 13-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
Tenaga
51,275.00
54,775.00
42,000.00
28,000.00
29,400.00
0.35
OH
Tukang Batu
55,000.00
60,000.00
19,250.00
21,000.00
0.035
OH
Kepala Tukang
60,000.00
65,000.00
2,100.00
2,275.00
0.035
OH
Mandor
55,000.00
60,000.00
1,925.00
2,100.00
m2
146,235.00
166,640.00
80,310.00
96,215.00
Bahan
53
Buah
740.00
760.00
39,220.00
9.3
Kg
Portland Semen
40,280.00
1,200.00
1,250.00
11,160.00
0.018
m3
11,625.00
Pasir Pasang
135,000.00
170,000.00
2,430.00
2.75
Kg
3,060.00
Semen Warna
10,000.00
15,000.00
27,500.00
41,250.00
0.9
OH
65,925.00
70,425.00
Pekerja
40,000.00
42,000.00
36,000.00
0.45
37,800.00
OH
Tukang Batu
55,000.00
60,000.00
24,750.00
27,000.00
0.045
OH
Kepala Tukang
60,000.00
65,000.00
2,700.00
2,925.00
0.045
OH
Mandor
55,000.00
60,000.00
2,475.00
2,700.00
m2
136,015.00
158,730.00
70,090.00
88,305.00
Bahan
26.5
Buah
Keramik
1,400.00
1,680.00
37,100.00
9.3
44,520.00
Kg
Portland Semen
1,200.00
1,250.00
11,160.00
11,625.00
0.018
m3
Pasir Pasang
135,000.00
170,000.00
2,430.00
3,060.00
1.94
Kg
Semen Warna
10,000.00
15,000.00
19,400.00
29,100.00
65,925.00
70,425.00
0.9
OH
Pekerja
40,000.00
42,000.00
36,000.00
37,800.00
0.45
OH
Tukang Batu
55,000.00
60,000.00
24,750.00
27,000.00
0.045
OH
Kepala Tukang
60,000.00
65,000.00
2,700.00
2,925.00
0.045
OH
Mandor
55,000.00
60,000.00
2,475.00
2,700.00
m2
438,133.11
475,880.11
Bahan
342,908.11
374,155.11
318,000.00
344,500.00
Tenaga
6.55.1
1.06
buah
Marmer
3.003
buah
Paku 12 cm
12.44
kg
Portlan Semen
0.025
m3
0.65
kg
1.3
OH
0.65
300,000.00
35.00
325,000.00
35.00
105.11
105.11
1,200.00
1,250.00
14,928.00
15,550.00
Pasir Pasang
135,000.00
170,000.00
3,375.00
4,250.00
Semen Warna
10,000.00
15,000.00
6,500.00
9,750.00
95,225.00
101,725.00
Pekerja
40,000.00
42,000.00
52,000.00
54,600.00
OH
Tukang Batu
55,000.00
60,000.00
35,750.00
39,000.00
0.065
OH
Kepala Tukang
60,000.00
65,000.00
3,900.00
4,225.00
0.065
OH
Mandor
55,000.00
60,000.00
3,575.00
3,900.00
m2
152,600.00
161,212.50
Bahan
101,325.00
106,437.50
6.55.2
Tenaga
6.57.1
1.10
m2
Batu Paros
75,000.00
78,000.00
82,500.00
11.75
Kg
Portland Semen
85,800.00
1,200.00
1,250.00
14,100.00
0.035
m3
Pasir Pasang
14,687.50
135,000.00
170,000.00
4,725.00
5,950.00
0.70
OH
51,275.00
54,775.00
Pekerja
40,000.00
42,000.00
28,000.00
0.35
29,400.00
OH
Tukang Batu
55,000.00
60,000.00
19,250.00
21,000.00
0.035
OH
Kepala Tukang
60,000.00
65,000.00
2,100.00
2,275.00
0.035
OH
Mandor
55,000.00
60,000.00
1,925.00
2,100.00
m2
120,755.00
134,175.00
96,000.00
107,750.00
88,000.00
99,000.00
8,000.00
8,750.00
Tenaga
6.57.2
6.60.1
Bahan
2.2
m'
Wall Paper
0.25
kg
Lem
0.35
OH
0.175
40,000.00
45,000.00
32,000.00
35,000.00
24,755.00
26,425.00
Pekerja
40,000.00
42,000.00
14,000.00
14,700.00
OH
Tukang Batu
55,000.00
60,000.00
9,625.00
10,500.00
0.017
OH
Kepala Tukang
60,000.00
65,000.00
1,020.00
1,105.00
0.002
OH
Mandor
55,000.00
60,000.00
110.00
120.00
6.60.2
149235156.xlsx.ms_office
Keramik
Tenaga
6.54.2
6.60
MAKSIMUM
Rp
40,000.00
6.54.1
6.57
JUMLAH
MINIMUM
Rp
Pekerja
6.53.2
6.55
MAKSIMUM
Rp
OH
6.53.1
6.54
MINIMUM
Rp
0.70
6.46.2
6.53
URAIAN PEKERJAAN
SAT.
Tenaga
83/78
abk 13-14
HARGA BAHAN/UPAH
No.
SNI
KODE
6.63
KOEF
1
m'
6.63.1
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
34,355.00
35,885.50
Bahan
21,905.00
22,505.50
0.003
m3
7,300,000.00
7,500,000.00
21,900.00
22,500.00
0.05
kg
Paku Sekrup 5 cm
100.00
110.00
5.00
5.50
12,450.00
13,380.00
0.12
OH
Pekerja
40,000.00
42,000.00
4,800.00
5,040.00
0.12
OH
Tukang Batu
55,000.00
60,000.00
6,600.00
7,200.00
0.012
OH
Kepala Tukang
60,000.00
65,000.00
720.00
780.00
0.006
OH
Mandor
55,000.00
60,000.00
330.00
360.00
6.61.2
149235156.xlsx.ms_office
URAIAN PEKERJAAN
SAT.
Tenaga
83/79
abk 13-14
HARGA BAHAN/UPAH
No.
XIV 03-
SNI
KODE
KOEF
URAIAN PEKERJAAN
SAT.
MINIMUM
Rp
MAKSIMUM
Rp
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
PEKERJAAN PENGECATAN
-2002
6.1
m2
0.05
Kg
0.15
OH
0.0025
6,137.50
6,450.00
42,000.00
6,000.00
6,300.00
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
6,687.50
7,100.00
550.00
650.00
550.00
650.00
0.05
Kg
11,000.00
13,000.00
0.15
OH
0.0025
6,137.50
6,450.00
Pekerja
40,000.00
42,000.00
6,000.00
6,300.00
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
6,687.50
7,100.00
550.00
650.00
550.00
650.00
Bahan
6.3.1
0.05
Kg
11,000.00
13,000.00
0.15
OH
0.0025
6,137.50
6,450.00
Pekerja
40,000.00
42,000.00
6,000.00
6,300.00
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
6,687.50
7,100.00
550.00
650.00
550.00
650.00
Bahan
6.4.1
0.05
Kg
11,000.00
13,000.00
0.15
OH
0.0025
6,137.50
6,450.00
Pekerja
40,000.00
42,000.00
6,000.00
6,300.00
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
5,787.50
6,285.00
Bahan
1,610.00
1,795.00
6.6.1
0.08
Kg
Dempul Jadi
14,000.00
15,000.00
1,120.00
0.02
Kg
1,200.00
Minyak Cat
7,000.00
11,250.00
140.00
0.1
lbr
225.00
Amplas
3,500.00
3,700.00
350.00
370.00
0.04
OH
4,177.50
4,490.00
Pekerja
40,000.00
42,000.00
1,600.00
0.04
1,680.00
OH
Tukang Cat
55,000.00
60,000.00
2,200.00
2,400.00
0.004
OH
Kepala Tukang
60,000.00
65,000.00
240.00
260.00
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
19,302.50
20,952.50
Bahan
11,790.00
12,875.00
Tenaga
6.6.2
6.7.1
0.15
Kg
Plamir
14,000.00
15,000.00
2,100.00
2,250.00
0.17
Kg
Cat Dasar
15,000.00
16,000.00
2,550.00
2,720.00
0.17
Kg
Cat Penutup
42,000.00
46,500.00
7,140.00
7,905.00
7,512.50
8,077.50
0.07
OH
Pekerja
40,000.00
42,000.00
2,800.00
2,940.00
0.075
OH
Tukang Cat
55,000.00
60,000.00
4,125.00
4,500.00
0.0075
OH
Kepala Tukang
60,000.00
65,000.00
450.00
487.50
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
22,056.50
24,280.00
Tenaga
6.7.2
6.8
Sabun
Tenaga
6.4.2
6.7
Sabun
Tenaga
6.3.2
6.6
Sabun
Tenaga
6.2.2
6.4
650.00
40,000.00
Bahan
650.00
600.00
Pekerja
Tenaga
7,100.00
600.00
13,000.00
6.2.1
6.3
Soda Api
6,737.50
12,000.00
6.1.2
6.2
6.1.1
20,260.00
0.2
Kg
Bahan
Cat Meni
15,000.00
16,000.00
3,000.00
3,200.00
0.15
Kg
Plamir
14,000.00
15,000.00
2,100.00
2,250.00
0.17
Kg
Cat Dasar
13,200.00
16,000.00
2,244.00
2,720.00
0.26
Kg
42,000.00
46,500.00
10,920.00
12,090.00
6.8.1
149235156.xlsx.ms_office
83/80
abk 14-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
MINIMUM
Rp
MAKSIMUM
Rp
Tenaga
JUMLAH
MINIMUM
Rp
MAKSIMUM
Rp
3,792.50
4,020.00
0.07
OH
Pekerja
40,000.00
42,000.00
2,800.00
2,940.00
0.009
OH
Tukang Cat
55,000.00
60,000.00
495.00
540.00
0.006
OH
Kepala Tukang
60,000.00
65,000.00
360.00
390.00
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
30,996.50
34,095.00
6.8.2
6.9
URAIAN PEKERJAAN
SAT.
24,445.00
0.2
Kg
Bahan
Cat Meni
15,000.00
16,000.00
3,000.00
3,200.00
0.15
Kg
Plamir
14,000.00
15,000.00
2,100.00
2,250.00
0.17
Kg
Cat Dasar
13,200.00
16,000.00
2,244.00
2,720.00
0.35
Kg
42,000.00
46,500.00
14,700.00
16,275.00
8,952.50
9,650.00
0.07
OH
Pekerja
40,000.00
42,000.00
2,800.00
2,940.00
0.105
OH
Tukang Cat
55,000.00
60,000.00
5,775.00
6,300.00
0.004
OH
Kepala Tukang
60,000.00
65,000.00
240.00
260.00
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
27,702.50
32,025.00
Bahan
18,720.00
22,320.00
18,720.00
22,320.00
6.9.1
Tenaga
6.9.2
6.10
6.10.1
0.36
Ltr
0.04
OH
0.063
52,000.00
62,000.00
8,982.50
9,705.00
Pekerja
40,000.00
42,000.00
1,600.00
1,680.00
OH
Tukang Cat
55,000.00
60,000.00
3,465.00
3,780.00
0.063
OH
Kepala Tukang
60,000.00
65,000.00
3,780.00
4,095.00
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
38,541.50
44,554.00
Bahan
34,144.00
39,764.00
Tenaga
6.10.2
6.11
6.11.1
0.15
Ltr
Politur
52,000.00
62,000.00
7,800.00
9,300.00
0.372
Ltr
Politur Jadi
52,000.00
62,000.00
19,344.00
23,064.00
Lbr
Ampelas
3,500.00
3,700.00
7,000.00
7,400.00
4,397.50
4,790.00
Tenaga
6.11.2
6.12
0.06
OH
Tukang Cat
55,000.00
60,000.00
3,300.00
3,600.00
0.016
OH
Kepala Tukang
60,000.00
65,000.00
960.00
1,040.00
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
4,986.25
5,610.00
656.25
1,050.00
656.25
1,050.00
Bahan
6.12.1
0.35
Ltr
1,875.00
3,000.00
0.1
OH
0.006
4,330.00
4,560.00
Pekerja
40,000.00
42,000.00
4,000.00
4,200.00
OH
Mandor
55,000.00
60,000.00
330.00
360.00
m2
25,162.50
27,955.00
8,865.00
10,445.00
Bahan
6.13.1
0.15
Ltr
Vernis
52,000.00
62,000.00
7,800.00
9,300.00
0.05
Ltr
Dempul
14,000.00
15,000.00
700.00
750.00
0.1
Lbr
Ampelas
3,500.00
3,700.00
350.00
370.00
1,500.00
2,500.00
15.00
25.00
0.01
Buah Kuas
16,297.50
17,510.00
0.16
OH
Tenaga
Pekerja
40,000.00
42,000.00
6,400.00
6,720.00
0.16
OH
Tukang Cat
55,000.00
60,000.00
8,800.00
9,600.00
0.016
OH
Kepala Tukang
60,000.00
65,000.00
960.00
1,040.00
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
12,010.50
13,375.50
6.13.2
6.14
6.12.2
6.13
Teak Oil
8,196.00
0.1
Kg
Bahan
Plamir
10,500.00
12,000.00
1,050.00
1,200.00
0.1
Kg
Cat Dasar
15,000.00
19,000.00
1,500.00
1,900.00
0.26
Kg
18,000.00
19,600.00
4,680.00
5,096.00
6.14.1
149235156.xlsx.ms_office
83/81
abk 14-14
HARGA BAHAN/UPAH
No.
SNI
KODE
KOEF
4,780.50
MAKSIMUM
Rp
5,179.50
Pekerja
40,000.00
42,000.00
800.00
840.00
0.063
OH
Tukang Cat
55,000.00
60,000.00
3,465.00
3,780.00
0.0063
OH
Kepala Tukang
60,000.00
65,000.00
378.00
409.50
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
8,559.50
9,547.00
Bahan
4,740.00
5,428.00
0.1
Kg
Cat Dasar
15,000.00
19,000.00
1,500.00
1,900.00
0.18
Kg
18,000.00
19,600.00
3,240.00
3,528.00
3,819.50
4,119.00
0.028
OH
Tenaga
Pekerja
40,000.00
42,000.00
1,120.00
1,176.00
0.042
OH
Tukang Cat
55,000.00
60,000.00
2,310.00
2,520.00
0.0042
OH
Kepala Tukang
60,000.00
65,000.00
252.00
273.00
0.0025
OH
Mandor
55,000.00
60,000.00
137.50
150.00
m2
14,290.00
15,920.00
1,820.00
2,350.00
Bahan
6.20.1
0.1
Kg
Meni Besi
15,000.00
20,000.00
1,500.00
2,000.00
0.01
Kg
Perekat / Lem
32,000.00
35,000.00
320.00
350.00
12,470.00
13,570.00
0.02
OH
Pekerja
40,000.00
42,000.00
800.00
840.00
0.2
OH
Tukang Cat
55,000.00
60,000.00
11,000.00
12,000.00
0.002
OH
Kepala Tukang
60,000.00
65,000.00
120.00
130.00
0.01
OH
Mandor
55,000.00
60,000.00
550.00
600.00
m2
28,057.50
30,462.50
3,920.00
4,550.00
2,000.00
Tenaga
6.20.2
Bahan
6.21.1
0.1
Kg
Meni Besi
15,000.00
20,000.00
1,500.00
0.01
Kg
Perekat / Lem
32,000.00
35,000.00
320.00
350.00
0.002
m3
Perancah Kayu
1,050,000.00
1,100,000.00
2,100.00
2,200.00
24,137.50
25,912.50
0.25
OH
Pekerja
40,000.00
42,000.00
10,000.00
10,500.00
0.225
OH
Tukang Cat
55,000.00
60,000.00
12,375.00
13,500.00
0.0225
OH
Kepala Tukang
60,000.00
65,000.00
1,350.00
1,462.50
0.0075
OH
Mandor
55,000.00
60,000.00
412.50
450.00
m2
100,480.00
109,140.00
Tenaga
6.21.2
6.24
JUMLAH
MINIMUM
Rp
OH
6.15.2
6.21
MAKSIMUM
Rp
0.02
6.15.1
6.20
MINIMUM
Rp
Tenaga
6.14.2
6.15
URAIAN PEKERJAAN
SAT.
8,640.00
0.11
Kg
Bahan
Cat dasar
13,000.00
16,000.00
1,430.00
1,760.00
0.17
Kg
Cat Antara
13,000.00
16,000.00
2,210.00
2,720.00
0.08
Kg
Cat Penutup
48,000.00
52,000.00
3,840.00
4,160.00
93,000.00
100,500.00
0.50
OH
Pekerja
40,000.00
42,000.00
20,000.00
21,000.00
0.80
OH
Tukang Cat
55,000.00
60,000.00
44,000.00
48,000.00
0.30
OH
Kepala Tukang
60,000.00
65,000.00
18,000.00
19,500.00
0.20
OH
Mandor
55,000.00
60,000.00
11,000.00
12,000.00
6.24.1
Tenaga
6.24.2
149235156.xlsx.ms_office
83/82
abk 14-14