01.

LAND CLEARING
05/06/14
05/06/14
02. LAND CLEARING
07/06/14
14/06/14
03. LIME STONE TO TEMPORARY ACCES
14/06/2014
14/06/2014
04. NATIVE SOIL COMPECTION
30/06/2014
04/07/2014
TOOL TO MONITOR HEAP OF RED SOIL
23/06/2014
24/06/2014
RED SOIL BACKFIL
23/06/2014
23/06/2014
LAND CONDITION
09/06/2014
09/06/2014
LAND LEVELING RED ( LAYER - 1)
16/06/2014
23/06/2014
RED SOIL COMPACTION ( LAYER - 1 )
28/06/2014
23/06/2014
RAIN OUT CONDITIONS
13/06/2014
13/06/2014
LAKES FOR WATER RESERVOIR WHILE
28/06/2014
28/06/2014
CHANNEL WATER FROM THE LAKE WHILE
28/06/2014
28/06/2014
SULITnya koordinasi dg suply tanah,.meski untk sementara di stop tanah masuk krn habis hujan
Tapi tetep aja tanah dikirim...akibatnya....tanah di buang asal sampai menutupin jalan masuk
Lime stone....KERJA JD TDK MAKSIMAL...Tanah yg dikirimpun jg ga maksimal (jelek).....
di tambah jalan ke lokasi jadi RUSAK SEMUA..........Pusiiiing.......???
Tanggal kejadian...10/07/2014
REPAIR TEMPORARY ACCESS
11/07/2014
16/07/2014
REPAIR TEMPORARY ACCESS
19/07/2014
19/07/2014
Ket. Banyak butiran CADAS
PENGIRIMAN TANAH MERAH YANG TIDAK BAGUS
22/07/2014
22/07/2014
Ket.
Tanah warna coklat tua kehitaman ( berjenis Lempung/Clay )
Ket.
Bercampur Tanah Cadas
05/07/2014
05/07/2014
Ket.
Ada juga Tanah Boncos yg dikirim
Ket.
Banyak batu koral & pasir uruknya
05/07/2014
05/07/2014
Ket.
Banyak butiran batu koral & pasir uruk
Ket.
Banyak campuran pasir uruk
30/06/2014
30/06/2014
Ket.
Kondisi tanah yg di kirim BASAH
Ket.
Kondisi tanah yg basah & berwarna kehitaman
( dijemur dulu / tdk bs dipadatkan )
19/06/2014
20/06/2014
Ket.
Pemadatan dgn SIPUT yg tdk maksimal krn kondisi mat.tanahnya tdk bagus & basah
KET.
Pemadatan dgn VIBRO jg tdk maksimal
30/06/2014
30/06/2014
OWNER : PT. HAKA
CONTRACTOR : PT. TOKYU CONTRUCTION INDONESIA
LOCATION : EAST BEKASI - WEST JAVA
DOCUMENT FOTO'S
PROJECT : SAKURA REGENCY - 3
PENGIRIMAN TANAH YG TDK STANDAR / JELEK
PROYEK SAKURA REGENCY - 3 BEKASI TIMUR
DOCUMENT PT. TOKYU
-
-