NO
I
1
2
3
4
5
II
1
2
III
1
2
3
4
5
IV
1
2
3
4
5
V
URAIAN
PEKERJAAN SLOOF
Galian tanah
Beton lantai kerja, tb = 50mm, mutu K-100
Beton cor mutu K-225
Bekisting / acuan
Pembesian:
- D 13 mm
- 6 mm
PEKERJAAN PEMANCANGAN
Pengadaan, pemancangan tiang pancang mini pile 20 x 20, L = 3 m
Pekerjaan pengelasan/joint tiang
PEKERJAAN PONDASI PILE CAP
Galian tanah
Beton lantai kerja, tb = 50mm, mutu K-100
Beton cor mutu K-225
Bekisting / acuan
Pembesian:
- D 10mm
PONDASI TAPAK P3 & P4
Galian tanah
Beton lantai kerja, tb = 50mm, mutu K-100
Beton cor mutu K-225
Bekisting / acuan
Pembesian:
- D 13mm
PEKERJAAN FLOOR HARDENER 3 Kg.
SATUAN
VOLUME
BLOK B
BLOK C
JUMLAH
VOLUME
HARGA SATUAN
Upah
Bahan
JLH. HARGA
Rp.
M3
M3
M3
M2
51.32
9.50
50.68
506.83
49.6449
9.1935
49.032
490.32
100.96
18.70
99.72
997.15
35,000.00
65,000.00
65,000.00
35,000.00
525,000.00
661,500.00
45,000.00
3,533,657.40
11,030,994.00
72,443,092.80
79,772,160.00
Kg
Kg
3960.45
1083.37
3831.427899
1049.094
7,791.88
2,132.46
1,500.00
1,500.00
8,500.00
8,500.00
77,918,828.36
21,324,634.39
M'
Joint
666.00
222
672.000
224.000
1,338.00
446.00
195,000.00
45,000.00
260,910,000.00
20,070,000.00
35,000.00
65,000.00
65,000.00
35,000.00
525,000.00
661,500.00
45,000.00
4,495,680.00
8,420,480.00
46,658,736.00
34,252,800.00
M3
M3
M3
M2
128.45
14.27
64.22
428.16
Kg
5,823.63
1,500.00
8,500.00
58,236,316.20
M3
M3
M3
M2
233.10
8.04
33.98
129.60
35,000.00
65,000.00
65,000.00
35,000.00
525,000.00
661,500.00
45,000.00
8,158,570.00
4,742,420.00
24,689,376.00
10,368,000.00
Kg
M2
1,437.68
25,777.00
1,500.00
8,500.00
17,500.00
14,376,762.74
451,097,500.00
TOTAL
PROPIT & RESIKO KERJA 10%
GRAND TOTAL
PEMBULATAN
1,212,500,007.89
121,250,000.79
1,333,750,008.68
1,333,750,000.00
Diperiksa Oleh,
BURSA PROPERTY
SARIPUDDIN
PROJECT MANAGER
RAHMAD S.
PIMPRO
KETERANGAN
Diperiksa Oleh,
BURSA PROPERTY
RAHMAD S.
PIMPRO