15 REKAPITULASI RAB
REKAPITULASI
KEGIATAN : PEMBANGUNAN RUKO
PEKERJAAN : RENCANA PEMBANGUNAN RUKO 3 LANTAI DI JL. MARSMA R. ISWAHYUDI BALIKPAPAN
TAHUN
: 2012
NO
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
X1V
URAIAN PEKERJAAN
PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGAN
PEKERJAAN BETON
PEKERJAAN PEMBESIAN
PEKERJAAN BEKISTING
PEKERJAAN DINDING
PEKERJAAN LANTAI
PEKERJAAN LANGIT-LANGIT / PLAFOND
PEK. KUSEN, DAUN PINTU DAN JENDELA
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN SANITAIR DAN INSTALASI AIR
PEKERJAAN PENGECATAN
PEKERJAAN PENGGANTUNG DAN PENGUNCI
PEKERJAAN LAIN-LAIN
23,742,500.00
23,454,985.75
120,207,932.45
252,185,610.39
345,860,158.45
97,685,741.49
57,852,182.41
86,144,681.25
32,583,600.50
11,585,290.00
19,390,976.30
48,794,697.69
4,807,500.00
2,000,000.00
Rp1,126,295,856.69
Rp112,629,585.67
Rp56,314,792.83
Rp112,629,585.67
Rp1,407,869,820.86
Rp1,407,870,000.00
TERBILANG:
"SATU MILIAR EMPAT RATUS TUJUH JUTA DELAPAN RATUS TUJUH PULUH RIBU RUPIAH "
SNI - 2
Uraian Pekerjaan
Sat. Kode
I.
PEKERJAAN PERSIAPAN
M'
M'
M'
M'
M2
M2
M2
M2
Harga
(Rp)
4
Upah
5
Jumlah
7
I.1.
60,000.00
80,000.00
90,000.00
85,000.00
70,000.00
1,600.00
312,500.00
380,600.00
3,500,000.00
15,000.00
15,000.00
Jumlah
24,000.00
16,000.00
1,800.00
1,700.00
43,500.00
87,500.00
4,000.00
1,562.50
3,425.40
252,000.00
900.00
6,000.00
355,387.90
24,000.00
16,000.00
1,800.00
1,700.00
87,500.00
4,000.00
1,562.50
3,425.40
252,000.00
900.00
6,000.00
398,887.90
60,000.00
80,000.00
90,000.00
85,000.00
70,000.00
1,600.00
100,000.00
312,500.00
380,600.00
3,500,000.00
15,000.00
61,500.00
Jumlah
24,000.00
16,000.00
1,800.00
1,700.00
43,500.00
87,500.00
4,000.00
120,000.00
1,562.50
3,425.40
252,000.00
900.00
27,675.00
497,062.90
24,000.00
16,000.00
1,800.00
1,700.00
87,500.00
4,000.00
120,000.00
1,562.50
3,425.40
252,000.00
900.00
27,675.00
540,562.90
60,000.00
80,000.00
90,000.00
85,000.00
70,000.00
1,600.00
80,000.00
312,500.00
380,600.00
15,000.00
Jumlah
18,000.00
16,000.00
1,800.00
1,700.00
37,500.00
70,000.00
3,200.00
2,000,000.00
1,562.50
3,425.40
900.00
2,079,087.90
18,000.00
16,000.00
1,800.00
1,700.00
70,000.00
3,200.00
2,000,000.00
1,562.50
3,425.40
900.00
2,116,587.90
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah
6,000.00
8,000.00
900.00
425.00
15,325.00
66,500.00
300.00
66,800.00
6,000.00
8,000.00
900.00
425.00
66,500.00
300.00
82,125.00
60,000.00
80,000.00
90,000.00
85,000.00
70,000.00
3,500,000.00
15,000.00
100,000.00
Jumlah
60,000.00
120,000.00
13,500.00
4,250.00
197,750.00
210,000.00
966,000.00
10,500.00
150,000.00
1,336,500.00
60,000.00
120,000.00
13,500.00
4,250.00
210,000.00
966,000.00
10,500.00
150,000.00
1,534,250.00
60,000.00
85,000.00
Jumlah
6,000.00
4,250.00
10,250.00
60,000.00
80,000.00
90,000.00
85,000.00
70,000.00
3,500,000.00
15,000.00
100,000.00
Jumlah
60,000.00
160,000.00
18,000.00
4,250.00
242,250.00
87,500.00
651,000.00
4,500.00
150,000.00
893,000.00
60,000.00
160,000.00
18,000.00
4,250.00
87,500.00
651,000.00
4,500.00
150,000.00
1,135,250.00
60,000.00
85,000.00
346,000.00
60,000.00
4,250.00
-
51,900.00
60,000.00
4,250.00
51,900.00
I.2.
I.3.
I.4.
I.5.
I.6.
-
6,000.00
4,250.00
10,250.00
I.7.
I.7.
SNI - 3
Uraian Pekerjaan
0.0900 M3
0.0100 M3
II.
1
Sat. Kode
M3
M3
PEKERJAAN TANAH
Penggalian Tanah Biasa Sedalam 1 Meter
0.4000 Oh
Pekerja
0.0400 Oh
Mandor
M3
M3
M3
M3
M3
M3
M2
M3
Urugan Kembali
0.1920 Oh
0.0190 Oh
M3
Pekerja
Mandor
11 Urugan Tanah
0.3000 Oh
0.0100 Oh
1.2000 M3
Pekerja
Mandor
Tanah Urug
12 Urugan Pasir
0.3000 Oh
0.0100 Oh
1.2000 M3
13 Urugan Sirtu
0.2500 Oh
0.0250 Oh
1.2000 M3
Jumlah
31,140.00
2,350.00
149,640.00
I.8.
60,000.00
85,000.00
Jumlah
400,020.00
28,305.00
428,325.00
400,020.00
28,305.00
428,325.00
60,000.00
85,000.00
Jumlah
400,020.00
28,305.00
428,325.00
400,020.00
28,305.00
428,325.00
60,000.00
85,000.00
Jumlah
24,000.00
3,400.00
27,400.00
24,000.00
3,400.00
27,400.00
60,000.00
85,000.00
Jumlah
31,560.00
4,420.00
35,980.00
31,560.00
4,420.00
35,980.00
60,000.00
85,000.00
Jumlah
44,100.00
6,205.00
50,305.00
44,100.00
6,205.00
50,305.00
60,000.00
85,000.00
Jumlah
37,500.00
5,270.00
42,770.00
37,500.00
5,270.00
42,770.00
60,000.00
85,000.00
Jumlah
75,000.00
10,625.00
85,625.00
75,000.00
10,625.00
85,625.00
60,000.00
85,000.00
Jumlah
49,380.00
7,055.00
56,435.00
49,380.00
7,055.00
56,435.00
60,000.00
85,000.00
Jumlah
3,000.00
425.00
3,425.00
3,000.00
425.00
3,425.00
60,000.00
85,000.00
Jumlah
30,960.00
4,250.00
35,210.00
30,960.00
4,250.00
35,210.00
60,000.00
85,000.00
Jumlah
11,520.00
1,615.00
13,135.00
11,520.00
1,615.00
13,135.00
60,000.00
85,000.00
Jumlah
30,000.00
4,250.00
34,250.00
30,000.00
4,250.00
34,250.00
60,000.00
85,000.00
42,500.00
Jumlah
18,000.00
850.00
60,000.00
85,000.00
75,000.00
Jumlah
18,000.00
850.00
60,000.00
85,000.00
380,600.00
Jumlah
15,000.00
2,125.00
60,000.00
85,000.00
60,000.00
8,500.00
I.9.
II.1.
II.2.
II.3.
II.4.
II.5.
II.6.
II.7.
II.8.
II.9.
Pekerja
Mandor
10 Pemadatan Tanah
0.5000 Oh
0.0500 Oh
Harga
(Rp)
346,000.00
235,000.00
Jumlah
M3 II.10.
M3 II.11.
18,850.00
51,000.00
51,000.00
18,000.00
850.00
51,000.00
69,850.00
90,000.00
90,000.00
18,000.00
850.00
90,000.00
108,850.00
456,720.00
456,720.00
15,000.00
2,125.00
456,720.00
473,845.00
M3 II.12.
Pekerja
Mandor
Pasir Urug
18,850.00
M3 II.13.
Pekerja
Mandor
Sirtu
17,125.00
M3 II.14.
-
60,000.00
8,500.00
SNI - 4
Uraian Pekerjaan
0.2750 M3
0.0300 M3
0.0500 M3
Sat. Kode
Batu Pecah
Kerikil
Pasir Pasang
Harga
(Rp)
346,000.00
380,600.00
235,000.00
Jumlah
Jumlah
95,150.00
11,418.00
11,750.00
186,818.00
M3
M3
M3
M3
M3
M3
M3
M3
III.1.
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah
90,000.00
48,000.00
5,400.00
6,375.00
149,775.00
398,750.00
627,200.00
73,790.00
1,099,740.00
90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
627,200.00
73,790.00
1,249,515.00
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah
90,000.00
48,000.00
5,400.00
6,375.00
149,775.00
398,750.00
427,200.00
100,345.00
926,295.00
90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
427,200.00
100,345.00
1,076,070.00
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah
90,000.00
48,000.00
5,400.00
6,375.00
149,775.00
398,750.00
374,400.00
107,160.00
880,310.00
90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
374,400.00
107,160.00
1,030,085.00
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah
90,000.00
48,000.00
5,400.00
6,375.00
149,775.00
398,750.00
323,200.00
113,975.00
835,925.00
90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
323,200.00
113,975.00
985,700.00
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah
90,000.00
48,000.00
5,400.00
6,375.00
149,775.00
398,750.00
260,800.00
122,200.00
781,750.00
90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
260,800.00
122,200.00
931,525.00
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah
90,000.00
48,000.00
5,400.00
6,375.00
149,775.00
398,750.00
217,600.00
127,840.00
744,190.00
90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
217,600.00
127,840.00
893,965.00
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah
90,000.00
48,000.00
5,400.00
6,375.00
149,775.00
398,750.00
187,200.00
131,835.00
717,785.00
90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
187,200.00
131,835.00
867,560.00
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
235,000.00
Jumlah
90,000.00
48,000.00
5,400.00
6,375.00
149,775.00
398,750.00
145,600.00
131,835.00
676,185.00
90,000.00
48,000.00
5,400.00
6,375.00
398,750.00
145,600.00
131,835.00
825,960.00
III.2.
III.3.
III.4.
III.5.
III.6.
III.7.
III.8.
SNI - 5
Uraian Pekerjaan
Pasang Pondasi Batu Kosong
0.7800 Oh
Pekerja
0.3900 Oh
Tukang Batu
0.0390 Oh
Kepala Tukang
0.0390 Oh
Mandor
1.2000 M3
Batu Gunung
0.3000 M3
Pasir Urug
Sat. Kode
M3
Harga
(Rp)
Upah
Jumlah
III.9.
Bh III.10.
Bh III.11.
M' III.12.
Ttk III.13.
Ttk III.13a.
Ttk III.13a.
Ttk III.14.
Ttk III.15.
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
75,000.00
Jumlah
46,800.00
31,200.00
3,510.00
3,315.00
84,825.00
435,000.00
22,500.00
457,500.00
46,800.00
31,200.00
3,510.00
3,315.00
435,000.00
22,500.00
542,325.00
60,000.00
80,000.00
90,000.00
85,000.00
Jumlah
6,000.00
20,000.00
2,250.00
425.00
28,675.00
6,000.00
20,000.00
2,250.00
425.00
28,675.00
80,000.00
90,000.00
Jumlah
48,000.00
5,400.00
53,400.00
48,000.00
5,400.00
53,400.00
60,000.00
80,000.00
90,000.00
85,000.00
Jumlah
108,000.00
3,200.00
360.00
88,825.00
200,385.00
108,000.00
3,200.00
360.00
88,825.00
200,385.00
60,000.00
80,000.00
90,000.00
85,000.00
6,000,000.00
3,600.00
Jumlah
6,000.00
20,000.00
2,250.00
4,250.00
32,500.00
240,000.00
3,600.00
243,600.00
6,000.00
20,000.00
2,250.00
4,250.00
240,000.00
3,600.00
276,100.00
60,000.00
80,000.00
90,000.00
85,000.00
7,500,000.00
3,600.00
Jumlah
6,000.00
20,000.00
2,250.00
4,250.00
32,500.00
864,000.00
3,600.00
867,600.00
6,000.00
20,000.00
2,250.00
4,250.00
864,000.00
3,600.00
900,100.00
60,000.00
80,000.00
90,000.00
85,000.00
7,500,000.00
3,600.00
Jumlah
6,000.00
20,000.00
2,250.00
4,250.00
32,500.00
432,000.00
3,600.00
435,600.00
6,000.00
20,000.00
2,250.00
4,250.00
432,000.00
3,600.00
468,100.00
60,000.00
80,000.00
90,000.00
85,000.00
6,000,000.00
3,600.00
Jumlah
6,000.00
20,000.00
2,250.00
4,250.00
32,500.00
120,000.00
3,600.00
123,600.00
6,000.00
20,000.00
2,250.00
4,250.00
120,000.00
3,600.00
156,100.00
60,000.00
80,000.00
90,000.00
85,000.00
362,500.00
1,600.00
312,500.00
380,600.00
Jumlah
142,800.00
24,000.00
2,700.00
6,800.00
176,300.00
163,125.00
448,000.00
140,625.00
255,002.00
1,006,752.00
142,800.00
24,000.00
2,700.00
6,800.00
163,125.00
448,000.00
140,625.00
255,002.00
1,183,052.00
60,000.00
80,000.00
90,000.00
85,000.00
900.00
360,000.00
160,000.00
18,000.00
27,625.00
-
405,000.00
360,000.00
160,000.00
18,000.00
27,625.00
405,000.00
M3
IV.1.
SNI - 6
Uraian Pekerjaan
2.5360 Zak
0.4100 M3
Sat. Kode
M3
M3
M2
M2
M2
M2
M2
M2
Harga
(Rp)
80,000.00
235,000.00
Jumlah
60,000.00
80,000.00
90,000.00
85,000.00
900.00
80,000.00
235,000.00
Jumlah
360,000.00
160,000.00
18,000.00
27,625.00
565,625.00
405,000.00
252,160.00
89,300.00
746,460.00
360,000.00
160,000.00
18,000.00
27,625.00
405,000.00
252,160.00
89,300.00
1,312,085.00
60,000.00
80,000.00
90,000.00
85,000.00
900.00
80,000.00
235,000.00
Jumlah
360,000.00
160,000.00
18,000.00
27,625.00
565,625.00
405,000.00
329,600.00
79,900.00
814,500.00
360,000.00
160,000.00
18,000.00
27,625.00
405,000.00
329,600.00
79,900.00
1,380,125.00
60,000.00
80,000.00
90,000.00
85,000.00
8,900.00
80,000.00
235,000.00
9,000.00
Jumlah
21,000.00
12,000.00
1,350.00
1,445.00
35,795.00
111,250.00
21,600.00
11,280.00
17,550.00
161,680.00
21,000.00
12,000.00
1,350.00
1,445.00
111,250.00
21,600.00
11,280.00
17,550.00
197,475.00
60,000.00
80,000.00
90,000.00
85,000.00
6,725.00
80,000.00
235,000.00
9,000.00
Jumlah
19,200.00
9,600.00
1,080.00
1,275.00
31,155.00
84,062.50
16,720.00
8,930.00
17,550.00
127,262.50
19,200.00
9,600.00
1,080.00
1,275.00
84,062.50
16,720.00
8,930.00
17,550.00
158,417.50
60,000.00
80,000.00
90,000.00
85,000.00
5,000.00
80,000.00
235,000.00
9,000.00
Jumlah
19,200.00
8,000.00
900.00
1,275.00
29,375.00
62,500.00
12,000.00
6,345.00
17,550.00
98,395.00
19,200.00
8,000.00
900.00
1,275.00
62,500.00
12,000.00
6,345.00
17,550.00
127,770.00
60,000.00
80,000.00
90,000.00
85,000.00
3,850.00
80,000.00
235,000.00
Jumlah
18,000.00
8,000.00
900.00
1,275.00
28,175.00
65,450.00
20,480.00
8,225.00
94,155.00
18,000.00
8,000.00
900.00
1,275.00
65,450.00
20,480.00
8,225.00
122,330.00
60,000.00
80,000.00
90,000.00
85,000.00
900.00
1,600.00
235,000.00
Jumlah
19,200.00
45,000.00
30,320.00
8,930.00
103,450.00
8,000.00
900.00
1,275.00
10,175.00
19,200.00
8,000.00
900.00
1,275.00
45,000.00
30,320.00
8,930.00
113,625.00
60,000.00
80,000.00
90,000.00
85,000.00
900.00
1,600.00
235,000.00
Jumlah
19,200.00
45,000.00
18,400.00
10,105.00
92,705.00
8,000.00
900.00
1,275.00
10,175.00
19,200.00
8,000.00
900.00
1,275.00
45,000.00
18,400.00
10,105.00
102,880.00
Upah
IV.2.
IV.3.
IV.4.
IV.5.
IV.6.
IV.7.
IV.8.
IV.9.
SNI - 7
Uraian Pekerjaan
V. PEKERJAAN PLESTERAN
1 Plesteran 1Pc : 1Psr, Tebal 15 mm
0.2000 Oh
Pekerja
0.1500 Oh
Tukang Batu
0.0150 Oh
Kepala Tukang
0.0100 Oh
Mandor
12.9200 Kg
Semen Ex. Tonasa
0.0130 M3
Pasir Pasang
Sat. Kode
M2
M2
M2
M2
M2
M2
M2
M2
M2
Harga
(Rp)
Upah
Jumlah
V.1.
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
12,000.00
12,000.00
1,350.00
850.00
26,200.00
20,672.00
3,055.00
23,727.00
12,000.00
12,000.00
1,350.00
850.00
20,672.00
3,055.00
49,927.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
12,000.00
12,000.00
1,350.00
850.00
26,200.00
13,632.00
3,995.00
17,627.00
12,000.00
12,000.00
1,350.00
850.00
13,632.00
3,995.00
43,827.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
12,000.00
12,000.00
1,350.00
850.00
26,200.00
10,368.00
4,465.00
14,833.00
12,000.00
12,000.00
1,350.00
850.00
10,368.00
4,465.00
41,033.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
12,000.00
12,000.00
1,350.00
850.00
26,200.00
8,320.00
4,700.00
13,020.00
12,000.00
12,000.00
1,350.00
850.00
8,320.00
4,700.00
39,220.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
12,000.00
12,000.00
1,350.00
850.00
26,200.00
6,912.00
5,170.00
12,082.00
12,000.00
12,000.00
1,350.00
850.00
6,912.00
5,170.00
38,282.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
12,000.00
12,000.00
1,350.00
850.00
26,200.00
5,888.00
5,405.00
11,293.00
12,000.00
12,000.00
1,350.00
850.00
5,888.00
5,405.00
37,493.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
12,000.00
12,000.00
1,350.00
850.00
26,200.00
4,608.00
5,640.00
10,248.00
12,000.00
12,000.00
1,350.00
850.00
4,608.00
5,640.00
36,448.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
15,000.00
16,000.00
1,800.00
1,062.50
33,862.50
22,848.00
5,405.00
28,253.00
15,000.00
16,000.00
1,800.00
1,062.50
22,848.00
5,405.00
62,115.50
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
15,000.00
16,000.00
1,800.00
1,062.50
33,862.50
17,280.00
6,110.00
23,390.00
15,000.00
16,000.00
1,800.00
1,062.50
17,280.00
6,110.00
57,252.50
60,000.00
80,000.00
15,000.00
16,000.00
V.2.
V.3.
V.4.
V.5.
V.6.
V.7.
V.8.
V.9.
M2 V.10.
-
15,000.00
16,000.00
SNI - 8
Uraian Pekerjaan
0.0200
0.0125
8.6800
0.0280
Oh
Oh
Kg
M3
Sat. Kode
Kepala Tukang
Mandor
Semen Ex. Tonasa
Pasir Pasang
M2 V.11.
M2 V.12.
M2 V.13.
M2 V.14.
M2 V.15.
M2 V.16.
M2 V.17.
M2 V.18.
M2 V.19.
Harga
(Rp)
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
Upah
1,800.00
1,062.50
33,862.50
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
15,000.00
16,000.00
1,800.00
1,062.50
33,862.50
11,664.00
6,580.00
18,244.00
15,000.00
16,000.00
1,800.00
1,062.50
11,664.00
6,580.00
52,106.50
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
15,000.00
16,000.00
1,800.00
1,062.50
33,862.50
9,984.00
7,050.00
17,034.00
15,000.00
16,000.00
1,800.00
1,062.50
9,984.00
7,050.00
50,896.50
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
18,000.00
16,000.00
1,800.00
1,105.00
36,905.00
24,800.00
3,055.00
27,855.00
18,000.00
16,000.00
1,800.00
1,105.00
24,800.00
3,055.00
64,760.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
18,000.00
16,000.00
1,800.00
1,105.00
36,905.00
18,800.00
8,225.00
27,025.00
18,000.00
16,000.00
1,800.00
1,105.00
18,800.00
8,225.00
63,930.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
18,000.00
16,000.00
1,800.00
1,105.00
36,905.00
15,168.00
8,930.00
24,098.00
18,000.00
16,000.00
1,800.00
1,105.00
15,168.00
8,930.00
61,003.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
19,200.00
20,000.00
2,250.00
1,275.00
42,725.00
29,840.00
8,225.00
38,065.00
19,200.00
20,000.00
2,250.00
1,275.00
29,840.00
8,225.00
80,790.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
19,200.00
20,000.00
2,250.00
1,275.00
42,725.00
22,640.00
9,165.00
31,805.00
19,200.00
20,000.00
2,250.00
1,275.00
22,640.00
9,165.00
74,530.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
19,200.00
20,000.00
2,250.00
1,275.00
42,725.00
18,208.00
9,870.00
28,078.00
19,200.00
20,000.00
2,250.00
1,275.00
18,208.00
9,870.00
70,803.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
15,600.00
16,000.00
1,800.00
1,105.00
34,505.00
14,880.00
4,230.00
19,110.00
15,600.00
16,000.00
1,800.00
1,105.00
14,880.00
4,230.00
53,615.00
Jumlah
1,800.00
1,062.50
13,888.00
6,580.00
54,330.50
SNI - 9
Uraian Pekerjaan
Sat. Kode
M2 V.20.
M2 V.21.
M2 V.22.
M3
M3
M2
M2
M2
M2
M3
Harga
(Rp)
Upah
Jumlah
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
15,600.00
16,000.00
1,800.00
1,105.00
34,505.00
11,312.00
4,935.00
16,247.00
15,600.00
16,000.00
1,800.00
1,105.00
11,312.00
4,935.00
50,752.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
3,420.00
3,040.00
3,420.00
170.00
10,050.00
800.00
470.00
1,270.00
3,420.00
3,040.00
3,420.00
170.00
800.00
470.00
11,320.00
60,000.00
80,000.00
90,000.00
85,000.00
1,600.00
235,000.00
Jumlah
9,000.00
5,600.00
630.00
680.00
15,910.00
6,912.00
3,760.00
10,672.00
9,000.00
5,600.00
630.00
680.00
6,912.00
3,760.00
26,582.00
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
Jumlah
360,000.00
1,600,000.00
180,000.00
25,500.00
2,165,500.00
8,400,000.00
8,400,000.00
360,000.00
1,600,000.00
180,000.00
25,500.00
8,400,000.00
10,565,500.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
Jumlah
360,000.00
1,600,000.00
180,000.00
25,500.00
2,165,500.00
4,200,000.00
4,200,000.00
360,000.00
1,600,000.00
180,000.00
25,500.00
4,200,000.00
6,365,500.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah
21,000.00
84,000.00
9,450.00
1,530.00
115,980.00
126,000.00
750.00
126,750.00
21,000.00
84,000.00
9,450.00
1,530.00
126,000.00
750.00
242,730.00
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah
21,000.00
84,000.00
9,450.00
1,530.00
115,980.00
252,000.00
750.00
252,750.00
21,000.00
84,000.00
9,450.00
1,530.00
252,000.00
750.00
368,730.00
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
Jumlah
60,000.00
200,000.00
22,500.00
4,250.00
286,750.00
280,000.00
280,000.00
60,000.00
200,000.00
22,500.00
4,250.00
280,000.00
566,750.00
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah
30,000.00
160,000.00
18,000.00
2,125.00
210,125.00
420,000.00
2,250.00
422,250.00
30,000.00
160,000.00
18,000.00
2,125.00
420,000.00
2,250.00
632,375.00
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
240,000.00
960,000.00
108,000.00
17,000.00
-
7,700,000.00
240,000.00
960,000.00
108,000.00
17,000.00
7,700,000.00
VI.1.
VI.2.
VI.3.
VI.4.
VI.5.
VI.6.
VI.7.
SNI - 10
Uraian Pekerjaan
0.8000 Kg
15.0000 Kg
Sat. Kode
Paku Biasa
Besi Strip
M3
M2
Harga
(Rp)
15,000.00
13,200.00
Jumlah
VI.8.
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah
240,000.00
960,000.00
108,000.00
17,000.00
1,085,000.00
3,850,000.00
12,000.00
3,862,000.00
240,000.00
960,000.00
108,000.00
17,000.00
3,850,000.00
12,000.00
5,187,000.00
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah
6,000.00
8,000.00
900.00
425.00
9,325.00
98,000.00
2,250.00
100,250.00
6,000.00
8,000.00
900.00
425.00
98,000.00
2,250.00
115,575.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah
7,200.00
9,600.00
1,080.00
510.00
18,390.00
63,000.00
3,000.00
66,000.00
7,200.00
9,600.00
1,080.00
510.00
63,000.00
3,000.00
84,390.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah
9,000.00
20,000.00
2,250.00
6,375.00
37,625.00
42,000.00
1,500.00
43,500.00
9,000.00
20,000.00
2,250.00
6,375.00
42,000.00
1,500.00
81,125.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah
12,000.00
24,000.00
2,700.00
850.00
39,550.00
80,500.00
2,250.00
82,750.00
12,000.00
24,000.00
2,700.00
850.00
80,500.00
2,250.00
122,300.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah
15,000.00
28,000.00
3,150.00
1,062.50
47,212.50
94,500.00
3,000.00
97,500.00
15,000.00
28,000.00
3,150.00
1,062.50
94,500.00
3,000.00
144,712.50
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah
6,000.00
16,000.00
2,250.00
425.00
24,675.00
50,400.00
750.00
51,150.00
6,000.00
16,000.00
2,250.00
425.00
50,400.00
750.00
75,825.00
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah
6,600.00
17,600.00
1,980.00
425.00
20,005.00
77,000.00
750.00
77,750.00
6,600.00
17,600.00
1,980.00
425.00
77,000.00
750.00
97,755.00
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah
9,000.00
20,000.00
2,250.00
6,375.00
28,625.00
101,500.00
900.00
102,400.00
9,000.00
20,000.00
2,250.00
6,375.00
101,500.00
900.00
131,025.00
VI.9.
M2 VI.10.
M2 VI.11.
M2 VI.12.
M2 VI.13.
M2 VI.14.
M2 VI.15.
M2 VI.15.
M2 VI.17.
SNI - 11
Uraian Pekerjaan
0.1000
0.1000
0.0100
0.0500
0.0086
0.0600
Oh
Oh
Oh
Oh
M3
Kg
Sat. Kode
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Papan Kayu Bangkirai
Paku Biasa
M2 VI.15.
M2 VI.16.
M2 VI.17.
M3 VI.18.
M3 VI.19.
M3 VI.20.
M3 VI.21.
Harga
(Rp)
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah
Upah
6,000.00
8,000.00
900.00
4,250.00
13,150.00
60,000.00
80,000.00
90,000.00
85,000.00
15,000.00
Jumlah
1,260.00
1,680.00
180.00
85.00
3,205.00
15,750.00
15,750.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah
6,000.00
20,000.00
2,250.00
425.00
87,500.00
6,000.00
122,175.00
6,000.00
20,000.00
2,250.00
425.00
87,500.00
6,000.00
122,175.00
60,000.00
80,000.00
90,000.00
85,000.00
5,500,000.00
15,000.00
Jumlah
6,000.00
20,000.00
2,250.00
425.00
170,500.00
6,000.00
205,175.00
6,000.00
20,000.00
2,250.00
425.00
170,500.00
6,000.00
205,175.00
60,000.00
80,000.00
90,000.00
85,000.00
6,000,000.00
24,500.00
Jumlah
150,000.00
600,000.00
67,500.00
10,625.00
6,600,000.00
73,500.00
7,501,625.00
150,000.00
600,000.00
67,500.00
10,625.00
6,600,000.00
73,500.00
7,501,625.00
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
15,000.00
Jumlah
150,000.00
600,000.00
67,500.00
10,625.00
7,700,000.00
45,000.00
8,573,125.00
150,000.00
600,000.00
67,500.00
10,625.00
7,700,000.00
45,000.00
8,573,125.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
15,000.00
Jumlah
150,000.00
600,000.00
67,500.00
10,625.00
3,850,000.00
45,000.00
4,723,125.00
150,000.00
600,000.00
67,500.00
10,625.00
3,850,000.00
45,000.00
4,723,125.00
60,000.00
80,000.00
90,000.00
85,000.00
135,000.00
Jumlah
900.00
12,000.00
1,350.00
63.75
148,500.00
162,813.75
900.00
12,000.00
1,350.00
63.75
148,500.00
162,813.75
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
99,000.00
20,000.00
2,250.00
6,800.00
128,050.00
60,000.00
80,000.00
99,000.00
20,000.00
Jumlah
6,000.00
8,000.00
900.00
4,250.00
60,200.00
900.00
74,250.00
1,260.00
1,680.00
180.00
85.00
15,750.00
18,955.00
M3 VII.1.
M3 VII.2.
162,500.00
331,122.00
348,800.00
842,422.00
99,000.00
20,000.00
2,250.00
6,800.00
162,500.00
331,122.00
348,800.00
970,472.00
99,000.00
20,000.00
SNI - 12
Uraian Pekerjaan
0.0250
0.0800
0.4700
0.9400
197.0000
Oh
Oh
M3
M3
Kg
Sat. Kode
Kepala Tukang
Mandor
Pasir Beton
Koral Beton
Semen Ex. Tonasa
M3 VII.3.
M3 VII.4.
M3 VII.5.
M3 VII.6.
M3 VII.7.
M3 VII.8.
M3 VII.9.
M3 VII.10.
Harga
(Rp)
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
Upah
2,250.00
6,800.00
128,050.00
Jumlah
2,250.00
6,800.00
146,875.00
357,764.00
315,200.00
947,889.00
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
99,000.00
20,000.00
2,250.00
6,800.00
128,050.00
178,125.00
331,122.00
276,800.00
786,047.00
99,000.00
20,000.00
2,250.00
6,800.00
178,125.00
331,122.00
276,800.00
914,097.00
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
69,000.00
1,600.00
180.00
510.00
71,290.00
8,125.00
16,746.40
16,000.00
40,871.40
69,000.00
1,600.00
180.00
510.00
8,125.00
16,746.40
16,000.00
112,161.40
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
99,000.00
20,000.00
2,250.00
6,800.00
128,050.00
162,500.00
296,868.00
371,200.00
830,568.00
99,000.00
20,000.00
2,250.00
6,800.00
162,500.00
296,868.00
371,200.00
958,618.00
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
99,000.00
20,000.00
2,250.00
6,800.00
128,050.00
140,625.00
342,540.00
448,000.00
931,165.00
99,000.00
20,000.00
2,250.00
6,800.00
140,625.00
342,540.00
448,000.00
1,059,215.00
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
99,000.00
20,000.00
2,250.00
6,800.00
128,050.00
175,000.00
266,420.00
563,200.00
1,004,620.00
99,000.00
20,000.00
2,250.00
6,800.00
175,000.00
266,420.00
563,200.00
1,132,670.00
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
99,000.00
20,000.00
2,250.00
6,800.00
128,050.00
131,250.00
205,524.00
571,200.00
907,974.00
99,000.00
20,000.00
2,250.00
6,800.00
131,250.00
205,524.00
571,200.00
1,036,024.00
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
99,000.00
20,000.00
2,250.00
6,800.00
128,050.00
146,875.00
296,868.00
617,600.00
1,061,343.00
99,000.00
20,000.00
2,250.00
6,800.00
146,875.00
296,868.00
617,600.00
1,189,393.00
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
99,000.00
20,000.00
2,250.00
6,800.00
128,050.00
115,625.00
281,644.00
766,400.00
1,163,669.00
99,000.00
20,000.00
2,250.00
6,800.00
115,625.00
281,644.00
766,400.00
1,291,719.00
SNI - 13
Uraian Pekerjaan
Sat. Kode
M3 VII.11.
M3 VII.12.
M3 VII.13.
M3 VII.14.
Kg VII.15.
Kg VII.16.
M2 VII.17.
M2 VII.18.
M2 VII.19.
Harga
(Rp)
Upah
Jumlah
60,000.00
80,000.00
90,000.00
85,000.00
235,000.00
380,600.00
1,600.00
Jumlah
234,000.00
51,000.00
18,000.00
5,737.50
308,737.50
129,250.00
315,898.00
544,000.00
989,148.00
234,000.00
51,000.00
18,000.00
5,737.50
129,250.00
315,898.00
544,000.00
1,297,885.50
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
234,000.00
51,000.00
18,000.00
5,737.50
308,737.50
153,125.00
308,286.00
604,800.00
1,066,211.00
234,000.00
51,000.00
18,000.00
5,737.50
153,125.00
308,286.00
604,800.00
1,374,948.50
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
234,000.00
51,000.00
18,000.00
5,737.50
308,737.50
153,125.00
312,092.00
658,400.00
1,123,617.00
234,000.00
51,000.00
18,000.00
5,737.50
153,125.00
312,092.00
658,400.00
1,432,354.50
60,000.00
80,000.00
90,000.00
85,000.00
312,500.00
380,600.00
1,600.00
Jumlah
234,000.00
51,000.00
18,000.00
5,737.50
308,737.50
131,250.00
304,480.00
712,000.00
1,147,730.00
234,000.00
51,000.00
18,000.00
5,737.50
131,250.00
304,480.00
712,000.00
1,456,467.50
60,000.00
80,000.00
90,000.00
85,000.00
9,000.00
23,500.00
Jumlah
420.00
560.00
63.00
25.50
1,068.50
9,450.00
352.50
9,802.50
420.00
560.00
63.00
25.50
9,450.00
352.50
10,871.00
60,000.00
80,000.00
90,000.00
85,000.00
9,700.00
23,500.00
Jumlah
420.00
560.00
63.00
25.50
1,068.50
10,185.00
352.50
10,537.50
420.00
560.00
63.00
25.50
10,185.00
352.50
11,606.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
15,000.00
Jumlah
18,000.00
20,800.00
2,340.00
425.00
41,565.00
140,000.00
7,050.00
1,500.00
148,550.00
18,000.00
20,800.00
2,340.00
425.00
140,000.00
7,050.00
1,500.00
190,115.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
15,000.00
Jumlah
18,000.00
20,800.00
2,340.00
425.00
41,565.00
157,500.00
7,050.00
1,500.00
166,050.00
18,000.00
20,800.00
2,340.00
425.00
157,500.00
7,050.00
1,500.00
207,615.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
18,000.00
26,400.00
2,970.00
510.00
-
192,500.00
9,400.00
18,000.00
26,400.00
2,970.00
510.00
192,500.00
9,400.00
SNI - 14
Uraian Pekerjaan
0.3500 Lbr
2.0000 Btg
0.2000 Ltr
Sat. Kode
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4 m
Minyak Bekisting
M2 VII.20
M2 VII.21.
M2 VII.22.
M3 VII.23.
M3 VII.24.
M3 VII.25.
Harga
(Rp)
100,000.00
70,000.00
15,000.00
Jumlah
Jumlah
35,000.00
140,000.00
3,000.00
427,780.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
100,000.00
70,000.00
15,000.00
Jumlah
19,200.00
26,400.00
2,970.00
510.00
49,080.00
203,000.00
9,400.00
35,000.00
140,000.00
3,000.00
390,400.00
19,200.00
26,400.00
2,970.00
510.00
203,000.00
9,400.00
35,000.00
140,000.00
3,000.00
439,480.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
100,000.00
70,000.00
1,600.00
Jumlah
19,200.00
26,400.00
2,970.00
510.00
49,080.00
192,500.00
9,400.00
35,000.00
420,000.00
320.00
657,220.00
19,200.00
26,400.00
2,970.00
510.00
192,500.00
9,400.00
35,000.00
420,000.00
320.00
706,300.00
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
100,000.00
70,000.00
1,600.00
Jumlah
19,200.00
26,400.00
2,970.00
510.00
49,080.00
157,500.00
9,400.00
35,000.00
140,000.00
320.00
342,220.00
19,200.00
26,400.00
2,970.00
510.00
157,500.00
9,400.00
35,000.00
140,000.00
320.00
391,300.00
60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah
234,000.00
28,000.00
83,200.00
84,000.00
22,050.00
14,025.00
465,275.00
700,000.00
35,250.00
640.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
3,114,933.00
234,000.00
28,000.00
83,200.00
84,000.00
22,050.00
14,025.00
700,000.00
35,250.00
640.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
3,580,208.00
60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah
291,000.00
28,000.00
124,800.00
112,000.00
29,790.00
14,450.00
600,040.00
945,000.00
47,000.00
960.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
3,839,628.00
291,000.00
28,000.00
124,800.00
112,000.00
29,790.00
14,450.00
945,000.00
47,000.00
960.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
4,439,668.00
60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
438,000.00
28,000.00
264,000.00
168,000.00
51,300.00
21,250.00
-
1,925,000.00
94,000.00
3,200.00
2,700,000.00
438,000.00
28,000.00
264,000.00
168,000.00
51,300.00
21,250.00
1,925,000.00
94,000.00
3,200.00
2,700,000.00
SNI - 15
Uraian Pekerjaan
4.5000
323.0000
0.5200
0.7800
3.5000
20.0000
Kg
Kg
M3
M3
Lbr
Btg
Sat. Kode
Kawat Beton
Semen Ex. Tonasa
Pasir Beton
Koral Beton
Plywood Tebal 9 mm
Dolken Kayu Galam Dia. 8 - 4 m
M3 VII.26
M3 VII.27
M3 VII.28.
M3 VII.29.
M' VII.30.
Harga
(Rp)
23,500.00
1,600.00
312,500.00
380,600.00
100,000.00
70,000.00
Jumlah
60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
100,000.00
70,000.00
Jumlah
357,600.00
28,000.00
224,000.00
112,000.00
40,950.00
17,680.00
780,230.00
1,610,000.00
75,200.00
2,560.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
280,000.00
1,120,000.00
5,934,428.00
357,600.00
28,000.00
224,000.00
112,000.00
40,950.00
17,680.00
1,610,000.00
75,200.00
2,560.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
280,000.00
1,120,000.00
6,714,658.00
60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
100,000.00
70,000.00
Jumlah
348,000.00
28,000.00
224,000.00
84,000.00
37,800.00
15,725.00
737,525.00
1,540,000.00
75,200.00
2,560.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
280,000.00
2,240,000.00
6,516,803.00
348,000.00
28,000.00
224,000.00
84,000.00
37,800.00
15,725.00
1,540,000.00
75,200.00
2,560.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
280,000.00
2,240,000.00
7,254,328.00
60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
100,000.00
70,000.00
Jumlah
336,000.00
28,000.00
211,200.00
84,000.00
36,000.00
16,405.00
711,605.00
1,400,000.00
75,200.00
2,560.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
280,000.00
1,680,000.00
5,816,803.00
336,000.00
28,000.00
211,200.00
84,000.00
36,000.00
16,405.00
1,400,000.00
75,200.00
2,560.00
1,350,000.00
52,875.00
516,800.00
162,500.00
296,868.00
280,000.00
1,680,000.00
6,528,408.00
60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
1,600.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
100,000.00
70,000.00
Jumlah
336,000.00
28,000.00
184,000.00
112,000.00
36,450.00
17,170.00
713,620.00
1,242,500.00
70,500.00
1,920.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
250,000.00
980,000.00
5,391,588.00
336,000.00
28,000.00
184,000.00
112,000.00
36,450.00
17,170.00
1,242,500.00
70,500.00
1,920.00
1,800,000.00
70,500.00
516,800.00
162,500.00
296,868.00
250,000.00
980,000.00
6,105,208.00
60,000.00
3,600.00
3,600.00
SNI - 16
Uraian Pekerjaan
0.0200
0.0200
0.0200
0.0060
0.0030
0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Kg
M3
M3
Sat. Kode
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Meranti
Paku Biasa
Besi Beton Polos
Kawat Beton
Semen Ex. Tonasa
Pasir Beton
Koral Beton
M3 VII.31.
M' VII.32.
M3 VII.33.
Harga
(Rp)
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah
Upah
1,600.00
1,600.00
1,600.00
540.00
255.00
9,195.00
60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah
297,520.66
132,231.40
132,231.40
132,231.40
44,628.10
21,074.38
759,917.36
578,512.40
19,421.49
2,231,404.96
873,966.94
528,925.62
154,958.68
283,090.91
4,670,280.99
297,520.66
132,231.40
132,231.40
132,231.40
44,628.10
21,074.38
578,512.40
19,421.49
2,231,404.96
873,966.94
528,925.62
154,958.68
283,090.91
5,430,198.35
60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah
6,000.00
2,640.00
2,640.00
2,640.00
900.00
425.00
15,245.00
10,500.00
470.00
32,400.00
1,175.00
8,800.00
2,812.50
5,709.00
61,866.50
6,000.00
2,640.00
2,640.00
2,640.00
900.00
425.00
10,500.00
470.00
32,400.00
1,175.00
8,800.00
2,812.50
5,709.00
77,111.50
60,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
23,500.00
9,000.00
23,500.00
1,600.00
312,500.00
380,600.00
Jumlah
400,000.00
176,000.00
176,000.00
176,000.00
60,000.00
28,333.33
1,016,333.33
700,000.00
31,333.33
2,160,000.00
78,333.33
586,666.67
187,500.00
380,600.00
4,124,433.33
400,000.00
176,000.00
176,000.00
176,000.00
60,000.00
28,333.33
700,000.00
31,333.33
2,160,000.00
78,333.33
586,666.67
187,500.00
380,600.00
5,140,766.67
60,000.00
80,000.00
90,000.00
85,000.00
58,000.00
24,000.00
Jumlah
8,400.00
5,600.00
630.00
595.00
15,225.00
43,500.00
2,880.00
46,380.00
8,400.00
5,600.00
630.00
595.00
43,500.00
2,880.00
61,605.00
60,000.00
80,000.00
90,000.00
85,000.00
4,725.00
23,500.00
Jumlah
12,000.00
8,000.00
900.00
850.00
21,750.00
56,700.00
705.00
57,405.00
12,000.00
8,000.00
900.00
850.00
56,700.00
705.00
79,155.00
60,000.00
80,000.00
90,000.00
85,000.00
12,000.00
8,000.00
900.00
850.00
Jumlah
1,600.00
1,600.00
1,600.00
540.00
255.00
7,000.00
235.00
27,000.00
10,575.00
6,400.00
1,875.00
3,425.40
65,705.40
M2 VIII.1.
M2 VIII.2.
M2 VIII.3.
-
12,000.00
8,000.00
900.00
850.00
SNI - 17
Uraian Pekerjaan
1.3000 Lbr
0.0300 Kg
Genteng Metal
Paku Anti Karat
12
Harga
(Rp)
155,000.00
54,450.00
Jumlah
60,000.00
80,000.00
90,000.00
85,000.00
500.00
23,500.00
Jumlah
9,960.00
20,000.00
2,250.00
680.00
32,890.00
30,000.00
4,700.00
34,700.00
9,960.00
20,000.00
2,250.00
680.00
30,000.00
4,700.00
67,590.00
60,000.00
80,000.00
90,000.00
85,000.00
7,425.00
20,000.00
1,600.00
235,000.00
3,250.00
Jumlah
24,000.00
16,000.00
1,800.00
1,700.00
43,500.00
25,987.50
1,000.00
17,280.00
7,520.00
3,250.00
55,037.50
24,000.00
16,000.00
1,800.00
1,700.00
25,987.50
1,000.00
17,280.00
7,520.00
3,250.00
98,537.50
60,000.00
80,000.00
90,000.00
85,000.00
46,000.00
54,450.00
Jumlah
15,000.00
12,000.00
1,350.00
1,105.00
29,455.00
50,600.00
2,722.50
53,322.50
15,000.00
12,000.00
1,350.00
1,105.00
50,600.00
2,722.50
82,777.50
60,000.00
80,000.00
90,000.00
85,000.00
48,000.00
23,500.00
3,500,000.00
Jumlah
7,500.00
20,000.00
2,250.00
510.00
30,260.00
19,200.00
2,585.00
14,000.00
35,785.00
7,500.00
20,000.00
2,250.00
510.00
19,200.00
2,585.00
14,000.00
66,045.00
60,000.00
80,000.00
90,000.00
85,000.00
100,000.00
24,000.00
Jumlah
7,200.00
4,800.00
540.00
510.00
13,050.00
70,000.00
480.00
70,480.00
7,200.00
4,800.00
540.00
510.00
70,000.00
480.00
83,530.00
60,000.00
80,000.00
90,000.00
85,000.00
48,000.00
23,500.00
Jumlah
9,000.00
5,600.00
720.00
510.00
15,830.00
14,400.00
940.00
15,340.00
9,000.00
5,600.00
720.00
510.00
14,400.00
940.00
31,170.00
60,000.00
80,000.00
90,000.00
85,000.00
5,128.21
Jumlah
9,000.00
4,000.00
450.00
680.00
14,130.00
5,384.62
5,384.62
9,000.00
4,000.00
450.00
680.00
5,384.62
19,514.62
80,000.00
90,000.00
60,000.00
85,000.00
138,000.00
1,500.00
Jumlah
2,666.67
300.00
12,000.00
850.00
15,816.67
138,000.00
6,000.00
144,000.00
2,666.67
300.00
12,000.00
850.00
138,000.00
6,000.00
159,816.67
80,000.00
90,000.00
60,000.00
85,000.00
2,666.67
300.00
12,000.00
850.00
Upah
Jumlah
201,500.00
1,633.50
224,883.50
M2 VIII.4.
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Sirap
Paku biasa
M' VIII.5.
M' VIII.6.
M' VIII.7.
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Seng Plat BJLS 30
Paku Biasa
Kayu Meranti
M2 VIII.8.
M' VIII.9.
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Seng Plat BJLS
Paku Biasa
11
Sat. Kode
M2 VIII.10.
Pasang atap steel jenis Spandek Hi-ten tebal 0,45 mm finish M2 VIII.11.
Zincalume
0.03 oh
Tukang
0.003 oh
Kepala Kerja
0.20 oh
Pekerja
0.01 oh
Mandor
1.00 M2
Atap Spandek
4.00 bh
Sekrup Galbani (MTEKS 10-16x16 WAF)
Pasang atap steel jenis Spandek Hi-ten tebal 0,45 mm finish M2 VIII.12.
Colorbond
0.03 oh
Tukang
0.003 oh
Kepala Kerja
0.20 oh
Pekerja
0.01 oh
Mandor
2,666.67
300.00
12,000.00
850.00
SNI - 18
Uraian Pekerjaan
1.00 M2
4.00 bh
13
14
15
Atap Spandek
Sekrup Galbani (MTEKS 10-16x16 WAF)
M2 VIII.13.
M2 VIII.14.
Sat. Kode
Harga
(Rp)
215,000.00
1,500.00
Jumlah
80,000.00
90,000.00
60,000.00
85,000.00
262,000.00
Jumlah
2,666.67
300.00
12,600.00
850.00
16,416.67
262,000.00
262,000.00
2,666.67
300.00
12,600.00
850.00
262,000.00
278,416.67
80,000.00
90,000.00
60,000.00
85,000.00
173,000.00
Jumlah
2,666.67
300.00
12,600.00
850.00
16,416.67
173,000.00
173,000.00
2,666.67
300.00
12,600.00
850.00
173,000.00
189,416.67
80,000.00
90,000.00
60,000.00
85,000.00
70,000.00
1,500.00
Jumlah
1,600.00
180.00
7,200.00
170.00
9,150.00
70,000.00
6,000.00
76,000.00
1,600.00
180.00
7,200.00
170.00
70,000.00
6,000.00
85,150.00
80,000.00
90,000.00
60,000.00
85,000.00
60,000.00
24,000.00
Jumlah
8,000.00
900.00
4,200.00
297.50
13,397.50
21,600.00
720.00
22,320.00
8,000.00
900.00
4,200.00
297.50
21,600.00
720.00
35,717.50
60,000.00
80,000.00
90,000.00
85,000.00
77,000.00
24,000.00
Jumlah
4,200.00
8,000.00
900.00
297.50
13,397.50
27,720.00
720.00
28,440.00
4,200.00
8,000.00
900.00
297.50
27,720.00
720.00
41,837.50
60,000.00
80,000.00
90,000.00
85,000.00
60,000.00
24,000.00
Jumlah
4,200.00
8,000.00
900.00
297.50
13,397.50
22,500.00
720.00
23,220.00
4,200.00
8,000.00
900.00
297.50
22,500.00
720.00
36,617.50
60,000.00
80,000.00
90,000.00
85,000.00
77,000.00
24,000.00
Jumlah
4,200.00
8,000.00
900.00
297.50
13,397.50
28,875.00
720.00
29,595.00
4,200.00
8,000.00
900.00
297.50
28,875.00
720.00
42,992.50
60,000.00
80,000.00
90,000.00
85,000.00
1,500.00
23,500.00
9,000.00
40,000.00
4,500.00
637.50
54,137.50
1,500.00
3,525.00
5,025.00
9,000.00
40,000.00
4,500.00
637.50
1,500.00
3,525.00
59,162.50
60,000.00
80,000.00
90,000.00
85,000.00
15,000.00
3,000.00
4,000.00
450.00
255.00
-
16,500.00
3,000.00
4,000.00
450.00
255.00
16,500.00
Upah
Jumlah
215,000.00
6,000.00
236,816.67
m' VIII.15.
M2
M2
M2
M2
M2
M'
IX.1.
IX.2.
IX.3.
IX.4.
IX.5.
IX.6.
SNI - 19
Uraian Pekerjaan
0.0100 Kg
Sat. Kode
Paku
M2
M2
M2
Harga
(Rp)
24,000.00
Jumlah
Upah
Jumlah
240.00
24,445.00
IX.7.
60,000.00
80,000.00
90,000.00
85,000.00
3,500,000.00
24,000.00
Jumlah
18,600.00
37,600.00
4,230.00
1,317.50
61,747.50
94,500.00
1,440.00
95,940.00
18,600.00
37,600.00
4,230.00
1,317.50
94,500.00
1,440.00
157,687.50
60,000.00
80,000.00
90,000.00
85,000.00
75,000.00
15,000.00
Jumlah
4,200.00
8,000.00
28,125.00
450.00
40,775.00
900.00
297.50
1,197.50
4,200.00
8,000.00
900.00
297.50
28,125.00
450.00
41,972.50
80,000.00
90,000.00
60,000.00
85,000.00
5,000.00
10,000.00
100,000.00
1,000.00
25,000.00
Jumlah
8,000.00
900.00
3,600.00
255.00
12,755.00
3,750.00
7,000.00
84,000.00
1,390.00
41,750.00
137,890.00
8,000.00
900.00
3,600.00
255.00
3,750.00
7,000.00
84,000.00
1,390.00
41,750.00
150,645.00
60,000.00
80,000.00
90,000.00
85,000.00
21,100.00
61,500.00
Jumlah
3,600.00
480.00
540.00
25.50
4,645.50
23,210.00
4,920.00
28,130.00
3,600.00
480.00
540.00
25.50
23,210.00
4,920.00
32,775.50
60,000.00
80,000.00
90,000.00
85,000.00
800,000.00
Jumlah
39,000.00
52,000.00
5,850.00
2,720.00
99,570.00
800,000.00
800,000.00
39,000.00
52,000.00
5,850.00
2,720.00
800,000.00
899,570.00
60,000.00
80,000.00
90,000.00
85,000.00
800,000.00
Jumlah
63,000.00
84,000.00
9,450.00
446.25
156,896.25
800,000.00
800,000.00
63,000.00
84,000.00
9,450.00
446.25
800,000.00
956,896.25
60,000.00
80,000.00
90,000.00
85,000.00
960,000.00
Jumlah
63,000.00
120,000.00
9,450.00
442.00
192,892.00
960,000.00
960,000.00
63,000.00
120,000.00
9,450.00
442.00
960,000.00
1,152,892.00
60,000.00
80,000.00
90,000.00
85,000.00
30,854.81
23,500.00
3,500,000.00
Jumlah
6,000.00
8,000.00
900.00
42.50
14,942.50
33,940.30
470.00
6,300.00
40,710.30
6,000.00
8,000.00
900.00
42.50
33,940.30
470.00
6,300.00
55,652.80
60,000.00
80,000.00
90,000.00
85,000.00
19,444.44
6,000.00
8,000.00
900.00
42.50
-
21,388.89
6,000.00
8,000.00
900.00
42.50
21,388.89
IX.8.
IX.9.
Kg
M2
M2
M2
X.1.
X.2.
X.3.
X.4.
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Roll Door
M2
M2
X.5.
X.6.
SNI - 20
Uraian Pekerjaan
0.0200 Kg
0.0018 M3
Sat. Kode
M2
M2
60,000.00
80,000.00
90,000.00
85,000.00
27,777.78
23,500.00
3,500,000.00
Jumlah
6,000.00
8,000.00
900.00
42.50
14,942.50
30,555.56
470.00
6,300.00
37,325.56
6,000.00
8,000.00
900.00
42.50
30,555.56
470.00
6,300.00
52,268.06
60,000.00
80,000.00
90,000.00
85,000.00
85,000.00
85,000.00
35,000.00
Jumlah
30,000.00
20,000.00
2,250.00
2,125.00
54,375.00
85,000.00
85,000.00
35,000.00
205,000.00
30,000.00
20,000.00
2,250.00
2,125.00
85,000.00
85,000.00
35,000.00
259,375.00
60,000.00
80,000.00
90,000.00
85,000.00
3,804.17
1,600.00
3,250.00
235,000.00
Jumlah
37,200.00
28,000.00
3,150.00
2,550.00
70,900.00
45,650.00
18,208.00
4,875.00
9,870.00
78,603.00
37,200.00
28,000.00
3,150.00
2,550.00
45,650.00
18,208.00
4,875.00
9,870.00
149,503.00
60,000.00
80,000.00
90,000.00
85,000.00
2,464.00
1,600.00
3,250.00
235,000.00
Jumlah
37,200.00
28,000.00
3,150.00
2,550.00
70,900.00
61,600.00
18,208.00
4,875.00
9,870.00
94,553.00
37,200.00
28,000.00
3,150.00
2,550.00
61,600.00
18,208.00
4,875.00
9,870.00
165,453.00
60,000.00
80,000.00
90,000.00
85,000.00
1,232.00
1,600.00
3,250.00
235,000.00
Jumlah
37,200.00
28,000.00
3,150.00
2,550.00
70,900.00
61,600.00
18,208.00
4,875.00
9,870.00
94,553.00
37,200.00
28,000.00
3,150.00
2,550.00
61,600.00
18,208.00
4,875.00
9,870.00
165,453.00
60,000.00
80,000.00
90,000.00
85,000.00
1,232.00
1,600.00
3,250.00
235,000.00
Jumlah
5,400.00
7,200.00
810.00
382.50
13,792.50
6,160.00
2,640.00
325.00
752.00
9,877.00
5,400.00
7,200.00
810.00
382.50
6,160.00
2,640.00
325.00
752.00
23,669.50
60,000.00
80,000.00
90,000.00
85,000.00
1,275.00
1,600.00
3,250.00
235,000.00
Jumlah
37,200.00
28,000.00
3,150.00
2,550.00
70,900.00
56,100.00
67.20
4,875.00
9,870.00
70,912.20
37,200.00
28,000.00
3,150.00
2,550.00
56,100.00
67.20
4,875.00
9,870.00
141,812.20
60,000.00
80,000.00
90,000.00
85,000.00
36,000.00
36,000.00
4,050.00
2,550.00
Upah
Jumlah
470.00
6,300.00
43,101.39
X.7.
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kawat Kassa
Paku Biasa
Kayu Meranti
Harga
(Rp)
23,500.00
3,500,000.00
Jumlah
X.8.
M2
M2
M2
M'
M2
M2
XI.1.
XI.2.
XI.3.
XI.4.
XI.5.
XI.6.
-
36,000.00
36,000.00
4,050.00
2,550.00
SNI - 21
Uraian Pekerjaan
50.0000
9.3000
1.5000
0.0180
Bh
Kg
Kg
M3
Sat. Kode
Keramik 10 x 20 cm
Semen Ex.Tonasa
Semen Warna
Pasir Pasang
M2
M2
M2
M2 XI.11.
12
#REF!
0.4300
0.2000
0.0350
0.0300
1.7000
2.0000
11.3800
0.0420
Oh
Oh
Oh
Oh
Bh
Zak
Kg
M3
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Semen Warna
Koral sikat hitam / warna
Semen ex Tonasa
Pasir Pasang
36,000.00
36,000.00
4,050.00
2,550.00
78,600.00
57,530.00
14,880.00
4,875.00
4,230.00
81,515.00
36,000.00
36,000.00
4,050.00
2,550.00
57,530.00
14,880.00
4,875.00
4,230.00
160,115.00
60,000.00
80,000.00
90,000.00
85,000.00
4,000.00
1,600.00
235,000.00
Jumlah
37,200.00
28,000.00
3,150.00
2,550.00
70,900.00
320,000.00
19,904.00
5,875.00
345,779.00
37,200.00
28,000.00
3,150.00
2,550.00
320,000.00
19,904.00
5,875.00
416,679.00
60,000.00
80,000.00
90,000.00
85,000.00
25,000.00
Jumlah
7,200.00
9,600.00
1,080.00
510.00
18,390.00
75,000.00
75,000.00
7,200.00
9,600.00
1,080.00
510.00
75,000.00
93,390.00
60,000.00
80,000.00
90,000.00
85,000.00
7,000,000.00
25,000.00
Jumlah
7,200.00
9,600.00
1,080.00
510.00
18,390.00
16,800.00
1,250.00
18,050.00
7,200.00
9,600.00
1,080.00
510.00
16,800.00
1,250.00
36,440.00
60,000.00
80,000.00
90,000.00
85,000.00
3,804.17
120,000.00
1,600.00
235,000.00
Jumlah
25,800.00
16,000.00
3,150.00
2,550.00
-
22,825.00
120,000.00
18,208.00
9,870.00
170,903.00
25,800.00
16,000.00
3,150.00
2,550.00
22,825.00
120,000.00
18,208.00
9,870.00
218,403.00
60,000.00
80,000.00
90,000.00
85,000.00
3,250.00
120,000.00
1,600.00
235,000.00
Jumlah
25,800.00
16,000.00
3,150.00
2,550.00
47,500.00
5,525.00
240,000.00
18,208.00
9,870.00
273,603.00
25,800.00
16,000.00
3,150.00
2,550.00
5,525.00
240,000.00
18,208.00
9,870.00
321,103.00
60,000.00
85,000.00
15,000.00
Jumlah
9,000.00
212.50
9,212.50
750.00
750.00
9,000.00
212.50
750.00
9,962.50
60,000.00
85,000.00
15,000.00
Jumlah
9,000.00
212.50
9,212.50
750.00
750.00
9,000.00
212.50
750.00
9,962.50
60,000.00
80,000.00
90,000.00
4,200.00
6,000.00
675.00
4,200.00
6,000.00
675.00
XI.9.
11
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Keramik 30 x 30 cm
Koral sikat hitam / warna
Semen ex Tonasa
Pasir Pasang
60,000.00
80,000.00
90,000.00
85,000.00
2,301.20
1,600.00
3,250.00
235,000.00
Jumlah
Jumlah
61,600.00
14,880.00
4,875.00
4,230.00
164,185.00
XI.8.
M2 XI.10.
Oh
Oh
Oh
Oh
Bh
Zak
Kg
M3
XI.7.
#REF!
0.4300
0.2000
0.0350
0.0300
6.0000
1.0000
11.3800
0.0420
Harga
(Rp)
1,232.00
1,600.00
3,250.00
235,000.00
Jumlah
47,500.00
M2 XI.12.
M2 XII.1.
M2 XII.2.
M2 XII.3.
SNI - 22
Uraian Pekerjaan
0.0025
0.1500
0.1700
0.1700
Oh
Kg
Ltr
Ltr
Sat. Kode
Mandor
Plamir
Cat Dasar
Cat Penutup
M2 XII.4.
M2 XII.5.
M2 XII.6.
M2 XII.7.
M2 XII.8.
M2 XII.9.
M2 XII.10.
M2 XII.11.
M2 XII.12.
Harga
(Rp)
85,000.00
25,000.00
30,000.00
49,500.00
Jumlah
Upah
212.50
11,087.50
60,000.00
80,000.00
90,000.00
85,000.00
30,000.00
25,000.00
30,000.00
49,500.00
Jumlah
4,200.00
720.00
540.00
212.50
5,672.50
6,000.00
3,750.00
5,100.00
12,870.00
27,720.00
4,200.00
720.00
540.00
212.50
6,000.00
3,750.00
5,100.00
12,870.00
33,392.50
60,000.00
80,000.00
90,000.00
85,000.00
56,500.00
Jumlah
2,400.00
5,040.00
5,670.00
212.50
13,322.50
20,340.00
20,340.00
2,400.00
5,040.00
5,670.00
212.50
20,340.00
33,662.50
60,000.00
85,000.00
15,000.00
Jumlah
6,000.00
510.00
6,510.00
5,250.00
5,250.00
6,000.00
510.00
5,250.00
11,760.00
60,000.00
80,000.00
90,000.00
85,000.00
56,500.00
26,000.00
5,000.00
12,000.00
Jumlah
9,600.00
12,800.00
1,440.00
212.50
24,052.50
8,475.00
1,300.00
500.00
120.00
10,395.00
9,600.00
12,800.00
1,440.00
212.50
8,475.00
1,300.00
500.00
120.00
34,447.50
60,000.00
80,000.00
90,000.00
85,000.00
25,000.00
14,000.00
80,000.00
Jumlah
1,200.00
5,040.00
567.00
212.50
7,019.50
2,500.00
1,540.00
20,800.00
24,840.00
1,200.00
5,040.00
567.00
212.50
2,500.00
1,540.00
20,800.00
31,859.50
60,000.00
80,000.00
90,000.00
85,000.00
14,000.00
80,000.00
Jumlah
1,680.00
3,360.00
378.00
212.50
5,630.50
1,680.00
14,400.00
16,080.00
1,680.00
3,360.00
378.00
212.50
1,680.00
14,400.00
21,710.50
60,000.00
80,000.00
90,000.00
85,000.00
61,500.00
12,000.00
Jumlah
1,200.00
16,000.00
1,800.00
850.00
19,850.00
6,150.00
120.00
6,270.00
1,200.00
16,000.00
1,800.00
850.00
6,150.00
120.00
26,120.00
60,000.00
80,000.00
90,000.00
85,000.00
105,000.00
Jumlah
360.00
4,800.00
1,080.00
510.00
6,750.00
31,500.00
31,500.00
360.00
4,800.00
1,080.00
510.00
31,500.00
38,250.00
Jumlah
212.50
3,750.00
5,100.00
8,415.00
28,352.50
SNI - 23
Uraian Pekerjaan
0.5000
0.8000
0.3000
0.2000
0.1100
0.1700
0.0800
Oh
Oh
Oh
Oh
Kg
Kg
Kg
Sat. Kode
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Cat Dasar
Cat Antara
Cat Penutup
Harga
(Rp)
60,000.00
80,000.00
90,000.00
85,000.00
14,000.00
33,000.00
105,000.00
Jumlah
Upah
30,000.00
64,000.00
27,000.00
17,000.00
138,000.00
60,000.00
80,000.00
90,000.00
85,000.00
14,000.00
Jumlah
24,000.00
56,000.00
18,000.00
17,000.00
115,000.00
4,200.00
4,200.00
24,000.00
56,000.00
18,000.00
17,000.00
4,200.00
119,200.00
60,000.00
85,000.00
80,000.00
90,000.00
296,000.00
1,600.00
235,000.00
Jumlah
126,000.00
9,350.00
60,000.00
6,300.00
201,650.00
296,000.00
9,600.00
2,350.00
307,950.00
126,000.00
9,350.00
60,000.00
6,300.00
296,000.00
9,600.00
2,350.00
509,600.00
60,000.00
85,000.00
80,000.00
90,000.00
900.00
1,600.00
235,000.00
1,232.00
3,250.00
Jumlah
360,000.00
25,500.00
240,000.00
27,000.00
652,500.00
180,000.00
192,000.00
70,500.00
443,520.00
19,500.00
905,520.00
360,000.00
25,500.00
240,000.00
27,000.00
180,000.00
192,000.00
70,500.00
443,520.00
19,500.00
1,558,020.00
60,000.00
85,000.00
80,000.00
90,000.00
900.00
1,600.00
235,000.00
380,600.00
10,871.00
312,500.00
Jumlah
192,000.00
1,360.00
81,200.00
135.00
274,695.00
65,700.00
70,400.00
16,450.00
26,642.00
17,393.60
18,750.00
215,335.60
192,000.00
1,360.00
81,200.00
135.00
65,700.00
70,400.00
16,450.00
26,642.00
17,393.60
18,750.00
490,030.60
60,000.00
85,000.00
80,000.00
90,000.00
900.00
1,600.00
235,000.00
380,600.00
10,871.00
312,500.00
Jumlah
85,200.00
6,035.00
37,840.00
4,230.00
133,305.00
112,500.00
123,200.00
30,550.00
7,612.00
28,264.60
28,125.00
330,251.60
85,200.00
6,035.00
37,840.00
4,230.00
112,500.00
123,200.00
30,550.00
7,612.00
28,264.60
28,125.00
463,556.60
60,000.00
85,000.00
80,000.00
80,000.00
90,000.00
900.00
1,600.00
235,000.00
380,600.00
10,871.00
312,500.00
Jumlah
129,600.00
9,180.00
57,600.00
8,000.00
6,480.00
210,860.00
167,400.00
182,400.00
43,240.00
12,559.80
52,724.35
37,500.00
495,824.15
129,600.00
9,180.00
57,600.00
8,000.00
6,480.00
167,400.00
182,400.00
43,240.00
12,559.80
52,724.35
37,500.00
706,684.15
Jumlah
30,000.00
64,000.00
27,000.00
17,000.00
1,540.00
5,610.00
8,400.00
153,550.00
M2 XII.13.
Bh XIII.1.
Bh XIII.2.
Bh XIII.3.
Bh XIII.4.
Bh XIII.5.
SNI - 24
Uraian Pekerjaan
Sat. Kode
M' XIII.6.
M' XIII.7.
Bh XIII.8.
M2
M2
M2
M2
Upah
Jumlah
60,000.00
80,000.00
90,000.00
85,000.00
63,000.00
22,050.00
Jumlah
3,240.00
7,200.00
810.00
2,295.00
13,545.00
75,600.00
22,050.00
97,650.00
3,240.00
7,200.00
810.00
2,295.00
75,600.00
22,050.00
111,195.00
60,000.00
85,000.00
80,000.00
90,000.00
6,500.00
2,275.00
Jumlah
2,160.00
153.00
4,800.00
540.00
7,653.00
7,800.00
2,275.00
10,075.00
2,160.00
153.00
4,800.00
540.00
7,800.00
2,275.00
17,728.00
60,000.00
80,000.00
90,000.00
85,000.00
300,000.00
50,000.00
Jumlah
1,800.00
24,000.00
2,700.00
127.50
28,627.50
300,000.00
50,000.00
350,000.00
1,800.00
24,000.00
2,700.00
127.50
300,000.00
50,000.00
378,627.50
60,000.00
80,000.00
90,000.00
85,000.00
265,650.00
24,000.00
Jumlah
4,200.00
8,000.00
900.00
297.50
13,397.50
99,618.75
720.00
100,338.75
4,200.00
8,000.00
900.00
297.50
99,618.75
720.00
113,736.25
60,000.00
80,000.00
90,000.00
85,000.00
79,200.00
1,600.00
3,250.00
235,000.00
Jumlah
37,200.00
28,000.00
3,150.00
2,550.00
70,900.00
79,200.00
18,208.00
4,875.00
9,870.00
112,153.00
37,200.00
28,000.00
3,150.00
2,550.00
79,200.00
18,208.00
4,875.00
9,870.00
183,053.00
60,000.00
80,000.00
90,000.00
85,000.00
84,700.00
1,600.00
3,250.00
235,000.00
Jumlah
37,200.00
28,000.00
3,150.00
2,550.00
70,900.00
84,700.00
18,208.00
4,875.00
9,870.00
117,653.00
37,200.00
28,000.00
3,150.00
2,550.00
84,700.00
18,208.00
4,875.00
9,870.00
188,553.00
60,000.00
85,000.00
Jumlah
18,600.00
1,275.00
19,875.00
60,000.00
80,000.00
90,000.00
85,000.00
5,000.00
60,000.00
Jumlah
18,000.00
48,000.00
5,400.00
850.00
72,250.00
5,500.00
66,000.00
71,500.00
18,000.00
48,000.00
5,400.00
850.00
5,500.00
66,000.00
143,750.00
60,000.00
80,000.00
90,000.00
85,000.00
135,000.00
Jumlah
4,200.00
8,000.00
900.00
297.50
13,397.50
135,000.00
135,000.00
4,200.00
8,000.00
900.00
297.50
135,000.00
148,397.50
60,000.00
80,000.00
90,000.00
85,000.00
9,000.00
20,000.00
2,250.00
6,375.00
IX.4.
XI.1.
XI.1.
XI.1.
Harga
(Rp)
M2
M2 VI.11.
18,600.00
1,275.00
19,875.00
IX.4.
9,000.00
20,000.00
2,250.00
6,375.00
SNI - 25
Uraian Pekerjaan
1.0000 btg
0.1000 Kg
Sat. Kode
Besi holo
Paku Anti karat
M2
M' VIII.6.
Harga
(Rp)
96,000.00
54,450.00
Jumlah
60,000.00
80,000.00
90,000.00
85,000.00
154,000.00
54,450.00
Jumlah
4,200.00
8,000.00
900.00
297.50
13,397.50
57,750.00
1,633.50
59,383.50
4,200.00
8,000.00
900.00
297.50
57,750.00
1,633.50
72,781.00
60,000.00
80,000.00
90,000.00
85,000.00
203,000.00
49,500.00
Jumlah
12,000.00
8,000.00
900.00
850.00
21,750.00
162,400.00
1,485.00
163,885.00
12,000.00
8,000.00
900.00
850.00
162,400.00
1,485.00
185,635.00
Upah
Jumlah
96,000.00
5,445.00
139,070.00
IX.4.
No.
1
I
1
2
3
4
5
Uraian Pekerjaan
2
PEKERJAAN PENDAHULUAN
Pembersihan lokasi pekerjaan
Membuat Gudang Kerja
Penyediaan Air Kerja
Penyediaan Listrik
Pengukuran dan pemasangan bouplank
Volume
Sat.
Harga
Satuan
( Rp)
Jumlah
Harga
( Rp)
367.50
m
m
12.00
1.00
ls
1.00
ls
53.00
m'
SUB TOTAL
PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGAN
Galian pondasi foot plat
42.63
m
Menguruk kembali bekas galian pondasi
32.55
m
Urugan pasir bawah pondasi
1.47
m
Pekerjaan pancang ulin 10 x 10 - 4 m
75.00
titik
Urugan tanah menambah elevasi lantai
14.2
m
SUB TOTAL
PEKERJAAN BETON
Pondasi footplat
Beton K225
18.75
m
Cor Sloof 25/40
Beton K225
6.60
m
Cor Sloof 16/16
Beton K225
0.14
m
Kolom 25/25 lantai 1
Beton K225
3.07
m
10,250.00
1,135,250.00
1,000,000.00
1,000,000.00
82,125.00
3,766,875.00
13,623,000.00
1,000,000.00
1,000,000.00
4,352,625.00
23,742,500.00
27,400.00
13,135.00
108,850.00
276,100.00
69,850.00
1,168,062.00
427,544.25
160,009.50
20,707,500.00
991,870.00
23,454,985.75
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
25,780,284.38
9,074,660.10
192,492.79
4,221,091.90
Beton K225
2.53
1,374,948.50
3,478,619.71
Beton K225
1.52
1,374,948.50
2,089,921.72
Beton K225
0.20
1,374,948.50
274,989.70
II
1
2
3
4
5
III
1
2
3
4
No.
Uraian Pekerjaan
Volume
Sat.
Harga
Satuan
( Rp)
Jumlah
Harga
( Rp)
2 Beton K225
0.25
1,374,948.50
343,737.13
Beton K225
0.52
1,374,948.50
714,973.22
10
Beton K225
0.73
1,374,948.50
1,003,712.41
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton 1:3:5
Beton K225
Beton K225
Beton K225
Beton 1:3:5
Beton K225
Beton 1:3:5
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
970,472.00
1,374,948.50
970,472.00
1,374,948.50
970,472.00
1,374,948.50
970,472.00
494,981.46
6,805,995.08
6,805,995.08
4,647,325.93
1,897,428.93
934,964.98
384,985.58
4,427,334.17
3,918,603.23
1,429,946.44
10,908,105.28
13,378,248.91
9,830,881.36
7,094,734.26
11,645.66
13,749.49
48,523.60
120,207,932.45
IV
1
2
3
PEKERJAAN PEMBESIAN
Pek. Pembesian Balok Sloof 25/40
Pek. Pembesian Balok Sloof 16/16
Pek. Pembesian kolom 25/25
11,606.00
11,606.00
11,606.00
19,262,213.40
322,145.45
31,851,375.40
0.36
m
4.95
m
4.95
m
3.38
m
1.38
m
0.68
m
0.28
m
3.22
m
2.85
m
1.04
m
11.24
m
9.73
m
10.13
m
5.16
m
0.012
m
0.01
m
0.05
m
SUB TOTAL
1,659.68
27.76
2,744.39
kg
kg
kg
No.
Uraian Pekerjaan
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
V
1
2
3
4
5
6
PEKERJAAN BEKISTING
Pek. Pemasangan bekisting Foot plat
Pek. Pemasangan bekisting Sloof 25/40
Pek. Pemasangan bekisting Sloof 16/16
Pek. Pemasangan bekisting Kolom 25/25 lantai 1
Pek. Pemasangan bekisting Kolom 25/25 lantai 2
Pek. Pemasangan bekisting Kolom 25/25 lantai 3
Volume
Sat.
200.57
kg
358.44
kg
6,000.57
kg
1,069.60
kg
7.34
kg
1,274.61
kg
1,362.56
kg
780.74
kg
294.30
kg
897.95
kg
382.23
kg
557.23
kg
43.28
kg
57.70
kg
516.79
kg
24.88
m
21.70
m
SUB TOTAL
22.32
52.80
1.79
49.05
40.50
24.30
m
m
m
m
m
m
Harga
Satuan
( Rp)
Jumlah
Harga
( Rp)
11,606.00
11,606.00
11,606.00
11,606.00
10,871.00
10,871.00
10,871.00
10,871.00
11,606.00
10,871.00
10,871.00
10,871.00
10,871.00
10,871.00
11,606.00
955,000.00
955,000.00
2,327,791.25
4,160,077.59
69,642,596.30
12,413,833.46
79,753.46
13,856,326.08
14,812,362.31
8,487,376.71
3,415,672.54
9,761,587.70
4,155,222.33
6,057,688.64
470,478.40
627,304.53
5,997,904.84
23,760,400.00
20,723,500.00
252,185,610.39
190,115.00
207,615.00
207,615.00
427,780.00
427,780.00
427,780.00
4,243,366.80
10,962,072.00
371,630.85
20,982,609.00
17,325,090.00
10,395,054.00
No.
Uraian Pekerjaan
Volume
Sat.
7
8
9
10
11
2
Pek. Pemasangan bekisting Kolom
15/25 lantai 2
Pek. Pemasangan bekisting Kolom 15/25 lantai 3
Pek. Pemasangan bekisting Kolom 15/15 lantai 1
Pek. Pemasangan bekisting Kolom 15/15 lantai 2
Pek. Pemasangan bekisting Kolom 15/15 lantai 3
4.32
10.80
13.73
23.55
11.78
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
9.15
m
50.82
m
50.82
m
34.65
m
13.81
m
6.80
m
2.80
m
31.64
m
25.36
m
9.46
m
0.17
m
0.70
m
81.05
m
84.32
m
51.51
m
SUB TOTAL
VI
1
2
PEKERJAAN DINDING
Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 1
Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 2 dan 3
0.46
3.95
m
m
m
m
m
m
m
Harga
Satuan
( Rp)
Jumlah
Harga
( Rp)
427,780.00
427,780.00
427,780.00
427,780.00
427,780.00
1,848,009.60
4,620,024.00
5,873,419.40
10,074,219.00
5,039,248.40
427,780.00
439,480.00
439,480.00
439,480.00
439,480.00
439,480.00
439,480.00
391,300.00
391,300.00
439,480.00
439,480.00
439,480.00
706,300.00
706,300.00
706,300.00
3,914,187.00
22,334,373.60
22,334,373.60
15,227,982.00
6,069,218.80
2,988,464.00
1,230,544.00
12,380,732.00
9,923,368.00
4,157,480.80
74,711.60
307,636.00
57,245,615.00
59,555,216.00
36,381,513.00
345,860,158.45
1,380,125.00
1,380,125.00
636,237.63
5,457,014.25
No.
Uraian Pekerjaan
3
4
5
6
7
8
9
10
2 1
Pek. Pasangan bata 1 : 4 lantai
Pek. Pasangan bata 1 : 4 lantai 2
Pek. Pasangan bata 1 : 4 lantai 3
Pek. Pasangan bata 1:4 balkon lt 2 dan pagar lt 3
Pek. Plesteran 1 : 2
Pek. Plesteran 1 : 4 lantai 1
Pek. Plesteran 1 : 4 lantai 2
Pek. Plesteran 1 : 4 lantai 3
VII
1
2
3
4
5
6
7
8
9
10
11
12
13
PEKERJAAN LANTAI
Pemasangan Keramik 40 x 40 lantai 1
Pemasangan Keramik 30/30 teras
Pas.Keramik 20 x 20 kamar mandi lantai 1
Pas. Keramik dinding kamar mandi 20 x 30 lantai 1
Pemasangan Keramik 40 x 40 lantai 2
Pemasangan Keramik 30 x 30 balkon lantai 2
Pas.Keramik 20 x 20 kamar mandi lantai 2
Pas. Keramik dinding kamar mandi 20 x 30 lantai 2
Pemasangan Keramik 40 x 40 lantai 3
Pas.Keramik 20 x 20 kamar mandi lantai 3
Pas. Keramik dinding kamar mandi 20 x 30 lantai 3
Pemasangan Keramik 25 x 25 tangga lantai 1 ke lantai 2
Pemasangan Keramik 25 x 25 tangga lantai 2 ke lantai 3
VIII
Volume
Sat.
Harga
Satuan
( Rp)
Jumlah
Harga
( Rp)
m
14.03
m
15.38
m
11.00
m
1.00
m
88.30
m
280.62
307.60
m
307.60
m
SUB TOTAL
1,269,855.00
1,269,855.00
1,269,855.00
1,269,855.00
43,827.00
39,220.00
39,220.00
39,220.00
17,817,335.51
19,530,369.90
13,972,214.57
1,268,585.15
3,869,924.10
11,005,916.40
12,064,072.00
12,064,072.00
97,685,741.49
87.50
m
7.00
m
7.00
m
20.45
m
91.50
m
3.20
m
3.00
m
14.02
m
39.00
m
3.00
m
14.20
m
16.30
m
15.80
m
SUB TOTAL
183,053.00
183,053.00
165,453.00
165,453.00
183,053.00
183,053.00
165,453.00
165,453.00
183,053.00
165,453.00
165,453.00
183,053.00
183,053.00
16,017,137.50
1,281,371.00
1,158,171.00
3,383,513.85
16,749,349.50
585,769.60
496,359.00
2,319,651.06
7,139,067.00
496,359.00
2,349,432.60
2,983,763.90
2,892,237.40
57,852,182.41
No.
1
2
Uraian Pekerjaan
Pas. Rangka plafond
Plafond Gypsum
IX
1
2
3
4
5
6
7
8
X
1
2
3
4
5
6
7
8
9
XI
Volume
Sat.
Harga
Satuan
( Rp)
Jumlah
Harga
( Rp)
273.15
m
273.15
m
SUB TOTAL
157,687.50
157,687.50
43,072,340.63
43,072,340.63
86,144,681.25
0.43
m
0.09
m
18.48
m
0.07
m
0.09
m
6.51
m
m
15.80
1.60
m
SUB TOTAL
10,565,500.00
10,565,500.00
566,750.00
10,565,500.00
10,565,500.00
566,750.00
700,000.00
162,813.75
4,522,034.00
898,067.50
10,473,540.00
729,019.50
950,895.00
3,689,542.50
11,060,000.00
260,502.00
32,583,600.50
50
ttk
15
ttk
2
unit
6
bh
10
bh
15
bh
2
bh
25
bh
25
bh
SUB TOTAL
109,146.00
109,146.00
188,900.00
25,000.00
25,000.00
25,300.00
173,000.00
24,500.00
95,000.00
5,457,300.00
1,637,190.00
377,800.00
150,000.00
250,000.00
379,500.00
346,000.00
612,500.00
2,375,000.00
11,585,290.00
No.
1
2
3
4
5
6
7
8
9
Uraian Pekerjaan
Instalasi Pipa 4"
Instalasi Pipa 3"
Instalasi Pipa 1/2"
Bak Kontrol
Kran
Floor Drain
Pasang Closed Jongkok
kitchen zink
Biofil 2 x 1 x 1,5
XII
1
2
3
4
5
6
7
8
9
10
11
12
PEKERJAAN PENGECATAN
Cat dinding Lantai 1
Cat dinding Lantai 2
Cat dinding Lantai 3
Cat plafond
Cat kusen pintu KPJ1 dengan cat minyak
Cat kusen pintu KP1 dengan cat minyak
Cat kusen pintu KP2 dengan cat minyak
Cat kusen pintu KJ1 dengan cat minyak
Cat Ranga V1 dengan cat minyak
Cat Ranga V2 dengan cat minyak
Cat Ranga R1 dengan cat minyak
Cat Ranga R2 dengan cat minyak
XIII
Volume
Sat.
Harga
Satuan
( Rp)
17.75
m'
27,550.00
39.16
m'
24,500.00
44.90
m'
17,728.00
1.00
bh
463,556.60
9.00
bh
235,000.00
4.00
bh
12,000.00
4.00
bh
150,000.00
1.00
Unit
320,000.00
1.00
Unit
13,600,000.00
SUB TOTAL
561.24
m
615.20
m
22.01
m
273.15
m
12.42
m
13.25
m
22.21
m
5.12
m
1.08
m
0.91
m
1.05
m
1.17
m
SUB TOTAL
31,859.50
31,859.50
31,859.50
31,859.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
Jumlah
Harga
( Rp)
489,012.50
959,420.00
795,987.20
463,556.60
2,115,000.00
48,000.00
600,000.00
320,000.00
13,600,000.00
19,390,976.30
17,880,825.78
19,599,964.40
701,100.16
8,702,422.43
414,734.85
442,450.63
741,647.43
170,969.60
36,063.90
30,387.18
35,062.13
39,069.23
48,794,697.69
No.
Uraian Pekerjaan
1
2
3
4
5
6
7
8
9
XIV
1
2
PEKERJAAN LAIN-LAIN
Pembersihan lokasi pekerjaan
Quality Control
Volume
Sat.
Harga
Satuan
( Rp)
Jumlah
Harga
( Rp)
2
set
8
set
68
bh
2
bh
7
bh
8
bh
12
bh
14
bh
7
bh
SUB TOTAL
187,000.00
98,000.00
42,000.00
9,500.00
6,500.00
6,500.00
36,000.00
14,000.00
7,000.00
374,000.00
784,000.00
2,856,000.00
19,000.00
45,500.00
52,000.00
432,000.00
196,000.00
49,000.00
4,807,500.00
1.00
Ls
1.00
Ls
SUB TOTAL
TOTAL
1,000,000.00
1,000,000.00
1,000,000.00
1,000,000.00
2,000,000.00
1,126,295,856.69
NO
I
URAIAN PEKERJAAN
PEKERJAAN PENDAHULUAN
II
III
IV
PEKERJAAN PEMBESIAN
PEKERJAAN BEKISTING
VI
PEKERJAAN DINDING
VII
PEKERJAAN LANTAI
VIII
IX
XI
XII
PEKERJAAN PENGECATAN
XIII
X1V
PEKERJAAN LAIN-LAIN
HARGA
HARI
1
2.1
23,742,500.0
2.1
23,454,985.8
10.7
120,207,932.5
20
22.4
252,185,610.4
28
30.7
345,860,158.5
50
8.67
97,685,741.49
79
5.14
57,852,182.41
35
7.65
86,144,681.25
47
2.89
19,390,976.30
12
1.03
11,585,290.00
1.72
19,390,976.30
4.33
4,807,500.00
14
0.43
4,807,500.00
0.18
2,000,000.00
100.00
JUMLAH BOBOT
KOMULATIF BOBOT
1.37
BULAN 1
MINGGU
2
0.68
1.48
0
0
1.4
1.4
2.16
3.53
BULAN 2
MINGGU
6
7
BULAN 3
MINGGU
10
0.74
0.54
1.08
1.08
1.08
1.08
1.08
1.08
1.08
1.6
2.4
3.2
3.16
2.37
3.16
3.16
2.37
2.5
3.7
3.7
3.7
3.7
3.7
3.7
3.7
0.7
0.5
0.7
0.5
0.6
0.30
0.30
0.30
0.59
0.44
0.30
8.22
24.20
8.88
33.08
7.98
41.06
9.18
50.24
8.92
59.16
8.07
67.22
4.58
8.11
7.88
15.98
BULAN 3
MINGGU
11
12
1.08
1.62
13
BULAN 4
MINGGU
14
15
BULAN 5
MINGGU
16
17
0.7
0.7
1.0
0.79
2.5
0.5
0.7
0.5
0.5
0.7
0.59
0.59
0.30
0.59
0.89
0.6
1.0
1.0
1.0
0.74
0.74
0.74
0.74
0.74
0.34
0.34
0.57
0.86
0.29
1.5
0.14
5.47
72.69
4.60
77.29
1.96
79.25
0.14
3.43
82.68
0.036
0.11
4.16
86.84
2.40
89.23
3.80
93.03
BULAN 5
MINGGU
18
19
20
21
100
90
80
70
0.7
0.1
60
1.0
1.0
1.0
50
0.34
40
30
1.2
0.31
0.6
0.6
0.14
0.04
20
10
0
3.20
96.23
1.42
97.65
1.58
0.76
99.24 100.00
Nama Barang
X.3.1.
X.3.1.1.
Ukuran/Tipe
Sat.
Harga (Rp)
Batu
Bahan Struktur
1.
Abu Batu/Palu
M3
385,000.00
M3
450,000.00
1.
Batu Quarry/Batu
M3
362,500.00
Gunung
2.
Batu Pecah
10 -
15 cm
M3
346,000.00
3.
Batu Pecah
5 -
7 cm
M3
346,000.00
4.
Batu Pecah
3 -
5 cm
M3
346,000.00
5.
Batu Pecah
2 -
3 cm
M3
346,000.00
6.
Batu Pecah
1 -
2 cm
M3
346,000.00
7.
Batu Pecah
0.5 -
1.0 cm
M3
346,000.00
8.
M3
385,000.00
9.
Kerikil
M3
380,600.00
10.
Sirtu Royalti
M3
380,600.00
11.
M3
346,000.00
Agregat Kasar
M3
346,000.00
Agregat Halus
M3
361,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
Bh
900.00
74,500.00
3,500.00
3,500.00
3,500.00
16,000.00
8,900.00
6,725.00
6,200.00
5,000.00
4,620.00
6,385.00
4,400.00
3,850.00
3,850.00
3,850.00
3,850.00
320,000.00
140,000.00
140,000.00
320,000.00
76,800.00
140,000.00
23,650.00
312,500.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
(Chipping)
Sungai
X.3.2.
Loster Perancis
Loster Bulan Berkait
Loster Bintang Wajik
Loster Bunga Wajik
Loster Matahari
Batu Candi
Batu Marmo
Batu Palimanan
Batu Ardiret
Batu Lempengan Biasa
Batu Lempengan Merah
Uk. c 10
Uk.
10
Uk.
20
Uk.
10
Uk.
20
Uk.
20
Uk.
20
Uk.
15
Uk.
12
Uk.
10
Uk.
20
Uk.
30
Uk.
10
Uk.
9
Uk.
10
Uk.
20
Uk.
10
Uk.
20
Uk.
20
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
10
20
20
20
20
20
20
20
20
20
20
30
10
14
20
20
20
20
20
Uk.
30
30
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
20
25
10
30
10
10
40
40
40
40
40
0.5
20
30
25
10
30
10
10
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
Pasir
1.
M3
2.
Pasir Urug
M3
75,000.00
3.
Pasir Putih/Pasangan
M3
235,000.00
X.3.3.
Tanah
1.
Tanah Urug
M3
42,500.00
M3
80,000.00
1.
2.
3.
X.3.4.
Semen
Semen Abu-abu
Semen Abu-abu
Semen Abu-abu
Zak
Zak
Zak
80,000.00
65,000.00
60,000.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
1 zak = 50 kg
1 zak = 50 kg
1 zak = 50 kg
No
Nama Barang
4.
5.
2
Semen Abu-abu
Semen Abu-abu
Semen Putih
Semen Putih
X.3.5.
Kayu
1.
Kayu Ulin
Ukuran
12 x
12
2.
Kayu Ulin
Ukuran
10 x
10
3.
Kayu Ulin
Ukuran
5 x
10
Kayu Ulin
Ukuran
5 x
Papan Ulin
Ukuran
Papan Ulin
4.
1
6.
7.
8.
9.
Ukuran/Tipe
57,500.00
60,000.00
65,000.00
140,000.00
400 cm
M3
7,500,000.00
400 cm
M3
6,000,000.00
400 cm
M3
6,000,000.00
400 cm
M3
4,500,000.00
2 x
20
400 cm
M3
5,500,000.00
Ukuran
2 x
20
200 cm
M3
3,500,000.00
Kayu Meranti
Ukuran
6 x
12
400 cm
M3
3,500,000.00
Kayu Meranti
Ukuran
7 x
10
400 cm
M3
2,500,000.00
Papan Meranti
Ukuran
2.5 x
20
400 cm
M3
3,500,000.00
Papan Meranti
Ukuran
2 x
20
400 cm
M3
5,500,000.00
Kayu Meranti
Ukuran
5 x
400 cm
M3
5,000,000.00
Kayu Meranti
Ukuran
5 x
400 cm
M3
2,500,000.00
Kayu Bangkirai
Ukuran
6 x
12
400 cm
M3
7,000,000.00
Kayu Bangkirai
Ukuran
10 x
10
400 cm
M3
5,100,000.00
Papan Bangkirai
Ukuran
2 x
20
400 cm
M3
6,050,000.00
Papan Bangkirai
Ukuran
4 x
20
200 cm
M3
Btg
Btg
Btg
5,700,000.00
cm
cm
cm
cm
cm
cm
Btg
Btg
Btg
Btg
Btg
Btg
14,500.00
18,500.00
17,500.00
15,500.00
11,000.00
15,000.00
Roll
Dos
Dos
Dos
Kg
Roll
779,900.00
111,000.00
134,500.00
165,300.00
23,500.00
4,165,400.00
M'
M'
Kg
17,500.00
25,000.00
80,000.00
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
27,500.00
32,500.00
37,500.00
85,000.00
40,000.00
57,500.00
85,000.00
80,000.00
133,000.00
125,000.00
155,000.00
245,000.00
195,000.00
227,000.00
405,000.00
640,000.00
1.
2.
3.
4.
5.
6.
X.3.6.
Besi
X.3.6.1. Besi Nako
Besi Nako
Besi Nako
Besi Nako
Besi Nako
Besi Nako
Besi Nako
1 zak = 50 kg
1 zak = 50 kg
1 zak = 20 kg
1 zak = 40 kg
Harga (Rp)
Zak
Zak
Zak
Zak
10.
11.
12.
Panjang 400 cm
Diameter 8 panjang 400 cm
Ukuran
7.
8.
9.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
2 x
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
X.3.6.2. Kawat
Kawat Wiremesh
Kawat Las
Kawat Las
Kawat Las
Kawat Bendrat
Kawat Wiremesh
M6
Kawat Nyamuk
Kawat Kasa
Kawat Duri
1.
2.
3.
4.
5.
6.
Sat.
Panjang
Panjang
Panjang
Panjang
Bendrat
Panjang
Lebar
Lebar
27
66
65
53
24
60
8
2.6
3.2
4
mmx 2.25 m
mm
RB 26 @ 5 Kg
mm
RB 26 @ 5 Kg
mm
RB 26 @ 5 Kg
5.5 m
mmx
60 m
2.25
90 cm
90 cm
berat
berat
berat
berat
berat
berat
berat
berat
berat
berat
berat
berat
berat
0,22
0,393
0,393
0,393
0,393
0,62
0,62
0,887
1, 209
1, 209
1, 58
1, 58
2, 23
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
kg/m'
400 cm
60,000.00
70,000.00
32,000.00
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
1
18.
Besi Beton
Besi Strip
Kg
Kg
9,000.00
18,000.00
1.
2.
3.
Btg
Btg
Btg
21,500.00
26,500.00
37,500.00
1.
2.
3.
4.
1
Btg
Btg
Btg
Btg
Kg
66,500.00
166,500.00
227,000.00
400,000.00
9,700.00
1.
2.
3.
4.
5.
Psg
Psg
Kg
Kg
Kg
5,000.00
10,500.00
35,000.00
35,000.00
35,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
1
25.
26.
27.
28.
29.
X.3.6.5. Paku
Paku Triplek
Paku Payung
Paku Ulir
Paku Sumbat
Paku Sekrup
Paku Sekrup
Paku Sekrup
Paku Sekrup
Paku Beton
Paku Beton
Paku Beton
Paku Beton
Paku Beton
Paku Beton
Paku Beton
Paku Seng
Paku Seng
Paku Ulin
Paku Ulin
Paku Ulin
Paku Ulin
Paku Ulin
Paku Ulin
Paku Biasa
Paku Biasa
Paku Biasa
Paku Biasa
Paku Biasa
Paku Anti Karat
Kg
Kg
bh
bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
24,000.00
24,000.00
990.00
704.00
6,000.00
7,000.00
9,000.00
9,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
29,260.00
29,260.00
24,500.00
18,000.00
18,000.00
18,000.00
18,000.00
18,000.00
20,000.00
15,000.00
15,000.00
15,000.00
15,000.00
54,450.00
1.
X.3.6.6. Baja
Baja Profil
Kg
21,100.00
2.
Pintu Besi
M2
800,000.00
3.
Rolling Door
M2
960,000.00
1.
2.
3.
X.3.7.
Cat
X.3.7.1. Peralatan Cat
Ampelas
Kuas Roll
Kuas
Lbr
Bh
Bh
5,000.00
15,000.00
12,000.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
10 x 12,0 m
16 x 12,0 m
19 x 12,0 m
25 x 12,0 m
10 mm
12 mm
16 mm
10 mm
1 1/4"
1 1/2"
2"
2 1/2"
2 x 25"
2,5 x 30"
2,5 x 40"
3 x 50"
3 x 60"
4,2 x 100"
4,3 x 100"
2" besar
1 3/4" kecil
1"
1 1/2"
2"
3"
3 1/2"
4"
1 1/2"
2"
3"
3 1/2"
4"
WF 150
berat
berat
berat
berat
0,56
1,56
2,25
3,98
kg/m'
kg/m'
kg/m'
kg/m'
No
Nama Barang
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
1.
2.
3.
4.
5.
6.
7.
8.
9.
X.3.7.2.3. Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Waterproofing
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Ukuran/Tipe
Sat.
Kayu
Kayu
Besi
Dcor DWF - 200, 4 Kg
Emulsion EE-4003 warna standard 2,5 Liter
Emulsion EE-4003 warna standard 20 Liter
no. A
no. 7
Type 364
Type 397
Type 393
Type 355
Putih
Putih
White
Premium Full Acrylic Emulsion ( Exterior)
Standard
Premium Full Acrylic Emulsion ( Exterior)
White
Pure Acrylic Binder ( Exterior)
Standard
Pure Acrylic Binder ( Exterior)
Modified Acrylic (matt Finish) ( Exterior)White
Standard
Pure Acrylic Binder ( Exterior)
Sea Grass
Pure Acrylic Binder ( Exterior)
Signal Green
Pure Acrylic Binder ( Exterior)
Burnt Orange
Pure Acrylic Binder ( Exterior)
Signal Blue
Pure Acrylic Binder ( Exterior)
Black
Pure Acrylic Binder ( Exterior)
Signal Red
Pure Acrylic Binder ( Exterior)
White
Matt Finish Synthetic Acrylic topcoat (ext)
Standard
Matt Finish Synthetic Acrylic topcoat (ext)
Special
Matt Finish Synthetic Acrylic topcoat (ext)
Anti bacterial & Elastomeric (Interior) White
Anti bacterial & Elastomeric (Interior) Standard
White
Modified Acrylic (High Sheen Finish) ( Interior)
Standard
Modified Acrylic (High Sheen Finish) ( Interior)
Standard
Durable Elastomeric Exterior
Special
Durable Elastomeric Exterior
Standard
Acrylic weather shield
Special
Acrylic weather shield
Standard
Interior
Dcor alkali resisting primer
Weatershield ( Exterior )
Interior
Interior
Interior
Interior
Interior
Interior
1 Liter
1 Liter
5
5
5
5
20
5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
5
5
5
1
1
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
20
2.5
2.5
2.5
2.5
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Harga (Rp)
Kg
Kg
Kg
Klg
Klg
Klg
Kg
Kg
Kg
Klg
Klg
30,000.00
30,000.00
42,900.00
83,270.00
82,720.00
561,000.00
25,000.00
15,000.00
25,000.00
25,000.00
38,500.00
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
70,000.00
53,750.00
70,000.00
70,000.00
276,000.00
70,000.00
185,000.00
191,500.00
165,000.00
171,500.00
66,000.00
69,500.00
135,500.00
103,000.00
80,600.00
80,600.00
80,600.00
360,600.00
406,500.00
612,000.00
530,000.00
85,100.00
100,800.00
120,000.00
131,000.00
162,600.00
176,000.00
150,000.00
163,700.00
185,000.00
86,350.00
200,000.00
150,000.00
480,000.00
80,000.00
45,000.00
175,000.00
80,000.00
Klg
Klg
Klg
Kg
Kg
Kg
Kg
Kg
Kg
41,600.00
138,000.00
650,000.00
21,000.00
42,250.00
19,000.00
42,250.00
27,500.00
110,000.00
No
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Nama Barang
Ukuran/Tipe
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
Waterproofing
Sikaproof 400 SBS
Waterproofing
Sikaproof Primer
White
Floor coating
Alkyd Paint
Yellow 2
Floor coating
Alkyd Paint
Grey
Floor coating
Alkyd Paint
Green
Floor coating
Alkyd Paint
Red
Floor coating
Alkyd Paint
Blue
Floor coating
Alkyd Paint
Black
Floor coating
Alkyd Paint
Semen
AM 50 Nat
Standar
X.3.7.2.4. Cat Besi Anti Karat
White
Cat Besi
Alkyd/Synthetic Finish
Standard
Cat Besi
Alkyd/Synthetic Finish
Special base C
Cat Besi
Durable Interior Water-Base Glaze
Cat Besi
Interior Water based for special effects Golden Glow
Cat Besi
Interior Water based for special effects Starlights
Cat Besi
Undercoat/sealer (water base)
Cat Besi
Undercoat/sealer (solvent base)
Cat Besi
Alkyd Undercoat
Cat Besi
Thinner PT
20 Liter
Cat Besi
PUT - 603
1 Kg/Set
Cat Besi
PUT - 603
5 Kg/Set
Cat Besi
PUT - 603
20 Kg/Set
Cat Besi
Thinner Epoxy
0.8 Liter
Cat Besi
Thinner Epoxy
3.8 Liter
Cat Besi
Thinner Epoxy
20 Liter
Cat Besi
Thinner UT - 02
0.8 Liter
Cat Besi
Thinner UT - 02
3.8 Liter
Cat Besi
Thinner UT - 02
20 Liter
Cat Besi
624
Cat Besi
627
Cat Besi
660
Cat Besi
622
Cat Besi
623
Cat Besi
406 (Coklat Tua)
Cat Besi
899 (Hijau)
Cat Besi
879 (Abu-abu)
Cat Besi
3044/083 (Coklat)
Cat Besi
9102 (Putih)
Cat Besi
Hitam
Cat Besi
Coklat 084
Cat Besi
Hijau 222
1.
2.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Sat.
5
5
5
5
5
5
5
1
liter
liter
liter
liter
liter
liter
liter
liter
1
1
1
1
1
1
1
1
Liter
Liter
Liter
Liter
Liter
Liter
Liter
Liter
5 Kg
5 Kg
Wood Filler
Wood Stain (Pewarna kayu)Warna muda
Wood Stain (Pewarna kayu)Warna tua
Melamine system
Clear Dof,Clear Gloss
Melamine system
Semi gloss (cat akhir)
NC System
Clear Dof,Clear Gloss
NC System
Semi gloss (cat akhir)
Ultran Politur
Standard
Ultran Politur
Clear Dof,Clear Gloss
Ultran Politur
Warna transparant
Ultran Politur
Warna Oxide
Ultran Politur
Natural Gloss, Natural Dof
Thinner Ultran Politur
Ultran Lasur
Warna transparant
Ultran Lasur
Warna Oxide
Ultran Lasur
Natural Gloss, Natural Dof
Thinner Lasur
- 1 kg
- 1 liter
- 1 liter
- 1 liter
- 5 liter
- 1 liter
- 5 liter
- 1 liter
- 1 liter
- 1 liter
- 1 liter
- 1 liter
- 0.8 liter
- 1 liter
- 1 liter
- 1 liter
- 0.8 liter
Harga (Rp)
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
125,000.00
52,750.00
505,000.00
505,000.00
505,000.00
505,000.00
505,000.00
505,000.00
505,000.00
13,000.00
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
61,000.00
72,800.00
176,000.00
165,000.00
437,500.00
45,000.00
63,000.00
61,500.00
320,000.00
115,000.00
535,000.00
2,026,000.00
28,000.00
145,000.00
715,000.00
31,500.00
144,000.00
715,000.00
78,980.00
78,980.00
78,980.00
78,980.00
78,980.00
51,700.00
51,700.00
51,700.00
51,700.00
51,700.00
51,700.00
51,700.00
51,700.00
Klg
Klg
225,500.00
19,250.00
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
Klg
26,000.00
50,000.00
55,000.00
45,000.00
176,000.00
41,000.00
185,000.00
59,500.00
59,500.00
45,000.00
45,000.00
56,500.00
25,000.00
61,000.00
64,000.00
66,000.00
24,000.00
No
Nama Barang
18.
Cat Kayu
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
X.3.8.
Multipleks
Triplek
Triplek
Triplek
Triplek
Triplek
Triplek
Triplek
Melamine
Teakwood
Teakwood
Triplek
Lumbercoll
Multiplek
X.3.9.
X.3.9.1.
Ukuran/Tipe
Sat.
-
1 liter
3 mm
3,2 mm
4 mm
6 mm
9 mm
12 mm
18 mm
3 mm
4 mm
lapis aluminium
16 mm
Mega sungkai
mm
Harga (Rp)
Klg
49,500.00
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
60,000.00
46,000.00
60,000.00
77,000.00
100,000.00
135,000.00
210,000.00
121,000.00
121,000.00
265,650.00
205,150.00
185,000.00
110,000.00
1.
Kaca Bening
mm
M2
123,200.00
2.
Kaca Bening
mm
M2
135,000.00
3.
Kaca Bening
mm
M2
228,250.00
4.
Kaca Bening
mm
M2
308,000.00
5.
Kaca Bening
####
mm
M2
431,200.00
6.
Kaca Bening
####
mm
M2
554,400.00
7.
Kaca Rayband
mm
M2
137,500.00
8.
Kaca Rayband
####
mm
M2
352,000.00
9.
Kaca Rayband
####
mm
M2
566,500.00
10.
Kaca Grafir
mm
M2
665,000.00
11.
Kaca Grafir
mm
M2
832,000.00
11.
mm
M2
256,000.00
12.
mm
M2
448,000.00
12.
mm
M2
448,000.00
13.
mm
M2
640,000.00
14.
Kaca Patri
####
mm
M2
1,408,000.00
15.
Kaca Flash
mm
M2
576,000.00
16.
Kaca RD
mm
M2
448,000.00
X.3.9.2.
Gypsum
1.
Ukuran
1200
2400
mm
M2
56,000.00
2.
Ukuran
12
1200
2400
mm
M2
39,600.00
3.
Gypsum Fireshield
Ukuran
12
1200
2400
mm
M2
85,800.00
4.
Gypsum Fireshield
Ukuran
15
1200
2400
mm
M2
93,500.00
5.
Gypsum Moistureshield
Ukuran
1200
2400
mm
M2
77,000.00
6.
Gypsum Moistureshield
Ukuran
12
1200
2400
mm
M2
85,800.00
7.
Gypsum Moistureshield
Ukuran
15
1200
2400
mm
M2
94,600.00
8.
Gypsum Denseshield
Ukuran
12
1200
2400
mm
M2
85,800.00
9.
Gypsum Denseshield
Ukuran
15
1200
2400
mm
M2
94,600.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
X.3.9.3. GRC
GRC (External)
GRC (External)
GRC (External)
GRC (External)
GRC (External)
GRC (External)
GRC (External)
GRC (Internal)
GRC (Internal)
GRC (Internal)
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
9
9
12
15
4
9
9
4
5
6
x
x
x
x
x
x
x
x
x
x
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
95,150.00
302,500.00
409,200.00
540,100.00
26,620.00
37,620.00
67,100.00
95,000.00
113,300.00
154,000.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
300
1220
1220
1220
600
100
200
1220
1220
1220
x
x
x
x
x
x
x
x
x
x
2440
2440
2440
2440
2440
2440
2440
2440
2440
2440
No
11.
12.
Nama Barang
Ukuran/Tipe
GRC (Internal)
GRC (Internal)
X.3.9.4.
Ukuran
Ukuran
Aluminium composit
T = 4 mm
2.
Aluminium composit
T = 6 mm
Uk.
3.
Aluminium composit
T = 4 mm
Uk.
4.
Aluminium composit
(XL/XX) t. 4 mm
Uk.
5.
Aluminium composit
(XI) t. 4 mm
Uk.
6.
Aluminium composit
T. 4 mm
Uk.
7.
Aluminium composit
T. 4 mm
1.
2.
3.
4.
5.
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
1220
1220
x
x
x
x
2440
2440
mm
mm
Harga (Rp)
Lbr
Lbr
220,000.00
250,000.00
M2
1,605,000.00
M2
1,605,000.00
Aluminium Panel
1.
1.
2.
8
10
Sat.
Uk.
1200
1200
1200
1200
1200
X.3.9.6.
Accoustic Ceiling
Accoustic Ceiling
Ukuran
Suspension/Exposed (Rod 4 Ukuran
mm,
4 mm, Main T/Cross T. 24 mm,
Wall Angle L Metal)
X.3.10.
Bahan Pelapis Lantai
X.3.10.1. Granito Tile
Granito Tile
Castello
Granito Tile
Castello
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Salt & Pepper
Granito Tile
Travertine
Granito Tile
Travertine
Granito Tile
Travertine
Granito Tile
Travertine
Granito Tile
Big Grain
Granito Tile
Big Grain
Granito Tile
Marble
Granito Tile
Marble
Granito Tile
Domus
Granito Tile
Flame
Granito Tile
Ructic
Granito Tile
Salsa
Granito Tile
Salsa
Granito Tile
Salsa
Granito Tile
Salsa
Granito Tile
Palazzo
Granito Tile
Palazzo
Granito Tile
Salt & Pepper
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
2m
Lebar
Lebar
Lebar
Lebar
Lebar
1250
m
m
M2
1,475,000.00
m
m
M2
1,250,000.00
1220
m
m
1,220,000.00
1220
m
m
M2
1,475,000.00
m
m
1,350,000.00
Lbr
Lbr
Lbr
Lbr
Lbr
49,400.00
75,000.00
98,000.00
160,000.00
204,000.00
1220
1220
1220
2400
2400
2400
2400
2400
x
x
x
x
x
15 x 600
600
x
x
x
x
x
x
x
3.02 m
3.5
4.5
6
9
12
mm
mm
mm
mm
mm
1200 mm
600 mm
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Lbr
Meter
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
40
40
40
40
40
40
40
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
40
40
40
40
40
40
40
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
Box
Box
Box
Box
Box
Bh
Box
Box
Box
Bh
Box
Box
Box
Bh
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
186,533.00
201,850.00
184,500.00
258,000.00
173,800.00
34,200.00
211,167.00
283,689.00
185,000.00
37,500.00
240,000.00
322,083.00
225,030.00
40,500.00
318,900.00
371,000.00
366,000.00
418,000.00
258,000.00
305,000.00
269,000.00
321,000.00
246,000.00
246,000.00
170,000.00
202,400.00
249,700.00
228,800.00
268,400.00
270,000.00
316,800.00
185,000.00
No
Nama Barang
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
Granito Tile
1.
2.
3.
4.
1
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
X.3.10.2. Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Ukuran/Tipe
Sat.
Harga (Rp)
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
20
20
90
90
160
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
60
10
20
90
90
120
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Bh
Bh
Bh
258,000.00
211,000.00
284,000.00
240,000.00
322,000.00
319,000.00
371,000.00
366,000.00
418,000.00
317,000.00
264,500.00
269,000.00
321,000.00
246,000.00
246,000.00
184,000.00
295,900.00
346,500.00
366,300.00
347,700.00
403,700.00
195,200.00
236,800.00
275,200.00
360,000.00
282,000.00
351,000.00
366,000.00
348,700.00
436,000.00
386,000.00
341,200.00
282,600.00
618,500.00
176,000.00
126,000.00
985,500.00
1,689,000.00
Dinding
Dinding
Roxy
Polos
Special ( Warna Muda )
Dinding
Dinding
Dinding
Polos
Special ( Warna Muda )
Medium ( Warna Tua )
Dinding
Dinding
Dinding
List
Special
Medium
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
20
20
20
20
10
20
20
20
20
20
7.5
25
25
25
7.5
25
25
7.5
30
30
30
30
30
30
30
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
20
20
20
20
20
20
25
25
25
25
20
40
40
40
20
40
40
20
50
50
30
30
30
30
30
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Bh
Box
Box
Box
Bh
Box
Box
Bh
Box
Box
Box
Box
Box
Box
Box
53,900.00
57,530.00
526,900.00
53,900.00
61,600.00
50,600.00
60,000.00
61,050.00
64,350.00
66,000.00
8,000.00
114,950.00
122,100.00
106,700.00
17,000.00
132,000.00
141,000.00
29,000.00
148,000.00
156,000.00
45,650.00
46,860.00
48,070.00
48,950.00
52,800.00
Dinding
List
Dinding
Premium
Dinding
Exclusive A
Dinding
List
Dinding
Premium
Dinding
Exclusive A
Murano
Jungle/Etna
Orient/Marmol/Capri/Milo
Newton/Nori/Marble
Corsica
No
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
Nama Barang
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Keramik
Ukuran/Tipe
Oscar
Petra
Dinding
Lantai
Sat.
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
List
Rustic
Lantai
Special
Lantai
Medium
Murano
Torino/Galleria
Tahiti
Genesis
Caracas
Cordon
Albatros
Ozone
30
30
7.5
30
30
30
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
45
45
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
30
30
20
30
30
30
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
45
45
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
Harga (Rp)
Box
Box
Bh
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
Box
65,000.00
56,100.00
38,500.00
60,000.00
49,500.00
56,100.00
71,500.00
73,700.00
51,700.00
55,000.00
56,100.00
59,400.00
59,400.00
64,900.00
66,000.00
71,500.00
63,800.00
57,200.00
63,800.00
66,000.00
84,700.00
79,200.00
56,100.00
58,300.00
60,500.00
77,000.00
80,300.00
Wallpaper
M2
243,000.00
2.
Wallpaper
M2
282,000.00
3.
Vertical Blind
M2
243,000.00
4.
Horizontal Blind
M2
192,000.00
5.
Wood Blind
M2
154,000.00
6.
Wood Blind
M2
128,000.00
Lantai Kayu
Costul (DCW)
Ukuran
12
x102
900
m
m
M2
430,000.00
2.
Lantai Kayu
Costul (DCW)
Ukuran
12
x140
900
m
m
M2
430,000.00
430,000.00
3.
Lantai Kayu
Costul (DCW)
Ukuran
12
x140
m
915
m
4.
Lantai Kayu
Costul (DCW)
Ukuran
12
x140
925
m
m
M2
430,000.00
m
900
m
530,000.00
M2
530,000.00
5.
Lantai Kayu
Kalimantan Poon
Ukuran
12
x102
6.
Lantai Kayu
Kalimantan Poon
Ukuran
12
x140
m
900
m
7.
Lantai Kayu
Kalimantan Poon
Ukuran
12
x140
900
m
m
M2
530,000.00
M2
530,000.00
8.
Lantai Kayu
Kalimantan Poon
Ukuran
12
x140
m
915
m
9.
Lantai Kayu
Kalimantan Poon
Ukuran
12
x140
925
m
m
M2
530,000.00
M2
530,000.00
10.
Lantai Kayu
Light Nyatoh
Ukuran
12
x102
m
900
m
11.
Lantai Kayu
Light Nyatoh
Ukuran
12
x140
900
m
m
M2
530,000.00
M2
530,000.00
m
m
M2
530,000.00
12.
Lantai Kayu
Light Nyatoh
Ukuran
12
x140
m
915
m
13.
Lantai Kayu
Light Nyatoh
Ukuran
12
x140
925
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
14.
Lantai Kayu
Golden Rosewood
Ukuran
12
x102
900
m
m
M2
580,000.00
15.
Lantai Kayu
Golden Rosewood
Ukuran
12
x140
900
m
m
M2
580,000.00
M2
580,000.00
m
m
M2
580,000.00
16.
Lantai Kayu
Golden Rosewood
17.
Lantai Kayu
Golden Rosewood
18.
Lantai Kayu
Costul (DCW)
19.
Lantai Kayu
Costul (DCW)
20.
Lantai Kayu
Basic Collection
21.
Lantai Kayu
Comfort Collection
Ukura
nUkura
n
Ukura
n
Ukuran
12
x140
m
915
m
Ukuran
12
x140
925
28
180
1000 mm
M2
860,000.00
28
180
2000 mm
M2
860,000.00
7 mm
19 cm
128.5
cm
M2
506,000.00
Ukura
n
8 mm
19 cm
128.5
cm
M2
545,000.00
8 mm
19 cm
121
cm
M2
428,000.00
22.
Lantai Kayu
Ukuran
Ukura
n
23.
Lantai Kayu
Ukuran
Ukura
n
8 mm
19 cm
121
cm
M2
428,000.00
Ukuran
Ukura
n
8 mm
19 cm
121
cm
M2
488,000.00
Botol
Botol
50,000.00
94,000.00
24.
Lantai Kayu
1.
2.
3.
PE Foam
Tebal 3 mm
M2
13,000.00
4.
PE Foam
Warna Abu-abu
M2
25,000.00
5.
PE Foam
Warna Putih
M2
12,000.00
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
36,000.00
72,500.00
36,000.00
72,500.00
227,000.00
253,000.00
278,000.00
430,000.00
480,000.00
544,000.00
468,000.00
480,000.00
544,000.00
686,000.00
480,000.00
44 /m2
44 /m2
Bh
2,100.00
Bh
2,980.00
44 /m2
44 /m2
Bh
2,380.00
Bh
3,460.00
35 /m2
35 /m2
Bh
2,380.00
Bh
3,260.00
35 /m2
35 /m2
Bh
2,660.00
Bh
3,740.00
40 /m2
40 /m2
Bh
2,240.00
Bh
3,446.00
40 /m2
40 /m2
Bh
2,520.00
Bh
3,600.00
48 /m2
48 /m2
Bh
1,960.00
Bh
2,840.00
48 /m2
48 /m2
Bh
2,240.00
Bh
3,320.00
2.5
2.4
2.4
m
m
m
Paving Block
Serasi Abu-Abu
(6 cm)
isi
2.
Paving Block
Serasi Merah
(6 cm)
isi
3.
Paving Block
Serasi Abu-Abu
(8 cm)
isi
4.
Paving Block
Serasi Merah
(8 cm)
isi
5.
Paving Block
isi
6.
Paving Block
(6 cm)
isi
7.
Paving Block
isi
8.
Paving Block
(8 cm)
isi
9.
Paving Block
Diagonal Abu-Abu
(6 cm)
isi
10.
Paving Block
Diagonal Merah
(6 cm)
isi
11.
Paving Block
Diagonal Abu-Abu
(8 cm)
isi
12.
Paving Block
Diagonal Merah
(8 cm)
isi
13.
Paving Block
Bata Abu-Abu
(6 cm)
isi
14.
Paving Block
Bata Merah
(6 cm)
isi
15.
Paving Block
Bata Abu-Abu
(8 cm)
isi
16.
Paving Block
Bata Merah
(8 cm)
isi
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
No
Nama Barang
Ukuran/Tipe
17.
Paving Block
(6 cm)
isi
18.
Paving Block
isi
19.
Paving Block
isi
20.
Paving Block
isi
21.
Paving Block
isi
22.
Paving Block
Benteng Abu-Abu
(6 cm)
isi
23.
Paving Block
Benteng Merah
(6 cm)
isi
24.
Paving Block
Benteng Abu-Abu
(8 cm)
isi
25.
Paving Block
Benteng Merah
(8 cm)
isi
26.
Serasi Abu-Abu
(6 cm)
isi
27.
Serasi Merah
(6 cm)
isi
28.
Serasi Abu-Abu
(8 cm)
isi
29.
Serasi Merah
(8 cm)
isi
30.
isi
31.
(6 cm)
isi
32.
isi
33.
(8 cm)
isi
34.
Diagonal Abu-Abu
(6 cm)
isi
35.
Diagonal Merah
(6 cm)
isi
36.
Diagonal Abu-Abu
(8 cm)
isi
37.
Diagonal Merah
(8 cm)
isi
38.
Bata Abu-Abu
(6 cm)
isi
39.
Bata Merah
(6 cm)
isi
40.
Bata Abu-Abu
(8 cm)
isi
41.
Bata Merah
(8 cm)
isi
42.
(6 cm)
isi
43.
isi
44.
isi
45.
isi
46.
isi
47.
Benteng Abu-Abu
(6 cm)
isi
48.
Benteng Merah
(6 cm)
isi
49.
Benteng Abu-Abu
(8 cm)
isi
50.
Benteng Merah
(8 cm)
isi
51.
Serasi Abu-Abu
(6 cm)
isi
52.
Serasi Merah
(6 cm)
isi
53.
Serasi Abu-Abu
(8 cm)
isi
54.
Serasi Merah
(8 cm)
isi
55.
isi
56.
(6 cm)
isi
57.
isi
58.
(8 cm)
isi
59.
Diagonal Abu-Abu
(6 cm)
isi
60.
Diagonal Merah
(6 cm)
isi
61.
Diagonal Abu-Abu
(8 cm)
isi
62.
Diagonal Merah
(8 cm)
isi
63.
Bata Abu-Abu
(6 cm)
isi
64.
Bata Merah
(6 cm)
isi
65.
Bata Abu-Abu
(8 cm)
isi
66.
Bata Merah
(8 cm)
isi
67.
(6 cm)
isi
68.
isi
69.
isi
70.
isi
71.
isi
72.
Benteng Abu-Abu
(6 cm)
isi
73.
Benteng Merah
(6 cm)
isi
74.
Benteng Abu-Abu
(8 cm)
isi
75.
Benteng Merah
(8 cm)
isi
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Sat.
Harga (Rp)
9 /m2
30 /m2
30 /m2
Bh
10,500.00
Bh
3,920.00
Bh
5,400.00
30 /m2
30 /m2
Bh
5,400.00
Bh
5,400.00
35 /m2
35 /m2
Bh
980.00
Bh
1,420.00
35 /m2
35 /m2
Bh
1,120.00
Bh
1,660.00
44 /m2
44 /m2
Bh
2,600.00
Bh
3,600.00
44 /m2
44 /m2
Bh
3,000.00
Bh
4,000.00
35 /m2
35 /m2
Bh
3,000.00
Bh
4,000.00
35 /m2
35 /m2
Bh
3,200.00
Bh
4,500.00
40 /m2
40 /m2
Bh
3,000.00
Bh
4,000.00
40 /m2
40 /m2
Bh
4,200.00
Bh
4,300.00
48 /m2
48 /m2
Bh
2,500.00
Bh
3,500.00
48 /m2
48 /m2
Bh
3,000.00
Bh
4,000.00
9 /m2
30 /m2
Bh
11,600.00
Bh
3,300.00
30 /m2
30 /m2
Bh
3,600.00
Bh
3,600.00
30 /m2
35 /m2
Bh
3,800.00
Bh
3,000.00
35 /m2
35 /m2
Bh
4,000.00
Bh
3,300.00
35 /m2
44 /m2
Bh
4,500.00
Bh
3,150.00
44 /m2
44 /m2
Bh
4,470.00
Bh
3,570.00
44 /m2
35 /m2
Bh
5,190.00
Bh
3,570.00
35 /m2
35 /m2
Bh
4,850.00
Bh
3,990.00
35 /m2
40 /m2
Bh
5,610.00
Bh
3,360.00
40 /m2
40 /m2
Bh
5,169.00
Bh
3,780.00
40 /m2
48 /m2
Bh
5,400.00
Bh
3,940.00
48 /m2
48 /m2
Bh
4,260.00
Bh
3,360.00
48 /m2
9 /m2
Bh
4,980.00
Bh
11,700.00
30 /m2
30 /m2
Bh
3,500.00
Bh
3,700.00
30 /m2
30 /m2
Bh
3,700.00
Bh
4,000.00
35 /m2
35 /m2
Bh
3,570.00
Bh
4,890.00
35 /m2
35 /m2
Bh
3,990.00
Bh
5,610.00
No
Nama Barang
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
X.3.10.5. Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Kansteen
Type K.225
Type K.300
Type K.225
Type K.300
Type K.225
Type K.300
Type K.225
Type K.300
Type K.225
Type K.300
Ukura
nUkura
n
Ukura
nUkura
nUkura
nUkura
nUkura
nUkura
nUkura
nUkura
n
1.
2.
3.
4.
X.3.10.6. Tegel/Ubin
Tegel/Ubin
Tegel/Ubin
Tegel/Ubin
Tegel/Ubin
Grys Warna
Grys Warna
Grys Abu-abu
Grys Abu-abu
Ukura
n
Ukura
nUkura
nUkura
n
1.
2.
3.
4.
5.
6.
Ukuran/Tipe
41,681.00
49,883.00
33,750.00
39,555.00
36,750.00
43,200.00
33,850.00
49,950.00
33,000.00
34,300.00
Bh
Bh
Bh
Bh
4,500.00
2,200.00
4,000.00
2,000.00
Bh
Lbr
M2
Lbr
Lbr
Bh
650.00
44,000.00
250,000.00
198,000.00
58,000.00
45,000.00
75,000.00
Isi 20 Bh/M2
Isi 20 Bh/M2
Bh
4,725.00
Bh
2,600.00
Isi 20 Bh/M2
Isi 20 Bh/M2
Bh
3,350.00
Bh
4,725.00
Isi 20 Bh/M2
Isi 20 Bh/M2
Bh
2,600.00
Bh
3,350.00
Isi 12 Bh/M2
Isi 12 Bh/M2
Bh
6,025.00
Bh
4,300.00
Isi 12 Bh/M2
Isi 12 Bh/M2
Bh
5,000.00
Bh
3,800.00
Bh
6,025.00
Bh
5,000.00
9 Bh/M2
9 Bh/M2
Bh
6,025.00
Bh
5,586.00
9 Bh/M2
Isi 3,5 Bh/M2
Bh
6,900.00
Bh
7,425.00
Bh
5,875.00
Bh
6,027.00
Bh
5,145.00
Bh
6,875.00
Bh
6,027.00
Bh
Bh
Bh
Bh
Bh
Bh
7,938.00
6,645.00
7,000.00
7,938.00
6,645.00
7,000.00
Ukura
n
x
x
x
x
x
x
x
x
x
x
30
20
30
20
90
x
x
x
x
x ##### cm
30
30
20
20
30
30
40
40
30
30
30
20
30
20
x50
x50
x50
x50
x50
x50
x50
x50
x40
x40
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
Harga (Rp)
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
X.3.11.
Bahan Penutup Atap
Atap Sirap
Tilux
Atap tegola
Atap Onduline
Asbes Gelombang
Bubungan Asbes Gelombang
Talang PVC
15/20
15/20
15/20
15/20
20/20
20/20
15/20
15/20
15/20
15/20
Sat.
Genteng Beton
Kia Natural
2.
Genteng Beton
3.
Genteng Beton
4.
Genteng Beton
Garuda Natural
5.
Genteng Beton
6.
Genteng Beton
Garuda Natural 2x
7.
Genteng Beton
Garuda Natural
8.
Genteng Beton
9.
Genteng Beton
10.
Genteng Beton
SafariI Natural
11.
Genteng Beton
12.
Genteng Beton
Isi 12 Bh/M2
Isi 12 Bh/M2
13.
Genteng Beton
Amsterdam/Flat Natural
Isi
14.
Genteng Beton
Isi
15.
Genteng Beton
Isi
16.
Genteng Beton
17.
Genteng Beton
18.
Genteng Beton
19.
Genteng Beton
20.
Genteng Beton
21.
Genteng Beton
22.
23.
24.
25.
26.
27.
Genteng Beton
Genteng Beton
Genteng Beton
Genteng Beton
Genteng Beton
Genteng Beton
28.
Genteng Beton
Kyoto Natural
6,075.00
Genteng Beton
Isi# Bh/M2
Isi# Bh/M2
Bh
29.
Bh
4,400.00
30.
Genteng Beton
Isi# Bh/M2
Bh
5,050.00
Isi# Bh/M2
Bh
9,200.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
KM 1 Standard
No
Nama Barang
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
17.
18.
19.
20.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
Ukuran/Tipe
KM 1 PA
KM 2 Nok
KM 2 PP
KM 3
KM 4
KM 6
KM 7A
KM 7B
KM 8A
KM 8A
KM 9 + 9A
KM 10 A
KM 10 B
KM 10 C
KM 11
(Pemanas Air)
3,9
Isi Bh/M'
(Penangkal Petir)
(Lisplank Kiri)
(Lisplank Kanan)
(Ujung Jurai)
(Ujung Nok Kanan)
(Ujung Nok Kiri)
(Nok 3 Arah Kanan)
(Nok 3 Arah Kari)
(Hiasan Sudut Jurai)
(Nok 2 Arah)
(Nok 2 Arah Kanan)
(Nok 2 Arah Kiri)
(Nok 4 Arah Jurai)
Genteng 2 x 5 ( 1 m2 =
1,3 lb ) 2 x 5 ( 1 m2 =
Genteng
1,3 lb ) 1 x 5 ( 1 m2 =
Genteng
2,6
lb ) 1 x 5 ( 1 m2 =
Genteng
2,6 lb )
Nok model U
Nok model U
Nok Model C
Nok Model C
Nok samping
Nok samping
Wall Flashing
Wall Flashing
Tutup Nok
Tutup Nok
Genteng 4 x 4
Genteng 4 x 4
Genteng 3 x 4
Genteng 3 x 4
Genteng 2 x 4
Genteng 2 x 4
Genteng 1 x 4
Genteng 1 x 4
Nok model U
Nok model U
Nok Model C
Nok Model C
Nok samping
Nok samping
Wall Flashing
Wall Flashing
Tutup Nok
Tutup Nok
Genteng 2 x 4
Genteng 2 x 4
Genteng 2 x 4
Genteng 1 x 4
Genteng 1 x 4
Genteng 1 x 4
Nok model U
Nok Model C
Nok samping
Wall Flashing
Tutup Nok
Sat.
( Merpati )
( Elang )
( Garuda )
( Merpati )
( Elang )
( Garuda )
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
77
77
38.5
38.5
110
110
R. 9 - 9,5 cm
R. 9 - 9,5 cm
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
154
154
#
#
#
77
77
38.5
38.5
110
110
R. 9 - 9,5 cm
R. 9 - 9,5 cm
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
77
77
77
38.5
38.5
38.5
110
R. 9 - 9,5 cm
110
110
110
110
110
110
110
110
110
110
x100 cm
x100 cm
x100 cm
x100 cm
x 5
x
x 5
x
x 40
x 40
#
x
x
#
x
x
#
x
10
x
10
x
x
x
x
x
x
x
x
x
x
x
x
x
x
80 cm
80 cm
80 cm
80 cm
80 cm
80 cm
80 cm
80 cm
5
x
5
x
x 40
x 40
#
x
#
x
#
10
10
6
6
cm
cm
6
6
cm
cm
6
6
cm
cm
6
6
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
80 cm
80 cm
80 cm
80 cm
80 cm
80 cm
5
x 6 cm
cm
x 40
#
x
x 6 cm
#
cm
x
10
x
x
x
x
x
x
x
Harga (Rp)
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
16,200.00
20,600.00
44,000.00
17,000.00
17,000.00
60,000.00
60,000.00
60,000.00
76,000.00
76,000.00
76,000.00
76,000.00
76,000.00
76,000.00
250,000.00
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
155,000.00
140,000.00
80,000.00
70,000.00
46,000.00
40,000.00
30,000.00
25,000.00
46,000.00
42,000.00
46,000.00
42,000.00
30,000.00
39,000.00
203,000.00
177,000.00
153,000.00
133,000.00
103,000.00
90,000.00
53,000.00
46,000.00
46,000.00
40,000.00
61,000.00
81,000.00
90,000.00
31,000.00
42,000.00
46,000.00
33,000.00
27,000.00
21,000.00
33,000.00
46,000.00
40,000.00
29,000.00
23,000.00
46,000.00
40,000.00
26,000.00
30,000.00
26,000.00
Atap Aluminium
1.
Atap Aluminium
Klip Lok
Tebal 0,50
mm
TCT,Colourbond
M2
262,000.00
2.
Atap Aluminium
Klip Lok
Tebal 0,50
mm
TCT,Zincalume
M2
173,000.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
3.
Atap Aluminium
Spandek
Tebal 0,45
mm
TCT,Colourbond
M2
215,000.00
4.
Atap Aluminium
Spandek
Tebal 0,45
mm
TCT,Zincalume
M2
138,000.00
5.
Atap Aluminium
Spandek
Tebal 0,40
mm
TCT,Colourbond
M2
199,000.00
6.
Atap Aluminium
Spandek
Tebal 0,40
mm
TCT,Zincalume
M2
125,000.00
7.
Atap Aluminium
Trimdek
Tebal 0,45
mm
TCT,Colourbond
M2
200,000.00
8.
Atap Aluminium
Trimdek
Tebal 0,45
mm
TCT,Zincalume
M2
128,000.00
9.
Atap Aluminium
Trimdek
Tebal 0,40
mm
TCT,Colourbond
M2
183,000.00
10.
Atap Aluminium
Trimdek
Tebal 0,40
mm
TCT,Zincalume
M2
115,000.00
11.
Atap Aluminium
Tebal 0,50
mm
TCT,Pelangi
M2
237,000.00
12.
Atap Aluminium
Tebal 0,45
mm
TCT,Pelangi
M2
218,000.00
13.
Atap Aluminium
Tebal 0,45
mm
TCT,Bare
M2
156,000.00
14.
Atap Aluminium
Spandek (Indodek)
Tebal 0,45
mm
TCT,Pelangi
M2
192,000.00
15.
Atap Aluminium
Spandek (Indodek)
Tebal 0,40
mm
TCT,Pelangi
M2
173,000.00
16.
Atap Aluminium
Spandek (Indodek)
Tebal 0,35
mm
TCT,Pelangi
M2
160,000.00
17.
Atap Aluminium
Spandek (Indodek)
Tebal 0,35
mm
TCT,Zincalume
M2
110,000.00
18.
Atap Aluminium
Trimdek ( Nusadek )
Tebal 0,45
mm
TCT,Pelangi
M2
180,000.00
19.
Atap Aluminium
Trimdek ( Nusadek )
Tebal 0,40
mm
TCT,Pelangi
M2
160,000.00
20.
Atap Aluminium
Trimdek ( Nusadek )
Tebal 0,35
mm
TCT,Pelangi
M2
141,000.00
21.
Atap Aluminium
Trimdek ( Nusadek )
Tebal 0,35
mm
TCT,Zincalume
M2
103,000.00
22.
Atap Aluminium
Tebal 0,50
mm
TCT,Gemilang
M2
205,000.00
23.
Atap Aluminium
Tebal 0,50
mm
TCT,Abadi
M2
157,000.00
24.
Atap Aluminium
Tebal 0,45
mm
TCT,Gemilang
M2
188,000.00
25.
Atap Aluminium
Tebal 0,45
mm
TCT,Abadi
M2
142,000.00
26.
Atap Aluminium
Spandek (Satria)
Tebal 0,45
mm
TCT,Gemilang
M2
166,000.00
27.
Atap Aluminium
Spandek (Satria)
Tebal 0,45
mm
TCT,Abadi
M2
127,000.00
28.
Atap Aluminium
Spandek (Satria)
Tebal 0,40
mm
TCT,Gemilang
M2
148,000.00
29.
Atap Aluminium
Spandek (Satria)
Tebal 0,40
mm
TCT,Abadi
M2
114,000.00
30.
Atap Aluminium
Spandek (Satria)
Tebal 0,35
mm
TCT,Gemilang
M2
135,000.00
31.
Atap Aluminium
Spandek (Satria)
Tebal 0,35
mm
TCT,Abadi
M2
102,000.00
32.
Atap Aluminium
Trimdek ( Arjuna )
Tebal 0,45
mm
TCT,Gemilang
M2
152,000.00
33.
Atap Aluminium
Trimdek ( Arjuna )
Tebal 0,45
mm
TCT,Abadi
M2
119,000.00
34.
Atap Aluminium
Trimdek ( Arjuna )
Tebal 0,40
mm
TCT,Gemilang
M2
137,000.00
35.
Atap Aluminium
Trimdek ( Arjuna )
Tebal 0,40
mm
TCT,Abadi
M2
106,000.00
36.
Atap Aluminium
Trimdek ( Arjuna )
Tebal 0,35
mm
TCT,Gemilang
M2
125,000.00
37.
Atap Aluminium
Trimdek ( Arjuna )
Tebal 0,35
mm
TCT,Abadi
M2
93,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
lebar 45 cm
lebar 45 cm
0,37 x 60 cm
Besar BJLS 30
Besar BJLS 20
BJLS 20 KI
BJLS 25 KI
BJLS 30
BJLS 25
BJLS 20
BJLS 18
BJLS 20 KI
BJLS 25 KI
BJLS 30
BJLS 25
BJLS 20
BJLS 18
M'
M'
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
19,000.00
7,500.00
36,000.00
100,000.00
90,000.00
37,500.00
80,000.00
60,000.00
55,000.00
50,000.00
45,000.00
54,000.00
64,000.00
48,000.00
43,000.00
32,000.00
27,000.00
1.
2.
Roll
Roll
310,000.00
400,000.00
3.
Glasswoll
4.
Glasswoll
5.
Glasswoll
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
1.3 x
1.3 x
60
60
m
m
D. 16 Kg/M3
Tebal # mm
1.2
m x
30
Roll
239,000.00
D. 16 Kg/M3
Tebal # mm
1.2
m x
15
Roll
239,000.00
D. 24 Kg/M3
Tebal # mm
1.2
m x
30
Roll
345,000.00
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
6.
Glasswoll
D. 24 Kg/M3
Tebal # mm
1.2
m x
15
Roll
345,000.00
7.
Glasswoll
D. 32 Kg/M3
Tebal # mm
1.2
m x
30
Roll
485,000.00
8.
Glasswoll
1.2
m x
15
Roll
485,000.00
9.
10.
11.
Roofmesh
Aluminium Tape
Metalizing Tape
Tebal # mm
D. 32 Kg/M3
3315 : 1.8 x 30 m
Roll
Roll
Roll
275,000.00
24,000.00
7,500.00
12.
Rockwoll Slab
D. 40 Kg/M3
Tebal # mm
0.6
m x
1.2
Roll
12,000.00
13.
Rockwoll Slab
D. 40 Kg/M3
Tebal # mm
0.6
m x
1.2
Roll
23,500.00
14.
Rockwoll Slab
D. 60 Kg/M3
Tebal # mm
0.6
m x
1.2
Roll
16,000.00
15.
Rockwoll Slab
D. 60 Kg/M3
Tebal # mm
0.6
m x
1.2
Roll
33,000.00
16.
Rockwoll Slab
D. 80 Kg/M3
Tebal # mm
0.6
m x
1.2
Roll
22,500.00
17.
Rockwoll Slab
D. 80 Kg/M3
Tebal # mm
0.6
m x
1.2
Roll
44,000.00
18.
Rockwoll Slab
D. 100 Kg/M3
Tebal # mm
0.6
m x
1.2
Roll
29,000.00
19.
Rockwoll Slab
D. 100 Kg/M3
Tebal # mm
0.6
m x
1.2
Roll
55,500.00
20.
Rockwoll Blanket
D. 40 Kg/M3
Tebal # mm
0.6
m x
Roll
47,000.00
21.
Rockwoll Blanket
D. 40 Kg/M3
Tebal # mm
0.6
m x
Roll
94,000.00
22.
Rockwoll Blanket
D. 60 Kg/M3
Tebal # mm
0.6
m x
Roll
66,500.00
23.
Rockwoll Blanket
D. 60 Kg/M3
Tebal # mm
0.6
m x
Roll
146,000.00
24.
Rockwoll Blanket
D. 80 Kg/M3
Tebal # mm
0.6
m x
Roll
88,000.00
25.
Rockwoll Blanket
D. 80 Kg/M3
Tebal # mm
0.6
m x
Roll
178,500.00
26.
Rockwoll Blanket
D. 100 Kg/M3
Tebal # mm
0.6
m x
Roll
111,000.00
27.
Rockwoll Blanket
m x
Roll
228,500.00
28.
29.
Aluminium Foil
Aluminium Foil
Tebal # mm
x
0.6
D. 100 Kg/M3
Lebar 1,25 m Panjang 60 m (Single Side)
Lebar 1,25 m Panjang 60 m (Double Side)
Lbr
Lbr
290,000.00
513,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
X.3.12.
Penggantung & Pengunci
Engsel (Nylon)
4"
Engsel (Nylon)
3"
Engsel
Kipas
Grendel
Grendel
Tanam
Hak Angin
20 cm
Handle
4"
Kunci Pintu
Besar 693 LD
Kunci Pintu
Kecil
Kunci Tanam
2 x Slaag
Kunci Tanam
Pintu Sorong
Kunci Alpha 8000
8000
Kunci Pintu
Besar
Kunci Pintu
WC Cylinder
Finishing US3
WC Cylinder
Finishing US14
Mortice Lock
D Cylinder
Finishing BRS
D Cylinder
Finishing BRS
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
Bh
Bh
Set
Set
Set
Bh
Bh
Bh
Bh
Bh
42,000.00
36,000.00
42,000.00
21,000.00
71,000.00
14,000.00
11,000.00
187,000.00
141,000.00
212,000.00
247,000.00
176,000.00
212,000.00
916,000.00
105,000.00
112,000.00
20.
Pull Handle
Pasang
4,573,000.00
21.
Pull Handle
Finishing US32(P.75.64)
Pasang
5,000,000.00
22.
Pull Handle
Finishing GPD(PR.88.21)
Pasang
962,000.00
23.
Lever Handle
HP.88.01
Pasang
245,000.00
24.
Lever Handle
HRE.65.03
Pasang
458,000.00
25.
Lever Handle
HRE.75.01
Pasang
310,000.00
26.
Glass Handle
GHD0001 D25x200MM
Pasang
845,000.00
27.
Glass Handle
GHD0001 D32x300MM
Pasang
1,182,000.00
28.
29.
Door Closer RA
Door Closer RA
71410 - 03
85510 - 02
Bh
Bh
1,423,000.00
390,000.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
138,000.00
295,000.00
No
Nama Barang
Ukuran/Tipe
30.
31.
Floor Hinge
Floor Hinge
60221
09584 Komplit
32.
SEL0007 4x3x2
33.
Engsel Brass
34.
497
US32
D
Harga (Rp)
Bh
Bh
2,580,000.00
1,737,000.00
Pasang
146,000.00
Pasang
254,000.00
US P
Pasang
277,000.00
Pasang
309,000.00
Pasang
77,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
184,000.00
273,000.00
81,000.00
94,000.00
128,000.00
85,000.00
92,000.00
135,000.00
130,000.00
374,000.00
152,000.00
149,000.00
149,000.00
160,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
352,000.00
296,000.00
212,000.00
402,000.00
182,000.00
253,000.00
126,000.00
169,000.00
148,000.00
190,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
Set
Set
Set
Set
Set
659,000.00
600,000.00
150,000.00
40,400.00
215,000.00
2,327,000.00
4,000,000.00
6,400,000.00
6,603,000.00
5,019,000.00
4,273,000.00
2,692,000.00
2,514,000.00
Wall Tap
Wall Tap
Wall Tap
Wall Tap
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
375,000.00
400,000.00
500,000.00
235,000.00
215,000.00
130,000.00
130,000.00
150,000.00
130,000.00
35.
Casement Stay
CMT75-030"
US32
D
36.
Casement Stay
CMT45-008"
US32
D
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
Grendel Tanam
Grendel Tanam
Grendel
Grendel
Grendel WC
Security Bolt
Door Viewer
Door Selector
Ramskar
Rambuncis
Spring Knip
Door Stop
Door Stop
Door Stop
BRS
306 6"
BRS
306 12"
US 3
440 3"
US 3
440 4"
US
SKT 741 (Indicator)
32D
BRS
5071 + Key
US 3
36 - 60 mm
US
RC 75-002
32D
US 3
321
US 3
330
US 3
75 - 378
US 3
75 - 011
US 15
75 - 011
US 4
75 - 012
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
X.3.13.
Perlengkapan Sanitasi
X.3.13.1. Bak Mandi
Bak Mandi
Abu-abu
Bak Mandi
Terazo
Bak Mandi
Abu-abu
Bak Mandi
Terazo
Bak Mandi
Abu-abu
Bak Mandi
Terazo
Bak Mandi
Abu-abu
Bak Mandi
Terazo
Bak Mandi
Abu-abu
Bak Mandi
Terazo
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
X.3.13.2. Closet
Closet Jongkok
Closet Jongkok
Closet Jongkok
Closet Jongkok
Closet Jongkok
Closet Jongkok
Closet Duduk
Closet Duduk
Closet Duduk
Closet Duduk
Closet Duduk
Closet Duduk
Closet Duduk
1.
2.
3.
4.
5.
6.
7.
8.
9.
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Sat.
Uk.
Uk.
Uk.
Uk.
Uk.
Uk.
Uk.
Uk.
Uk.
Uk.
80
80
60
60
60
60
60
60
50
50
x
x
x
x
x
x
x
x
x
x
60
60
60
60
50
50
40
40
50
50
x
x
x
x
x
x
x
x
x
x
60
60
60
60
50
50
40
40
50
50
CE 9
CE 7
Rapi C Squat
Rapi EX Squat
Rapi DX Top Spud Squat
+ Flush Valve Squat TS
CW 668 J/SW 668 J
One Piece Toilet Champion One Piece Toilet
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
No
Nama Barang
Ukuran/Tipe
Sat.
10.
Kran air
Wall Tap
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
X.3.13.4. Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
Wastafel
1.
2.
3.
4.
X.3.13.5. Urinal
Urinal
Urinal
Urinal
Urinal Divider
1.
2.
3.
4.
5.
6.
7.
Sink R -1
Kitchen Set R8
Elegant R4
Kitchen Sink R9
Work Table
Work Table
Kitchen Sink Naomi
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
100
120
133
116
81
116
62
x
x
x
x
x
x
x
56
56
56
56
43
63
48
8.
Kitchen Sink
Uk105
56
87
cm
deep
9.
Kitchen Sink
Kitchen Sink SB
Uk 63
57
76
cm
deep
1.
2.
3.
X.3.14.
Pipa
X.3.14.1. Pipa Besi
Pipa Besi
Pipa Besi
Pipa Besi
1.
2.
3.
4.
5.
6.
1
8.
9.
10.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1/2"
Pipa PVC
3/4"
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Harga (Rp)
Bh
280,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
6,242,000.00
3,345,000.00
1,343,000.00
1,848,000.00
2,033,000.00
1,926,000.00
775,000.00
559,000.00
513,000.00
1,516,000.00
1,469,000.00
1,390,000.00
Bh
Bh
Bh
Bh
4,025,000.00
3,072,000.00
2,570,000.00
532,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
1,759,000.00
1,830,000.00
2,000,000.00
1,900,000.00
320,000.00
960,000.00
500,000.00
27 cm
Bh
960,000.00
30 cm
Bh
1,037,000.00
1/2" Panjang 4 m
3/4" Panjang 4 m
2" Panjang 4 m
Btg
Btg
Btg
250,000.00
350,000.00
925,000.00
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
25,000.00
40,000.00
45,000.00
65,000.00
40,000.00
240,000.00
350,000.00
8,223,000.00
42,733,000.00
55,803,000.00
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
41,000.00
105,000.00
193,000.00
293,000.00
387,000.00
587,000.00
734,000.00
775,000.00
20,000.00
28,000.00
1/2"
3/4"
1"
1 1/2"
2"
3"
4"
4"
16" (400 mm)
24" (600 mm)
Washbrook
Mini Washbrook
Maybrook II
x
x
x
x
x
x
x
88
88
88
90
88
88
75
cm
cm
cm
cm
cm
cm
cm
No
Nama Barang
Ukuran/Tipe
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Sat.
Harga (Rp)
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
38,000.00
58,000.00
66,000.00
86,000.00
174,000.00
288,000.00
657,000.00
1,123,000.00
1,697,000.00
2,478,000.00
5,093,000.00
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
26,000.00
31,000.00
32,000.00
36,000.00
45,000.00
59,000.00
75,000.00
114,000.00
163,000.00
237,000.00
375,000.00
525,000.00
900,000.00
1,450,000.00
1,985,000.00
2,207,000.00
2,770,000.00
38,000.00
47,000.00
67,000.00
88,000.00
132,000.00
170,000.00
242,000.00
354,000.00
557,000.00
739,000.00
1,148,000.00
1,636,000.00
2,355,000.00
3,285,000.00
1,117,000.00
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
29,000.00
33,000.00
42,000.00
62,000.00
91,000.00
127,000.00
210,000.00
258,000.00
454,000.00
792,000.00
1,079,000.00
1,419,000.00
1,838,000.00
42,000.00
47,000.00
63,000.00
93,000.00
135,000.00
1"
1 1/4"
1 1/2"
2"
3"
4"
6"
8"
10"
12"
16"
4
6
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
No
Nama Barang
Ukuran/Tipe
19.
20.
21.
22.
23.
24.
25.
26.
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
Pipa PVC
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1/2"
3/4"
1"
1 1/2"
2"
3"
4"
6"
8"
10"
12"
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
4"
5"
6"
8"
10"
12"
14"
16"
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
#
#
#
#
#
#
#
#
#
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
Sat.
Harga (Rp)
m
m
m
m
m
m
m
m
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
190,000.00
313,000.00
383,000.00
675,000.00
1,177,000.00
1,604,000.00
2,106,000.00
2,728,000.00
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
5,000.00
11,000.00
15,000.00
19,000.00
23,000.00
36,000.00
47,000.00
54,000.00
70,000.00
8,000.00
15,000.00
22,000.00
29,000.00
34,000.00
54,000.00
70,000.00
81,000.00
105,000.00
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
252,000.00
332,000.00
481,000.00
685,000.00
952,000.00
1,720,000.00
2,523,000.00
3,850,000.00
6,500,000.00
8,500,000.00
14,500,000.00
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
175,000.00
200,000.00
235,000.00
285,000.00
375,000.00
525,000.00
600,000.00
650,000.00
750,000.00
800,000.00
969,000.00
71,000.00
90,000.00
123,000.00
159,000.00
211,000.00
297,000.00
408,000.00
502,000.00
666,000.00
941,000.00
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
22.
Pipa Air
6"
Air
Btg
1,141,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
225.00
295,000.00
425,000.00
550,000.00
650,000.00
895,000.00
1,100,000.00
1,400,000.00
2,250,000.00
2,750,000.00
3,316,000.00
250,000.00
295,000.00
450,000.00
585,000.00
685,000.00
925,000.00
1,100,000.00
1,600,000.00
2,500,000.00
2,975,000.00
3,850,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
174,000.00
240,000.00
348,000.00
450,000.00
510,000.00
714,000.00
1,140,000.00
1,560,000.00
2,280,000.00
3,000,000.00
3,780,000.00
5,700,000.00
420,000.00
462,000.00
582,000.00
660,000.00
900,000.00
1,170,000.00
1,656,000.00
2,340,000.00
3,300,000.00
3,600,000.00
4,740,000.00
7,800,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
89,000.00
97,000.00
136,000.00
174,000.00
224,000.00
305,000.00
422,000.00
497,000.00
704,000.00
993,000.00
1,183,000.00
2,242,000.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
89,000.00
114,000.00
161,000.00
218,000.00
266,000.00
361,000.00
497,000.00
584,000.00
830,000.00
1,171,000.00
1,395,000.00
2,645,000.00
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Hitam
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Air
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
150,000.00
180,000.00
270,000.00
348,000.00
456,000.00
510,000.00
600,000.00
1,020,000.00
1,380,000.00
1,680,000.00
2,160,000.00
4,500,000.00
180,000.00
234,000.00
354,000.00
450,000.00
522,000.00
720,000.00
1,080,000.00
1,320,000.00
1,800,000.00
2,280,000.00
2,820,000.00
5,640,000.00
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
413,000.00
715,000.00
841,000.00
1,190,000.00
1,519,000.00
1,949,000.00
2,968,000.00
4,057,000.00
4,842,000.00
487,000.00
843,000.00
993,000.00
1,403,000.00
1,792,000.00
2,289,000.00
3,501,000.00
5,274,000.00
6,294,000.00
Bh
Bh
Bh
Bh
5,500.00
8,000.00
11,500.00
18,000.00
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
Pipa Air
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
1.
2.
3.
4.
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
8"
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
5.
6.
7.
8.
9.
10.
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
1 1/2"
2"
2 1/2"
3"
4"
6"
Bh
Bh
Bh
Bh
Bh
Bh
22,500.00
37,500.00
70,000.00
115,000.00
187,500.00
750,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
X.3.14.5.2. Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
Bushing
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
5,500.00
8,000.00
11,500.00
18,000.00
22,500.00
37,500.00
70,000.00
115,000.00
187,500.00
750,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
X.3.14.5.3. Cap
Cap
Cap
Cap
Cap
Cap
Cap
Cap
Cap
Cap
Cap
Cap
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
4,500.00
5,500.00
7,500.00
11,000.00
15,000.00
21,000.00
425,000.00
60,000.00
97,500.00
250,000.00
325,000.00
1.
2.
3.
4.
5.
6.
7.
8.
X.3.14.5.4. Cross
Cross
Cross
Cross
Cross
Cross
Cross
Cross
Cross
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
22,500.00
27,500.00
35,000.00
50,000.00
65,000.00
85,000.00
165,000.00
225,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
X.3.14.5.5. Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
Elbow 45
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
7,500.00
10,000.00
15,000.00
22,500.00
30,000.00
40,000.00
85,000.00
125,000.00
235,000.00
550,000.00
750,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
X.3.14.5.6. Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
Elbow 90
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
3,000.00
6,000.00
6,000.00
9,000.00
12,000.00
19,000.00
39,000.00
59,000.00
105,000.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
10.
11.
Elbow 90
Elbow 90
5"
6"
Bh
Bh
363,000.00
422,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
1,000.00
1,000.00
2,000.00
2,000.00
3,000.00
5,000.00
10,000.00
15,000.00
30,000.00
47,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
X.3.14.5.8. Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
Nipple
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
5,000.00
6,000.00
9,500.00
13,500.00
18,500.00
27,500.00
45,000.00
75,000.00
125,000.00
275,000.00
450,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
2" - 9
2" - 45
3" - 11,25
3" - 22,5
3" - 45
3" - 90
4" - 22,5
6" - 11,25
6" - 22,5
6" - 45
12" - 45
1/2" 90 DGR
3/4" 90 DGR
1"
90 DGR
1 1/2" 90 DGR
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
54,000.00
58,000.00
51,000.00
61,000.00
66,000.00
115,000.00
132,000.00
293,000.00
278,000.00
330,000.00
954,000.00
3,000.00
3,000.00
4,000.00
11,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
X.3.14.5.10.Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
Blind Flend
2"
3"
4"
6"
8"
10"
12"
14" (350 mm)
16" (400 mm)
18" (450 mm)
20" (500 mm)
24" (600 mm)
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
321,000.00
348,000.00
458,000.00
825,000.00
1,376,000.00
1,605,000.00
1,651,000.00
2,064,000.00
2,753,000.00
3,441,000.00
3,212,000.00
3,304,000.00
1.
2.
3.
4.
5.
X.3.14.5.11.Gate Valve
Gate Valve
Gate Valve
Gate Valve
Gate Valve
Gate Valve
2"
3"
4"
6"
12"
Bh
Bh
Bh
Bh
Bh
3,750,000.00
5,850,000.00
6,750,000.00
9,000,000.00
18,000,000.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
Bh
Bh
Bh
Bh
Bh
7,709,000.00
9,750,000.00
1,945,000.00
2,055,000.00
7,636,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
249,000.00
337,000.00
308,000.00
396,000.00
367,000.00
367,000.00
866,000.00
785,000.00
895,000.00
6.
7.
8.
9.
10.
Gate Valve
Gate Valve
Gate Valve
Gate Valve
Gate Valve
8"
12"
2"
3"
6"
1.
2.
3.
4.
5.
6.
7.
8.
9.
X.3.14.5.12.Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Tee PVC
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
Ukuran
1.
2.
3.
4.
5.
6.
7.
X.3.14.5.13.Repair
RepairSocket
SocketPVC
PVC
Repair Socket PVC
2"
Repair Socket PVC
3"
Repair Socket PVC
4"
Repair Socket PVC
6"
Repair Socket PVC
8"
Repair Socket PVC
10"
Repair Socket PVC
12"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
26,000.00
39,000.00
55,000.00
110,000.00
183,000.00
277,000.00
477,000.00
1.
2.
3.
4.
X.3.14.5.14.DOP PVC
DOP PVC
DOP PVC
DOP PVC
DOP PVC
Bh
Bh
Bh
Bh
27,000.00
51,000.00
99,000.00
151,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
25,000.00
58,000.00
80,000.00
220,000.00
367,000.00
660,000.00
1,079,000.00
29,000.00
55,000.00
88,000.00
256,000.00
440,000.00
756,000.00
29,000.00
66,000.00
110,000.00
305,000.00
521,000.00
954,000.00
36,000.00
80,000.00
146,000.00
359,000.00
748,000.00
1,350,000.00
1.
2.
3.
4.
X.3.14.5.16.Flend
FlendSock
SockPVC
PVC
Flend Sock PVC
Bh
Bh
Bh
Bh
132,000.00
183,000.00
462,000.00
595,000.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
2"
3"
4"
6"
2"
3"
6"
8"
63
90
90
110
110
110
160
160
160
x 63
x 90
x 63
x 10
x 90
x 63
x 160
x 110
x 90
x
x
x
x
x
x
x
x
x
63
90
90
110
110
110
160
160
160
mm
mm
mm
mm
mm
mm
mm
mm
mm
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
1.
2.
3.
4.
5.
6.
7.
X.3.14.5.17.Street Elbow
Street Elbow
Street Elbow
Street Elbow
Street Elbow
Street Elbow
Street Elbow
Street Elbow
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
9,000.00
23,000.00
23,000.00
33,000.00
39,000.00
59,000.00
125,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
X.3.14.5.18.Plug
Plug
Plug
Plug
Plug
Plug
Plug
Plug
Plug
Plug
Plug
Plug
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
2,000.00
3,000.00
5,000.00
6,000.00
7,000.00
9,000.00
19,000.00
26,000.00
46,000.00
125,000.00
165,000.00
1.
2.
3.
4.
5.
X.3.14.5.19.Red Elbow
Red Elbow
Red Elbow
Red Elbow
Red Elbow
Red Elbow
3/4"
1"
1 1/4"
1 1/2"
2"
Bh
Bh
Bh
Bh
Bh
9,000.00
12,000.00
23,000.00
26,000.00
36,000.00
1.
2.
3.
4.
5.
X.3.14.5.20.Red Nipple
Red Nipple
Red Nipple
Red Nipple
Red Nipple
Red Nipple
3/4"
1"
1 1/4"
1 1/2"
2"
Bh
Bh
Bh
Bh
Bh
6,000.00
9,000.00
13,000.00
29,000.00
36,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
X.3.14.5.21.Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
Red Sock
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
4,000.00
5,000.00
8,000.00
10,000.00
16,000.00
36,000.00
46,000.00
99,000.00
178,000.00
244,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
X.3.14.5.22.Red
RedTee
Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
Red Tee
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
9,000.00
13,000.00
23,000.00
33,000.00
46,000.00
79,000.00
125,000.00
283,000.00
429,000.00
686,000.00
1.
2.
3.
4.
X.3.14.5.23.Round
RoundFlens
Flens
Round Flens
Round Flens
Round Flens
Round Flens
1/2"
3/4"
1"
1 1/4"
Bh
Bh
Bh
Bh
6,000.00
9,000.00
11,000.00
15,000.00
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
No
Nama Barang
Ukuran/Tipe
Sat.
Harga (Rp)
5.
6.
7.
8.
9.
10.
11.
Round Flens
Round Flens
Round Flens
Round Flens
Round Flens
Round Flens
Round Flens
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
18,000.00
22,000.00
36,000.00
47,000.00
72,000.00
118,000.00
132,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
X.3.14.5.24.Sock
Sock
Sock
Sock
Sock
Sock
Sock
Sock
Sock
Sock
Sock
Sock
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
2,000.00
3,000.00
5,000.00
7,000.00
9,000.00
13,000.00
26,000.00
46,000.00
66,000.00
165,000.00
257,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
X.3.14.5.25.Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
4,000.00
5,000.00
9,000.00
12,000.00
16,000.00
36,000.00
62,000.00
79,000.00
132,000.00
363,000.00
495,000.00
1.
2.
3.
4.
5.
6.
7.
8.
9.
X.3.14.5.26.Union
Union
Union
Union
Union
Union
Union
Union
Union
Union
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
6"
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
12,000.00
16,000.00
19,000.00
26,000.00
33,000.00
52,000.00
79,000.00
132,000.00
627,000.00
1.
2.
3.
4.
5.
X.3.14.6. Lem
Lem PVC
Lem PVC
Lem PVC
Seltif TBA
Seltif
Kecil 1/2 Kg
Kecil 1/4 Kg (2 ons)
Klg
Klg
Klg
Bh
Bh
36,000.00
13,000.00
51,000.00
3,000.00
3,000.00
1.
2.
3.
4.
5.
Bh
Bh
Bh
Bh
Bh
95,000.00
244,000.00
7,342,000.00
7,782,000.00
8,076,000.00
1.
2.
3.
4.
X.3.15.
Bulat
Bulat
Bulat
Bulat
Bh
Bh
Bh
Bh
211,200.00
209,100.00
104,600.00
153,600.00
1/2" Linflow
2" PAM
3" PAM
4" PAM
Buish Beton/Gorong-gorong
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
f
f
f
f
100
80
60
50
x
x
x
x
50
50
50
100
cm
cm
cm
cm
No
Nama Barang
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Bulat
Bulat
Bulat
Belahan
Belahan
Belahan
Belahan
Belahan
Belahan
Belahan
Bulat Cor Besi
Bulat Cor Besi
Bulat Cor Besi
Belahan Cor Non Besi
Belahan Cor Non Besi
Belahan Cor Non Besi
1.
X.3.16.
Aspal
1.
2.
3.
4.
5.
X.3.17.
Bahan Bakar
Minyak Bensin/Premium
Minyak Diessel/solar
Minyak Pelumas
Minyak Tanah
Minyak Aspal/Kerosine
Ukuran/Tipe
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
Pasir Putih Samboja
f
f
f
f
f
f
f
f
f
f
f
f
f
f
f
f
40
30
20
100
80
60
50
40
30
20
60
80
100
60
80
100
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
100
100
100
50
50
50
100
100
100
100
50
50
50
50
50
50
Sat.
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
cm
Harga (Rp)
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
89,600.00
76,800.00
32,000.00
105,600.00
89,600.00
44,800.00
76,800.00
44,800.00
38,400.00
146,000.00
192,000.00
352,000.00
448,000.00
108,800.00
256,000.00
371,200.00
Kg
12,350.00
Aspal
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Liter
Liter
Liter
Liter
Liter
6,888.00
10,200.00
35,000.00
10,000.00
10,000.00
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Tonasa
Tiga Roda
Bosowa
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Holcim
Gresik
Red Bull
Esab
Esab
Esab
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Untuk Gen
teng Metal
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Kembang
Ef Talite
Ef Talite
Jotun
Paragon
Paragon
Paragon
Paragon
Paragon
Paragon
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Propan
Propan
Propan
Propan
Propan
Propan
ICI Dulux
ICI Dulux
ICI Dulux
Vinilex
Komilex
Mowilex
Catylac
Propan
Propan
Propan
Sika
Sika
Sika
Sika
Sika
Sika
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Sika
Sika
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Jotun
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Kimek
Kimek
Kimek
Kimek
Kimek
Platon
Platon
Platon
Platon
Platon
Platon
Platon
Platon
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Propan
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Ftalit
Asahimas
Asahimas
Asahimas
Asahimas
Asahimas
Asahimas
Asahimas
Asahimas
Asahimas
Knauf
Knauf
Knauf
Knauf
Knauf
Knauf
Knauf
Knauf
Knauf
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Alusingen
Alcotex
Alcopla
Alcopla
Alcopla
Alcotex
Tribond
Nitobo
Nitobo
Granito
Granito
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Granito
Granito
Granito
Granito
Granito
Granito
Essenza
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Granito
Granito
Granito
Granito
Granito
Sejati
Sejati
Sejati
Sejati
Sejati
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Essenza
Granito
Granito
Granito
Granito
Granito
Kia
Kia
Asia
Asia
Ikad
Mulia
Kia
Kia
Kia
Ikad
Kia
Kia
Kia
Kia
Kia
Lacasa
Lacasa
Lacasa
Lacasa
Lacasa
Asia
Asia
Asia
Asia
Asia
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Asia
Asia
Lacasa
Kia
Mulia
Ikad
Kia
Kia
Platinum
Platinum
Platinum
Platinum
Platinum
Platinum
Platinum
Platinum
Mulia
Asia
Milan
Milan
Supermilan
Supermilan
Hercules
Hercules
Hercules
Kia
Kia
Elegance
Oasis
Ona
Ona
Ona
Tamarin
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Gracewood
Hornitex
(Ex Jerman)
Hornitex
Ipokett
Tarawood
Tarawood
Gracewood
Hornitex
Hornitex
(Ex Jerman)
Hornitex
(Ex Jerman)
Gracewood
Gracewood
Gracewood
Gracewood
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Hornitex
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Maspion
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Kanmuri
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Kanmuri
Multi Roof
Multi Color
Multi Roof
Multi Color
Multi Roof
Multi Color
Multi Roof
Multi Color
Multi Roof
Multi Color
Multi Roof
Multi Color
Multi Roof
Multi Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Surya Roof
Surya Color
Sakura Roof
Sakura Roof
Sakura Roof
Sakura Roof
Sakura Roof
Sakura Roof
Sakura Roof
Sakura Roof
Surya Roof
Surya Color
Surya Roof
Lysaght
Lysaght
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Lysaght
Lysaght
Lysaght
Lysaght
Lysaght
Lysaght
Lysaght
Lysaght
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Kharisma
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Persada
Polyfoil
Polyfoil
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Talenta
Samson
AB Foil
AB Foil
Mortise
Top Union
Alpha
Yale
Fadex
Kend
Kend
Cisa
Kend
Cisa
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Cisa
Kend
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Cisa
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Kend
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Toto
Toto
Duty
Amstad
Amstad
Amstad
Toto
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad
Toto
Toto
Toto
San Ei
Toto
Amstad
Amstad
Amstad
Amstad
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Amstad
Toto
Toto
Toto
Toto
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad
Amstad
Standart
Top
Royal
Absolute
Royal
Royal
Royal
Royal
Royal
Butterfly KV
Butterfly KV
Butterfly KV
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Wavin
Wavin
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Wavin
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Supralon
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Spindo
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
RR/SII
Wavin
Wavin
Wavin
Wavin
10 K
10 K
10 K
10 K
10 K
10 K
10 K
10 K
10 K
10 K
10 K
10 K
Kitz
Kitz
Kitz
Kitz
Kitz
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
HE
HE
Blark Box
Blark Box
Blark Box
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Rubbering
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
Spigot RR
SII RR
SII RR
SII RR
SII RR
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
Merk
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Malang Indah
Keterangan :
Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku
1
2
3
4
5
6
7
8
Uraian
60,000.00
75,000.00
80,000.00
80,000.00
80,000.00
80,000.00
90,000.00
85,000.00
Keterangan
Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join Tekukan
Tulangan
Tulangan
Panjang besi
40 d
4.78
10
D 16
1,051.60 m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
87.63
btg 1659.68
kg
kg
ket
Jumlah
balok
m
m
1
1
Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join Tekukan
Tulangan
Tulangan
Panjang besi
40 d
4.46
2.86
m
m
4
4
12
13
17.84
11.44
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
1.49
0.95
btg
btg
15.84
11.92
kg
kg
kg
ket
Tinggi Kolom
3.5
15
Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join/Tekukan
Tulangan
Tulangan
Panjang besi
40 d
4.26
D 19
511.20
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
42.60
btg 1137.71
kg
kg
ket
Tinggi Kolom
15
Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join/Tekukan
Tulangan
Tulangan
Panjang besi
40 d
3.76
D 19
451.20
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
37.60
btg 1004.17
kg
kg
ket
3.76
D 19
270.72
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
22.56
btg
602.50
kg
kg
ket
Tinggi Kolom
Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join/Tekukan
Tulangan
Tulangan
Panjang besi
40 d
3.76
D 19
45.12
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
3.76
btg
100.42
kg
kg
ket
Tinggi Kolom
1.5
Panjang Tulangan
Jumlah Diameter Besi
Jumlah
+ Join/Tekukan
Tulangan
Tulangan
Panjang besi
40 d
1.5
D 19
45.00
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
3.75
btg
100.15
kg
kg
ket
Tinggi Kolom
3.5
3.98
12
111.44
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
9.29
btg
98.93
kg
kg
ket
Tinggi Kolom
12
3.48
12
167.04
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
13.92
btg
148.29
kg
kg
ket
Tinggi Kolom
3.48
12
125.28
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
10.44
btg
111.22
kg
kg
ket
3.5
0.875
1.75
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
10
10
10
4.26
1.635
2.51
m
m
m
6
2
1
D 19
D 19
D 19
255.60
32.70
25.10
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
21.30
2.73
2.09
btg
btg
btg
568.85
72.78
55.86
kg
kg
kg
kg
ket
Tumpuan
Lapangan
3.5
0.875
1.75
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
10
10
10
4.26
1.635
2.51
m
m
m
6
2
1
D 19
D 19
D 19
255.60
32.70
25.10
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
21.30
2.73
2.09
btg
btg
btg
568.85
72.78
55.86
kg
kg
kg
kg
ket
Tumpuan
Lapangan
3.5
0.875
1.75
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
6
6
6
4.26
1.635
2.51
m
m
m
6
2
1
D 19
D 19
D 19
153.36
19.62
15.06
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
12.78
1.64
1.26
btg
btg
btg
341.31
43.67
33.52
kg
kg
kg
kg
ket
Tumpuan
Lapangan
4
1
2
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
24
24
24
4.76
1.76
2.76
m
m
m
6
2
1
D 19
D 19
D 19
685.44
84.48
66.24
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
57.12
7.04
5.52
btg 1525.49
btg 188.02
btg 147.42
kg
kg
kg
kg
ket
Tumpuan
Lapangan
4
1
2
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
24
24
24
4.76
1.76
2.76
m
m
m
6
2
1
D 19
D 19
D 19
685.44
84.48
66.24
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
57.12
7.04
5.52
btg 1525.49
btg 188.02
btg 147.42
kg
kg
kg
kg
ket
Tumpuan
Lapangan
4
1
2
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
6
6
6
4.76
1.76
2.76
m
m
m
6
2
1
D 19
D 19
D 19
171.36
21.12
16.56
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
14.28
1.76
1.38
btg
btg
btg
381.37
47.00
36.86
kg
kg
kg
kg
ket
Tumpuan
Lapangan
3.5
0.875
1.75
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
9
9
9
4.14
1.515
2.39
m
m
m
6
2
1
D 16
D 16
D 16
223.56
27.27
21.51
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
18.63
2.27
1.79
btg
btg
btg
352.83
43.04
33.95
kg
kg
kg
kg
ket
Tumpuan
Lapangan
3.5
0.875
1.75
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
4
4
4
4.14
1.515
2.39
m
m
m
6
2
1
D 16
D 16
D 16
99.36
12.12
9.56
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
8.28
1.01
0.80
btg
btg
btg
156.81
19.13
15.09
kg
kg
kg
kg
ket
Tumpuan
Lapangan
3.5
0.875
1.75
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
2
2
2
4.14
1.515
2.39
m
m
m
6
2
1
D 16
D 16
D 16
49.68
6.06
4.78
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
4.14
0.51
0.40
btg
btg
btg
78.41
9.56
7.54
kg
kg
kg
kg
ket
Tumpuan
Lapangan
2
0.5
1
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
1
1
1
2.64
1.14
1.64
m
m
m
6
2
1
D 16
D 16
D 16
15.84
2.28
1.64
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
1.32
0.19
0.14
btg
btg
btg
25.00
3.60
2.59
kg
kg
kg
kg
ket
Tumpuan
Lapangan
2
0.5
1
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
1
1
1
2.64
1.14
1.64
m
m
m
6
2
1
D 16
D 16
D 16
15.84
2.28
1.64
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
1.32
0.19
0.14
btg
btg
btg
25.00
3.60
2.59
kg
kg
kg
kg
ket
Tumpuan
Lapangan
1.5
0.375
0.75
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
2
2
2
2.14
1.015
1.39
m
m
m
6
2
1
D 16
D 16
D 16
25.68
4.06
2.78
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
2.14
0.34
0.23
btg
btg
btg
40.53
6.41
4.39
kg
kg
kg
kg
ket
Tumpuan
Lapangan
1
0.25
0.5
m
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
8
8
8
1.64
0.89
1.14
m
m
m
6
2
1
D 16
D 16
D 16
78.72
14.24
9.12
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
6.56
1.19
0.76
btg
btg
btg
124.24
22.47
14.39
kg
kg
kg
kg
ket
Tumpuan
Lapangan
1
0.7
m
m
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
1
1
1
0.7
m
m
7
7
10
10
7.00
4.90
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
0.58
0.41
btg
btg
4.32
3.02
kg
kg
kg
ket
0.78
Panjang Balok
Jumlah
Jumlah Diameter Besi
Jumlah
Tulangan tumpuan
Tulangan
Tulangan
Panjang besi
balok
+ Join
5
1.42
D 16
49.70
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
4.14
btg
78.44
kg
kg
ket
m
m
m
m
2
2
2
2
3.9
16.9
12.9
7.4
m
m
m
m
18
18
18
60
10
10
10
10
136.50
591.50
451.50
888.00
m
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
11.38
49.29
37.63
74.00
btg
btg
btg
btg
84.15
364.66
278.35
547.45
kg
kg
kg
kg
kg
ket
lebar 3,5 m
lebar 3,5 m
lebar 3,5 m
lebar 12 m
m
m
m
m
m
2
2
2
2
2
3.9
7.4
16.9
12.9
11.9
m
m
m
m
m
18
60
10
18
17
10
10
10
10
10
136.50
888.00
329.55
451.50
404.60
m
m
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
11.38
btg 84.15
74.00
btg 547.45
27.46
btg 203.17
37.63
btg 278.35
33.72
btg 249.44
Total berat = 1362.56
kg
kg
kg
kg
kg
kg
ket
lebar 3,5 m
lebar 12 m
lebar 1,9 m
lebar 1,9 m
lebar 3,4 m
m
m
2
2
9
7.4
m
m
35
43
10
10
630.00
636.40
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
52.50
53.03
btg
btg
388.40
392.34
kg
kg
kg
ket
lebar 7 m
lebar 8,6 m
m
m
2
2
2.1
3.4
m
m
15
9
12
16
63.00
57.80
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
5.25
4.82
btg
btg
55.93
91.22
kg
kg
kg
ket
lebar 3 m
lebar 1,7 m
m
m
m
m
m
m
16
16
2
2
16
16
0.93
0.93
3.5
3.5
4.2
4.2
m
m
m
m
m
m
9
9
11
11
1
1
8
8
12
12
8
8
138.88
138.88
78.40
78.40
67.20
67.20
m
m
m
m
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
11.57
btg 109.59
11.57
btg 109.59
6.53
btg 139.20
6.53
btg 139.20
5.60
btg 53.03
5.60
btg 53.03
Total berat = 603.65
ket
lebar 1,4 m
kg
kg
lebar 1,4 m
kg
lebar 1,4 m
kg
lebar 1,4 m
kg lebar 1,4 x 3 m
kg lebar 1,4 x 3 m
kg
m
m
Jumlah
Begel
(buah)
440
36
Jumlah
Panjang Tulangan Panjang Diameter Besi
Jumlah
+ Tekukan 4 d
Balok
Tulangan
Panjang besi
(m)
1.36
0.6
m
m
66
5.4
10
10
598.40
21.60
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
49.87
1.80
btg
btg
368.91
13.32
kg
kg
kg
Ket.
25/40
16/16
m
m
350
163
0.92
0.56
m
m
52.5
24.5
10
10
322.00
91.47
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
26.83
7.62
btg
btg
198.51
56.39
kg
kg
kg
Ket.
25/25
15/15
m
m
280
80
0.92
0.56
m
m
42
12
Diameter Besi
Jumlah
Tulangan
Panjang besi
10
10
257.60
44.80
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
21.47
3.73
btg
btg
158.81
27.62
kg
kg
kg
Ket.
25/25
15/15
m
m
180
40
0.92
0.56
m
m
27
6
10
10
165.60
22.40
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
13.80
1.87
btg
btg
102.09
13.81
kg
kg
kg
Ket.
25/25
15/15
m
m
40
50
0.78
0.78
m
m
6
7.5
Diameter Besi
Jumlah
Tulangan
Panjang besi
10
10
31.20
39.00
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
2.60
3.25
btg
btg
19.23
24.04
Total berat = 43
Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan
kg
kg
kg
Ket.
lt1
lt2
m
m
Jumlah
Begel
(buah)
60
60
Panjang Tulangan
+ Tekukan 4 d
0.78
0.78
m
m
Jumlah
Diameter Besi
Jumlah
panjang
Tulangan
Panjang besi
balok (m)
9
9
10
10
46.80
46.80
m
m
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
3.90
3.90
btg
btg
28.85
28.85
Total berat = 58
Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan
kg
kg
kg
Ket.
lt1
lt2
2.7
2.59
1.01
m
m
m
Jumlah
Begel
(buah)
7
Jumlah
Panjang Tulangan panjang Diameter Besi
+ Tekukan
tulangan
Tulangan
(m)
2.86
2.59
0.92
m
m
m
18
8
93
D 16
D 19
10
Kebutuhan besi
Berat Besi
tulangan
Tulangan (kg)
(Batang)
Jumlah
Pondasi
15
15
15
bh
bh
bh
22.50
10.00
7.74
btg
btg
btg
426.12
33.38
57.29
kg
kg
kg
kg
Ket.
telapak
tul.kolom
begel
No.
Uraian Pekerjaan
Volume
Harga
Satuan
( Rp)
5
1
I
1
2
3
4
5
2
PEKERJAAN PENDAHULUAN
Pembersihan lokasi pekerjaan
Membuat Gudang Kerja
Penyediaan Air Kerja
Penyediaan Listrik
Pengukuran dan pemasangan bouplank
II
1
2
3
4
5
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
PEKERJAAN BETON
Pondasi footplat
Cor Sloof 25/40
Cor Sloof 16/16
Kolom 25/25 lantai 1
Kolom 25/25 lantai 2
Kolom 25/25 lantai 3
Kolom 15/25 lantai 2
Kolom 15/25 lantai 3
Kolom 15/15 lantai 1
Kolom 15/15 lantai 2
Kolom 15/15 lantai 3
Balok 25/30 lantai 2
Balok 25/30 lantai 3
Balok 25/30 atap dag
Balok 20/20 lantai 2
Balok 20/20 lantai 3
Balok 20/20 atap dag
Tangga Beton lt 1 ke lt 2
Tangga Beton lt 2 ke lt 3
Balok bordes 20/30
Rabat beton
Plat lantai 2
Plat lantai 3
Plat atap dag
Beton duc bawah kusen
Balok latei atas kusen
Konsol kantiliver
IV
1
2
3
4
5
6
7
8
9
10
PEKERJAAN PEMBESIAN
Pek. Pembesian Balok Sloof 25/40
Pek. Pembesian Balok Sloof 16/16
Pek. Pembesian kolom 25/25
Pek. Pembesian kolom 15/25
Pek. Pembesian kolom 15/15
Pek. Pembesian balok 25/30
Pek. Pembesian balok 20/20
Pek. Pembesian balok 12/12 balok latei
Pek. Pembesian plat lantai 2
Pek. Pembesian plat lantai 3
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton K225
Beton 1:3:5
Beton K225
Beton K225
Beton K225
Beton 1:3:5
Beton K225
Beton 1:3:5
367.50
12.00
1.00
1.00
53.00
10,250.00
1,135,250.00
1,000,000.00
1,000,000.00
82,125.00
Koefisien Pekerja
Pekerja
Tukang
8
0.1
1
0.1
0.10
0.4
0.192
0.735
0.1
0.25
Koefisien
Pekerja +
tukang
Jumlah
Pekerja
Tenaga
tersedia
Rencana hari
10
11
12
0.1
3
0
0
0.2
36.75
9
36
9
0
9
0
9
10.6
9
Hari Perkiraan
4.08
4.00
0.00
0.00
1.18
9
0.4
0.192
0.735
0.35
0
17.052
9
6.2496
9
1.08045
9
26.25
9
0
9
Hari Perkiraan
1.89
0.69
0.12
2.92
0.00
6
35.625
9
12.54
9
0.266
9
5.833
9
4.807
9
2.888
9
0.38
9
0.475
9
0.988
9
1.387
9
0.684
9
9.405
9
9.405
9
6.422
9
2.622
9
1.292
9
0.532
9
6.118
9
5.415
9
1.976
9
21.356
9
18.487
9
19.247
9
9.804
9
0.0228
9
0.019
9
0.095
9
Hari Perkiraan
3.96
1.39
0.03
0.65
0.53
0.32
0.04
0.05
0.11
0.15
0.08
1.05
1.05
0.71
0.29
0.14
0.06
0.68
0.60
0.22
2.37
2.05
2.14
1.09
0.00
0.00
0.01
20
18.75
6.60
0.14
3.07
2.53
1.52
0.20
0.25
0.52
0.73
0.36
4.95
4.95
3.38
1.38
0.68
0.28
3.22
2.85
1.04
11.24
9.73
10.13
5.16
0.012
0.01
0.05
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
1,374,948.50
970,472.00
1,374,948.50
970,472.00
1,374,948.50
970,472.00
1,374,948.50
970,472.00
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
1.65
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1,659.68
27.76
2,744.39
200.57
358.44
6,000.57
1,069.60
7.34
1,274.61
1,362.56
11,606.00
11,606.00
11,606.00
11,606.00
11,606.00
11,606.00
11,606.00
10,871.00
10,871.00
10,871.00
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.014
0.014
0.014
0.014
0.014
0.014
0.014
0.014
0.014
0.014
23.235481
0.3885952
38.421442
2.8079508
5.0181877
84.007957
14.974467
0.1027089
17.844593
19.075805
9
9
9
9
9
9
9
9
9
9
2.58
0.04
4.27
0.31
0.56
9.33
1.66
0.01
1.98
2.12
780.74
Volume
294.30
897.95
382.23
557.23
43.28
57.70
516.79
24.88
21.70
V
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
PEKERJAAN BEKISTING
Pek. Pemasangan bekisting Foot plat
Pek. Pemasangan bekisting Sloof 25/40
Pek. Pemasangan bekisting Sloof 16/16
Pek. Pemasangan bekisting Kolom 25/25 lantai 1
Pek. Pemasangan bekisting Kolom 25/25 lantai 2
Pek. Pemasangan bekisting Kolom 25/25 lantai 3
Pek. Pemasangan bekisting Kolom 15/25 lantai 2
Pek. Pemasangan bekisting Kolom 15/25 lantai 3
Pek. Pemasangan bekisting Kolom 15/15 lantai 1
Pek. Pemasangan bekisting Kolom 15/15 lantai 2
Pek. Pemasangan bekisting Kolom 15/15 lantai 3
Pek. Pemasangan bekisting Kolom 25/25 diatas Foot
plat
Pek. Pemasangan bekisting Balok 25/30 lantai 2
Pek. Pemasangan bekisting Balok 25/30 lantai 3
Pek. Pemasangan bekisting Balok 25/30 atap dag
Pek. Pemasangan bekisting Balok 20/20 lantai 2
Pek. Pemasangan bekisting Balok 20/20 lantai 3
Pek. Pemasangan bekisting Balok 20/20 atap dag
Pek. Pemasangan bekisting Tangga dari lt.1 ke lt.2
Pek. Pemasangan bekisting Tangga dari lt.2 ke lt.3
Pek. Pemasangan bekisting Balok Bordes 20/30
Pek. Pemasangan bekisting Balok latei 12/12
Pek. Pemasangan bekisting Konsol Kantiliver
Pek. Pemasangan bekisting Plat lantai 2
Pek. Pemasangan bekisting Plat lantai 3
Pek. Pemasangan bekisting Plat atap dag
VI
1
2
3
4
5
6
7
8
9
10
PEKERJAAN DINDING
Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 1
Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 2 dan 3
Pek. Pasangan bata 1 : 4 lantai 1
Pek. Pasangan bata 1 : 4 lantai 2
Pek. Pasangan bata 1 : 4 lantai 3
Pek. Pasangan bata 1:4 balkon lt 2 dan pagar lt 3
Pek. Plesteran 1 : 2
Pek. Plesteran 1 : 4 lantai 1
Pek. Plesteran 1 : 4 lantai 2
Pek. Plesteran 1 : 4 lantai 3
VII
1
2
3
4
5
6
7
PEKERJAAN LANTAI
Pemasangan Keramik 40 x 40 lantai 1
Pemasangan Keramik 30/30 teras
Pas.Keramik 20 x 20 kamar mandi lantai 1
Pas. Keramik dinding kamar mandi 20 x 30 lantai 1
Pemasangan Keramik 40 x 40 lantai 2
Pemasangan Keramik 30 x 30 balkon lantai 2
Pas.Keramik 20 x 20 kamar mandi lantai 2
10,871.00
11,606.00
10,871.00
10,871.00
10,871.00
10,871.00
10,871.00
11,606.00
955,000.00
955,000.00
Koefisien
0.007 Pekerja0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
0.007
Koefisien
0.014 10.930298
Jumlah
Pekerja
+
0.014
4.1202323
Pekerja
tukang
0.014 12.571266
0.014
5.35122
0.014 7.8012732
0.014 0.6058962
0.014 0.8078616
0.014 7.2351084
9
1.21
Tenaga
Rencana0.46
hari
tersedia 9
9
1.40
9
0.59
9
0.87
9
0.07
9
0.09
9
0.80
Hari Perkiraan
28
22.32
52.80
1.79
49.05
40.50
24.30
4.32
10.80
13.73
23.55
11.78
190,115.00
207,615.00
207,615.00
427,780.00
427,780.00
427,780.00
427,780.00
427,780.00
427,780.00
427,780.00
427,780.00
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.26
0.26
0.26
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.56
0.56
0.56
0.63
0.63
0.63
0.63
0.63
0.63
0.63
0.63
12.4992
29.568
1.0024
30.9015
25.515
15.309
2.7216
6.804
8.6499
14.8365
7.4214
9
9
9
9
9
9
9
9
9
9
9
1.39
3.29
0.11
3.43
2.84
1.70
0.30
0.76
0.96
1.65
0.82
9.15
50.82
50.82
34.65
13.81
6.80
2.80
31.64
25.36
9.46
0.17
0.70
81.05
84.32
51.51
427,780.00
439,480.00
439,480.00
439,480.00
439,480.00
439,480.00
439,480.00
391,300.00
391,300.00
439,480.00
439,480.00
439,480.00
706,300.00
706,300.00
706,300.00
0.3
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.63
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
0.65
5.7645
9
33.033
9
33.033
9
22.5225
9
8.9765
9
4.42
9
1.82
9
20.566
9
16.484
9
6.149
9
0.1105
9
0.455
9
52.6825
9
54.808
9
33.4815
9
Hari Perkiraan
0.64
3.67
3.67
2.50
1.00
0.49
0.20
2.29
1.83
0.68
0.01
0.05
5.85
6.09
3.72
50
0.46
3.95
14.03
15.38
11.00
1.00
88.30
280.62
307.60
307.60
1,380,125.00
1,380,125.00
1,269,855.00
1,269,855.00
1,269,855.00
1,269,855.00
43,827.00
39,220.00
39,220.00
39,220.00
6
6
6
6
6
6
0.2
0.2
0.2
0.2
2
2
2
2
2
2
0.15
0.15
0.15
0.15
8
8
8
8
8
8
0.35
0.35
0.35
0.35
3.688
9
31.632
9
112.248
9
123.04
9
88.024
9
7.992
9
30.905
9
98.217
9
107.66
9
107.66
9
Hari Perkiraan
0.41
3.51
12.47
13.67
9.78
0.89
3.43
10.91
11.96
11.96
79
87.50
7.00
7.00
20.45
91.50
3.20
3.00
183,053.00
183,053.00
165,453.00
165,453.00
183,053.00
183,053.00
165,453.00
0.62
0.62
0.62
0.62
0.62
0.62
0.62
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.97
0.97
0.97
0.97
0.97
0.97
0.97
84.875
6.79
6.79
19.8365
88.755
3.104
2.91
9
9
9
9
9
9
9
9.43
0.75
0.75
2.20
9.86
0.34
0.32
165,453.00
183,053.00
165,453.00
165,453.00
183,053.00
183,053.00
VIII
1
2
273.15
273.15
157,687.50
157,687.50
IX
1
2
3
4
5
6
7
8
0.43
0.09
18.48
0.07
0.09
6.51
15.80
1.60
10,565,500.00
10,565,500.00
566,750.00
10,565,500.00
10,565,500.00
566,750.00
700,000.00
162,813.75
X
1
2
3
4
5
6
7
8
9
XI
1
2
3
4
5
6
7
8
9
XII
1
2
3
4
5
6
7
8
9
10
11
12
PEKERJAAN PENGECATAN
XIII
1
2
50
15
2
6
10
15
2
25
25
17.75
39.16
44.90
1.00
9.00
4.00
4.00
1.00
1.00
Koefisien
0.62 Pekerja
0.62
0.62
0.62
0.62
0.62
0.35
0.35
0.35
0.35
0.35
0.35
Koefisien
0.97
Pekerja0.97
+
tukang
0.97
0.31
0.31
0.47
0.47
0.78
0.78
6
6
1
6
6
1
20
20
2.5
20
20
2.5
26
26
3.5
26
26
3.5
0.97
0.97
0.97
13.5994
9
1.51
Jumlah
Tenaga
hari
37.83 tersedia 9 Rencana4.20
Pekerja
2.91
9
0.32
13.774
9
1.53
15.811
9
1.76
15.326
9
1.70
Hari Perkiraan
35
213.057
9
213.057
9
Hari Perkiraan
11.128
2.21
64.68
1.794
2.34
22.785
23.67
23.67
47
9
9
9
9
9
9
1.24
0.25
7.19
0.20
0.26
2.53
Hari Perkiraan
12
Hari Perkiraan
109,146.00
109,146.00
188,900.00
25,000.00
25,000.00
25,300.00
173,000.00
24,500.00
95,000.00
27,550.00
24,500.00
17,728.00
463,556.60
235,000.00
12,000.00
150,000.00
320,000.00
13,600,000.00
561.24
615.20
22.01
273.15
12.42
13.25
22.21
5.12
1.08
0.91
1.05
1.17
31,859.50
31,859.50
31,859.50
31,859.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
33,392.50
2
8
187,000.00
98,000.00
0.036
0.036
0.036
1.42
0.02
0.02
0.02
0.02
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.0018
0.0018
0.0018
0.473
0.063
0.063
0.063
0.063
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.009
0.0378
0.0378
0.0378
1.893
0.083
0.083
0.083
0.083
0.079
0.079
0.079
0.079
0.079
0.079
0.079
0.079
0.67095
1.480248
1.69722
1.893
9
9
9
9
0.07
0.16
0.19
0.21
Hari Perkiraan
0.64
6.00
46.58292
9
51.0616
9
1.826498
9
22.67145
9
0.98118
9
1.04675
9
1.75459
9
0.40448
9
0.08532
9
0.07189
9
0.08295
9
0.09243
9
Hari Perkiraan
5.18
5.67
0.20
2.52
0.11
0.12
0.19
0.04
0.01
0.01
0.01
0.01
14
XIV
1
2
PEKERJAAN LAIN-LAIN
Pembersihan lokasi pekerjaan
Quality Control
Volume
68
2
7
8
12
14
7
1.00
1.00
42,000.00
9,500.00
6,500.00
6,500.00
36,000.00
14,000.00
7,000.00
Koefisien Pekerja
Koefisien
Pekerja +
tukang
Jumlah
Pekerja
Tenaga
tersedia
Rencana hari
Hari Perkiraan
Hari Perkiraan
1,000,000.00
1,000,000.00