: Pekerjaan Inspeksi Struktur Beton PLTGU Muara karang

: PLTGU Muara Karang Jakarta utara


: Tanggul PLTU
METODA UJI : Indirect Transmission
: 16 Juni 2014
: 1 Dari 1
L(mm) T
1
( det) T
2
( det) h (mm) L(mm) T
1
( det) T
2
( det) h (mm) L(mm) T
1
( det) T
2
( det) h (mm)
1 150 39.9 1386 3.32 150 41.1 1718 2.59 150 35.2 1185 3.46
2 150 35.3 1746 2.03 150 50.9 1557 3.90 150 45.6 1354 4.05
3 150 37.0 1144 3.85 150 44.8 1357 3.95 150 26.7 1105 2.62
4
5
The Crack Depth:
h = l . SQRT (T1 / T2)^2 - 1
Where:
h = Depth of the crack
l = length of travel wave
T1 = Travel Time of the sound concrete (Uncrack)
T2 = Travel Time of the crack concrete
STRUKTUR
Tanggul + 800 M Tanggul + 900 M Tanggul + 900 M
TGL PENGUJIAN
TANDA TANGAN
DIPERIKSA OLEH :
NO
TANDA TANGAN
PENGUJIAN ULTRASONIC
ULTRASONIC PULSE VELOCITY ( ASTM C-597 & BS-4408 )
PROYEK
LOKASI
ket
TANGGAL
16 Juni 2014 (Kharisma R.F)
DIUJI OLEH :
LEMBAR
TANGGAL
23 Juni 2014 ( Gagan Rohdiana)
PT. BINANUSA PRACETAK & REKAYASA
Jl. Gegerkalong Hilir No. 175 Tlp. +62.22.2003252 / 2000589, Faks. +62.22.2003252
BANDUNG JAWA BARAT INDONESIA ( 40151)
E-mail : binanusa175@gmail.com; Web: Binanusa.co.id