15 REKAPITULASI RAB
REKAPITULASI
KEGIATAN : PEMBANGUNAN RUKO
PEKERJAAN : RENCANA PEMBANGUNAN RUKO 3 LANTAI DI JL. MARSMA R. ISWAHYUDI BALIKPAPAN
TAHUN
: 2012
NO
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
X1V

URAIAN PEKERJAAN

NILAI PEKERJAAN (Rp)

PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGAN
PEKERJAAN BETON
PEKERJAAN PEMBESIAN
PEKERJAAN BEKISTING
PEKERJAAN DINDING
PEKERJAAN LANTAI
PEKERJAAN LANGIT-LANGIT / PLAFOND
PEK. KUSEN, DAUN PINTU DAN JENDELA
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN SANITAIR DAN INSTALASI AIR
PEKERJAAN PENGECATAN
PEKERJAAN PENGGANTUNG DAN PENGUNCI
PEKERJAAN LAIN-LAIN

23,742,500.00
23,454,985.75
120,207,932.45
252,185,610.39
345,860,158.45
97,685,741.49
57,852,182.41
86,144,681.25
32,583,600.50
11,585,290.00
19,390,976.30
48,794,697.69
4,807,500.00
2,000,000.00

JUMLAH PEKERJAAN FISIK


PPN 10%
KEUNTUNGAN 5%
OVER HEAD 10%
JUMLAH KESELURUHAN
DIBULATKAN

Rp1,126,295,856.69
Rp112,629,585.67
Rp56,314,792.83
Rp112,629,585.67
Rp1,407,869,820.86
Rp1,407,870,000.00

TERBILANG:

"SATU MILIAR EMPAT RATUS TUJUH JUTA DELAPAN RATUS TUJUH PULUH RIBU RUPIAH "

SNI - 2

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan

Sat. Kode

I.

PEKERJAAN PERSIAPAN

Pagar Sementara Dari Kayu Tinggi 2 Meter


0.4000 Oh
Pekerja
0.2000 Oh
Tukang Kayu
0.0200 Oh
Kepala Tukang
0.0200 Oh
Mandor
1.2500 Btg
Dolken Kayu Dia. 8 - 400 cm
2.5000 Kg
Semen PC ex Tonasa
0.0050 M3
Pasir Beton
0.0090 M3
Koral Beton
0.0720 M3
Kayu Meranti
0.0600 Kg
Paku Biasa
0.4000 Ltr
Residu

M'

Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter


0.4000 Oh
Pekerja
0.2000 Oh
Tukang Kayu
0.0200 Oh
Kepala Tukang
0.0200 Oh
Mandor
1.2500 Btg
Dolken Kayu Dia. 8 - 400 cm
2.5000 Kg
Semen Ex. Tonasa
1.2000 Lbr
Seng Gelombang
0.0050 M3
Pasir Beton
0.0090 M3
Koral Beton
0.0720 M3
Kayu Meranti
0.0600 Kg
Paku Biasa
0.4500 Kg
Meni Besi

M'

Pagar Sementara Dari Kawat Duri Tinggi 1,8 Meter


0.3000 Oh
Pekerja
0.2000 Oh
Tukang Kayu
0.0200 Oh
Kepala Tukang
0.0200 Oh
Mandor
1.0000 Btg
Dolken Kayu Dia. 8 - 400 cm
2.0000 Kg
Semen PC ex. Tonasa
25.0000 Kg
Kawat duri
0.0050 M3
Pasir Beton
0.0090 M3
Koral Beton
0.0600 Kg
Paku Biasa

M'

Pengukuran Dan Pemasangan Bouwplank


0.1000 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0050 Oh
Mandor
0.0190 M3
Kayu Meranti
0.0200 Kg
Paku Biasa

M'

Pembuatan Rumah Jaga/Konstruksi Kayu


1.0000 Oh
Pekerja
1.5000 Oh
Tukang Kayu
0.1500 Oh
Kepala Tukang
0.0500 Oh
Mandor
3.0000 Btg
Dolken Kayu Dia. 8 - 400 cm
0.2760 M3
Kayu Meranti
0.7000 Kg
Paku Biasa
1.5000 Lbr
Seng Gelombang BJLS 30

M2

Membersihkan Lapangan Dan Perataan


0.1000 Oh
Pekerja
0.0500 Oh
Mandor

M2

Pembuatan Bedeng Buruh


1.0000 Oh
Pekerja
2.0000 Oh
Tukang Kayu
0.2000 Oh
Kepala Tukang
0.0500 Oh
Mandor
1.2500 Btg
Dolken Kayu Dia. 8 - 400 cm
0.1860 M3
Kayu Meranti
0.3000 Kg
Paku Biasa
1.5000 Lbr
Seng Gelombang BJLS 30

M2

Pembuatan Jalan Sementara


1.0000 Oh
Pekerja
0.0500 Oh
Mandor
0.1500 M3
Batu Pecah 15/20

M2

Harga
(Rp)
4

Upah
5

Jumlah Harga (Rp)


Bahan
6

Jumlah
7

I.1.
60,000.00
80,000.00
90,000.00
85,000.00
70,000.00
1,600.00
312,500.00
380,600.00
3,500,000.00
15,000.00
15,000.00
Jumlah

24,000.00
16,000.00
1,800.00
1,700.00
43,500.00

87,500.00
4,000.00
1,562.50
3,425.40
252,000.00
900.00
6,000.00
355,387.90

24,000.00
16,000.00
1,800.00
1,700.00
87,500.00
4,000.00
1,562.50
3,425.40
252,000.00
900.00
6,000.00
398,887.90

60,000.00
80,000.00
90,000.00
85,000.00
70,000.00
1,600.00
100,000.00
312,500.00
380,600.00
3,500,000.00
15,000.00
61,500.00
Jumlah

24,000.00
16,000.00
1,800.00
1,700.00
43,500.00

87,500.00
4,000.00
120,000.00
1,562.50
3,425.40
252,000.00
900.00
27,675.00
497,062.90

24,000.00
16,000.00
1,800.00
1,700.00
87,500.00
4,000.00
120,000.00
1,562.50
3,425.40
252,000.00
900.00
27,675.00
540,562.90

60,000.00
80,000.00
90,000.00
85,000.00
70,000.00
1,600.00
80,000.00
312,500.00
380,600.00
15,000.00
Jumlah

18,000.00
16,000.00
1,800.00
1,700.00
37,500.00

70,000.00
3,200.00
2,000,000.00
1,562.50
3,425.40
900.00
2,079,087.90

18,000.00
16,000.00
1,800.00
1,700.00
70,000.00
3,200.00
2,000,000.00
1,562.50
3,425.40
900.00
2,116,587.90

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah

6,000.00
8,000.00
900.00
425.00
15,325.00

66,500.00
300.00
66,800.00

6,000.00
8,000.00
900.00
425.00
66,500.00
300.00
82,125.00

60,000.00
80,000.00
90,000.00
85,000.00
70,000.00
3,500,000.00
15,000.00
100,000.00
Jumlah

60,000.00
120,000.00
13,500.00
4,250.00
197,750.00

210,000.00
966,000.00
10,500.00
150,000.00
1,336,500.00

60,000.00
120,000.00
13,500.00
4,250.00
210,000.00
966,000.00
10,500.00
150,000.00
1,534,250.00

60,000.00
85,000.00
Jumlah

6,000.00
4,250.00
10,250.00

60,000.00
80,000.00
90,000.00
85,000.00
70,000.00
3,500,000.00
15,000.00
100,000.00
Jumlah

60,000.00
160,000.00
18,000.00
4,250.00
242,250.00

87,500.00
651,000.00
4,500.00
150,000.00
893,000.00

60,000.00
160,000.00
18,000.00
4,250.00
87,500.00
651,000.00
4,500.00
150,000.00
1,135,250.00

60,000.00
85,000.00
346,000.00

60,000.00
4,250.00
-

51,900.00

60,000.00
4,250.00
51,900.00

I.2.

I.3.

I.4.

I.5.

I.6.
-

6,000.00
4,250.00
10,250.00

I.7.

I.7.

SNI - 3

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.0900 M3
0.0100 M3

II.
1

Sat. Kode

Batu Pecah 5/7


Pasir Pasang

Bongkaran Beton Bertulang


6.6670 Oh
Pekerja
0.3330 Oh
Mandor

M3

Bongkaran Dinding Tembok Batu Bata


6.6670 Oh
Pekerja
0.3330 Oh
Mandor

M3

PEKERJAAN TANAH
Penggalian Tanah Biasa Sedalam 1 Meter
0.4000 Oh
Pekerja
0.0400 Oh
Mandor

M3

Penggalian Tanah Biasa Sedalam 2 Meter


0.5260 Oh
Pekerja
0.0520 Oh
Mandor

M3

Penggalian Tanah Biasa Sedalam 3 Meter


0.7350 Oh
Pekerja
0.0730 Oh
Mandor

M3

Penggalian Tanah Keras Sedalam 1 Meter


0.6250 Oh
Pekerja
0.0620 Oh
Mandor

M3

Penggalian Tanah Cadas Sedalam 1 Meter


1.2500 Oh
Pekerja
0.1250 Oh
Mandor

M3

Penggalian Tanah Lumpur Sedalam 1 Meter


0.8230 Oh
Pekerja
0.0830 Oh
Mandor

M3

Pekerjaan Stripping Setinggi 1 Meter


0.0500 Oh
Pekerja
0.0050 Oh
Mandor

M2

Pembuangan Tanah Sejauh 150 Meter


0.5160 Oh
Pekerja
0.0500 Oh
Mandor

M3

Urugan Kembali
0.1920 Oh
0.0190 Oh

M3

Pekerja
Mandor

11 Urugan Tanah
0.3000 Oh
0.0100 Oh
1.2000 M3

Pekerja
Mandor
Tanah Urug

12 Urugan Pasir
0.3000 Oh
0.0100 Oh
1.2000 M3

13 Urugan Sirtu
0.2500 Oh
0.0250 Oh
1.2000 M3

Jumlah Harga (Rp)


Bahan
31,140.00
2,350.00
64,250.00
85,390.00
Upah

Jumlah
31,140.00
2,350.00
149,640.00

I.8.
60,000.00
85,000.00
Jumlah

400,020.00
28,305.00
428,325.00

400,020.00
28,305.00
428,325.00

60,000.00
85,000.00
Jumlah

400,020.00
28,305.00
428,325.00

400,020.00
28,305.00
428,325.00

60,000.00
85,000.00
Jumlah

24,000.00
3,400.00
27,400.00

24,000.00
3,400.00
27,400.00

60,000.00
85,000.00
Jumlah

31,560.00
4,420.00
35,980.00

31,560.00
4,420.00
35,980.00

60,000.00
85,000.00
Jumlah

44,100.00
6,205.00
50,305.00

44,100.00
6,205.00
50,305.00

60,000.00
85,000.00
Jumlah

37,500.00
5,270.00
42,770.00

37,500.00
5,270.00
42,770.00

60,000.00
85,000.00
Jumlah

75,000.00
10,625.00
85,625.00

75,000.00
10,625.00
85,625.00

60,000.00
85,000.00
Jumlah

49,380.00
7,055.00
56,435.00

49,380.00
7,055.00
56,435.00

60,000.00
85,000.00
Jumlah

3,000.00
425.00
3,425.00

3,000.00
425.00
3,425.00

60,000.00
85,000.00
Jumlah

30,960.00
4,250.00
35,210.00

30,960.00
4,250.00
35,210.00

60,000.00
85,000.00
Jumlah

11,520.00
1,615.00
13,135.00

11,520.00
1,615.00
13,135.00

60,000.00
85,000.00
Jumlah

30,000.00
4,250.00
34,250.00

30,000.00
4,250.00
34,250.00

60,000.00
85,000.00
42,500.00
Jumlah

18,000.00
850.00

60,000.00
85,000.00
75,000.00
Jumlah

18,000.00
850.00

60,000.00
85,000.00
380,600.00
Jumlah

15,000.00
2,125.00

60,000.00
85,000.00

60,000.00
8,500.00

I.9.

II.1.

II.2.

II.3.

II.4.

II.5.

II.6.

II.7.

II.8.

II.9.

Pekerja
Mandor

10 Pemadatan Tanah
0.5000 Oh
0.0500 Oh

Harga
(Rp)
346,000.00
235,000.00
Jumlah

M3 II.10.

M3 II.11.

18,850.00

51,000.00
51,000.00

18,000.00
850.00
51,000.00
69,850.00

90,000.00
90,000.00

18,000.00
850.00
90,000.00
108,850.00

456,720.00
456,720.00

15,000.00
2,125.00
456,720.00
473,845.00

M3 II.12.
Pekerja
Mandor
Pasir Urug

18,850.00

M3 II.13.
Pekerja
Mandor
Sirtu

14 Pembuatan Jalan Sementara, Tebal 25 cm


1.0000 Oh
Pekerja
0.1000 Oh
Mandor

17,125.00

M3 II.14.
-

60,000.00
8,500.00

SNI - 4

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.2750 M3
0.0300 M3
0.0500 M3

Sat. Kode

Batu Pecah
Kerikil
Pasir Pasang

Harga
(Rp)
346,000.00
380,600.00
235,000.00
Jumlah

Jumlah Harga (Rp)


Bahan
95,150.00
11,418.00
11,750.00
68,500.00
118,318.00
Upah

Jumlah
95,150.00
11,418.00
11,750.00
186,818.00

III. PEKERJAAN PONDASI


1

Pasang Batu Gunung Campuran 1Pc : 1Psr


1.5000 Oh
Pekerja
0.6000 Oh
Tukang Batu
0.0600 Oh
Kepala Tukang
0.0750 Oh
Mandor
1.1000 M3
Batu Gunung
392.0000 Kg
Semen Ex. Tonasa
0.3140 M3
Pasir Pasang

M3

Pasang Batu Gunung Campuran 1Pc : 2 Psr


1.5000 Oh
Pekerja
0.6000 Oh
Tukang Batu
0.0600 Oh
Kepala Tukang
0.0750 Oh
Mandor
1.1000 M3
Batu Gunung
267.0000 Kg
Semen Ex. Tonasa
0.4270 M3
Pasir Pasang

M3

Pasang Batu Gunung Campuran 1Pc : 2,5Psr


1.5000 Oh
Pekerja
0.6000 Oh
Tukang Batu
0.0600 Oh
Kepala Tukang
0.0750 Oh
Mandor
1.1000 M3
Batu Gunung
234.0000 Kg
Semen Ex. Tonasa
0.4560 M3
Pasir Pasang

M3

Pasang Batu Gunung Campuran 1Pc : 3Psr


1.5000 Oh
Pekerja
0.6000 Oh
Tukang Batu
0.0600 Oh
Kepala Tukang
0.0750 Oh
Mandor
1.1000 M3
Batu Gunung
202.0000 Kg
Semen Ex. Tonasa
0.4850 M3
Pasir Pasang

M3

Pasang Batu Gunung Campuran 1Pc : 4Psr


1.5000 Oh
Pekerja
0.6000 Oh
Tukang Batu
0.0600 Oh
Kepala Tukang
0.0750 Oh
Mandor
1.1000 M3
Batu Gunung
163.0000 Kg
Semen Ex. Tonasa
0.5200 M3
Pasir Pasang

M3

Pasang Batu Gunung Campuran 1Pc : 5Psr


1.5000 Oh
Pekerja
0.6000 Oh
Tukang Batu
0.0600 Oh
Kepala Tukang
0.0750 Oh
Mandor
1.1000 M3
Batu Gunung
136.0000 Kg
Semen Ex. Tonasa
0.5440 M3
Pasir Pasang

M3

Pasang Batu Gunung Campuran 1Pc : 6Psr


1.5000 Oh
Pekerja
0.6000 Oh
Tukang Batu
0.0600 Oh
Kepala Tukang
0.0750 Oh
Mandor
1.1000 M3
Batu Gunung
117.0000 Kg
Semen Ex. Tonasa
0.5610 M3
Pasir Pasang

M3

Pasang Batu Gunung Campuran 1Pc : 8Psr


1.5000 Oh
Pekerja
0.6000 Oh
Tukang Batu
0.0600 Oh
Kepala Tukang
0.0750 Oh
Mandor
1.1000 M3
Batu Gunung
91.0000 Kg
Semen Ex. Tonasa
0.5610 M3
Pasir Pasang

M3

III.1.
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah

90,000.00
48,000.00
5,400.00
6,375.00
149,775.00

398,750.00
627,200.00
73,790.00
1,099,740.00

90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
627,200.00
73,790.00
1,249,515.00

60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah

90,000.00
48,000.00
5,400.00
6,375.00
149,775.00

398,750.00
427,200.00
100,345.00
926,295.00

90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
427,200.00
100,345.00
1,076,070.00

60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah

90,000.00
48,000.00
5,400.00
6,375.00
149,775.00

398,750.00
374,400.00
107,160.00
880,310.00

90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
374,400.00
107,160.00
1,030,085.00

60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah

90,000.00
48,000.00
5,400.00
6,375.00
149,775.00

398,750.00
323,200.00
113,975.00
835,925.00

90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
323,200.00
113,975.00
985,700.00

60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah

90,000.00
48,000.00
5,400.00
6,375.00
149,775.00

398,750.00
260,800.00
122,200.00
781,750.00

90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
260,800.00
122,200.00
931,525.00

60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah

90,000.00
48,000.00
5,400.00
6,375.00
149,775.00

398,750.00
217,600.00
127,840.00
744,190.00

90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
217,600.00
127,840.00
893,965.00

60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah

90,000.00
48,000.00
5,400.00
6,375.00
149,775.00

398,750.00
187,200.00
131,835.00
717,785.00

90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
187,200.00
131,835.00
867,560.00

60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah

90,000.00
48,000.00
5,400.00
6,375.00
149,775.00

398,750.00
145,600.00
131,835.00
676,185.00

90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
145,600.00
131,835.00
825,960.00

III.2.

III.3.

III.4.

III.5.

III.6.

III.7.

III.8.

SNI - 5

RINCIAN ANALISA PEKERJAAN


No
9

Uraian Pekerjaan
Pasang Pondasi Batu Kosong
0.7800 Oh
Pekerja
0.3900 Oh
Tukang Batu
0.0390 Oh
Kepala Tukang
0.0390 Oh
Mandor
1.2000 M3
Batu Gunung
0.3000 M3
Pasir Urug

Sat. Kode
M3

Harga
(Rp)

Upah

Jumlah Harga (Rp)


Bahan

Jumlah

III.9.

10 Membikin Kepala & Meruncing Tiang Ditumbuk


0.1000 Oh
Pekerja
0.2500 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang Kayu
0.0050 Oh
Mandor

Bh III.10.

11 Membikin Pen dan Melobang


Tiap-tiap Pen Dan Lobang
0.6000 Oh
Tukang Kayu
0.0600 Oh
Kepala Tukang

Bh III.11.

12 Menumbuk Tiang Ditanah Lembek (Yang Dipergunakan


Bagian Masuk Dalam Tanah
1.8000 Oh
Pekerja
0.0400 Oh
Tukang Kayu
0.0040 Oh
Kepala Tukang Kayu
1.0450 Oh
Mandor

M' III.12.

13 Pancang Ulin 10/10-400


0.1000 Oh
Pekerja
0.2500 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang
0.0500 Oh
Mandor
0.0400 M3
Kayu Ulin 10/10-400
1.0000 Ls
Peralatan Pancang

Ttk III.13.

13a Pancang Ulin 12/12-800


0.1000 Oh
Pekerja
0.2500 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang
0.0500 Oh
Mandor
0.1152 M3
Kayu Ulin 12/12-800
1.0000 Ls
Peralatan Pancang

Ttk III.13a.

13b Pancang Ulin 12/12-400


0.1000 Oh
Pekerja
0.2500 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang
0.0500 Oh
Mandor
0.0576 M3
Kayu Ulin 12/12-800
1.0000 Ls
Peralatan Pancang

Ttk III.13a.

14 Pancang Ulin 10/10-200


0.1000 Oh
Pekerja
0.2500 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang
0.0500 Oh
Mandor
0.0200 M3
Kayu Ulin 10/10-200
1.0000 Ls
Peralatan Pancang

Ttk III.14.

15 Pasang Pondasi Sumuran Diameter 100 cm


2.3800 Oh
Pekerja
0.3000 Oh
Tukang Batu
0.0300 Oh
Kepala Tukang
0.0800 Oh
Mandor
0.4500 M3
Batu Gunung
280.0000 Kg
Semen Ex. Tonasa
0.4500 M3
Pasir Beton
0.6700 M3
Koral Beton

Ttk III.15.

60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
75,000.00
Jumlah

46,800.00
31,200.00
3,510.00
3,315.00
84,825.00

435,000.00
22,500.00
457,500.00

46,800.00
31,200.00
3,510.00
3,315.00
435,000.00
22,500.00
542,325.00

60,000.00
80,000.00
90,000.00
85,000.00
Jumlah

6,000.00
20,000.00
2,250.00
425.00
28,675.00

6,000.00
20,000.00
2,250.00
425.00
28,675.00

80,000.00
90,000.00
Jumlah

48,000.00
5,400.00
53,400.00

48,000.00
5,400.00
53,400.00

60,000.00
80,000.00
90,000.00
85,000.00
Jumlah

108,000.00
3,200.00
360.00
88,825.00
200,385.00

108,000.00
3,200.00
360.00
88,825.00
200,385.00

60,000.00
80,000.00
90,000.00
85,000.00
6,000,000.00
3,600.00
Jumlah

6,000.00
20,000.00
2,250.00
4,250.00
32,500.00

240,000.00
3,600.00
243,600.00

6,000.00
20,000.00
2,250.00
4,250.00
240,000.00
3,600.00
276,100.00

60,000.00
80,000.00
90,000.00
85,000.00
7,500,000.00
3,600.00
Jumlah

6,000.00
20,000.00
2,250.00
4,250.00
32,500.00

864,000.00
3,600.00
867,600.00

6,000.00
20,000.00
2,250.00
4,250.00
864,000.00
3,600.00
900,100.00

60,000.00
80,000.00
90,000.00
85,000.00
7,500,000.00
3,600.00
Jumlah

6,000.00
20,000.00
2,250.00
4,250.00
32,500.00

432,000.00
3,600.00
435,600.00

6,000.00
20,000.00
2,250.00
4,250.00
432,000.00
3,600.00
468,100.00

60,000.00
80,000.00
90,000.00
85,000.00
6,000,000.00
3,600.00
Jumlah

6,000.00
20,000.00
2,250.00
4,250.00
32,500.00

120,000.00
3,600.00
123,600.00

6,000.00
20,000.00
2,250.00
4,250.00
120,000.00
3,600.00
156,100.00

60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
312,500.00
380,600.00
Jumlah

142,800.00
24,000.00
2,700.00
6,800.00
176,300.00

163,125.00
448,000.00
140,625.00
255,002.00
1,006,752.00

142,800.00
24,000.00
2,700.00
6,800.00
163,125.00
448,000.00
140,625.00
255,002.00
1,183,052.00

60,000.00
80,000.00
90,000.00
85,000.00
900.00

360,000.00
160,000.00
18,000.00
27,625.00
-

405,000.00

360,000.00
160,000.00
18,000.00
27,625.00
405,000.00

IV. PEKERJAAN DINDING


1

Pasang Batu Merah Campuran 1 : 4


6.0000 Oh
Pekerja
2.0000 Oh
Tukang Batu
0.2000 Oh
Kepala Tukang
0.3250 Oh
Mandor
450.0000 Bh
Batu Bata

M3

IV.1.

SNI - 6

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
2.5360 Zak
0.4100 M3

Sat. Kode

Semen Ex. Tonasa


Pasir Pasang

Pasang Batu Merah Campuran 1 : 3


6.0000 Oh
Pekerja
2.0000 Oh
Tukang Batu
0.2000 Oh
Kepala Tukang
0.3250 Oh
Mandor
450.0000 Bh
Batu Bata
3.1520 Zak
Semen Ex. Tonasa
0.3800 M3
Pasir Pasang

M3

Pasang Batu Merah Campuran 1 : 2


6.0000 Oh
Pekerja
2.0000 Oh
Tukang Batu
0.2000 Oh
Kepala Tukang
0.3250 Oh
Mandor
450.0000 Bh
Batu Bata
4.1200 Zak
Semen Ex. Tonasa
0.3400 M3
Pasir Pasang

M3

Pasangan Dinding Bataco Tebal 20 cm


0.3500 Oh
Pekerja
0.1500 Oh
Tukang Batu
0.0150 Oh
Kepala Tukang
0.0170 Oh
Mandor
12.5000 Bh
Bataco Tebal 20 cm
0.2700 Zak
Semen Ex. Tonasa
0.0480 M3
Pasir Pasang
1.9500 Kg
Besi Beton Polos

M2

Pasangan Dinding Bataco Tebal 15 cm


0.3200 Oh
Pekerja
0.1200 Oh
Tukang Batu
0.0120 Oh
Kepala Tukang
0.0150 Oh
Mandor
12.5000 Bh
Bataco Tebal 15 cm
0.2090 Zak
Semen Ex. Tonasa
0.0380 M3
Pasir Pasang
1.9500 Kg
Besi Beton Polos

M2

Pasangan Dinding Bataco Tebal 10 cm


0.3200 Oh
Pekerja
0.1000 Oh
Tukang Batu
0.0100 Oh
Kepala Tukang
0.0150 Oh
Mandor
12.5000 Bh
Bataco Tebal 10 cm
0.1500 Zak
Semen Ex. Tonasa
0.0270 M3
Pasir Pasang
1.9500 Kg
Besi Beton Polos

M2

Pas. Dinding Roster Bintang Wajik (10x20x30) cm


0.3000 Oh
Pekerja
0.1000 Oh
Tukang Batu
0.0100 Oh
Kepala Tukang
0.0150 Oh
Mandor
17.0000 Bh
Roster
0.2560 Zak
Semen Ex. Tonasa
0.0350 M3
Pasir Pasang

M2

8 Pasangan Bata Merah Tebal 1/2 Batu 1Pc : 2Ps


0.320 Oh
Pekerja
0.100 Oh
Tukang Batu
0.010 Oh
Kepala Tukang
0.015 Oh
Mandor
50.000 Bh
Bata Merah
18.950 Kg
Semen Ex. Tonasa
0.038 M3
Pasir Pasang

M2

9 Pasangan Bata Merah Tebal 1/2 Batu 1Pc : 4Ps


0.320 Oh
Pekerja
0.100 Oh
Tukang Batu
0.010 Oh
Kepala Tukang
0.015 Oh
Mandor
50.000 Bh
Bata Merah
11.500 Kg
Semen Ex. Tonasa
0.043 M3
Pasir Pasang

M2

Harga
(Rp)
80,000.00
235,000.00
Jumlah

Jumlah Harga (Rp)


Bahan
Jumlah
202,880.00
202,880.00
96,350.00
96,350.00
565,625.00
704,230.00
1,269,855.00

60,000.00
80,000.00
90,000.00
85,000.00
900.00
80,000.00
235,000.00
Jumlah

360,000.00
160,000.00
18,000.00
27,625.00
565,625.00

405,000.00
252,160.00
89,300.00
746,460.00

360,000.00
160,000.00
18,000.00
27,625.00
405,000.00
252,160.00
89,300.00
1,312,085.00

60,000.00
80,000.00
90,000.00
85,000.00
900.00
80,000.00
235,000.00
Jumlah

360,000.00
160,000.00
18,000.00
27,625.00
565,625.00

405,000.00
329,600.00
79,900.00
814,500.00

360,000.00
160,000.00
18,000.00
27,625.00
405,000.00
329,600.00
79,900.00
1,380,125.00

60,000.00
80,000.00
90,000.00
85,000.00
8,900.00
80,000.00
235,000.00
9,000.00
Jumlah

21,000.00
12,000.00
1,350.00
1,445.00
35,795.00

111,250.00
21,600.00
11,280.00
17,550.00
161,680.00

21,000.00
12,000.00
1,350.00
1,445.00
111,250.00
21,600.00
11,280.00
17,550.00
197,475.00

60,000.00
80,000.00
90,000.00
85,000.00
6,725.00
80,000.00
235,000.00
9,000.00
Jumlah

19,200.00
9,600.00
1,080.00
1,275.00
31,155.00

84,062.50
16,720.00
8,930.00
17,550.00
127,262.50

19,200.00
9,600.00
1,080.00
1,275.00
84,062.50
16,720.00
8,930.00
17,550.00
158,417.50

60,000.00
80,000.00
90,000.00
85,000.00
5,000.00
80,000.00
235,000.00
9,000.00
Jumlah

19,200.00
8,000.00
900.00
1,275.00
29,375.00

62,500.00
12,000.00
6,345.00
17,550.00
98,395.00

19,200.00
8,000.00
900.00
1,275.00
62,500.00
12,000.00
6,345.00
17,550.00
127,770.00

60,000.00
80,000.00
90,000.00
85,000.00
3,850.00
80,000.00
235,000.00
Jumlah

18,000.00
8,000.00
900.00
1,275.00
28,175.00

65,450.00
20,480.00
8,225.00
94,155.00

18,000.00
8,000.00
900.00
1,275.00
65,450.00
20,480.00
8,225.00
122,330.00

60,000.00
80,000.00
90,000.00
85,000.00
900.00
1,600.00
235,000.00
Jumlah

19,200.00
45,000.00
30,320.00
8,930.00
103,450.00

8,000.00
900.00
1,275.00
10,175.00

19,200.00
8,000.00
900.00
1,275.00
45,000.00
30,320.00
8,930.00
113,625.00

60,000.00
80,000.00
90,000.00
85,000.00
900.00
1,600.00
235,000.00
Jumlah

19,200.00
45,000.00
18,400.00
10,105.00
92,705.00

8,000.00
900.00
1,275.00
10,175.00

19,200.00
8,000.00
900.00
1,275.00
45,000.00
18,400.00
10,105.00
102,880.00

Upah

IV.2.

IV.3.

IV.4.

IV.5.

IV.6.

IV.7.

IV.8.

IV.9.

SNI - 7

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan

V. PEKERJAAN PLESTERAN
1 Plesteran 1Pc : 1Psr, Tebal 15 mm
0.2000 Oh
Pekerja
0.1500 Oh
Tukang Batu
0.0150 Oh
Kepala Tukang
0.0100 Oh
Mandor
12.9200 Kg
Semen Ex. Tonasa
0.0130 M3
Pasir Pasang

Sat. Kode

M2

Plesteran 1Pc : 2Psr, Tebal 15 mm


0.2000 Oh
Pekerja
0.1500 Oh
Tukang Batu
0.0150 Oh
Kepala Tukang
0.0100 Oh
Mandor
8.5200 Kg
Semen Ex. Tonasa
0.0170 M3
Pasir Pasang

M2

Plesteran 1Pc : 3Psr, Tebal 15 mm


0.2000 Oh
Pekerja
0.1500 Oh
Tukang Batu
0.0150 Oh
Kepala Tukang
0.0100 Oh
Mandor
6.4800 Kg
Semen Ex. Tonasa
0.0190 M3
Pasir Pasang

M2

Plesteran 1Pc : 4Psr, Tebal 15 mm


0.2000 Oh
Pekerja
0.1500 Oh
Tukang Batu
0.0150 Oh
Kepala Tukang
0.0100 Oh
Mandor
5.2000 Kg
Semen Ex. Tonasa
0.0200 M3
Pasir Pasang

M2

Plesteran 1Pc : 5Psr, Tebal 15 mm


0.2000 Oh
Pekerja
0.1500 Oh
Tukang Batu
0.0150 Oh
Kepala Tukang
0.0100 Oh
Mandor
4.3200 Kg
Semen Ex. Tonasa
0.0220 M3
Pasir Pasang

M2

Plesteran 1Pc : 6Psr, Tebal 15 mm


0.2000 Oh
Pekerja
0.1500 Oh
Tukang Batu
0.0150 Oh
Kepala Tukang
0.0100 Oh
Mandor
3.6800 Kg
Semen Ex. Tonasa
0.0230 M3
Pasir Pasang

M2

Plesteran 1Pc : 8Psr, Tebal 15 mm


0.2000 Oh
Pekerja
0.1500 Oh
Tukang Batu
0.0150 Oh
Kepala Tukang
0.0100 Oh
Mandor
2.8800 Kg
Semen Ex. Tonasa
0.0240 M3
Pasir Pasang

M2

Plesteran 1Pc : 2Psr, Tebal 20 mm


0.2500 Oh
Pekerja
0.2000 Oh
Tukang Batu
0.0200 Oh
Kepala Tukang
0.0125 Oh
Mandor
14.2800 Kg
Semen Ex. Tonasa
0.0230 M3
Pasir Pasang

M2

Plesteran 1Pc : 3Psr, Tebal 20 mm


0.2500 Oh
Pekerja
0.2000 Oh
Tukang Batu
0.0200 Oh
Kepala Tukang
0.0125 Oh
Mandor
10.8000 Kg
Semen Ex. Tonasa
0.0260 M3
Pasir Pasang

M2

10 Plesteran 1Pc : 4Psr, Tebal 20 mm


0.2500 Oh
Pekerja
0.2000 Oh
Tukang Batu

Harga
(Rp)

Upah

Jumlah Harga (Rp)


Bahan

Jumlah

V.1.
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

12,000.00
12,000.00
1,350.00
850.00
26,200.00

20,672.00
3,055.00
23,727.00

12,000.00
12,000.00
1,350.00
850.00
20,672.00
3,055.00
49,927.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

12,000.00
12,000.00
1,350.00
850.00
26,200.00

13,632.00
3,995.00
17,627.00

12,000.00
12,000.00
1,350.00
850.00
13,632.00
3,995.00
43,827.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

12,000.00
12,000.00
1,350.00
850.00
26,200.00

10,368.00
4,465.00
14,833.00

12,000.00
12,000.00
1,350.00
850.00
10,368.00
4,465.00
41,033.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

12,000.00
12,000.00
1,350.00
850.00
26,200.00

8,320.00
4,700.00
13,020.00

12,000.00
12,000.00
1,350.00
850.00
8,320.00
4,700.00
39,220.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

12,000.00
12,000.00
1,350.00
850.00
26,200.00

6,912.00
5,170.00
12,082.00

12,000.00
12,000.00
1,350.00
850.00
6,912.00
5,170.00
38,282.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

12,000.00
12,000.00
1,350.00
850.00
26,200.00

5,888.00
5,405.00
11,293.00

12,000.00
12,000.00
1,350.00
850.00
5,888.00
5,405.00
37,493.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

12,000.00
12,000.00
1,350.00
850.00
26,200.00

4,608.00
5,640.00
10,248.00

12,000.00
12,000.00
1,350.00
850.00
4,608.00
5,640.00
36,448.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

15,000.00
16,000.00
1,800.00
1,062.50
33,862.50

22,848.00
5,405.00
28,253.00

15,000.00
16,000.00
1,800.00
1,062.50
22,848.00
5,405.00
62,115.50

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

15,000.00
16,000.00
1,800.00
1,062.50
33,862.50

17,280.00
6,110.00
23,390.00

15,000.00
16,000.00
1,800.00
1,062.50
17,280.00
6,110.00
57,252.50

60,000.00
80,000.00

15,000.00
16,000.00

V.2.

V.3.

V.4.

V.5.

V.6.

V.7.

V.8.

V.9.

M2 V.10.
-

15,000.00
16,000.00

SNI - 8

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.0200
0.0125
8.6800
0.0280

Oh
Oh
Kg
M3

Sat. Kode

Kepala Tukang
Mandor
Semen Ex. Tonasa
Pasir Pasang

11 Plesteran 1Pc : 5Psr, Tebal 20 mm


0.2500 Oh
Pekerja
0.2000 Oh
Tukang Batu
0.0200 Oh
Kepala Tukang
0.0125 Oh
Mandor
7.2900 Kg
Semen Ex. Tonasa
0.0280 M3
Pasir Pasang

M2 V.11.

12 Plesteran 1Pc : 6Psr, Tebal 20 mm


0.2500 Oh
Pekerja
0.2000 Oh
Tukang Batu
0.0200 Oh
Kepala Tukang
0.0125 Oh
Mandor
6.2400 Kg
Semen Ex. Tonasa
0.0300 M3
Pasir Pasang

M2 V.12.

13 Plesteran 1Pc : 2Psr, Tebal 25 mm


0.3000 Oh
Pekerja
0.2000 Oh
Tukang Batu
0.0200 Oh
Kepala Tukang
0.0130 Oh
Mandor
15.5000 Kg
Semen Ex. Tonasa
0.0130 M3
Pasir Pasang

M2 V.13.

14 Plesteran 1Pc : 3Psr, Tebal 25 mm


0.3000 Oh
Pekerja
0.2000 Oh
Tukang Batu
0.0200 Oh
Kepala Tukang
0.0130 Oh
Mandor
11.7500 Kg
Semen Ex. Tonasa
0.0350 M3
Pasir Pasang

M2 V.14.

15 Plesteran 1Pc : 4Psr, Tebal 25 mm


0.3000 Oh
Pekerja
0.2000 Oh
Tukang Batu
0.0200 Oh
Kepala Tukang
0.0130 Oh
Mandor
9.4800 Kg
Semen Ex. Tonasa
0.0380 M3
Pasir Pasang

M2 V.15.

16 Plesteran 1Pc : 2Psr, Tebal 30 mm


0.3200 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0150 Oh
Mandor
18.6500 Kg
Semen Ex. Tonasa
0.0350 M3
Pasir Pasang

M2 V.16.

17 Plesteran 1Pc : 3Psr, Tebal 30 mm


0.3200 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0150 Oh
Mandor
14.1500 Kg
Semen Ex. Tonasa
0.0390 M3
Pasir Pasang

M2 V.17.

18 Plesteran 1Pc : 4Psr, Tebal 30 mm


0.3200 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0150 Oh
Mandor
11.3800 Kg
Semen Ex. Tonasa
0.0420 M3
Pasir Pasang

M2 V.18.

19 Plesteran Beton 1Pc : 2Psr, Tebal 15 mm


0.2600 Oh
Pekerja
0.2000 Oh
Tukang Batu
0.0200 Oh
Kepala Tukang
0.0130 Oh
Mandor
9.3000 Kg
Semen Ex. Tonasa
0.0180 M3
Pasir Pasang

M2 V.19.

Harga
(Rp)
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

Upah
1,800.00
1,062.50
33,862.50

Jumlah Harga (Rp)


Bahan
13,888.00
6,580.00
20,468.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

15,000.00
16,000.00
1,800.00
1,062.50
33,862.50

11,664.00
6,580.00
18,244.00

15,000.00
16,000.00
1,800.00
1,062.50
11,664.00
6,580.00
52,106.50

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

15,000.00
16,000.00
1,800.00
1,062.50
33,862.50

9,984.00
7,050.00
17,034.00

15,000.00
16,000.00
1,800.00
1,062.50
9,984.00
7,050.00
50,896.50

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

18,000.00
16,000.00
1,800.00
1,105.00
36,905.00

24,800.00
3,055.00
27,855.00

18,000.00
16,000.00
1,800.00
1,105.00
24,800.00
3,055.00
64,760.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

18,000.00
16,000.00
1,800.00
1,105.00
36,905.00

18,800.00
8,225.00
27,025.00

18,000.00
16,000.00
1,800.00
1,105.00
18,800.00
8,225.00
63,930.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

18,000.00
16,000.00
1,800.00
1,105.00
36,905.00

15,168.00
8,930.00
24,098.00

18,000.00
16,000.00
1,800.00
1,105.00
15,168.00
8,930.00
61,003.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

19,200.00
20,000.00
2,250.00
1,275.00
42,725.00

29,840.00
8,225.00
38,065.00

19,200.00
20,000.00
2,250.00
1,275.00
29,840.00
8,225.00
80,790.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

19,200.00
20,000.00
2,250.00
1,275.00
42,725.00

22,640.00
9,165.00
31,805.00

19,200.00
20,000.00
2,250.00
1,275.00
22,640.00
9,165.00
74,530.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

19,200.00
20,000.00
2,250.00
1,275.00
42,725.00

18,208.00
9,870.00
28,078.00

19,200.00
20,000.00
2,250.00
1,275.00
18,208.00
9,870.00
70,803.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

15,600.00
16,000.00
1,800.00
1,105.00
34,505.00

14,880.00
4,230.00
19,110.00

15,600.00
16,000.00
1,800.00
1,105.00
14,880.00
4,230.00
53,615.00

Jumlah
1,800.00
1,062.50
13,888.00
6,580.00
54,330.50

SNI - 9

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan

Sat. Kode

20 Plesteran Beton 1Pc : 3Psr, Tebal 15 mm


0.2600 Oh
Pekerja
0.2000 Oh
Tukang Batu
0.0200 Oh
Kepala Tukang
0.0130 Oh
Mandor
7.0700 Kg
Semen Ex. Tonasa
0.0210 M3
Pasir Pasang

M2 V.20.

21 Plesteran Skoning 1Pc : 2Psr


0.0570 Oh
Pekerja
0.0380 Oh
Tukang Batu
0.0380 Oh
Kepala Tukang
0.0020 Oh
Mandor
0.5000 Kg
Semen Ex. Tonasa
0.0020 M3
Pasir Pasang

M2 V.21.

22 Plesteran Siar 1Pc : 2Psr


0.1500 Oh
Pekerja
0.0700 Oh
Tukang Batu
0.0070 Oh
Kepala Tukang
0.0080 Oh
Mandor
4.3200 Kg
Semen Ex. Tonasa
0.0160 M3
Pasir Pasang

M2 V.22.

VI. PEKERJAAN KAYU


1 Pasang Kusen Pintu Dan Jendela Kayu Bangkirai
6.0000 Oh
Pekerja
20.0000 Oh
Tukang Kayu
2.0000 Oh
Kepala Tukang
0.3000 Oh
Mandor
1.2000 M3
Kayu Bangkirai

M3

Pasang Kusen Pintu Dan Jendela Kayu Meranti


6.0000 Oh
Pekerja
20.0000 Oh
Tukang Kayu
2.0000 Oh
Kepala Tukang
0.3000 Oh
Mandor
1.2000 M3
Kayu Meranti

M3

Pasang Pintu Klam Kayu Meranti


0.3500 Oh
Pekerja
1.0500 Oh
Tukang Kayu
0.1050 Oh
Kepala Tukang
0.0180 Oh
Mandor
0.0360 M3
Papan/Kayu Meranti
0.0500 kg
Paku Biasa

M2

Pasang Pintu Klam Kayu Bangkirai


0.3500 Oh
Pekerja
1.0500 Oh
Tukang Kayu
0.1050 Oh
Kepala Tukang
0.0180 Oh
Mandor
0.0360 M3
Papan/Kayu Bangkirai
0.0500 kg
Paku Biasa

M2

Pasang Pintu Panel Kayu Bangkirai


1.0000 Oh
Pekerja
2.5000 Oh
Tukang Kayu
0.2500 Oh
Kepala Tukang
0.0500 Oh
Mandor
0.0400 M3
Papan /Kayu Bangkirai

M2

Pasang Jalusi Mati Kusen Kayu Bangkirai


0.5000 Oh
Pekerja
2.0000 Oh
Tukang Kayu
0.2000 Oh
Kepala Tukang
0.0250 Oh
Mandor
0.0600 M3
Papan /Kayu Bangkirai
0.1500 Kg
Paku Biasa

M2

Pasang Konstruksi Kuda-kuda Kayu Bangkirai


4.0000 Oh
Pekerja
12.0000 Oh
Tukang Kayu
1.2000 Oh
Kepala Tukang
0.2000 Oh
Mandor
1.1000 M3
Kayu Bangkirai

M3

Harga
(Rp)

Upah

Jumlah Harga (Rp)


Bahan

Jumlah

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

15,600.00
16,000.00
1,800.00
1,105.00
34,505.00

11,312.00
4,935.00
16,247.00

15,600.00
16,000.00
1,800.00
1,105.00
11,312.00
4,935.00
50,752.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

3,420.00
3,040.00
3,420.00
170.00
10,050.00

800.00
470.00
1,270.00

3,420.00
3,040.00
3,420.00
170.00
800.00
470.00
11,320.00

60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah

9,000.00
5,600.00
630.00
680.00
15,910.00

6,912.00
3,760.00
10,672.00

9,000.00
5,600.00
630.00
680.00
6,912.00
3,760.00
26,582.00

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
Jumlah

360,000.00
1,600,000.00
180,000.00
25,500.00
2,165,500.00

8,400,000.00
8,400,000.00

360,000.00
1,600,000.00
180,000.00
25,500.00
8,400,000.00
10,565,500.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
Jumlah

360,000.00
1,600,000.00
180,000.00
25,500.00
2,165,500.00

4,200,000.00
4,200,000.00

360,000.00
1,600,000.00
180,000.00
25,500.00
4,200,000.00
6,365,500.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah

21,000.00
84,000.00
9,450.00
1,530.00
115,980.00

126,000.00
750.00
126,750.00

21,000.00
84,000.00
9,450.00
1,530.00
126,000.00
750.00
242,730.00

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah

21,000.00
84,000.00
9,450.00
1,530.00
115,980.00

252,000.00
750.00
252,750.00

21,000.00
84,000.00
9,450.00
1,530.00
252,000.00
750.00
368,730.00

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
Jumlah

60,000.00
200,000.00
22,500.00
4,250.00
286,750.00

280,000.00
280,000.00

60,000.00
200,000.00
22,500.00
4,250.00
280,000.00
566,750.00

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah

30,000.00
160,000.00
18,000.00
2,125.00
210,125.00

420,000.00
2,250.00
422,250.00

30,000.00
160,000.00
18,000.00
2,125.00
420,000.00
2,250.00
632,375.00

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00

240,000.00
960,000.00
108,000.00
17,000.00
-

7,700,000.00

240,000.00
960,000.00
108,000.00
17,000.00
7,700,000.00

VI.1.

VI.2.

VI.3.

VI.4.

VI.5.

VI.6.

VI.7.

SNI - 10

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.8000 Kg
15.0000 Kg

Sat. Kode

Paku Biasa
Besi Strip

Pasang Gording Kayu Meranti


4.0000 Oh
Pekerja
12.0000 Oh
Tukang Kayu
1.2000 Oh
Kepala Tukang
0.2000 Oh
Mandor
1.1000 M3
Kayu Meranti
0.8000 Kg
Paku Biasa

M3

Pas. Kasau + Reng Genteng Beton Kayu Bangkirai


0.1000 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0050 Oh
Mandor
0.0140 M3
Kayu Bangkirai
0.1500 Kg
Paku Biasa

M2

Harga
(Rp)
15,000.00
13,200.00
Jumlah

Jumlah Harga (Rp)


Bahan
Jumlah
12,000.00
12,000.00
198,000.00
198,000.00
1,325,000.00
7,910,000.00
9,235,000.00
Upah

VI.8.
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah

240,000.00
960,000.00
108,000.00
17,000.00
1,085,000.00

3,850,000.00
12,000.00
3,862,000.00

240,000.00
960,000.00
108,000.00
17,000.00
3,850,000.00
12,000.00
5,187,000.00

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah

6,000.00
8,000.00
900.00
425.00
9,325.00

98,000.00
2,250.00
100,250.00

6,000.00
8,000.00
900.00
425.00
98,000.00
2,250.00
115,575.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah

7,200.00
9,600.00
1,080.00
510.00
18,390.00

63,000.00
3,000.00
66,000.00

7,200.00
9,600.00
1,080.00
510.00
63,000.00
3,000.00
84,390.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah

9,000.00
20,000.00
2,250.00
6,375.00
37,625.00

42,000.00
1,500.00
43,500.00

9,000.00
20,000.00
2,250.00
6,375.00
42,000.00
1,500.00
81,125.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah

12,000.00
24,000.00
2,700.00
850.00
39,550.00

80,500.00
2,250.00
82,750.00

12,000.00
24,000.00
2,700.00
850.00
80,500.00
2,250.00
122,300.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah

15,000.00
28,000.00
3,150.00
1,062.50
47,212.50

94,500.00
3,000.00
97,500.00

15,000.00
28,000.00
3,150.00
1,062.50
94,500.00
3,000.00
144,712.50

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah

6,000.00
16,000.00
2,250.00
425.00
24,675.00

50,400.00
750.00
51,150.00

6,000.00
16,000.00
2,250.00
425.00
50,400.00
750.00
75,825.00

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah

6,600.00
17,600.00
1,980.00
425.00
20,005.00

77,000.00
750.00
77,750.00

6,600.00
17,600.00
1,980.00
425.00
77,000.00
750.00
97,755.00

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah

9,000.00
20,000.00
2,250.00
6,375.00
28,625.00

101,500.00
900.00
102,400.00

9,000.00
20,000.00
2,250.00
6,375.00
101,500.00
900.00
131,025.00

VI.9.

10 Pas. Kasau + Reng Atap Sirap Kayu Meranti


0.1200 Oh
Pekerja
0.1200 Oh
Tukang Kayu
0.0120 Oh
Kepala Tukang
0.0060 Oh
Mandor
0.0180 M3
Kayu Meranti
0.2000 Kg
Paku Biasa

M2 VI.10.

11 Pas. Rangka Langit-langit (1.00 x 1.00) m Kayu Meranti


0.1500 Oh
Pekerja
0.2500 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang
0.0750 Oh
Mandor
0.0120 M3
Kayu Meranti
0.1000 Kg
Paku Biasa

M2 VI.11.

12 Pas. Rangka Langit-langit (30 x 60) cm Kayu Meranti


0.2000 Oh
Pekerja
0.3000 Oh
Tukang Kayu
0.0300 Oh
Kepala Tukang
0.0100 Oh
Mandor
0.0230 M3
Kayu Meranti
0.1500 Kg
Paku Biasa

M2 VI.12.

13 Pas. Rangka Langit-langit (30 x 30) cm Kayu Meranti


0.2500 Oh
Pekerja
0.3500 Oh
Tukang Kayu
0.0350 Oh
Kepala Tukang
0.0125 Oh
Mandor
0.0270 M3
Kayu Meranti
0.2000 Kg
Paku Biasa

M2 VI.13.

14 Pas. Listplank Kayu Bangkirai


0.1000 Oh
Pekerja
0.2000 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang
0.0050 Oh
Mandor
0.0072 M3
Papan/ Kayu Bangkirai
0.0500 Kg
Paku Biasa

M2 VI.14.

15 Pas. Listplank Ukuran (3 x 30) cm Kayu Bangkirai


0.1100 Oh
Pekerja
0.2200 Oh
Tukang Kayu
0.0220 Oh
Kepala Tukang
0.0050 Oh
Mandor
0.0110 M3
Papan Kayu Bangkirai
0.0500 Kg
Paku Biasa

M2 VI.15.

15 Pas. Listplank Ukuran 2 x (3 x 20) cm Kayu Bangkirai


0.1500 Oh
Pekerja
0.2500 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang
0.0750 Oh
Mandor
0.0145 M3
Papan Kayu Bangkirai
0.0600 Kg
Paku Biasa

M2 VI.15.

16 Pas. Listplank Ukuran 2x (2 x 20) cm Kayu Bangkirai

M2 VI.17.

SNI - 11

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.1000
0.1000
0.0100
0.0500
0.0086
0.0600

Oh
Oh
Oh
Oh
M3
Kg

Sat. Kode

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Papan Kayu Bangkirai
Paku Biasa

15 Pasang List Plafond Kayu Profil


0.0210 Oh
Pekerja
0.0210 Oh
Tukang Kayu
0.0020 Oh
Kepala Tukang
0.0010 Oh
Mandor
1.0500 M'
Kayu Profil

M2 VI.15.

16 Pekerjaan Lantai Jembatan Papan Meranti Yang Dipaku


Diatas Gelagar
0.1000 Oh
Pekerja
0.2500 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang
0.0050 Oh
Mandor
0.0250 M3
Papan Meranti
0.4000 Kg
Paku Biasa

M2 VI.16.

17 Pekerjaan Lantai Jembatan Papan Ulin Yang Dipaku


Diatas Gelagar
0.1000 Oh
Pekerja
0.2500 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang
0.0050 Oh
Mandor
0.0310 M3
Papan Ulin
0.4000 Kg
Paku Biasa

M2 VI.17.

18 Pekerjaan Kayu Kasar Ulin


2.5000 Oh
Pekerja
7.5000 Oh
Tukang Kayu
0.7500 Oh
Kepala Tukang
0.1250 Oh
Mandor
1.1000 M3
Kayu Ulin
3.0000 Kg
Paku Ulin

M3 VI.18.

19 Pekerjaan Kayu Kasar Bangkirai


2.5000 Oh
Pekerja
7.5000 Oh
Tukang Kayu
0.7500 Oh
Kepala Tukang
0.1250 Oh
Mandor
1.1000 M3
Kayu Bangkirai
3.0000 Kg
Paku Biasa

M3 VI.19.

20 Pekerjaan Kayu Kasar Meranti


2.5000 Oh
Pekerja
7.5000 Oh
Tukang Kayu
0.7500 Oh
Kepala Tukang
0.1250 Oh
Mandor
1.1000 M3
Kayu meranti
3.0000 Kg
Paku Biasa

M3 VI.20.

21 Pekerjaan Kaca Mati Tebal 5 mm


0.0150 Oh
Pekerja
0.1500 Oh
Tukang Kayu
0.0150 Oh
Kepala Tukang
0.0008 Oh
Mandor
1.1000 M2
Kaca 5 mm

M3 VI.21.

Harga
(Rp)
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah

Upah
6,000.00
8,000.00
900.00
4,250.00
13,150.00

Jumlah Harga (Rp)


Bahan
60,200.00
900.00
61,100.00

60,000.00
80,000.00
90,000.00
85,000.00
15,000.00
Jumlah

1,260.00
1,680.00
180.00
85.00
3,205.00

15,750.00
15,750.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah

6,000.00
20,000.00
2,250.00
425.00
87,500.00
6,000.00
122,175.00

6,000.00
20,000.00
2,250.00
425.00
87,500.00
6,000.00
122,175.00

60,000.00
80,000.00
90,000.00
85,000.00
5,500,000.00
15,000.00
Jumlah

6,000.00
20,000.00
2,250.00
425.00
170,500.00
6,000.00
205,175.00

6,000.00
20,000.00
2,250.00
425.00
170,500.00
6,000.00
205,175.00

60,000.00
80,000.00
90,000.00
85,000.00
6,000,000.00
24,500.00
Jumlah

150,000.00
600,000.00
67,500.00
10,625.00
6,600,000.00
73,500.00
7,501,625.00

150,000.00
600,000.00
67,500.00
10,625.00
6,600,000.00
73,500.00
7,501,625.00

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah

150,000.00
600,000.00
67,500.00
10,625.00
7,700,000.00
45,000.00
8,573,125.00

150,000.00
600,000.00
67,500.00
10,625.00
7,700,000.00
45,000.00
8,573,125.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah

150,000.00
600,000.00
67,500.00
10,625.00
3,850,000.00
45,000.00
4,723,125.00

150,000.00
600,000.00
67,500.00
10,625.00
3,850,000.00
45,000.00
4,723,125.00

60,000.00
80,000.00
90,000.00
85,000.00
135,000.00
Jumlah

900.00
12,000.00
1,350.00
63.75
148,500.00
162,813.75

900.00
12,000.00
1,350.00
63.75
148,500.00
162,813.75

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

99,000.00
20,000.00
2,250.00
6,800.00
128,050.00

60,000.00
80,000.00

99,000.00
20,000.00

Jumlah
6,000.00
8,000.00
900.00
4,250.00
60,200.00
900.00
74,250.00

1,260.00
1,680.00
180.00
85.00
15,750.00
18,955.00

VII. PEKERJAAN BETON


1

Beton Tumbuk 1Pc : 3Psr : 5Kr


1.6500 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0800 Oh
Mandor
0.5200 M3
Pasir Beton
0.8700 M3
Koral Beton
218.0000 Kg
Semen Ex. Tonasa

M3 VII.1.

Beton Tumbuk 1Pc : 3Psr : 6Kr


1.6500 Oh
Pekerja
0.2500 Oh
Tukang Batu

M3 VII.2.

162,500.00
331,122.00
348,800.00
842,422.00

99,000.00
20,000.00
2,250.00
6,800.00
162,500.00
331,122.00
348,800.00
970,472.00

99,000.00
20,000.00

SNI - 12

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.0250
0.0800
0.4700
0.9400
197.0000

Oh
Oh
M3
M3
Kg

Sat. Kode

Kepala Tukang
Mandor
Pasir Beton
Koral Beton
Semen Ex. Tonasa

Beton Tumbuk 1Pc : 4Psr : 6Kr


1.6500 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0800 Oh
Mandor
0.5700 M3
Pasir Beton
0.8700 M3
Koral Beton
173.0000 Kg
Semen Ex. Tonasa

M3 VII.3.

Lantai Kerja Beton Tumbuk 1Pc : 3Psr : 5Kr Tebal 5 cm


1.1500 Oh
Pekerja
0.0200 Oh
Tukang Batu
0.0020 Oh
Kepala Tukang
0.0060 Oh
Mandor
0.0260 M3
Pasir Beton
0.0440 M3
Koral Beton
10.0000 Kg
Semen Ex. Tonasa

M3 VII.4.

Beton Bertulang 1Pc : 2Psr : 3Kr


1.6500 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0800 Oh
Mandor
0.5200 M3
Pasir Beton
0.7800 M3
Koral Beton
232.0000 Kg
Semen Ex. Tonasa

M3 VII.5.

Beton Bertulang 1Pc : 2Psr : 4Kr


1.6500 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0800 Oh
Mandor
0.4500 M3
Pasir Beton
0.9000 M3
Koral Beton
280.0000 Kg
Semen Ex. Tonasa

M3 VII.6.

Beton Bertulang 1Pc : 2Psr : 2,5Kr


1.6500 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0800 Oh
Mandor
0.5600 M3
Pasir Beton
0.7000 M3
Koral Beton
352.0000 Kg
Semen Ex. Tonasa

M3 VII.7.

Beton Bertulang 1Pc : 1,5Psr : 3Kr


1.6500 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0800 Oh
Mandor
0.4200 M3
Pasir Beton
0.5400 M3
Koral Beton
357.0000 Kg
Semen Ex. Tonasa

M3 VII.8.

Beton Bertulang 1Pc : 1,5Psr : 2,5Kr


1.6500 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0800 Oh
Mandor
0.4700 M3
Pasir Beton
0.7800 M3
Koral Beton
386.0000 Kg
Semen Ex. Tonasa

M3 VII.9.

10 Beton Bertulang 1Pc : 1Psr : 2Kr


1.6500 Oh
Pekerja
0.2500 Oh
Tukang Batu
0.0250 Oh
Kepala Tukang
0.0800 Oh
Mandor
0.3700 M3
Pasir Beton
0.7400 M3
Koral Beton
479.0000 Kg
Semen Ex. Tonasa

M3 VII.10.

Harga
(Rp)
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

Upah
2,250.00
6,800.00
128,050.00

Jumlah Harga (Rp)


Bahan
146,875.00
357,764.00
315,200.00
819,839.00

Jumlah
2,250.00
6,800.00
146,875.00
357,764.00
315,200.00
947,889.00

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

99,000.00
20,000.00
2,250.00
6,800.00
128,050.00

178,125.00
331,122.00
276,800.00
786,047.00

99,000.00
20,000.00
2,250.00
6,800.00
178,125.00
331,122.00
276,800.00
914,097.00

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

69,000.00
1,600.00
180.00
510.00
71,290.00

8,125.00
16,746.40
16,000.00
40,871.40

69,000.00
1,600.00
180.00
510.00
8,125.00
16,746.40
16,000.00
112,161.40

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

99,000.00
20,000.00
2,250.00
6,800.00
128,050.00

162,500.00
296,868.00
371,200.00
830,568.00

99,000.00
20,000.00
2,250.00
6,800.00
162,500.00
296,868.00
371,200.00
958,618.00

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

99,000.00
20,000.00
2,250.00
6,800.00
128,050.00

140,625.00
342,540.00
448,000.00
931,165.00

99,000.00
20,000.00
2,250.00
6,800.00
140,625.00
342,540.00
448,000.00
1,059,215.00

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

99,000.00
20,000.00
2,250.00
6,800.00
128,050.00

175,000.00
266,420.00
563,200.00
1,004,620.00

99,000.00
20,000.00
2,250.00
6,800.00
175,000.00
266,420.00
563,200.00
1,132,670.00

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

99,000.00
20,000.00
2,250.00
6,800.00
128,050.00

131,250.00
205,524.00
571,200.00
907,974.00

99,000.00
20,000.00
2,250.00
6,800.00
131,250.00
205,524.00
571,200.00
1,036,024.00

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

99,000.00
20,000.00
2,250.00
6,800.00
128,050.00

146,875.00
296,868.00
617,600.00
1,061,343.00

99,000.00
20,000.00
2,250.00
6,800.00
146,875.00
296,868.00
617,600.00
1,189,393.00

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

99,000.00
20,000.00
2,250.00
6,800.00
128,050.00

115,625.00
281,644.00
766,400.00
1,163,669.00

99,000.00
20,000.00
2,250.00
6,800.00
115,625.00
281,644.00
766,400.00
1,291,719.00

SNI - 13

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan

Sat. Kode

11 Beton Bertulang K 175


3.9000 Oh
Pekerja
0.6375 Oh
Tukang Batu
0.2000 Oh
Kepala Tukang
0.0675 Oh
Mandor
0.5500 M3
Pasir Pasang
0.8300 M3
Koral Beton
340.0000 Kg
Semen Ex. Tonasa

M3 VII.11.

12 Beton Bertulang K 225


3.9000 Oh
Pekerja
0.6375 Oh
Tukang Batu
0.2000 Oh
Kepala Tukang
0.0675 Oh
Mandor
0.4900 M3
Pasir Beton
0.8100 M3
Koral Beton
378.0000 Kg
Semen Ex. Tonasa

M3 VII.12.

13 Beton Bertulang K 300


3.9000 Oh
Pekerja
0.6375 Oh
Tukang Batu
0.2000 Oh
Kepala Tukang
0.0675 Oh
Mandor
0.4900 M3
Pasir Beton
0.8200 M3
Koral Beton
411.5000 Kg
Semen Ex. Tonasa

M3 VII.13.

14 Beton Bertulang K 350


3.9000 Oh
Pekerja
0.6375 Oh
Tukang Batu
0.2000 Oh
Kepala Tukang
0.0675 Oh
Mandor
0.4200 M3
Pasir Beton
0.8000 M3
Koral Beton
445.0000 Kg
Semen Ex. Tonasa

M3 VII.14.

15 Pembesian Dengan Besi Polos


0.0070 Oh
Pekerja
0.0070 Oh
Tukang Besi
0.0007 Oh
Kepala Tukang
0.0003 Oh
Mandor
1.0500 Kg
Besi Beton Polos
0.0150 Kg
Kawat Beton

Kg VII.15.

16 Pembesian Dengan Besi Ulir


0.0070 Oh
Pekerja
0.0070 Oh
Tukang Besi
0.0007 Oh
Kepala Tukang
0.0003 Oh
Mandor
1.0500 Kg
Besi beton ulir
0.0150 Kg
Kawat Beton

Kg VII.16.

17 Pasang Bekisting Untuk Pondasi


0.3000 Oh
Pekerja
0.2600 Oh
Tukang Kayu
0.0260 Oh
Kepala Tukang
0.0050 Oh
Mandor
0.0400 M3
Kayu Meranti
0.3000 Kg
Paku Biasa
0.1000 Ltr
Minyak Bekisting

M2 VII.17.

18 Pasang Bekisting Untuk Sloof


0.3000 Oh
Pekerja
0.2600 Oh
Tukang Kayu
0.0260 Oh
Kepala Tukang
0.0050 Oh
Mandor
0.0450 M3
Kayu Meranti
0.3000 Kg
Paku Biasa
0.1000 Ltr
Minyak Bekisting

M2 VII.18.

19 Pasang Bekisting Untuk Kolom


0.3000 Oh
Pekerja
0.3300 Oh
Tukang Kayu
0.0330 Oh
Kepala Tukang
0.0060 Oh
Mandor
0.0550 M3
Kayu Meranti
0.4000 Kg
Paku Biasa

M2 VII.19.

Harga
(Rp)

Upah

Jumlah Harga (Rp)


Bahan

Jumlah

60,000.00
80,000.00
90,000.00
85,000.00
235,000.00
380,600.00
1,600.00
Jumlah

234,000.00
51,000.00
18,000.00
5,737.50
308,737.50

129,250.00
315,898.00
544,000.00
989,148.00

234,000.00
51,000.00
18,000.00
5,737.50
129,250.00
315,898.00
544,000.00
1,297,885.50

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

234,000.00
51,000.00
18,000.00
5,737.50
308,737.50

153,125.00
308,286.00
604,800.00
1,066,211.00

234,000.00
51,000.00
18,000.00
5,737.50
153,125.00
308,286.00
604,800.00
1,374,948.50

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

234,000.00
51,000.00
18,000.00
5,737.50
308,737.50

153,125.00
312,092.00
658,400.00
1,123,617.00

234,000.00
51,000.00
18,000.00
5,737.50
153,125.00
312,092.00
658,400.00
1,432,354.50

60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah

234,000.00
51,000.00
18,000.00
5,737.50
308,737.50

131,250.00
304,480.00
712,000.00
1,147,730.00

234,000.00
51,000.00
18,000.00
5,737.50
131,250.00
304,480.00
712,000.00
1,456,467.50

60,000.00
80,000.00
90,000.00
85,000.00
9,000.00
23,500.00
Jumlah

420.00
560.00
63.00
25.50
1,068.50

9,450.00
352.50
9,802.50

420.00
560.00
63.00
25.50
9,450.00
352.50
10,871.00

60,000.00
80,000.00
90,000.00
85,000.00
9,700.00
23,500.00
Jumlah

420.00
560.00
63.00
25.50
1,068.50

10,185.00
352.50
10,537.50

420.00
560.00
63.00
25.50
10,185.00
352.50
11,606.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
15,000.00
Jumlah

18,000.00
20,800.00
2,340.00
425.00
41,565.00

140,000.00
7,050.00
1,500.00
148,550.00

18,000.00
20,800.00
2,340.00
425.00
140,000.00
7,050.00
1,500.00
190,115.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
15,000.00
Jumlah

18,000.00
20,800.00
2,340.00
425.00
41,565.00

157,500.00
7,050.00
1,500.00
166,050.00

18,000.00
20,800.00
2,340.00
425.00
157,500.00
7,050.00
1,500.00
207,615.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00

18,000.00
26,400.00
2,970.00
510.00
-

192,500.00
9,400.00

18,000.00
26,400.00
2,970.00
510.00
192,500.00
9,400.00

SNI - 14

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.3500 Lbr
2.0000 Btg
0.2000 Ltr

Sat. Kode

Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4 m
Minyak Bekisting

20 Pasang Bekisting Untuk Balok


0.3200 Oh
Pekerja
0.3300 Oh
Tukang Kayu
0.0330 Oh
Kepala Tukang
0.0060 Oh
Mandor
0.0580 M3
Kayu Meranti
0.4000 Kg
Paku Biasa
0.3500 Lbr
Plywood Tebal 9 mm
2.0000 Btg
Dolken Kayu Galam Dia. 8 - 4 m
0.2000 Ltr
Minyak Bekisting

M2 VII.20

21 Pasang Bekisting Untuk Lantai


0.3200 Oh
Pekerja
0.3300 Oh
Tukang Kayu
0.0330 Oh
Kepala Tukang
0.0060 Oh
Mandor
0.0550 M3
Kayu Meranti
0.4000 Kg
Paku Biasa
0.3500 Lbr
Plywood Tebal 9 mm
6.0000 Btg
Dolken Kayu Galam Dia. 8 - 4 m
0.2000 Ltr
Minyak Bekisting

M2 VII.21.

22 Pasang Bekisting Untuk Tangga


0.3200 Oh
Pekerja
0.3300 Oh
Tukang Kayu
0.0330 Oh
Kepala Tukang
0.0060 Oh
Mandor
0.0450 M3
Kayu Meranti
0.4000 Kg
Paku Biasa
0.3500 Lbr
Plywood Tebal 9 mm
2.0000 Btg
Dolken Kayu Galam Dia. 8 - 4 m
0.2000 Ltr
Minyak Bekisting

M2 VII.22.

23 Pondasi Beton Bertulang (150 Kg Besi + Bekisting)


3.9000 Oh
Pekerja
0.3500 Oh
Tukang Batu
1.0400 Oh
Tukang Kayu
1.0500 Oh
Tukang Besi
0.2450 Oh
Kepala Tukang
0.1650 Oh
Mandor
0.2000 M3
Kayu Meranti
1.5000 Kg
Paku Biasa
0.4000 Ltr
Minyak Bekisting
150.0000 Kg
Besi Beton Polos
2.2500 Kg
Kawat Beton
323.0000 Kg
Semen Ex. Tonasa
0.5200 M3
Pasir Beton
0.7800 M3
Koral Beton

M3 VII.23.

24 Sloof Beton Bertulang (200 Kg Besi + Bekisting)


4.8500 Oh
Pekerja
0.3500 Oh
Tukang Batu
1.5600 Oh
Tukang Kayu
1.4000 Oh
Tukang Besi
0.3310 Oh
Kepala Tukang
0.1700 Oh
Mandor
0.2700 M3
Kayu Meranti
2.0000 Kg
Paku Biasa
0.6000 Ltr
Minyak Bekisting
200.0000 Kg
Besi Beton Polos
3.0000 Kg
Kawat Beton
323.0000 Kg
Semen Ex. Tonasa
0.5200 M3
Pasir Beton
0.7800 M3
Koral Beton

M3 VII.24.

25 Kolom Beton Bertulang (300 Kg Besi + Bekisting)


7.3000 Oh
Pekerja
0.3500 Oh
Tukang Batu
3.3000 Oh
Tukang Kayu
2.1000 Oh
Tukang Besi
0.5700 Oh
Kepala Tukang
0.2500 Oh
Mandor
0.5500 M3
Kayu Meranti
4.0000 Kg
Paku Biasa
2.0000 Ltr
Minyak Bekisting
300.0000 Kg
Besi Beton Polos

M3 VII.25.

Harga
(Rp)
100,000.00
70,000.00
15,000.00
Jumlah

Jumlah Harga (Rp)


Bahan
35,000.00
140,000.00
3,000.00
47,880.00
379,900.00
Upah

Jumlah
35,000.00
140,000.00
3,000.00
427,780.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
100,000.00
70,000.00
15,000.00
Jumlah

19,200.00
26,400.00
2,970.00
510.00
49,080.00

203,000.00
9,400.00
35,000.00
140,000.00
3,000.00
390,400.00

19,200.00
26,400.00
2,970.00
510.00
203,000.00
9,400.00
35,000.00
140,000.00
3,000.00
439,480.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
100,000.00
70,000.00
1,600.00
Jumlah

19,200.00
26,400.00
2,970.00
510.00
49,080.00

192,500.00
9,400.00
35,000.00
420,000.00
320.00
657,220.00

19,200.00
26,400.00
2,970.00
510.00
192,500.00
9,400.00
35,000.00
420,000.00
320.00
706,300.00

60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
100,000.00
70,000.00
1,600.00
Jumlah

19,200.00
26,400.00
2,970.00
510.00
49,080.00

157,500.00
9,400.00
35,000.00
140,000.00
320.00
342,220.00

19,200.00
26,400.00
2,970.00
510.00
157,500.00
9,400.00
35,000.00
140,000.00
320.00
391,300.00

60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah

234,000.00
28,000.00
83,200.00
84,000.00
22,050.00
14,025.00
465,275.00

700,000.00
35,250.00
640.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
3,114,933.00

234,000.00
28,000.00
83,200.00
84,000.00
22,050.00
14,025.00
700,000.00
35,250.00
640.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
3,580,208.00

60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah

291,000.00
28,000.00
124,800.00
112,000.00
29,790.00
14,450.00
600,040.00

945,000.00
47,000.00
960.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
3,839,628.00

291,000.00
28,000.00
124,800.00
112,000.00
29,790.00
14,450.00
945,000.00
47,000.00
960.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
4,439,668.00

60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00

438,000.00
28,000.00
264,000.00
168,000.00
51,300.00
21,250.00
-

1,925,000.00
94,000.00
3,200.00
2,700,000.00

438,000.00
28,000.00
264,000.00
168,000.00
51,300.00
21,250.00
1,925,000.00
94,000.00
3,200.00
2,700,000.00

SNI - 15

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
4.5000
323.0000
0.5200
0.7800
3.5000
20.0000

Kg
Kg
M3
M3
Lbr
Btg

Sat. Kode

Kawat Beton
Semen Ex. Tonasa
Pasir Beton
Koral Beton
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4 m

26 Balok Beton Bertulang (200 Kg Besi + Bekisting)


5.9600 Oh
Pekerja
0.3500 Oh
Tukang Batu
2.8000 Oh
Tukang Kayu
1.4000 Oh
Tukang Besi
0.4550 Oh
Kepala Tukang
0.2080 Oh
Mandor
0.4600 M3
Kayu Meranti
3.2000 Kg
Paku Biasa
1.6000 Ltr
Minyak Bekisting
200.0000 Kg
Besi Beton Polos
3.0000 Kg
Kawat Beton
323.0000 Kg
Semen Ex. Tonasa
0.5200 M3
Pasir Beton
0.7800 M3
Koral Beton
2.8000 Lbr
Plywood Tebal 9 mm
16.0000 Btg
Dolken Kayu Galam Dia. 8 - 4 m

M3 VII.26

27 Balok Beton Bertulang (150 Kg Besi + Bekisting)


5.8000 Oh
Pekerja
0.3500 Oh
Tukang Batu
2.8000 Oh
Tukang Kayu
1.0500 Oh
Tukang Besi
0.4200 Oh
Kepala Tukang
0.1850 Oh
Mandor
0.4400 M3
Kayu Meranti
3.2000 Kg
Paku Biasa
1.6000 Ltr
Minyak Bekisting
150.0000 Kg
Besi Beton Polos
2.2500 Kg
Kawat Beton
323.0000 Kg
Semen Ex. Tonasa
0.5200 M3
Pasir Beton
0.7800 M3
Koral Beton
2.8000 Lbr
Plywood Tebal 9 mm
32.0000 Btg
Dolken Kayu Galam Dia. 8 - 4 m

M3 VII.27

28 Dinding Beton Bertulang (150 Kg Besi + Bekisting)


5.6000 Oh
Pekerja
0.3500 Oh
Tukang Batu
2.6400 Oh
Tukang Kayu
1.0500 Oh
Tukang Besi
0.4000 Oh
Kepala Tukang
0.1930 Oh
Mandor
0.4000 M3
Kayu Meranti
3.2000 Kg
Paku Biasa
1.6000 Ltr
Minyak Bekisting
150.0000 Kg
Besi Beton Polos
2.2500 Kg
Kawat Beton
323.0000 Kg
Semen Ex. Tonasa
0.5200 M3
Pasir Beton
0.7800 M3
Koral Beton
2.8000 Lbr
Plywood Tebal 9 mm
24.0000 Btg
Dolken Kayu Galam Dia. 8 - 4 m

M3 VII.28.

29 Tangga Beton Bertulang (200 Kg Besi + Bekisting)


5.6000 Oh
Pekerja
0.3500 Oh
Tukang Batu
2.3000 Oh
Tukang Kayu
1.4000 Oh
Tukang Besi
0.4050 Oh
Kepala Tukang
0.2020 Oh
Mandor
0.3550 M3
Kayu Meranti
3.0000 Kg
Paku Biasa
1.2000 Ltr
Minyak Bekisting
200.0000 Kg
Besi Beton Polos
3.0000 Kg
Kawat Beton
323.0000 Kg
Semen Ex. Tonasa
0.5200 M3
Pasir Beton
0.7800 M3
Koral Beton
2.5000 Lbr
Plywood Tebal 9 mm
14.0000 Btg
Dolken Kayu Galam Dia. 8 - 4 m

M3 VII.29.

30 Kolom Penguat Beton Bertulang (11 x 11) cm


0.0600 Oh
Pekerja

M' VII.30.

Harga
(Rp)
23,500.00
1,600.00
312,500.00
380,600.00
100,000.00
70,000.00
Jumlah

Jumlah Harga (Rp)


Bahan
Jumlah
105,750.00
105,750.00
516,800.00
516,800.00
162,500.00
162,500.00
296,868.00
296,868.00
350,000.00
350,000.00
1,400,000.00
1,400,000.00
970,550.00
7,554,118.00
8,524,668.00
Upah

60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
100,000.00
70,000.00
Jumlah

357,600.00
28,000.00
224,000.00
112,000.00
40,950.00
17,680.00
780,230.00

1,610,000.00
75,200.00
2,560.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
280,000.00
1,120,000.00
5,934,428.00

357,600.00
28,000.00
224,000.00
112,000.00
40,950.00
17,680.00
1,610,000.00
75,200.00
2,560.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
280,000.00
1,120,000.00
6,714,658.00

60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
100,000.00
70,000.00
Jumlah

348,000.00
28,000.00
224,000.00
84,000.00
37,800.00
15,725.00
737,525.00

1,540,000.00
75,200.00
2,560.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
280,000.00
2,240,000.00
6,516,803.00

348,000.00
28,000.00
224,000.00
84,000.00
37,800.00
15,725.00
1,540,000.00
75,200.00
2,560.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
280,000.00
2,240,000.00
7,254,328.00

60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
100,000.00
70,000.00
Jumlah

336,000.00
28,000.00
211,200.00
84,000.00
36,000.00
16,405.00
711,605.00

1,400,000.00
75,200.00
2,560.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
280,000.00
1,680,000.00
5,816,803.00

336,000.00
28,000.00
211,200.00
84,000.00
36,000.00
16,405.00
1,400,000.00
75,200.00
2,560.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
280,000.00
1,680,000.00
6,528,408.00

60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
100,000.00
70,000.00
Jumlah

336,000.00
28,000.00
184,000.00
112,000.00
36,450.00
17,170.00
713,620.00

1,242,500.00
70,500.00
1,920.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
250,000.00
980,000.00
5,391,588.00

336,000.00
28,000.00
184,000.00
112,000.00
36,450.00
17,170.00
1,242,500.00
70,500.00
1,920.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
250,000.00
980,000.00
6,105,208.00

60,000.00

3,600.00

3,600.00

SNI - 16

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.0200
0.0200
0.0200
0.0060
0.0030
0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090

Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Kg
M3
M3

Sat. Kode

Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Meranti
Paku Biasa
Besi Beton Polos
Kawat Beton
Semen Ex. Tonasa
Pasir Beton
Koral Beton

31 Kolom Penguat Beton Bertulang (11 x 11) cm


4.9587 Oh
Pekerja
1.6529 Oh
Tukang Batu
1.6529 Oh
Tukang Kayu
1.6529 Oh
Tukang Besi
0.4959 Oh
Kepala Tukang
0.2479 Oh
Mandor
0.1653 M3
Kayu Meranti
0.8264 Kg
Paku Biasa
247.9339 Kg
Besi Beton Polos
37.1901 Kg
Kawat Beton
330.5785 Kg
Semen Ex. Tonasa
0.4959 M3
Pasir Beton
0.7438 M3
Koral Beton

M3 VII.31.

32 Ring Balok Beton Bertulang (10 x 15) cm


0.1000 Oh
Pekerja
0.0330 Oh
Tukang Batu
0.0330 Oh
Tukang Kayu
0.0330 Oh
Tukang Besi
0.0100 Oh
Kepala Tukang
0.0050 Oh
Mandor
0.0030 M3
Kayu Meranti
0.0200 Kg
Paku Biasa
3.6000 Kg
Besi Beton Polos
0.0500 Kg
Kawat Beton
5.5000 Kg
Semen Ex. Tonasa
0.0090 M3
Pasir Beton
0.0150 M3
Koral Beton

M' VII.32.

33 Ring Balok Beton Bertulang (10 x 15) cm


6.6667 Oh
Pekerja
2.2000 Oh
Tukang Batu
2.2000 Oh
Tukang Kayu
2.2000 Oh
Tukang Besi
0.6667 Oh
Kepala Tukang
0.3333 Oh
Mandor
0.2000 M3
Kayu Meranti
1.3333 Kg
Paku Biasa
240.0000 Kg
Besi Beton Polos
3.3333 Kg
Kawat Beton
366.6667 Kg
Semen Ex. Tonasa
0.6000 M3
Pasir Beton
1.0000 M3
Koral Beton

M3 VII.33.

VIII. PEKERJAAN PENUTUP ATAP


1 Pasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm
0.1400 Oh
Pekerja
0.0700 Oh
Tukang Kayu
0.0070 Oh
Kepala Tukang
0.0070 Oh
Mandor
0.7500 Lbr
Asbes Gelombang
0.1200 Kg
Paku Payung

Harga
(Rp)
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah

Upah
1,600.00
1,600.00
1,600.00
540.00
255.00
9,195.00

Jumlah Harga (Rp)


Bahan
7,000.00
235.00
27,000.00
10,575.00
6,400.00
1,875.00
3,425.40
56,510.40

60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah

297,520.66
132,231.40
132,231.40
132,231.40
44,628.10
21,074.38
759,917.36

578,512.40
19,421.49
2,231,404.96
873,966.94
528,925.62
154,958.68
283,090.91
4,670,280.99

297,520.66
132,231.40
132,231.40
132,231.40
44,628.10
21,074.38
578,512.40
19,421.49
2,231,404.96
873,966.94
528,925.62
154,958.68
283,090.91
5,430,198.35

60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah

6,000.00
2,640.00
2,640.00
2,640.00
900.00
425.00
15,245.00

10,500.00
470.00
32,400.00
1,175.00
8,800.00
2,812.50
5,709.00
61,866.50

6,000.00
2,640.00
2,640.00
2,640.00
900.00
425.00
10,500.00
470.00
32,400.00
1,175.00
8,800.00
2,812.50
5,709.00
77,111.50

60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah

400,000.00
176,000.00
176,000.00
176,000.00
60,000.00
28,333.33
1,016,333.33

700,000.00
31,333.33
2,160,000.00
78,333.33
586,666.67
187,500.00
380,600.00
4,124,433.33

400,000.00
176,000.00
176,000.00
176,000.00
60,000.00
28,333.33
700,000.00
31,333.33
2,160,000.00
78,333.33
586,666.67
187,500.00
380,600.00
5,140,766.67

60,000.00
80,000.00
90,000.00
85,000.00
58,000.00
24,000.00
Jumlah

8,400.00
5,600.00
630.00
595.00
15,225.00

43,500.00
2,880.00
46,380.00

8,400.00
5,600.00
630.00
595.00
43,500.00
2,880.00
61,605.00

60,000.00
80,000.00
90,000.00
85,000.00
4,725.00
23,500.00
Jumlah

12,000.00
8,000.00
900.00
850.00
21,750.00

56,700.00
705.00
57,405.00

12,000.00
8,000.00
900.00
850.00
56,700.00
705.00
79,155.00

60,000.00
80,000.00
90,000.00
85,000.00

12,000.00
8,000.00
900.00
850.00

Jumlah
1,600.00
1,600.00
1,600.00
540.00
255.00
7,000.00
235.00
27,000.00
10,575.00
6,400.00
1,875.00
3,425.40
65,705.40

M2 VIII.1.

Pasang Atap Genteng Beton Biasa


0.2000 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0100 Oh
Mandor
12.0000 Lbr
Genteng Beton Type Garuda Natural
0.0300 Kg
Paku Biasa

M2 VIII.2.

Pasang Atap Genteng Metal


0.2000 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0100 Oh
Mandor

M2 VIII.3.
-

12,000.00
8,000.00
900.00
850.00

SNI - 17

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
1.3000 Lbr
0.0300 Kg

Pasang Atap Sirap


0.1660 Oh
0.2500 Oh
0.0250 Oh
0.0080 Oh
60.0000 Lbr
0.2000 Kg

Genteng Metal
Paku Anti Karat

12

Harga
(Rp)
155,000.00
54,450.00
Jumlah

Jumlah Harga (Rp)


Bahan
201,500.00
1,633.50
21,750.00
203,133.50

60,000.00
80,000.00
90,000.00
85,000.00
500.00
23,500.00
Jumlah

9,960.00
20,000.00
2,250.00
680.00
32,890.00

30,000.00
4,700.00
34,700.00

9,960.00
20,000.00
2,250.00
680.00
30,000.00
4,700.00
67,590.00

60,000.00
80,000.00
90,000.00
85,000.00
7,425.00
20,000.00
1,600.00
235,000.00
3,250.00
Jumlah

24,000.00
16,000.00
1,800.00
1,700.00
43,500.00

25,987.50
1,000.00
17,280.00
7,520.00
3,250.00
55,037.50

24,000.00
16,000.00
1,800.00
1,700.00
25,987.50
1,000.00
17,280.00
7,520.00
3,250.00
98,537.50

60,000.00
80,000.00
90,000.00
85,000.00
46,000.00
54,450.00
Jumlah

15,000.00
12,000.00
1,350.00
1,105.00
29,455.00

50,600.00
2,722.50
53,322.50

15,000.00
12,000.00
1,350.00
1,105.00
50,600.00
2,722.50
82,777.50

60,000.00
80,000.00
90,000.00
85,000.00
48,000.00
23,500.00
3,500,000.00
Jumlah

7,500.00
20,000.00
2,250.00
510.00
30,260.00

19,200.00
2,585.00
14,000.00
35,785.00

7,500.00
20,000.00
2,250.00
510.00
19,200.00
2,585.00
14,000.00
66,045.00

60,000.00
80,000.00
90,000.00
85,000.00
100,000.00
24,000.00
Jumlah

7,200.00
4,800.00
540.00
510.00
13,050.00

70,000.00
480.00
70,480.00

7,200.00
4,800.00
540.00
510.00
70,000.00
480.00
83,530.00

60,000.00
80,000.00
90,000.00
85,000.00
48,000.00
23,500.00
Jumlah

9,000.00
5,600.00
720.00
510.00
15,830.00

14,400.00
940.00
15,340.00

9,000.00
5,600.00
720.00
510.00
14,400.00
940.00
31,170.00

60,000.00
80,000.00
90,000.00
85,000.00
5,128.21
Jumlah

9,000.00
4,000.00
450.00
680.00
14,130.00

5,384.62
5,384.62

9,000.00
4,000.00
450.00
680.00
5,384.62
19,514.62

80,000.00
90,000.00
60,000.00
85,000.00
138,000.00
1,500.00
Jumlah

2,666.67
300.00
12,000.00
850.00
15,816.67

138,000.00
6,000.00
144,000.00

2,666.67
300.00
12,000.00
850.00
138,000.00
6,000.00
159,816.67

80,000.00
90,000.00
60,000.00
85,000.00

2,666.67
300.00
12,000.00
850.00

Upah

Jumlah
201,500.00
1,633.50
224,883.50

M2 VIII.4.
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Sirap
Paku biasa

Pasang Nok Genteng Beton


0.4000 Oh
Pekerja
0.2000 Oh
Tukang Kayu
0.0200 Oh
Kepala Tukang
0.0200 Oh
Mandor
3.5000 Bh
Nok Genteng Beton
0.0500 Kg
Paku Biasa
10.8000 Kg
Semen Ex. Tonasa
0.0320 M3
Pasir Pasang
1.0000 Kg
Semen Warna

M' VIII.5.

Pasang Nok Genteng Metal


0.2500 Oh
Pekerja
0.1500 Oh
Tukang Kayu
0.0150 Oh
Kepala Tukang
0.0130 Oh
Mandor
1.1000 Bh
Nok Genteng Metal
0.0500 Kg
Paku Anti Karat

M' VIII.6.

Pasang Nok Sirap


0.1250 Oh
0.2500 Oh
0.0250 Oh
0.0060 Oh
0.4000 Lbr
0.1100 Kg
0.0040 M3

M' VIII.7.
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Seng Plat BJLS 30
Paku Biasa
Kayu Meranti

Pasang Atap Seng Gelombang


0.1200 Oh
Pekerja
0.0600 Oh
Tukang Kayu
0.0060 Oh
Kepala Tukang
0.0060 Oh
Mandor
0.7000 Lbr
Seng Gelombang
0.0200 Kg
Paku Payung

M2 VIII.8.

Pasang Nok Seng


0.1500 Oh
0.0700 Oh
0.0080 Oh
0.0060 Oh
0.3000 Lbr
0.0400 Kg

M' VIII.9.
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Seng Plat BJLS
Paku Biasa

10 Pasang Aluminium Foil


0.1500 Oh
Pekerja
0.0500 Oh
Tukang Kayu
0.0050 Oh
Kepala Tukang
0.0080 Oh
Mandor
1.0500 M2
Aluminium foil

11

Sat. Kode

M2 VIII.10.

Pasang atap steel jenis Spandek Hi-ten tebal 0,45 mm finish M2 VIII.11.
Zincalume
0.03 oh
Tukang
0.003 oh
Kepala Kerja
0.20 oh
Pekerja
0.01 oh
Mandor
1.00 M2
Atap Spandek
4.00 bh
Sekrup Galbani (MTEKS 10-16x16 WAF)

Pasang atap steel jenis Spandek Hi-ten tebal 0,45 mm finish M2 VIII.12.
Colorbond
0.03 oh
Tukang
0.003 oh
Kepala Kerja
0.20 oh
Pekerja
0.01 oh
Mandor

2,666.67
300.00
12,000.00
850.00

SNI - 18

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
1.00 M2
4.00 bh

13

14

15

Atap Spandek
Sekrup Galbani (MTEKS 10-16x16 WAF)

Pasang atap steel jenis Klip Lok Hi-ten tebal 0,50 mm


Colorbond
0.03 oh
Tukang
0.003 oh
Kepala Kerja
0.21 oh
Pekerja
0.01 oh
Mandor
1.00 M2
Klip Lok Hi-ten

M2 VIII.13.

Pasang atap steel jenis Klip Lok Hi-ten tebal 0,50 mm


Zincalume
0.03 oh
Tukang
0.003 oh
Kepala Kerja
0.21 oh
Pekerja
0.01 oh
Mandor
1.00 M2
Klip Lok Hi-ten

M2 VIII.14.

Pasang ridge capping/nok steel finish Zincalume


0.02 oh
Tukang
0.002 oh
Kepala Kerja
0.12 oh
Pekerja
0.002 oh
Mandor
1.00 m'
Standard Capping Lysaght Zincalume
4.00 bh
Screw C-Teks 12-14x45 HGS

IX. PEKERJAAN LANGIT-LANGIT


1 Pas. Langit-langit Plywood (30 x 60) cm Tebal 4 mm
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0700 Oh
Pekerja
0.0035 Oh
Mandor
0.3600 Lbr
Plywood Tebal 4 mm
0.0300 Kg
Paku Triplek

Sat. Kode

Harga
(Rp)
215,000.00
1,500.00
Jumlah

Jumlah Harga (Rp)


Bahan
215,000.00
6,000.00
15,816.67
221,000.00

80,000.00
90,000.00
60,000.00
85,000.00
262,000.00
Jumlah

2,666.67
300.00
12,600.00
850.00
16,416.67

262,000.00
262,000.00

2,666.67
300.00
12,600.00
850.00
262,000.00
278,416.67

80,000.00
90,000.00
60,000.00
85,000.00
173,000.00
Jumlah

2,666.67
300.00
12,600.00
850.00
16,416.67

173,000.00
173,000.00

2,666.67
300.00
12,600.00
850.00
173,000.00
189,416.67

80,000.00
90,000.00
60,000.00
85,000.00
70,000.00
1,500.00
Jumlah

1,600.00
180.00
7,200.00
170.00
9,150.00

70,000.00
6,000.00
76,000.00

1,600.00
180.00
7,200.00
170.00
70,000.00
6,000.00
85,150.00

80,000.00
90,000.00
60,000.00
85,000.00
60,000.00
24,000.00
Jumlah

8,000.00
900.00
4,200.00
297.50
13,397.50

21,600.00
720.00
22,320.00

8,000.00
900.00
4,200.00
297.50
21,600.00
720.00
35,717.50

60,000.00
80,000.00
90,000.00
85,000.00
77,000.00
24,000.00
Jumlah

4,200.00
8,000.00
900.00
297.50
13,397.50

27,720.00
720.00
28,440.00

4,200.00
8,000.00
900.00
297.50
27,720.00
720.00
41,837.50

60,000.00
80,000.00
90,000.00
85,000.00
60,000.00
24,000.00
Jumlah

4,200.00
8,000.00
900.00
297.50
13,397.50

22,500.00
720.00
23,220.00

4,200.00
8,000.00
900.00
297.50
22,500.00
720.00
36,617.50

60,000.00
80,000.00
90,000.00
85,000.00
77,000.00
24,000.00
Jumlah

4,200.00
8,000.00
900.00
297.50
13,397.50

28,875.00
720.00
29,595.00

4,200.00
8,000.00
900.00
297.50
28,875.00
720.00
42,992.50

60,000.00
80,000.00
90,000.00
85,000.00
1,500.00
23,500.00

9,000.00
40,000.00
4,500.00
637.50
54,137.50

1,500.00
3,525.00
5,025.00

9,000.00
40,000.00
4,500.00
637.50
1,500.00
3,525.00
59,162.50

60,000.00
80,000.00
90,000.00
85,000.00
15,000.00

3,000.00
4,000.00
450.00
255.00
-

16,500.00

3,000.00
4,000.00
450.00
255.00
16,500.00

Upah

Jumlah
215,000.00
6,000.00
236,816.67

m' VIII.15.

M2

Pas. Langit-langit Plywood (30 x 60) cm Tebal 6 mm


0.0700 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0035 Oh
Mandor
0.3600 Lbr
Plywood Tebal 6 mm
0.0300 Kg
Paku Triplek

M2

Pas. Langit-langit Plywood (60 x 120) cm Tebal 4 mm


0.0700 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0035 Oh
Mandor
0.3750 Lbr
Plywood Tebal 4 mm
0.0300 Kg
Paku Triplek

M2

Pas. Langit-langit Plywood (60 x 120) cm Tebal 6 mm


0.0700 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0035 Oh
Mandor
0.3750 Lbr
Plywood Tebal 6 mm
0.0300 Kg
Paku Triplek

M2

Pasang Langit-langit Akustik (60 x 120) cm +


Rangka Alluminium
0.1500 Oh
Pekerja
0.5000 Oh
Tukang Kayu
0.0500 Oh
Kepala Tukang
0.0075 Oh
Mandor
1.0000 M2
Akustik 60 x 120 cm
3.6000 M'
Profil Aluminium T
1.0000 Bh
Ramset/Dyna Bolt
0.1500 Kg
Kawat Seng Polos

M2

Pasang List Langit-langit Kayu Profil


0.0500 Oh
Pekerja
0.0500 Oh
Tukang Kayu
0.0050 Oh
Kepala Tukang
0.0030 Oh
Mandor
1.1000 M'
List Kayu Profil

M'

IX.1.

IX.2.

IX.3.

IX.4.

IX.5.

IX.6.

SNI - 19

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.0100 Kg

Sat. Kode

Paku

Pasang Langit-langit Akustik (60 x 120) cm + Rangka


Kayu Meranti
0.3100 Oh
Pekerja
0.4700 Oh
Tukang Kayu
0.0470 Oh
Kepala Tukang
0.0155 Oh
Mandor
1.1000 M2
Akustik 60 x 120 cm
0.0270 M3
Kayu Meranti
0.0600 Kg
Paku

M2

Langit-langit Kalsi Board, Tebal 4.5 mm


0.0700 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0035 Oh
Mandor
0.3750 Lbr
Kalsi Board (120x240x4.5) mm
0.0300 Kg
Paku Sekrup

M2

Pasang rangka Metal Ceiling


0.10 oh
Tukang
0.01 oh
Kepala Kerja
0.06 oh
Pekerja
###### oh
Mandor
0.75 set
Rod M5
0.70 Pc
U Clamp Channel
0.84 m'
C Channel
1.39 Pc
Channel Clamp
1.67 m'
Metal Furring

M2

Harga
(Rp)
24,000.00
Jumlah

Jumlah Harga (Rp)


Bahan
240.00
7,705.00
16,740.00

Upah

Jumlah
240.00
24,445.00

IX.7.
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
24,000.00
Jumlah

18,600.00
37,600.00
4,230.00
1,317.50
61,747.50

94,500.00
1,440.00
95,940.00

18,600.00
37,600.00
4,230.00
1,317.50
94,500.00
1,440.00
157,687.50

60,000.00
80,000.00
90,000.00
85,000.00
75,000.00
15,000.00
Jumlah

4,200.00
8,000.00
28,125.00
450.00
40,775.00

900.00
297.50
1,197.50

4,200.00
8,000.00
900.00
297.50
28,125.00
450.00
41,972.50

80,000.00
90,000.00
60,000.00
85,000.00
5,000.00
10,000.00
100,000.00
1,000.00
25,000.00
Jumlah

8,000.00
900.00
3,600.00
255.00
12,755.00

3,750.00
7,000.00
84,000.00
1,390.00
41,750.00
137,890.00

8,000.00
900.00
3,600.00
255.00
3,750.00
7,000.00
84,000.00
1,390.00
41,750.00
150,645.00

60,000.00
80,000.00
90,000.00
85,000.00
21,100.00
61,500.00
Jumlah

3,600.00
480.00
540.00
25.50
4,645.50

23,210.00
4,920.00
28,130.00

3,600.00
480.00
540.00
25.50
23,210.00
4,920.00
32,775.50

60,000.00
80,000.00
90,000.00
85,000.00
800,000.00
Jumlah

39,000.00
52,000.00
5,850.00
2,720.00
99,570.00

800,000.00
800,000.00

39,000.00
52,000.00
5,850.00
2,720.00
800,000.00
899,570.00

60,000.00
80,000.00
90,000.00
85,000.00
800,000.00
Jumlah

63,000.00
84,000.00
9,450.00
446.25
156,896.25

800,000.00
800,000.00

63,000.00
84,000.00
9,450.00
446.25
800,000.00
956,896.25

60,000.00
80,000.00
90,000.00
85,000.00
960,000.00
Jumlah

63,000.00
120,000.00
9,450.00
442.00
192,892.00

960,000.00
960,000.00

63,000.00
120,000.00
9,450.00
442.00
960,000.00
1,152,892.00

60,000.00
80,000.00
90,000.00
85,000.00
30,854.81
23,500.00
3,500,000.00
Jumlah

6,000.00
8,000.00
900.00
42.50
14,942.50

33,940.30
470.00
6,300.00
40,710.30

6,000.00
8,000.00
900.00
42.50
33,940.30
470.00
6,300.00
55,652.80

60,000.00
80,000.00
90,000.00
85,000.00
19,444.44

6,000.00
8,000.00
900.00
42.50
-

21,388.89

6,000.00
8,000.00
900.00
42.50
21,388.89

IX.8.

IX.9.

X. PEKERJAAN BESI DAN ALUMINIUM


1

Pasang Rangka Atap Baja


0.0600 Oh
Pekerja
0.0060 Oh
Tukang Besi
0.0060 Oh
Kepala Tukang
0.0003 Oh
Mandor
1.1000 Kg
Baja Profil WF
0.0800 Kg
Meni Besi

Kg

Pasang Pintu Besi Baja


0.6500 Oh
Pekerja
0.6500 Oh
Tukang Besi
0.0650 Oh
Kepala Tukang
0.0320 Oh
Mandor
1.0000 M2
Pintu besi

M2

Pasang Jendela Besi Baja


1.0500 Oh
Pekerja
1.0500 Oh
Tukang Besi
0.1050 Oh
Kepala Tukang
0.0053 Oh
Mandor
1.0000 M2
Jendela Besi

M2

Pasang Rolling Door


1.0500 Oh
1.5000 Oh
0.1050 Oh
0.0052 Oh
1.0000 M2

M2

X.1.

X.2.

X.3.

X.4.

Pekerja
Tukang Besi
Kepala Tukang
Mandor
Roll Door

Pasang Kawat Harmonika


0.1000 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0005 Oh
Mandor
1.1000 M2
Kawat Harmonika
0.0200 Kg
Paku Biasa 1/2"
0.0018 M3
Kayu Meranti

M2

Pasang Kawat Nyamuk


0.1000 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0005 Oh
Mandor
1.1000 M2
Kawat Nyamuk

M2

X.5.

X.6.

SNI - 20

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.0200 Kg
0.0018 M3

Pasang Kawat Kassa


0.1000 Oh
0.1000 Oh
0.0100 Oh
0.0005 Oh
1.1000 M2
0.0200 Kg
0.0018 M3

Sat. Kode

Paku Biasa 1/2"


Kayu Meranti

M2

M2

Jumlah Harga (Rp)


Bahan
470.00
6,300.00
14,942.50
28,158.89

60,000.00
80,000.00
90,000.00
85,000.00
27,777.78
23,500.00
3,500,000.00
Jumlah

6,000.00
8,000.00
900.00
42.50
14,942.50

30,555.56
470.00
6,300.00
37,325.56

6,000.00
8,000.00
900.00
42.50
30,555.56
470.00
6,300.00
52,268.06

60,000.00
80,000.00
90,000.00
85,000.00
85,000.00
85,000.00
35,000.00
Jumlah

30,000.00
20,000.00
2,250.00
2,125.00
54,375.00

85,000.00
85,000.00
35,000.00
205,000.00

30,000.00
20,000.00
2,250.00
2,125.00
85,000.00
85,000.00
35,000.00
259,375.00

60,000.00
80,000.00
90,000.00
85,000.00
3,804.17
1,600.00
3,250.00
235,000.00
Jumlah

37,200.00
28,000.00
3,150.00
2,550.00
70,900.00

45,650.00
18,208.00
4,875.00
9,870.00
78,603.00

37,200.00
28,000.00
3,150.00
2,550.00
45,650.00
18,208.00
4,875.00
9,870.00
149,503.00

60,000.00
80,000.00
90,000.00
85,000.00
2,464.00
1,600.00
3,250.00
235,000.00
Jumlah

37,200.00
28,000.00
3,150.00
2,550.00
70,900.00

61,600.00
18,208.00
4,875.00
9,870.00
94,553.00

37,200.00
28,000.00
3,150.00
2,550.00
61,600.00
18,208.00
4,875.00
9,870.00
165,453.00

60,000.00
80,000.00
90,000.00
85,000.00
1,232.00
1,600.00
3,250.00
235,000.00
Jumlah

37,200.00
28,000.00
3,150.00
2,550.00
70,900.00

61,600.00
18,208.00
4,875.00
9,870.00
94,553.00

37,200.00
28,000.00
3,150.00
2,550.00
61,600.00
18,208.00
4,875.00
9,870.00
165,453.00

60,000.00
80,000.00
90,000.00
85,000.00
1,232.00
1,600.00
3,250.00
235,000.00
Jumlah

5,400.00
7,200.00
810.00
382.50
13,792.50

6,160.00
2,640.00
325.00
752.00
9,877.00

5,400.00
7,200.00
810.00
382.50
6,160.00
2,640.00
325.00
752.00
23,669.50

60,000.00
80,000.00
90,000.00
85,000.00
1,275.00
1,600.00
3,250.00
235,000.00
Jumlah

37,200.00
28,000.00
3,150.00
2,550.00
70,900.00

56,100.00
67.20
4,875.00
9,870.00
70,912.20

37,200.00
28,000.00
3,150.00
2,550.00
56,100.00
67.20
4,875.00
9,870.00
141,812.20

60,000.00
80,000.00
90,000.00
85,000.00

36,000.00
36,000.00
4,050.00
2,550.00

Upah

Jumlah
470.00
6,300.00
43,101.39

X.7.

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kawat Kassa
Paku Biasa
Kayu Meranti

Pasang Rangka Atap Baja Ringan


0.5000 Oh
Pekerja
0.2500 Oh
Tukang Besi
0.0250 Oh
Kepala Tukang
0.0250 Oh
Mandor
1.0000 M2
Kuda-kuda Baja Ringan
1.0000 M2
Reng Baja Ringan
1.0000 Ls
Accessories

Harga
(Rp)
23,500.00
3,500,000.00
Jumlah

X.8.

XI. PEKERJAAN PENUTUP LANTAI DAN DINDING


1

Pasang Lantai Keramik 30 x 30 cm


0.6200 Oh
Pekerja
0.3500 Oh
Tukang Batu
0.0350 Oh
Kepala Tukang
0.0300 Oh
Mandor
12.0000 Bh
Keramik 30 x 30 cm
11.3800 Kg
Semen ex Tonasa
1.5000 Kg
Semen warna
0.0420 M3
Pasir Pasang

M2

Pasang Lantai Keramik 20 x 20 cm


0.6200 Oh
Pekerja
0.3500 Oh
Tukang Batu
0.0350 Oh
Kepala Tukang
0.0300 Oh
Mandor
25.0000 Bh
Keramik 20 x 20 cm
11.3800 Kg
Semen Ex.Tonasa
1.5000 Kg
Semen Warna
0.0420 M3
Pasir Pasang

M2

Pasang Lantai Keramik 10 x 20 cm


0.6200 Oh
Pekerja
0.3500 Oh
Tukang Batu
0.0350 Oh
Kepala Tukang
0.0300 Oh
Mandor
50.0000 Bh
Keramik 10 x 20 cm
11.3800 Kg
Semen Ex.Tonasa
1.5000 Kg
Semen Warna
0.0420 M3
Pasir Pasang

M2

Pasang Plint Keramik 10 x 20 cm


0.0900 Oh
Pekerja
0.0900 Oh
Tukang Batu
0.0090 Oh
Kepala Tukang
0.0045 Oh
Mandor
5.0000 Bh
Keramik 10 x 20 cm
1.6500 Kg
Semen Ex.Tonasa
0.1000 Kg
Semen Warna
0.0032 M3
Pasir Pasang

M'

Pasang Lantai Keramik 15 x 15 cm


0.6200 Oh
Pekerja
0.3500 Oh
Tukang Batu
0.0350 Oh
Kepala Tukang
0.0300 Oh
Mandor
44.0000 Bh
Keramik 15 x 15 cm
0.0420 Kg
Semen Ex.Tonasa
1.5000 Kg
Semen Warna
0.0420 M3
Pasir Pasang

M2

Pasang Dinding Keramik 10 x 20 cm


0.6000 Oh
Pekerja
0.4500 Oh
Tukang Batu
0.0450 Oh
Kepala Tukang
0.0300 Oh
Mandor

M2

XI.1.

XI.2.

XI.3.

XI.4.

XI.5.

XI.6.
-

36,000.00
36,000.00
4,050.00
2,550.00

SNI - 21

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
50.0000
9.3000
1.5000
0.0180

Bh
Kg
Kg
M3

Sat. Kode

Keramik 10 x 20 cm
Semen Ex.Tonasa
Semen Warna
Pasir Pasang

Pasang Dinding Keramik 20 x 20 cm


0.6000 Oh
Pekerja
0.4500 Oh
Tukang Batu
0.0450 Oh
Kepala Tukang
0.0300 Oh
Mandor
25.0000 Bh
Keramik 20 x 20 cm
9.3000 Kg
Semen Ex.Tonasa
1.5000 Kg
Semen Warna
0.0180 M3
Pasir Pasang

M2

Pasang Dinding Bata Klinker 5 x 5 x 24 cm


0.6200 Oh
Pekerja
0.3500 Oh
Tukang Batu
0.0350 Oh
Kepala Tukang
0.0300 Oh
Mandor
80.0000 Bh
Bata Klinker
12.4400 Kg
Semen Ex.Tonasa
0.0250 M3
Pasir Pasang

M2

Pasang Floor Hardener


0.1200 Oh
Pekerja
0.1200 Oh
Tukang Batu
0.0120 Oh
Kepala Tukang
0.0060 Oh
Mandor
3.0000 Kg
Floor Hardener

M2

M2 XI.11.

12

#REF!
0.4300
0.2000
0.0350
0.0300
1.7000
2.0000
11.3800
0.0420

Oh
Oh
Oh
Oh
Bh
Zak
Kg
M3

Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen Warna
Koral sikat hitam / warna
Semen ex Tonasa
Pasir Pasang

36,000.00
36,000.00
4,050.00
2,550.00
78,600.00

57,530.00
14,880.00
4,875.00
4,230.00
81,515.00

36,000.00
36,000.00
4,050.00
2,550.00
57,530.00
14,880.00
4,875.00
4,230.00
160,115.00

60,000.00
80,000.00
90,000.00
85,000.00
4,000.00
1,600.00
235,000.00
Jumlah

37,200.00
28,000.00
3,150.00
2,550.00
70,900.00

320,000.00
19,904.00
5,875.00
345,779.00

37,200.00
28,000.00
3,150.00
2,550.00
320,000.00
19,904.00
5,875.00
416,679.00

60,000.00
80,000.00
90,000.00
85,000.00
25,000.00
Jumlah

7,200.00
9,600.00
1,080.00
510.00
18,390.00

75,000.00
75,000.00

7,200.00
9,600.00
1,080.00
510.00
75,000.00
93,390.00

60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
25,000.00
Jumlah

7,200.00
9,600.00
1,080.00
510.00
18,390.00

16,800.00
1,250.00
18,050.00

7,200.00
9,600.00
1,080.00
510.00
16,800.00
1,250.00
36,440.00

60,000.00
80,000.00
90,000.00
85,000.00
3,804.17
120,000.00
1,600.00
235,000.00
Jumlah

25,800.00
16,000.00
3,150.00
2,550.00
-

22,825.00
120,000.00
18,208.00
9,870.00
170,903.00

25,800.00
16,000.00
3,150.00
2,550.00
22,825.00
120,000.00
18,208.00
9,870.00
218,403.00

60,000.00
80,000.00
90,000.00
85,000.00
3,250.00
120,000.00
1,600.00
235,000.00
Jumlah

25,800.00
16,000.00
3,150.00
2,550.00
47,500.00

5,525.00
240,000.00
18,208.00
9,870.00
273,603.00

25,800.00
16,000.00
3,150.00
2,550.00
5,525.00
240,000.00
18,208.00
9,870.00
321,103.00

60,000.00
85,000.00
15,000.00
Jumlah

9,000.00
212.50
9,212.50

750.00
750.00

9,000.00
212.50
750.00
9,962.50

60,000.00
85,000.00
15,000.00
Jumlah

9,000.00
212.50
9,212.50

750.00
750.00

9,000.00
212.50
750.00
9,962.50

60,000.00
80,000.00
90,000.00

4,200.00
6,000.00
675.00

4,200.00
6,000.00
675.00

XI.9.

11

Pekerja
Tukang Batu
Kepala Tukang
Mandor
Keramik 30 x 30 cm
Koral sikat hitam / warna
Semen ex Tonasa
Pasir Pasang

60,000.00
80,000.00
90,000.00
85,000.00
2,301.20
1,600.00
3,250.00
235,000.00
Jumlah

Jumlah
61,600.00
14,880.00
4,875.00
4,230.00
164,185.00

XI.8.

M2 XI.10.

Oh
Oh
Oh
Oh
Bh
Zak
Kg
M3

Jumlah Harga (Rp)


Bahan
61,600.00
14,880.00
4,875.00
4,230.00
78,600.00
85,585.00
Upah

XI.7.

10 Pasang Plint Kayu 2 x 10 cm


0.1200 Oh
Pekerja
0.1200 Oh
Tukang Kayu
0.0120 Oh
Kepala Tukang
0.0060 Oh
Mandor
0.0024 M3
Papan Kayu Bangkirai
0.0500 Kg
Paku Skrup

#REF!
0.4300
0.2000
0.0350
0.0300
6.0000
1.0000
11.3800
0.0420

Harga
(Rp)
1,232.00
1,600.00
3,250.00
235,000.00
Jumlah

47,500.00

M2 XI.12.

XII. PEKERJAAN PENGECATAN


1

Mencuci Bidang Permukaan Tembok


Yang Pernah Di Cat
0.1500 Oh
Pekerja
0.0025 Oh
Mandor
0.0500 Kg
Sabun

M2 XII.1.

Mengerok Karat Cat Lama Permukaan Baja Dengan


Cara Manual
0.1500 Oh
Pekerja
0.0025 Oh
Mandor
0.0500 Kg
Sabun

M2 XII.2.

Pengecatan Bidang Kayu Lama


0.0700 Oh
Pekerja
0.0750 Oh
Tukang Cat
0.0075 Oh
Kepala Tukang

M2 XII.3.

SNI - 22

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.0025
0.1500
0.1700
0.1700

Oh
Kg
Ltr
Ltr

Sat. Kode

Mandor
Plamir
Cat Dasar
Cat Penutup

Pengecatan Bidang Kayu Baru (1 Lapis Plamir),


1 Lapis Cat Dasar, 2 Lapis Cat Penutup
0.0700 Oh
Pekerja
0.0090 Oh
Tukang Cat
0.0060 Oh
Kepala Tukang
0.0025 Oh
Mandor
0.2000 Ltr
Cat meni
0.1500 Kg
Plamir
0.1700 Ltr
Cat Dasar
0.2600 Ltr
Cat Penutup

M2 XII.4.

Pelaburan Bidang Kayu Dengan Teak Oil


0.0400 Oh
Pekerja
0.0630 Oh
Tukang Cat
0.0630 Oh
Kepala Tukang
0.0025 Oh
Mandor
0.3600 Ltr
Teak oil

M2 XII.5.

Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter


0.1000 Oh
Pekerja
0.0060 Oh
Mandor
0.3500 Ltr
Residu Atau Ter

M2 XII.6.

Pelaburan Bidang Kayu Dengan Vernis


0.1600 Oh
Pekerja
0.1600 Oh
Tukang Cat
0.0160 Oh
Kepala Tukang
0.0025 Oh
Mandor
0.1500 Ltr
Vernis
0.0500 Ltr
Dempul
0.1000 Lbr
Ampelas
0.0100 Bh
Kuas

M2 XII.7.

Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis


Cat Dasar, 2 Lapis Cat Penutup)
0.0200 Oh
Pekerja
0.0630 Oh
Tukang Cat
0.0063 Oh
Kepala Tukang
0.0025 Oh
Mandor
0.1000 Kg
Plamir
0.1100 Ltr
Cat Dasar
0.2600 Klg
Cat Penutup 2 x

M2 XII.8.

Pengecatan Tembok Lama (1 Lapis Cat Dasar,


2 Lapis Cat Penutup)
0.0280 Oh
Pekerja
0.0420 Oh
Tukang Cat
0.0042 Oh
Kepala Tukang
0.0025 Oh
Mandor
0.1200 Ltr
Cat Dasar
0.1800 Kg
Cat Penutup 2 x

M2 XII.9.

10 Pengecatan Permukaan Baja Dengan Meni Besi


0.0200 Oh
Pekerja
0.2000 Oh
Tukang Cat
0.0200 Oh
Kepala Tukang
0.0100 Oh
Mandor
0.1000 Kg
Meni besi
0.0100 Bh
Kuas

M2 XII.10.

11 Pengecatan Permukaan Baja Lapis Seng (Galbani)


Secara Manual Sistem 1 Lapis Cat Mutakhir
Dengan Tebal 200 um
0.0060 Oh
Pekerja
0.0600 Oh
Tukang Cat
0.0120 Oh
Kepala Tukang
0.0060 Oh
Mandor
0.3000 Kg
Cat Penutup

M2 XII.11.

12 Pengecatan Permukaan Baja Lapis Seng (Galbani)


Secara Manual Sistem 3 Lapis Cat Konvensional
Dengan Tebal 200 um

M2 XII.12.

Harga
(Rp)
85,000.00
25,000.00
30,000.00
49,500.00
Jumlah

Upah
212.50
11,087.50

Jumlah Harga (Rp)


Bahan
3,750.00
5,100.00
8,415.00
17,265.00

60,000.00
80,000.00
90,000.00
85,000.00
30,000.00
25,000.00
30,000.00
49,500.00
Jumlah

4,200.00
720.00
540.00
212.50
5,672.50

6,000.00
3,750.00
5,100.00
12,870.00
27,720.00

4,200.00
720.00
540.00
212.50
6,000.00
3,750.00
5,100.00
12,870.00
33,392.50

60,000.00
80,000.00
90,000.00
85,000.00
56,500.00
Jumlah

2,400.00
5,040.00
5,670.00
212.50
13,322.50

20,340.00
20,340.00

2,400.00
5,040.00
5,670.00
212.50
20,340.00
33,662.50

60,000.00
85,000.00
15,000.00
Jumlah

6,000.00
510.00
6,510.00

5,250.00
5,250.00

6,000.00
510.00
5,250.00
11,760.00

60,000.00
80,000.00
90,000.00
85,000.00
56,500.00
26,000.00
5,000.00
12,000.00
Jumlah

9,600.00
12,800.00
1,440.00
212.50
24,052.50

8,475.00
1,300.00
500.00
120.00
10,395.00

9,600.00
12,800.00
1,440.00
212.50
8,475.00
1,300.00
500.00
120.00
34,447.50

60,000.00
80,000.00
90,000.00
85,000.00
25,000.00
14,000.00
80,000.00
Jumlah

1,200.00
5,040.00
567.00
212.50
7,019.50

2,500.00
1,540.00
20,800.00
24,840.00

1,200.00
5,040.00
567.00
212.50
2,500.00
1,540.00
20,800.00
31,859.50

60,000.00
80,000.00
90,000.00
85,000.00
14,000.00
80,000.00
Jumlah

1,680.00
3,360.00
378.00
212.50
5,630.50

1,680.00
14,400.00
16,080.00

1,680.00
3,360.00
378.00
212.50
1,680.00
14,400.00
21,710.50

60,000.00
80,000.00
90,000.00
85,000.00
61,500.00
12,000.00
Jumlah

1,200.00
16,000.00
1,800.00
850.00
19,850.00

6,150.00
120.00
6,270.00

1,200.00
16,000.00
1,800.00
850.00
6,150.00
120.00
26,120.00

60,000.00
80,000.00
90,000.00
85,000.00
105,000.00
Jumlah

360.00
4,800.00
1,080.00
510.00
6,750.00

31,500.00
31,500.00

360.00
4,800.00
1,080.00
510.00
31,500.00
38,250.00

Jumlah
212.50
3,750.00
5,100.00
8,415.00
28,352.50

SNI - 23

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
0.5000
0.8000
0.3000
0.2000
0.1100
0.1700
0.0800

Oh
Oh
Oh
Oh
Kg
Kg
Kg

Sat. Kode

Pekerja
Tukang Cat
Kepala Tukang
Mandor
Cat Dasar
Cat Antara
Cat Penutup

13 Pengecatan Permukaan Baja Lapis Seng (Galbani)


Secara Semprot (Airless Spray) Dengan Sistem
1 Lapis Mutakhir Dengan Tebal 200 um
0.4000 Oh
Pekerja
0.7000 Oh
Tukang Cat
0.2000 Oh
Kepala Tukang
0.2000 Oh
Mandor
0.3000 Kg
Cat Dasar

Harga
(Rp)
60,000.00
80,000.00
90,000.00
85,000.00
14,000.00
33,000.00
105,000.00
Jumlah

Upah
30,000.00
64,000.00
27,000.00
17,000.00
138,000.00

Jumlah Harga (Rp)


Bahan
1,540.00
5,610.00
8,400.00
15,550.00

60,000.00
80,000.00
90,000.00
85,000.00
14,000.00
Jumlah

24,000.00
56,000.00
18,000.00
17,000.00
115,000.00

4,200.00
4,200.00

24,000.00
56,000.00
18,000.00
17,000.00
4,200.00
119,200.00

60,000.00
85,000.00
80,000.00
90,000.00
296,000.00
1,600.00
235,000.00
Jumlah

126,000.00
9,350.00
60,000.00
6,300.00
201,650.00

296,000.00
9,600.00
2,350.00
307,950.00

126,000.00
9,350.00
60,000.00
6,300.00
296,000.00
9,600.00
2,350.00
509,600.00

60,000.00
85,000.00
80,000.00
90,000.00
900.00
1,600.00
235,000.00
1,232.00
3,250.00
Jumlah

360,000.00
25,500.00
240,000.00
27,000.00
652,500.00

180,000.00
192,000.00
70,500.00
443,520.00
19,500.00
905,520.00

360,000.00
25,500.00
240,000.00
27,000.00
180,000.00
192,000.00
70,500.00
443,520.00
19,500.00
1,558,020.00

60,000.00
85,000.00
80,000.00
90,000.00
900.00
1,600.00
235,000.00
380,600.00
10,871.00
312,500.00
Jumlah

192,000.00
1,360.00
81,200.00
135.00
274,695.00

65,700.00
70,400.00
16,450.00
26,642.00
17,393.60
18,750.00
215,335.60

192,000.00
1,360.00
81,200.00
135.00
65,700.00
70,400.00
16,450.00
26,642.00
17,393.60
18,750.00
490,030.60

60,000.00
85,000.00
80,000.00
90,000.00
900.00
1,600.00
235,000.00
380,600.00
10,871.00
312,500.00
Jumlah

85,200.00
6,035.00
37,840.00
4,230.00
133,305.00

112,500.00
123,200.00
30,550.00
7,612.00
28,264.60
28,125.00
330,251.60

85,200.00
6,035.00
37,840.00
4,230.00
112,500.00
123,200.00
30,550.00
7,612.00
28,264.60
28,125.00
463,556.60

60,000.00
85,000.00
80,000.00
80,000.00
90,000.00
900.00
1,600.00
235,000.00
380,600.00
10,871.00
312,500.00
Jumlah

129,600.00
9,180.00
57,600.00
8,000.00
6,480.00
210,860.00

167,400.00
182,400.00
43,240.00
12,559.80
52,724.35
37,500.00
495,824.15

129,600.00
9,180.00
57,600.00
8,000.00
6,480.00
167,400.00
182,400.00
43,240.00
12,559.80
52,724.35
37,500.00
706,684.15

Jumlah
30,000.00
64,000.00
27,000.00
17,000.00
1,540.00
5,610.00
8,400.00
153,550.00

M2 XII.13.

XIII. PEKERJAAN SANITASI


1

Memasang Bak Mandi Teraso Volume 0,30 m3


2.1000 Oh
Pekerja
0.1100 Oh
Mandor
0.7500 Oh
Tukang Batu
0.0700 Oh
Kepala Tukang
1.0000 Bh
Bak Teraso
6.0000 Kg
Semen Ex. Tonasa
0.0100 M3
Pasir Pasang

Bh XIII.1.

Memasang Bak Mandi Batu Bata Volume 0,30 m3


6.0000 Oh
Pekerja
0.3000 Oh
Mandor
3.0000 Oh
Tukang Batu
0.3000 Oh
Kepala Tukang
200.0000 Bh
Batu Bata
120.0000 Kg
Semen Ex. Tonasa
0.3000 M3
Pasir Pasang
360.0000 Bh
Keramik (11 x 11) cm
6.0000 Kg
Semen Putih

Bh XIII.2.

Memasang Bak Kontrol Pasangan Batu Bata


Ukuran (30 x 30) cm Tinggi 35 cm
3.2000 Oh
Pekerja
0.0160 Oh
Mandor
1.0150 Oh
Tukang Batu
0.0015 Oh
Kepala Tukang
73.0000 Bh
Batu Bata
44.0000 Kg
Semen Ex. Tonasa
0.0700 M3
Pasir Pasang
0.0700 M3
Batu Kerikil
1.6000 Kg
Besi Beton
0.0600 M3
Pasir Beton

Bh XIII.3.

Memasang Bak Kontrol Pasangan Batu Bata


Ukuran (45 x 45) cm Tinggi 50 cm
1.4200 Oh
Pekerja
0.0710 Oh
Mandor
0.4730 Oh
Tukang Batu
0.0470 Oh
Kepala Tukang
125.0000 Bh
Batu Bata
77.0000 Kg
Semen Ex. Tonasa
0.1300 M3
Pasir Pasang
0.0200 M3
Batu Kerikil
2.6000 Kg
Besi Beton
0.0900 M3
Pasir Beton

Bh XIII.4.

Memasang Bak Kontrol Pasangan Batu Bata


Ukuran (60 x 60) cm Tinggi 60 cm
2.1600 Oh
Pekerja
0.1080 Oh
Mandor
0.7200 Oh
Tukang Batu
0.1000 Oh
Tukang Gali
0.0720 Oh
Kepala Tukang
186.0000 Bh
Batu Bata
114.0000 Kg
Semen Ex. Tonasa
0.1840 M3
Pasir Pasang
0.0330 M3
Batu Kerikil
4.8500 Kg
Besi Beton
0.1200 M3
Pasir Beton

Bh XIII.5.

SNI - 24

RINCIAN ANALISA PEKERJAAN


No
6

Uraian Pekerjaan

Sat. Kode

Memasang Pipa Galvanis Diameter 1/2"


0.0540 Oh
Pekerja
0.0900 Oh
Tukang Batu
0.0090 Oh
Kepala Tukang
0.0270 Oh
Mandor
1.2000 M'
Pipa Galvanis
1.0000 Ls
Perlengkapan (35% Harga Pipa)

M' XIII.6.

Memasang Pipa PVC Type AW Diameter 1/2"


0.0360 Oh
Pekerja
0.0018 Oh
Tukang Batu
0.0600 Oh
Kepala Tukang
0.0060 Oh
Mandor
1.2000 M'
Pipa PVC
1.0000 Ls
Perlengkapan (35% Harga Pipa)

M' XIII.7.

Memasang Bak Cuci Piring Stainles Steel


0.0300 Oh
Pekerja
0.3000 Oh
Tukang Batu
0.0300 Oh
Kepala Tukang
0.0015 Oh
Mandor
1.0000 Bh
Bak Cuci Stainles Steel
1.0000 Set
Water Drain + Assesories

Bh XIII.8.

Pas. dinding teakwood Tebal 3 mm


0.0700 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0035 Oh
Mandor
0.3750 Lbr
Teakwood Tebal 4 mm
0.0300 Kg
Paku Triplek

M2

Pasang Lantai keramik 40 x 40 cm


0.6200 Oh
Pekerja
0.3500 Oh
Tukang Batu
0.0350 Oh
Kepala Tukang
0.0300 Oh
Mandor
1.0000 box
Keramik 40x40
11.3800 Kg
Semen ex Tonasa
1.5000 Kg
Semen warna
0.0420 M3
Pasir Pasang

M2

Pasang Lantai Keramik 40 x 40 cm Kasar


0.6200 Oh
Pekerja
0.3500 Oh
Tukang Batu
0.0350 Oh
Kepala Tukang
0.0300 Oh
Mandor
1.0000 box
Kearmik 40x40 Kasar
11.3800 Kg
Semen ex Tonasa
1.5000 Kg
Semen warna
0.0420 M3
Pasir Pasang

M2

Bongkaran lantai keramik


0.3100 Oh
Pekerja
0.0150 Oh
Mandor

M2

Upah

Jumlah Harga (Rp)


Bahan

Jumlah

60,000.00
80,000.00
90,000.00
85,000.00
63,000.00
22,050.00
Jumlah

3,240.00
7,200.00
810.00
2,295.00
13,545.00

75,600.00
22,050.00
97,650.00

3,240.00
7,200.00
810.00
2,295.00
75,600.00
22,050.00
111,195.00

60,000.00
85,000.00
80,000.00
90,000.00
6,500.00
2,275.00
Jumlah

2,160.00
153.00
4,800.00
540.00
7,653.00

7,800.00
2,275.00
10,075.00

2,160.00
153.00
4,800.00
540.00
7,800.00
2,275.00
17,728.00

60,000.00
80,000.00
90,000.00
85,000.00
300,000.00
50,000.00
Jumlah

1,800.00
24,000.00
2,700.00
127.50
28,627.50

300,000.00
50,000.00
350,000.00

1,800.00
24,000.00
2,700.00
127.50
300,000.00
50,000.00
378,627.50

60,000.00
80,000.00
90,000.00
85,000.00
265,650.00
24,000.00
Jumlah

4,200.00
8,000.00
900.00
297.50
13,397.50

99,618.75
720.00
100,338.75

4,200.00
8,000.00
900.00
297.50
99,618.75
720.00
113,736.25

60,000.00
80,000.00
90,000.00
85,000.00
79,200.00
1,600.00
3,250.00
235,000.00
Jumlah

37,200.00
28,000.00
3,150.00
2,550.00
70,900.00

79,200.00
18,208.00
4,875.00
9,870.00
112,153.00

37,200.00
28,000.00
3,150.00
2,550.00
79,200.00
18,208.00
4,875.00
9,870.00
183,053.00

60,000.00
80,000.00
90,000.00
85,000.00
84,700.00
1,600.00
3,250.00
235,000.00
Jumlah

37,200.00
28,000.00
3,150.00
2,550.00
70,900.00

84,700.00
18,208.00
4,875.00
9,870.00
117,653.00

37,200.00
28,000.00
3,150.00
2,550.00
84,700.00
18,208.00
4,875.00
9,870.00
188,553.00

60,000.00
85,000.00
Jumlah

18,600.00
1,275.00
19,875.00

60,000.00
80,000.00
90,000.00
85,000.00
5,000.00
60,000.00
Jumlah

18,000.00
48,000.00
5,400.00
850.00
72,250.00

5,500.00
66,000.00
71,500.00

18,000.00
48,000.00
5,400.00
850.00
5,500.00
66,000.00
143,750.00

60,000.00
80,000.00
90,000.00
85,000.00
135,000.00
Jumlah

4,200.00
8,000.00
900.00
297.50
13,397.50

135,000.00
135,000.00

4,200.00
8,000.00
900.00
297.50
135,000.00
148,397.50

60,000.00
80,000.00
90,000.00
85,000.00

9,000.00
20,000.00
2,250.00
6,375.00

IX.4.

XI.1.

XI.1.

XI.1.

Pasang Kusen Aluminium


0.3000 Oh
Pekerja
0.6000 Oh
Tukang aluminium
0.0600 Oh
Kepala tukang
0.0100 Oh
Mandor
1.1000 M'
karet pres
1.1000 M'
Kusen aluminium

Harga
(Rp)

Pas. dinding kaca tebal 5mm


0.0700 Oh
Pekerja
0.1000 Oh
Tukang Kaca
0.0100 Oh
Kepala Tukang
0.0035 Oh
Mandor
1.0000 m2
Kaca tebal 5mm

M2

Pas. Rangka Aluminium (1.00 x 1.00) m Besi holo


0.1500 Oh
Pekerja
0.2500 Oh
Tukang Kayu
0.0250 Oh
Kepala Tukang
0.0750 Oh
Mandor

M2 VI.11.

18,600.00
1,275.00
19,875.00

IX.4.

9,000.00
20,000.00
2,250.00
6,375.00

SNI - 25

RINCIAN ANALISA PEKERJAAN


No

Uraian Pekerjaan
1.0000 btg
0.1000 Kg

Sat. Kode

Besi holo
Paku Anti karat

Pas. Dinding GRC Tebal 3 mm


0.0700 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0035 Oh
Mandor
0.3750 Lbr
GRC
0.0300 Kg
Paku

M2

Pasang Genteng Metal


0.2000 Oh
Pekerja
0.1000 Oh
Tukang Kayu
0.0100 Oh
Kepala Tukang
0.0100 Oh
Mandor
0.8000 Bh
Genteng Metal
0.0300 Kg
Paku Anti Karat

M' VIII.6.

Harga
(Rp)
96,000.00
54,450.00
Jumlah

Jumlah Harga (Rp)


Bahan
96,000.00
5,445.00
37,625.00
101,445.00

60,000.00
80,000.00
90,000.00
85,000.00
154,000.00
54,450.00
Jumlah

4,200.00
8,000.00
900.00
297.50
13,397.50

57,750.00
1,633.50
59,383.50

4,200.00
8,000.00
900.00
297.50
57,750.00
1,633.50
72,781.00

60,000.00
80,000.00
90,000.00
85,000.00
203,000.00
49,500.00
Jumlah

12,000.00
8,000.00
900.00
850.00
21,750.00

162,400.00
1,485.00
163,885.00

12,000.00
8,000.00
900.00
850.00
162,400.00
1,485.00
185,635.00

Upah

Jumlah
96,000.00
5,445.00
139,070.00

IX.4.

4.14 RENCANA ANGGARAN BIAYA


PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI
DIJALAN MARSMA R ISWAHYUDI BALIKPAPAN
TAHUN
: 2012

No.
1
I
1
2
3
4
5

Uraian Pekerjaan
2
PEKERJAAN PENDAHULUAN
Pembersihan lokasi pekerjaan
Membuat Gudang Kerja
Penyediaan Air Kerja
Penyediaan Listrik
Pengukuran dan pemasangan bouplank

Volume

Sat.

Harga
Satuan
( Rp)

Jumlah
Harga
( Rp)

367.50
m
m
12.00
1.00
ls
1.00
ls
53.00
m'
SUB TOTAL
PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGAN
Galian pondasi foot plat
42.63
m
Menguruk kembali bekas galian pondasi
32.55
m
Urugan pasir bawah pondasi
1.47
m
Pekerjaan pancang ulin 10 x 10 - 4 m
75.00
titik
Urugan tanah menambah elevasi lantai
14.2
m
SUB TOTAL
PEKERJAAN BETON
Pondasi footplat
Beton K225
18.75
m
Cor Sloof 25/40
Beton K225
6.60
m
Cor Sloof 16/16
Beton K225
0.14
m
Kolom 25/25 lantai 1
Beton K225
3.07
m

10,250.00
1,135,250.00
1,000,000.00
1,000,000.00
82,125.00

3,766,875.00
13,623,000.00
1,000,000.00
1,000,000.00
4,352,625.00
23,742,500.00

27,400.00
13,135.00
108,850.00
276,100.00
69,850.00

1,168,062.00
427,544.25
160,009.50
20,707,500.00
991,870.00
23,454,985.75

1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50

25,780,284.38
9,074,660.10
192,492.79
4,221,091.90

Kolom 25/25 lantai 2

Beton K225

2.53

1,374,948.50

3,478,619.71

Kolom 25/25 lantai 3

Beton K225

1.52

1,374,948.50

2,089,921.72

Kolom 15/25 lantai 2

Beton K225

0.20

1,374,948.50

274,989.70

II
1
2
3
4
5
III
1
2
3
4

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI


DIJALAN MARSMA R ISWAHYUDI BALIKPAPAN
TAHUN
: 2012

No.

Uraian Pekerjaan

Volume

Sat.

Harga
Satuan
( Rp)

Jumlah
Harga
( Rp)

Kolom 15/25 lantai 3

2 Beton K225

0.25

1,374,948.50

343,737.13

Kolom 15/15 lantai 1

Beton K225

0.52

1,374,948.50

714,973.22

10

Kolom 15/15 lantai 2

Beton K225

0.73

1,374,948.50

1,003,712.41

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Kolom 15/15 lantai 3


Balok 25/30 lantai 2
Balok 25/30 lantai 3
Balok 25/30 atap dag
Balok 20/20 lantai 2
Balok 20/20 lantai 3
Balok 20/20 atap dag
Tangga Beton lt 1 ke lt 2
Tangga Beton lt 2 ke lt 3
Balok bordes 20/30
Rabat beton
Plat lantai 2
Plat lantai 3
Plat atap dag
Beton duc bawah kusen
Balok latei atas kusen
Konsol kantiliver

Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton 1:3:5
Beton K225
Beton K225
Beton K225
Beton 1:3:5
Beton K225
Beton 1:3:5

1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
970,472.00
1,374,948.50
970,472.00
1,374,948.50
970,472.00
1,374,948.50
970,472.00

494,981.46
6,805,995.08
6,805,995.08
4,647,325.93
1,897,428.93
934,964.98
384,985.58
4,427,334.17
3,918,603.23
1,429,946.44
10,908,105.28
13,378,248.91
9,830,881.36
7,094,734.26
11,645.66
13,749.49
48,523.60
120,207,932.45

IV
1
2
3

PEKERJAAN PEMBESIAN
Pek. Pembesian Balok Sloof 25/40
Pek. Pembesian Balok Sloof 16/16
Pek. Pembesian kolom 25/25

11,606.00
11,606.00
11,606.00

19,262,213.40
322,145.45
31,851,375.40

0.36
m
4.95
m
4.95
m
3.38
m
1.38
m
0.68
m
0.28
m
3.22
m
2.85
m
1.04
m
11.24
m
9.73
m
10.13
m
5.16
m
0.012
m
0.01
m
0.05
m
SUB TOTAL
1,659.68
27.76
2,744.39

kg
kg
kg

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI


DIJALAN MARSMA R ISWAHYUDI BALIKPAPAN
TAHUN
: 2012

No.

Uraian Pekerjaan

4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Pek. Pembesian kolom 15/252


Pek. Pembesian kolom 15/15
Pek. Pembesian balok 25/30
Pek. Pembesian balok 20/20
Pek. Pembesian balok 12/12 balok latei
Pek. Pembesian plat lantai 2
Pek. Pembesian plat lantai 3
Pek. Pembesian plat atap dag
Pek. Pembesian plat bordes
Pek. Pembesian tangga
Pek. Pembesian begel sloof 25/40 dan 16/16
Pek. Pembesian begel kolom 25/25 dan 15/15
Pek. Pembesian begel kolom 25/15
Pek. Pembesian begel balok bordes
Pek. Pembesian pondasi foot plat
Pagar balkon dan pagar lantai 2
Pekerjaan Railing Tangga

V
1
2
3
4
5
6

PEKERJAAN BEKISTING
Pek. Pemasangan bekisting Foot plat
Pek. Pemasangan bekisting Sloof 25/40
Pek. Pemasangan bekisting Sloof 16/16
Pek. Pemasangan bekisting Kolom 25/25 lantai 1
Pek. Pemasangan bekisting Kolom 25/25 lantai 2
Pek. Pemasangan bekisting Kolom 25/25 lantai 3

Volume

Sat.

200.57
kg
358.44
kg
6,000.57
kg
1,069.60
kg
7.34
kg
1,274.61
kg
1,362.56
kg
780.74
kg
294.30
kg
897.95
kg
382.23
kg
557.23
kg
43.28
kg
57.70
kg
516.79
kg
24.88
m
21.70
m
SUB TOTAL
22.32
52.80
1.79
49.05
40.50
24.30

m
m
m
m
m
m

Harga
Satuan
( Rp)

Jumlah
Harga
( Rp)

11,606.00
11,606.00
11,606.00
11,606.00
10,871.00
10,871.00
10,871.00
10,871.00
11,606.00
10,871.00
10,871.00
10,871.00
10,871.00
10,871.00
11,606.00
955,000.00
955,000.00

2,327,791.25
4,160,077.59
69,642,596.30
12,413,833.46
79,753.46
13,856,326.08
14,812,362.31
8,487,376.71
3,415,672.54
9,761,587.70
4,155,222.33
6,057,688.64
470,478.40
627,304.53
5,997,904.84
23,760,400.00
20,723,500.00
252,185,610.39

190,115.00
207,615.00
207,615.00
427,780.00
427,780.00
427,780.00

4,243,366.80
10,962,072.00
371,630.85
20,982,609.00
17,325,090.00
10,395,054.00

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI


DIJALAN MARSMA R ISWAHYUDI BALIKPAPAN
TAHUN
: 2012

No.

Uraian Pekerjaan

Volume

Sat.

7
8
9
10
11

2
Pek. Pemasangan bekisting Kolom
15/25 lantai 2
Pek. Pemasangan bekisting Kolom 15/25 lantai 3
Pek. Pemasangan bekisting Kolom 15/15 lantai 1
Pek. Pemasangan bekisting Kolom 15/15 lantai 2
Pek. Pemasangan bekisting Kolom 15/15 lantai 3

4.32
10.80
13.73
23.55
11.78

12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Pek. Pemasangan bekisting Kolom 25/25 diatas Foot plat


Pek. Pemasangan bekisting Balok 25/30 lantai 2
Pek. Pemasangan bekisting Balok 25/30 lantai 3
Pek. Pemasangan bekisting Balok 25/30 atap dag
Pek. Pemasangan bekisting Balok 20/20 lantai 2
Pek. Pemasangan bekisting Balok 20/20 lantai 3
Pek. Pemasangan bekisting Balok 20/20 atap dag
Pek. Pemasangan bekisting Tangga dari lt.1 ke lt.2
Pek. Pemasangan bekisting Tangga dari lt.2 ke lt.3
Pek. Pemasangan bekisting Balok Bordes 20/30
Pek. Pemasangan bekisting Balok latei 12/12
Pek. Pemasangan bekisting Konsol Kantiliver
Pek. Pemasangan bekisting Plat lantai 2
Pek. Pemasangan bekisting Plat lantai 3
Pek. Pemasangan bekisting Plat atap dag

9.15
m
50.82
m
50.82
m
34.65
m
13.81
m
6.80
m
2.80
m
31.64
m
25.36
m
9.46
m
0.17
m
0.70
m
81.05
m
84.32
m
51.51
m
SUB TOTAL

VI
1
2

PEKERJAAN DINDING
Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 1
Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 2 dan 3

0.46
3.95

m
m
m
m
m

m
m

Harga
Satuan
( Rp)

Jumlah
Harga
( Rp)

427,780.00
427,780.00
427,780.00
427,780.00
427,780.00

1,848,009.60
4,620,024.00
5,873,419.40
10,074,219.00
5,039,248.40

427,780.00
439,480.00
439,480.00
439,480.00
439,480.00
439,480.00
439,480.00
391,300.00
391,300.00
439,480.00
439,480.00
439,480.00
706,300.00
706,300.00
706,300.00

3,914,187.00
22,334,373.60
22,334,373.60
15,227,982.00
6,069,218.80
2,988,464.00
1,230,544.00
12,380,732.00
9,923,368.00
4,157,480.80
74,711.60
307,636.00
57,245,615.00
59,555,216.00
36,381,513.00
345,860,158.45

1,380,125.00
1,380,125.00

636,237.63
5,457,014.25

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI


DIJALAN MARSMA R ISWAHYUDI BALIKPAPAN
TAHUN
: 2012

No.

Uraian Pekerjaan

3
4
5
6
7
8
9
10

2 1
Pek. Pasangan bata 1 : 4 lantai
Pek. Pasangan bata 1 : 4 lantai 2
Pek. Pasangan bata 1 : 4 lantai 3
Pek. Pasangan bata 1:4 balkon lt 2 dan pagar lt 3
Pek. Plesteran 1 : 2
Pek. Plesteran 1 : 4 lantai 1
Pek. Plesteran 1 : 4 lantai 2
Pek. Plesteran 1 : 4 lantai 3

VII
1
2
3
4
5
6
7
8
9
10
11
12
13

PEKERJAAN LANTAI
Pemasangan Keramik 40 x 40 lantai 1
Pemasangan Keramik 30/30 teras
Pas.Keramik 20 x 20 kamar mandi lantai 1
Pas. Keramik dinding kamar mandi 20 x 30 lantai 1
Pemasangan Keramik 40 x 40 lantai 2
Pemasangan Keramik 30 x 30 balkon lantai 2
Pas.Keramik 20 x 20 kamar mandi lantai 2
Pas. Keramik dinding kamar mandi 20 x 30 lantai 2
Pemasangan Keramik 40 x 40 lantai 3
Pas.Keramik 20 x 20 kamar mandi lantai 3
Pas. Keramik dinding kamar mandi 20 x 30 lantai 3
Pemasangan Keramik 25 x 25 tangga lantai 1 ke lantai 2
Pemasangan Keramik 25 x 25 tangga lantai 2 ke lantai 3

VIII

PEKERJAAN LANGIT-LANGIT / PLAFOND

Volume

Sat.

Harga
Satuan
( Rp)

Jumlah
Harga
( Rp)

m
14.03
m
15.38
m
11.00
m
1.00
m
88.30
m
280.62
307.60
m
307.60
m
SUB TOTAL

1,269,855.00
1,269,855.00
1,269,855.00
1,269,855.00
43,827.00
39,220.00
39,220.00
39,220.00

17,817,335.51
19,530,369.90
13,972,214.57
1,268,585.15
3,869,924.10
11,005,916.40
12,064,072.00
12,064,072.00
97,685,741.49

87.50
m
7.00
m
7.00
m
20.45
m
91.50
m
3.20
m
3.00
m
14.02
m
39.00
m
3.00
m
14.20
m
16.30
m
15.80
m
SUB TOTAL

183,053.00
183,053.00
165,453.00
165,453.00
183,053.00
183,053.00
165,453.00
165,453.00
183,053.00
165,453.00
165,453.00
183,053.00
183,053.00

16,017,137.50
1,281,371.00
1,158,171.00
3,383,513.85
16,749,349.50
585,769.60
496,359.00
2,319,651.06
7,139,067.00
496,359.00
2,349,432.60
2,983,763.90
2,892,237.40
57,852,182.41

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI


DIJALAN MARSMA R ISWAHYUDI BALIKPAPAN
TAHUN
: 2012

No.
1
2

Uraian Pekerjaan
Pas. Rangka plafond
Plafond Gypsum

IX
1
2
3
4
5
6
7
8

PEK. KUSEN, DAUN PINTU DAN JENDELA


Kusen pintu kayu bangkirai
Kusen jendela kayu bangkirai
Daun pintu panel kayu bangkirai
Rangka ventilasi kayu bengkirai
Rangka roster kayu bengkirai
Daun jendela kaca rangka kayu bangkirai
Pintu harmonika
Pasangan kaca mati bening 5 mm

X
1
2
3
4
5
6
7
8
9

PEKERJAAN INSTALASI LISTRIK


Pasang instalasi titik lampu
Pasang instalasi stop kontak
Pasang box MCB
Saklar tunggal setara Broco
Saklar ganda setara Broco
Stop kontak setara Broco
Box Panel 300 x 400 x 200 mm/Legrand + Accessories
Lampu Jari (TL) 15 Watt Phillips
Lampu Neon (TL) 30 Watt Phillips

XI

PEKERJAAN SANITAIR DAN INSTALASI AIR

Volume

Sat.

Harga
Satuan
( Rp)

Jumlah
Harga
( Rp)

273.15
m
273.15
m
SUB TOTAL

157,687.50
157,687.50

43,072,340.63
43,072,340.63
86,144,681.25

0.43
m
0.09
m
18.48
m
0.07
m
0.09
m
6.51
m
m
15.80
1.60
m
SUB TOTAL

10,565,500.00
10,565,500.00
566,750.00
10,565,500.00
10,565,500.00
566,750.00
700,000.00
162,813.75

4,522,034.00
898,067.50
10,473,540.00
729,019.50
950,895.00
3,689,542.50
11,060,000.00
260,502.00
32,583,600.50

50
ttk
15
ttk
2
unit
6
bh
10
bh
15
bh
2
bh
25
bh
25
bh
SUB TOTAL

109,146.00
109,146.00
188,900.00
25,000.00
25,000.00
25,300.00
173,000.00
24,500.00
95,000.00

5,457,300.00
1,637,190.00
377,800.00
150,000.00
250,000.00
379,500.00
346,000.00
612,500.00
2,375,000.00
11,585,290.00

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI


DIJALAN MARSMA R ISWAHYUDI BALIKPAPAN
TAHUN
: 2012

No.
1
2
3
4
5
6
7
8
9

Uraian Pekerjaan
Instalasi Pipa 4"
Instalasi Pipa 3"
Instalasi Pipa 1/2"
Bak Kontrol
Kran
Floor Drain
Pasang Closed Jongkok
kitchen zink
Biofil 2 x 1 x 1,5

XII
1
2
3
4
5
6
7
8
9
10
11
12

PEKERJAAN PENGECATAN
Cat dinding Lantai 1
Cat dinding Lantai 2
Cat dinding Lantai 3
Cat plafond
Cat kusen pintu KPJ1 dengan cat minyak
Cat kusen pintu KP1 dengan cat minyak
Cat kusen pintu KP2 dengan cat minyak
Cat kusen pintu KJ1 dengan cat minyak
Cat Ranga V1 dengan cat minyak
Cat Ranga V2 dengan cat minyak
Cat Ranga R1 dengan cat minyak
Cat Ranga R2 dengan cat minyak

XIII

PEKERJAAN PENGGANTUNG DAN PENGUNCI

Volume

Sat.

Harga
Satuan
( Rp)

17.75
m'
27,550.00
39.16
m'
24,500.00
44.90
m'
17,728.00
1.00
bh
463,556.60
9.00
bh
235,000.00
4.00
bh
12,000.00
4.00
bh
150,000.00
1.00
Unit
320,000.00
1.00
Unit
13,600,000.00
SUB TOTAL
561.24
m
615.20
m
22.01
m
273.15
m
12.42
m
13.25
m
22.21
m
5.12
m
1.08
m
0.91
m
1.05
m
1.17
m
SUB TOTAL

31,859.50
31,859.50
31,859.50
31,859.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50

Jumlah
Harga
( Rp)
489,012.50
959,420.00
795,987.20
463,556.60
2,115,000.00
48,000.00
600,000.00
320,000.00
13,600,000.00
19,390,976.30
17,880,825.78
19,599,964.40
701,100.16
8,702,422.43
414,734.85
442,450.63
741,647.43
170,969.60
36,063.90
30,387.18
35,062.13
39,069.23
48,794,697.69

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI


DIJALAN MARSMA R ISWAHYUDI BALIKPAPAN
TAHUN
: 2012

No.

Uraian Pekerjaan

1
2
3
4
5
6
7
8
9

Pasang kunci pintu utama 2


Pasang kunci pintu
Pas. Engsel pintu 4"
Pas. Grendel pintu (panjang)
Pas. Grendel jendela
Pas Grendel pintu (kecil)
Pas. Engsel jendela
Hak Angin standard
Pas. Handel Jendela

XIV
1
2

PEKERJAAN LAIN-LAIN
Pembersihan lokasi pekerjaan
Quality Control

Volume

Sat.

Harga
Satuan
( Rp)

Jumlah
Harga
( Rp)

2
set
8
set
68
bh
2
bh
7
bh
8
bh
12
bh
14
bh
7
bh
SUB TOTAL

187,000.00
98,000.00
42,000.00
9,500.00
6,500.00
6,500.00
36,000.00
14,000.00
7,000.00

374,000.00
784,000.00
2,856,000.00
19,000.00
45,500.00
52,000.00
432,000.00
196,000.00
49,000.00
4,807,500.00

1.00
Ls
1.00
Ls
SUB TOTAL
TOTAL

1,000,000.00
1,000,000.00

1,000,000.00
1,000,000.00
2,000,000.00
1,126,295,856.69

NO
I

URAIAN PEKERJAAN
PEKERJAAN PENDAHULUAN

II
III

PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGAN


PEKERJAAN BETON

IV

PEKERJAAN PEMBESIAN

PEKERJAAN BEKISTING

VI

PEKERJAAN DINDING

VII

PEKERJAAN LANTAI

VIII

PEKERJAAN LANGIT-LANGIT / PLAFOND

IX

PEK. KUSEN, DAUN PINTU DAN JENDELA

PEKERJAAN INSTALASI LISTRIK

XI

PEKERJAAN SANITAIR DAN INSTALASI AIR

XII

PEKERJAAN PENGECATAN

XIII

PEKERJAAN PENGGANTUNG DAN PENGUNCI

X1V

PEKERJAAN LAIN-LAIN

PENJADWALAN RUKO 3 LANTAI


BOBOT
PEKERJAAN
(%)

HARGA

HARI
1

2.1

23,742,500.0

2.1

23,454,985.8

10.7

120,207,932.5

20

22.4

252,185,610.4

28

30.7

345,860,158.5

50

8.67

97,685,741.49

79

5.14

57,852,182.41

35

7.65

86,144,681.25

47

2.89

19,390,976.30

12

1.03

11,585,290.00

1.72

19,390,976.30

4.33

4,807,500.00

14

0.43

4,807,500.00

0.18

2,000,000.00

100.00

JUMLAH BOBOT
KOMULATIF BOBOT

1.37

BULAN 1
MINGGU
2
0.68
1.48

0
0

1.4
1.4

2.16
3.53

PENJADWALAN RUKO 3 LANTAI


BULAN 1
MINGGU
3

BULAN 2
MINGGU
6
7

BULAN 3
MINGGU
10

0.74
0.54

1.08

1.08

1.08

1.08

1.08

1.08

1.08

1.6

2.4

3.2

3.16

2.37

3.16

3.16

2.37

2.5

3.7

3.7

3.7

3.7

3.7

3.7

3.7

0.7

0.5

0.7

0.5

0.6

0.30

0.30

0.30

0.59

0.44

0.30

8.22
24.20

8.88
33.08

7.98
41.06

9.18
50.24

8.92
59.16

8.07
67.22

4.58
8.11

7.88
15.98

BULAN 3
MINGGU
11

12

1.08

1.62

13

BULAN 4
MINGGU
14
15

BULAN 5
MINGGU
16

17

0.7

0.7

1.0

0.79
2.5
0.5

0.7

0.5

0.5

0.7

0.59

0.59

0.30

0.59

0.89

0.6

1.0

1.0

1.0

0.74

0.74

0.74

0.74

0.74
0.34

0.34
0.57

0.86

0.29
1.5

0.14

5.47
72.69

4.60
77.29

1.96
79.25

0.14

3.43
82.68

0.036

0.11

4.16
86.84

2.40
89.23

3.80
93.03

BULAN 5
MINGGU
18
19

20

21
100

90

80

70
0.7

0.1
60

1.0

1.0

1.0
50

0.34

40

30
1.2

0.31

0.6

0.6
0.14

0.04

20
10
0

3.20
96.23

1.42
97.65

1.58
0.76
99.24 100.00

HARGA BAHAN BANGUNAN


No

Nama Barang
X.3.1.
X.3.1.1.

Ukuran/Tipe

Sat.

Harga (Rp)

Batu
Bahan Struktur

1.

Abu Batu/Palu

M3

385,000.00

Base Course (LPA)

M3

450,000.00

1.

Batu Quarry/Batu

M3

362,500.00

Gunung
2.

Batu Pecah

10 -

15 cm

M3

346,000.00

3.

Batu Pecah

5 -

7 cm

M3

346,000.00

4.

Batu Pecah

3 -

5 cm

M3

346,000.00

5.

Batu Pecah

2 -

3 cm

M3

346,000.00

6.

Batu Pecah

1 -

2 cm

M3

346,000.00

7.

Batu Pecah

0.5 -

1.0 cm

M3

346,000.00

8.

Batu Abu Filler/Kapur

M3

385,000.00

9.

Kerikil

M3

380,600.00

10.

Sirtu Royalti

M3

380,600.00

11.

Sub Base Course (LPB)

M3

346,000.00

Agregat Kasar

M3

346,000.00

Agregat Halus

M3

361,000.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
Bh

900.00
74,500.00
3,500.00
3,500.00
3,500.00
16,000.00
8,900.00
6,725.00
6,200.00
5,000.00
4,620.00
6,385.00

4,400.00
3,850.00
3,850.00
3,850.00
3,850.00
320,000.00
140,000.00
140,000.00
320,000.00
76,800.00
140,000.00
23,650.00

312,500.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.

(Chipping)

Sungai

X.3.1.2. Bahan Pasangan


Batu Bata
Loster
Perancis
Loster
Bulan berkait
Loster
Bintang wajik
Loster
Bunga wajik
Loster
Matahari
Pasir Samboja Type I
Bataco
Pasir Samboja Type I
Bataco
Pasir Samboja Type I
Bataco
Pasir Samboja Type II
Bataco
Cable Tile
Cable Tile Type I
Cable Tile
Cable Tile Type I
Bata Semen Type I
Bata Semen
Bata Semen Type II
Bata Semen
Loster
Loster
Loster
Loster
Loster
Batu alam
Batu alam
Batu alam
Batu alam
Batu alam
Batu alam
Glass Block

X.3.2.

Loster Perancis
Loster Bulan Berkait
Loster Bintang Wajik
Loster Bunga Wajik
Loster Matahari
Batu Candi
Batu Marmo
Batu Palimanan
Batu Ardiret
Batu Lempengan Biasa
Batu Lempengan Merah

Uk. c 10
Uk.
10
Uk.
20
Uk.
10
Uk.
20
Uk.
20
Uk.
20
Uk.
15
Uk.
12
Uk.
10
Uk.
20
Uk.
30
Uk.
10
Uk.
9
Uk.
10
Uk.
20
Uk.
10
Uk.
20
Uk.
20

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

10
20
20
20
20
20
20
20
20
20
20
30
10
14
20
20
20
20
20

Uk.

30

30

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

20
25
10
30
10
10
40
40
40
40
40
0.5
20
30
25
10
30
10
10

cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm

cm

Pasir

1.

Pasir Beton ex Palu

M3

2.

Pasir Urug

M3

75,000.00

3.

Pasir Putih/Pasangan

M3

235,000.00

X.3.3.

Tanah

1.

Tanah Urug

M3

42,500.00

Tanah Urug Pilihan

M3

80,000.00

1.
2.
3.

X.3.4.
Semen
Semen Abu-abu
Semen Abu-abu
Semen Abu-abu

Zak
Zak
Zak

80,000.00
65,000.00
60,000.00

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

1 zak = 50 kg
1 zak = 50 kg
1 zak = 50 kg

No

Nama Barang

4.
5.
2

Semen Abu-abu
Semen Abu-abu
Semen Putih
Semen Putih
X.3.5.
Kayu

1.

Kayu Ulin

Ukuran

12 x

12

2.

Kayu Ulin

Ukuran

10 x

10

3.

Kayu Ulin

Ukuran

5 x

10

Kayu Ulin

Ukuran

5 x

Papan Ulin

Ukuran

Papan Ulin

4.
1
6.
7.
8.
9.

Ukuran/Tipe

57,500.00
60,000.00
65,000.00
140,000.00

400 cm

M3

7,500,000.00

400 cm

M3

6,000,000.00

400 cm

M3

6,000,000.00

400 cm

M3

4,500,000.00

2 x

20

400 cm

M3

5,500,000.00

Ukuran

2 x

20

200 cm

M3

3,500,000.00

Kayu Meranti

Ukuran

6 x

12

400 cm

M3

3,500,000.00

Kayu Meranti

Ukuran

7 x

10

400 cm

M3

2,500,000.00

Papan Meranti

Ukuran

2.5 x

20

400 cm

M3

3,500,000.00

Papan Meranti

Ukuran

2 x

20

400 cm

M3

5,500,000.00

Kayu Meranti

Ukuran

5 x

400 cm

M3

5,000,000.00

Kayu Meranti

Ukuran

5 x

400 cm

M3

2,500,000.00

Kayu Bangkirai

Ukuran

6 x

12

400 cm

M3

7,000,000.00

Kayu Bangkirai

Ukuran

10 x

10

400 cm

M3

5,100,000.00

Papan Bangkirai

Ukuran

2 x

20

400 cm

M3

6,050,000.00

Papan Bangkirai

Ukuran

4 x

20

200 cm

M3
Btg
Btg
Btg

5,700,000.00

cm
cm
cm
cm
cm
cm

Btg
Btg
Btg
Btg
Btg
Btg

14,500.00
18,500.00
17,500.00
15,500.00
11,000.00
15,000.00

Roll
Dos
Dos
Dos
Kg
Roll

779,900.00
111,000.00
134,500.00
165,300.00
23,500.00
4,165,400.00

M'
M'
Kg

17,500.00
25,000.00
80,000.00

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

27,500.00
32,500.00
37,500.00
85,000.00
40,000.00
57,500.00
85,000.00
80,000.00
133,000.00
125,000.00
155,000.00
245,000.00
195,000.00
227,000.00
405,000.00
640,000.00

Kayu List Profil


Dolken K.Galam
Papan Sungkai

1.
2.
3.
4.
5.
6.

X.3.6.
Besi
X.3.6.1. Besi Nako
Besi Nako
Besi Nako
Besi Nako
Besi Nako
Besi Nako
Besi Nako

1 zak = 50 kg
1 zak = 50 kg
1 zak = 20 kg
1 zak = 40 kg

Harga (Rp)

Zak
Zak
Zak
Zak

10.
11.
12.

Panjang 400 cm
Diameter 8 panjang 400 cm
Ukuran

7.
8.
9.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

X.3.6.3. Besi Beton


X.3.6.3.1. Besi Beton Polos (Full)
Besi Beton
6 ( 5,0) x 11,0 m
Besi Beton
8 ( 6,2) x 11,0 m
Besi Beton
8 ( 7,0) x 11,4 m
Besi Beton
8 ( 7,4) x 11,4 m
Besi Beton
8 ( 7,8) x 11,4 m
Besi Beton
10 ( 8,3) x 11,4 m
Besi Beton
10 ( 9,4) x 11,4 m
Besi Beton
12 (11,4) x 11,4 m
Besi Beton
14 (12,0) x 11,4 m
Besi Beton
14 (12,8) x 11,4 m
Besi Beton
16 (13,8) x 11,4 m
Besi Beton
16 (15,0) x 12,0 m
Besi Beton
19 (18,6) x 12,0 m
Besi Beton
22
Besi Beton
25
Besi Beton
32

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

2 x

Panjang
Panjang
Panjang
Panjang
Panjang
Panjang

X.3.6.2. Kawat
Kawat Wiremesh
Kawat Las
Kawat Las
Kawat Las
Kawat Bendrat
Kawat Wiremesh
M6
Kawat Nyamuk
Kawat Kasa
Kawat Duri

1.
2.
3.
4.
5.
6.

Sat.

Panjang
Panjang
Panjang
Panjang
Bendrat
Panjang
Lebar
Lebar

27
66
65
53
24
60

8
2.6
3.2
4

mmx 2.25 m
mm
RB 26 @ 5 Kg
mm
RB 26 @ 5 Kg
mm
RB 26 @ 5 Kg

5.5 m

mmx

60 m

2.25

90 cm
90 cm

berat
berat
berat
berat
berat
berat
berat
berat
berat
berat
berat
berat
berat

0,22
0,393
0,393
0,393
0,393
0,62
0,62
0,887
1, 209
1, 209
1, 58
1, 58
2, 23

kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'

400 cm

60,000.00
70,000.00
32,000.00

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

1
18.

Besi Beton
Besi Strip

Kg
Kg

9,000.00
18,000.00

1.
2.
3.

X.3.6.3.2. Besi Beton Polos (Banci)


8 ( 5,2) x 7,5 m
Besi Beton
10 ( 6,2) x 7,0 m
Besi Beton
12 ( 8,0) x 7,0 m
Besi Beton

Btg
Btg
Btg

21,500.00
26,500.00
37,500.00

1.
2.
3.
4.
1

X.3.6.3.3. Besi Beton Ulir


Besi Beton
Besi Beton
Besi Beton
Besi Beton
Besi Beton

Btg
Btg
Btg
Btg
Kg

66,500.00
166,500.00
227,000.00
400,000.00
9,700.00

1.
2.
3.
4.
5.

X.3.6.4. Baut & Mur


Baut Dan Mur
Baut Dan Klam
Baut
Baut
Baut

Psg
Psg
Kg
Kg
Kg

5,000.00
10,500.00
35,000.00
35,000.00
35,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
1
25.
26.
27.
28.
29.

X.3.6.5. Paku
Paku Triplek
Paku Payung
Paku Ulir
Paku Sumbat
Paku Sekrup
Paku Sekrup
Paku Sekrup
Paku Sekrup
Paku Beton
Paku Beton
Paku Beton
Paku Beton
Paku Beton
Paku Beton
Paku Beton
Paku Seng
Paku Seng
Paku Ulin
Paku Ulin
Paku Ulin
Paku Ulin
Paku Ulin
Paku Ulin
Paku Biasa
Paku Biasa
Paku Biasa
Paku Biasa
Paku Biasa
Paku Anti Karat

Kg
Kg
bh
bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

24,000.00
24,000.00
990.00
704.00
6,000.00
7,000.00
9,000.00
9,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
29,260.00
29,260.00
24,500.00
18,000.00
18,000.00
18,000.00
18,000.00
18,000.00
20,000.00
15,000.00
15,000.00
15,000.00
15,000.00
54,450.00

1.

X.3.6.6. Baja
Baja Profil

Kg

21,100.00

2.

Pintu Besi

M2

800,000.00

3.

Rolling Door

M2

960,000.00

1.
2.
3.

X.3.7.
Cat
X.3.7.1. Peralatan Cat
Ampelas
Kuas Roll
Kuas

Lbr
Bh
Bh

5,000.00
15,000.00
12,000.00

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

10 x 12,0 m
16 x 12,0 m
19 x 12,0 m
25 x 12,0 m

10 mm
12 mm
16 mm
10 mm

1 1/4"
1 1/2"
2"
2 1/2"
2 x 25"
2,5 x 30"
2,5 x 40"
3 x 50"
3 x 60"
4,2 x 100"
4,3 x 100"
2" besar
1 3/4" kecil
1"
1 1/2"
2"
3"
3 1/2"
4"
1 1/2"
2"
3"
3 1/2"
4"

WF 150

berat
berat
berat
berat

0,56
1,56
2,25
3,98

kg/m'
kg/m'
kg/m'
kg/m'

No

Nama Barang

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

X.3.7.2. Jenis Cat


X.3.7.2.1. Cat Dasar
Cat Meni
Cat Meni
Cat Meni
Wall Filler
Eco Emulsion
Eco Emulsion
Plamir
Residu
Dempul
Thinner
Thinner

1.
2.
3.
4.

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.

1.
2.
3.
4.
5.
6.
7.
8.
9.

X.3.7.2.2. Cat Tembok


Cat
Cat
Cat
Cat
Cat
Cat
Elastomeric Wall Paint
Elastomeric Wall Paint
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Solvent Base)
Wall Paint (Solvent Base)
Wall Paint (Solvent Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Wall Paint (Water Base)
Cat tembok
Cat tembok
Cat tembok
Cat tembok
Cat tembok
Cat tembok
Cat Eksterior
Cat Interior
Cat tembok
Cat tembok
Cat tembok
Cat tembok
Cat tembok

X.3.7.2.3. Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Ukuran/Tipe

Sat.

Kayu
Kayu
Besi
Dcor DWF - 200, 4 Kg
Emulsion EE-4003 warna standard 2,5 Liter
Emulsion EE-4003 warna standard 20 Liter

no. A
no. 7

Type 364
Type 397
Type 393
Type 355
Putih
Putih
White
Premium Full Acrylic Emulsion ( Exterior)
Standard
Premium Full Acrylic Emulsion ( Exterior)
White
Pure Acrylic Binder ( Exterior)
Standard
Pure Acrylic Binder ( Exterior)
Modified Acrylic (matt Finish) ( Exterior)White
Standard
Pure Acrylic Binder ( Exterior)
Sea Grass
Pure Acrylic Binder ( Exterior)
Signal Green
Pure Acrylic Binder ( Exterior)
Burnt Orange
Pure Acrylic Binder ( Exterior)
Signal Blue
Pure Acrylic Binder ( Exterior)
Black
Pure Acrylic Binder ( Exterior)
Signal Red
Pure Acrylic Binder ( Exterior)
White
Matt Finish Synthetic Acrylic topcoat (ext)
Standard
Matt Finish Synthetic Acrylic topcoat (ext)
Special
Matt Finish Synthetic Acrylic topcoat (ext)
Anti bacterial & Elastomeric (Interior) White
Anti bacterial & Elastomeric (Interior) Standard
White
Modified Acrylic (High Sheen Finish) ( Interior)
Standard
Modified Acrylic (High Sheen Finish) ( Interior)
Standard
Durable Elastomeric Exterior
Special
Durable Elastomeric Exterior
Standard
Acrylic weather shield
Special
Acrylic weather shield
Standard
Interior
Dcor alkali resisting primer
Weatershield ( Exterior )
Interior
Interior
Interior
Interior
Interior
Interior

Ultraproof UPR - 960


1 Kg
Ultraproof UPR - 960
4 Kg
Ultraproof UPR - 960
20 Kg
Sikaset Accelerator Per Kg
Sika 102
Sika Top 107 Seal
Sika Rain Tite Compound (Red & Grey)
Sika Rain Tite Membrane
Sikaproof 300 RM

1 Liter
1 Liter

5
5
5
5
20
5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
5
5
5
1
1
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
20
2.5
2.5
2.5
2.5

Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr

Harga (Rp)

Kg
Kg
Kg
Klg
Klg
Klg
Kg
Kg
Kg
Klg
Klg

30,000.00
30,000.00
42,900.00
83,270.00
82,720.00
561,000.00
25,000.00
15,000.00
25,000.00
25,000.00
38,500.00

Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg

70,000.00
53,750.00
70,000.00
70,000.00
276,000.00
70,000.00
185,000.00
191,500.00
165,000.00
171,500.00
66,000.00
69,500.00
135,500.00
103,000.00
80,600.00
80,600.00
80,600.00
360,600.00
406,500.00
612,000.00
530,000.00
85,100.00
100,800.00
120,000.00
131,000.00
162,600.00
176,000.00
150,000.00
163,700.00
185,000.00
86,350.00
200,000.00
150,000.00
480,000.00
80,000.00
45,000.00
175,000.00
80,000.00

Klg
Klg
Klg
Kg
Kg
Kg
Kg
Kg
Kg

41,600.00
138,000.00
650,000.00
21,000.00
42,250.00
19,000.00
42,250.00
27,500.00
110,000.00

No
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

Nama Barang

Ukuran/Tipe

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.

Waterproofing
Sikaproof 400 SBS
Waterproofing
Sikaproof Primer
White
Floor coating
Alkyd Paint
Yellow 2
Floor coating
Alkyd Paint
Grey
Floor coating
Alkyd Paint
Green
Floor coating
Alkyd Paint
Red
Floor coating
Alkyd Paint
Blue
Floor coating
Alkyd Paint
Black
Floor coating
Alkyd Paint
Semen
AM 50 Nat
Standar
X.3.7.2.4. Cat Besi Anti Karat
White
Cat Besi
Alkyd/Synthetic Finish
Standard
Cat Besi
Alkyd/Synthetic Finish
Special base C
Cat Besi
Durable Interior Water-Base Glaze
Cat Besi
Interior Water based for special effects Golden Glow
Cat Besi
Interior Water based for special effects Starlights
Cat Besi
Undercoat/sealer (water base)
Cat Besi
Undercoat/sealer (solvent base)
Cat Besi
Alkyd Undercoat
Cat Besi
Thinner PT
20 Liter
Cat Besi
PUT - 603
1 Kg/Set
Cat Besi
PUT - 603
5 Kg/Set
Cat Besi
PUT - 603
20 Kg/Set
Cat Besi
Thinner Epoxy
0.8 Liter
Cat Besi
Thinner Epoxy
3.8 Liter
Cat Besi
Thinner Epoxy
20 Liter
Cat Besi
Thinner UT - 02
0.8 Liter
Cat Besi
Thinner UT - 02
3.8 Liter
Cat Besi
Thinner UT - 02
20 Liter
Cat Besi
624
Cat Besi
627
Cat Besi
660
Cat Besi
622
Cat Besi
623
Cat Besi
406 (Coklat Tua)
Cat Besi
899 (Hijau)
Cat Besi
879 (Abu-abu)
Cat Besi
3044/083 (Coklat)
Cat Besi
9102 (Putih)
Cat Besi
Hitam
Cat Besi
Coklat 084
Cat Besi
Hijau 222

1.
2.

X.3.7.2.5. Tennokote Tennis Court Coating


Cat Lap.Tennis
TNK - 1000 WA
Cat Lap.Tennis
TNK - 1020 WA

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

X.3.7.2.6. Cat Kayu


Cat Kayu (Interior)
Cat Kayu (Interior)
Cat Kayu (Interior)
Cat Kayu (Interior)
Cat Kayu (Interior)
Cat Kayu (Interior)
Cat Kayu (Interior)
Cat Kayu (Interior)
Cat Kayu (Interior)
Cat Kayu (Exterior)
Cat Kayu (Exterior)
Cat Kayu (Exterior)
Cat Kayu (Exterior)
Cat Kayu (Exterior)
Cat Kayu (Exterior)
Cat Kayu (Exterior)
Cat Kayu (Exterior)

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Sat.

5
5
5
5
5
5
5
1

liter
liter
liter
liter
liter
liter
liter
liter

1
1
1
1
1
1
1
1

Liter
Liter
Liter
Liter
Liter
Liter
Liter
Liter

5 Kg
5 Kg

Wood Filler
Wood Stain (Pewarna kayu)Warna muda
Wood Stain (Pewarna kayu)Warna tua
Melamine system
Clear Dof,Clear Gloss
Melamine system
Semi gloss (cat akhir)
NC System
Clear Dof,Clear Gloss
NC System
Semi gloss (cat akhir)
Ultran Politur
Standard
Ultran Politur
Clear Dof,Clear Gloss
Ultran Politur
Warna transparant
Ultran Politur
Warna Oxide
Ultran Politur
Natural Gloss, Natural Dof
Thinner Ultran Politur
Ultran Lasur
Warna transparant
Ultran Lasur
Warna Oxide
Ultran Lasur
Natural Gloss, Natural Dof
Thinner Lasur

- 1 kg
- 1 liter
- 1 liter
- 1 liter
- 5 liter
- 1 liter
- 5 liter
- 1 liter
- 1 liter
- 1 liter
- 1 liter
- 1 liter
- 0.8 liter
- 1 liter
- 1 liter
- 1 liter
- 0.8 liter

Harga (Rp)

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

125,000.00
52,750.00
505,000.00
505,000.00
505,000.00
505,000.00
505,000.00
505,000.00
505,000.00
13,000.00

Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg

61,000.00
72,800.00
176,000.00
165,000.00
437,500.00
45,000.00
63,000.00
61,500.00
320,000.00
115,000.00
535,000.00
2,026,000.00
28,000.00
145,000.00
715,000.00
31,500.00
144,000.00
715,000.00
78,980.00
78,980.00
78,980.00
78,980.00
78,980.00
51,700.00
51,700.00
51,700.00
51,700.00
51,700.00
51,700.00
51,700.00
51,700.00

Klg
Klg

225,500.00
19,250.00

Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg

26,000.00
50,000.00
55,000.00
45,000.00
176,000.00
41,000.00
185,000.00
59,500.00
59,500.00
45,000.00
45,000.00
56,500.00
25,000.00
61,000.00
64,000.00
66,000.00
24,000.00

No

Nama Barang

18.

Cat Kayu

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

X.3.8.
Multipleks
Triplek
Triplek
Triplek
Triplek
Triplek
Triplek
Triplek
Melamine
Teakwood
Teakwood
Triplek
Lumbercoll
Multiplek

X.3.9.
X.3.9.1.

Ukuran/Tipe

Sat.
-

1 liter

3 mm
3,2 mm
4 mm
6 mm
9 mm
12 mm
18 mm
3 mm
4 mm
lapis aluminium
16 mm
Mega sungkai

mm

Harga (Rp)

Klg

49,500.00

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

60,000.00
46,000.00
60,000.00
77,000.00
100,000.00
135,000.00
210,000.00
121,000.00
121,000.00
265,650.00
205,150.00
185,000.00
110,000.00

Bahan Pelapis Dinding


Kaca

1.

Kaca Bening

mm

M2

123,200.00

2.

Kaca Bening

mm

M2

135,000.00

3.

Kaca Bening

mm

M2

228,250.00

4.

Kaca Bening

mm

M2

308,000.00

5.

Kaca Bening

####

mm

M2

431,200.00

6.

Kaca Bening

####

mm

M2

554,400.00

7.

Kaca Rayband

mm

M2

137,500.00

8.

Kaca Rayband

####

mm

M2

352,000.00

9.

Kaca Rayband

####

mm

M2

566,500.00

10.

Kaca Grafir

mm

M2

665,000.00

11.

Kaca Grafir

mm

M2

832,000.00

11.

Kaca Buram Polos

mm

M2

256,000.00

12.

Kaca Buram Polos

mm

M2

448,000.00

12.

Kaca Buram Motif

mm

M2

448,000.00

13.

Kaca Buram Motif

mm

M2

640,000.00

14.

Kaca Patri

####

mm

M2

1,408,000.00

15.

Kaca Flash

mm

M2

576,000.00

16.

Kaca RD

mm

M2

448,000.00

X.3.9.2.

Gypsum

1.

Gypsum Standard Board

Ukuran

1200

2400

mm

M2

56,000.00

2.

Gypsum Standard Board

Ukuran

12

1200

2400

mm

M2

39,600.00

3.

Gypsum Fireshield

Ukuran

12

1200

2400

mm

M2

85,800.00

4.

Gypsum Fireshield

Ukuran

15

1200

2400

mm

M2

93,500.00

5.

Gypsum Moistureshield

Ukuran

1200

2400

mm

M2

77,000.00

6.

Gypsum Moistureshield

Ukuran

12

1200

2400

mm

M2

85,800.00

7.

Gypsum Moistureshield

Ukuran

15

1200

2400

mm

M2

94,600.00

8.

Gypsum Denseshield

Ukuran

12

1200

2400

mm

M2

85,800.00

9.

Gypsum Denseshield

Ukuran

15

1200

2400

mm

M2

94,600.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

X.3.9.3. GRC
GRC (External)
GRC (External)
GRC (External)
GRC (External)
GRC (External)
GRC (External)
GRC (External)
GRC (Internal)
GRC (Internal)
GRC (Internal)

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

9
9
12
15
4
9
9
4
5
6

x
x
x
x
x
x
x
x
x
x

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

95,150.00
302,500.00
409,200.00
540,100.00
26,620.00
37,620.00
67,100.00
95,000.00
113,300.00
154,000.00

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

300
1220
1220
1220
600
100
200
1220
1220
1220

x
x
x
x
x
x
x
x
x
x

2440
2440
2440
2440
2440
2440
2440
2440
2440
2440

No
11.
12.

Nama Barang

Ukuran/Tipe

GRC (Internal)
GRC (Internal)
X.3.9.4.

Ukuran
Ukuran

Aluminium composit

T = 4 mm

2.

Aluminium composit

T = 6 mm

Uk.

3.

Aluminium composit

T = 4 mm

Uk.

4.

Aluminium composit

(XL/XX) t. 4 mm

Uk.

5.

Aluminium composit

(XI) t. 4 mm

Uk.

6.

Aluminium composit

T. 4 mm

Uk.

7.

Aluminium composit

T. 4 mm

1.
2.
3.
4.
5.

X.3.9.5. Kalsi Board


Kalsi Board
Kalsi Board
Kalsi Board
Kalsi Board
Kalsi Board

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.

1220
1220

x
x

x
x

2440
2440

mm
mm

Harga (Rp)

Lbr
Lbr

220,000.00
250,000.00

M2

1,605,000.00

M2

1,605,000.00

Aluminium Panel

1.

1.
2.

8
10

Sat.

Uk.

1200
1200
1200
1200
1200

X.3.9.6.
Accoustic Ceiling
Accoustic Ceiling
Ukuran
Suspension/Exposed (Rod 4 Ukuran
mm,
4 mm, Main T/Cross T. 24 mm,
Wall Angle L Metal)
X.3.10.
Bahan Pelapis Lantai
X.3.10.1. Granito Tile
Granito Tile
Castello
Granito Tile
Castello
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Travertine
Granito Tile
Travertine
Granito Tile
Travertine
Granito Tile
Travertine
Granito Tile
Big Grain
Granito Tile
Big Grain
Granito Tile
Marble
Granito Tile
Marble
Granito Tile
Domus
Granito Tile
Flame
Granito Tile
Ructic
Granito Tile
Salsa
Granito Tile
Salsa
Granito Tile
Salsa
Granito Tile
Salsa
Granito Tile
Palazzo
Granito Tile
Palazzo
Granito Tile
Salt & Pepper

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

2m
Lebar
Lebar
Lebar
Lebar
Lebar

1250

m
m

M2

1,475,000.00

Panj. 2440, 3100, 4200

m
m

M2

1,250,000.00

1220

Panj. 2440, 3100, 4200

m
m

1,220,000.00

1220

Panj. 2440, 3100, 4200

m
m

M2

1,475,000.00

Panj. 2440, 3100, 4200

m
m

1,350,000.00

Lbr
Lbr
Lbr
Lbr
Lbr

49,400.00
75,000.00
98,000.00
160,000.00
204,000.00

1220

1220

1220

2400
2400
2400
2400
2400

x
x
x
x
x

15 x 600
600

x
x

x
x
x
x
x

3.02 m

3.5
4.5
6
9
12

Rustic ( unpolished ), Silver


Rustic ( unpolished ), Gold
Unpolished Grup A
Polished
Grup A
Rock
Grup A
Stepnose
Grup A
Unpolished Grup B
Polished
Grup B
Rock
Grup B
Stepnose
Grup B
Unpolished Grup C
Polished
Grup C
Rock
Grup C
Stepnose
Grup C
Honed
Grup A
Polished
Grup A
Honed
Grup B
Polished
Grup B
Unpolished Grup A
Polished
Grup A
Honed
Grup A
Polished
Grup A
Unpolished Grup A
Rock
Grup A
Oasis ( unpolished ), Silver
Crystal ( polished ), Silver
Oasis ( unpolished ), Gold
Crystal ( polished ), Gold
Mirror ( polished ), Silver
Mirror ( polished ), Gold
Unpolished Grup A

mm
mm
mm
mm
mm

1200 mm
600 mm

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

Lbr
Meter

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
40
40
40
40
40
40
40

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
40
40
40
40
40
40
40

cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm

Box
Box
Box
Box
Box
Bh
Box
Box
Box
Bh
Box
Box
Box
Bh
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box

186,533.00
201,850.00
184,500.00
258,000.00
173,800.00
34,200.00
211,167.00
283,689.00
185,000.00
37,500.00
240,000.00
322,083.00
225,030.00
40,500.00
318,900.00
371,000.00
366,000.00
418,000.00
258,000.00
305,000.00
269,000.00
321,000.00
246,000.00
246,000.00
170,000.00
202,400.00
249,700.00
228,800.00
268,400.00
270,000.00
316,800.00
185,000.00

No

Nama Barang

33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.

Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile

1.
2.
3.
4.
1
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.

X.3.10.2. Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Ukuran/Tipe

Sat.

Harga (Rp)

Salt & Pepper Polished


Grup A
Salt & Pepper Unpolished Grup B
Salt & Pepper Polished
Grup B
Salt & Pepper Unpolished Grup C
Salt & Pepper Polished
Grup C
Travertine
Honed
Grup A
Travertine
Polished
Grup A
Travertine
Honed
Grup B
Travertine
Polished
Grup B
Big Grain
Polished
Grup A
Big Grain
Unpolished Grup A
Marble
Honed
Grup A
Marble
Polished
Grup A
Domus
Unpolished Grup A
Flame
Rock
Grup A
Ructic
Salsa
Crystal ( polished ), Silver
Palazzo
Mirror ( polished ), Silver
Palazzo
Mirror ( polished ), Gold
Aurora
Mirror ( polished ), Silver
Aurora
Mirror ( polished ), Gold
Sejati
Polished
Sejati
AL - Polished
Sejati
YS - Polished
San Remo (Rustic)
Nordic 1 - 4
Salsa & Pepper ( Grup A )
Salsa & Pepper ( Grup B )
Travertine ( Grup A )
Travertine ( Grup B )
Marble Polished
Marble Honed
Domus ( Grup A ) unpolished
Cove
Utility Tile
Mosaics
Jasmine
Mosaics
Sonar
Mosaics
Venus

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
20
20
90
90
160

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
10
20
90
90
120

cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm

Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Bh
Bh
Bh

258,000.00
211,000.00
284,000.00
240,000.00
322,000.00
319,000.00
371,000.00
366,000.00
418,000.00
317,000.00
264,500.00
269,000.00
321,000.00
246,000.00
246,000.00
184,000.00
295,900.00
346,500.00
366,300.00
347,700.00
403,700.00
195,200.00
236,800.00
275,200.00
360,000.00
282,000.00
351,000.00
366,000.00
348,700.00
436,000.00
386,000.00
341,200.00
282,600.00
618,500.00
176,000.00
126,000.00
985,500.00
1,689,000.00

Dinding
Dinding
Roxy

Polos
Special ( Warna Muda )

Dinding
Dinding
Dinding

Polos
Special ( Warna Muda )
Medium ( Warna Tua )

Dinding
Dinding
Dinding

List
Special
Medium

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

20
20
20
20
10
20
20
20
20
20
7.5
25
25
25
7.5
25
25
7.5
30
30
30
30
30
30
30

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

20
20
20
20
20
20
25
25
25
25
20
40
40
40
20
40
40
20
50
50
30
30
30
30
30

cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm

Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Bh
Box
Box
Box
Bh
Box
Box
Bh
Box
Box
Box
Box
Box
Box
Box

53,900.00
57,530.00
526,900.00
53,900.00
61,600.00
50,600.00
60,000.00
61,050.00
64,350.00
66,000.00
8,000.00
114,950.00
122,100.00
106,700.00
17,000.00
132,000.00
141,000.00
29,000.00
148,000.00
156,000.00
45,650.00
46,860.00
48,070.00
48,950.00
52,800.00

Dinding
List
Dinding
Premium
Dinding
Exclusive A
Dinding
List
Dinding
Premium
Dinding
Exclusive A
Murano
Jungle/Etna
Orient/Marmol/Capri/Milo
Newton/Nori/Marble
Corsica

No
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.

Nama Barang
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik

Ukuran/Tipe
Oscar
Petra
Dinding
Lantai

Sat.
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

List
Rustic

Lantai
Special
Lantai
Medium
Murano
Torino/Galleria
Tahiti
Genesis
Caracas
Cordon
Albatros
Ozone

Normay (Dasar terang)


Normay (Dasar gelap)
Liceo ( dasar gelap)
Liceo ( dasar terang)
Putih polos
Dasar terang
Dasar gelap
Lantai
Special
Lantai
Medium

30
30
7.5
30
30
30
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
45
45

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

30
30
20
30
30
30
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
45
45

cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm

Harga (Rp)

Box
Box
Bh
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box

65,000.00
56,100.00
38,500.00
60,000.00
49,500.00
56,100.00
71,500.00
73,700.00
51,700.00
55,000.00
56,100.00
59,400.00
59,400.00
64,900.00
66,000.00
71,500.00
63,800.00
57,200.00
63,800.00
66,000.00
84,700.00
79,200.00
56,100.00
58,300.00
60,500.00
77,000.00
80,300.00

X.3.10.3. Dan Lain-lain


1.

Wallpaper

M2

243,000.00

2.

Wallpaper

M2

282,000.00

3.

Vertical Blind

M2

243,000.00

4.

Horizontal Blind

M2

192,000.00

5.

Wood Blind

M2

154,000.00

6.

Wood Blind

M2

128,000.00

X.3.10.3. Lantai Parket (Lantai Kayu)


X.3.10.3.1. Lantai Parket
1.

Lantai Kayu

Costul (DCW)

Ukuran

12

x102

900

m
m

M2

430,000.00

2.

Lantai Kayu

Costul (DCW)

Ukuran

12

x140

900

m
m

M2

430,000.00

430,000.00

3.

Lantai Kayu

Costul (DCW)

Ukuran

12

x140

m
915
m

4.

Lantai Kayu

Costul (DCW)

Ukuran

12

x140

925

m
m

M2

430,000.00

m
900
m

530,000.00

M2

530,000.00

5.

Lantai Kayu

Kalimantan Poon

Ukuran

12

x102

6.

Lantai Kayu

Kalimantan Poon

Ukuran

12

x140

m
900
m

7.

Lantai Kayu

Kalimantan Poon

Ukuran

12

x140

900

m
m

M2

530,000.00

M2

530,000.00

8.

Lantai Kayu

Kalimantan Poon

Ukuran

12

x140

m
915
m

9.

Lantai Kayu

Kalimantan Poon

Ukuran

12

x140

925

m
m

M2

530,000.00

M2

530,000.00

10.

Lantai Kayu

Light Nyatoh

Ukuran

12

x102

m
900
m

11.

Lantai Kayu

Light Nyatoh

Ukuran

12

x140

900

m
m

M2

530,000.00

M2

530,000.00

m
m

M2

530,000.00

12.

Lantai Kayu

Light Nyatoh

Ukuran

12

x140

m
915
m

13.

Lantai Kayu

Light Nyatoh

Ukuran

12

x140

925

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

14.

Lantai Kayu

Golden Rosewood

Ukuran

12

x102

900

m
m

M2

580,000.00

15.

Lantai Kayu

Golden Rosewood

Ukuran

12

x140

900

m
m

M2

580,000.00

M2

580,000.00

m
m

M2

580,000.00

16.

Lantai Kayu

Golden Rosewood

17.

Lantai Kayu

Golden Rosewood

18.

Lantai Kayu

Costul (DCW)

19.

Lantai Kayu

Costul (DCW)

20.

Lantai Kayu

Basic Collection

21.

Lantai Kayu

Comfort Collection

Ukura
nUkura
n
Ukura
n

Ukuran

12

x140

m
915
m

Ukuran

12

x140

925

28

180

1000 mm

M2

860,000.00

28

180

2000 mm

M2

860,000.00

7 mm

19 cm

128.5

cm

M2

506,000.00

Ukura
n

8 mm

19 cm

128.5

cm

M2

545,000.00

8 mm

19 cm

121

cm

M2

428,000.00

22.

Lantai Kayu

Ukuran

Ukura
n

23.

Lantai Kayu

Ukuran

Ukura
n

8 mm

19 cm

121

cm

M2

428,000.00

Ukuran

Ukura
n

8 mm

19 cm

121

cm

M2

488,000.00

Botol
Botol

50,000.00
94,000.00

24.

Lantai Kayu

1.
2.

X.3.10.3.2. Pelengkap Lantai Parket


Lem Perekat Khusus
Berat 400 gram
Lem Perekat Khusus
Berat 800 gram

3.

PE Foam

Tebal 3 mm

M2

13,000.00

4.

PE Foam

Warna Abu-abu

M2

25,000.00

5.

PE Foam

Warna Putih

M2

12,000.00

6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.

Step Nosing Kayu


Step Nosing Kayu
Step Nosing Kayu
Step Nosing Kayu
Plin Lantai
Plin Lantai
Plin Lantai
Lis Jepit Bawah Pintu
Lis Jepit Bawah Pintu
Lis Jepit Bawah Pintu
Lis Jepit Antar Parket
Lis Jepit Antar Parket
Lis Jepit Antar Parket
Step Noosing Tangga
Step Noosing Tangga

Tongue Panjang 1,2 m


Tongue Panjang 2,4 m
Groove Panjang 1,2 m
Groove Panjang 2,4 m
#
MDF Ukuran
cm x Panjang
#
MDF Ukuran
cm x Panjang
#
MDF Ukuran
cm x Panjang
#
Aluminium Panjang 2,7 m
MDF Panjang 2,4 m
MDF Panjang 2,7 m
Aluminium Panjang 2,7 m
MDF Panjang 2,4 m
MDF Panjang 2,7 m
Aluminium Panjang 2,7 m
MDF Motif Kayu Panjang 2,4 m

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

36,000.00
72,500.00
36,000.00
72,500.00
227,000.00
253,000.00
278,000.00
430,000.00
480,000.00
544,000.00
468,000.00
480,000.00
544,000.00
686,000.00
480,000.00

44 /m2
44 /m2

Bh

2,100.00

Bh

2,980.00

44 /m2
44 /m2

Bh

2,380.00

Bh

3,460.00

35 /m2
35 /m2

Bh

2,380.00

Bh

3,260.00

35 /m2
35 /m2

Bh

2,660.00

Bh

3,740.00

40 /m2
40 /m2

Bh

2,240.00

Bh

3,446.00

40 /m2
40 /m2

Bh

2,520.00

Bh

3,600.00

48 /m2
48 /m2

Bh

1,960.00

Bh

2,840.00

48 /m2
48 /m2

Bh

2,240.00

Bh

3,320.00

2.5
2.4
2.4

m
m
m

X.3.10.4. Paving Block


1.

Paving Block

Serasi Abu-Abu

(6 cm)

isi

2.

Paving Block

Serasi Merah

(6 cm)

isi

3.

Paving Block

Serasi Abu-Abu

(8 cm)

isi

4.

Paving Block

Serasi Merah

(8 cm)

isi

5.

Paving Block

Tiga Berlian Abu-Abu (6 cm)

isi

6.

Paving Block

Tiga Berlian Merah

(6 cm)

isi

7.

Paving Block

Tiga Berlian Abu-Abu (8 cm)

isi

8.

Paving Block

Tiga Berlian Merah

(8 cm)

isi

9.

Paving Block

Diagonal Abu-Abu

(6 cm)

isi

10.

Paving Block

Diagonal Merah

(6 cm)

isi

11.

Paving Block

Diagonal Abu-Abu

(8 cm)

isi

12.

Paving Block

Diagonal Merah

(8 cm)

isi

13.

Paving Block

Bata Abu-Abu

(6 cm)

isi

14.

Paving Block

Bata Merah

(6 cm)

isi

15.

Paving Block

Bata Abu-Abu

(8 cm)

isi

16.

Paving Block

Bata Merah

(8 cm)

isi

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No

Nama Barang

Ukuran/Tipe

17.

Paving Block

Gras Block Abu-Abu

(6 cm)

isi

18.

Paving Block

Diagonal Jumbo Abu-Abu


(6 cm)

isi

19.

Paving Block

Diagonal Jumbo Merah (6 cm)

isi

20.

Paving Block

Diagonal Jumbo Abu-Abu


(8 cm)

isi

21.

Paving Block

Diagonal Jumbo Merah (8 cm)

isi

22.

Paving Block

Benteng Abu-Abu

(6 cm)

isi

23.

Paving Block

Benteng Merah

(6 cm)

isi

24.

Paving Block

Benteng Abu-Abu

(8 cm)

isi

25.

Paving Block

Benteng Merah

(8 cm)

isi

26.

Paving Block K 225

Serasi Abu-Abu

(6 cm)

isi

27.

Paving Block K 225

Serasi Merah

(6 cm)

isi

28.

Paving Block K 225

Serasi Abu-Abu

(8 cm)

isi

29.

Paving Block K 225

Serasi Merah

(8 cm)

isi

30.

Paving Block K 225

Tiga Berlian Abu-Abu (6 cm)

isi

31.

Paving Block K 225

Tiga Berlian Merah

(6 cm)

isi

32.

Paving Block K 225

Tiga Berlian Abu-Abu (8 cm)

isi

33.

Paving Block K 225

Tiga Berlian Merah

(8 cm)

isi

34.

Paving Block K 225

Diagonal Abu-Abu

(6 cm)

isi

35.

Paving Block K 225

Diagonal Merah

(6 cm)

isi

36.

Paving Block K 225

Diagonal Abu-Abu

(8 cm)

isi

37.

Paving Block K 225

Diagonal Merah

(8 cm)

isi

38.

Paving Block K 225

Bata Abu-Abu

(6 cm)

isi

39.

Paving Block K 225

Bata Merah

(6 cm)

isi

40.

Paving Block K 225

Bata Abu-Abu

(8 cm)

isi

41.

Paving Block K 225

Bata Merah

(8 cm)

isi

42.

Paving Block K 225

Gras Block Abu-Abu

(6 cm)

isi

43.

Paving Block K 225

Diagonal Jumbo Abu-Abu


(6 cm)

isi

44.

Paving Block K 225

Diagonal Jumbo Merah (6 cm)

isi

45.

Paving Block K 225

Diagonal Jumbo Abu-Abu


(8 cm)

isi

46.

Paving Block K 225

Diagonal Jumbo Merah (8 cm)

isi

47.

Paving Block K 225

Benteng Abu-Abu

(6 cm)

isi

48.

Paving Block K 225

Benteng Merah

(6 cm)

isi

49.

Paving Block K 225

Benteng Abu-Abu

(8 cm)

isi

50.

Paving Block K 225

Benteng Merah

(8 cm)

isi

51.

Paving Block 300

Serasi Abu-Abu

(6 cm)

isi

52.

Paving Block 300

Serasi Merah

(6 cm)

isi

53.

Paving Block 300

Serasi Abu-Abu

(8 cm)

isi

54.

Paving Block 300

Serasi Merah

(8 cm)

isi

55.

Paving Block 300

Tiga Berlian Abu-Abu (6 cm)

isi

56.

Paving Block 300

Tiga Berlian Merah

(6 cm)

isi

57.

Paving Block 300

Tiga Berlian Abu-Abu (8 cm)

isi

58.

Paving Block 300

Tiga Berlian Merah

(8 cm)

isi

59.

Paving Block 300

Diagonal Abu-Abu

(6 cm)

isi

60.

Paving Block 300

Diagonal Merah

(6 cm)

isi

61.

Paving Block 300

Diagonal Abu-Abu

(8 cm)

isi

62.

Paving Block 300

Diagonal Merah

(8 cm)

isi

63.

Paving Block 300

Bata Abu-Abu

(6 cm)

isi

64.

Paving Block 300

Bata Merah

(6 cm)

isi

65.

Paving Block 300

Bata Abu-Abu

(8 cm)

isi

66.

Paving Block 300

Bata Merah

(8 cm)

isi

67.

Paving Block 300

Gras Block Abu-Abu

(6 cm)

isi

68.

Paving Block 300

Diagonal Jumbo Abu-Abu


(6 cm)

isi

69.

Paving Block 300

Diagonal Jumbo Merah (6 cm)

isi

70.

Paving Block 300

Diagonal Jumbo Abu-Abu


(8 cm)

isi

71.

Paving Block 300

Diagonal Jumbo Merah (8 cm)

isi

72.

Paving Block 300

Benteng Abu-Abu

(6 cm)

isi

73.

Paving Block 300

Benteng Merah

(6 cm)

isi

74.

Paving Block 300

Benteng Abu-Abu

(8 cm)

isi

75.

Paving Block 300

Benteng Merah

(8 cm)

isi

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Sat.

Harga (Rp)

9 /m2
30 /m2
30 /m2

Bh

10,500.00

Bh

3,920.00

Bh

5,400.00

30 /m2
30 /m2

Bh

5,400.00

Bh

5,400.00

35 /m2
35 /m2

Bh

980.00

Bh

1,420.00

35 /m2
35 /m2

Bh

1,120.00

Bh

1,660.00

44 /m2
44 /m2

Bh

2,600.00

Bh

3,600.00

44 /m2
44 /m2

Bh

3,000.00

Bh

4,000.00

35 /m2
35 /m2

Bh

3,000.00

Bh

4,000.00

35 /m2
35 /m2

Bh

3,200.00

Bh

4,500.00

40 /m2
40 /m2

Bh

3,000.00

Bh

4,000.00

40 /m2
40 /m2

Bh

4,200.00

Bh

4,300.00

48 /m2
48 /m2

Bh

2,500.00

Bh

3,500.00

48 /m2
48 /m2

Bh

3,000.00

Bh

4,000.00

9 /m2
30 /m2

Bh

11,600.00

Bh

3,300.00

30 /m2
30 /m2

Bh

3,600.00

Bh

3,600.00

30 /m2
35 /m2

Bh

3,800.00

Bh

3,000.00

35 /m2
35 /m2

Bh

4,000.00

Bh

3,300.00

35 /m2
44 /m2

Bh

4,500.00

Bh

3,150.00

44 /m2
44 /m2

Bh

4,470.00

Bh

3,570.00

44 /m2
35 /m2

Bh

5,190.00

Bh

3,570.00

35 /m2
35 /m2

Bh

4,850.00

Bh

3,990.00

35 /m2
40 /m2

Bh

5,610.00

Bh

3,360.00

40 /m2
40 /m2

Bh

5,169.00

Bh

3,780.00

40 /m2
48 /m2

Bh

5,400.00

Bh

3,940.00

48 /m2
48 /m2

Bh

4,260.00

Bh

3,360.00

48 /m2
9 /m2

Bh

4,980.00

Bh

11,700.00

30 /m2
30 /m2

Bh

3,500.00

Bh

3,700.00

30 /m2
30 /m2

Bh

3,700.00

Bh

4,000.00

35 /m2
35 /m2

Bh

3,570.00

Bh

4,890.00

35 /m2
35 /m2

Bh

3,990.00

Bh

5,610.00

No

Nama Barang

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

X.3.10.5. Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen

Type K.225
Type K.300
Type K.225
Type K.300
Type K.225
Type K.300
Type K.225
Type K.300
Type K.225
Type K.300

Ukura
nUkura
n
Ukura
nUkura
nUkura
nUkura
nUkura
nUkura
nUkura
nUkura
n

1.
2.
3.
4.

X.3.10.6. Tegel/Ubin
Tegel/Ubin
Tegel/Ubin
Tegel/Ubin
Tegel/Ubin

Grys Warna
Grys Warna
Grys Abu-abu
Grys Abu-abu

Ukura
n
Ukura
nUkura
nUkura
n

1.
2.
3.
4.
5.
6.

Ukuran/Tipe

41,681.00
49,883.00
33,750.00
39,555.00
36,750.00
43,200.00
33,850.00
49,950.00
33,000.00
34,300.00

Bh
Bh
Bh
Bh

4,500.00
2,200.00
4,000.00
2,000.00

Bh
Lbr
M2
Lbr
Lbr
Bh

650.00
44,000.00
250,000.00
198,000.00
58,000.00
45,000.00
75,000.00

Isi 20 Bh/M2
Isi 20 Bh/M2

Bh

4,725.00

Bh

2,600.00

Isi 20 Bh/M2
Isi 20 Bh/M2

Bh

3,350.00

Bh

4,725.00

Isi 20 Bh/M2
Isi 20 Bh/M2

Bh

2,600.00

Bh

3,350.00

Isi 12 Bh/M2
Isi 12 Bh/M2

Bh

6,025.00

Bh

4,300.00

Isi 12 Bh/M2
Isi 12 Bh/M2

Bh

5,000.00

Bh

3,800.00

Bh

6,025.00

Bh

5,000.00

9 Bh/M2
9 Bh/M2

Bh

6,025.00

Bh

5,586.00

9 Bh/M2
Isi 3,5 Bh/M2

Bh

6,900.00

Bh

7,425.00

Isi 3,5 Bh/M2


Isi 3,5 Bh/M2

Bh

5,875.00

Bh

6,027.00

Isi 3,5 Bh/M2


Bubungan Piramid Cat Air 1x Isi 3,5 Bh/M2

Bh

5,145.00

Bh

6,875.00

Bh

6,027.00

Bh
Bh
Bh
Bh
Bh
Bh

7,938.00
6,645.00
7,000.00
7,938.00
6,645.00
7,000.00

Ukura
n

x
x
x
x
x
x
x
x
x
x

30
20
30
20

90

x
x
x
x

x ##### cm

30
30
20
20
30
30
40
40
30
30

30
20
30
20

x50
x50
x50
x50
x50
x50
x50
x50
x40
x40

cm
cm
cm
cm

cm
cm
cm
cm
cm
cm
cm
cm
cm
cm

Harga (Rp)

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

X.3.11.
Bahan Penutup Atap
Atap Sirap
Tilux
Atap tegola
Atap Onduline
Asbes Gelombang
Bubungan Asbes Gelombang
Talang PVC

15/20
15/20
15/20
15/20
20/20
20/20
15/20
15/20
15/20
15/20

Sat.

X.3.11.1. Genteng Press


1.

Genteng Beton

Kia Natural

2.

Genteng Beton

Kia Cat Air 1x

3.

Genteng Beton

Kia Cat Air 2x

4.

Genteng Beton

Garuda Natural

5.

Genteng Beton

Garuda Cat Air 1x

6.

Genteng Beton

Garuda Natural 2x

7.

Genteng Beton

Garuda Natural

8.

Genteng Beton

Garuda Cat Air 1x

9.

Genteng Beton

Garuda Cat Air 2x

10.

Genteng Beton

SafariI Natural

11.

Genteng Beton

Safari Cat Air 1x

12.

Genteng Beton

Safari Cat Air 2x

Isi 12 Bh/M2
Isi 12 Bh/M2

13.

Genteng Beton

Amsterdam/Flat Natural

Isi

14.

Genteng Beton

Amsterdam/Flat Cat Air 1x

Isi

15.

Genteng Beton

Amsterdam/Flat Cat Air 2x

Isi

16.

Genteng Beton

Bubungan Bulat Natural

17.

Genteng Beton

Bubungan Bulat Cat Air 1x

18.

Genteng Beton

Bubungan Bulat Cat Air 2x

19.

Genteng Beton

Bubungan Piramid Natural

20.

Genteng Beton

21.

Genteng Beton

22.
23.
24.
25.
26.
27.

Genteng Beton
Genteng Beton
Genteng Beton
Genteng Beton
Genteng Beton
Genteng Beton

Bubungan Piramid Cat Air 2x Isi 3,5 Bh/M2


Nok Bubungan Bulat Natural
Nok Bubungan Bulat Cat Air 1x
Nok Bubungan Bulat Cat Air 2x
Nok Bubungan Piramid Natural
Nok Bubungan Piramid Cat Air 1x
Nok Bubungan Piramid Cat Air 2x

28.

Genteng Beton

Kyoto Natural

6,075.00

Genteng Beton

Kyoto Cat Air 1x

Isi# Bh/M2
Isi# Bh/M2

Bh

29.

Bh

4,400.00

30.

Genteng Beton

Kyoto Cat Air 2x

Isi# Bh/M2

Bh

5,050.00

Isi# Bh/M2

Bh

9,200.00

X.3.11.2. Genteng Keramik


1.

Gent. Krm. Berglazur

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

KM 1 Standard

No

Nama Barang

2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

Gent. Krm. Berglazur


Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur
Gent. Krm. Berglazur

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
17.
18.
19.
20.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.

X.3.11.3. Genteng Metal


Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
Atap Metal
X.3.11.4.

Ukuran/Tipe
KM 1 PA
KM 2 Nok
KM 2 PP
KM 3
KM 4
KM 6
KM 7A
KM 7B
KM 8A
KM 8A
KM 9 + 9A
KM 10 A
KM 10 B
KM 10 C
KM 11

(Pemanas Air)
3,9
Isi Bh/M'
(Penangkal Petir)
(Lisplank Kiri)
(Lisplank Kanan)
(Ujung Jurai)
(Ujung Nok Kanan)
(Ujung Nok Kiri)
(Nok 3 Arah Kanan)
(Nok 3 Arah Kari)
(Hiasan Sudut Jurai)
(Nok 2 Arah)
(Nok 2 Arah Kanan)
(Nok 2 Arah Kiri)
(Nok 4 Arah Jurai)

Genteng 2 x 5 ( 1 m2 =
1,3 lb ) 2 x 5 ( 1 m2 =
Genteng
1,3 lb ) 1 x 5 ( 1 m2 =
Genteng
2,6
lb ) 1 x 5 ( 1 m2 =
Genteng
2,6 lb )
Nok model U
Nok model U
Nok Model C
Nok Model C
Nok samping
Nok samping
Wall Flashing
Wall Flashing
Tutup Nok
Tutup Nok
Genteng 4 x 4
Genteng 4 x 4
Genteng 3 x 4
Genteng 3 x 4
Genteng 2 x 4
Genteng 2 x 4
Genteng 1 x 4
Genteng 1 x 4
Nok model U
Nok model U
Nok Model C
Nok Model C
Nok samping
Nok samping
Wall Flashing
Wall Flashing
Tutup Nok
Tutup Nok
Genteng 2 x 4
Genteng 2 x 4
Genteng 2 x 4
Genteng 1 x 4
Genteng 1 x 4
Genteng 1 x 4
Nok model U
Nok Model C
Nok samping
Wall Flashing
Tutup Nok

Sat.

( Merpati )
( Elang )
( Garuda )
( Merpati )
( Elang )
( Garuda )

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

77
77
38.5
38.5
110
110
R. 9 - 9,5 cm
R. 9 - 9,5 cm

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

154
154
#
#
#
77
77
38.5
38.5
110
110
R. 9 - 9,5 cm
R. 9 - 9,5 cm

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

77
77
77
38.5
38.5
38.5
110
R. 9 - 9,5 cm

110
110
110
110

110
110
110
110

110
110

x100 cm
x100 cm
x100 cm
x100 cm
x 5
x
x 5
x
x 40
x 40
#
x
x
#
x
x
#
x
10
x
10

x
x
x
x
x
x
x
x
x
x

x
x
x
x

80 cm
80 cm
80 cm
80 cm
80 cm
80 cm
80 cm
80 cm
5
x
5
x
x 40
x 40
#
x
#
x
#
10
10

6
6
cm
cm
6
6

cm
cm

6
6
cm
cm
6
6

cm
cm

cm
cm
cm
cm

cm
cm
cm
cm

80 cm
80 cm
80 cm
80 cm
80 cm
80 cm
5
x 6 cm
cm
x 40
#
x
x 6 cm
#
cm
x
10
x
x
x
x
x
x
x

Harga (Rp)

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

16,200.00
20,600.00
44,000.00
17,000.00
17,000.00
60,000.00
60,000.00
60,000.00
76,000.00
76,000.00
76,000.00
76,000.00
76,000.00
76,000.00
250,000.00

Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh

155,000.00
140,000.00
80,000.00
70,000.00
46,000.00
40,000.00
30,000.00
25,000.00
46,000.00
42,000.00
46,000.00
42,000.00
30,000.00
39,000.00
203,000.00
177,000.00
153,000.00
133,000.00
103,000.00
90,000.00
53,000.00
46,000.00
46,000.00
40,000.00
61,000.00
81,000.00
90,000.00
31,000.00
42,000.00
46,000.00
33,000.00
27,000.00
21,000.00
33,000.00
46,000.00
40,000.00
29,000.00
23,000.00
46,000.00
40,000.00
26,000.00
30,000.00
26,000.00

Atap Aluminium

1.

Atap Aluminium

Klip Lok

Tebal 0,50

mm

TCT,Colourbond

M2

262,000.00

2.

Atap Aluminium

Klip Lok

Tebal 0,50

mm

TCT,Zincalume

M2

173,000.00

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

3.

Atap Aluminium

Spandek

Tebal 0,45

mm

TCT,Colourbond

M2

215,000.00

4.

Atap Aluminium

Spandek

Tebal 0,45

mm

TCT,Zincalume

M2

138,000.00

5.

Atap Aluminium

Spandek

Tebal 0,40

mm

TCT,Colourbond

M2

199,000.00

6.

Atap Aluminium

Spandek

Tebal 0,40

mm

TCT,Zincalume

M2

125,000.00

7.

Atap Aluminium

Trimdek

Tebal 0,45

mm

TCT,Colourbond

M2

200,000.00

8.

Atap Aluminium

Trimdek

Tebal 0,45

mm

TCT,Zincalume

M2

128,000.00

9.

Atap Aluminium

Trimdek

Tebal 0,40

mm

TCT,Colourbond

M2

183,000.00

10.

Atap Aluminium

Trimdek

Tebal 0,40

mm

TCT,Zincalume

M2

115,000.00

11.

Atap Aluminium

Klip Lok (Proklip)

Tebal 0,50

mm

TCT,Pelangi

M2

237,000.00

12.

Atap Aluminium

Klip Lok (Proklip)

Tebal 0,45

mm

TCT,Pelangi

M2

218,000.00

13.

Atap Aluminium

Klip Lok (Proklip)

Tebal 0,45

mm

TCT,Bare

M2

156,000.00

14.

Atap Aluminium

Spandek (Indodek)

Tebal 0,45

mm

TCT,Pelangi

M2

192,000.00

15.

Atap Aluminium

Spandek (Indodek)

Tebal 0,40

mm

TCT,Pelangi

M2

173,000.00

16.

Atap Aluminium

Spandek (Indodek)

Tebal 0,35

mm

TCT,Pelangi

M2

160,000.00

17.

Atap Aluminium

Spandek (Indodek)

Tebal 0,35

mm

TCT,Zincalume

M2

110,000.00

18.

Atap Aluminium

Trimdek ( Nusadek )

Tebal 0,45

mm

TCT,Pelangi

M2

180,000.00

19.

Atap Aluminium

Trimdek ( Nusadek )

Tebal 0,40

mm

TCT,Pelangi

M2

160,000.00

20.

Atap Aluminium

Trimdek ( Nusadek )

Tebal 0,35

mm

TCT,Pelangi

M2

141,000.00

21.

Atap Aluminium

Trimdek ( Nusadek )

Tebal 0,35

mm

TCT,Zincalume

M2

103,000.00

22.

Atap Aluminium

Klip Lok (Bima)

Tebal 0,50

mm

TCT,Gemilang

M2

205,000.00

23.

Atap Aluminium

Klip Lok (Bima)

Tebal 0,50

mm

TCT,Abadi

M2

157,000.00

24.

Atap Aluminium

Klip Lok (Bima)

Tebal 0,45

mm

TCT,Gemilang

M2

188,000.00

25.

Atap Aluminium

Klip Lok (Bima)

Tebal 0,45

mm

TCT,Abadi

M2

142,000.00

26.

Atap Aluminium

Spandek (Satria)

Tebal 0,45

mm

TCT,Gemilang

M2

166,000.00

27.

Atap Aluminium

Spandek (Satria)

Tebal 0,45

mm

TCT,Abadi

M2

127,000.00

28.

Atap Aluminium

Spandek (Satria)

Tebal 0,40

mm

TCT,Gemilang

M2

148,000.00

29.

Atap Aluminium

Spandek (Satria)

Tebal 0,40

mm

TCT,Abadi

M2

114,000.00

30.

Atap Aluminium

Spandek (Satria)

Tebal 0,35

mm

TCT,Gemilang

M2

135,000.00

31.

Atap Aluminium

Spandek (Satria)

Tebal 0,35

mm

TCT,Abadi

M2

102,000.00

32.

Atap Aluminium

Trimdek ( Arjuna )

Tebal 0,45

mm

TCT,Gemilang

M2

152,000.00

33.

Atap Aluminium

Trimdek ( Arjuna )

Tebal 0,45

mm

TCT,Abadi

M2

119,000.00

34.

Atap Aluminium

Trimdek ( Arjuna )

Tebal 0,40

mm

TCT,Gemilang

M2

137,000.00

35.

Atap Aluminium

Trimdek ( Arjuna )

Tebal 0,40

mm

TCT,Abadi

M2

106,000.00

36.

Atap Aluminium

Trimdek ( Arjuna )

Tebal 0,35

mm

TCT,Gemilang

M2

125,000.00

37.

Atap Aluminium

Trimdek ( Arjuna )

Tebal 0,35

mm

TCT,Abadi

M2

93,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

X.3.11.5. Atap Seng


Seng Aluminium
Karpet
Seng Aluminium
Seng Gelombang
Seng Gelombang
Seng Gelombang
Seng Gelombang
Seng Gelombang
Seng Gelombang
Seng Gelombang
Seng Gelombang
Seng Plat
Seng Plat
Seng Plat
Seng Plat
Seng Plat
Seng Plat

lebar 45 cm
lebar 45 cm
0,37 x 60 cm
Besar BJLS 30
Besar BJLS 20
BJLS 20 KI
BJLS 25 KI
BJLS 30
BJLS 25
BJLS 20
BJLS 18
BJLS 20 KI
BJLS 25 KI
BJLS 30
BJLS 25
BJLS 20
BJLS 18

M'
M'
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

19,000.00
7,500.00
36,000.00
100,000.00
90,000.00
37,500.00
80,000.00
60,000.00
55,000.00
50,000.00
45,000.00
54,000.00
64,000.00
48,000.00
43,000.00
32,000.00
27,000.00

1.
2.

X.3.11.6. Bahan Insulation


Aluminium Foil
SS 810
Aluminium Foil
DS 820

Roll
Roll

310,000.00
400,000.00

3.

Glasswoll

4.

Glasswoll

5.

Glasswoll

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

1.3 x
1.3 x

60
60

m
m

D. 16 Kg/M3

Tebal # mm

1.2

m x

30

Roll

239,000.00

D. 16 Kg/M3

Tebal # mm

1.2

m x

15

Roll

239,000.00

D. 24 Kg/M3

Tebal # mm

1.2

m x

30

Roll

345,000.00

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

6.

Glasswoll

D. 24 Kg/M3

Tebal # mm

1.2

m x

15

Roll

345,000.00

7.

Glasswoll

D. 32 Kg/M3

Tebal # mm

1.2

m x

30

Roll

485,000.00

8.

Glasswoll

1.2

m x

15

Roll

485,000.00

9.
10.
11.

Roofmesh
Aluminium Tape
Metalizing Tape

Tebal # mm
D. 32 Kg/M3
3315 : 1.8 x 30 m

Roll
Roll
Roll

275,000.00
24,000.00
7,500.00

12.

Rockwoll Slab

D. 40 Kg/M3

Tebal # mm

0.6

m x

1.2

Roll

12,000.00

13.

Rockwoll Slab

D. 40 Kg/M3

Tebal # mm

0.6

m x

1.2

Roll

23,500.00

14.

Rockwoll Slab

D. 60 Kg/M3

Tebal # mm

0.6

m x

1.2

Roll

16,000.00

15.

Rockwoll Slab

D. 60 Kg/M3

Tebal # mm

0.6

m x

1.2

Roll

33,000.00

16.

Rockwoll Slab

D. 80 Kg/M3

Tebal # mm

0.6

m x

1.2

Roll

22,500.00

17.

Rockwoll Slab

D. 80 Kg/M3

Tebal # mm

0.6

m x

1.2

Roll

44,000.00

18.

Rockwoll Slab

D. 100 Kg/M3

Tebal # mm

0.6

m x

1.2

Roll

29,000.00

19.

Rockwoll Slab

D. 100 Kg/M3

Tebal # mm

0.6

m x

1.2

Roll

55,500.00

20.

Rockwoll Blanket

D. 40 Kg/M3

Tebal # mm

0.6

m x

Roll

47,000.00

21.

Rockwoll Blanket

D. 40 Kg/M3

Tebal # mm

0.6

m x

Roll

94,000.00

22.

Rockwoll Blanket

D. 60 Kg/M3

Tebal # mm

0.6

m x

Roll

66,500.00

23.

Rockwoll Blanket

D. 60 Kg/M3

Tebal # mm

0.6

m x

Roll

146,000.00

24.

Rockwoll Blanket

D. 80 Kg/M3

Tebal # mm

0.6

m x

Roll

88,000.00

25.

Rockwoll Blanket

D. 80 Kg/M3

Tebal # mm

0.6

m x

Roll

178,500.00

26.

Rockwoll Blanket

D. 100 Kg/M3

Tebal # mm

0.6

m x

Roll

111,000.00

27.

Rockwoll Blanket

m x

Roll

228,500.00

28.
29.

Aluminium Foil
Aluminium Foil

Tebal # mm
x
0.6
D. 100 Kg/M3
Lebar 1,25 m Panjang 60 m (Single Side)
Lebar 1,25 m Panjang 60 m (Double Side)

Lbr
Lbr

290,000.00
513,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

X.3.12.
Penggantung & Pengunci
Engsel (Nylon)
4"
Engsel (Nylon)
3"
Engsel
Kipas
Grendel
Grendel
Tanam
Hak Angin
20 cm
Handle
4"
Kunci Pintu
Besar 693 LD
Kunci Pintu
Kecil
Kunci Tanam
2 x Slaag
Kunci Tanam
Pintu Sorong
Kunci Alpha 8000
8000
Kunci Pintu
Besar
Kunci Pintu
WC Cylinder
Finishing US3
WC Cylinder
Finishing US14
Mortice Lock
D Cylinder
Finishing BRS
D Cylinder
Finishing BRS

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
Bh
Bh
Set
Set
Set
Bh
Bh
Bh
Bh
Bh

42,000.00
36,000.00
42,000.00
21,000.00
71,000.00
14,000.00
11,000.00
187,000.00
141,000.00
212,000.00
247,000.00
176,000.00
212,000.00
916,000.00
105,000.00
112,000.00

20.

Pull Handle

Finishing US32D (P.75.64)

Pasang

4,573,000.00

21.

Pull Handle

Finishing US32(P.75.64)

Pasang

5,000,000.00

22.

Pull Handle

Finishing GPD(PR.88.21)

Pasang

962,000.00

23.

Lever Handle

HP.88.01

Pasang

245,000.00

24.

Lever Handle

HRE.65.03

Pasang

458,000.00

25.

Lever Handle

HRE.75.01

Pasang

310,000.00

26.

Glass Handle

GHD0001 D25x200MM

Pasang

845,000.00

27.

Glass Handle

GHD0001 D32x300MM

Pasang

1,182,000.00

28.
29.

Door Closer RA
Door Closer RA

71410 - 03
85510 - 02

Bh
Bh

1,423,000.00
390,000.00

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

138,000.00
295,000.00

No

Nama Barang

Ukuran/Tipe

30.
31.

Floor Hinge
Floor Hinge

60221
09584 Komplit

32.

Engsel St. Steel

SEL0007 4x3x2

33.

Engsel Brass

SEL00012 4x3x3.3 US3

34.

Engsel Pintu Besi

497

US32
D

Harga (Rp)

Bh
Bh

2,580,000.00
1,737,000.00

Pasang

146,000.00

Pasang

254,000.00

US P

Pasang

277,000.00

Pasang

309,000.00

Pasang

77,000.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

184,000.00
273,000.00
81,000.00
94,000.00
128,000.00
85,000.00
92,000.00
135,000.00
130,000.00
374,000.00
152,000.00
149,000.00
149,000.00
160,000.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

352,000.00
296,000.00
212,000.00
402,000.00
182,000.00
253,000.00
126,000.00
169,000.00
148,000.00
190,000.00

One Piece Toilet Lexington One Piece Toilet


One Piece Toilet Hamilton One Piece Toilet
One Piece Toilet Sanremo Classic One Piece Toilet
Close Coupled Toilet
Granada 3000 CCST
Close Coupled Toilet
Projecta CCST

Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
Set
Set
Set
Set
Set

659,000.00
600,000.00
150,000.00
40,400.00
215,000.00
2,327,000.00
4,000,000.00
6,400,000.00
6,603,000.00
5,019,000.00
4,273,000.00
2,692,000.00
2,514,000.00

Wall Tap
Wall Tap
Wall Tap
Wall Tap

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

375,000.00
400,000.00
500,000.00
235,000.00
215,000.00
130,000.00
130,000.00
150,000.00
130,000.00

35.

Casement Stay

CMT75-030"

US32
D

36.

Casement Stay

CMT45-008"

US32
D

37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.

Grendel Tanam
Grendel Tanam
Grendel
Grendel
Grendel WC
Security Bolt
Door Viewer
Door Selector
Ramskar
Rambuncis
Spring Knip
Door Stop
Door Stop
Door Stop

BRS
306 6"
BRS
306 12"
US 3
440 3"
US 3
440 4"
US
SKT 741 (Indicator)
32D
BRS
5071 + Key
US 3
36 - 60 mm
US
RC 75-002
32D
US 3
321
US 3
330
US 3
75 - 378
US 3
75 - 011
US 15
75 - 011
US 4
75 - 012

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

X.3.13.
Perlengkapan Sanitasi
X.3.13.1. Bak Mandi
Bak Mandi
Abu-abu
Bak Mandi
Terazo
Bak Mandi
Abu-abu
Bak Mandi
Terazo
Bak Mandi
Abu-abu
Bak Mandi
Terazo
Bak Mandi
Abu-abu
Bak Mandi
Terazo
Bak Mandi
Abu-abu
Bak Mandi
Terazo

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

X.3.13.2. Closet
Closet Jongkok
Closet Jongkok
Closet Jongkok
Closet Jongkok
Closet Jongkok
Closet Jongkok
Closet Duduk
Closet Duduk
Closet Duduk
Closet Duduk
Closet Duduk
Closet Duduk
Closet Duduk

1.
2.
3.
4.
5.
6.
7.
8.
9.

X.3.13.3. Kran Air


Kran Washtafel
Kran bebek
Kran Shower
Kran air
Kran tembok
Kran air
Kran air
Kran air
Kran air

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Sat.

Uk.
Uk.
Uk.
Uk.
Uk.
Uk.
Uk.
Uk.
Uk.
Uk.

80
80
60
60
60
60
60
60
50
50

x
x
x
x
x
x
x
x
x
x

60
60
60
60
50
50
40
40
50
50

x
x
x
x
x
x
x
x
x
x

60
60
60
60
50
50
40
40
50
50

CE 9
CE 7
Rapi C Squat
Rapi EX Squat
Rapi DX Top Spud Squat
+ Flush Valve Squat TS
CW 668 J/SW 668 J
One Piece Toilet Champion One Piece Toilet

IN 301C Wall Tap Chrome 1/2"


IN 301A Wall Tap Acrylic 1/2"
IN 26 Garden Wall Tap Chrome 1/2"
IN 24 Double Faucet 2 in 1 W/M Chrome 1/2"

cm
cm
cm
cm
cm
cm
cm
cm
cm
cm

No

Nama Barang

Ukuran/Tipe

Sat.

10.

Kran air

Wall Tap

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

X.3.13.4. Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel

1.
2.
3.
4.

X.3.13.5. Urinal
Urinal
Urinal
Urinal
Urinal Divider

1.
2.
3.
4.
5.
6.
7.

X.3.13.6. Kitchen Sink


Kitchen Sink
Kitchen Sink
Kitchen Sink
Kitchen Sink
Kitchen Sink
Kitchen Sink
Kitchen Sink

Sink R -1
Kitchen Set R8
Elegant R4
Kitchen Sink R9
Work Table
Work Table
Kitchen Sink Naomi

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

100
120
133
116
81
116
62

x
x
x
x
x
x
x

56
56
56
56
43
63
48

8.

Kitchen Sink

Double Kitcken Sink

Uk105

56

87

cm
deep

9.

Kitchen Sink

Kitchen Sink SB

Uk 63

57

76

cm
deep

1.
2.
3.

X.3.14.
Pipa
X.3.14.1. Pipa Besi
Pipa Besi
Pipa Besi
Pipa Besi

1.
2.
3.
4.
5.
6.
1
8.
9.
10.

X.3.14.2. Pipa PVC


Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

X.3.14.2.1. Pipa PVC Serie 12,5


Pipa PVC
1"
Pipa PVC
2"
Pipa PVC
3"
Pipa PVC
4"
Pipa PVC
6"
Pipa PVC
8"
Pipa PVC
10"
Pipa PVC
12"
Pipa PVC

1/2"
Pipa PVC

3/4"

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

IN 301C Wall Tap Chrome 1/2"

Harga (Rp)

Bh

280,000.00

Type LW 650 J/LW 650 FJ


Type LW 501 J
Type L 34
Type L 529 V1
Lavatory and Pedestal
San Remo 55
Lavatory and Pedestal
Nevada
Vanitory
Monaco
Vanitory
Rondalyn
Vanitory
Aqualyn
Wall Hung LavatoryStudio 50
Wall Hung LavatoryStudio 45
Wall Hung LavatoryStudio 35

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

6,242,000.00
3,345,000.00
1,343,000.00
1,848,000.00
2,033,000.00
1,926,000.00
775,000.00
559,000.00
513,000.00
1,516,000.00
1,469,000.00
1,390,000.00

Top Spud Urinal


Top Spud Urinal
Top Spud Urinal

Bh
Bh
Bh
Bh

4,025,000.00
3,072,000.00
2,570,000.00
532,000.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh

1,759,000.00
1,830,000.00
2,000,000.00
1,900,000.00
320,000.00
960,000.00
500,000.00

27 cm

Bh

960,000.00

30 cm

Bh

1,037,000.00

1/2" Panjang 4 m
3/4" Panjang 4 m
2" Panjang 4 m

Btg
Btg
Btg

250,000.00
350,000.00
925,000.00

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

25,000.00
40,000.00
45,000.00
65,000.00
40,000.00
240,000.00
350,000.00
8,223,000.00
42,733,000.00
55,803,000.00

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

41,000.00
105,000.00
193,000.00
293,000.00
387,000.00
587,000.00
734,000.00
775,000.00
20,000.00
28,000.00

1/2"
3/4"
1"
1 1/2"
2"
3"
4"
4"
16" (400 mm)
24" (600 mm)

Washbrook
Mini Washbrook
Maybrook II

x
x
x
x
x
x
x

88
88
88
90
88
88
75

cm
cm
cm
cm
cm
cm
cm

No

Nama Barang

Ukuran/Tipe

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.

X.3.14.2.2. Pipa PVC Type AW


Pipa PVC
1/2"
Pipa PVC
1/2"
Pipa PVC
3/4"
Pipa PVC
1"
Pipa PVC
1 1/4"
Pipa PVC
1 1/2"
Pipa PVC
2"
Pipa PVC
2 1/2"
Pipa PVC
3"
Pipa PVC
4"
Pipa PVC
5"
Pipa PVC
6"
Pipa PVC
8"
Pipa PVC
10"
Pipa PVC
12"
Pipa PVC
14"
Pipa PVC
16"
Pipa PVC
3/4"
Pipa PVC
1"
Pipa PVC
1 1/4"
Pipa PVC
1 1/2"
Pipa PVC
2"
Pipa PVC
2 1/2"
Pipa PVC
3"
Pipa PVC
4"
Pipa PVC
5"
Pipa PVC
6"
Pipa PVC
8"
Pipa PVC
10"
Pipa PVC
12"
Pipa PVC
14"
Pipa PVC
16"

Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

X.3.14.2.3. Pipa PVC Type D


Pipa PVC
1 1/4"
Pipa PVC
1 1/2"
Pipa PVC
2"
Pipa PVC
2 1/2"
Pipa PVC
3"
Pipa PVC
4"
Pipa PVC
5"
Pipa PVC
6"
Pipa PVC
8"
Pipa PVC
10"
Pipa PVC
12"
Pipa PVC
14"
Pipa PVC
16"
Pipa PVC
1 1/4"
Pipa PVC
1 1/2"
Pipa PVC
2"
Pipa PVC
2 1/2"
Pipa PVC
3"

Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Sat.

Harga (Rp)

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

38,000.00
58,000.00
66,000.00
86,000.00
174,000.00
288,000.00
657,000.00
1,123,000.00
1,697,000.00
2,478,000.00
5,093,000.00

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

26,000.00
31,000.00
32,000.00
36,000.00
45,000.00
59,000.00
75,000.00
114,000.00
163,000.00
237,000.00
375,000.00
525,000.00
900,000.00
1,450,000.00
1,985,000.00
2,207,000.00
2,770,000.00
38,000.00
47,000.00
67,000.00
88,000.00
132,000.00
170,000.00
242,000.00
354,000.00
557,000.00
739,000.00
1,148,000.00
1,636,000.00
2,355,000.00
3,285,000.00
1,117,000.00

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

29,000.00
33,000.00
42,000.00
62,000.00
91,000.00
127,000.00
210,000.00
258,000.00
454,000.00
792,000.00
1,079,000.00
1,419,000.00
1,838,000.00
42,000.00
47,000.00
63,000.00
93,000.00
135,000.00

1"
1 1/4"
1 1/2"
2"
3"
4"
6"
8"
10"
12"
16"

4
6
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6

#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

No

Nama Barang

Ukuran/Tipe

19.
20.
21.
22.
23.
24.
25.
26.

Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

X.3.14.2.4. Pipa PVC Type C


Pipa PVC
5/8"
Pipa PVC
3/4"
Pipa PVC
1"
Pipa PVC
1 1/4"
Pipa PVC
1 1/2"
Pipa PVC
2"
Pipa PVC
2 1/2"
Pipa PVC
3"
Pipa PVC
4"
Pipa PVC
5/8"
Pipa PVC
3/4"
Pipa PVC
1"
Pipa PVC
1 1/4"
Pipa PVC
1 1/2"
Pipa PVC
2"
Pipa PVC
2 1/2"
Pipa PVC
3"
Pipa PVC
4"

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

X.3.14.3. Pipa Galvanis


Pipa Galvanis
Pipa Galvanis
Pipa Galvanis
Pipa Galvanis
Pipa Galvanis
Pipa Galvanis
Pipa Galvanis
Pipa Galvanis
Pipa Galvanis
Pipa Galvanis
Pipa Galvanis

1/2"
3/4"
1"
1 1/2"
2"
3"
4"
6"
8"
10"
12"

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

X.3.14.4. Pipa Air


X.3.14.4.1. Pipa Air BSA
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

4"
5"
6"
8"
10"
12"
14"
16"

Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air

Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang

#
#
#
#
#
#
#
#
#

Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang

#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

Sat.

Harga (Rp)

m
m
m
m
m
m
m
m

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

190,000.00
313,000.00
383,000.00
675,000.00
1,177,000.00
1,604,000.00
2,106,000.00
2,728,000.00

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

5,000.00
11,000.00
15,000.00
19,000.00
23,000.00
36,000.00
47,000.00
54,000.00
70,000.00
8,000.00
15,000.00
22,000.00
29,000.00
34,000.00
54,000.00
70,000.00
81,000.00
105,000.00

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

252,000.00
332,000.00
481,000.00
685,000.00
952,000.00
1,720,000.00
2,523,000.00
3,850,000.00
6,500,000.00
8,500,000.00
14,500,000.00

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

175,000.00
200,000.00
235,000.00
285,000.00
375,000.00
525,000.00
600,000.00
650,000.00
750,000.00
800,000.00
969,000.00
71,000.00
90,000.00
123,000.00
159,000.00
211,000.00
297,000.00
408,000.00
502,000.00
666,000.00
941,000.00

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

22.

Pipa Air

6"

Air

Btg

1,141,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

X.3.14.4.2. Pipa Air MED II


Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

225.00
295,000.00
425,000.00
550,000.00
650,000.00
895,000.00
1,100,000.00
1,400,000.00
2,250,000.00
2,750,000.00
3,316,000.00
250,000.00
295,000.00
450,000.00
585,000.00
685,000.00
925,000.00
1,100,000.00
1,600,000.00
2,500,000.00
2,975,000.00
3,850,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

X.3.14.4.3. Pipa Air SCH-40 ASTM A-53 Gr A


Pipa Air
1/2"
Hitam
Pipa Air
3/4"
Hitam
Pipa Air
1"
Hitam
Pipa Air
1 1/4"
Hitam
Pipa Air
1 1/2"
Hitam
Pipa Air
2"
Hitam
Pipa Air
2 1/2"
Hitam
Pipa Air
3"
Hitam
Pipa Air
4"
Hitam
Pipa Air
5"
Hitam
Pipa Air
6"
Hitam
Pipa Air
8"
Hitam
Pipa Air
1/2"
Air
Pipa Air
3/4"
Air
Pipa Air
1"
Air
Pipa Air
1 1/4"
Air
Pipa Air
1 1/2"
Air
Pipa Air
2"
Air
Pipa Air
2 1/2"
Air
Pipa Air
3"
Air
Pipa Air
4"
Air
Pipa Air
5"
Air
Pipa Air
6"
Air
Pipa Air
8"
Air

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

174,000.00
240,000.00
348,000.00
450,000.00
510,000.00
714,000.00
1,140,000.00
1,560,000.00
2,280,000.00
3,000,000.00
3,780,000.00
5,700,000.00
420,000.00
462,000.00
582,000.00
660,000.00
900,000.00
1,170,000.00
1,656,000.00
2,340,000.00
3,300,000.00
3,600,000.00
4,740,000.00
7,800,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

X.3.14.4.4. Pipa Air BSA/Med B


Pipa Air
1/2"
Pipa Air
3/4"
Pipa Air
1"
Pipa Air
1 1/4"
Pipa Air
1 1/2"
Pipa Air
2"
Pipa Air
2 1/2"
Pipa Air
3"
Pipa Air
4"
Pipa Air
5"
Pipa Air
6"
Pipa Air
8"

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

89,000.00
97,000.00
136,000.00
174,000.00
224,000.00
305,000.00
422,000.00
497,000.00
704,000.00
993,000.00
1,183,000.00
2,242,000.00

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

89,000.00
114,000.00
161,000.00
218,000.00
266,000.00
361,000.00
497,000.00
584,000.00
830,000.00
1,171,000.00
1,395,000.00
2,645,000.00

Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

150,000.00
180,000.00
270,000.00
348,000.00
456,000.00
510,000.00
600,000.00
1,020,000.00
1,380,000.00
1,680,000.00
2,160,000.00
4,500,000.00
180,000.00
234,000.00
354,000.00
450,000.00
522,000.00
720,000.00
1,080,000.00
1,320,000.00
1,800,000.00
2,280,000.00
2,820,000.00
5,640,000.00

X.3.14.4.6. Pipa Air SCH 20 ASTM A - 53 A


Pipa Air
2"
Hitam
Pipa Air
2 1/2" Hitam
Pipa Air
3"
Hitam
Pipa Air
4"
Hitam
Pipa Air
5"
Hitam
Pipa Air
6"
Hitam
Pipa Air
8"
Hitam
Pipa Air
10"
Hitam
Pipa Air
12"
Hitam
Pipa Air
2"
Air
Pipa Air
2 1/2" Air
Pipa Air
3"
Air
Pipa Air
4"
Air
Pipa Air
5"
Air
Pipa Air
6"
Air
Pipa Air
8"
Air
Pipa Air
10"
Air
Pipa Air
12"
Air

Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

413,000.00
715,000.00
841,000.00
1,190,000.00
1,519,000.00
1,949,000.00
2,968,000.00
4,057,000.00
4,842,000.00
487,000.00
843,000.00
993,000.00
1,403,000.00
1,792,000.00
2,289,000.00
3,501,000.00
5,274,000.00
6,294,000.00

X.3.14.5. Sambungan Pipa Air


X.3.14.5.1. Bend 90
Pipa
1/2"
Pipa
3/4"
Pipa
1"
Pipa
1 1/4"

Bh
Bh
Bh
Bh

5,500.00
8,000.00
11,500.00
18,000.00

13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

X.3.14.4.5. Pipa Air MED SNI


Pipa Air
1/2"
Pipa Air
3/4"
Pipa Air
1"
Pipa Air
1 1/4"
Pipa Air
1 1/2"
Pipa Air
2"
Pipa Air
2 1/2"
Pipa Air
3"
Pipa Air
4"
Pipa Air
5"
Pipa Air
6"
Pipa Air
8"
Pipa Air
1/2"
Pipa Air
3/4"
Pipa Air
1"
Pipa Air
1 1/4"
Pipa Air
1 1/2"
Pipa Air
2"
Pipa Air
2 1/2"
Pipa Air
3"
Pipa Air
4"
Pipa Air
5"
Pipa Air
6"
Pipa Air
8"

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

1.
2.
3.
4.

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
8"

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

5.
6.
7.
8.
9.
10.

Pipa
Pipa
Pipa
Pipa
Pipa
Pipa

1 1/2"
2"
2 1/2"
3"
4"
6"

Bh
Bh
Bh
Bh
Bh
Bh

22,500.00
37,500.00
70,000.00
115,000.00
187,500.00
750,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

X.3.14.5.2. Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
Bushing

3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

5,500.00
8,000.00
11,500.00
18,000.00
22,500.00
37,500.00
70,000.00
115,000.00
187,500.00
750,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

X.3.14.5.3. Cap
Cap
Cap
Cap
Cap
Cap
Cap
Cap
Cap
Cap
Cap
Cap

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

4,500.00
5,500.00
7,500.00
11,000.00
15,000.00
21,000.00
425,000.00
60,000.00
97,500.00
250,000.00
325,000.00

1.
2.
3.
4.
5.
6.
7.
8.

X.3.14.5.4. Cross
Cross
Cross
Cross
Cross
Cross
Cross
Cross
Cross

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

22,500.00
27,500.00
35,000.00
50,000.00
65,000.00
85,000.00
165,000.00
225,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

X.3.14.5.5. Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

7,500.00
10,000.00
15,000.00
22,500.00
30,000.00
40,000.00
85,000.00
125,000.00
235,000.00
550,000.00
750,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.

X.3.14.5.6. Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

3,000.00
6,000.00
6,000.00
9,000.00
12,000.00
19,000.00
39,000.00
59,000.00
105,000.00

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

10.
11.

Elbow 90
Elbow 90

5"
6"

Bh
Bh

363,000.00
422,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

X.3.14.5.7. Look Nut


Look Nut
Look Nut
Look Nut
Look Nut
Look Nut
Look Nut
Look Nut
Look Nut
Look Nut
Look Nut

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

1,000.00
1,000.00
2,000.00
2,000.00
3,000.00
5,000.00
10,000.00
15,000.00
30,000.00
47,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

X.3.14.5.8. Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

5,000.00
6,000.00
9,500.00
13,500.00
18,500.00
27,500.00
45,000.00
75,000.00
125,000.00
275,000.00
450,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

X.3.14.5.9. Elbow PVC


Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC
Elbow PVC

2" - 9
2" - 45
3" - 11,25
3" - 22,5
3" - 45
3" - 90
4" - 22,5
6" - 11,25
6" - 22,5
6" - 45
12" - 45
1/2" 90 DGR
3/4" 90 DGR
1"
90 DGR
1 1/2" 90 DGR

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

54,000.00
58,000.00
51,000.00
61,000.00
66,000.00
115,000.00
132,000.00
293,000.00
278,000.00
330,000.00
954,000.00
3,000.00
3,000.00
4,000.00
11,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

X.3.14.5.10.Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend

2"
3"
4"
6"
8"
10"
12"
14" (350 mm)
16" (400 mm)
18" (450 mm)
20" (500 mm)
24" (600 mm)

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

321,000.00
348,000.00
458,000.00
825,000.00
1,376,000.00
1,605,000.00
1,651,000.00
2,064,000.00
2,753,000.00
3,441,000.00
3,212,000.00
3,304,000.00

1.
2.
3.
4.
5.

X.3.14.5.11.Gate Valve
Gate Valve
Gate Valve
Gate Valve
Gate Valve
Gate Valve

2"
3"
4"
6"
12"

Bh
Bh
Bh
Bh
Bh

3,750,000.00
5,850,000.00
6,750,000.00
9,000,000.00
18,000,000.00

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

Bh
Bh
Bh
Bh
Bh

7,709,000.00
9,750,000.00
1,945,000.00
2,055,000.00
7,636,000.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

249,000.00
337,000.00
308,000.00
396,000.00
367,000.00
367,000.00
866,000.00
785,000.00
895,000.00

6.
7.
8.
9.
10.

Gate Valve
Gate Valve
Gate Valve
Gate Valve
Gate Valve

8"
12"
2"
3"
6"

1.
2.
3.
4.
5.
6.
7.
8.
9.

X.3.14.5.12.Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC

Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran

1.
2.
3.
4.
5.
6.
7.

X.3.14.5.13.Repair
RepairSocket
SocketPVC
PVC
Repair Socket PVC
2"
Repair Socket PVC
3"
Repair Socket PVC
4"
Repair Socket PVC
6"
Repair Socket PVC
8"
Repair Socket PVC
10"
Repair Socket PVC
12"

Bh
Bh
Bh
Bh
Bh
Bh
Bh

26,000.00
39,000.00
55,000.00
110,000.00
183,000.00
277,000.00
477,000.00

1.
2.
3.
4.

X.3.14.5.14.DOP PVC
DOP PVC
DOP PVC
DOP PVC
DOP PVC

Bh
Bh
Bh
Bh

27,000.00
51,000.00
99,000.00
151,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.

X.3.14.5.15.Long Bend Socket


Long Bend Socket
2" x 11
Long Bend Socket
3" x 11
Long Bend Socket
4" x 11
Long Bend Socket
6" x 11
Long Bend Socket
8" x 11
Long Bend Socket
10" x 11
Long Bend Socket
12" x 11
Long Bend Socket
2" x 22
Long Bend Socket
3" x 22
Long Bend Socket
4" x 22
Long Bend Socket
6" x 22
Long Bend Socket
8" x 22
Long Bend Socket
10" x 22
Long Bend Socket
2" x 45
Long Bend Socket
3" x 45
Long Bend Socket
4" x 45
Long Bend Socket
6" x 45
Long Bend Socket
8" x 45
Long Bend Socket
10" x 45
Long Bend Socket
2" x 90
Long Bend Socket
3" x 90
Long Bend Socket
4" x 90
Long Bend Socket
6" x 90
Long Bend Socket
8" x 90
Long Bend Socket
10" x 22

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

25,000.00
58,000.00
80,000.00
220,000.00
367,000.00
660,000.00
1,079,000.00
29,000.00
55,000.00
88,000.00
256,000.00
440,000.00
756,000.00
29,000.00
66,000.00
110,000.00
305,000.00
521,000.00
954,000.00
36,000.00
80,000.00
146,000.00
359,000.00
748,000.00
1,350,000.00

1.
2.
3.
4.

X.3.14.5.16.Flend
FlendSock
SockPVC
PVC
Flend Sock PVC

Flend Sock PVC

Flend Sock PVC

Flend Sock PVC

Bh
Bh
Bh
Bh

132,000.00
183,000.00
462,000.00
595,000.00

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

2"
3"
4"
6"

2"
3"
6"
8"

63
90
90
110
110
110
160
160
160

x 63
x 90
x 63
x 10
x 90
x 63
x 160
x 110
x 90

x
x
x
x
x
x
x
x
x

63
90
90
110
110
110
160
160
160

mm
mm
mm
mm
mm
mm
mm
mm
mm

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

1.
2.
3.
4.
5.
6.
7.

X.3.14.5.17.Street Elbow
Street Elbow
Street Elbow
Street Elbow
Street Elbow
Street Elbow
Street Elbow
Street Elbow

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"

Bh
Bh
Bh
Bh
Bh
Bh
Bh

9,000.00
23,000.00
23,000.00
33,000.00
39,000.00
59,000.00
125,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

X.3.14.5.18.Plug
Plug
Plug
Plug
Plug
Plug
Plug
Plug
Plug
Plug
Plug
Plug

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

2,000.00
3,000.00
5,000.00
6,000.00
7,000.00
9,000.00
19,000.00
26,000.00
46,000.00
125,000.00
165,000.00

1.
2.
3.
4.
5.

X.3.14.5.19.Red Elbow
Red Elbow
Red Elbow
Red Elbow
Red Elbow
Red Elbow

3/4"
1"
1 1/4"
1 1/2"
2"

Bh
Bh
Bh
Bh
Bh

9,000.00
12,000.00
23,000.00
26,000.00
36,000.00

1.
2.
3.
4.
5.

X.3.14.5.20.Red Nipple
Red Nipple
Red Nipple
Red Nipple
Red Nipple
Red Nipple

3/4"
1"
1 1/4"
1 1/2"
2"

Bh
Bh
Bh
Bh
Bh

6,000.00
9,000.00
13,000.00
29,000.00
36,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

X.3.14.5.21.Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock

3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

4,000.00
5,000.00
8,000.00
10,000.00
16,000.00
36,000.00
46,000.00
99,000.00
178,000.00
244,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

X.3.14.5.22.Red
RedTee
Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee

3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

9,000.00
13,000.00
23,000.00
33,000.00
46,000.00
79,000.00
125,000.00
283,000.00
429,000.00
686,000.00

1.
2.
3.
4.

X.3.14.5.23.Round
RoundFlens
Flens
Round Flens
Round Flens
Round Flens
Round Flens

1/2"
3/4"
1"
1 1/4"

Bh
Bh
Bh
Bh

6,000.00
9,000.00
11,000.00
15,000.00

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No

Nama Barang

Ukuran/Tipe

Sat.

Harga (Rp)

5.
6.
7.
8.
9.
10.
11.

Round Flens
Round Flens
Round Flens
Round Flens
Round Flens
Round Flens
Round Flens

1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh

18,000.00
22,000.00
36,000.00
47,000.00
72,000.00
118,000.00
132,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

X.3.14.5.24.Sock
Sock
Sock
Sock
Sock
Sock
Sock
Sock
Sock
Sock
Sock
Sock

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

2,000.00
3,000.00
5,000.00
7,000.00
9,000.00
13,000.00
26,000.00
46,000.00
66,000.00
165,000.00
257,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

X.3.14.5.25.Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

4,000.00
5,000.00
9,000.00
12,000.00
16,000.00
36,000.00
62,000.00
79,000.00
132,000.00
363,000.00
495,000.00

1.
2.
3.
4.
5.
6.
7.
8.
9.

X.3.14.5.26.Union
Union
Union
Union
Union
Union
Union
Union
Union
Union

1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
6"

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

12,000.00
16,000.00
19,000.00
26,000.00
33,000.00
52,000.00
79,000.00
132,000.00
627,000.00

1.
2.
3.
4.
5.

X.3.14.6. Lem
Lem PVC
Lem PVC
Lem PVC
Seltif TBA
Seltif

Kecil 1/2 Kg
Kecil 1/4 Kg (2 ons)

Klg
Klg
Klg
Bh
Bh

36,000.00
13,000.00
51,000.00
3,000.00
3,000.00

1.
2.
3.
4.
5.

X.3.14.7. Instalasi Air


Bak Pengaman Meter Air
Water Meter
Water Meter
Water Meter
Water Meter

Bh
Bh
Bh
Bh
Bh

95,000.00
244,000.00
7,342,000.00
7,782,000.00
8,076,000.00

1.
2.
3.
4.

X.3.15.
Bulat
Bulat
Bulat
Bulat

Bh
Bh
Bh
Bh

211,200.00
209,100.00
104,600.00
153,600.00

1/2" Linflow
2" PAM
3" PAM
4" PAM

Buish Beton/Gorong-gorong
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

f
f
f
f

100
80
60
50

x
x
x
x

50
50
50
100

cm
cm
cm
cm

No

Nama Barang

5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.

Bulat
Bulat
Bulat
Belahan
Belahan
Belahan
Belahan
Belahan
Belahan
Belahan
Bulat Cor Besi
Bulat Cor Besi
Bulat Cor Besi
Belahan Cor Non Besi
Belahan Cor Non Besi
Belahan Cor Non Besi

1.

X.3.16.
Aspal

1.
2.
3.
4.
5.

X.3.17.
Bahan Bakar
Minyak Bensin/Premium
Minyak Diessel/solar
Minyak Pelumas
Minyak Tanah
Minyak Aspal/Kerosine

Ukuran/Tipe
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja

f
f
f
f
f
f
f
f
f
f
f
f
f
f
f
f

40
30
20
100
80
60
50
40
30
20
60
80
100
60
80
100

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

100
100
100
50
50
50
100
100
100
100
50
50
50
50
50
50

Sat.
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm

Harga (Rp)

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

89,600.00
76,800.00
32,000.00
105,600.00
89,600.00
44,800.00
76,800.00
44,800.00
38,400.00
146,000.00
192,000.00
352,000.00
448,000.00
108,800.00
256,000.00
371,200.00

Kg

12,350.00

Aspal

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Liter
Liter
Liter
Liter
Liter

6,888.00
10,200.00
35,000.00
10,000.00
10,000.00

HARGA BAHAN BANGUNAN


Merk

Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah

Tonasa
Tiga Roda
Bosowa

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Holcim
Gresik
Red Bull

Esab
Esab
Esab

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Untuk Gen
teng Metal

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Kembang
Ef Talite
Ef Talite

Jotun

Paragon
Paragon
Paragon
Paragon
Paragon
Paragon
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Propan
Propan
Propan
Propan
Propan
Propan
ICI Dulux
ICI Dulux
ICI Dulux
Vinilex
Komilex
Mowilex
Catylac

Propan
Propan
Propan
Sika
Sika
Sika
Sika
Sika
Sika

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Sika
Sika
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun

Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Kimek
Kimek
Kimek
Kimek
Kimek
Platon
Platon
Platon
Platon
Platon
Platon
Platon
Platon

Propan
Propan

Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Ftalit

Asahimas
Asahimas
Asahimas
Asahimas
Asahimas
Asahimas
Asahimas
Asahimas
Asahimas

Knauf
Knauf
Knauf
Knauf
Knauf
Knauf
Knauf
Knauf
Knauf

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Alusingen
Alcotex
Alcopla
Alcopla
Alcopla
Alcotex
Tribond

Nitobo
Nitobo

Granito
Granito
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Granito
Granito
Granito
Granito
Granito
Granito
Essenza

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Granito
Granito
Granito
Granito
Granito
Sejati
Sejati
Sejati
Sejati
Sejati
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Granito
Granito
Granito
Granito
Granito

Kia
Kia
Asia
Asia
Ikad
Mulia
Kia
Kia
Kia
Ikad
Kia
Kia
Kia
Kia
Kia
Lacasa
Lacasa
Lacasa
Lacasa
Lacasa
Asia
Asia
Asia
Asia
Asia

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Asia
Asia
Lacasa
Kia
Mulia
Ikad
Kia
Kia
Platinum
Platinum
Platinum
Platinum
Platinum
Platinum
Platinum
Platinum
Mulia
Asia
Milan
Milan
Supermilan
Supermilan
Hercules
Hercules
Hercules
Kia
Kia

Elegance
Oasis
Ona
Ona
Ona
Tamarin

Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Hornitex
(Ex Jerman)
Hornitex
Ipokett
Tarawood
Tarawood

Gracewood
Hornitex
Hornitex
(Ex Jerman)
Hornitex
(Ex Jerman)
Gracewood
Gracewood
Gracewood
Gracewood
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex

Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah

Malang Indah
Malang Indah
Malang Indah
Malang Indah

Maspion

Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah

Kanmuri

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri

Multi Roof
Multi Color
Multi Roof
Multi Color
Multi Roof
Multi Color
Multi Roof
Multi Color
Multi Roof
Multi Color
Multi Roof
Multi Color
Multi Roof
Multi Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Sakura Roof
Sakura Roof
Sakura Roof
Sakura Roof
Sakura Roof
Sakura Roof
Sakura Roof
Sakura Roof
Surya Roof
Surya Color
Surya Roof

Lysaght
Lysaght

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Lysaght
Lysaght
Lysaght
Lysaght
Lysaght
Lysaght
Lysaght
Lysaght
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada

Polyfoil
Polyfoil

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Talenta
Samson

AB Foil
AB Foil

Mortise
Top Union

Alpha
Yale
Fadex
Kend
Kend
Cisa
Kend
Cisa
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Cisa
Kend

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Cisa
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend

Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah

Toto
Toto
Duty
Amstad
Amstad
Amstad
Toto
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad

Toto
Toto
Toto
San Ei
Toto
Amstad
Amstad
Amstad
Amstad

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Amstad

Toto
Toto
Toto
Toto
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad

Amstad
Amstad
Amstad
Amstad

Standart
Top
Royal
Absolute
Royal
Royal
Royal
Royal
Royal

Butterfly KV
Butterfly KV
Butterfly KV

Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Wavin
Wavin

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin

Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon

Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon

Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon

Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Spindo

Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo

Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo

Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo

Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo

Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
Wavin
Wavin
Wavin
Wavin

10 K
10 K
10 K
10 K
10 K
10 K
10 K
10 K
10 K
10 K
10 K
10 K

Kitz
Kitz
Kitz
Kitz
Kitz

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
HE
HE
Blark Box
Blark Box
Blark Box

Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering

Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering

Rubbering
Rubbering
Rubbering
Rubbering

Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR

SII RR
SII RR
SII RR
SII RR

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Malang Indah
Malang Indah
Malang Indah
Malang Indah

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah

Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

UPAH TENAGA KERJA


NO

1
2
3
4
5
6
7
8

Uraian

Buruh Tidak Terampil


Buruh Terampil/Pekerja
Tukang Kayu
Tukang Batu
Tukang Besi
Tukang Cat
Kepala Tukang
Mandor

Upah Kerja (Rp.)

60,000.00
75,000.00
80,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00

Keterangan

1 hari = 7 jam kerja


1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja
1 hari = 7 jam kerja

UPAH TENAGA KERJA


Keterangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
1.) Pembesian balok Sloof ( 25/40 )
Panjang
Jumlah
bentang 25/40
balok
(m)
3.5
m
22

Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join Tekukan
Tulangan
Tulangan
Panjang besi
40 d
4.78

10

D 16

1,051.60 m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
87.63

btg 1659.68

Total berat = 1660


Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
2.) Pembesian balok Sloof ( 16/16 )
Panjang
bentangan
3.5
1.9

Jumlah
balok
m
m

1
1

Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join Tekukan
Tulangan
Tulangan
Panjang besi
40 d
4.46
2.86

m
m

4
4

12
13

17.84
11.44

m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
1.49
0.95

btg
btg

15.84
11.92

Total berat = 27.76


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
3.) Pembesian kolom (25/25) lantai 1
Jumlah
kolom

Tinggi Kolom

3.5

15

Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join/Tekukan
Tulangan
Tulangan
Panjang besi
40 d
4.26

D 19

511.20

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
42.60

btg 1137.71

Total berat = 1137.71


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
4.) Pembesian kolom (25/25) lantai 2
Jumlah
kolom

Tinggi Kolom

15

Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join/Tekukan
Tulangan
Tulangan
Panjang besi
40 d
3.76

D 19

451.20

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
37.60

btg 1004.17

Total berat = 1004.17


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
5.) Pembesian kolom (25/25) lantai 3
Panjang
Jumlah
Tulangan +
Tinggi Kolom
kolom Join/Tekukan
40 d
3

3.76

Jumlah Diameter Besi


Jumlah
Tulangan
Tulangan
Panjang besi
m

D 19

270.72

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
22.56

btg

602.50

Total berat = 602.50


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
6.) Pembesian kolom (15/25) lantai 2
Jumlah
kolom

Tinggi Kolom

Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join/Tekukan
Tulangan
Tulangan
Panjang besi
40 d
3.76

D 19

45.12

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
3.76

btg

100.42

Total berat = 100.42


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
7.) Pembesian kolom (15/25) lantai 3 (pagar)
Jumlah
kolom

Tinggi Kolom

1.5

Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join/Tekukan
Tulangan
Tulangan
Panjang besi
40 d
1.5

D 19

45.00

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
3.75

btg

100.15

Total berat = 100.15


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
8.) Pembesian kolom (15/15) lantai 1
Jumlah Panjang Tulangan Jumlah Diameter Besi
Jumlah
+ Join/Tekukan Tulangan
Tulangan
Panjang besi
kolom

Tinggi Kolom

3.5

3.98

12

111.44

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
9.29

btg

98.93

Total berat = 98.93


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
9.) Pembesian kolom (15/15) lantai 2
Jumlah Panjang Tulangan Jumlah Diameter Besi
Jumlah
+ Join/Tekukan Tulangan
Tulangan
Panjang besi
kolom

Tinggi Kolom

12

3.48

12

167.04

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
13.92

btg

148.29

Total berat = 148.29


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
10.) Pembesian kolom (15/15) lantai 3
Jumlah Panjang Tulangan Jumlah Diameter Besi
Jumlah
+ Join/Tekukan Tulangan
Tulangan
Panjang besi
kolom

Tinggi Kolom

3.48

12

125.28

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
10.44

btg

111.22

Total berat = 111.22


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
11.) Pembesian balok (25 x 30) bentangan 3,5 m lantai 2
Panjang Tulangan

3.5
0.875
1.75

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
10
10
10

4.26
1.635
2.51

m
m
m

6
2
1

D 19
D 19
D 19

255.60
32.70
25.10

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
21.30
2.73
2.09

btg
btg
btg

568.85
72.78
55.86

Total berat = 697.49


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
12.) Pembesian balok (25 x 30) bentangan 3,5 m lantai 3
Panjang Tulangan

3.5
0.875
1.75

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
10
10
10

4.26
1.635
2.51

m
m
m

6
2
1

D 19
D 19
D 19

255.60
32.70
25.10

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
21.30
2.73
2.09

btg
btg
btg

568.85
72.78
55.86

Total berat = 697.49


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
13.) Pembesian balok (25 x 30) bentangan 3,5 m Atap Dag
Panjang Tulangan

3.5
0.875
1.75

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
6
6
6

4.26
1.635
2.51

m
m
m

6
2
1

D 19
D 19
D 19

153.36
19.62
15.06

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
12.78
1.64
1.26

btg
btg
btg

341.31
43.67
33.52

Total berat = 418.50


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
14.) Pembesian balok (25 x 30) bentangan 4m lantai 2
Panjang Tulangan

4
1
2

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
24
24
24

4.76
1.76
2.76

m
m
m

6
2
1

D 19
D 19
D 19

685.44
84.48
66.24

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
57.12
7.04
5.52

btg 1525.49
btg 188.02
btg 147.42

Total berat = 1860.93


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
15.) Pembesian balok (25 x 30) bentangan 4m lantai 3
Panjang Tulangan

4
1
2

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
24
24
24

4.76
1.76
2.76

m
m
m

6
2
1

D 19
D 19
D 19

685.44
84.48
66.24

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
57.12
7.04
5.52

btg 1525.49
btg 188.02
btg 147.42

Total berat = 1860.93


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
16.) Pembesian balok (25 x 30) bentangan 4m atap dag
Panjang Tulangan

4
1
2

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
6
6
6

4.76
1.76
2.76

m
m
m

6
2
1

D 19
D 19
D 19

171.36
21.12
16.56

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
14.28
1.76
1.38

btg
btg
btg

381.37
47.00
36.86

Total berat = 465.23


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
17.) Pembesian balok (20 x 20) bentangan 3,5 m lantai 2
Panjang Tulangan

3.5
0.875
1.75

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
9
9
9

4.14
1.515
2.39

m
m
m

6
2
1

D 16
D 16
D 16

223.56
27.27
21.51

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
18.63
2.27
1.79

btg
btg
btg

352.83
43.04
33.95

Total berat = 429.82


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
18.) Pembesian balok (20 x 20) bentangan 3,5 m lantai 3
Panjang Tulangan

3.5
0.875
1.75

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
4
4
4

4.14
1.515
2.39

m
m
m

6
2
1

D 16
D 16
D 16

99.36
12.12
9.56

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
8.28
1.01
0.80

btg
btg
btg

156.81
19.13
15.09

Total berat = 191.03


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
19.) Pembesian balok (20 x 20) bentangan 3,5 m atap dag
Panjang Tulangan

3.5
0.875
1.75

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
2
2
2

4.14
1.515
2.39

m
m
m

6
2
1

D 16
D 16
D 16

49.68
6.06
4.78

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
4.14
0.51
0.40

btg
btg
btg

78.41
9.56
7.54

Total berat = 95.52


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
20.) Pembesian balok (20 x 20) bentangan 2 m lantai 2
Panjang Tulangan

2
0.5
1

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
1
1
1

2.64
1.14
1.64

m
m
m

6
2
1

D 16
D 16
D 16

15.84
2.28
1.64

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
1.32
0.19
0.14

btg
btg
btg

25.00
3.60
2.59

Total berat = 31.19


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
21.) Pembesian balok (20 x 20) bentangan 2 m lantai 3
Panjang Tulangan

2
0.5
1

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
1
1
1

2.64
1.14
1.64

m
m
m

6
2
1

D 16
D 16
D 16

15.84
2.28
1.64

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
1.32
0.19
0.14

btg
btg
btg

25.00
3.60
2.59

Total berat = 31.19


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
22.) Pembesian balok (20 x 20) bentangan 1,5 m lantai 2 dan 3
Panjang Tulangan

1.5
0.375
0.75

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
2
2
2

2.14
1.015
1.39

m
m
m

6
2
1

D 16
D 16
D 16

25.68
4.06
2.78

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
2.14
0.34
0.23

btg
btg
btg

40.53
6.41
4.39

Total berat = 51.32


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
23.) Pembesian balok (20 x 20) bentangan 1 m lantai 2 dan 3
Panjang Tulangan

1
0.25
0.5

m
m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
8
8
8

1.64
0.89
1.14

m
m
m

6
2
1

D 16
D 16
D 16

78.72
14.24
9.12

m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
6.56
1.19
0.76

btg
btg
btg

124.24
22.47
14.39

Total berat = 161.11


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

ket

Tumpuan
Lapangan

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
24.) Pembesian balok latei (12 x 12 ) dan konsol kantiliver
Panjang Tulangan

1
0.7

m
m

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
1
1

1
0.7

m
m

7
7

10
10

7.00
4.90

m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
0.58
0.41

btg
btg

4.32
3.02

Total berat = 7.34


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
25.) Pembesian balok (20 x 20) bentangan 0,78 m lantai 2 dan 3
Panjang Tulangan

0.78

Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
5

1.42

D 16

49.70

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
4.14

btg

78.44

Total berat = 78.44


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg

kg

ket

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
26.) Pembesian plat lantai 2
Tulangan
Panjang Tulangan Jumlah Diameter Besi
Jumlah
Panjang Tulangan atas dan
+ Join
Tulangan
Tulangan
Panjang besi
bawah
3.5
16.5
12.5
7

m
m
m
m

2
2
2
2

3.9
16.9
12.9
7.4

m
m
m
m

18
18
18
60

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

10
10
10
10

136.50
591.50
451.50
888.00

m
m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
11.38
49.29
37.63
74.00

btg
btg
btg
btg

84.15
364.66
278.35
547.45

kg
kg
kg
kg

Total berat = 1274.61

kg

ket

lebar 3,5 m
lebar 3,5 m
lebar 3,5 m
lebar 12 m

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
27.) Pembesian plat lantai 3
Tulangan
Panjang Tulangan Jumlah Diameter Besi
Jumlah
Panjang Tulangan atas dan
+ Join
Tulangan
Tulangan
Panjang besi
bawah
3.5
7
16.5
12.5
11.5

m
m
m
m
m

2
2
2
2
2

3.9
7.4
16.9
12.9
11.9

m
m
m
m
m

18
60
10
18
17

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

10
10
10
10
10

136.50
888.00
329.55
451.50
404.60

m
m
m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
11.38
btg 84.15
74.00
btg 547.45
27.46
btg 203.17
37.63
btg 278.35
33.72
btg 249.44
Total berat = 1362.56

kg
kg
kg
kg
kg
kg

ket

lebar 3,5 m
lebar 12 m
lebar 1,9 m
lebar 1,9 m
lebar 3,4 m

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
28.) Pembesian plat atap dag
Tulangan
Panjang Tulangan Jumlah Diameter Besi
Jumlah
Panjang Tulangan atas dan
+ Join
Tulangan
Tulangan
Panjang besi
bawah
8.6
7

m
m

2
2

9
7.4

m
m

35
43

10
10

630.00
636.40

m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
52.50
53.03

btg
btg

388.40
392.34

Total berat = 780.74


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg

kg

ket

lebar 7 m
lebar 8,6 m

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
29.) Pembesian plat bordes (2)
Tulangan
Panjang Tulangan Jumlah Diameter Besi
Jumlah
Panjang Tulangan atas dan
+ Join
Tulangan
Tulangan
Panjang besi
bawah
1.7
3

m
m

2
2

2.1
3.4

m
m

15
9

12
16

63.00
57.80

m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
5.25
4.82

btg
btg

55.93
91.22

Total berat = 294.30


Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

kg
kg

kg

ket

lebar 3 m
lebar 1,7 m

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
30.) Pembesian tangga dari lantai 1 ke lantai 2 dan lantai 2 ke lantai 3
Jumlah
jumlah
Panjang Tulangan Tulangan/ Diameter Besi
Jumlah
Panjang Tulangan tangga
+ Join
anak
Tulangan
Panjang besi
/plat
tangga
0.93
0.93
3.1
3.1
1.4
1.4

m
m
m
m
m
m

16
16
2
2
16
16

0.93
0.93
3.5
3.5
4.2
4.2

m
m
m
m
m
m

9
9
11
11
1
1

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

8
8
12
12
8
8

138.88
138.88
78.40
78.40
67.20
67.20

m
m
m
m
m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
11.57
btg 109.59
11.57
btg 109.59
6.53
btg 139.20
6.53
btg 139.20
5.60
btg 53.03
5.60
btg 53.03
Total berat = 603.65

ket

lebar 1,4 m
kg
kg
lebar 1,4 m
kg
lebar 1,4 m
kg
lebar 1,4 m
kg lebar 1,4 x 3 m
kg lebar 1,4 x 3 m
kg

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
31.) Pembesian begel sloof ( 25/40 ) dan (16/16)
Panjang Tulangan
Begel
1.2
0.44

m
m

Jumlah
Begel
(buah)
440
36

Jumlah
Panjang Tulangan Panjang Diameter Besi
Jumlah
+ Tekukan 4 d
Balok
Tulangan
Panjang besi
(m)
1.36
0.6

m
m

66
5.4

10
10

598.40
21.60

m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
49.87
1.80

btg
btg

368.91
13.32

Total berat = 382


Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

kg
kg

kg

Ket.

25/40
16/16

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
32.) Pembesian begel kolom ( 25/25 ) dan (15/15) lantai 1
Jumlah
Jumlah
Panjang Tulangan
Panjang Tulangan Tinggi Diameter Besi
Jumlah
Begel
Begel
+ Tekukan 4 d
kolom
Tulangan
Panjang besi
(buah)
(m)
0.76
0.4

m
m

350
163

0.92
0.56

m
m

52.5
24.5

10
10

322.00
91.47

m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
26.83
7.62

btg
btg

198.51
56.39

Total berat = 255


Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

kg
kg

kg

Ket.

25/25
15/15

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
33) Pembesian begel kolom ( 25/25 ) dan (15/15) lantai 2
Jumlah
Jumlah
Panjang Tulangan
Panjang Tulangan Tinggi
Begel
Begel
+ Tekukan 4 d
kolom
(buah)
(m)
0.76
0.4

m
m

280
80

0.92
0.56

m
m

42
12

Diameter Besi
Jumlah
Tulangan
Panjang besi
10
10

257.60
44.80

m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
21.47
3.73

btg
btg

158.81
27.62

Total berat = 186


Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

kg
kg

kg

Ket.

25/25
15/15

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
34.) Pembesian begel kolom ( 25/25 ) dan (15/15) lantai 3
Jumlah
Jumlah
Panjang Tulangan
Panjang Tulangan Tinggi Diameter Besi
Jumlah
Begel
Begel
+ Tekukan 4 d
kolom
Tulangan
Panjang besi
(buah)
(m)
0.76
0.4

m
m

180
40

0.92
0.56

m
m

27
6

10
10

165.60
22.40

m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
13.80
1.87

btg
btg

102.09
13.81

Total berat = 116


Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

kg
kg

kg

Ket.

25/25
15/15

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
35.) Pembesian begel kolom ( 25/15 ) lantai 2 dan 3
Jumlah
Jumlah
Panjang Tulangan
Panjang Tulangan Tinggi
Begel
Begel
+ Tekukan 4 d
kolom
(buah)
(m)
0.62
0.62

m
m

40
50

0.78
0.78

m
m

6
7.5

Diameter Besi
Jumlah
Tulangan
Panjang besi
10
10

31.20
39.00

m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
2.60
3.25

btg
btg

19.23
24.04

Total berat = 43
Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

kg
kg

kg

Ket.

lt1
lt2

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
36.) Pembesian begel balok bordes ( 30/20 ) dari lantai 1 ke lantai 2 dan dari lantai 2 ke lantai 3
Panjang Tulangan
Begel
0.62
0.62

m
m

Jumlah
Begel
(buah)
60
60

Panjang Tulangan
+ Tekukan 4 d
0.78
0.78

m
m

Jumlah
Diameter Besi
Jumlah
panjang
Tulangan
Panjang besi
balok (m)
9
9

10
10

46.80
46.80

m
m

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
3.90
3.90

btg
btg

28.85
28.85

Total berat = 58
Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

kg
kg

kg

Ket.

lt1
lt2

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI


IV PEKERJAAN PEMBESIAN
37.) Pembesian pondasi footplat
Panjang Tulangan

2.7
2.59
1.01

m
m
m

Jumlah
Begel
(buah)
7

Jumlah
Panjang Tulangan panjang Diameter Besi
+ Tekukan
tulangan
Tulangan
(m)
2.86
2.59
0.92

m
m
m

18
8
93

D 16
D 19
10

Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)

Jumlah
Pondasi
15
15
15

bh
bh
bh

22.50
10.00
7.74

btg
btg
btg

426.12
33.38
57.29

Total berat = 517


Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

kg
kg
kg

kg

Ket.

telapak
tul.kolom
begel

4.16 Menentukan Durasi Perkiraan Pekerjaan


MENENTUKAN HARI PERKIRAAN PEKERJAAN
PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DI JALAN MARSMA ISWAHYUDI BALIKPAPAN
TAHUN
: 2012

No.

Uraian Pekerjaan

Volume

Harga
Satuan

( Rp)
5

1
I
1
2
3
4
5

2
PEKERJAAN PENDAHULUAN
Pembersihan lokasi pekerjaan
Membuat Gudang Kerja
Penyediaan Air Kerja
Penyediaan Listrik
Pengukuran dan pemasangan bouplank

II
1
2
3
4
5

PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGAN


Galian pondasi foot plat
42.63
27,400.00
Menguruk kembali bekas galian pondasi
32.55
13,135.00
Urugan pasir bawah pondasi
1.47
108,850.00
Pekerjaan pancang ulin 10 x 10 - 4 m
75.00
276,100.00
Urugan tanah menambah elevasi lantai
14.2
69,850.00

III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

PEKERJAAN BETON
Pondasi footplat
Cor Sloof 25/40
Cor Sloof 16/16
Kolom 25/25 lantai 1
Kolom 25/25 lantai 2
Kolom 25/25 lantai 3
Kolom 15/25 lantai 2
Kolom 15/25 lantai 3
Kolom 15/15 lantai 1
Kolom 15/15 lantai 2
Kolom 15/15 lantai 3
Balok 25/30 lantai 2
Balok 25/30 lantai 3
Balok 25/30 atap dag
Balok 20/20 lantai 2
Balok 20/20 lantai 3
Balok 20/20 atap dag
Tangga Beton lt 1 ke lt 2
Tangga Beton lt 2 ke lt 3
Balok bordes 20/30
Rabat beton
Plat lantai 2
Plat lantai 3
Plat atap dag
Beton duc bawah kusen
Balok latei atas kusen
Konsol kantiliver

IV
1
2
3
4
5
6
7
8
9
10

PEKERJAAN PEMBESIAN
Pek. Pembesian Balok Sloof 25/40
Pek. Pembesian Balok Sloof 16/16
Pek. Pembesian kolom 25/25
Pek. Pembesian kolom 15/25
Pek. Pembesian kolom 15/15
Pek. Pembesian balok 25/30
Pek. Pembesian balok 20/20
Pek. Pembesian balok 12/12 balok latei
Pek. Pembesian plat lantai 2
Pek. Pembesian plat lantai 3

Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton 1:3:5
Beton K225
Beton K225
Beton K225
Beton 1:3:5
Beton K225
Beton 1:3:5

367.50
12.00
1.00
1.00
53.00

10,250.00
1,135,250.00
1,000,000.00
1,000,000.00
82,125.00

Koefisien Pekerja
Pekerja

Tukang

8
0.1
1

0.1

0.10

0.4
0.192
0.735
0.1

0.25

Koefisien
Pekerja +
tukang

Jumlah
Pekerja

Tenaga
tersedia

Rencana hari

10

11

12

0.1
3
0
0
0.2

36.75
9
36
9
0
9
0
9
10.6
9
Hari Perkiraan

4.08
4.00
0.00
0.00
1.18
9

0.4
0.192
0.735
0.35
0

17.052
9
6.2496
9
1.08045
9
26.25
9
0
9
Hari Perkiraan

1.89
0.69
0.12
2.92
0.00
6

35.625
9
12.54
9
0.266
9
5.833
9
4.807
9
2.888
9
0.38
9
0.475
9
0.988
9
1.387
9
0.684
9
9.405
9
9.405
9
6.422
9
2.622
9
1.292
9
0.532
9
6.118
9
5.415
9
1.976
9
21.356
9
18.487
9
19.247
9
9.804
9
0.0228
9
0.019
9
0.095
9
Hari Perkiraan

3.96
1.39
0.03
0.65
0.53
0.32
0.04
0.05
0.11
0.15
0.08
1.05
1.05
0.71
0.29
0.14
0.06
0.68
0.60
0.22
2.37
2.05
2.14
1.09
0.00
0.00
0.01
20

18.75
6.60
0.14
3.07
2.53
1.52
0.20
0.25
0.52
0.73
0.36
4.95
4.95
3.38
1.38
0.68
0.28
3.22
2.85
1.04
11.24
9.73
10.13
5.16
0.012
0.01
0.05

1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
970,472.00
1,374,948.50
970,472.00
1,374,948.50
970,472.00
1,374,948.50
970,472.00

1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9

1,659.68
27.76
2,744.39
200.57
358.44
6,000.57
1,069.60
7.34
1,274.61
1,362.56

11,606.00
11,606.00
11,606.00
11,606.00
11,606.00
11,606.00
11,606.00
10,871.00
10,871.00
10,871.00

0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007

0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007

0.014
0.014
0.014
0.014
0.014
0.014
0.014
0.014
0.014
0.014

23.235481
0.3885952
38.421442
2.8079508
5.0181877
84.007957
14.974467
0.1027089
17.844593
19.075805

9
9
9
9
9
9
9
9
9
9

2.58
0.04
4.27
0.31
0.56
9.33
1.66
0.01
1.98
2.12

MENENTUKAN HARI PERKIRAAN PEKERJAAN


PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DI JALAN MARSMA ISWAHYUDI BALIKPAPAN
TAHUN
: 2012
11
No.
12
13
14
15
16
17
18
19
20

Pek. Pembesian plat atap dag


Uraian
Pekerjaan
Pek. Pembesian plat
bordes
Pek. Pembesian tangga
Pek. Pembesian begel sloof 25/40 dan 16/16
Pek. Pembesian begel kolom 25/25 dan 15/15
Pek. Pembesian begel kolom 25/15
Pek. Pembesian begel balok bordes
Pek. Pembesian pondasi foot plat
Pagar balkon dan pagar lantai 2
Pekerjaan Railing Tangga

780.74
Volume
294.30
897.95
382.23
557.23
43.28
57.70
516.79
24.88
21.70

V
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

PEKERJAAN BEKISTING
Pek. Pemasangan bekisting Foot plat
Pek. Pemasangan bekisting Sloof 25/40
Pek. Pemasangan bekisting Sloof 16/16
Pek. Pemasangan bekisting Kolom 25/25 lantai 1
Pek. Pemasangan bekisting Kolom 25/25 lantai 2
Pek. Pemasangan bekisting Kolom 25/25 lantai 3
Pek. Pemasangan bekisting Kolom 15/25 lantai 2
Pek. Pemasangan bekisting Kolom 15/25 lantai 3
Pek. Pemasangan bekisting Kolom 15/15 lantai 1
Pek. Pemasangan bekisting Kolom 15/15 lantai 2
Pek. Pemasangan bekisting Kolom 15/15 lantai 3
Pek. Pemasangan bekisting Kolom 25/25 diatas Foot
plat
Pek. Pemasangan bekisting Balok 25/30 lantai 2
Pek. Pemasangan bekisting Balok 25/30 lantai 3
Pek. Pemasangan bekisting Balok 25/30 atap dag
Pek. Pemasangan bekisting Balok 20/20 lantai 2
Pek. Pemasangan bekisting Balok 20/20 lantai 3
Pek. Pemasangan bekisting Balok 20/20 atap dag
Pek. Pemasangan bekisting Tangga dari lt.1 ke lt.2
Pek. Pemasangan bekisting Tangga dari lt.2 ke lt.3
Pek. Pemasangan bekisting Balok Bordes 20/30
Pek. Pemasangan bekisting Balok latei 12/12
Pek. Pemasangan bekisting Konsol Kantiliver
Pek. Pemasangan bekisting Plat lantai 2
Pek. Pemasangan bekisting Plat lantai 3
Pek. Pemasangan bekisting Plat atap dag

VI
1
2
3
4
5
6
7
8
9
10

PEKERJAAN DINDING
Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 1
Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 2 dan 3
Pek. Pasangan bata 1 : 4 lantai 1
Pek. Pasangan bata 1 : 4 lantai 2
Pek. Pasangan bata 1 : 4 lantai 3
Pek. Pasangan bata 1:4 balkon lt 2 dan pagar lt 3
Pek. Plesteran 1 : 2
Pek. Plesteran 1 : 4 lantai 1
Pek. Plesteran 1 : 4 lantai 2
Pek. Plesteran 1 : 4 lantai 3

VII
1
2
3
4
5
6
7

PEKERJAAN LANTAI
Pemasangan Keramik 40 x 40 lantai 1
Pemasangan Keramik 30/30 teras
Pas.Keramik 20 x 20 kamar mandi lantai 1
Pas. Keramik dinding kamar mandi 20 x 30 lantai 1
Pemasangan Keramik 40 x 40 lantai 2
Pemasangan Keramik 30 x 30 balkon lantai 2
Pas.Keramik 20 x 20 kamar mandi lantai 2

10,871.00
11,606.00
10,871.00
10,871.00
10,871.00
10,871.00
10,871.00
11,606.00
955,000.00
955,000.00

Koefisien
0.007 Pekerja0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007

Koefisien
0.014 10.930298
Jumlah
Pekerja
+
0.014
4.1202323
Pekerja
tukang
0.014 12.571266
0.014
5.35122
0.014 7.8012732
0.014 0.6058962
0.014 0.8078616
0.014 7.2351084

9
1.21
Tenaga
Rencana0.46
hari
tersedia 9
9
1.40
9
0.59
9
0.87
9
0.07
9
0.09
9
0.80

Hari Perkiraan

28

22.32
52.80
1.79
49.05
40.50
24.30
4.32
10.80
13.73
23.55
11.78

190,115.00
207,615.00
207,615.00
427,780.00
427,780.00
427,780.00
427,780.00
427,780.00
427,780.00
427,780.00
427,780.00

0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

0.26
0.26
0.26
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33

0.56
0.56
0.56
0.63
0.63
0.63
0.63
0.63
0.63
0.63
0.63

12.4992
29.568
1.0024
30.9015
25.515
15.309
2.7216
6.804
8.6499
14.8365
7.4214

9
9
9
9
9
9
9
9
9
9
9

1.39
3.29
0.11
3.43
2.84
1.70
0.30
0.76
0.96
1.65
0.82

9.15
50.82
50.82
34.65
13.81
6.80
2.80
31.64
25.36
9.46
0.17
0.70
81.05
84.32
51.51

427,780.00
439,480.00
439,480.00
439,480.00
439,480.00
439,480.00
439,480.00
391,300.00
391,300.00
439,480.00
439,480.00
439,480.00
706,300.00
706,300.00
706,300.00

0.3
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32

0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33

0.63
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65

5.7645
9
33.033
9
33.033
9
22.5225
9
8.9765
9
4.42
9
1.82
9
20.566
9
16.484
9
6.149
9
0.1105
9
0.455
9
52.6825
9
54.808
9
33.4815
9
Hari Perkiraan

0.64
3.67
3.67
2.50
1.00
0.49
0.20
2.29
1.83
0.68
0.01
0.05
5.85
6.09
3.72
50

0.46
3.95
14.03
15.38
11.00
1.00
88.30
280.62
307.60
307.60

1,380,125.00
1,380,125.00
1,269,855.00
1,269,855.00
1,269,855.00
1,269,855.00
43,827.00
39,220.00
39,220.00
39,220.00

6
6
6
6
6
6
0.2
0.2
0.2
0.2

2
2
2
2
2
2
0.15
0.15
0.15
0.15

8
8
8
8
8
8
0.35
0.35
0.35
0.35

3.688
9
31.632
9
112.248
9
123.04
9
88.024
9
7.992
9
30.905
9
98.217
9
107.66
9
107.66
9
Hari Perkiraan

0.41
3.51
12.47
13.67
9.78
0.89
3.43
10.91
11.96
11.96
79

87.50
7.00
7.00
20.45
91.50
3.20
3.00

183,053.00
183,053.00
165,453.00
165,453.00
183,053.00
183,053.00
165,453.00

0.62
0.62
0.62
0.62
0.62
0.62
0.62

0.35
0.35
0.35
0.35
0.35
0.35
0.35

0.97
0.97
0.97
0.97
0.97
0.97
0.97

84.875
6.79
6.79
19.8365
88.755
3.104
2.91

9
9
9
9
9
9
9

9.43
0.75
0.75
2.20
9.86
0.34
0.32

MENENTUKAN HARI PERKIRAAN PEKERJAAN


PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DI JALAN MARSMA ISWAHYUDI BALIKPAPAN
TAHUN
: 2012
8
No.
9
10
11
12
13

Pas. Keramik dinding kamar mandi 20 x 30 lantai 2


14.02
Uraian
Volume
Pemasangan Keramik
40Pekerjaan
x 40 lantai 3
39.00
Pas.Keramik 20 x 20 kamar mandi lantai 3
3.00
Pas. Keramik dinding kamar mandi 20 x 30 lantai 3
14.20
Pemasangan Keramik 25 x 25 tangga lantai 1 ke lantai 2
16.30
Pemasangan Keramik 25 x 25 tangga lantai 2 ke lantai 3
15.80

165,453.00
183,053.00
165,453.00
165,453.00
183,053.00
183,053.00

VIII
1
2

PEKERJAAN LANGIT-LANGIT / PLAFOND


Pas. Rangka plafond
Plafond Gypsum

273.15
273.15

157,687.50
157,687.50

IX
1
2
3
4
5
6
7
8

PEK. KUSEN, DAUN PINTU DAN JENDELA


Kusen pintu kayu bangkirai
Kusen jendela kayu bangkirai
Daun pintu panel kayu bangkirai
Rangka ventilasi kayu bengkirai
Rangka roster kayu bengkirai
Daun jendela kaca rangka kayu bangkirai
Pintu harmonika
Pasangan kaca mati bening 5 mm

0.43
0.09
18.48
0.07
0.09
6.51
15.80
1.60

10,565,500.00
10,565,500.00
566,750.00
10,565,500.00
10,565,500.00
566,750.00
700,000.00
162,813.75

X
1
2
3
4
5
6
7
8
9

PEKERJAAN INSTALASI LISTRIK


Pasang instalasi titik lampu
Pasang instalasi stop kontak
Pasang box MCB
Saklar tunggal setara Broco
Saklar ganda setara Broco
Stop kontak setara Broco
Box Panel 300 x 400 x 200 mm/Legrand + Accessories
Lampu Jari (TL) 15 Watt Phillips
Lampu Neon (TL) 30 Watt Phillips

XI
1
2
3
4
5
6
7
8
9

PEKERJAAN SANITAIR DAN INSTALASI AIR


Instalasi Pipa 4"
Instalasi Pipa 3"
Instalasi Pipa 1/2"
Bak Kontrol
Kran
Floor Drain
Pasang Closed Jongkok
kitchen zink
Biofil 2 x 1 x 1,5

XII
1
2
3
4
5
6
7
8
9
10
11
12

PEKERJAAN PENGECATAN

XIII
1
2

PEKERJAAN PENGGANTUNG DAN PENGUNCI


Pasang kunci pintu utama
Pasang kunci pintu

Cat dinding Lantai 1


Cat dinding Lantai 2
Cat dinding Lantai 3
Cat plafond
Cat kusen pintu KPJ1 dengan cat minyak
Cat kusen pintu KP1 dengan cat minyak
Cat kusen pintu KP2 dengan cat minyak
Cat kusen pintu KJ1 dengan cat minyak
Cat Ranga V1 dengan cat minyak
Cat Ranga V2 dengan cat minyak
Cat Ranga R1 dengan cat minyak
Cat Ranga R2 dengan cat minyak

50
15
2
6
10
15
2
25
25

17.75
39.16
44.90
1.00
9.00
4.00
4.00
1.00
1.00

Koefisien
0.62 Pekerja
0.62
0.62
0.62
0.62
0.62

0.35
0.35
0.35
0.35
0.35
0.35

Koefisien
0.97
Pekerja0.97
+
tukang
0.97

0.31
0.31

0.47
0.47

0.78
0.78

6
6
1
6
6
1

20
20
2.5
20
20
2.5

26
26
3.5
26
26
3.5

0.97
0.97
0.97

13.5994
9
1.51
Jumlah
Tenaga
hari
37.83 tersedia 9 Rencana4.20
Pekerja
2.91
9
0.32
13.774
9
1.53
15.811
9
1.76
15.326
9
1.70
Hari Perkiraan
35
213.057
9
213.057
9
Hari Perkiraan
11.128
2.21
64.68
1.794
2.34
22.785

23.67
23.67
47

9
9
9
9
9
9

1.24
0.25
7.19
0.20
0.26
2.53

Hari Perkiraan

12

Hari Perkiraan

109,146.00
109,146.00
188,900.00
25,000.00
25,000.00
25,300.00
173,000.00
24,500.00
95,000.00

27,550.00
24,500.00
17,728.00
463,556.60
235,000.00
12,000.00
150,000.00
320,000.00
13,600,000.00

561.24
615.20
22.01
273.15
12.42
13.25
22.21
5.12
1.08
0.91
1.05
1.17

31,859.50
31,859.50
31,859.50
31,859.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50

2
8

187,000.00
98,000.00

0.036
0.036
0.036
1.42

0.02
0.02
0.02
0.02
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07

0.0018
0.0018
0.0018
0.473

0.063
0.063
0.063
0.063
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009

0.0378
0.0378
0.0378
1.893

0.083
0.083
0.083
0.083
0.079
0.079
0.079
0.079
0.079
0.079
0.079
0.079

0.67095
1.480248
1.69722
1.893

9
9
9
9

0.07
0.16
0.19
0.21

Hari Perkiraan

0.64
6.00

46.58292
9
51.0616
9
1.826498
9
22.67145
9
0.98118
9
1.04675
9
1.75459
9
0.40448
9
0.08532
9
0.07189
9
0.08295
9
0.09243
9
Hari Perkiraan

5.18
5.67
0.20
2.52
0.11
0.12
0.19
0.04
0.01
0.01
0.01
0.01
14

MENENTUKAN HARI PERKIRAAN PEKERJAAN


PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DI JALAN MARSMA ISWAHYUDI BALIKPAPAN
TAHUN
: 2012
3
No.
4
5
6
7
8
9

Pas. Engsel pintu 4"


Pekerjaan
Pas. Grendel pintuUraian
(panjang)
Pas. Grendel jendela
Pas Grendel pintu (kecil)
Pas. Engsel jendela
Hak Angin standard
Pas. Handel Jendela

XIV
1
2

PEKERJAAN LAIN-LAIN
Pembersihan lokasi pekerjaan
Quality Control

Volume

68
2
7
8
12
14
7

1.00
1.00

42,000.00
9,500.00
6,500.00
6,500.00
36,000.00
14,000.00
7,000.00

Koefisien Pekerja

Koefisien
Pekerja +
tukang

Jumlah
Pekerja

Tenaga
tersedia

Rencana hari

Hari Perkiraan

Hari Perkiraan

1,000,000.00
1,000,000.00

Anda mungkin juga menyukai